Loading...
HomeMy WebLinkAbout20-26 approved planTHE VILLAGE AT ORCHARD RIDGE WATER TREATMENT BUILDING SITE PLAN (SP #20-26) FREDERICK COUNTY, VIRGINIA LOCATION MAP: PROJECT INFORMATION:SHEET INDEX: PROJECT NOTES: SCALE: 1" = 1000' PROJECT LOCATION SHEET DESCRIPTION SHEET NUMBER COVER SHEET....................................................................................... GENERAL NOTES.................................................................................. OVERALL PLAN...................................................................................... EXISTING CONDITIONS AND DEMO PLAN.......................................... SITE AND GRADING & E&SC PLAN...................................................... CONSTRUCTION DETAILS.................................................................... EXISTING SITE PROFFERS................................................................... EXISTING SITE PROFFERS................................................................... EXISTING SITE PROFFERS................................................................... EXISTING SITE PROFFERS................................................................... C-01 C-02 C-03 C-04 C-05 C-06 C-07 C-08 C-09 C-10 VA STATEGRID NORTHCURRENT OWNER: REFERENCE: EXISTING USE DESCRIPTION: PROPOSED USE DESCRIPTION: PROPERTY ACREAGE: DISTURBED AREA: ZONING: PHYSICAL ADDRESS: FLOODPLAIN: PREVIOUSLY APPROVED PLANS: THE VILLAGE AT ORCHARD RIDGE, INC. TM 52-A-50 GAINESBORO MAGISTERIAL DISTRICT CONTINUING CARE RETIREMENT (CCRC) - ADDITIONS TO EXISTING FACILITY NO PROPOSED CHANGE IN USE 131.06 ACRES 0.11 ACRES (4905 SF) MS 400 CLOCKTOWER RIDGE DRIVE, WINCHESTER, VA 22603 PROPOSED AREA OF DISTURBANCE LOCATED OUTSIDE THE ZONE A FLOODPLAIN BASED ON FIRM MAP PANEL NO. 51069C0204E, DATED 01/29/2021 SP#02-13, SP#07-14, SP#45-20, SP #44-25, MDP#01-09 PROJECT CONTACTS: OWNER: ADDRESS- PHONE NUMBER- FAX NUMBER- E-MAIL- CONTACT- CONTRACTOR: ADDRESS- PHONE NUMBER- FAX NUMBER- E-MAIL- CONTACT- ENGINEER (CIVIL): ADDRESS- PHONE NUMBER- FAX NUMBER- E-MAIL- CONTACT- THE VILLAGE AT ORCHARD RIDGE, INC. 400 CLOCKTOWER RIDGE DRIVE WINCHESTER, VA 22603 540.431.2800 HOWARD SHOCKEY & SONS, INC. 1057 MARTINSBURG PIKE WINCHESTER, VA 22601 540.723.4185 RWAGONER@HOWARDSHOCKEY.COM ROB WAGONER DICE ENGINEERING, PLC 101 SHELBY CT. WINCHESTER, VA 22602 540.974.5157 540.723.4868 DDUNLAP@DICE-ENG.COM DENNIE DUNLAP RESPONSIBLE LAND DISTURBER NAME: CERTIFICATION #: EXP. DATE: THE RESPONSIBLE LAND DISTURBER IS THE PARTY RESPONSIBLE FOR CARRYING OUT THE LAND DISTURBING ACTIVITY AS SET FORTH IN THE PLANS. ELECTRIC COMPANY: ADDRESS- PHONE NUMBER- CONTACT- WATER PROVIDER: ADDRESS- PHONE NUMBER- CONTACT- SEWER PROVIDER: ADDRESS- PHONE NUMBER- CONTACT- GAS COMPANY: ADDRESS- PHONE NUMBER- CONTACT- PHONE COMPANY: ADDRESS- PHONE NUMBER- CONTACT- SHEN. VALLEY ELECTRIC COOPERATIVE, INC. 3463 VALLEY PIKE WINCHESTER, VA 22602 540.450.0111 FREDERICK WATER P.O. BOX 1877 WINCHESTER, VA 22604 540.868.1061 FREDERICK WATER P.O. BOX 1877 WINCHESTER, VA 22604 540.868.1061 SHENANDOAH GAS 350 HILLANDALE LANE WINCHESTER, VA 22602 540.869.1111 VERIZON 404 HILLANDALE LANE WINCHESTER, VA 22602 540.665.3153 CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYCOVER SHEETJOB NO.: 26-03 C-01C-01.DWGDDDN/ADDDDESCRIPTION04-29-2026WATER USAGE CALCULATION: PHASE 1 (EXISTING): - IL UNITS: 1.4 PERSONS/UNIT * 100 GPD/PERSON * 205 UNITS = 28,700 GPD - AL UNITS: 1.0 PERSONS/UNIT * 200 GPD/PERSON * 28 UNITS = 5,600 GPD - EMPLOYEES: 90 EMPLOYEES * 35 GPD/EMPLOYEE = 3,150 GPD - TOTAL PHASE 1: 37,450 GPD PHASE 1B (EXISTING): - IL UNITS: 1.4 PERSONS/UNIT * 100 GPD/PERSON * 18 UNITS = 2,520 GPD PHASE 1C (EXISTING): - IL UNITS: 1.4 PERSONS/UNIT * 100 GPD/PERSON * 13 UNITS = 1,820 GPD PHASE 2 (EXISTING): - IL UNITS: 1.4 PERSONS/UNIT * 100 GPD/PERSON * 104 UNITS = 14,560 GPD - SKILLED NURSING UNITS: 1.0 PERSONS/UNIT * 200 GPD/PERSON * 11 UNITS = 2,200 GPD - EMPLOYEES: 30 EMPLOYEES * 35 GPD/EMPLOYEE = 1,050 GPD - TOTAL PHASE 2: 17,810 GPD TOTAL EXISTING (PHASES 1, 1B, 1C, & 2): - 37,450 GPD + 2,520 GPD + 1,820 GPD + 17,810 GPD = 59,600 GPD APPROVED BUT NOT CONSTRUCTED (4 NEW COTTAGES): - IL UNITS: 1.4 PERSONS/UNIT * 100 GPD/PERSON * 4 UNITS = 560 GPD TOTAL (EXISTING & APPROVED): - 59,600 GPD + 560 GPD = 60,160 GPD * NO ADDITIONAL WATER USAGE PER THIS PLAN TVOR WATER TREATMENT BUILDINGFREDERICK COUNTY, VIRGINIAFREDERICK COUNTY SP #20-26 07-10-2026 1. BUILDING DEPT. NOTE:1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS07-10-2026DDD CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYGENERAL NOTESJOB NO.: 26-03 C-02C-02.DWGDDDN/ADDDDESCRIPTION04-29-2026FREDERICK COUNTY SP #20-26 07-10-2026 TVOR WATER TREATMENT BUILDINGFREDERICK COUNTY, VIRGINIAEROSION CONTROL NOTES: 1.ALL EROSION CONTROL DEVICES AS SHOWN OR AS REQUIRED ARE TO BE CONSTRUCTED TO STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (LATEST EDITION) AND ARE TO BE IN PLACE PRIOR TO ALL CONSTRUCTION. 2.EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED CONTINUOUSLY, RELOCATED WHEN AND AS NECESSARY AND SHALL BE CHECKED AFTER EVERY RAINFALL. SEEDED AREAS SHALL BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED, RESEEDED AND MULCHED AS NECESSARY TO OBTAIN A DENSE STAND OF GRASS. 3.ALL DISTURBED AREAS NOT PAVED OR BUILT UPON ARE TO BE FERTILIZED, SEEDED, AND MULCHED BY THE CONTRACTOR IN ACCORDANCE WITH THE VIRGINIA STORMWATER MANAGEMENT HANDBOOK (LATEST EDITION). 4.ALL DRAIN INLETS SHALL BE PROTECTED FROM SILTATION. INEFFECTIVE PROTECTION DEVICES SHALL BE IMMEDIATELY REPLACED AND THE INLET CLEANED. FLUSHING IS NOT AN ACCEPTABLE METHOD OF CLEANING. 5.GRADE AREAS ADJACENT TO BUILDING TO ACHIEVE DRAINAGE AWAY FROM THE STRUCTURE AND TO PREVENT PONDING IN SWALES. 6.PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 21 DAYS. 7.DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. 8.VEGETATIVE STABILIZATION SHALL BE UNIFORM AND MATURE ENOUGH TO SURVIVE AND ADEQUATE TO INHIBIT EROSION. 9.SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND- DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 10.STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 11.UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A.NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B.EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C.EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY. D.MATERIAL USED FOR BACK FILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. E.RESTABILIZATION SHALL BE ACCOMPANIED IN ACCORDANCE WITH THESE REGULATIONS. F.APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. 12.WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. 13.ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM ADMINISTRATOR. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 14.ALL DISTURBED AREAS NOT PAVED OR BUILT UPON SHALL BE TOP SEEDED, MULCHED AND FERTILIZED. PERFORM PERMANENT TOP SOILING, SEEDING, LANDSCAPING, FERTILIZING, AND MULCHING AS SOON AFTER FINISH GRADING AS POSSIBLE. SEEDING SHALL COMPLY WITH THE FOLLOWING: A.TOPSOIL - 4 INCH MINIMUM FOR PERMANENT TURF B.FERTILIZER - 450 POUNDS PER ACRES OF 10-20-10 FERTILIZER OR EQUIVALENT POUNDAGE OF DIFFERENT ANALYSIS. WORK INTO SOIL PRIOR TO SEEDING. C.LIME (PERMANENT SEEDING) - AGRICULTURAL LIME SPREAD AT RATE OF 2 TONS/ACRE. WORK INTO SOIL PRIOR TO SEEDING. D.MULCH-CHOPPED STRAW AT RATE OF 2 TON PER ACRE AND TACKED IN PLACE. HYDRO-MULCH AT RATE OF 30 BALES PER ACRE.1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS07-10-2026DDD 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 200 CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYOVERALL PLANJOB NO.: 26-03 C-03C-03.DWGDDD1" = 200'DDDDESCRIPTION04-29-202650' W O O D L A N D S T RI P 100' B U F F E R/ S E T B A C K 200' B U F F E R/ S E T B A C K 5 0 ' W O O D L A N D S T R I P 1 0 0 ' B U F F E R / S E T B A C K 50' WOODLAND STRIP100' BUFFER/SETBACKN66°5 1' 5 6 " E 1 4 5 2. 0 0' 2 0 0 ' B U I L D I N G S E T B A C K / B U F F E R 5 0 ' W O O D L A N D S T R I P S 5 4 ° 1 1 ' 3 7 " E 8 5 7 . 8 4 ' S 4 8 ° 0 3 ' 4 9 " E 1 1 3 5 . 0 0 'S27°21'02"W 1439.50'50 ' W O O D L A N D S T R I P 10 0 ' B U F F E R / S E T B A C K S 5 6 ° 3 3 ' 5 8 " E 4 5 9 . 5 0 '50' WOODLAND STRIP100' BUFFER/SETBACKS19°23'41"W 640.05'S29°05'14"W 10.55' N71° 3 6 ' 1 8 " W 3 0 2 . 5 5 ' 50' B . R . L . 50' B.R . L .50' B.R.L.100' BUFFER/SETBACKN16°31'42"W 805.00 ' N76°5 5 ' 5 5 " W 3 0 1 . 9 0 'N32°46 '41 "W 292 .01 ' R = 9 3 5 . 0 0 ' L = 7 2 0 . 5 4 ' C H D = N 5 4 ° 5 1 ' 1 8 "W C H D L = 7 0 2 . 8 4 ' R = 8 2 5 . 0 0 ' L = 5 5 9 . 0 7 ' C H D = N 5 2 ° 1 1 ' 3 0 "W C H D L = 5 4 8 . 4 3 ' R=1455.00' L=656.37' CHD=N89°51'19"W CHD L=650.82'N40°57'55"E 1119.11'S83°40'44"W 229.00' S86°59'41"W 196.00'N 5 6 ° 3 7 ' 0 1 " W 20 4 . 0 0 ' N67 ° 3 3 ' 5 8 " W 242 . 0 0 'N29°28 '31 "W179.00 ' (2) ADVOWSON PLACE COTTAGES NOT YET BUILT (SP #44-25) (2) PROMINENCE CIRCLE COTTAGES NOT YET BUILT (SP #44-25)TVOR WATER TREATMENT BUILDINGFREDERICK COUNTY, VIRGINIA07-10-2026 FREDERICK COUNTY SP #20-26 PROPOSED WATER TREATMENT BLDG.1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS07-10-2026DDD 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 10 CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYJOB NO.: 26-03 C-04C-04.DWGDDD1" = 10'DDDDESCRIPTION04-29-2026TVOR WATER TREATMENT BUILDINGFREDERICK COUNTY, VIRGINIAFREDERICK COUNTY SP #20-26 07-10-2026 EXISTING CONDITIONS & DEMO PLAN(TO BE REMOVED) REMOVE SECTION OF EX. TREES & BRUSH WITHIN HATCHED AREA (APPROX. 7 TREES) DEMO EXISTING U/G ELECTRIC AND FIBER OPTIC LINES WITHIN CLOUDED AREA (SEE ELECTRIC PLAN, E001)1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS07-10-2026DDD WWUGEUGEU G E U G E U G E U G E U G E WW888888892888888890UGEUGEU G E U G E U G E U G E U G ESFSFSFSFSF SFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFS F S F S F SF SFSFSF1 inch = ft. ( IN FEET ) GRAPHIC SCALE 10 CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYJOB NO.: 26-03 C-05C-05.DWGDDD1" = 10'DDDDESCRIPTION04-29-2026TVOR WATER TREATMENT BUILDINGFREDERICK COUNTY, VIRGINIAFREDERICK COUNTY SP #20-26 07-10-2026 SITE PLAN 31' 11'24'-11" 16'36" DOOR OVERHEAD DOOR (8'W x 7'H) PROPOSED WATER TREATMENT BUILDING (948 SQ. FT.) (HT. = 17') 2'CONC. PAD (2'W x 14.5'L)SITE AND GRADING & E&SC PLANC.O. TOP = 888.10 42.3LF - 6" PVC SDR 35/26 DRAIN FOR WATER SOFTENER BACKWASH (VERIFY DEPTH @ CONNECTION TO EX. C.O., MAINTAIN A MINIMUM SLOPE OF 1.00%) 12" DIP CL52 W/L (INCOMING - PRIVATE) (SEE PROJECT NOTE #1) 12" DIP CL52 W/L (OUTGOING - PRIVATE) (SEE PROJECT NOTE #1) (2) 12"x12"x12" HANDHOLE FOR ELECTRIC & TELECOM (SEE ELECTRIC PLAN, E001) (2) 1.5" CONDUITS FOR ELECTRIC & TELECOM GRADING AND E&SC PLAN F.F. = 888.30 DRAINAGE FLOW ARROW (TYP.) SF SF SF SFSF NOTE: 1.LIMITS OF DISTURBANCE SHALL BE AS INDICATED. THE ESTIMATED DISTURBED AREA FOR THIS PROJECT IS 0.11 ACRES (4905 SF). - LIMITS OF DISTURBANCE SF TEMPORARY TOPSOIL STOCKPILE FREDERICK WATER GENERAL NOTES: 1.NO TREES OR SHRUBS SHALL BE PLACED WITHIN FREDERICK WATER EASEMENT. 2.VALVES, MANHOLES, ARV'S, AND OTHER FREDERICK WATER SURFACE FEATURES SHALL NOT BE PLACED IN CURB AND GUTTER, NOR SLOPED PORTION OF HANDICAP RAMPS. CONTRACTOR SHALL COORDINATE LOCATIONS WITH THE FREDERICK WATER INSPECTOR. 3.IRRIGATION LINES AND DEVICES, LIGHT POLES, TRANSFORMERS, JUNCTION BOXES, PEDESTALS, OTHER OBSTACLES AND ALL DRY UTILITIES SHALL NOT BE PLACED IN FREDERICK WATER EASEMENTS. PERPENDICULAR IRRIGATION LINES AND DRY UTILITY CROSSINGS ARE PERMITTED WITH 18" MINIMUM VERTICAL SEPARATION. 4.RETAINING WALLS AND THEIR TIE-BACKS SUCH AS GEOGRID OR OTHER SUPPORTS SHALL NOT BE PLACED IN FREDERICK WATER EASEMENTS. 5.CONTRACTOR SHALL: A.COORDINATE A MEETING WITH THE FREDERICK WATER INSPECTOR AT LEAST SEVEN (7) WORKING DAYS PRIOR TO GROUND-DISTURBING ACTIVITIES. B.EXERCISE EXTREME CAUTION WHILE TRAVELING AND WORKING OVER THE EXISTING FREDERICK WATER FACILITIES. C.ADJUST ALL FREDERICK WATER FACILITIES TO FINISHED GRADE AS NECESSARY. D.PERFORM ALL WORK PER FREDERICK WATER INSPECTOR'S REQUIREMENTS. PROJECT NOTE: 1.PLUMBING CONTRACTOR TO COORDINATE INSTALLATION OF PROPOSED WATER LINES WITH BUILDING PLANS AND THE FREDERICK WATER INSPECTOR FOR INSTALLATION INSIDE THE EXISTING VAULT TO PROVIDE PROPER CONNECTIONS TO THE EXISTING LINES. A MINIMUM DEPTH OF COVER OF 4' SHALL BE PROVIDED ON ALL EXTERIOR WATER LINES. TO SO TO SO 1.OWNER OF PROPERTY SHALL MAINTAIN REQUIRED LANDSCAPING IN GOOD CONDITION. 2.SPECIFIED PLANT SPECIES MAY BE SUBJECT TO SUBSTITUTION WITH THE REQUIREMENT THAT NEWLY SELECTED SPECIES PROVIDE THE SAME VISUAL EFFECT. 3.PRIOR TO PLANT SPECIES SUBSTITUTION WRITTEN APPROVAL MUST BE GRANTED BY THE FREDERICK COUNTY PLANNING DEPARTMENT. 4.ALL PLANTING SHALL CONFORM WITH 165-203.01B OF THE FREDERICK COUNTY ZONING ORDINANCE (PLANT SELECTION, PLANTING PROCEDURE, AND MAINTENANCE). 5.NO TREES OR SHRUBS SHALL BE PLACED WITHIN FREDERICK WATER EASEMENT. 9' 20' 2 CONC. WHEEL STOP 1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS07-10-2026DDD CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYCONSTRUCTION DETAILSJOB NO.: 26-03 C-06C-06.DWGDDDN/ADDDDESCRIPTION04-29-202607-10-2026 FREDERICK COUNTY SP #20-26TVOR WATER TREATMENT BUILDINGFREDERICK COUNTY, VIRGINIA1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS07-10-2026DDDWHEEL STOP DETAIL PLAN VIEW SECTION B-B SECTION A-A BAB A CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYEXISTING SITE PROFFERSJOB NO.: 26-03 C-07C-07.DWGDDDN/ADDDDESCRIPTION04-29-2026TVOR WATER TREATMENT BUILDINGFREDERICK COUNTY, VIRGINIAFREDERICK COUNTY SP #20-26 07-10-2026 1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS07-10-2026DDD CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYEXISTING SITE PROFFERSJOB NO.: 26-03 C-08C-08.DWGDDDN/ADDDDESCRIPTION04-29-2026TVOR WATER TREATMENT BUILDINGFREDERICK COUNTY, VIRGINIAFREDERICK COUNTY SP #20-26 07-10-2026 CONTINUED FROM SHEET C-19 1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS07-10-2026DDD CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYEXISTING SITE PROFFERSJOB NO.: 26-03 C-09C-09.DWGDDDN/ADDDDESCRIPTION04-29-2026TVOR WATER TREATMENT BUILDINGFREDERICK COUNTY, VIRGINIAFREDERICK COUNTY SP #20-26 07-10-2026 1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS07-10-2026DDD CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYEXISTING SITE PROFFERSJOB NO.: 26-03 C-10C-10.DWGDDDN/ADDDDESCRIPTION04-29-2026TVOR WATER TREATMENT BUILDINGFREDERICK COUNTY, VIRGINIAFREDERICK COUNTY SP #20-26 07-10-2026 CONTINUED FROM SHEET C-09 1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS07-10-2026DDD