HomeMy WebLinkAbout18-26 Plasters HVAC Minor Site Plan REV01 06.12.20261COVER SHEET1" 1,000
PLASTERS HVAC
MINOR SITE DEVELOPMENT PLAN
BACK CREEK MAGISTERIAL DISTRICT
FREDERICK COUNTY, VA
SP #18-26
Gas:Washington Gas Co.
P.O. Box 2400
Winchester, VA 22604
(540) 869-1111
Water/Sewer:Frederick Water
P.O. Box 1877
Winchester, VA. 22604
(540) 868-1061
Power:Shenandoah Valley Electric Coop
3463 Valley Pike
Winchester, VA 22602
(540) 450-2051
UTILITY NOTICE REQUIRED
Contractors shall notify all public utility operators who maintain underground utility lines in the
area of proposed excavating or blasting at least two (2) working days, but not more than ten
(10) working days, prior to commencement of excavation or demolition. Names and telephone
numbers of the operators of underground utility lines appear below. These numbers shall also
be used to serve in an emergency condition.
CALL "MISS UTILITY"
VIRGINIA UTILITY PROTECTION SERVICE (VUPS) AT 811 OR 1-800-552-7001, 48 HOURS
PRIOR TO THE START OF WORK. EXCAVATORS MUST NOTIFY ALL PUBLIC UTILITY
OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF
PROPOSED EXCAVATING OR BLASTING AND HAVE THOSE FACILITIES LOCATED BY THE
UTILITY COMPANIES PRIOR TO COMMENCING EXCAVATION. THE EXCAVATOR IS
RESPONSIBLE FOR COMPLIANCE WITH ALL COUNTY REQUIREMENTS, VIRGINIA CODE
AND REGULATIONS.
VICINITY MAP
SCALE: 1" 1000
OWNER
WINCHESTER REAL ESTATE, LLC
PO BOX 1173
NEWINGTON, VA 22122
(703) 644-2200
WSTILLWAGON@MILLERSOFFICE.COM
DEVELOPER
CASSIE PLASTERS GET PLASTERED, LLC
3473 N FREDERICK PIKE
WINCHESTER, VA 22603
(540) 664-3943
cassie.plastershvac@gmail.com PLASTERS HVACBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VA04/30/2026
TTC
SP #18-26
9
2530MR
Plan Revisions
Rev. No Rev. Date Comment
01 06/11/2026 FC Planning & FC Fire Marshal Comments
DATE
APPROVAL
=ONING ADMINISTRATOR
SITE PLAN VALID FOR (5) FIVE YEARS FROM DATE OF APPROVAL 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:
Telecom:Verizon
P.O. Box 17398
Baltimore, MD 21297
(301) 954-6282
Sheet List Table
Sheet
Number Sheet Title Revsion
No
Revison
Date
1 Cover Sheet 01 06/11/2026
2 General Notes and Legend
3 Rezoning Boundary Exhibit & Proffers
4 Existing Conditions 01 06/11/2026
5 Pavement Demolition and E&S Plan 01 06/11/26
6 E&S Narrative
7 Minor Site Plan 01 06/11/2026
8 Landscape Plan 01 06/11/2026
9 Life Safety Plan 01 06/11/2026 PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA | ASHBURN, VA | MARTINSBURG, WVLIST OF SERVICES: CIVIL ENGINEERING I GIS I PLANNING I LAND SURVEYING I ENVIRONMENTAL
06/12/2026
N/A
GENERAL NOTES AND LEGENDPLASTERS HVACBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY VA//
TTC
SP
9
MR WLQG\ HLOO LDQHWLQFKHVWHU VLUJLQLD THOHSKRQH FD[ 9ZZZ.JUHHQZD\HQJ.FRPFND1971ENGINEERINGSHEET OF
DESIGNED BY
FILE NO.
SCALE
DATEPROUDLY SERVING VIRGINIA WEST VIRGINIAOFFICES IN WINCHESTER VA _ ASHBURN VA _ MARTINSBURG WVUSECLASS * TRIP RATE
TRIP GENERATION DATAFIRE MARSHAL'S NOTE
DWELLING UNITS
GENERAL NOTES VDOT GENERAL NOTES PROJECT NOTES
VPD
* TAKEN FROM ITE TRIP GENERATION 9TH EDITION
LEGEND
FREDERICK WATER CONSTRUCTION NOTES
FLUH ODQH PDUNLQJV DQG VLJQDJH
AQ\ NR PDUNLQJ VLJQV DQG \HOORZ SDLQWHG FXUE ORFDWLRQV ZLOO EH LQVWDOOHG
E\ ILHOG LQVSHFWLRQ DW WKH GLUHFWLRQ RI WKH FLUH MDUVKDO'V OIILFH.
FREDERICK WATER PROJECT INFORMATION
WATER AND SANITARY SEWER USAGE
WATER DEMAND GPD
SANITARY SEWER DISCHARGE GPD
CDOFXODWLRQ RI GHPDQG/GLVFKDUJH
WATER DEMAND
*RHVLGHQWLDO JSG SHU FRQQHFWLRQ
*CRPPHUFLDO JSG SHU VI
*IQGXVWULDO JSG # SHUVRQV SHU DFUH
SEWER DISCHARGE
SHZHU GLVFKDUJH HTXDOV ZDWHU GHPDQG
PROPOSED SAN. LAT. CLEANOUT
PROPOSED CENTERLINE
EXISTING SPOT ELEVATION
STORM DRAIN STRUCTURE IDENTIFIER
SANITARY MANHOLE IDENTIFIER
PROPOSED SPOT ELEVATION
EXISTING CURB AND GUTTER
PROPOSED EDGE OF PAVEMENT
EXISTING EDGE OF PAVEMENT
PROPOSED STORM SEWER WITH INLET
EXISTING STORM SEWER WITH INLET
PROPOSED TELEPHONE LINE
EXISTING TELEPHONE LINE
TRANSITION TO REVERSE CURB
PROPOSED CURB AND GUTTER
PROPOSED ELECTRIC SERVICE
EXISTING ELECTRIC SERVICE
PROPOSED SANITARY SEWER WITH MANHOLE
EXISTING SANITARY SEWER WITH MANHOLE
PROPOSED GAS LINE
EXISTING GAS LINE
FENCELINE
FLOW LINE
PROPOSED WATERLINE W/ TEE
PROPERTY LINE
EXISTING TELEPHONE PEDESTAL
EXISTING WATERLINE W/ TEE
EXISTING UTILITY POLE/GUIDE WIRE
SIGNS
PROPOSED REDUCER
EXISTING FIRE HYDRANT/VALVE/METER
INDICATES THE NUMBER OF TYP. PARKING SPACES
PARKING INDICATOR
HANDICAP PARKING
PROPOSED BUILDING ENTRANCE
VEHICLES PER DAY COUNT
PROPOSED FIRE HYDRANT/VALVE/METER
LIGHT POLE
EXISTING TREE LINE
EXISTING EASEMENT
PROPOSED EASEMENT
EXISTING CENTERLINE
EXISTING INDEX CONTOUR
EXISTING INTERMEDIATE CONTOUR
PROPOSED CONTOUR
PROJECT INFORMATION
PDUFHO IGHQWLILFDWLRQ NR.
SWUHHW AGGUHVV
PUHYLRXVO\ ASSURYHG SLWH PODQV
PUHYLRXVO\ ASSURYHG RH]RQLQJV
PUHYLRXVO\ ASSURYHG MDVWHU DHYHORSPHQW PODQV
PURMHFW SLWH AUHD
DLVWXUEHG AUHD
CXUUHQW =RQLQJ
PURSRVHG =RQLQJ
CXUUHQW UVH
PURSRVHG UVH
MD[LPXP BXLOGLQJ HHLJKW
E[LVWLQJ BXLOGLQJ HHLJKW
RHTXLUHG BXLOGLQJ SHWEDFNV
FURQW
RHDU
SLGH
PURYLGHG BXLOGLQJ SHWEDFNV
FURQW
SLGH
RHDU
PDUNLQJ SHWEDFN
FURQW
RHDU
SLGH
SLJQ SHWEDFNV
OXWGRRU LLJKWLQJ
FDU CDOFXODWLRQ
PDUNLQJ RHTXLUHG
PDUNLQJ PURYLGHG
ADA PDUNLQJ RHTXLUHG
ADA PDUNLQJ PURYLGHG
OSHQ SSDFH CDOFXODWLRQV
RHTXLUHG
PURYLGHG .
LDQGVFDSLQJ
A9E
CRPPRQZHDOWK CRXUW
SP 99 SP 99 SP SP 9
RE= 9 RE=
MDP
. AFUHV
. AFUHV
B
B
OIILFH / WDUHKRXVH CRPSOH[
OIILFH / WDUHKRXVH CRPSOH[
'
.'
'
'
'
.'
.9'
.'
' FURP DQ\ VWUHHW RU URDG ROW
' AOO RWKHU SURSHUW\ OLQHV
' AOO RWKHU SURSHUW\ OLQHV
NR VLJQ SURSRVHG ZLWK WKLV SODQ
NR RXWGRRU OLJKWLQJ SURSRVHG ZLWK WKLV SODQ
TRWDO ORW DUHD . ACRES . SF
TRWDO IORRU DUHD 9. SF
BXLOGLQJ DUHD/LRW DUHD . .
SHU SF RIILFH IORRU DUHD
VSDFHV* 9 SF /
*PDUNLQJ FDOFXODWLRQV SURYLGHG DUH SHU WKH DSSURYHG
// MICHAEL G. PRELIP INC. PROPOSED
CONTRACTOR'S OFFICE COMPLEX COMMONWEALTH
BUSINESS CENTER LOT PLAN.
VSDFHV H[LVWLQJ VSDFHV SURSRVHG VSDFHV
PHU TDEOH . RI WKH VLUJLQLD CRQVWUXFWLRQ CRGH
VSDFHV
VSDFHV
. AC. [ . . AC. OR SF
. AFUHV OR SF
TZR DGGLWLRQDO WUHHV DUH UHTXLUHG/SURSRVHG ZLWK WKH
LQFUHDVH LQ SDUNLQJ VSDFHV.
.GUHHQZD\ EQJLQHHULQJ IQF. GE LVVXHG WKLV SODQ VHW EDVHG RQ SURMHFW FULWHULD GLFWDWHG E\ WKH FOLHQW DQG PXQLFLSDO FRGHV.
TKLV SODQ VHW LV QRW FRQVLGHUHG FRPSOHWH RU DSSURSULDWH IRU FRQVWUXFWLRQ XQWLO ALL QHFHVVDU\ DJHQFLHV KDYH JLYHQ DSSURYDO
AND WKLV SODQ VHW LV VLJQHG DQG VHDOHG E\ D OLFHQVHG SURIHVVLRQDO. AQ\ ZRUN SODQQLQJ VFKHGXOLQJ PDWHULDO SXUFKDVHV
DQG/RU FRQVWUXFWLRQ SULRU WR DSSURYDOV DQG OLFHQVHG/SURIHVVLRQDO VHDOLQJ ZLOO EH SHUIRUPHG DW WKH ULVN RI WKH SHUVRQQHO
DXWKRUL]LQJ ZRUN. GE VKDOO EH KHOG KDUPOHVV IURP DQG FRVWV WLPH GHOD\ DQG/RU PDWHULDO FKDQJHV LQFXUUHG RQ ZRUN VWDUWHG
EHIRUH WKLV SODQ VHW UHFHLYHV DSSURYDOV DQG VHDOV.
.MHWKRGV DQG PDWHULDOV XVHG LQ WKH FRQVWUXFWLRQ RI WKH LPSURYHPHQWV KHUHLQ VKDOO FRQIRUP WR FXUUHQW CRXQW\ CRQVWUXFWLRQ
SWDQGDUGV DQG SSHFLILFDWLRQV DQG/RU FXUUHQW VDOT SWDQGDUGV DQG SSHFLILFDWLRQV.
.TKH EQJLQHHU VKDOO QRW KDYH FRQWURO RYHU RU FKDUJH RI DQG VKDOO QRW EH UHVSRQVLEOH IRU FRQVWUXFWLRQ PHDQV PHWKRGV
WHFKQLTXHV VHTXHQFHV RU SURFHGXUHV QRU IRU VDIHW\ SUHFDXWLRQV DQG SURJUDPV LQ FRQQHFWLRQ ZLWK ZRUN VKRZQ RQ WKHVH
SODQV. TKH EQJLQHHU LV QRW UHVSRQVLEOH IRU WKH FRQWUDFWRU'V VFKHGXOHV RU IDLOXUH WR FDUU\ RXW WKH ZRUN. TKH EQJLQHHU LV QRW
UHVSRQVLEOH IRU DFWV RI RPLVVLRQV RI WKH FRQWUDFWRU VXEFRQWUDFWRU RU WKHLU DJHQWV RU HPSOR\HHV RU DQ\ RWKHU SHUVRQ
SHUIRUPLQJ SRUWLRQV RI WKH ZRUN.
.TKH CRQWUDFWRU OZQHU RU DHYHORSHU VKDOO EH UHVSRQVLEOH IRU VHFXULQJ DQ\ WKLUG SDUW\ LQVSHFWLRQ/WHVWLQJ VHUYLFH WR LQVXUH
FRQVWUXFWLRQ FRPSOLDQFH ZLWK WKHVH SODQV DQG VSHFLILFDWLRQV. IW LV GUHHQZD\ EQJLQHHULQJ'V UHFRPPHQGDWLRQ WKDW D WKLUG
SDUW\ LQVSHFWLRQ/WHVWLQJ VHUYLFH EH HPSOR\HG WR HQVXUH WKDW SURMHFW LV FRPSOHWHG DQG PDWHULDOV LQVWDOOHG PHHW WKH GHWDLOV
DQG VSHFLILFDWLRQV LQ WKHVH SODQV.
.TKH ORFDWLRQ RI H[LVWLQJ XWLOLWLHV VKRZQ LQ WKHVH SODQV DUH WDNHQ IURP H[LVWLQJ UHFRUGV. IW VKDOO EH WKH FRQWUDFWRUV
UHVSRQVLELOLW\ WR YHULI\ WKH H[DFW KRUL]RQWDO DQG YHUWLFDO ORFDWLRQ RI DOO H[LVWLQJ XWLOLWLHV DV QHHGHG SULRU WR FRQVWUXFWLRQ. TKH
FRQWUDFWRU VKDOO EH UHVSRQVLEOH IRU WKH GLJJLQJ RI DOO WHVW KROHV WKDW PD\ EH UHTXLUHG ZKHWKHU UHFRPPHQGHG RU QRW E\
WKHVH SODQV WR GHWHUPLQH WKH H[DFW ORFDWLRQ DQG HOHYDWLRQ RI H[LVWLQJ XWLOLWLHV. II DQ\ FRQIOLFWV DULVLQJ IURP WKLV H[LVWLQJ XWLOLW\
YHULILFDWLRQ RU LI GXULQJ WKH FRXUVH RI FRQVWUXFWLRQ DQ\ REMHFW RI DQ XQXVXDO QDWXUH LV HQFRXQWHUHG WKH FRQWUDFWRU VKDOO
FHDVH ZRUN LQ WKDW DUHD DQG LPPHGLDWHO\ QRWLI\ GUHHQZD\ EQJLQHHULQJ DW DQG/RU WKH SURSHU DXWKRULW\.
GUHHQZD\ EQJLQHHULQJ RU DQ\ HQJLQHHU DVVRFLDWHG ZLWK WKHVH SODQV VKDOO QRW EH UHVSRQVLEOH RU OLDEOH IRU DQ\ FRQVWUXFWLRQ
FRVW WKDW PD\ EH DVVRFLDWHG ZLWK WKH LQVWDOODWLRQ RU UHLQVWDOODWLRQ DQ\ XWLOLW\ RU RWKHU LPSURYHPHQWV LI QRW QRWLILHG RI DQ\
GLVFUHSDQFLHV EHWZHHQ DFWXDO ILHOG FRQGLWLRQV DQG WKH DSSURYHG SODQ.
.TKH DSSURYDO RI WKHVH SODQV LQ QR ZD\ UHOLHYH WKH GHYHORSHU WKH FRQWUDFWRU RU WKHLU DJHQWV RI DQ\ OHJDO UHVSRQVLELOLW\
ZKLFK PD\ EH UHTXLUHG E\ WKH FRGH RI VLUJLQLD RU DQ\ RWKHU RUGLQDQFH HQDFWHG E\ WKH CRXQW\ QRU GRHV LW JXDUDQWHH WKH
LVVXDQFH RI DQ\ UHTXLUHG SHUPLW E\ WKH CRXQW\ VDOT RU DQ\ RWKHU AJHQF\.
.AQ DSSURYHG VHW RI SODQV DQG DOO DSSOLFDEOH SHUPLWV PXVW EH DYDLODEOH DW WKH FRQVWUXFWLRQ VLWH DW DOO WLPHV GXULQJ
FRQVWUXFWLRQ. A UHSUHVHQWDWLYH RI WKH GHYHORSHU PXVW EH DYDLODEOH DW DOO WLPHV.
.PULRU WR WKH LQLWLDWLRQ RI DQ\ ODQG GLVWXUELQJ DFWLYLWLHV WKH DHYHORSHU WKH CRQWUDFWRU RU WKH RHVSRQVLEOH LDQG DLVWXUEHU VKDOO
REWDLQ D LDQG DLVWXUEDQFH PHUPLW IURP WKH CRXQW\ EQJLQHHU'V RIILFH. TKH CRQWUDFWRU DHYHORSHU RU KLV DJHQW VKDOO EH
UHVSRQVLEOH IRU REWDLQLQJ D VLUJLQLD SWRUPZDWHU MDQDJHPHQW PURJUDP VSMP PHUPLW DQG VKDOO EH UHVSRQVLEOH IRU WKH
UHJLVWUDWLRQ RI WKH FRQVWUXFWLRQ VLWH DV UHTXLUHG E\ ODZ. TKH\ VKDOO DOVR EH UHVSRQVLEOH IRU REWDLQLQJ DQG PDLQWDLQLQJ RQ VLWH
D SWRUPZDWHU PROOXWLRQ PUHYHQWLRQ PODQ SWPPP. TKH DSSURYDO RI WKHVH SODQV LQ QR ZD\ UHOLHYHV WKH GHYHORSHU RU KLV
DJHQW RI WKH UHVSRQVLELOLWLHV FRQWDLQHG LQ WKH VLUJLQLD EURVLRQ DQG SHGLPHQW CRQWURO HDQGERRN.
9.TKH DHYHORSHU RU KLV DJHQW VKDOO EH UHVSRQVLEOH IRU REWDLQLQJ DQ\ UHTXLUHG SHUPLWV IURP WKH VLUJLQLD DHSDUWPHQW RI
EQYLURQPHQWDO 4XDOLW\ DE4 RU WKH UQLWHG SWDWHV AUP\ CRUS RI EQJLQHHUV IRU DQ\ SODQ ZHWODQG GLVWXUEDQFH DV VKRZQ RQ
WKHVH SODQV. TKH\ VKDOO DOVR EH UHVSRQVLEOH WKH LGHQWLILFDWLRQ DQG GHOLQHDWLRQ RI DQ\ ZHWODQGV WKDW PD\ EH SUHVHQW RQ WKH
FRQVWUXFWLRQ VLWH.
.TKH FRQWUDFWRU VKDOO SURYLGH DGHTXDWH PHDQV RI FOHDQLQJ PXG IURP WUXFNV DQG/RU RWKHU HTXLSPHQW SULRU WR HQWHULQJ SXEOLF
VWUHHWV DQG LW LV WKH FRQWUDFWRUV UHVSRQVLELOLW\ WR FOHDQ VWUHHWV DOOD\ GXVW DQG WR WDNH ZKDWHYHU PHDVXUHV DUH QHFHVVDU\ WR
LQVXUH WKDW SXEOLF VWUHHWV DUH PDLQWDLQHG LQ D FOHDQ PXG DQG GXVW IUHH FRQGLWLRQ DW DOO WLPHV.
.A SHUPLW PXVW EH REWDLQHG IURP WKH OIILFH RI WKH RHVLGHQW EQJLQHHU VLUJLQLD DHSDUWPHQW RI TUDQVSRUWDWLRQ VDOT DQG
FUHGHULFN CRXQW\ SULRU WR DQ\ FRQVWUXFWLRQ DFWLYLWLHV ZLWKLQ H[LVWLQJ SWDWH ULJKWRIZD\.
.TKH GHYHORSHU ZLOO EH UHVSRQVLEOH IRU DQ\ GDPDJH WR WKH H[LVWLQJ VWUHHWV DQG XWLOLWLHV ZKLFK RFFXUV DV D UHVXOW RI KLV
FRQVWUXFWLRQ SURMHFW ZLWKLQ RU FRQWLJXRXV WR WKH H[LVWLQJ ULJKWRIZD\.
.WDUQLQJ VLJQV PDUNHUV EDUULFDGHV RU IODJPHQ VKRXOG EH LQ DFFRUGDQFH ZLWK WKH SWDWH DQG FHGHUDO MDQXDO RQ UQLIRUP
TUDIILF CRQWURO DHYLFHV MUTCD.
.TKH H[DFW ORFDWLRQ RI DOO JXDUG UDLOV DQG SDYHG GLWFKHV ZLOO EH GHWHUPLQHG E\ VDOT SHUVRQQHO. A MRLQW LQVSHFWLRQ ZLOO EH
KHOG ZLWK WKH DHYHORSHU CRXQW\ RHSUHVHQWDWLYHV DQG RHSUHVHQWDWLYHV RI WKH VLUJLQLD DHSDUWPHQW RI TUDQVSRUWDWLRQ
VDOT WR GHWHUPLQH LI DQG ZKHUH JXDUG UDLO DQG/RU SDYHG GLWFKHV ZLOO EH QHHGHG. TKH GHYHORSHU ZLOO EH UHVSRQVLEOH IRU
SURYLGLQJ JXDUGUDLO DQG SDYHG GLWFKHV DV GHWHUPLQHG E\ WKLV MRLQW LQVSHFWLRQ. RHIHU WR VLUJLQLD DHSDUWPHQW RI
TUDQVSRUWDWLRQ VDOT GXDUG RDLO DQG PDYHG DLWFK SSHFLILFDWLRQV.
.AOO XQVXLWDEOH PDWHULDO VKDOO EH UHPRYHG IURP WKH FRQVWUXFWLRQ OLPLWV RI WKH VLWH SODQ EHIRUH SODFLQJ HPEDQNPHQW.
.AOO SDYHPHQW VHFWLRQV VKRZQ RQ WKHVH DSSURYHG SODQV DUH EDVHG RQ D PLQLPXP CBR YDOXH RI DQG DUH IRU SUHOLPLQDU\
GHVLJQ RQO\. FLQDO SDYHPHQW GHVLJQ VKDOO EH EDVHG XSRQ DFWXDO ILHOG WHVWHG CBR YDOXHV. TKH CRQWUDFWRU RU DHYHORSHU VKDOO
EH UHVSRQVLEOH IRU ILHOG WHVWV SHU VDOT VWDQGDUGV WR REWDLQ DFWXDO CBR YDOXHV IRU ILQDO GHVLJQ. FLQDO SDYHPHQW GHVLJQV ZLOO
EH DSSURYHG E\ VDOT DQG/RU WKH OZQHU/DHYHORSHU ZKLFK HYHU DSSOLFDEOH SULRU WR LQVWDOODWLRQ.
.AOO VSULQJV VKDOO EH FDSSHG DQG SLSHG WR WKH QHDUHVW VWRUP VHZHU PDQKROHV RU FXUE LQOHW. TKH SLSH VKDOO EH PLQLPXP
GLDPHWHU DQG FRQIRUP WR VDOT VWDQGDUG SB.
.WKHQ JUDGLQJ LV SURSRVHG ZLWKLQ HDVHPHQWV RI XWLOLWLHV OHWWHUV RI SHUPLVVLRQ IURP DOO LQYROYHG FRPSDQLHV PXVW EH SURYLGHG
WR WKH CRXQW\ PXEOLF WRUNV DHSDUWPHQW SULRU WR LVVXDQFH RI JUDGLQJ DQG/RU VLWH GHYHORSPHQW SHUPLWV.
9.NRWLILFDWLRQ VKDOO EH JLYHQ WR WKH DSSURSULDWH XWLOLW\ FRPSDQ\ SULRU WR FRQVWUXFWLRQ RI ZDWHU DQG/RU VDQLWDU\ VHZHU OLQHV.
IQIRUPDWLRQ VKRXOG DOVR EH REWDLQHG IURP WKH DSSURSULDWH DXWKRULW\ FRQFHUQLQJ SHUPLWV FXW VKHHWV DQG FRQQHFWLRQV WR
H[LVWLQJ OLQHV.
.TKH DHYHORSHU DQG/RU CRQWUDFWRU VKDOO EH UHVSRQVLEOH WR VXSSO\ DOO XWLOLW\ FRPSDQLHV ZLWK FRSLHV RI WKH DSSURYHG SODQV DQG
DGYLVH WKHP WKDW DOO JUDGLQJ VKDOO FRQIRUP WR WKH DSSURYHG SODQV DQG IXUWKHU WKDW WKH XWLOLW\ FRPSDQLHV VKDOO EH UHVSRQVLEOH
IRU KRUQLQJ WKHVH SODQV DQG WKH ILQLVKHG JUDGHV LQ WKH LQVWDOODWLRQ RI WKHLU XWLOLW\ OLQHV.
.AOO XWLOLWLHV WR EH ORFDWHG XQGHUJURXQG.
.CRQWUDFWRUV VKDOO QRWLI\ RSHUDWRUV ZKR PDLQWDLQ XQGHUJURXQG XWLOLW\ OLQHV LQ WKH DUHD RI SURSRVHG H[FDYDWLQJ RU EODVWLQJ DW
OHDVW WZR ZRUNLQJ GD\V EXW QRW PRUH WKDQ WHQ ZRUNLQJ GD\V SULRU WR FRPPHQFHPHQW RI H[FDYDWLRQ RU GHPROLWLRQ.
.TKH GHYHORSHU ZLOO EH UHVSRQVLEOH IRU WKH UHORFDWLRQ RI DQ\ XWLOLWLHV ZKLFK LV UHTXLUHG DV D UHVXOW RI KLV SURMHFW. TKH
UHORFDWLRQ VKRXOG EH GRQH SULRU WR FRQVWUXFWLRQ.
.AOO SDUNLQJ ORW/VWUHHW OLJKW DQG GU\ XWLOLW\ GHVLJQ VKDOO EH SHUIRUPHG DQG SURYLGHG VHSDUDWHO\ E\ RWKHUV. AOO GU\ XWLOLW\ DQG RU
OLJKWLQJ LQIRUPDWLRQ VKRZQ KHUHRQ LV DV VSHFLILHG E\ RWKHUV DQG LV LQFOXGHG IRU LQIRUPDWLRQDO SXUSRVHV RQO\ DV GLUHFWHG E\
WKH OZQHU DHYHORSHU DQG/RU SXEOLF DJHQF\ UHTXLUHPHQWV. GUHHQZD\ EQJLQHHULQJ KDV QRW SHUIRUPHG WKH OLJKWLQJ DQG/RU
GU\ XWLOLW\ GHVLJQ DQG GRHV QRW ZDUUDQW DQG LV QRW UHVSRQVLEOH IRU WKH GHJUHH DQG/RU DGHTXDF\ RI LOOXPLQDWLRQ RQ WKLV SURMHFW
RU WKH DGHTXDF\ RI WKH GU\ XWLOLW\ WR VHUYLFH WKH VLWH.
.AOO VDQLWDU\ VHZHUV ZDWHU PDLQV DQG DSSXUWHQDQFHV VKDOO EH FRQVWUXFWHG LQ DFFRUGDQFH ZLWK WKH FXUUHQW VWDQGDUGV DQG
VSHFLILFDWLRQV RI FUHGHULFN WDWHU.
.AOO VWRUPZDWHU SLSLQJ DQG VWUXFWXUHV VKRZQ RQ WKHVH SODQV DUH RQO\ DFFXUDWH WR WKH LQOHW RU PDQKROH ORFDWLRQV DV VKRZQ
KHUHRQ. DHWDLO GHVLJQ RI VWRUPZDWHU VWUXFWXUHV ZHUH QRW SURYLGHG WR GUHHQZD\ EQJLQHHULQJ. AFWXDO SLSH DOLJQPHQWV ZLOO EH
EDVHG XSRQ GHYHORSHG VWUXFWXUDO VKRS GUDZLQJV DV SURYLGHG E\ WKH PDQXIDFWXUHU. CRQWUDFWRU VKDOO PDNH DGMXVWPHQWV WR
SLSH DOLJQPHQWV EDVH RQ SURYLGHG VKRS GUDZLQJV. GUHHQZD\ EQJLQHHULQJ ZLOO QRW EH KHOG UHVSRQVLEOH RU OLDEOH IRU DQ\
GLVFUHSDQFLHV RU FKDQJHV FDXVHG E\ WKH VWUXFWXUDO GHVLJQ. CRQWUDFWRU PD\ VXEPLW VKRS GUDZLQJV WR GUHHQZD\
EQJLQHHULQJ IRU UHYLHZ DQG DSSURYDO DW FRQWUDFWRU'V H[SHQVH. SKRS GUDZLQJV ZLOO EH UHYLHZHG IRU FRPSOLDQFH ZLWK GHVLJQ
SODQV. TKH OZQHU RU DHYHORSHU ZLOO EH UHVSRQVLEOH IRU DQ\ UHGHVLJQ DV D UHVXOW RI VWUXFWXUDO VKRS GUDZLQJ GHVLJQ.
.CRQWUROOHG ILOOV VKDOO EH FRPSDFWHG WR 9 RI PD[LPXP GHQVLW\ DV GHWHUPLQHG E\ PHWKRG A SHU VWDQGDUG SURFWRU
AASHTOT99 ASTMD9 RU VTM DV DSSOLFDEOH. DHQVLW\ VKDOO EH FHUWLILHG E\ D UHJLVWHUHG SURIHVVLRQDO HQJLQHHU DQG
UHVXOWV VXEPLWWHG WR FUHGHULFN CRXQW\ SULRU WR SDYHPHQW FRQVWUXFWLRQ. II D JHRWHFKQLFDO UHSRUW KDV EHHQ SUHSDUHG LW
VKRXOG VXSHUVHGH WKH UHTXLUHPHQWV LQ WKLV QRWH.
.RHIHU WR GHRWHFKQLFDO EQJLQHHU IRU PHWKRGV PDWHULDOV DQG GHWDLOV IRU FRQVWUXFWLRQ RI DOO HDUWKZRUN DFWLYLWLHV.
9.AQ\ UHWDLQLQJ ZDOO IW. RU JUHDWHU LQ KHLJKW VKDOO UHTXLUH WKH LVVXDQFH RI D VHSDUDWH EXLOGLQJ SHUPLW.
.CRQVWUXFWLRQ GHEULV VKDOO EH FRQWDLQHUL]HG LQ DFFRUGDQFH ZLWK WKH VLUJLQLD LLWWHU CRQWURO AFW QR OHVV WKDQ RQH OLWWHU
UHFHSWDFOH VKDOO EH SURYLGHG DW WKH FRQVWUXFWLRQ VLWH.
.TKHVH SODQV LGHQWLI\ WKH ORFDWLRQ RI DOO NQRZQ JUDYHVLWHV. GUDYHVLWHV VKRZQ RQ WKLV SODQ ZLOO EH SURWHFWHG LQ DFFRUGDQFH
ZLWK VWDWH ODZ. IQ WKH HYHQW JUDYHVLWHV DUH GLVFRYHUHG GXULQJ FRQVWUXFWLRQ WKH RZQHU DQG HQJLQHHU PXVW EH QRWLILHG
LPPHGLDWHO\.
.IQGLYLGXDO VLJQ SHUPLWV ZLOO EH UHTXLUHG IURP WKH =RQLQJ OIILFH IRU DOO IUHH VWDQGLQJ DQG/RU IDFDGH VLJQV SULRU WR HUHFWLQJ WKH
VLJQ DQG PD\ UHTXLUH D VHSDUDWH EXLOGLQJ SHUPLW.
V. AOO ZRUN RQ WKLV SURMHFW VKDOO FRQIRUP WR WKH FXUUHQW HGLWLRQV RI DQG ODWHVW UHYLVLRQV WR WKH VLUJLQLD DHSDUWPHQW RI
TUDQVSRUWDWLRQ VDOT RRDG DQG BULGJH SSHFLILFDWLRQV DQG SWDQGDUGV WKH VLUJLQLD EURVLRQ DQG SHGLPHQW CRQWURO
RHJXODWLRQV DQG DQ\ RWKHU DSSOLFDEOH VWDWH IHGHUDO RU ORFDO UHJXODWLRQV. IQ FDVH RI D GLVFUHSDQF\ RU FRQIOLFW EHWZHHQ WKH
SWDQGDUGV RU SSHFLILFDWLRQV DQG RHJXODWLRQV WKH PRVW VWULQJHQW VKDOO JRYHUQ.
V. AOO FRQVWUXFWLRQ VKDOO FRPSO\ ZLWK WKH ODWHVW U.S. DHSDUWPHQW RI LDERU OFFXSDWLRQDO SDIHW\ DQG HHDOWK AGPLQLVWUDWLRQ
OSHA DQG VLUJLQLD OFFXSDWLRQDO SDIHW\ HHDOWK VOSH RXOHV DQG RHJXODWLRQV.
V. WKHQ ZRUNLQJ ZLWKLQ VDOT ULJKWRIZD\ DOO WUDIILF FRQWURO ZKHWKHU SHUPDQHQW RU WHPSRUDU\ VKDOO EH LQ DFFRUGDQFH ZLWK
WKH FXUUHQW HGLWLRQ RI VDOT¶V WRUN AUHD PURWHFWLRQ MDQXDO. A WUDQVSRUWDWLRQ PDQDJHPHQW SODQ QHHGV WR EH VXEPLWWHG
IRU DSSURYDO DQG ODQG XVH SHUPLW LVVXHG SULRU WR DQ\ H[HFXWLRQ RI ZRUN ZLWKLQ WKH VDOT ULJKW RI ZD\.
V TKH GHYHORSHU VKDOO EH UHVSRQVLEOH IRU UHORFDWLQJ DW KLV H[SHQVH DQ\ DQG DOO XWLOLWLHV LQFOXGLQJ WUDIILF VLJQDO SROHV
MXQFWLRQ ER[HV FRQWUROOHUV HWF. RZQHG E\ VDOT RU SULYDWH / SXEOLF XWLOLW\ FRPSDQLHV. IW LV WKH VROH UHVSRQVLELOLW\ RI WKH
GHYHORSHU WR ORFDWH DQG LGHQWLI\ XWLOLW\ IDFLOLWLHV RU LWHPV WKDW PD\ EH LQ FRQIOLFW ZLWK WKH SURSRVHG FRQVWUXFWLRQ DFWLYLW\.
VDOT DSSURYDO RI WKHVH SODQV GRHV QRW LQGHPQLI\ WKH GHYHORSHU IURP WKLV UHVSRQVLELOLW\.
V. DHVLJQ IHDWXUHV UHODWLQJ WR ILHOG FRQVWUXFWLRQ UHJXODWLRQV DQG FRQWURO RU VDIHW\ RI WUDIILF PD\ EH VXEMHFW WR FKDQJH DV
GHHPHG QHFHVVDU\ E\ VDOT. AQ\ DGGLWLRQDO H[SHQVH LQFXUUHG DV D UHVXOW RI DQ\ ILHOG UHYLVLRQ VKDOO EH WKH UHVSRQVLELOLW\
RI WKH GHYHORSHU.
V. II UHTXLUHG E\ WKH ORFDO VDOT LDQG DHYHORSPHQW OIILFH D SUHFRQVWUXFWLRQ FRQIHUHQFH VKDOO EH DUUDQJHG DQG KHOG E\ WKH
HQJLQHHU DQG/RU GHYHORSHU ZLWK WKH DWWHQGDQFH RI WKH FRQWUDFWRU V YDULRXV CRXQW\ DJHQFLHV XWLOLW\ FRPSDQLHV DQG
VDOT SULRU WR LQLWLDWLRQ RI ZRUN.
V. TKH FRQWUDFWRU VKDOO QRWLI\ WKH ORFDO VDOT LDQG DHYHORSPHQW OIILFH ZKHQ ZRUN LV WR EHJLQ RU FHDVH IRU DQ\
XQGHWHUPLQHG OHQJWK RI WLPH. VDOT UHTXLUHV DQG VKDOO UHFHLYH KRXUV DGYDQFH QRWLFH SULRU WR DQ\ UHTXLUHG RU
UHTXHVWHG LQVSHFWLRQ.
V. TKH FRQWUDFWRU VKDOO QRWLI\ WKH TUDIILF OSHUDWLRQV CHQWHU DW 9 IRU DQ\ WUDIILF FRQWURO SODQ WKDW LPSDFWV D
VDOT PDLQWDLQHG IQWHUVWDWH RU PULPDU\ URDGZD\ WR SURYLGH QRWLILFDWLRQ RI WKH LQVWDOODWLRQ DQG UHPRYDO RI WKH ZRUN ]RQH.
V9. TKH FRQWUDFWRU VKDOO EH UHVSRQVLEOH IRU PDLQWDLQLQJ D VDOT SHUPLWWHG WHPSRUDU\ FRQVWUXFWLRQ HQWUDQFHV LQ DFFRUGDQFH
ZLWK SHFWLRQ . RI WKH VLUJLQLD EURVLRQ DQG SHGLPHQW CRQWURO HDQGERRN. FXUWKHUPRUH DFFHVV WR RWKHU SURSHUWLHV
DIIHFWHG E\ WKLV SURMHFW VKDOO EH PDLQWDLQHG WKURXJK FRQVWUXFWLRQ.
V. CRQWUDFWRU VKDOO HQVXUH DGHTXDWH GUDLQDJH LV DFKLHYHG DQG PDLQWDLQHG RQ WKH VLWH GXULQJ DQG DW WKH HQG RI
FRQVWUXFWLRQ.
V. AOO ZDWHU DQG VHZHU OLQHV ZLWKLQ H[LVWLQJ RU SURSRVHG VDOT ULJKWRIZD\ VKDOO KDYH D PLQLPXP WKLUW\VL[ LQFKHV
FRYHU DQG ZKHQ SRVVLEOH VKDOO EH LQVWDOOHG XQGHU URDGZD\ GUDLQDJH IDFLOLWLHV DW FRQIOLFW SRLQWV.
V. AQ\ XQXVXDO VXEVXUIDFH FRQGLWLRQV H.J. XQVXLWDEOH VRLOV VSULQJV VLQNKROHV YRLGV FDYHV HWF. HQFRXQWHUHG GXULQJ WKH
FRXUVH RI FRQVWUXFWLRQ VKDOO EH LPPHGLDWHO\ EURXJKW WR WKH DWWHQWLRQ RI WKH HQJLQHHU DQG VDOT. WRUN VKDOO FHDVH LQ WKDW
YLFLQLW\ XQWLO DQ DGHTXDWH GHVLJQ FDQ EH GHWHUPLQHG E\ WKH HQJLQHHU DQG DSSURYHG E\ VDOT.
V. AOO ILOO DUHDV ERUURZ PDWHULDO DQG XQGHUFXW DUHDV VKDOO EH LQVSHFWHG DQG DSSURYHG E\ D VDOT UHSUHVHQWDWLYH SULRU WR
SODFHPHQW RI ILOO. A VDOT UHSUHVHQWDWLYH VKDOO EH SUHVHQW WR LQVXUH WKH VRLO VDPSOHV REWDLQHG IRU CBR¶V LV
UHSUHVHQWDWLYH RI WKH ORFDWLRQ. WKHQ VRLO VDPSOHV DUH VXEPLWWHG WR SULYDWH ODERUDWRULHV IRU WHVWLQJ WKH VDPSOHV VKDOO EH
FOHDUO\ LGHQWLILHG DQG ODEHOHG DV EHORQJLQJ WR D SURMHFW WR EH DFFHSWHG E\ VDOT DQG WKDW WHVWLQJ VKDOO EH SHUIRUPHG LQ
DFFRUGDQFH ZLWK DOO DSSOLFDEOH VDOT VWDQGDUGV DQG SURFHGXUHV.
V. AOO URDGZD\ ILOO EDVH VXEJUDGH PDWHULDO DQG EDFNILOO LQ XWLOLW\/VWRUP VHZHU WUHQFKHV VKDOO EH FRPSDFWHG LQ DFFRUGDQFH
ZLWK WKH OLIW WKLFNQHVVHV GHQVLW\ DQG PRLVWXUH UHTXLUHPHQWV DV VSHFLILHG LQ WKH FXUUHQW VDOT RRDG DQG BULGJH
SSHFLILFDWLRQV. CHUWLILHG FRSLHV RI WHVW UHSRUWV VKDOO EH VXEPLWWHG WR VDOT GDLO\ XQOHVV VSHFLILHG RWKHUZLVH.
V. VDOT SWDQGDUG CD DQG UD XQGHUGUDLQV VKDOO EH LQVWDOOHG ZKHUH LQGLFDWHG RQ WKHVH SODQV DQG/RU DV VSHFLILHG E\
VDOT.
V. A SRVW LQVWDOODWLRQ YLVXDO/YLGHR FDPHUD LQVSHFWLRQ VKDOO EH FRQGXFWHG E\ WKH CRQWUDFWRU RQ DOO SLSHV LGHQWLILHG RQ WKH
SODQV DV VWRUP VHZHU SLSH DQG D VHOHFW QXPEHU RI SLSH FXOYHUWV. FRU SLSH FXOYHUWV D PLQLPXP RI RQH SLSH LQVWDOODWLRQ IRU
HDFK VL]H RI HDFK PDWHULDO W\SH ZLOO EH LQVSHFWHG RU WHQ SHUFHQW RI WKH WRWDO DPRXQW IRU HDFK VL]H DQG PDWHULDO W\SH
VXPPDUL]HG. AOO SLSH LQVWDOODWLRQV RQ WKH SODQV QRW LGHQWLILHG DV VWRUP VHZHU SLSH VKDOO EH FRQVLGHUHG DV FXOYHUW SLSH IRU
LQVSHFWLRQ SXUSRVHV. AGGLWLRQDO WHVWLQJ PD\ EH UHTXLUHG DV GLUHFWHG E\ WKH AUHD LDQG UVH EQJLQHHU RU WKHLU
UHSUHVHQWDWLYH.
V. TKH LQVWDOODWLRQ RI DQ\ HQWUDQFHV DQG PDLOER[HV ZLWKLQ DQ\ GHGLFDWHG VWUHHW ULJKWRIZD\ VKDOO PHHW VDOT PLQLPXP
GHVLJQ VWDQGDUGV DQG LV WKH UHVSRQVLELOLW\ RI WKH GHYHORSHU.
V. PULRU WR VDOT DFFHSWDQFH RI DQ\ VWUHHWV DOO UHTXLUHG VWUHHW VLJQDJH DQG/RU SDYHPHQW PDUNLQJV VKDOO EH LQVWDOOHG E\ WKH
GHYHORSHU LQ DFFRUGDQFH ZLWK WKH MDQXDO OQ UQLIRUP TUDIILF CRQWURO DHYLFHV.
V9. TKH GHYHORSHU VKDOO SURYLGH WKH VDOT LDQG DHYHORSPHQW OIILFH ZLWK D OLVW RI DOO PDWHULDO VRXUFHV SULRU WR WKH VWDUW RI
FRQVWUXFWLRQ. CRSLHV RI DOO LQYRLFHV IRU PDWHULDOV XWLOL]HG ZLWKLQ DQ\ GHGLFDWHG VWUHHW ULJKWRIZD\ PXVW EH SURYLGHG WR WKH
ORFDO VDOT LDQG DHYHORSPHQW OIILFH SULRU WR DFFHSWDQFH RI WKH ZRUN. UQLW DQG WRWDO SULFHV PD\ EH REVFXUHG.
V. AJJUHJDWH EDVH DQG VXEEDVH PDWHULDOV VKDOO EH SODFHG RQ VXEJUDGH E\ PHDQV RI D PHFKDQLFDO VSUHDGHU. DHQVLW\ ZLOO
EH GHWHUPLQHG XVLQJ WKH GHQVLW\ FRQWURO VWULS LQ DFFRUGDQFH ZLWK SHFWLRQ RI WKH VDOT RRDG DQG BULGJH
SSHFLILFDWLRQV DQG VTM. A FHUWLILHG FRPSDFWLRQ WHFKQLFLDQ VKDOO SHUIRUP WKHVH WHVWV. CHUWLILHG FRSLHV RI WHVW UHSRUWV
VKDOO EH VXEPLWWHG WR VDOT GDLO\ XQOHVV VSHFLILHG RWKHUZLVH. IQ DGGLWLRQ WR FKHFNLQJ VWRQH GHSWKV D VDOT
UHSUHVHQWDWLYH VKDOO EH QRWLILHG DQG JLYHQ WKH RSSRUWXQLW\ WR EH SUHVHQW GXULQJ WKH FRQVWUXFWLRQ DQG WHVWLQJ RI WKH GHQVLW\
FRQWURO VWULS.
V. AVSKDOW FRQFUHWH SDYHPHQWV VKDOO EH SODFHG LQ DFFRUGDQFH ZLWK SHFWLRQ RI WKH VDOT RRDG DQG BULGJH
SSHFLILFDWLRQV. DHQVLW\ VKDOO EH GHWHUPLQHG XVLQJ WKH GHQVLW\ FRQWURO VWULS DV VSHFLILHG LQ SHFWLRQ DQG VTM. A
FHUWLILHG FRPSDFWLRQ WHFKQLFLDQ VKDOO SHUIRUP WKHVH WHVWV. CHUWLILHG FRSLHV RI WHVW UHSRUWV VKDOO EH VXEPLWWHG WR VDOT
GDLO\ XQOHVV VSHFLILH RWKHUZLVH. A VDOT UHSUHVHQWDWLYH VKDOO EH QRWLILHG DQG JLYHQ WKH RSSRUWXQLW\ WR EH SUHVHQW GXULQJ
WKH FRQVWUXFWLRQ DQG WHVWLQJ RI WKH FRQWURO VWULS.
V. IQ DFFRUGDQFH ZLWK SHFWLRQ . WKH IRXQGDWLRQV IRU SLSH FXOYHUWV WKLUW\VL[ LQFKHV DQG ODUJHU VKDOO EH H[SORUHG
EHORZ WKH ERWWRP RI WKH H[FDYDWLRQ WR GHWHUPLQH WKH W\SH DQG FRQGLWLRQ RI WKH IRXQGDWLRQ. TKH FRQWUDFWRU VKDOO UHSRUW
ILQGLQJV RI IRXQGDWLRQ H[SORUDWLRQ WR WKH HQJLQHHU DQG VDOT IRU DSSURYDO SULRU WR SODFLQJ SLSH. FRXQGDWLRQ GHVLJQV VKDOO
FRPSO\ ZLWK VDOT RRDG DQG BULGJH SWDQGDUG PB. WKHUH VRIW \LHOGLQJ RU RWKHUZLVH XQVXLWDEOH IRXQGDWLRQ LV
HQFRXQWHUHG WKH IRXQGDWLRQ GHVLJQ DQG/RU QHHG IRU IRXQGDWLRQ VWDELOL]DWLRQ VKDOO EH GHWHUPLQHG E\ WKH HQJLQHHU DQG
DSSURYHG E\ VDOT.
V. VDOT SWDQGDUG GXDUGUDLO VKDOO EH LQVWDOOHG ZKHUH ZDUUDQWHG DQG/RU DV SURSRVHG RQ WKHVH SODQV LQ DFFRUGDQFH ZLWK
VDOT¶V LQVWDOODWLRQ FULWHULD. FLQDO DSSURYDO RI WKH JXDUGUDLO OD\RXW WR EH JLYHQ E\ VDOT DIWHU JUDGLQJ LV PRVWO\ FRPSOHWH.
V. ASSURYDO RI WKHVH SODQV VKDOO H[SLUH ILYH \HDUV IURP WKH GDWH RI WKH DSSURYDO OHWWHU.
V. VDOT SWDQGDUG CG CXUE RDPSV VKDOO EH LQVWDOOHG ZKHUH LQGLFDWHG RQ WKHVH SODQV DQG/RU DV VSHFLILHG E\ VDOT.
V. TKH IRXQGDWLRQV IRU DOO ER[ FXOYHUWV VKDOO EH LQYHVWLJDWHG E\ PHDQV RI H[SORUDWRU\ ERULQJV DGYDQFHG EHORZ SURSRVHG
IRXQGDWLRQ HOHYDWLRQ WR GHWHUPLQH WKH W\SH DQG FRQGLWLRQ RI WKH IRXQGDWLRQ. TKH FRQWUDFWRU VKDOO VXEPLW FRSLHV RI
ERUHKROH ORJV DQG UHSRUW ILQGLQJV RI IRXQGDWLRQ H[SORUDWLRQ WR WKH HQJLQHHU DQG VDOT IRU DSSURYDO SULRU WR FRQVWUXFWLQJ
ER[. FRXQGDWLRQ GHVLJQV VKDOO FRPSO\ ZLWK VDOT RRDG DQG BULGJH SWDQGDUG PB. CRQWUDU\ WR WKH SWDQGDUG ZKHUH
URFN LV HQFRXQWHUHG DQG FDVWLQSODFH ER[ LV SURSRVHG WKH WKLFNQHVV RI EHGGLQJ VKDOO EH VL[ LQFKHV. WKHUH VRIW
\LHOGLQJ RU RWKHUZLVH XQVXLWDEOH IRXQGDWLRQ LV HQFRXQWHUHG WKH IRXQGDWLRQ GHVLJQ DQG/RU QHHG IRU IRXQGDWLRQ
VWDELOL]DWLRQ VKDOO EH GHWHUPLQHG E\ WKH HQJLQHHU DQG DSSURYHG E\ VDOT.
.PHU WKH DSSURYHG // MLFKDHO G. PUHOLS IQF. PURSRVHG CRQWUDFWRU'V OIILFH CRPSOH[ CRPPRQZHDOWK
BXVLQHVV CHQWHU LRW PODQ RQ DHFHPEHU 999 WKH SODQQLQJ FRPPLVVLRQ DSSURYHG D ZDLYHU IRU WKH GULYHZD\
DOLJQPHQW UHTXLUHPHQW VHFWLRQ 9.A. RI WKH ]RQLQJ RUGLQDQFH VR WKDW WKH SURSRVHG RQHZD\ GULYHZD\
FLUFXODWLRQ SDWWHUQ PD\ EH XVHG.
.PDUNLQJ FDOFXODWLRQV SURYLGHG DUH SHU WKH DSSURYHG // MLFKDHO G. PUHOLS IQF. PURSRVHG CRQWUDFWRU'V
OIILFH CRPSOH[ CRPPRQZHDOWK BXVLQHVV CHQWHU LRW PODQ.
.RHFRUGHG PURIIHU SWDWHPHQW SHU IQVWUXPHQW 99.
. FUHGHULFN WDWHU¶V WDWHU DQG SHZHU SWDQGDUGV DQG SSHFLILFDWLRQV DUH DYDLODEOH DW ZZZ.IUHGHULFNZDWHU.FRP
. TKH FRQWUDFWRU VKDOO DGKHUH WR FUHGHULFN WDWHU VWDQGDUGV DQG VSHFLILFDWLRQV LQ HIIHFW DW WKH WLPH RI FRQVWUXFWLRQ.
. TKH FRQWUDFWRU VKDOO VFKHGXOH D SUHFRQVWUXFWLRQ PHHWLQJ ZLWK WKH FUHGHULFN WDWHU IQVSHFWRU SULRU WR FRPPHQFLQJ
LQVWDOODWLRQ RI DQ\ ZDWHU RU VHZHU IDFLOLWLHV. CRQWUDFWRU VKDOO DOVR DUUDQJH IRU LQVSHFWLRQ RI VDLG IDFLOLWLHV E\
FUHGHULFN WDWHU. OLO ZDWHU VHSDUDWRUV DQG/RU JUHDVH WUDSV PD\ EH UHTXLUHG E\ FUHGHULFN RU CODUNH CRXQW\ BXLOGLQJ
IQVSHFWLRQV. BRWK FUHGHULFN RU CODUNH CRXQW\ BXLOGLQJ IQVSHFWLRQV DQG FUHGHULFN WDWHU ZLOO LQVSHFW WKH LQVWDOODWLRQ
RI WKRVH IDFLOLWLHV. BRWK LQVSHFWLRQV VKDOO EH VFKHGXOHG E\ CRQWUDFWRU.
. TKH FRQWUDFWRU VKDOO FRQQHFW D QHZ VHZHU OLQH WR DQ H[LVWLQJ PDQKROH E\ FRUH GULOOLQJ WKH PDQKROH.
. A QHZ ZDWHU RU IRUFHG VHZHU PDLQ VKDOO EH FRQQHFWHG WR DQ H[LVWLQJ PDLQ E\ D FXWLQ WHH ZLWK DFFRPSDQ\LQJ YDOYHV.
. E[DFW ORFDWLRQV RI ZDWHU DQG VHZHU VHUYLFHV RQ QHZ OLQHV DUH WR EH FRRUGLQDWHG ZLWK FUHGHULFN WDWHU¶V LQVSHFWRU.
D. AGMXVW FUHGHULFN WDWHU IDFLOLWLHV WR JUDGH DV UHTXLUHG E\ WKH FUHGHULFN WDWHU IQVSHFWRU.
. FUHGHULFN WDWHU¶V PDLQWHQDQFH GLYLVLRQ VKDOO IXUQLVK DQG LQVWDOO DOO ZDWHU PHWHUV WKURXJK LQFK LQ VL]H.
IW LV WKH FRQWUDFWRU¶V UHVSRQVLELOLW\ WR KDYH WKH PHWHU ER[ DVVHPEO\ LQVWDOOHG FRUUHFWO\.
BHIRUH D SHUPDQHQW PHWHU LV LQVWDOOHG
D. TKH PHWHU ER[ ZLWK LWV IUDPH DQG FRYHU PXVW EH SURSHUO\ DOLJQHG ZLWK WKH \RNH EDU.
E. TKH IUDPH DQG FRYHU VKDOO EH VHW WR ILQDO JUDGH.
F. TKH GLVWDQFH EHWZHHQ WKH WRS RI WKH FRYHU DQG WKH \RNH EDU VKDOO EH EHWZHHQ DQG LQFKHV.
G. AOO FRPSRQHQWV RI WKH PHWHU ER[ DVVHPEO\ VKDOO EH LQ SURSHU ZRUNLQJ RUGHU.
. FRU VHUYLFHV WKDW FRQQHFW WR H[LVWLQJ OLQHV
D. FUHGHULFN WDWHU VKDOO IXUQLVK DQG LQVWDOO
L. DOO ǫ´[ô´ ô´ ´ ò´ DQG ´ ZDWHU VHUYLFHV
LL. DOO VHZHU VHUYLFHV.
E. TKH RZQHU/GHYHORSHU VKDOO
L. FRRUGLQDWH RU KDYH WKH FRQWUDFWRU FRRUGLQDWH WKH ORFDWLRQ RI WKH VHUYLFH ODWHUDO ZLWK
FUHGHULFN WDWHU¶V HQJLQHHULQJ DVVLVWDQW.
LL. VXEPLW DQ ASSOLFDWLRQ IRU SHUYLFH DQG SD\ WKH UHTXLUHG IHHV.
9. AOO ZDWHU VHUYLFH OLQHV PXVW KDYH D EDFNIORZ SUHYHQWLRQ DVVHPEO\ GRXEOH FKHFN YDOYH RU RP= DV UHTXLUHG. TKH
DVVHPEO\ PXVW PHHW ASSE VWDQGDUG QXPEHU RU .
. AOO ILUH OLQHV PXVW KDYH D EDFNIORZ SUHYHQWLRQ DVVHPEO\ GHWHFWRU GRXEOH FKHFN YDOYH RU RP= DV UHTXLUHG. TKH
DVVHPEO\ VKDOO PHHW ASSE VWDQGDUG QXPEHU RU . AQ\ SULYDWHO\ RZQHG ILUH OLQH LQWHULRU RU H[WHULRU VKDOO
DOVR KDYH D ILUH VHUYLFH PHWHU. TKLV DVVHPEO\ VKDOO EH LQVWDOOHG LPPHGLDWHO\ EHIRUH WKH EDFNIORZ SUHYHQWLRQ XQLW.
RDGLR UHDG UHPRWHV DUH UHTXLUHG.
. FUHGHULFN WDWHU VKDOO UHYLHZ WKH PHFKDQLFDO SODQV IRU GHVLJQ DQG PDWHULDO DSSURYDO RI D EXLOGLQJ¶V
D. GRPHVWLF ZDWHU PHWHU DQG LWV EDFNIORZ SUHYHQWLRQ GHYLFH DQG/RU LWV
E. FLUH VHUYLFH OLQH¶V ZDWHU PHWHU DQG EDFNIORZ SUHYHQWLRQ GHYLFH.
. DE4 PXVW DOVR DSSURYH VHZHU SXPS VWDWLRQV. FUHGHULFN WDWHU UHTXLUHV D FRS\ RI DE4¶V CHUWLILFDWH WR
OSHUDWH DQG D FRS\ RI WKH VWDWLRQ¶V DE4 DSSURYHG O M PDQXDO. TKHVH GRFXPHQWV PXVW EH UHFHLYHG
EHIRUH VXEVWDQWLDO FRPSOHWLRQ LV LVVXHG DQG ZDWHU PHWHUV UHOHDVHG.
OFWREHU
RHY. NR.DDWH
06/12/2026
151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA | ASHBURN, VA | MARTINSBURG, WVNOT TO SCALE
3REZONING BOUNDARY EXHIBIT & PROFFERSPLASTERS HVACBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VA04/30/2026
TTC
SP #18-26
9
2530MR
Rev. No.Date
06/12/2026
XXXXXXXXXXXXXXXXXXXX10
8
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSCOMMONWEALTH COURT
SPEED: 25 MPH; ROW: 50 FT; ROUTE 1167 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA | ASHBURN, VA | MARTINSBURG, WV1 20
4EXISTING CONDITIONSPLASTERS HVACBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VA04/30/2026
TTC
SP #18-26
9
2530MR
Rev. No.Date
01 06/11/2026
06/12/2026
XXXXXXXXXXXXXXXXXXXX108SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSPROP. DEMO AREA 4,085 SQFEET TO MEET 25% OPENSPACE REQUIREMENTEX. BUILDINGPROP. EDGE OF PAVEMENTProp 8" FilltrexxCompost Filter SockLCGLCGCOMMONWEALTH COURTSPEED: 25 MPH; ROW: 50 FT; ROUTE 1167PSLIMITS OF DISTURBANCE(7,693 SQ. FT.)151 Windy Hill Lane
Winchester, Virginia 22602
Telephone: (540) 662-4185
Fax: (540) 722-9528
www.greenwayeng.com
FND 1971
E N G I N E E R I N GSHEET OFDESIGNED BY:FILE NO.SCALE:DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIA
OFFICES IN: WINCHESTER, VA | ASHBURN, VA | MARTINSBURG, WV1" 20
5PAVEMENT DEMOLITION AND E&S PLAN
BACK CREEK MAGISTERIAL DISTRICT
FREDERICK COUNTY, VA04/30/2026TTCSP #18-2692530MRPLASTERS HVAC LEGENDPAVEMENT TO BE REMOVED ( 4,085 SF)NO. KEY SYMBOL DESCRIPTIONEROSION/SEDIMENT CONTROL LEGENDCOMPOST FILTER SOCKC-PCM-05CFSCFSLIMITS OF CLEARING& GRADINGLCGPSC-SSM-10PERMANENT SEEDINGPSCRITICAL AREA - EXISTING UNDERGROUND UTILITIES IN THEAREA (SANITARY SEWER AND GAS). CONTRACTOR TOCOORDINATE WITH UTILITY PROVIDERS AS NECESSARY.402001020SCALE: 1" 20
NOTES:1.POWER, COMMUNICATIONS AND GAS UTILITIES ARE SHOWN HERE FOR REFERENCEPURPOSES IN COORDINATION OF CONSTRUCTION. DESIGN OF THESE SYSTEMS ARE BYTHE RESPECTIVE UTILITY COMPANY PROVIDING THE SERVICE. IF ANY CONFLICTSBETWEEN THE CIVIL PLANS AND THE UTILITY COMPANY PLANS, THE ENGINEER MUST BENOTIFIED IMMEDIATELY TO DETERMINE THE BEST COURSE OF ACTION.2.UPON REMOVAL OF PAVEMENT, CONTRACTOR TO APPLY PERMANENT SEEDINGSTABILIZATION OF THE DISTURBED AREA. CONTRACTOR TO RETURN AREA TOAPPROXIMATE ORIGINAL CONTOURS AND MAINTAIN EXISTING DRAINAGE PATTERNS.Rev. No.Date0106/11/2606/12/2026
151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA | ASHBURN, VA | MARTINSBURG, WVEROSION AND SEDIMENT
CONTROL NARRATIVE
Description: The project will consist of the demolition of 4,085 square feet of existing pavement on the western
side of the property to meet minimum open space required for the B3 rezoning. Additionally, 15 parking spaces
will be delineated onto the existing pavement located in the rear of the property. No disturbance is proposed
with the pavement striping. The property has been recently rezoned to B3 and is located at 161 Commonwealth
Court, Winchester, Frederick County, Virginia. The total project area is 1.218 acres of which 0.177 acres will be
disturbed for construction.
Date of construction: Construction will begin following plan approval and will take approximately three (3)
months to complete.
Existing site conditions: The site is currently an occupied office complex with parking in the front and a loading
dock in the back.
Adjacent areas: The site is bounded by HP Hood (zoned M2) to the north and bounded by Commonwealth
drive to the south. West is bounded by a vacant lot (zoned B3) while a commercial property (zoned B3) bounds
the property to the east.
Offsite areas: No offsite areas will be impacted by this project.
Soils: The existing soil conditions were obtained from the NRCS Soils Survey. Refer to the soils map this sheet.
Critical areas: Contractor to maintain sheet flow for demolition of pavement area. No concentrated flow is
allowed. Existing utilities (water, sewer and gas) are located under the pavement area shown to be demolished.
Contract to coordinate with the respective utility providers as necessary. Caution should be taken to prevent
impacts to existing utilities.
Erosion And Sediment Control Measures: Unless otherwise indicated, all vegetative and structural erosion and
sediment control measures shall be constructed and maintained according to the minimum standards and
specifications of the Virginia Erosion and Sediment Control Handbook.
Structural Measures:
Phase I & II:
Install Filltrexx compost filter sock (C-PCM-05) as shown on the plans to intercept and detain small amounts of
sediment from disturbed areas during construction in order to prevent sediment from leaving the site.
Permanent seeding (C-SSM-10) shall be placed on all critical slopes (3:1 or greater) and as needed to stabilize
disturbed areas.
Vegetative Measures:
Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final
grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven (7) days
to denuded areas that may not be at final grade but will remain dormant for longer than fourteen (14) days.
Permanent soil stabilization shall be applied to all areas that are to be left dormant for more than one year.
Topsoil that has been stockpiled shall be surrounded with silt fence and protected by mulch and/or temporary
vegetation immediately after grading.
All earth berms, diversions and sediment trap embankments are to be machine-compacted, seeded and
mulched (hay mulch or straw) for temporary and/or permanent vegetative cover immediately after construction
Erosion control mats shall be installed over steep (3:1) cut and fills slope which have been brought to final
grade and seeded to protect from rill and gully erosion.
Management Strategies:
Construction shall be sequenced such that grading operations will begin and end as quickly as possible.
The site superintendent shall be responsible for the installation and maintenance of all erosion and
sediment control measures. Maintenance of these measures throughout the project is critical to the
effectiveness of the program.
After areas above controls have been stabilized, the controls shall be cleaned up and removed.
Electric power, telephone, storm, sanitary, water & gas supply trenches are to be compacted, seeded
and mulched within five (5) days after backfilling. No more than 500 feet are to be open at any one time.
All cut and fill slopes are to be seeded and mulched within five (5) days of completion of grading.
Drainage swales shall be stabilized with check dams until vegetation has been well established, at which
time the check dams shall be removed.
Devices listed above are considered minimum erosion and sediment controls. Additional control
measures may be necessary due to contractor phasing or other unforeseen conditions. It is the
contractor's responsibility to provide additional measures to those shown, as needed, in order to control
erosion and contain sediment on site. All measures shall be installed according to the standards and
specifications in the Virginia Erosion and Sediment Control Handbook.
Stormwater Management:
The existing site drainage patterns are remaining unchanged. Stormwater runoff is not being
concentrated with this plan and will continue as sheet flow. Additionally, the reduction of impervious area
will reduce the flow rate, as such, no stormwater management is proposed with this minor site plan.
Maintenance Program:
All control measures shall be inspected daily by the site superintendent or his representative and within
24 hours after any storm event greater than 0.5 inches of rain per 24-hour period. Any damaged
structural measures are to be repaired by the end of the day. Seeded areas shall be checked regularly
to ensure that a good stand of grass is maintained. All areas shall be fertilized and reseeded as needed
until grass is established.
Trapped sediment is to be removed as required to maintain 50% trap efficiency and disposed of by
spreading on site.
Inlet protection shall be checked regularly for sediment build-up. If the gravel outlet is clogged by
sediment, it shall be removed and cleaned or replaced immediately.
The contractor is responsible for keeping existing public roads in a clean, dust and mud free, condition at
all times.
Erosion and sediment control program:
1.Hold pre-construction meeting on site with inspector.
2.Install perimeter control device compost filter sock.
3.Demolition.
4.Start construction of loading dock enclosure.
5.Remove erosion and sediment control measures with the approval of the inspector.
Note: The Frederick County Public Works and Engineering Department retain the right to add and/or
modify these erosion and sediment control measures during the construction process, within
reason, to ensure adequate protection to the public and the environment.
Seeding schedule (soil stabilization):
1.All permanent seeding shall be in accordance with section 3.31 & 3.32 of the VESCH.
2.Spread topsoil at a minimum depth of four (4) inches.
3.Incorporate pulverized agricultural limestone into the topsoil at a rate of 92 lbs. per 1,000 square
feet (2 tons per acre).
4.Fertilize with 10-10-10 fertilizer at a rate of 23 lbs per 1,000 square feet (1,000 lbs per acre).
5.Seed all areas with a seed mix consisting of 67% Kentucky 31 Tall Fescue and 33% Red Top
Clover.
6.Mulch all seeded areas with straw mulch applied at a rate of 3,500 lbs per acre anchored with
cutback or emulsified asphalt applied at a rate of 200 gallons per acre.
Dust control:
1.Temporary seeding shall be applied to all disturbed areas subject to little or no construction traffic.
2.All haul roads and other heavy traffic routes shall be sprinkled with water until the surface is wet and
repeated as needed to control dust.
AS SHOWN
6E&S NARRATIVEPLASTERS HVACBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VA04/30/2026
TTC
SP #18-26
9
2530MR
MINIMUM CONSTRUCTION STANDARDS
A. An erosion and sediment control plan consistent with the following criteria, techniques,
and methods shall be submitted to the VESMP authority or VESCP authority for review
and approval:
1. Permanent or temporary soil stabilization shall be applied to denuded areas within
seven days after final grade is reached on any portion of the site. Temporary soil
stabilization shall be applied within seven days to denuded areas that may not be at final
grade but will remain dormant for longer than 14 days. Permanent stabilization shall be
applied to areas that are to be left dormant for more than one year.
2. During construction of the project, soil stockpiles and borrow areas shall be stabilized
or protected with sediment trapping measures. The applicant is responsible for the
temporary protection and permanent stabilization of all soil stockpiles on site as well as
borrow areas and soil intentionally transported from the project site.
3. A permanent vegetative cover shall be established on denuded areas not otherwise
permanently stabilized. Permanent vegetation shall not be considered established until a
ground cover is achieved that is uniform, is mature enough to survive, and will inhibit
erosion.
4. Sediment basins and traps, perimeter dikes, sediment barriers, and other measures
intended to trap sediment shall be constructed as a first step in any land-disturbing activity
and shall be made functional before upslope land disturbance takes place.
5. Stabilization measures shall be applied to earthen structures such as dams, dikes, and
diversions immediately after installation.
6. Sediment traps and sediment basins shall be designed and constructed based upon
the total drainage area to be served by the trap or basin.
a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of
drainage area and the trap shall only control drainage areas less than three acres.
b. Surface runoff from disturbed areas that is comprised of flow from drainage areas
greater than or equal to three acres shall be controlled by a sediment basin. The minimum
storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area.
The outfall system shall, at a minimum, maintain the structural integrity of the basin during
a 25-year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall
correspond to a bare earth condition or those conditions expected to exist while the
sediment basin is utilized.
7. Cut and fill slopes shall be designed and constructed in a manner that will minimize
erosion. Slopes that are found to be eroding excessively within one year of permanent
stabilization shall be provided with additional slope stabilizing measures until the problem
is corrected.
8. Concentrated runoff shall not flow down cut or fill slopes unless contained within an
adequate temporary or permanent channel, flume, or slope drain structure.
9. Whenever water seeps from a slope face, adequate drainage or other protection shall
be provided.
10. All storm sewer inlets that are made operable during construction shall be protected
so that sediment-laden water cannot enter the conveyance system without first being
filtered or otherwise treated to remove sediment.
11. Before newly constructed stormwater conveyance channels or pipes are made
operational, adequate outlet protection and any required temporary or permanent channel
lining shall be installed in both the conveyance channel and receiving channel.
12. When work in a live watercourse is performed, precautions shall be taken to minimize
encroachment, control sediment transport, and stabilize the work area to the greatest
extent possible during construction. Nonerodible material shall be used for the
construction of causeways and cofferdams. Earthen fill may be used for these structures if
armored by nonerodible cover materials.
13. When a live watercourse must be crossed by construction vehicles more than twice in
any six-month period, a temporary vehicular stream crossing constructed of nonerodible
material shall be provided.
14. All applicable federal, state, and local requirements pertaining to working in or
crossing live watercourses shall be met.
15. The bed and banks of a watercourse shall be stabilized immediately after work in the
watercourse is completed.
16. Underground utility lines shall be installed in accordance with the following standards
in addition to other applicable criteria:
a. No more than 500 linear feet of trench may be opened at one time.
b. Excavated material shall be placed on the uphill side of trenches.
c. Effluent from dewatering operations shall be filtered or passed through an approved
sediment trapping device, or both and discharged in a manner that does not adversely
affect flowing streams or off-site property.
d. Material used for backfilling trenches shall be properly compacted in order to minimize
erosion and promote stabilization.
e. Restabilization shall be accomplished in accordance with this chapter.
f. Applicable safety requirements shall be complied with.
17. Where construction vehicle access routes intersect paved or public roads, provisions
shall be made to minimize the transport of sediment by vehicular tracking onto the paved
surface. Where sediment is transported onto a paved or public road surface, the road
surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed
from the roads by shoveling or sweeping and transported to a sediment control disposal
area. Street washing shall be allowed only after sediment is removed in this manner. This
provision shall apply to individual development lots as well as to larger land-disturbing
activities.
18. All temporary erosion and sediment control measures shall be removed within 30 days
after final site stabilization or after the temporary measures are no longer needed, unless
otherwise authorized by the VESCP or VESMP authority. Trapped sediment and the
disturbed soil areas resulting from the disposition of temporary measures shall be
permanently stabilized to prevent further erosion and sedimentation.
19. Properties and waterways downstream from development sites shall be protected
from sediment deposition, erosion, and damage due to increases in volume, velocity, and
peak flow rate of stormwater runoff for the stated frequency storm of 24-hour duration in
accordance with the following standards and criteria. Stream restoration and relocation
projects that incorporate natural channel design concepts are not manmade channels and
shall be exempt from any flow rate capacity and velocity requirements for natural or
manmade channels:
a. Concentrated stormwater runoff leaving a development site shall be discharged directly
into an adequate natural or manmade receiving channel, pipe, or storm sewer system.
For those sites where runoff is discharged into a pipe or pipe system, downstream
stability analyses at the outfall of the pipe or pipe system shall be performed.
b. Adequacy of all channels and pipes shall be verified in the following manner:
(1) The applicant shall demonstrate that the total drainage area to the point of analysis
within the channel is 100 times greater than the contributing drainage area of the project
in question; or
(2) (a) Natural channels shall be analyzed by the use of a two-year storm to verify that
stormwater will not overtop channel banks nor cause erosion of channel bed or banks;
(b) All previously constructed manmade channels shall be analyzed by the use of a
10-year storm to verify that stormwater will not overtop the stormwater's banks and by the
use of a two-year storm to demonstrate that stormwater will not cause erosion of channel
bed or banks; and
(c) Pipes and storm sewer systems shall be analyzed by the use of a 10-year storm to
verify that stormwater will be contained within the pipe or system.
c. If existing natural receiving channels or previously constructed manmade channels or
pipes are not adequate, the applicant shall:
(1) Improve the channels to a condition where a 10-year storm will not overtop the banks
and a two-year storm will not cause erosion to the channel, the bed, or the banks;
(2) Improve the pipe or pipe system to a condition where the 10-year storm is contained
within the appurtenances;
(3) Develop a site design that will not cause the predevelopment peak runoff rate from a
two-year storm to increase when runoff outfalls into a natural channel or will not cause the
predevelopment peak runoff rate from a 10-year storm to increase when runoff outfalls
into a manmade channel; or
(4) Provide a combination of channel improvement, stormwater detention, or other
measures that is satisfactory to the VESCP or VESMP authority to prevent downstream
erosion.
d. The applicant shall provide evidence of permission to make the improvements.
e. All hydrologic analyses shall be based on the existing watershed characteristics and
the ultimate development condition of the subject project.
f. If the applicant chooses an option that includes stormwater detention, the applicant shall
obtain approval from the VESCP or VESMP authority for a plan for maintenance of the
detention facilities. The plan shall set forth the maintenance requirements of the facility
and the person responsible for performing the maintenance.
g. Outfall from a detention facility shall be discharged to a receiving channel, and energy
dissipators shall be placed at the outfall of all detention facilities as necessary to provide a
stabilized transition from the facility to the receiving channel.
h. All onsite channels must be verified to be adequate.
i. Increased volumes of sheet flows that may cause erosion or sedimentation on adjacent
property shall be diverted to a stable outlet, adequate channel, pipe, or pipe system or to
a detention facility.
j. In applying these stormwater management criteria, individual lots or parcels in a
residential, commercial, or industrial development shall not be considered to be separate
development projects. Instead, the development as a whole shall be considered to be a
single development project. Hydrologic parameters that reflect the ultimate development
condition shall be used in all engineering calculations.
k. All measures used to protect properties and waterways shall be employed in a manner
that minimizes impacts on the physical, chemical, and biological integrity of rivers,
streams, and other waters of the state.
l. Any plan approved prior to July 1, 2014, that provides for stormwater management that
addresses any flow rate capacity and velocity requirements for natural or manmade
channels shall satisfy the flow rate capacity and velocity requirements for natural or
manmade channels if the practices are designed to (i) detain the water quality volume and
to release it over 48 hours; (ii) detain and release over a 24-hour period the expected
rainfall resulting from the one year, 24-hour storm; and (iii) reduce the allowable peak flow
rate resulting from the 1.5-year, two-year, and 10-year 24-hour storms to a level that is
less than or equal to the peak flow rate from the site assuming the site was in a good
forested condition, achieved through multiplication of the forested peak flow rate by a
reduction factor that is equal to the runoff volume from the site when the site was in a
good forested condition divided by the runoff volume from the site in the site's proposed
condition, and shall be exempt from any flow rate capacity and velocity requirements for
natural or manmade channels as defined in any regulations promulgated pursuant to §
62.1-44.15:28 of the Code of Virginia (VESMA) or § 62.1-44.15:54 or 62.1-44.15:65 of the
Code of Virginia (ESCL).
m. For plans approved on and after July 1, 2014, the flow rate capacity and velocity
requirements of § 62.1-44.15:52 A of the Code of Virginia (ESCL) and this subdivision 19
shall be satisfied by compliance with water quantity requirements in the VESMA and
attendant regulations, unless such land-disturbing activities (i) are in accordance with
provisions for time limits on applicability of approved design criteria in 9VAC25-875-480 or
grandfathering in 9VAC25-875-490, in which case the flow rate capacity and velocity
requirements of § 62.1-44.15:52 A of the Code of Virginia (ESCL) shall apply; or (ii) are
exempt pursuant to § 62.1-44.15:34 G 2 of the Code of Virginia (VESMA).
n. Compliance with the water quantity minimum standards set out in 9VAC25-875-600
shall be deemed to satisfy the requirements of this subdivision 19.
B. All land-disturbing activities shall be conducted in a manner that is consistent with the
applicable requirements of subsection A of this section.
Rev. No.Date
06/12/2026
XXXXXXXXXXXXXXXXXXXX10
8
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSCOMMONWEALTH COURT
SPEED: 25 MPH; ROW: 50 FT; ROUTE 1167
10' TYP.15' BRL15' BRL
15' BRL
18' TYP.PROP. EDGE OF PAVEMENT151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA | ASHBURN, VA | MARTINSBURG, WV1 20'
7MINOR SITE PLANPLASTERS HVACBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VA04/30/2026
TTC
SP #18-26
9
2530MR
NOTES:
1.Parking spaces are to be painted onto existing pavement.
Rev. No.Date
01 06/11/2026
06/12/2026
XXXXXXXXXXXXXXXXXXX108SSSSSSSSSSSSSSSSSSSSSSSSSCOMMONWEALTH COURTSPEED: 25 MPH; ROW: 50 FT; ROUTE 1167151 Windy Hill Lane
Winchester, Virginia 22602
Telephone: (540) 662-4185
Fax: (540) 722-9528
www.greenwayeng.com
FND 1971
E N G I N E E R I N GSHEET OFDESIGNED BY:FILE NO.SCALE:DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIA
OFFICES IN: WINCHESTER, VA | ASHBURN, VA | MARTINSBURG, WV1" = 30'8LANDSCAPE PLAN
BACK CREEK MAGISTERIAL DISTRICT
FREDERICK COUNTY, VA04/30/2026TTCSP #18-2692530MRPLASTERS HVAC402001020SCALE: 1" = 20'Rev. No.Date0106/11/20263" EARTHSAUCEREXISTING SUB-BASEBACKFILL WITH SOIL MIX OF 3/4EXISTING SOIL & 1/4 ORGANIC MATTERREMOVE BURLAP FROMTOP 1/2 OF ROOT BALLSET TOP 1/8 OF ROOT BALL ABOVE FINISHED GRADEREMOVE PROBLEM, DISEASED ORWEAK BRANCHES ONLY. LEAVEPLANT'S NATURAL FORM INTACTSHRUB PLANTING DETAILNOT TO SCALE3" MULCH6" MIN12"MIN2. PERIMETER LANDSCAPING:8,426 SF OF IMPERVIOUS AREA1 TREE PER 2,000 SF OF IMPERVIOUS PAVEMENT UP TO 100,000 SF 8,426 SF x (1 TREE / 2,000 SF) = 5 TREES REQUIREDTOTAL TREES REQUIRED = 9TOTAL TREES PROVIDED = 131. INTERIOR LANDSCAPING:1 TREE PER 10 SPACES, (18 EXISTING SPACES + 15 PROPOSED SPACES = 33 SPACES) / 10= 4 TREES REQUIRED REQUIRED - 5.0% = 421 SF (INTERIOR ISLANDS AREA) / 8,426 SF (PARKING LOT AREA) = 0.050PROVIDED - 58.7% = 4,950 SF (INTERIOR ISLANDS AREA) / 8,426 SF (PARKING LOT AREA) = 0.587= PROPOSED INTERIOR ISLAND AREAPARKING LOT LANDSCAPE CALCULATIONSGENERAL CONDITIONS - COUNTY CODE COMPLIANT LANDSCAPE PLANSCOPE OF WORKTHE LANDSCAPE CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR AND EQUIPMENT TO COMPLETE ALLLANDSCAPE WORK AS SHOWN ON THE PLANS AND SPECIFICATIONS.NOTE: IF CONTRACTOR BIDS ACCORDING TO THE PLANT LIST, HE/SHE SHOULD THOROUGHLY CHECK THE PLANTLIST QUANTITIES WITH THE SYMBOLS DRAWN ON THE PLAN, TO BE SURE THERE ARE NO DISCREPANCIES. IFTHERE IS A DISCREPANCY BETWEEN THE DRAWING AND THE LIST ON THE PLANS, THE DRAWING TAKESPRECEDENCE.STANDARDSA. ALL PLANT MATERIAL WILL CONFORM TO THE CURRENT ISSUE OF THE AMERICAN STANDARD FOR NURSERYSTOCK PUBLISHED BY THE AMERICAN NURSERY & LANDSCAPE ASSOCIATION (ANLA).PLANT MATERIAL MUST BESELECTED FROM NURSERIES THAT HAVE BEEN INSPECTED AND CERTIFIED BY STATE PLANTINSPECTORS.COLLECTED MATERIAL MAY BE USED ONLY WHEN APPROVED BY OWNER'S REPRESENTATIVE.NOMENCLATURE WILL BE IN ACCORDANCE WITH HORTUS III BY L.H. BAILEY.B. BALLED AND BURLAPPED (B&B)1. BALLED AND BURLAPPED PLANTS SHALL BE DUG WITH FIRM ROOT BALLS FREE OF NOXIOUS WEEDS. THERESHOULD BE NO EXCESS SOIL ON TOP OF THE ROOTBALL OR AROUND THE TRUNK2. BALL SIZES SHALL BE IN ACCORDANCE WITH ANLA STANDARDS.3. CALIPER AND HEIGHT MEASUREMENT: IN SIZE GRADING B&B SINGLE TRUNK TREES, CALIPER SHALL TAKEPRECEDENCE OVER HEIGHT. CALIPER OF THE TRUNK SHALL BE TAKEN 6" ABOVE GROUND LEVEL (UP TO ANDINCLUDING 4" CALIPER SIZE) AND 12" ABOVE THE GROUND LEVEL FOR LARGER TREES. FOR MULTIPLE-TRUNKTREES, HEIGHT MEASUREMENT SHALL TAKE PRECEDENCE OVER CALIPER.C. CONTAINER - GROWN STOCK1. THE SIZE OF CONTAINER-GROWN SHRUBS IS MEASURED BY HEIGHT AND WIDTH OF THE PLANT.CONTAINER-GROWN TREES ARE MEASURED BY THE SAME STANDARDS LISTED IN B.3. ABOVE. THE ROOT SYSTEMOF CONTAINER-GROWN PLANTS SHALL BE WELL DEVELOPED AND WELL DISTRIBUTED THROUGH OUT THECONTAINER.2. ALL CONTAINER-GROWN TREES AND SHRUBS THAT HAVE CIRCLING (GIRDLING) AND MATTED ROOTS SHALL BETREATED IN THE FOLLOWING MANNER PRIOR TO PLANTING: SEPARATE THE ROOTS BY HAND, UNTANGLING SOCIRCLING ROOTS WILL NOT DAMAGE FUTURE OF THE PLANT. SEE PLANTING PROCEDURES FOR ALL CONTAINERGROWN TREES & SHRUBS IN THIS SECTION.3. ALL CONTAINER-GROWN PLANTS SHOULD BE GROUPED AND WATERED DAILY UNTIL THEY ARE PLANTED IN THELANDSCAPE, THE SOIL SHALL BE KEPT MOIST WITH THE EQUIVALENT OF ONE-INCH OF RAINFALL PER WEEK.A. PRUNING SHALL BE DONE BEFORE PLANTING OR DURING THE PLANTING OPERATION.B. ALL PLANT MATERIAL IN TRANSIT SHALL BE COVERED TO KEEP MATERIAL FROM DRYING OUT. THE COVERING SHALL COMPLY WITH THE STATE AND LOCAL LAWS PERTAINING TO THE TRANSPORT OF MATERIALS.C. TREES SHALL BE PLACED IN AN UPRIGHT POSITION WITH THE ROOT BALL COVERED BY MULCH AND KEPTMOIST. TREES AND SHRUBS SHOULD NOT BE LEFT ON SITE UNPLANTED FOR MORE THAN 24-HOURS WITHOUT ADEQUATE WATER TO INSURE ROOT SURVIVAL.SUBSTITUTIONS: PRE-BIDIT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO MAKE EVERY REASONABLE EFFORT TO FIND THEPLANTS SPECIFIED BY THE LANDSCAPE ARCHITECT. THE LANDSCAPE CONTRACTOR MAY OFFER SUBSTITUTIONSTO THE LANDSCAPE ARCHITECT FOR HIS/HER CONSIDERATION. THE LANDSCAPE CONTRACTOR WILL NOTIFY THELANDSCAPE ARCHITECT IF THERE ARE KNOWN DISEASES OR INSECT RESISTANT SPECIES THAT CAN BESUBSTITUTED FOR A SELECTED PEST-PRONE PLANT. THE CONTRACTOR SHALL SUBMIT A BASE BID AS PER PLANPLUS PRICE CLARIFICATIONS FOR ALL RECOMMENDED SUBSTITUTIONS.SUBSTITUTIONS: POST-BIDIT IS THE INTENT TO ELIMINATE POST-BID SUBSTITUTIONS. HOWEVER, IN THE EVENT THAT THE CONTRACTMATERIAL HAS BECOME UNAVAILABLE, AN APPROPRIATE SUBSTITUTION MUST BE APPROVED BY THE OWNER'SREPRESENTATIVE.UTILITIES AND UNDERGROUND FEATURESTHE LANDSCAPE CONTRACTOR SHALL NOTIFY UTILITY COMPANIES AND/OR THE GENERAL CONTRACTOR INADVANCE OF CONSTRUCTION TO LOCATE UTILITIES.TREES AND/OR SHRUBS SHALL NOT BE PLACED WITHIN FREDERICK WATER EASEMENTSIF THERE IS A CONFLICT WITH UTILITIES AND THE PLANTING, THE LANDSCAPE ARCHITECT / DESIGNER SHALL BERESPONSIBLE FOR RELOCATING PLANTS PRIOR TO THE PLANTING PROCESS. ANY COST DUE TO RELOCATINGAFTER PLANTING SHALL BE BORNE BY THE OWNER. IF PLANTS ARE TO BE INSTALLED IN AREAS THAT SHOWOBVIOUS POOR DRAINAGE, AND THE PLANTS ARE INAPPROPRIATE FOR THAT CONDITION, THE LANDSCAPECONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT AND OWNER. IF THEY DEEM NECESSARY, THE PLANTSSHALL BE RELOCATED, THE CONTRACT SHALL BE ADJUSTED TO ALLOW FOR DRAINAGE CORRECTION AT ANEGOTIATED COST, OR THE PLANT SELECTION MODIFIED BY THE LANDSCAPE ARCHITECT / DESIGNER TOACCOMMODATE THE POOR DRAINAGE.WARRANTYTHE STANDARD WARRANTY IS FOR ONE (1) YEAR PERIOD, EXCLUDING BULBS, SOD AND ANNUALS, COMMENCINGON THE DATE OF INITIAL ACCEPTANCE. ALL PLANTS SHALL BE ALIVE AND IN SATISFACTORY GROWTH AT THE ENDOF THE GUARANTEE PERIOD. ANY MATERIAL THAT IS 25% DEAD OR MORE SHALL BE CONSIDERED DEAD ANDMUST BE REPLACED AT NO CHARGE. A TREE SHALL BE CONSIDERED DEAD WHEN THE MAIN LEADER HAS DIEDBACK, OR 25% OF THE CROWN IS DEAD. REPLACEMENTS SHALL BE MADE DURING THE NEXT PLANTING PERIOD.REPLACEMENTS SHALL BE OF THE SAME TYPE, SIZE AND QUALITY AS ORIGINAL SPECIES UNLESS OTHERWISENEGOTIATED.INSPECTION1. PLANTS MAY BE SUBJECT TO INSPECTION AND APPROVAL BY THE OWNER OR OWNER'S REPRESENTATIVE ATTHE PLACE OF GROWTH OR HOLDING YARD FOR CONFORMITY TO SPECIFICATION REQUIREMENTS AS TOQUALITY, SIZE AND VARIETY.2. PLANTS DAMAGED IN HANDLING OR TRANSPORTATION CAN BE REJECTED BY THE OWNER OR OWNER'SREPRESENTATIVE.3. STATE NURSERY INSPECTION CERTIFICATES SHALL BE FURNISHED TO THE LANDSCAPE ARCHITECT UPONREQUEST.NOTES:1.ALL PLANTINGS SHALL CONFORM WITH §165-802.05 AND §165-802.06 OF THE FREDERICKCOUNTY ZONING ORDINANCE (PLANT SELECTION, PLANTING PROCEDURE, ANDMAINTENANCE)2.ANY PLANT SUBSTITUTIONS MUST BE APPROVED IN WRITING BY THE FREDERICK COUNTYPLANNING DEPARTMENT.3.TREE SIZE ON PLAN VIEW IS TO DIFFERENTIATE BETWEEN INTERIOR AND PERIMETERLANDSCAPE TREES. SIZES ARE AS SHOWN IN PLANT SCHEDULE.4.NO TREES OR SHRUBS SHALL BE PLACED ON FREDERICK WATER EASEMENTS.5.ALL PLANTINGS SHALL BE PLANTED WITH APPROPRIATE SPACING/LOCATION PER§165-802.06 TABLE VIII-4 OF THE FREDERICK COUNTY ZONING ORDINANCE.06/12/2026
COMMONWEALTH COURT
SPEED: 25 MPH; ROW: 50 FT; ROUTE 1167
SIGN TYPE "C"
EX. BUILDING
SIGN TYPE "A"
SIGN TYPE "D"
SIGN TYPE "A"
SIGN TYPE "C"
SIGN TYPE "A"
SIGN TYPE "A"
SIGN TYPE "C"
SIGN TYPE "D"
SIGN TYPE
MODIFIED "D"
SIGN TYPE "D"
PROP BOLLARD
APPROX. LOC. EX.
FIRE HYDRANT
APPROX. LOC. EX.
FIRE HYDRANT
5.4'40.0'
PROP. STABILIZED
GRASS PAVEMENT
SECTION (SEE DETAIL
THIS SHEET)
SIGN TYPE "C"
APPROX. LOC. EX.
FIRE HYDRANT 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA | ASHBURN, VA | MARTINSBURG, WV402001020
SCALE: 1" 20'
1" 20'
9LIFE SAFETY PLANRev. No.Date
01 06/11/2026PLASTERS HVACBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VA04/30/2026
TTC
SP #18-26
9
2530MR
THIS VIEW FOR FIRE LANE MARKINGS & SIGNAGE ONLY
PAVEMENT SECTION
N.T.S.
12" 50 50 MIX #57 AGGREGATE AND
TOP SOIL COMPACTED IN PLACE
3.0" TOP SOIL
COMPACTED SUBGRADE (COMPACTED TO 95%
DENSITY AT OPTIMUM MOISTURE CONTENT
VDOT VTM-1 METHOD)
FIRE LANE - STABILIZED GRASS
NOTE:
PAVEMENT DESIGN BASED ON A SUBGRADE CBR DESIGN VALUE OF . THE
CONTRACTOR SHALL OBTAIN A CBR TEST OF THE COMPACTED SUBGRADE AND
SUBMIT FOR DETERMINATION OF THE REQUIRED PAVEMENT SECTION PRIOR TO
PLACEMENT OF ANY PORTION OF THE PAVEMENT SECTION.
5
06/12/2026