HomeMy WebLinkAbout14-26 Volvo Dealership - Approved Site PlanVOLVO DEALERSHIP OUTDOOR STORAGE SITE PLAN (SP #14-26)
FREDERICK COUNTY, VIRGINIA
LOCATION MAP:
PROJECT INFORMATION:SHEET INDEX:
PROJECT NOTES:
SCALE: 1" = 1000'
SITEVA STATEGRID NORTHCURRENT OWNER:
REFERENCE:
USE DESCRIPTION:
ACREAGE:
ZONING:
PHYSICAL ADDRESS:
DISTURBED AREA:
FLOODPLAIN:
LAND GROWTH, LLC
TM 75-3-21
BACK CREEK MAGISTERIAL DISTRICT
PREVIOUS APPROVALS: SP #13-05, SP #03-12
AUTO SALES
6.77 ACRES
B2
4015 VALLEY PIKE, WINCHESTER, VA 22602
2.03 ACRES
OUTSIDE 100 YEAR FLOODPLAIN BASED ON FIRM MAP PANEL 51069C0330E, DATED
JANUARY 29, 2021
PROJECT CONTACTS:
OWNER/DEVELOPER:
ADDRESS-
PHONE NUMBER-
E-MAIL-
CONTACT-
CONTRACTOR:
ADDRESS-
PHONE NUMBER-
E-MAIL-
CONTACT-
ARCHITECT:
ADDRESS-
PHONE NUMBER-
E-MAIL-
CONTACT-
ENGINEER (CIVIL):
ADDRESS-
PHONE NUMBER-
E-MAIL-
CONTACT-
LAND GROWTH, LLC
8110 E. INDEPENDENCE BLVD.
CHARLOTTE, NC 28227
(240) 674-7372
JON@DOGWOODAUTO.COM
JON ALCORN
KEE CONSTRUCTION SERVICES, INC.
420 W. JUBAL EARLY DRIVE, SUITE 100
WINCHESTER, VA 22601
(540) 723-0585
DMCKEE@KEECONSTRUCTION.COM
DAN MCKEE
DICE ENGINEERING, PLC
101 SHELBY CT.
WINCHESTER, VA 22602
(540) 974-5157
DDUNLAP@DICE-ENG.COM
DENNIE DUNLAP
RESPONSIBLE LAND DISTURBER
NAME:
CONTACT INFO:
CERTIFICATION #:
EXP. DATE:
THE RESPONSIBLE LAND DISTURBER IS THE PARTY RESPONSIBLE
FOR CARRYING OUT THE LAND DISTURBING ACTIVITY AS SET
FORTH IN THE PLANS.
ELECTRIC COMPANY:
ADDRESS-
PHONE NUMBER-
CONTACT-
WATER PROVIDER:
ADDRESS-
PHONE NUMBER-
CONTACT-
SEWER PROVIDER:
ADDRESS-
PHONE NUMBER-
CONTACT-
GAS COMPANY:
ADDRESS-
PHONE NUMBER-
CONTACT-
PHONE COMPANY:
ADDRESS-
PHONE NUMBER-
CONTACT-
SHENANDOAH VALLEY ELECTRIC CO-OP
3463 VALLEY PIKE
WINCHESTER, VA 22602
(540) 450-0111
FREDERICK WATER
315 TASKER ROAD
STEPHENS CITY, VA 22655
(540) 868-1061
FREDERICK WATER
315 TASKER ROAD
STEPHENS CITY, VA 22655
(540) 868-1061
WASHINGTON GAS
350 HILLANDALE LANE
WINCHESTER, VA 22602
(540) 869-1111
VERIZON
404 HILLANDALE LANE
WINCHESTER, VA 22602
(540) 665-3153 CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYCOVER SHEETJOB NO.: 25-14
C-01C-01.DWGDDDN/ADDDDESCRIPTION04-27-2026 03-16-2026FREDERICK COUNTY
SP #14-26VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD
CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYGENERAL NOTESJOB NO.: 25-14
C-02C-02.DWGDDDN/ADDDDESCRIPTION03-16-202604-27-2026
FREDERICK COUNTY
SP #14-26VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD
CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYEXISTING CONDITIONSJOB NO.: 25-14
C-03C-03.DWGDDD1" = 40'DDDDESCRIPTION03-16-20261 inch = ft.
( IN FEET )
GRAPHIC SCALE
40 VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA04-27-2026
FREDERICK COUNTY
SP #14-26 1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD
733
736
736
733
732
732
731
733 735736736733735
735
732
731
733735
735735
735
735
736735
735
RR
RR
ST #1
ST #2
CE
TEMPORARY
TOPSOIL
STOCKPILE
OP SFSFSFSF
SF
SF
SF
SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF
SFSFSFSFSFSF
SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFS
F
SF
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
TS SR
TS SR736 DC
SF
SF
SF
CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYINITIAL E&SC PLANJOB NO.: 25-14
C-04C-04.DWGDDD1" = 20'DDDDESCRIPTION03-16-20261 inch = ft.
( IN FEET )
GRAPHIC SCALE
20 VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA04-27-2026
FREDERICK COUNTY
SP #14-26NOTE:
1.LIMITS OF DISTURBANCE SHALL BE AS INDICATED.
THE ESTIMATED DISTURBED AREA FOR THIS PROJECT
IS 2.03 ACRES.
DRAINAGE AREA TO ST #1 = 0.46 AC.
- LIMITS OF DISTURBANCE
DRAINAGE AREA TO ST #2 = 1.41 AC.
TOP OF EMBANKMENT
= 735.00 (8' WIDE)
TOP OF EMBANKMENT
= 736.00 (8' WIDE)
DRAINAGE DIVIDE TO ST
(TYP.)
OUTLET PROTECTION
D50 = 6"
La = 8'
W = 10'
REROUTE EX. STORM
SEWER OUTFALL AROUND
PROPOSED ST #1
(SEE SHEET C-05)1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD
CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYSITE PLANJOB NO.: 25-14
C-05C-05.DWGDDD1" = 20'DDDDESCRIPTION03-16-20261 inch = ft.
( IN FEET )
GRAPHIC SCALE
20 VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA04-27-2026
FREDERICK COUNTY
SP #14-26
PROPOSED CONC. WEIR
OUTLET FOR SWMB #1
(SEE SHEET C-12)
PROPOSED STONE-SURFACED
OUTDOOR STORAGE AREA (60,680 SF)
PROPOSED CONC. WEIR
OUTLET FOR SWMB #2
(SEE SHEET C-12)
1
2
3
4
# DENOTES STORM STRUCTURE ID #
REROUTE EX. STORM
SEWER OUTFALL AROUND
PROPOSED SWMB #1
(SEE PROFILE, SHEET C-12)
EDGE OF STONE (TYP.)1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDDFREDERICK WATER GENERAL NOTES:
1.VALVES, MANHOLES, ARV'S, AND OTHER FREDERICK WATER
SURFACE FEATURES SHALL NOT BE PLACED IN CURB AND
GUTTER, NOR SLOPED PORTION OF HANDICAP RAMPS.
CONTRACTOR SHALL COORDINATE LOCATIONS WITH THE
FREDERICK WATER INSPECTOR.
2.IRRIGATION LINES AND DEVICES, LIGHT POLES,
TRANSFORMERS, JUNCTION BOXES, PEDESTALS, OTHER
OBSTACLES AND ALL DRY UTILITIES SHALL NOT BE PLACED IN
FREDERICK WATER EASEMENTS. PERPENDICULAR
IRRIGATION LINES AND DRY UTILITY CROSSINGS ARE
PERMITTED WITH 18" MINIMUM VERTICAL SEPARATION.
3.RETAINING WALLS AND THEIR TIE-BACKS SUCH AS GEOGRID
OR OTHER SUPPORTS SHALL NOT BE PLACED IN FREDERICK
WATER EASEMENTS.
4.CONTRACTOR SHALL:
A.COORDINATE A MEETING WITH THE FREDERICK WATER
INSPECTOR AT LEAST SEVEN (7) WORKING DAYS PRIOR TO
GROUND-DISTURBING ACTIVITIES.
B.EXERCISE EXTREME CAUTION WHILE TRAVELING AND
WORKING OVER THE EXISTING FREDERICK WATER
FACILITIES.
C.ADJUST ALL FREDERICK WATER FACILITIES TO FINISHED
GRADE AS NECESSARY.
D.PERFORM ALL WORK PER FREDERICK WATER INSPECTOR'S
REQUIREMENTS.
733
736
736
733
732
732
731
733
736
737
738
738
737
737
735
735
735
735
735
735
736
738
RR
RR
OPSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF
SFSFSFSFSFSF
SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFS
F
SF
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
PS SR
PS SR
DC
TO
TO CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYGRADING AND FINAL E&SC PLANJOB NO.: 25-14
C-06C-06.DWGDDD1" = 20'DDDDESCRIPTION03-16-20261 inch = ft.
( IN FEET )
GRAPHIC SCALE
20 VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA04-27-2026
FREDERICK COUNTY
SP #14-26NOTE:
1.LIMITS OF DISTURBANCE SHALL BE AS INDICATED.
THE ESTIMATED DISTURBED AREA FOR THIS PROJECT
IS 2.03 ACRES.
TOP OF EMBANKMENT
= 735.00 (8' WIDE)
TOP OF EMBANKMENT
= 736.00 (8' WIDE)
OUTLET PROTECTION
D50 = 6"
La = 8'
W = 10'
- LIMITS OF DISTURBANCE
SWMB #1
SWMB #2
739.00 738.60
738.50
737.00
736.95
736.50
736.50
737.00
735.50
735.50
735.80
738.90
1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD
CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYPRE-DEVELOPED SWM PLANJOB NO.: 25-14
C-07C-07.DWGDDD1" = 20'DDDDESCRIPTION03-16-20261 inch = ft.
( IN FEET )
GRAPHIC SCALE
20 VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA04-27-2026
FREDERICK COUNTY
SP #14-26
DRAINAGE DIVIDE
FLOW PATH
IMPERVIOUS AREA
WOODS
TURF
LEGEND:
A
B
C
ANALYSIS PT. FOR DA 'A'
RUNOFF FROM THE EXISTING
SITE BEYOND THE PROJECT
LIMITS AS SHOWN IS COLLECTED
VIA ON-SITE STORM SEWER
PRE-DEV. DA 'A'
AREA = 2.84 AC.
CN = 74
Tc = 5 MIN.
Q1 = 3.72 CFS
Q2 = 5.36 CFS
Q10 = 10.21 CFS
Q25 = 13.70 CFS
Q100 = 19.95 CFS
SHALLOW CONC. FLOW
(185' @ 4.3%)
SHEET FLOW
(100' @ 2.0%)1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD
733
736
736
733
732
732
731
733
736
737
738
738
737
737
735
735
735
735
735
735
736
738
CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYPOST-DEVELOPED SWM PLANJOB NO.: 25-14
C-08C-08.DWGDDD1" = 20'DDDDESCRIPTION03-16-20261 inch = ft.
( IN FEET )
GRAPHIC SCALE
20 VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA04-27-2026
FREDERICK COUNTY
SP #14-26
A
B
C
RUNOFF FROM THE EXISTING
SITE BEYOND THE PROJECT
LIMITS AS SHOWN IS COLLECTED
VIA ON-SITE STORM SEWER
DRAINAGE DIVIDE
FLOW PATH
LIMITS OF DISTURBANCE
IMPERVIOUS AREA
WOODS
TURF
LEGEND:
POST-DEV. BYPASS
AREA = 0.51 AC.
CN = 80
Tc = 5 MIN.
Q1 = 0.71 CFS
Q2 = 1.01 CFS
Q10 = 1.90 CFS
Q25 = 2.53 CFS
Q100 = 3.66 CFS
POST-DEV.
(ROUTING FROM SWMB #1)
Q1 = 0.28 CFS
Q2 = 0.40 CFS
Q10 = 2.66 CFS
Q25 = 4.07 CFS
Q100 = 5.98 CFS
POST-DEV.
(ROUTING FROM SWMB #2)
Q1 = 0.30 CFS
Q2 = 0.33 CFS
Q10 = 2.72 CFS
Q25 = 5.86 CFS
Q100 = 10.80 CFS
POST-DEV. (TOTAL
DISCHARGE FROM SITE)
Q1 = 1.24 CFS
Q2 = 1.59 CFS
Q10 = 6.14 CFS
Q25 = 11.66 CFS
Q100 = 19.67 CFS
SWMB #1
SWMB #2
POST-DEV. TO SWMB #2
AREA = 1.58 AC.
CN = 93
Tc = 5 MIN.
Q1 = 4.34 CFS
Q2 = 5.45 CFS
Q10 = 8.44 CFS
Q25 = 10.41 CFS
Q100 = 13.83 CFS
POST-DEV. TO SWMB #1
AREA = 0.75 AC.
CN = 95
Tc = 5 MIN.
Q1 = 2.22 CFS
Q2 = 2.74 CFS
Q10 = 4.14 CFS
Q25 = 5.07 CFS
Q100 = 6.67 CFS
SHEET FLOW
(100' @ 2.0%)
SHALLOW CONC. FLOW
(185' @ 4.3%)1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD
EROSION CONTROL NOTES:CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYE&SC NOTESJOB NO.: 25-14
C-09C-09.DWGDDDN/ADDD1.THE CONTRACTOR SHALL ARRANGE FOR A PRE-CONSTRUCTION
CONFERENCE WITH THE FREDERICK COUNTY EROSION AND
SEDIMENT PROGRAM ADMINISTRATOR 48 HOURS PRIOR TO
BEGINNING WORK.
2.ALL EROSION CONTROL DEVICES AS SHOWN OR AS REQUIRED ARE TO
BE CONSTRUCTED TO STANDARDS AND SPECIFICATIONS OF THE
VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (LATEST
EDITION) AND ARE TO BE IN PLACE PRIOR TO ALL CONSTRUCTION.
3.THIS PLAN IS NOT COMPLETE WITHOUT THE APPROVED NARRATIVE.
4.EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED
CONTINUOUSLY, RELOCATED WHEN AND AS NECESSARY AND SHALL
BE CHECKED AFTER EVERY RAINFALL. SEEDED AREAS SHALL BE
CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED,
RESEEDED AND MULCHED AS NECESSARY TO OBTAIN A DENSE
STAND OF GRASS.
5.ALL DISTURBED AREAS NOT PAVED OR BUILT UPON ARE TO BE
FERTILIZED, SEEDED, AND MULCHED BY THE CONTRACTOR IN
ACCORDANCE WITH THE VIRGINIA STORMWATER MANAGEMENT
HANDBOOK (LATEST VERSION).
6.ALL DRAIN INLETS SHALL BE PROTECTED FROM SILTATION.
INEFFECTIVE PROTECTION DEVICES SHALL BE IMMEDIATELY
REPLACED AND THE INLET CLEANED. FLUSHING IS NOT AN
ACCEPTABLE METHOD OF CLEANING.
7.GRADE AREAS ADJACENT TO BUILDING TO ACHIEVE DRAINAGE AWAY
FROM THE STRUCTURE AND TO PREVENT PONDING IN SWALES.
8.PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED
TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS
REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL
STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED
AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN
DORMANT (UNDISTURBED) FOR LONGER THAN 21 DAYS.
9.DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES SHALL
BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING
MEASURES.
10.VEGETATIVE STABILIZATION SHALL BE UNIFORM AND MATURE
ENOUGH TO SURVIVE AND ADEQUATE TO INHIBIT EROSION.
11.SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT
BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT
SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND- DISTURBING
ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND
DISTURBANCE TAKES PLACE.
12.STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN
STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY
AFTER INSTALLATION.
13.UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE
WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER
APPLICABLE CRITERIA:
A.NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE
TIME.
B.EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF
TRENCHES.
C.EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR
PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR
BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY
AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY.
D.MATERIAL USED FOR BACK FILLING TRENCHES SHALL BE PROPERLY
COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE
STABILIZATION.
E.RESTABILIZATION SHALL BE ACCOMPANIED IN ACCORDANCE WITH
THESE REGULATIONS.
F.APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH.
14.WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED
PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE
TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE
PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A
PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY
AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE
ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A
SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE
ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER.
15.ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES
SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION
OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED,
UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM
ADMINISTRATOR. TRAPPED SEDIMENT AND THE DISTURBED SOIL
AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY
MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT
FURTHER EROSION AND SEDIMENTATION.
16.ALL DISTURBED AREAS NOT PAVED OR BUILT UPON SHALL BE TOP
SEEDED, MULCHED AND FERTILIZED. PERFORM PERMANENT TOP
SOILING, SEEDING, LANDSCAPING, FERTILIZING, AND MULCHING AS
SOON AFTER FINISH GRADING AS POSSIBLE. SEEDING SHALL COMPLY
WITH THE FOLLOWING:
A.TOPSOIL - 4 INCH MINIMUM FOR PERMANENT TURF
B.FERTILIZER - 450 POUNDS PER ACRES OF 10-20-10 FERTILIZER OR
EQUIVALENT POUNDAGE OF DIFFERENT ANALYSIS. WORK INTO SOIL
PRIOR TO SEEDING.
C.LIME (PERMANENT SEEDING) - AGRICULTURAL LIME SPREAD AT RATE
OF 2 TONS/ACRE. WORK INTO SOIL PRIOR TO SEEDING.
D.MULCH-CHOPPED STRAW AT RATE OF 2 TON PER ACRE AND TACKED
IN PLACE. HYDRO-MULCH AT RATE OF 30 BALES PER ACRE.DESCRIPTION03-16-202604-27-2026
FREDERICK COUNTY
SP #14-26VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD
CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYE&SC DETAILSJOB NO.: 25-14
C-10C-10.DWGDDDN/ADDDDESCRIPTION03-16-202604-27-2026
FREDERICK COUNTY
SP #14-26VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD
CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYE&SC DETAILSJOB NO.: 25-14
C-11C-11.DWGDDDN/ADDDDESCRIPTION03-16-202604-27-2026
FREDERICK COUNTY
SP #14-26VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD
725
730
735
740
745
750
755
725
730
735
740
745
750
755
10+00 11+00 12+00STA. 10+00.00 -- STR #1ADS FLARED END SECTIONINV. = 732.78 (15")STA. 10+40.00 -- STR #224" NYLOPLAST BASINW/ SOLID TOPTOP = 735.55INV. IN = 733.28 (15")INV. OUT = 733.18 (15")STA. 10+98.16 -- STR #324" NYLOPLAST BASINW/ SOLID TOPTOP = 736.40INV. IN = 733.96 (15")INV. OUT = 733.86 (15")STA. 11+02.16 -- STR #4COUPLER & ADAPTERFOR RCP TO HDPE(SEE DETAIL THIS SHEET)INV. = 734.00 (15")58.16 LF - 15"
HDPE @ 1.00%
PROPOSED
GRADE
HGL (10-YR)
40.00 LF - 15"
HDPE @ 1.00%
4.00 LF - 15"
HDPE @ 1.00%CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYSWM NOTES & CONSTRUCTION DETAILSJOB NO.: 25-14
C-12C-12.DWGDDDN/ADDDDESCRIPTION03-16-202604-27-2026
STORMWATER MANAGEMENT BASIN NOTES:
1. ALL STORMWATER MANAGEMENT POND CONSTRUCTION SHALL BE IN STRICT COMPLIANCE
WITH ALL APPLICABLE FREDERICK COUNTY AND THE U.S. DEPARTMENT OF AGRICULTURE SOIL
CONSERVATION SERVICE STANDARDS AND SPECIFICATIONS
2. MATERIAL. SITE AND STORMWATER MANAGEMENT BASIN FILL MATERIAL SHALL BE TAKEN
FROM APPROVED DESIGNATED BORROW AREAS. IT SHALL BE FREE OF ROOTS, STUMPS,
WOOD, RUBBISH, STONES WITH DIAMETERS GREATER THAN 6 INCHES, AND FROZEN OR
OTHER OBJECTIONABLE MATERIALS.
3. COMPACTION. BACKFILL SHALL BE SPREAD IN HORIZONTAL LIFTS WHICH DO NOT EXCEED 4
INCHES AND COMPACTED. THE MOVEMENT OF THE HAULING AND SPREADING EQUIPMENT
OVER THE FILL SHALL BE CONTROLLED SO THAT THE ENTIRE SURFACE OF EACH LIFT SHALL
BE TRAVERSED BY NOT LESS THAN ONE TREAD TRACK OF HEAVY EQUIPMENT OR
COMPACTION SHALL BE ACHIEVED BY A MINIMUM OF 4 COMPLETE PASSES OF A
SHEEPSFOOT, RUBBER-TIRED OR VIBRATORY ROLLER. FILL MATERIAL SHALL CONTAIN
SUFFICIENT MOISTURE SUCH THAT THE REQUIRED DEGREE OF COMPACTION WILL BE
OBTAINED WITH THE EQUIPMENT USED. THE FILL MATERIAL SHALL CONTAIN SUFFICIENT
MOISTURE SO THAT IF FORMED INTO A BALL IT WILL NOT CRUMBLE, YET NOT SO WET THAT
WATER CAN BE SQUEEZED OUT. THE MINIMUM REQUIRED DENSITY OF THE COMPACTED
BACKFILL SHALL NOT BE LESS THAN 95% OF MAXIMUM DRY DENSITY WITH A MOISTURE
CONTENT WITHIN 2% OF THE OPTIMUM. EACH LAYER OF FILL SHALL BE COMPACTED AS
NECESSARY TO OBTAIN THAT DENSITY, AND IS TO BE CERTIFIED BY THE ENGINEER AT THE
TIME OF CONSTRUCTION.
4. VEGETATION . NO TREES OR SHRUBS SHALL BE PLANTED ON ANY EMBANKMENT OF THE
STORMWATER MANAGEMENT BASINS.
SWM MAINTENANCE SCHEDULE
1. POST CONSTRUCTION STORM-WATER MANAGEMENT:
THE FOLLOWING CONTROL MEASURES SHALL BE IMPLEMENTED TO REDUCE POLLUTANTS IN
STORM-WATER DISCHARGE AFTER THE HEAVY SITE CIVIL CONSTRUCTION PHASES HAVE BEEN
COMPLETED AT THE SITE.
A. ROUTINE INSPECTION OF DRAINAGE WAYS BEFORE AND AFTER STORM SEASONS, INCLUDING
CLEANING AND REMOVAL OF SEDIMENT AND DEBRIS.
B. IMPLEMENTATION OF EROSION CONTROL MEASURES AS NEEDED IN THE LONG-TERM TO
MITIGATE THE EFFECTS OF EROSION ON OPEN SLOPES ADJACENT TO AND WITHIN THE
DEVELOPMENT.
C. PERMANENT RE-VEGETATION OF THE FILL SLOPES USING PROVEN TECHNIQUES UPON
COMPLETION.
D. REGULAR STREET AND PARKING LOT SWEEPING TO COLLECT SEDIMENT AFTER/BEFORE
RUNOFF EVENTS AND TO PREVENT DUST POLLUTION.
2. MAINTENANCE AND INSPECTION:
THE STORM-WATER POLLUTION PREVENTION PLAN SHALL INCLUDE MAINTENANCE, REPAIR, AND
TRACKING PROCEDURES TO ENSURE THAT ALL GRADED SURFACES AND MITIGATION
MEASURES, AND OTHER PROTECTIVE DEVICES, IN SITE PLAN, ARE MAINTAINED IN A GOOD AND
EFFECTIVE CONDITION, AND ARE REPAIRED OR RESTORED IF DAMAGED.
3. GENERAL PROCEDURE:
ALL MITIGATION MEASURES SHALL BE INSPECTED AFTER EACH AND EVERY MAJOR STORM
EVENT. A STORM EVENT IS DEFINED AS A RAINFALL EVENT WHERE MORE THAN 1/2" OF
RAINFALL OCCURS DURING A 24 HOUR PERIOD. REPAIRS SHALL BE MADE TO ALL MITIGATION
DEVICES UPON DISCOVERY OF DAMAGE. ADDITIONALLY, MONTHLY INSPECTION SHALL OCCUR
UNTIL THE NOTICE OF TERMINATION (NOT) IS FILED.
4. RECORD KEEPING DOCUMENTATION:
RECORDS OF ALL INSPECTION, COMPLIANCE CERTIFICATION, AND NON-COMPLIANCE
REPORTING WILL BE RETAINED FOR A PERIOD OF AT LEAST 3 YEAR. A COPY OF THIS
STORM-WATER POLLUTION PREVENTION PLAN WILL BE KEPT ONSITE DURING ALL
CONSTRUCTION ACTIVITIES.
FREDERICK COUNTY
SP #14-26
3" ORIFICE W/
TRASH RACK
INV. = 731.00
8'
TOP OF WEIR
ELEV. = 733.25
TOP OF EMBANKMENT
ELEV. = 735.00
SWMB #2 PRINCIPAL SPILLWAY
NOT TO SCALE
732.77
733.07
733.48
733.93
10 YR.
1 YR.
2 YR.
100 YR.
733.6625 YR.
DESIGN ELEVATIONS
CONCRETE WEIR TYPICAL SECTION (SWMB #1 & #2)
NOT TO SCALE
0.67'
1.00'
2.67'
VARIES
3.25' - SWMB #1
3.75' - SWMB #2
8"
1.50'CLASS AI RIPRAP
EXTEND CONC. WEIR
3' INTO EARTH
EMBANKMENT ON
EACH SIDE (TYP.)
COMPACTED
SUBGRADE
14'
3.75'
TOP OF CHANNEL
W/ RIPRAP LINING
(RIPRAP WIDTH = 8')
CONCRETE WEIR (3000 PSI)
8"
3" ORIFICE W/
TRASH RACK
INV. = 732.50
5'
TOP OF WEIR
ELEV. = 734.25
TOP OF EMBANKMENT
ELEV. = 736.00
SWMB #1 PRINCIPAL SPILLWAY
NOT TO SCALE
734.04
734.27
734.57
734.86 (NO ORIFICE)
10 YR.
1 YR.
2 YR.
100 YR.
734.6825 YR.
DESIGN ELEVATIONS
EXTEND CONC. WEIR
3' INTO EARTH
EMBANKMENT ON
EACH SIDE (TYP.)
COMPACTED
SUBGRADE
11'
3.25'
TOP OF CHANNEL
W/ RIPRAP LINING
(RIPRAP WIDTH = 5')
8"
STORM SEWER PROFILE -- STR #1 - STR #4
SCALE: 1" = 50' (HORIZ.), 1" = 5' (VERT.)VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD
CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYVRRM SUMMARYJOB NO.: 25-14
C-13C-13.DWGDDDN/ADDDDESCRIPTION03-16-202604-27-2026
FREDERICK COUNTY
SP #14-26VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD