Loading...
HomeMy WebLinkAbout14-26 Volvo Dealership - Approved Site PlanVOLVO DEALERSHIP OUTDOOR STORAGE SITE PLAN (SP #14-26) FREDERICK COUNTY, VIRGINIA LOCATION MAP: PROJECT INFORMATION:SHEET INDEX: PROJECT NOTES: SCALE: 1" = 1000' SITEVA STATEGRID NORTHCURRENT OWNER: REFERENCE: USE DESCRIPTION: ACREAGE: ZONING: PHYSICAL ADDRESS: DISTURBED AREA: FLOODPLAIN: LAND GROWTH, LLC TM 75-3-21 BACK CREEK MAGISTERIAL DISTRICT PREVIOUS APPROVALS: SP #13-05, SP #03-12 AUTO SALES 6.77 ACRES B2 4015 VALLEY PIKE, WINCHESTER, VA 22602 2.03 ACRES OUTSIDE 100 YEAR FLOODPLAIN BASED ON FIRM MAP PANEL 51069C0330E, DATED JANUARY 29, 2021 PROJECT CONTACTS: OWNER/DEVELOPER: ADDRESS- PHONE NUMBER- E-MAIL- CONTACT- CONTRACTOR: ADDRESS- PHONE NUMBER- E-MAIL- CONTACT- ARCHITECT: ADDRESS- PHONE NUMBER- E-MAIL- CONTACT- ENGINEER (CIVIL): ADDRESS- PHONE NUMBER- E-MAIL- CONTACT- LAND GROWTH, LLC 8110 E. INDEPENDENCE BLVD. CHARLOTTE, NC 28227 (240) 674-7372 JON@DOGWOODAUTO.COM JON ALCORN KEE CONSTRUCTION SERVICES, INC. 420 W. JUBAL EARLY DRIVE, SUITE 100 WINCHESTER, VA 22601 (540) 723-0585 DMCKEE@KEECONSTRUCTION.COM DAN MCKEE DICE ENGINEERING, PLC 101 SHELBY CT. WINCHESTER, VA 22602 (540) 974-5157 DDUNLAP@DICE-ENG.COM DENNIE DUNLAP RESPONSIBLE LAND DISTURBER NAME: CONTACT INFO: CERTIFICATION #: EXP. DATE: THE RESPONSIBLE LAND DISTURBER IS THE PARTY RESPONSIBLE FOR CARRYING OUT THE LAND DISTURBING ACTIVITY AS SET FORTH IN THE PLANS. ELECTRIC COMPANY: ADDRESS- PHONE NUMBER- CONTACT- WATER PROVIDER: ADDRESS- PHONE NUMBER- CONTACT- SEWER PROVIDER: ADDRESS- PHONE NUMBER- CONTACT- GAS COMPANY: ADDRESS- PHONE NUMBER- CONTACT- PHONE COMPANY: ADDRESS- PHONE NUMBER- CONTACT- SHENANDOAH VALLEY ELECTRIC CO-OP 3463 VALLEY PIKE WINCHESTER, VA 22602 (540) 450-0111 FREDERICK WATER 315 TASKER ROAD STEPHENS CITY, VA 22655 (540) 868-1061 FREDERICK WATER 315 TASKER ROAD STEPHENS CITY, VA 22655 (540) 868-1061 WASHINGTON GAS 350 HILLANDALE LANE WINCHESTER, VA 22602 (540) 869-1111 VERIZON 404 HILLANDALE LANE WINCHESTER, VA 22602 (540) 665-3153 CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYCOVER SHEETJOB NO.: 25-14 C-01C-01.DWGDDDN/ADDDDESCRIPTION04-27-2026 03-16-2026FREDERICK COUNTY SP #14-26VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYGENERAL NOTESJOB NO.: 25-14 C-02C-02.DWGDDDN/ADDDDESCRIPTION03-16-202604-27-2026 FREDERICK COUNTY SP #14-26VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYEXISTING CONDITIONSJOB NO.: 25-14 C-03C-03.DWGDDD1" = 40'DDDDESCRIPTION03-16-20261 inch = ft. ( IN FEET ) GRAPHIC SCALE 40 VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA04-27-2026 FREDERICK COUNTY SP #14-26 1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD 733 736 736 733 732 732 731 733 735736736733735 735 732 731 733735 735735 735 735 736735 735 RR RR ST #1 ST #2 CE TEMPORARY TOPSOIL STOCKPILE OP SFSFSFSF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SFSFSFSFSFSF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFS F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF TS SR TS SR736 DC SF SF SF CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYINITIAL E&SC PLANJOB NO.: 25-14 C-04C-04.DWGDDD1" = 20'DDDDESCRIPTION03-16-20261 inch = ft. ( IN FEET ) GRAPHIC SCALE 20 VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA04-27-2026 FREDERICK COUNTY SP #14-26NOTE: 1.LIMITS OF DISTURBANCE SHALL BE AS INDICATED. THE ESTIMATED DISTURBED AREA FOR THIS PROJECT IS 2.03 ACRES. DRAINAGE AREA TO ST #1 = 0.46 AC. - LIMITS OF DISTURBANCE DRAINAGE AREA TO ST #2 = 1.41 AC. TOP OF EMBANKMENT = 735.00 (8' WIDE) TOP OF EMBANKMENT = 736.00 (8' WIDE) DRAINAGE DIVIDE TO ST (TYP.) OUTLET PROTECTION D50 = 6" La = 8' W = 10' REROUTE EX. STORM SEWER OUTFALL AROUND PROPOSED ST #1 (SEE SHEET C-05)1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYSITE PLANJOB NO.: 25-14 C-05C-05.DWGDDD1" = 20'DDDDESCRIPTION03-16-20261 inch = ft. ( IN FEET ) GRAPHIC SCALE 20 VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA04-27-2026 FREDERICK COUNTY SP #14-26 PROPOSED CONC. WEIR OUTLET FOR SWMB #1 (SEE SHEET C-12) PROPOSED STONE-SURFACED OUTDOOR STORAGE AREA (60,680 SF) PROPOSED CONC. WEIR OUTLET FOR SWMB #2 (SEE SHEET C-12) 1 2 3 4 # DENOTES STORM STRUCTURE ID # REROUTE EX. STORM SEWER OUTFALL AROUND PROPOSED SWMB #1 (SEE PROFILE, SHEET C-12) EDGE OF STONE (TYP.)1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDDFREDERICK WATER GENERAL NOTES: 1.VALVES, MANHOLES, ARV'S, AND OTHER FREDERICK WATER SURFACE FEATURES SHALL NOT BE PLACED IN CURB AND GUTTER, NOR SLOPED PORTION OF HANDICAP RAMPS. CONTRACTOR SHALL COORDINATE LOCATIONS WITH THE FREDERICK WATER INSPECTOR. 2.IRRIGATION LINES AND DEVICES, LIGHT POLES, TRANSFORMERS, JUNCTION BOXES, PEDESTALS, OTHER OBSTACLES AND ALL DRY UTILITIES SHALL NOT BE PLACED IN FREDERICK WATER EASEMENTS. PERPENDICULAR IRRIGATION LINES AND DRY UTILITY CROSSINGS ARE PERMITTED WITH 18" MINIMUM VERTICAL SEPARATION. 3.RETAINING WALLS AND THEIR TIE-BACKS SUCH AS GEOGRID OR OTHER SUPPORTS SHALL NOT BE PLACED IN FREDERICK WATER EASEMENTS. 4.CONTRACTOR SHALL: A.COORDINATE A MEETING WITH THE FREDERICK WATER INSPECTOR AT LEAST SEVEN (7) WORKING DAYS PRIOR TO GROUND-DISTURBING ACTIVITIES. B.EXERCISE EXTREME CAUTION WHILE TRAVELING AND WORKING OVER THE EXISTING FREDERICK WATER FACILITIES. C.ADJUST ALL FREDERICK WATER FACILITIES TO FINISHED GRADE AS NECESSARY. D.PERFORM ALL WORK PER FREDERICK WATER INSPECTOR'S REQUIREMENTS. 733 736 736 733 732 732 731 733 736 737 738 738 737 737 735 735 735 735 735 735 736 738 RR RR OPSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SFSFSFSFSFSF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFS F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF PS SR PS SR DC TO TO CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYGRADING AND FINAL E&SC PLANJOB NO.: 25-14 C-06C-06.DWGDDD1" = 20'DDDDESCRIPTION03-16-20261 inch = ft. ( IN FEET ) GRAPHIC SCALE 20 VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA04-27-2026 FREDERICK COUNTY SP #14-26NOTE: 1.LIMITS OF DISTURBANCE SHALL BE AS INDICATED. THE ESTIMATED DISTURBED AREA FOR THIS PROJECT IS 2.03 ACRES. TOP OF EMBANKMENT = 735.00 (8' WIDE) TOP OF EMBANKMENT = 736.00 (8' WIDE) OUTLET PROTECTION D50 = 6" La = 8' W = 10' - LIMITS OF DISTURBANCE SWMB #1 SWMB #2 739.00 738.60 738.50 737.00 736.95 736.50 736.50 737.00 735.50 735.50 735.80 738.90 1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYPRE-DEVELOPED SWM PLANJOB NO.: 25-14 C-07C-07.DWGDDD1" = 20'DDDDESCRIPTION03-16-20261 inch = ft. ( IN FEET ) GRAPHIC SCALE 20 VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA04-27-2026 FREDERICK COUNTY SP #14-26 DRAINAGE DIVIDE FLOW PATH IMPERVIOUS AREA WOODS TURF LEGEND: A B C ANALYSIS PT. FOR DA 'A' RUNOFF FROM THE EXISTING SITE BEYOND THE PROJECT LIMITS AS SHOWN IS COLLECTED VIA ON-SITE STORM SEWER PRE-DEV. DA 'A' AREA = 2.84 AC. CN = 74 Tc = 5 MIN. Q1 = 3.72 CFS Q2 = 5.36 CFS Q10 = 10.21 CFS Q25 = 13.70 CFS Q100 = 19.95 CFS SHALLOW CONC. FLOW (185' @ 4.3%) SHEET FLOW (100' @ 2.0%)1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD 733 736 736 733 732 732 731 733 736 737 738 738 737 737 735 735 735 735 735 735 736 738 CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYPOST-DEVELOPED SWM PLANJOB NO.: 25-14 C-08C-08.DWGDDD1" = 20'DDDDESCRIPTION03-16-20261 inch = ft. ( IN FEET ) GRAPHIC SCALE 20 VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA04-27-2026 FREDERICK COUNTY SP #14-26 A B C RUNOFF FROM THE EXISTING SITE BEYOND THE PROJECT LIMITS AS SHOWN IS COLLECTED VIA ON-SITE STORM SEWER DRAINAGE DIVIDE FLOW PATH LIMITS OF DISTURBANCE IMPERVIOUS AREA WOODS TURF LEGEND: POST-DEV. BYPASS AREA = 0.51 AC. CN = 80 Tc = 5 MIN. Q1 = 0.71 CFS Q2 = 1.01 CFS Q10 = 1.90 CFS Q25 = 2.53 CFS Q100 = 3.66 CFS POST-DEV. (ROUTING FROM SWMB #1) Q1 = 0.28 CFS Q2 = 0.40 CFS Q10 = 2.66 CFS Q25 = 4.07 CFS Q100 = 5.98 CFS POST-DEV. (ROUTING FROM SWMB #2) Q1 = 0.30 CFS Q2 = 0.33 CFS Q10 = 2.72 CFS Q25 = 5.86 CFS Q100 = 10.80 CFS POST-DEV. (TOTAL DISCHARGE FROM SITE) Q1 = 1.24 CFS Q2 = 1.59 CFS Q10 = 6.14 CFS Q25 = 11.66 CFS Q100 = 19.67 CFS SWMB #1 SWMB #2 POST-DEV. TO SWMB #2 AREA = 1.58 AC. CN = 93 Tc = 5 MIN. Q1 = 4.34 CFS Q2 = 5.45 CFS Q10 = 8.44 CFS Q25 = 10.41 CFS Q100 = 13.83 CFS POST-DEV. TO SWMB #1 AREA = 0.75 AC. CN = 95 Tc = 5 MIN. Q1 = 2.22 CFS Q2 = 2.74 CFS Q10 = 4.14 CFS Q25 = 5.07 CFS Q100 = 6.67 CFS SHEET FLOW (100' @ 2.0%) SHALLOW CONC. FLOW (185' @ 4.3%)1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD EROSION CONTROL NOTES:CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYE&SC NOTESJOB NO.: 25-14 C-09C-09.DWGDDDN/ADDD1.THE CONTRACTOR SHALL ARRANGE FOR A PRE-CONSTRUCTION CONFERENCE WITH THE FREDERICK COUNTY EROSION AND SEDIMENT PROGRAM ADMINISTRATOR 48 HOURS PRIOR TO BEGINNING WORK. 2.ALL EROSION CONTROL DEVICES AS SHOWN OR AS REQUIRED ARE TO BE CONSTRUCTED TO STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (LATEST EDITION) AND ARE TO BE IN PLACE PRIOR TO ALL CONSTRUCTION. 3.THIS PLAN IS NOT COMPLETE WITHOUT THE APPROVED NARRATIVE. 4.EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED CONTINUOUSLY, RELOCATED WHEN AND AS NECESSARY AND SHALL BE CHECKED AFTER EVERY RAINFALL. SEEDED AREAS SHALL BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED, RESEEDED AND MULCHED AS NECESSARY TO OBTAIN A DENSE STAND OF GRASS. 5.ALL DISTURBED AREAS NOT PAVED OR BUILT UPON ARE TO BE FERTILIZED, SEEDED, AND MULCHED BY THE CONTRACTOR IN ACCORDANCE WITH THE VIRGINIA STORMWATER MANAGEMENT HANDBOOK (LATEST VERSION). 6.ALL DRAIN INLETS SHALL BE PROTECTED FROM SILTATION. INEFFECTIVE PROTECTION DEVICES SHALL BE IMMEDIATELY REPLACED AND THE INLET CLEANED. FLUSHING IS NOT AN ACCEPTABLE METHOD OF CLEANING. 7.GRADE AREAS ADJACENT TO BUILDING TO ACHIEVE DRAINAGE AWAY FROM THE STRUCTURE AND TO PREVENT PONDING IN SWALES. 8.PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 21 DAYS. 9.DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. 10.VEGETATIVE STABILIZATION SHALL BE UNIFORM AND MATURE ENOUGH TO SURVIVE AND ADEQUATE TO INHIBIT EROSION. 11.SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND- DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 12.STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 13.UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A.NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B.EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C.EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY. D.MATERIAL USED FOR BACK FILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. E.RESTABILIZATION SHALL BE ACCOMPANIED IN ACCORDANCE WITH THESE REGULATIONS. F.APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. 14.WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. 15.ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM ADMINISTRATOR. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 16.ALL DISTURBED AREAS NOT PAVED OR BUILT UPON SHALL BE TOP SEEDED, MULCHED AND FERTILIZED. PERFORM PERMANENT TOP SOILING, SEEDING, LANDSCAPING, FERTILIZING, AND MULCHING AS SOON AFTER FINISH GRADING AS POSSIBLE. SEEDING SHALL COMPLY WITH THE FOLLOWING: A.TOPSOIL - 4 INCH MINIMUM FOR PERMANENT TURF B.FERTILIZER - 450 POUNDS PER ACRES OF 10-20-10 FERTILIZER OR EQUIVALENT POUNDAGE OF DIFFERENT ANALYSIS. WORK INTO SOIL PRIOR TO SEEDING. C.LIME (PERMANENT SEEDING) - AGRICULTURAL LIME SPREAD AT RATE OF 2 TONS/ACRE. WORK INTO SOIL PRIOR TO SEEDING. D.MULCH-CHOPPED STRAW AT RATE OF 2 TON PER ACRE AND TACKED IN PLACE. HYDRO-MULCH AT RATE OF 30 BALES PER ACRE.DESCRIPTION03-16-202604-27-2026 FREDERICK COUNTY SP #14-26VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYE&SC DETAILSJOB NO.: 25-14 C-10C-10.DWGDDDN/ADDDDESCRIPTION03-16-202604-27-2026 FREDERICK COUNTY SP #14-26VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYE&SC DETAILSJOB NO.: 25-14 C-11C-11.DWGDDDN/ADDDDESCRIPTION03-16-202604-27-2026 FREDERICK COUNTY SP #14-26VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD 725 730 735 740 745 750 755 725 730 735 740 745 750 755 10+00 11+00 12+00STA. 10+00.00 -- STR #1ADS FLARED END SECTIONINV. = 732.78 (15")STA. 10+40.00 -- STR #224" NYLOPLAST BASINW/ SOLID TOPTOP = 735.55INV. IN = 733.28 (15")INV. OUT = 733.18 (15")STA. 10+98.16 -- STR #324" NYLOPLAST BASINW/ SOLID TOPTOP = 736.40INV. IN = 733.96 (15")INV. OUT = 733.86 (15")STA. 11+02.16 -- STR #4COUPLER & ADAPTERFOR RCP TO HDPE(SEE DETAIL THIS SHEET)INV. = 734.00 (15")58.16 LF - 15" HDPE @ 1.00% PROPOSED GRADE HGL (10-YR) 40.00 LF - 15" HDPE @ 1.00% 4.00 LF - 15" HDPE @ 1.00%CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYSWM NOTES & CONSTRUCTION DETAILSJOB NO.: 25-14 C-12C-12.DWGDDDN/ADDDDESCRIPTION03-16-202604-27-2026 STORMWATER MANAGEMENT BASIN NOTES: 1. ALL STORMWATER MANAGEMENT POND CONSTRUCTION SHALL BE IN STRICT COMPLIANCE WITH ALL APPLICABLE FREDERICK COUNTY AND THE U.S. DEPARTMENT OF AGRICULTURE SOIL CONSERVATION SERVICE STANDARDS AND SPECIFICATIONS 2. MATERIAL. SITE AND STORMWATER MANAGEMENT BASIN FILL MATERIAL SHALL BE TAKEN FROM APPROVED DESIGNATED BORROW AREAS. IT SHALL BE FREE OF ROOTS, STUMPS, WOOD, RUBBISH, STONES WITH DIAMETERS GREATER THAN 6 INCHES, AND FROZEN OR OTHER OBJECTIONABLE MATERIALS. 3. COMPACTION. BACKFILL SHALL BE SPREAD IN HORIZONTAL LIFTS WHICH DO NOT EXCEED 4 INCHES AND COMPACTED. THE MOVEMENT OF THE HAULING AND SPREADING EQUIPMENT OVER THE FILL SHALL BE CONTROLLED SO THAT THE ENTIRE SURFACE OF EACH LIFT SHALL BE TRAVERSED BY NOT LESS THAN ONE TREAD TRACK OF HEAVY EQUIPMENT OR COMPACTION SHALL BE ACHIEVED BY A MINIMUM OF 4 COMPLETE PASSES OF A SHEEPSFOOT, RUBBER-TIRED OR VIBRATORY ROLLER. FILL MATERIAL SHALL CONTAIN SUFFICIENT MOISTURE SUCH THAT THE REQUIRED DEGREE OF COMPACTION WILL BE OBTAINED WITH THE EQUIPMENT USED. THE FILL MATERIAL SHALL CONTAIN SUFFICIENT MOISTURE SO THAT IF FORMED INTO A BALL IT WILL NOT CRUMBLE, YET NOT SO WET THAT WATER CAN BE SQUEEZED OUT. THE MINIMUM REQUIRED DENSITY OF THE COMPACTED BACKFILL SHALL NOT BE LESS THAN 95% OF MAXIMUM DRY DENSITY WITH A MOISTURE CONTENT WITHIN 2% OF THE OPTIMUM. EACH LAYER OF FILL SHALL BE COMPACTED AS NECESSARY TO OBTAIN THAT DENSITY, AND IS TO BE CERTIFIED BY THE ENGINEER AT THE TIME OF CONSTRUCTION. 4. VEGETATION . NO TREES OR SHRUBS SHALL BE PLANTED ON ANY EMBANKMENT OF THE STORMWATER MANAGEMENT BASINS. SWM MAINTENANCE SCHEDULE 1. POST CONSTRUCTION STORM-WATER MANAGEMENT: THE FOLLOWING CONTROL MEASURES SHALL BE IMPLEMENTED TO REDUCE POLLUTANTS IN STORM-WATER DISCHARGE AFTER THE HEAVY SITE CIVIL CONSTRUCTION PHASES HAVE BEEN COMPLETED AT THE SITE. A. ROUTINE INSPECTION OF DRAINAGE WAYS BEFORE AND AFTER STORM SEASONS, INCLUDING CLEANING AND REMOVAL OF SEDIMENT AND DEBRIS. B. IMPLEMENTATION OF EROSION CONTROL MEASURES AS NEEDED IN THE LONG-TERM TO MITIGATE THE EFFECTS OF EROSION ON OPEN SLOPES ADJACENT TO AND WITHIN THE DEVELOPMENT. C. PERMANENT RE-VEGETATION OF THE FILL SLOPES USING PROVEN TECHNIQUES UPON COMPLETION. D. REGULAR STREET AND PARKING LOT SWEEPING TO COLLECT SEDIMENT AFTER/BEFORE RUNOFF EVENTS AND TO PREVENT DUST POLLUTION. 2. MAINTENANCE AND INSPECTION: THE STORM-WATER POLLUTION PREVENTION PLAN SHALL INCLUDE MAINTENANCE, REPAIR, AND TRACKING PROCEDURES TO ENSURE THAT ALL GRADED SURFACES AND MITIGATION MEASURES, AND OTHER PROTECTIVE DEVICES, IN SITE PLAN, ARE MAINTAINED IN A GOOD AND EFFECTIVE CONDITION, AND ARE REPAIRED OR RESTORED IF DAMAGED. 3. GENERAL PROCEDURE: ALL MITIGATION MEASURES SHALL BE INSPECTED AFTER EACH AND EVERY MAJOR STORM EVENT. A STORM EVENT IS DEFINED AS A RAINFALL EVENT WHERE MORE THAN 1/2" OF RAINFALL OCCURS DURING A 24 HOUR PERIOD. REPAIRS SHALL BE MADE TO ALL MITIGATION DEVICES UPON DISCOVERY OF DAMAGE. ADDITIONALLY, MONTHLY INSPECTION SHALL OCCUR UNTIL THE NOTICE OF TERMINATION (NOT) IS FILED. 4. RECORD KEEPING DOCUMENTATION: RECORDS OF ALL INSPECTION, COMPLIANCE CERTIFICATION, AND NON-COMPLIANCE REPORTING WILL BE RETAINED FOR A PERIOD OF AT LEAST 3 YEAR. A COPY OF THIS STORM-WATER POLLUTION PREVENTION PLAN WILL BE KEPT ONSITE DURING ALL CONSTRUCTION ACTIVITIES. FREDERICK COUNTY SP #14-26 3" ORIFICE W/ TRASH RACK INV. = 731.00 8' TOP OF WEIR ELEV. = 733.25 TOP OF EMBANKMENT ELEV. = 735.00 SWMB #2 PRINCIPAL SPILLWAY NOT TO SCALE 732.77 733.07 733.48 733.93 10 YR. 1 YR. 2 YR. 100 YR. 733.6625 YR. DESIGN ELEVATIONS CONCRETE WEIR TYPICAL SECTION (SWMB #1 & #2) NOT TO SCALE 0.67' 1.00' 2.67' VARIES 3.25' - SWMB #1 3.75' - SWMB #2 8" 1.50'CLASS AI RIPRAP EXTEND CONC. WEIR 3' INTO EARTH EMBANKMENT ON EACH SIDE (TYP.) COMPACTED SUBGRADE 14' 3.75' TOP OF CHANNEL W/ RIPRAP LINING (RIPRAP WIDTH = 8') CONCRETE WEIR (3000 PSI) 8" 3" ORIFICE W/ TRASH RACK INV. = 732.50 5' TOP OF WEIR ELEV. = 734.25 TOP OF EMBANKMENT ELEV. = 736.00 SWMB #1 PRINCIPAL SPILLWAY NOT TO SCALE 734.04 734.27 734.57 734.86 (NO ORIFICE) 10 YR. 1 YR. 2 YR. 100 YR. 734.6825 YR. DESIGN ELEVATIONS EXTEND CONC. WEIR 3' INTO EARTH EMBANKMENT ON EACH SIDE (TYP.) COMPACTED SUBGRADE 11' 3.25' TOP OF CHANNEL W/ RIPRAP LINING (RIPRAP WIDTH = 5') 8" STORM SEWER PROFILE -- STR #1 - STR #4 SCALE: 1" = 50' (HORIZ.), 1" = 5' (VERT.)VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD CADD FILE:DATE:REV. #SCALE:DATE101 SHELBY CT.WINCHESTER, VA 22602PHONE: 540.974.5157FAX: 540.723.4868EMAIL: OFFICE@DICE-ENG.COMSHEET NUMBER:DRAWN BY:CHECKED BY:BYVRRM SUMMARYJOB NO.: 25-14 C-13C-13.DWGDDDN/ADDDDESCRIPTION03-16-202604-27-2026 FREDERICK COUNTY SP #14-26VOLVO DEALERSHIP OUTDOOR STORAGEFREDERICK COUNTY, VA1REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS04-27-2026DDD