Loading...
HomeMy WebLinkAboutPublic Works ChecklistReview Checklist , nt Virginia Frederick County, inia g Department of Public Works Subdivision/Site Plan Name: 171 OLD FIREHOUSE LN Engineer/Surveyor Name: RACEY ENGINEERING. PLLC C/O BERLIN NEFF Engineer/Surveyor Phone: 540-743-9227 Tax Map (PIN): 52-A-287B i lGv4 s) for each Item orif not applicable. Note: Provide sheet numberindicate Requirements Sheet N/A FC Check Provide a note pertaining to temporary and permanent stabilization of denuded X areas. _ Provide a note pertaining to stabilization requirements for soil stockpiles. X X Provide a note stating that vegetative stabilization shall be uniform, mature enough to survive and adequate to inhibit erosion. Provide sediment trapping facilities as the first phase of land disturbing activity. X Provide a note requiring that dams, dikes and diversions be stabilized immediately after construction. X X Sediment traps and basins shall be installed if necessary and in the correct location. Basins shall maintain structural integrity during 100-year 24 hour storm event. (§79-3.A.1 Frederick County Code). X Cut and fill slopes shall be adequately stabilized. Fill slopes steeper than 3:1 will require a slope stability analysis and maintenance plan. X Provide adequate temporary or permanent channel, flume or slope drain for all concentrated runoff down cut or fill slopes. Provide adequate drainage or other protection whenever water seeps from a slope face. X Provide adequate inlet protection for all operational storm sewer inlets. X Provide adequate channel protection for open conveyance and receiving channel, provide adequate outlet protection for pipes and channels. X X Provide measures to minimize channel damage when conducting in -stream construction. Install temporary stream crossings of non -erodible material X All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met - all applicable permits shall be submitted with Land Disturbance application (§79-3.A.2 Frederick County X Code). X Provide a note stating that the bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. X Provide appropriate notes regarding trenching practices in accordance with 4VAC50-30-40 subsection 16. Requirements Sheet NIA FC Check Provide a note requiring cleaning/removal of any sediment on public or private X roadways. Provide a note requiring that all temporary controls be removed within 30-days X once no longer needed; trapped sediment must be removed and stabilized. Provide adequate protection from erosion and sediment deposition for X downstream properties and waterways. Demonstrate that concentrated stormwater runoff leaving the site discharges X directly into an adequate natural or manmade channel. Demonstrate that two (2)-year runoff from the site does not overtop banks of X natural channels and does not cause erosion. Demonstrate that discharge into the previously constructed man-made channels are not overtopped by a ten (10)-year storm and the two (2)-year storm does not X cause erosion Demonstrate that closed storm sewer systems contain the ten (10)-year storm. X Provide calculations and show ten (10)-year HGL in the storm sewer profiles. If offsite improvements are proposed, provide evidence of obtained easements, X etc. Provide an analysis of the existing and ultimate characteristics of the watershed. X Provide responsible party and maintenance plan for the proposed detention X facilities to include access, what is to be maintained?, how often?, who pays? Provide energy dissipaters at the outfall of all detention facilities. X Provide calculations demonstrating that onsite ditches are adequate. All sheet flow leaving the site shall be at or below pre -developed rates or it must X be diverted to an adequate channel, pipe system or detention facility. All calculations and assumptions shall pertain to the entire development and its X ultimate build -out. All measures utilized shall minimize the impact on waters of the State. X Project description - Describe the nature and purpose of the land disturbing X activity and area (acres) to be disturbed. Existing Site Conditions - Provide a description of the existing topography, X vegetation and drainage. Adjacent Areas - Provide a description of neighboring areas such as streams, X lakes, residential areas, roads, etc., which might be affected by the land disturbance. Off -site areas - Describe any off -site land -disturbing activities that will occur. X Soils - Provide a brief description of the soils on the site giving such information X as soil name, mapping unit, erodibility, permeability, depth, texture and soil structure. Geology - Provide a brief description of the geology on the site related to construction; i.e. methods of removal, use as engineered fills, Karst potential, X etc. Requirements Sheet N/A FC Check Critical areas - Provide a description of areas on the site which have potentially serious erosion problems. E&S control measures - Provide a description of the methods which will be used to control erosion and sedimentation on the site. X X Permanent stabilization - Provide a brief description, including specifications, of how the site will be stabilized after construction is completed. X Stormwater runoff narrative - Will the development of the site cause an increase in peak runoff rates? Will it cause flooding? Describe the strategy to control stormwater runoff. X Calculations - detailed calculations for the design of temporary sediment basins, permanent stormwater detention basins, diversions, channels, etc. Include calculations for pre- and post -development runoff X Provide a vicinity map. X Provide a North arrow and scale on all plan sheets. X Delineate the proposed limits of clearing and grading. X Show and label existing contours. Show and label final contours. X X Show existing vegetation. X Show boundaries of different soil types. X Show existing drainage patterns including the acreage of each drainage area. Label areas with potentially serious erosion problems. X Show and label all proposed site improvements. X Label all storm pipe systems on grading plan sheets (pipe size, material, structure numbers). X Show elevations for the proposed basement floor, first floor and garage slab for all buildings and finished grade elevations at building corners. X Show location of all retaining walls with elevations for proposed top and bottom of walls. X Conveyance system protection and flood protection analysis provided at every discharge point of concentrated flow originating from site improvements. X Show location of all erosion and sediment control measures using VESCH standard symbols. X Show all off -site land disturbing activities and erosion and sediment control measures. Provide letter of permission or show temporary construction easements as necessary. X Provide stage -storage, stage -discharge and routing data for all SWM/BMP ponds. Provide VRRM spreadsheet data. X X Requirements Sheet NIA FC Check X Drainage area map showing individual and cumulative drainage area contributing to each point of concentration. X Provide a maintenance schedule including regular inspection and repair of erosion and sediment control measures. Provide the Responsible Land Disturber signature block on the plans. E Provide a seeding schedule in accordance with VESCH standard 3.31 and 3.32. Provide a 20-foot drainage easement for all concentrated flows within on- or off- X site residential lots. Provide a minimum of 2% slope on grass channels. If less than 2%, provide an X alternative design. Any area in which drainage collects from more than three (3) lots shall be X placed within a platted drainage easement. All silt fence shall be wire reinforced. X Drop Inlets in areas accessible to the public will require an appropriately sized X grate opening. Please specify the grate type in the plans. Ensure that the backwater condition for the post -developed 100-year storm X does not impact adjacent properties. Show the location and extent of the overland relief flow paths provided for SWM X conditions and to clear buildings for the 100-year storm. Provide the dewatering structure details for the proposed sediment basins. The X details shall include elevations, type of structures, pipe sizes, etc. Engineer's Signature 8/12/25 Date