Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
07-26 Approved Plan
© 2025 Microsoft Corporation © 2025 TomTom © 2025 Zenrin C000 - Cover.dwgSHEET NO.FILENAMECRC PROJECT #DATEIMMACULATE HEART OF MARYCOUNTY PLAN #07-26HUTTLE ROAD & RELIANCE ROADTAX MAP: 91-A-83AOPEQUON MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIAPLAN SET DATE: JULY 1ST, 2026SITE PLANIMMACULATE HEART OF MARYHUTTLE ROAD & RELIANCE ROADSITE PLANCOVER SHEET1 of 31C999.2525JULY 1ST, 2026THIS SITE PLAN IS FOR THE CONSTRUCTION OF A PROPOSED CHURCH AND ASSOCIATED SITEIMPROVEMENTS, PARKING AREAS, STORM DRAINAGE, AND SIDEWALK AREAS AROUND THE CHURCHAND ALONG RELIANCE RD. THE TOTAL DISTURBED AREA (LIMITS OF DISTURBANCE) FOR THIS PROJECT IS3.98 ACRES. THE TOTAL ONSITE IMPERVIOUS AREA IS 1.98 ACRES, WITH THE REMAINING 2.00 ACRESCONSISTING OF MANAGED TURF THAT WILL BE PERMANENTLY SEEDED. STORMWATER RUNOFF FROMTHE SITE WILL BE CONVEYED THROUGH A PROPOSED STORM DRAINAGE SYSTEM AND DISCHARGEDFROM A DRY POND OUT OF A PROPOSED OUTFALL STRUCTURE IN ACCORDANCE WITH APPLICABLEREQUIREMENTS.PROJECT NARRATIVEENGINEERCARTER RUN LLC9 N 3RD STREET SUITE 204WARRENTON, VA 20186(571) 284-0041ADAM D. BAXTER, P.E.ADAM@CARTERRUN.COMSUBJECT PROPERTYVICINITY MAPSCALE: 1" = 2,000'OWNER/DEVELOPERSOCIETY OF SAINT PIUS X,FRONT ROYAL, VIRGINIA INC11485 NORTH FARLEY ROADPLATTE CITY, MISSOURI 64079ENGINEER'S CERTIFICATIONI, ADAM D. BAXTER, A LICENSED PROFESSIONAL ENGINEER IN THECOMMENWEALTH OF VIRGINIA, HEREBY CERTIFY THAT THE PROPERTYDEPICTED HEREON IS IN THE NAME OF SOCIETY OF SAINT PIUS X ANDIS FOUND AT INSTR # 250010778 IN THE LAND RECORDS OFFREDERICK COUNTY, VIRGINIA.ADAM D. BAXTER, P.E.VIRGINIA LICENSE #0402058741.www.carterrun.com(540) 418-0969C:\USERS\DAKOT\APPDATA\LOCAL\TEMP\ACPUBLISH_11076\C000 - COVER----->LAYOUT: C000 - COVER SHEET PARCEL INFORMATIONTAM MAP91-A-83AZONERAMAGISTERIAL DISTRICTOPEQUONSERVICE DISTRICTNONECURRENT USEVACANTPROPOSED USECHURCHFLOODPLAINZone X (51069C0320E) 1/29/21OVERALL PARCEL SIZE9.3806 ACRESPROPOSED PARCEL SIZE9.3806 ACRESIMPERVIOUS AREAS1.98 ACRESZONING COMPLIANCE: RAZONING REQUIREMENTREQUIRED/ALLOWEDPROVIDEDPERMITED USE: 165-401.02(G)CHURCHCHURCHMINIMUM LOT SIZE: 165-401.052 ACRES9.38 ACRESMINIMUM FRONT SETBACK: 165-401.0760 FEET95 FEETMINIMUM SIDE SETBACK: 165-401.07100 FEET128 FEETMINIMUM REAR SETBACK: 165-401.07100 FEET558 FEETMINIMUM WIDTH: 165-401.08250 FEET438 FEETMAXIMUM BUILDING HEIGHT: 165-401.0935 FEET20 FEETPARKING SPACES (1 SPACE/3 SEATS):SEE CALCULATIONSBELOW113 SPACES165-202.01(1)LOADING SPACES (12'X45'): 165-202.2A(1)11I- 8 1 I- 8 1 RELIANCE RDH U T T L E R D RELIANCE RDD E P E N D E N C E L N C O N F I D E N C E L N APPROVED BY FREDERICK COUNTYZONING ADMINISTRATORSIGNATUREAPPROVAL DATESITE PLAN VALID FOR FIVE (5) YEARS FROM APPROVAL DATESHEET INDEXSHEET #SHEET NAMEDATEC000COVER SHEET07/01/2026C001GENERAL NOTES07/01/2026C002GENERAL NOTES & LEGEND07/01/2026C100EXISTING CONDITIONS/DEMOLITION PLAN07/01/2026C200OVERALL SITE PLAN07/01/2026C201HORIZONTAL LAYOUT PLAN07/01/2026C202FIRE LANE PLAN07/01/2026C300GRADING & DRAINAGE PLAN07/01/2026C301INTERSECTION SIGHT DISTANCE & ENTRANCE DETAIL PROFILE07/01/2026C400STORM LAYOUT PLAN07/01/2026C401-C402STORM PROFILES & COMPUTATIONS07/01/2026C403STORM DETAILS & COMPUTATIONS07/01/2026C500UTILITY PLAN07/01/2026C600EROSION & SEDIMENT CONTROL NARRATIVE07/01/2026C601EROSION & SEDIMENT CONTROL DETAILS07/01/2026C602EROSION & SEDIMENT CONTROL DETAILS07/01/2026C603EROSION & SEDIMENT CONTROL PLAN PHASE I07/01/2026C604EROSION & SEDIMENT CONTROL PLAN PHASE II07/01/2026C700PRE DEVELOPED DRAINAGE AREA MAP07/01/2026C701POST DEVELOPED DRAINAGE AREA MAP07/01/2026C702STORMWATER MANAGEMENT NARRATIVE07/01/2026C703VRRM07/01/2026C704-C705STORMWATER MANAGEMENT COMPUTATIONS07/01/2026C800SURVEY (BY OTHERS)-C801SOILS MAP07/01/2026C900LANDSCAPE PLAN07/01/2026C901LANDSCAPE NOTES & DETAILS07/01/2026C902LIGHTING PLAN07/01/2026C903LIGHTING DETAILS07/01/2026TOTAL SHEETS: 31ADAM D. BAXTERLIC. NO. 05874107/01/2026PARKING TABULATIONSUSE REQUIREDPROVIDEDCHURCH: (274 SEATS) 92 SPACES* 92 SPACESOFFICE/MEETING AREA: (7972 SF) 32 SPACES**32 SPACES*1 SPACE / 3 SEATS = 274/3 = 91.33 (92 SPACES REQUIRED)**1 SPACE / 250 SF = 7972/250 = 31.88 (32 SPACES REQUIRED)TOTAL PARKING REQUIRED 124 SPACES.TOTAL PARKING PROVIDED 113 SPACES, THE CHURCH AND OFFICE/MEETING AREA WILLNOT BE IN USE AT THE SAME TIME. THEREFORE PARKING PROVIDED IS ADEQUATE.UTILITY INFORMATION:ELECTRIC: RAPPAHANNOCK ELECTRIC COOPERATIVE, (540)-622-2001, 137 KELLEY CT, FRONT ROYAL, VA 22630INTERNET: TBDWATER & SEWER: PRIVATE WELL & SEPTICREVISION TRACKINGREV #DATEBYDESCRIPTION17/01/2026ADBISSUED FOR CONSTRUCTIONISSUED FOR CONSTRUCTION XXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXX11.3'13'6'6' 3.5' 3.5'2.8'0.5' 0.5' 10'R/WR/WR/WR/WR/WR/W℄ 11' TRAVEL LANE11' TRAVEL LANE 2' 7' DITCH 2' 7' DITCH 40' VDOT RIGHT-OF-WAY 2.95%2.95% C001 GENERAL NOTESLAND DEVELOPMENT SERVICES LAND PLANNINGCIVIL ENGINEERING DESIGN PROJECT MANAGEMENT9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186www.carterrun.com(540) 418-0969SHEET NO. FILENAME PROJECT # DATESITE PLANIMMACULATE HEART OF MARYHUTTLE ROADFREDERICK COUNTY, VIRGINIAJULY 1ST, 2026 C001 - Notes.dwg ISSUED FOR CONSTRUCTION C:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C001 - NOTES----->LAYOUT: C001 - GENERAL NOTESC999.2525REVISION TRACKINGREV #DATEBYDESCRIPTION17/01/2026ADBISSUED FOR CONSTRUCTIONADAM D. BAXTER LIC. NO. 058741 07/01/2026 1.THE BOUNDARY, TOPOGRAPHICAL INFORMATION, AND EXISTING PHYSICAL FEATURES SHOWN HEREON ARE BASED ON A TOPOGRAPHIC SURVEY PERFORMED BY ERIC CASTEUBLE; DATED: NOVEMBER 5, 2025. 2.THE HORIZONTAL DATUM SHOWN HEREON IS VIRGINIA STATE PLANE COORDINATE SYSTEM, NAD 83 NORTH ZONE (2011). THE VERTICAL DATUM SHOWN HEREON IS NAVD 88. 3.THIS PLAN HAS BEEN PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT. EASEMENTS OR ENCUMBRANCES OF RECORD MAY EXIST THAT ARE NOT SHOWN. 4.THE LOCATION OF EXISTING UTILITIES SHOWN HEREON IS BASED ON OBSERVED SURFACE EVIDENCE AND AVAILABLE RECORDS. UNDERGROUND UTILITIES ARE NOT SHOWN AND SHALL BE VERIFIED PRIOR TO ANY LAND DISTURBANCE OR CONSTRUCTION. 5.ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH THE APPROVED PLANS AND APPLICABLE FREDERICK COUNTY STANDARDS, SPECIFICATIONS, AND REGULATIONS. 6.NO LAND DISTURBANCE OR CONSTRUCTION IS PERMITTED BEYOND THE APPROVED LIMITS OF DISTURBANCE SHOWN HEREON. 7.ALL DISTURBED AREAS SHALL BE STABILIZED IN ACCORDANCE WITH THE APPROVED EROSION AND SEDIMENT CONTROL PLANS. 8.THE CONTRACTOR SHALL CONTACT VIRGINIA 811 PRIOR TO ANY EXCAVATION ACTIVITIES. 9.ANY DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS SHALL BE REPORTED TO THE ENGINEER PRIOR TO CONSTRUCTION. GENERAL NOTES 1.PRIOR TO THE START OF ANY DEMOLITION OR LAND-DISTURBING ACTIVITIES, THE CONTRACTOR SHALL ENSURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED AND ARE AVAILABLE ON SITE. 2.REQUIRED EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE APPROVED PLANS PRIOR TO THE COMMENCEMENT OF DEMOLITION OR LAND-DISTURBING ACTIVITIES. 3.THE CONTRACTOR SHALL LOCATE ALL EXISTING UTILITIES, BOTH VERTICALLY AND HORIZONTALLY, WITHIN THE LIMITS OF DISTURBANCE PRIOR TO DEMOLITION. THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF VIRGINIA 811 BEFORE ANY EXCAVATION. 4.THE CONTRACTOR SHALL COORDINATE WITH THE APPLICABLE UTILITY PROVIDERS FOR THE DISCONNECTION, ABANDONMENT, OR REMOVAL OF EXISTING UTILITIES AS REQUIRED. ALL UTILITY WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE JURISDICTIONAL AND UTILITY COMPANY REQUIREMENTS. 5.DEMOLITION ACTIVITIES SHALL BE CONDUCTED IN A SAFE AND SYSTEMATIC MANNER IN ACCORDANCE WITH APPLICABLE OSHA REQUIREMENTS TO ENSURE THE SAFETY OF THE PUBLIC AND ALL PARTIES INVOLVED. 6.THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO STRUCTURES, UTILITIES, OR IMPROVEMENTS THAT ARE TO REMAIN. ANY DAMAGE RESULTING FROM DEMOLITION ACTIVITIES SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR’S EXPENSE. 7.ALL DEMOLITION DEBRIS AND WASTE MATERIALS SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS. DEMOLITION NOTES 4" 21-A STONE5" CONCRETE 2% ADA SIGN DETAIL WHITE BACKGROUND WITH GREEN LETTERING. ADA SYMBOL BLUE BACKGROUND WITH WHITE ADA SYMBOL WHITE BACKGROUND WITH GREEN LETTERING WHITE BACKGROUND WITH RED LETTERING IF SIGN IS NOT LOCATED IN A PEDESTRIAN WALKWAY INSTALL AT 4' LEVEL 5' MINIMUM CONCRETE SIDEWALK DETAIL SCALE: 1"=2'4' MIN. (7' MAX.)COMPACTED SUBGRADE (PER GEOTECHNICAL REPORT) 6" 21-A STONE 2.5" BM-25.0A ASPHALT 1.5" SM-9.5A ASPHALT TYPICAL PAVEMENT SECTION SCALE: 1"=1' NOTES: 1.THE TYPICAL PAVEMENT SECTION SHOWN HEREON SHALL BE MODIFIED AS NEEDED BASED ON ACTUAL CBR VALUES TAKEN AT THE SUBBASE LAYER. THE FINAL PAVEMENT DESIGN SHALL BE CONFIRMED/DETERMINED BY THE GEOTECHNICAL ENGINEER OVERSEEING CONSTRUCTION. TYPICAL ASPHALT PAVEMENT WIDENING DETAIL 6" 21-A COMPACTED AGGREGATE BASE 1.5" TAR & CHIP SURFACE TREATMENT (APPLIED IN 2 COATS) TYPICAL SURFACE TREATMENT (TAR & CHIP) SECTION SCALE: 1"=1' NOTES: 1.SURFACE TREATMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH VDOT ROAD AND BRIDGE SPECIFICATIONS SECTION 313. TRASH ENCLOSURE DETAIL SCALE: 1"=2' TYPICAL SECTION OF HUTTLE ROAD NTS NOTE: 1.THE PAVEMENT DESIGN IS PRELIMINARY AND FINAL DESIGN TO BE BASED UPON FIELD OBTAINED CBR VALUES OBTAINED THE PRESENCE OF A VDOT INSPECTOR. 2.LIMITS OF FULL DEPTH PAVEMENT WIDENING ALONG HUTTLE ROAD SHALL BE DETERMINED BY EXCAVATION IN THE PRESENCE OF A VDOT INSPECTOR AND MATCHING CORE SAMPLES REQUIRED PER WP-2 DETAIL. SEE NOTE 2 ON THIS SHEET C002 GENERAL NOTES & LEGENDSLAND DEVELOPMENT SERVICES LAND PLANNINGCIVIL ENGINEERING DESIGN PROJECT MANAGEMENT9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186www.carterrun.com(540) 418-0969SHEET NO. FILENAME PROJECT # DATESITE PLANIMMACULATE HEART OF MARYHUTTLE ROADFREDERICK COUNTY, VIRGINIAJULY 1ST, 2026 C001 - Notes.dwg ISSUED FOR CONSTRUCTION C:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C001 - NOTES----->LAYOUT: C002 - GENERAL NOTES & LEGENDC999.2525REVISION TRACKINGREV #DATEBYDESCRIPTION17/01/2026ADBISSUED FOR CONSTRUCTIONADAM D. BAXTER LIC. NO. 058741 07/01/2026 LIMITS OF DISTURBANCE R/WPROP RIGHT-0F-WAY PROP PROPERTY LINE PROP LOT LINE PROP SETBACK PROP BUFFER PROP CENTERLINE PROP ACCESS EASEMENT PROP ELEC. EASEMENT PROP GAS EASEMENT PROP STORM EASEMENT PROP WATER EASEMENT PROP SWM FACILITY PROP SIGHT DISTANCE EASEMENT PROP PAVEMENT MARK PROP SIDEWALK O OPROP HANDRAIL PROP DRIP PROP RETAINING WALL PROP TOPO MAJOR PROP TOPO MINOR PROP DITCH PROP COMMUNICATION LINE E EPROP ELEC. G GPROP GAS OHE OHEPROP OVERHEAD ELEC. PROP SAN. SEWER PROP STORM SEWER T TPROP TELEPHONE W WPROP WATER DEMO HATCH LEGEND EX CONCRETE (TBR) EX GRAVEL (TBR) EX CONCRETE EX WETLAND EX PROP (VACATED) EX CENTERLINE (TBR) EX ACCESS EASEMENT (VACATED) EX GAS EASEMENT (VACATED) PROP MISC EXISTING LINETYPE LEGEND R/WEX RIGHT-OF-WAY EX CURB AND GUTTER EX TRAIL EASEMENT EX BUILDING EX CURB EX FENCE EX PAVEMENT EX COMMUNICATION LINE EX OVERHEAD ELEC. EX SAN. EX STM EX TELE EX WATER EX PROP ADJ. EX SIGHT DISTANCE EASEMENT (VACATED) EX SAN. EASEMENT (VACATED) EX TRAIL EASEMENT (VACATED) EX WATER EASEMENT (VACATED) EX BUILDING (TBR) EX CURB (TBR) EX CURB AND GUTTER (TBR) EX FENCE (TBR) EX PAVEMENT (TBR) EX PAVEMENT MARK (TBR) EX SIDEWALK (TBR) EX GUARDRAIL (TBR) EX DRIP (TBR) EX RAILROAD (TBR) EX WALL (TBR) EX COMMUNICATION LINE (TBR) EX ELEC. (TBR) EX FIBER OPTIC (TBR) EX GAS (TBR) EX SAN. (TBR) EX WETLAND STREAM (TBR) PROPOSED EASEMENT LEGEND PROP ACCESS EASEMENTI/E DIM PROP ELEC EASEMENTELEC DIM PROP GAS EASEMENTGAS DIM PROP SAN EASEMENTSAN DIM PROP SIGHT DISTANCE EASEMENTSI DIM PROP STORM EASEMENTSTM DIM PROP TRAIL EASEMENTTRL DIM PROP WATER EASEMENTWAT DIM SAWCUT LINE PROP SAN. EASEMENT PROP TRAIL EASEMENT PROP BUILDING PROP BUILDING CANOPY PROP CURB PROP PAVEMENT [][][]PROP GUARDRAIL FO FOPROP FIBER OPTIC PROPOSED LINETYPE LEGEND PROPOSED HATCH LEGEND PROP ASHPALT PROP GRAVEL PROP CONCRETE PROP SIDEWALK PROP PAVEMENT & ADA PROP RIP-RAP EX WETLAND (TBR) EXISITING HATCH LEGEND EX GRAVEL DEMOLITION LINETYPE LEGEND R/WEX RIGHT-OF-WAY (VACATED) EX ELEC. EASEMENT (VACATED) EX MISC (TBR) EX MISC EX PROP PROP CURB AND GUTTER EX SETBACK EX RPA EX CENTERLINE EX ACCESS EASEMENT EX ELEC. EASEMENT EX GAS EASEMENT EX SIGHT EASEMENT EX STORM EASEMENT EX SAN. EASEMENT EX WATER EASEMENT EX TOPO MAJOR EX TOPO MINOR EX PAVEMENT MARK EX SIDEWALK EX GUARDRAIL EX DRIP EX DITCH EX RAILROAD EX WALL EX ELEC. EX FIBER OPTIC EX GAS EX WETLAND STREAM EPHEMERAL DRAIN PERENNIAL DRAIN EX FEMA FLOODPLAIN EX STORM EASEMENT (VACATED) EX DITCH (TBR) EX OVERHEAD ELEC. (TBR) EX STM (TBR) EX TELE (TBR) EX WATER (TBR) PROP BUILDING EX BUILDING PROP DRAINFIELD PROP SILL CURB PROP TRANSITION CURB SPOT ELEVATION LEGEND TOP OF CURB TC=640 00 TOP OF CONCRETE/SIDEWALK TS=640 00 TOP OF GRATE RIM=640 00 TOP OF WALL TW=64000 BOTTOM OF WALL BW=640 00 FINISH GRADE FG=640 00 FLOW LINE FL=640 00 TA=640 00TOP OF ASPHALT TOP OF STRUCTURE TOP=640 00 PROP STORM ACCESS EASEMENTSTM DIM PROP SWM ACCESS EASEMENTSWM DIM PROP SWM EASEMENTSWM DIM PROP BREAKLINE SOILS BOUNDARY78A EX BRICK SIDEWALK EX ACCESS CONSERVATION EASEMENT EX FEMA FLOODPLAIN FM FMPROP SAN. FORCEMAIN EX FEATURES (TBR) PROP CONSERVATION EASEMENTCON DIM EX DIVIDE PROP OVERALL/EROSION & SEDIMENT CONTROL PHASE II DRAINAGE DIVIDE PROP SUB DRAINAGE DIVIDE EX Tc PATH OVERALL EX Tc PATH SUB PROP Tc PATH SUB PROP Tc PATH OVERALL STANDARD ABBREVIATIONS FOR ENTIRE PLAN SET AC ACRES ADA AMERICANS WITH DISABILITY ACT ARCH ARCHITECTURAL BC BOTTOM OF CURB BF BASEMENT FLOOR BK BLOCK BL BASELINE BLDG BUILDING BM BUILDING BENCHMARK BRL BUILDING RESTRICTION LINE CF CUBIC FEET CL CENTERLINE CMP CORRUGATED METAL PIPE CONN CONNECTION CONC CONCRETE CPP CORRUGATED PLASTIC PIPE CY CUBIC YARDS DEC DECORATIVE DEP DEPRESSED DIP DUCTILE IRON PIPE DOM DOMESTIC ELEC ELECTRIC ELEV ELEVATION EP EDGE OF PAVEMENT ES EDGE OF SHOULDER EW END WALL EX EXISTING FES FLARED END SECTION FFE FINISHED FLOOR FH FIRE HYDRANT FG FINISHED GRADE G GRADE GF GARAGE FLOOR (AT DOOR) GH GRADE HIGHER SIDE OF WALL GL GRADE LOWER SIDE OF WALL GRT GRATE GV GATE VALVE HDPE HIGH DENSITY POLYETHYLENE PIPE HP HIGH POINT HOR HORIZONTAL HW HEADWALL INT INTERSECTION INV INVERT LF LINEAR FOOT LOC LIMITS OF CLEARING LOD LIMITS OF DISTURBANCE LOS LINE OF SIGHT LP LOW POINT L/S LANDSCAPE MAX MAXIMUM MIN MINIMUM MH MANHOLE MJ MECHANICAL JOINT OC ON CENTER PA POINT OF ANALYSIS PC POINT OF CURVATURE PCCR POINT OF COMPOUND CURVATURE, CURB RETURN PI POINT OF INTERSECTION POG POINT OF GRADE PROP PROPOSED PT POINT OF TANGENCY PTCR POINT OF TANGENCY, CURB RETURN PVC POLYVINYL CHLORIDE PIPE PVI POINT OF VERTICAL INTERSECTION PVT POINT OF VERTICAL TANGENCY R RADIUS RCP REINFORCED CONCRETE PIPE RET WALL RETAINING WALL R/W RIGHT OF WAY S SLOPE SAN SANITARY SEWER SF SQUARE FEET STA STATION STM STORM S/W SIDEWALK TBA TO BE ABANDONED TBR TO BE REMOVED TBRL TO BE RELOCATED TBV TO BE VACATED TC TOP OF CURB TELE TELEPHONE TPF TREE PROTECTION FENCE TW TOP OF WALL TYP TYPICAL UG UNDERGROUND UP UTILITY POLE W WIDE W/L WATER LINE W/M WATER METER ±PLUS OR MINUS °DEGREE Ø DIAMETER #NUMBER BORING BENCHMARK OR E T EP EB HYDRANT SANITARY MANHOLE STORM MANHOLE WATER METER WATER VALVE GAS VALVE GAS METER TYPICAL END SECTION HEADWALL OR ENDWALL GRATE INLET CURB INLET CLEAN OUT ELECTRIC MANHOLE TELEPHONE MANHOLE ELECTRIC BOX ELECTRIC PEDESTAL MONITORING WELL TEST PIT PROPOSED NOTETYPICAL NOTE TEXT STANDARD DRAWING SYMBOL LEGEND FOR ENTIRE PLAN SET POLE SITE LIGHT TTRANSFORMER GG SIGN UTILITY POLE WITH LIGHT POLE LIGHT TRAFFIC LIGHT IMPERVIOUS LAND COVER OFF-SITE TURF LAND COVER OFF-SITE FOREST LAND COVER OFF-SITE STORM WATER MANAGEMENT HATCH LEGEND OFF-SITE IMPERVIOUS LAND COVER OFF-SITE TURF LAND COVER OFF-SITE FOREST LAND COVER OFF-SITE STORM WATER MANAGEMENT HATCH LEGEND ON-SITE VDOT GENERAL NOTES: 1.ALL WORK ON THIS PROJECT SHALL CONFORM TO THE CURRENT EDITIONS OF AND LATEST REVISIONS TO THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) ROAD AND BRIDGE SPECIFICATIONS AND STANDARDS, THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS, AND ANY OTHER APPLICABLE STATE, FEDERAL OR LOCAL REGULATIONS. IN CASE OF A DISCREPANCY OR CONFLICT BETWEEN THE STANDARDS OR SPECIFICATIONS AND REGULATIONS, THE MOST STRINGENT SHALL GOVERN. 2.ALL CONSTRUCTION SHALL COMPLY WITH THE LATEST U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), AND VIRGINIA OCCUPATIONAL SAFETY & HEALTH (VOSH) RULES AND REGULATIONS. 3.WHEN WORKING WITHIN VDOT RIGHT-OF-WAY, ALL TRAFFIC CONTROL, WHETHER PERMANENT OR TEMPORARY, SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF VDOT'S WORK AREA PROTECTION MANUAL. A TRANSPORTATION MANAGEMENT PLAN NEEDS TO BE SUBMITTED FOR APPROVAL AND LAND USE PERMIT ISSUED PRIOR TO ANY EXECUTION OF WORK WITHIN THE VDOT RIGHT OF WAY. 4.THE DEVELOPER SHALL BE RESPONSIBLE FOR RELOCATING, AT HIS EXPENSE, ANY AND ALL UTILITIES, INCLUDING TRAFFIC SIGNAL POLES, JUNCTION BOXES, CONTROLLERS, ETC., OWNED BY VDOT OR PRIVATE / PUBLIC UTILITY COMPANIES. IT IS THE SOLE RESPONSIBILITY OF THE DEVELOPER TO LOCATE AND IDENTIFY UTILITY FACILITIES OR ITEMS THAT MAY BE IN CONFLICT WITH THE PROPOSED CONSTRUCTION ACTIVITY. VDOT APPROVAL OF THESE PLANS DOES NOT INDEMNIFY THE DEVELOPER FROM THIS RESPONSIBILITY. 5.DESIGN FEATURES RELATING TO FIELD CONSTRUCTION, REGULATIONS, AND CONTROL OR SAFETY OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY VDOT. ANY ADDITIONAL EXPENSE INCURRED AS A RESULT OF ANY FIELD REVISION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. 6.IF REQUIRED BY THE LOCAL VDOT LAND DEVELOPMENT OFFICE, A PRE-CONSTRUCTION CONFERENCE SHALL BE ARRANGED AND HELD BY THE ENGINEER AND/OR DEVELOPER WITH THE ATTENDANCE OF THE CONTRACTOR (S), VARIOUS COUNTY AGENCIES, UTILITY COMPANIES AND VDOT PRIOR TO INITIATION OF WORK. 7.THE CONTRACTOR SHALL NOTIFY THE LOCAL VDOT LAND DEVELOPMENT OFFICE WHEN WORK IS TO BEGIN OR CEASE FOR ANY UNDETERMINED LENGTH OF TIME. VDOT REQUIRES AND SHALL RECEIVE 48 HOURS ADVANCE NOTICE PRIOR TO ANY REQUIRED OR REQUESTED INSPECTION. 8.THE CONTRACTOR SHALL NOTIFY THE TRAFFIC OPERATIONS CENTER AT (540) 332-9500 FOR ANY TRAFFIC CONTROL PLAN THAT IMPACTS A VDOT MAINTAINED INTERSTATE OR PRIMARY ROADWAY TO PROVIDE NOTIFICATION OF THE INSTALLATION AND REMOVAL OF THE WORK ZONE. 9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A VDOT PERMITTED TEMPORARY CONSTRUCTION ENTRANCE(S) IN ACCORDANCE WITH SECTION 3.02 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. FURTHERMORE, ACCESS TO OTHER PROPERTIES AFFECTED BY THIS PROJECT SHALL BE MAINTAINED THROUGH CONSTRUCTION. 10.CONTRACTOR SHALL ENSURE ADEQUATE DRAINAGE IS ACHIEVED AND MAINTAINED ON THE SITE DURING AND AT THE END OF CONSTRUCTION. 11.ALL WATER AND SEWER LINES WITHIN EXISTING OR PROPOSED VDOT RIGHT-OF-WAY SHALL HAVE A MINIMUM THIRTY-SIX (36) INCHES COVER AND WHEN POSSIBLE SHALL BE INSTALLED UNDER ROADWAY DRAINAGE FACILITIES AT CONFLICT POINTS. 12.ANY UNUSUAL SUBSURFACE CONDITIONS (E.G., UNSUITABLE SOILS, SPRINGS, SINKHOLES, VOIDS, CAVES, ETC.) ENCOUNTERED DURING THE COURSE OF CONSTRUCTION SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER AND VDOT. WORK SHALL CEASE IN THAT VICINITY UNTIL AN ADEQUATE DESIGN CAN BE DETERMINED BY THE ENGINEER AND APPROVED BY VDOT. 13.ALL FILL AREAS, BORROW MATERIAL AND UNDERCUT AREAS SHALL BE INSPECTED AND APPROVED BY A VDOT REPRESENTATIVE PRIOR TO PLACEMENT OF FILL. A VDOT REPRESENTATIVE SHALL BE PRESENT TO INSURE THE SOIL SAMPLE(S) OBTAINED FOR CBR'S IS REPRESENTATIVE OF THE LOCATION. WHEN SOIL SAMPLES ARE SUBMITTED TO PRIVATE LABORATORIES FOR TESTING, THE SAMPLES SHALL BE CLEARLY IDENTIFIED AND LABELED AS BELONGING TO A PROJECT TO BE ACCEPTED BY VDOT AND THAT TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE VDOT STANDARDS AND PROCEDURES. 14.ALL ROADWAY FILL, BASE, SUBGRADE MATERIAL, AND BACKFILL IN UTILITY/STORM SEWER TRENCHES SHALL BE COMPACTED IN ACCORDANCE WITH THE LIFT THICKNESSES, DENSITY AND MOISTURE REQUIREMENTS AS SPECIFIED IN THE CURRENT VDOT ROAD AND BRIDGE SPECIFICATIONS. CERTIFIED COPIES OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE. 15.VDOT STANDARD CD AND UD UNDERDRAINS SHALL BE INSTALLED WHERE INDICATED ON THESE PLANS AND/OR AS SPECIFIED BY VDOT. 16.A POST INSTALLATION VISUAL/VIDEO CAMERA INSPECTION SHALL BE CONDUCTED BY THE CONTRACTOR ON ALL PIPES IDENTIFIED ON THE PLANS AS STORM SEWER PIPE AND A SELECT NUMBER OF PIPE CULVERTS. FOR PIPE CULVERTS, A MINIMUM OF ONE PIPE INSTALLATION FOR EACH SIZE OF EACH MATERIAL TYPE WILL BE INSPECTED OR TEN PERCENT OF THE TOTAL AMOUNT FOR EACH SIZE AND MATERIAL TYPE SUMMARIZED. ALL PIPE INSTALLATIONS ON THE PLANS NOT IDENTIFIED AS STORM SEWER PIPE SHALL BE CONSIDERED AS CULVERT PIPE FOR INSPECTION PURPOSES. ADDITIONAL TESTING MAY BE REQUIRED AS DIRECTED BY THE AREA LAND USE ENGINEER OR THEIR REPRESENTATIVE. 17.THE INSTALLATION OF ANY ENTRANCES AND MAILBOXES WITHIN ANY DEDICATED STREET RIGHT-OF-WAY SHALL MEET VDOT MINIMUM DESIGN STANDARDS AND IS THE RESPONSIBILITY OF THE DEVELOPER. 18.PRIOR TO VDOT ACCEPTANCE OF ANY STREETS, ALL REQUIRED STREET SIGNAGE AND/OR PAVEMENT MARKINGS SHALL BE INSTALLED BY THE DEVELOPER IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. 19.THE DEVELOPER SHALL PROVIDE THE VDOT LAND DEVELOPMENT OFFICE WITH A LIST OF ALL MATERIAL SOURCES PRIOR TO THE START OF CONSTRUCTION. COPIES OF ALL INVOICES FOR MATERIALS UTILIZED WITHIN ANY DEDICATED STREET RIGHT-OF-WAY MUST BE PROVIDED TO THE LOCAL VDOT LAND DEVELOPMENT OFFICE PRIOR TO ACCEPTANCE OF THE WORK. UNIT AND TOTAL PRICES MAY BE OBSCURED. 20.AGGREGATE BASE AND SUBBASE MATERIALS SHALL BE PLACED ON SUBGRADE BY MEANS OF A MECHANICAL SPREADER. DENSITY WILL BE DETERMINED USING THE DENSITY CONTROL STRIP IN ACCORDANCE WITH SECTION 304 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS AND VTM-10. A CERTIFIED COMPACTION TECHNICIAN SHALL PERFORM THESE TESTS. CERTIFIED COPIES OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE. IN ADDITION TO CHECKING STONE DEPTHS, A VDOT REPRESENTATIVE SHALL BE NOTIFIED AND GIVEN THE OPPORTUNITY TO BE PRESENT DURING THE CONSTRUCTION AND TESTING OF THE DENSITY CONTROL STRIP. 21.ASPHALT CONCRETE PAVEMENTS SHALL BE PLACED IN ACCORDANCE WITH SECTION 315 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS. DENSITY SHALL BE DETERMINED USING THE DENSITY CONTROL STRIP AS SPECIFIED IN SECTION 315 AND VTM-76. A CERTIFIED COMPACTION TECHNICIAN SHALL PERFORM THESE TESTS. CERTIFIED COPIES OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE. A VDOT REPRESENTATIVE SHALL BE NOTIFIED AND GIVEN THE OPPORTUNITY TO BE PRESENT DURING THE CONSTRUCTION AND TESTING OF THE CONTROL STRIP. 22.IN ACCORDANCE WITH SECTION 302.03, THE FOUNDATIONS FOR PIPE CULVERTS THIRTY-SIX (36) INCHES AND LARGER SHALL BE EXPLORED BELOW THE BOTTOM OF THE EXCAVATION TO DETERMINE THE TYPE AND CONDITION OF THE FOUNDATION. THE CONTRACTOR SHALL REPORT FINDINGS OF FOUNDATION EXPLORATION TO THE ENGINEER AND VDOT FOR APPROVAL PRIOR TO PLACING PIPE. FOUNDATION DESIGNS SHALL COMPLY WITH VDOT ROAD AND BRIDGE STANDARD PB-1. WHERE SOFT, YIELDING, OR OTHERWISE UNSUITABLE FOUNDATION IS ENCOUNTERED, THE FOUNDATION DESIGN AND/OR NEED FOR FOUNDATION STABILIZATION SHALL BE DETERMINED BY THE ENGINEER AND APPROVED BY VDOT. 23.VDOT STANDARD GUARDRAIL SHALL BE INSTALLED WHERE WARRANTED AND/OR AS PROPOSED ON THESE PLANS IN ACCORDANCE WITH VDOT'S INSTALLATION CRITERIA. FINAL APPROVAL OF THE GUARDRAIL LAYOUT TO BE GIVEN BY VDOT AFTER GRADING IS MOSTLY COMPLETE. 24.APPROVAL OF THESE PLANS SHALL EXPIRE FIVE (5) YEARS FROM THE DATE OF THE APPROVAL LETTER. 25.VDOT STANDARD CG-12 CURB RAMPS SHALL BE INSTALLED WHERE INDICATED ON THESE PLANS AND/OR AS SPECIFIED BY VDOT. 26.THE FOUNDATIONS FOR ALL BOX CULVERTS SHALL BE INVESTIGATED BY MEANS OF EXPLORATORY BORINGS ADVANCED BELOW PROPOSED FOUNDATION ELEVATION TO DETERMINE THE TYPE AND CONDITION OF THE FOUNDATION. THE CONTRACTOR SHALL SUBMIT COPIES OF BOREHOLE LOGS AND REPORT FINDINGS OF FOUNDATION EXPLORATION TO THE ENGINEER AND VDOT FOR APPROVAL PRIOR TO CONSTRUCTING BOX. FOUNDATION DESIGNS SHALL COMPLY WITH VDOT ROAD AND BRIDGE STANDARD PB-1. CONTRARY TO THE STANDARD, WHERE ROCK IS ENCOUNTERED AND CAST-IN-PLACE BOX IS PROPOSED, THE THICKNESS OF BEDDING SHALL BE SIX (6) INCHES. WHERE SOFT, YIELDING, OR OTHERWISE UNSUITABLE FOUNDATION IS ENCOUNTERED, THE FOUNDATION DESIGN AND/OR NEED FOR FOUNDATION STABILIZATION SHALL BE DETERMINED BY THE ENGINEER AND APPROVED BY VDOT. TAX MAP: 91-A-83ATRACT B1SOCIETY OF SAINT PIUS X,FRONT ROYAL VIRGINIA, INCAREA: 9.3806 ACZONED: RAUSE: VACANTTAX MAP: 91-A-83-BJAMES G DOWDY & NANCYA DOWDY TRUSTEEZONED: RAUSE: RESIDENTIALTAX MAP: 91-A-83KLINES MILL DEVELOPERS III LLCZONED: RAUSE: VACANTRELIANCE ROAD - ROUTE 627VARIABLE WIDTH RIGHT-OF-WAYPOSTED SPEED = 45 MPHHUTTLE ROAD - ROUTE 63640' RIGHT-OF-WAYPOSTED SPEED = 35 MPHLIMITS OF DISTURBANCE=3.98 ACLIMITS OF DISTURBANCE=3.98 ACLIMITS OF DISTURBANCE=3.98 ACTAX MAP: 91-A-84HARRISON DAVID BYRANZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-13-AROBBIES COUNTRYCOTTAGE LLC ZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-12-AROBBIES COUNTRYCOTTAGE LLC ZONED: RAUSE: RESIDENTIALTAX MAP: 91-2-1-11-AROBBIES COUNTRYCOTTAGE ZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-10DIMON SAMULE L SRZONED: RAUSE: RESIDENTIALTAX MAP: 90-A-60-AKERNS MICHAEL AZONED: RAUSE: RESIDENTIAL10' BUFFER10' BUFFER10' BUFFER10' BUFFER10' BUFFERLAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C100 - Demo.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C100 - DEMO----->LAYOUT: C100 - DEMO C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C100EXISTING CONDITIONS/DEMOLITION PLANSCALE: 1"=50'01005050D SIZE ONLY TAX MAP: 91-A-83-BJAMES G DOWDY & NANCYA DOWDY TRUSTEEZONED: RAUSE: RESIDENTIALTAX MAP: 91-A-83KLINES MILL DEVELOPERS III LLCZONED: RAUSE: VACANTRELIANCE ROAD - ROUTE 627VARIABLE WIDTH RIGHT-OF-WAYPOSTED SPEED = 45 MPHHUTTLE ROAD - ROUTE 63640' RIGHT-OF-WAYPOSTED SPEED = 35 MPHLIMITS OF DISTURBANCE=3.98 ACLIMITS OF DISTURBANCE=3.98 ACLIMITS OF DISTURBANCE=3.98 ACTAX MAP: 91-A-84HARRISON DAVID BYRANZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-13-AROBBIES COUNTRYCOTTAGE LLC ZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-12-AROBBIES COUNTRYCOTTAGE LLC ZONED: RAUSE: RESIDENTIALTAX MAP: 91-2-1-11-AROBBIES COUNTRYCOTTAGE ZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-10DIMON SAMULE L SRZONED: RAUSE: RESIDENTIALTAX MAP: 90-A-60-AKERNS MICHAEL AZONED: RAUSE: RESIDENTIAL10' BUFFER10' BUFFER10' BUFFER10' BUFFER10' BUFFERPROP CHURCH8,400 SFFFE=680.25PARISH HALL/OFFICE 4,600 SF FFE-680.25 OUTFALLPROP DETENTION BASIN(FOR WATER QUANTITY USE ONLY)265.65' INTERSECTION SPACING MEASURED FROM TANGENT TO TANGENT277.2' SIGHT DISTANCE LEFT (TO VEHICLE THAT HAS JUST COMPLETED THE TURNING MOVEMENT)390' SIGHT DISTANCE RIGHTEEE EEEEEWWPRIMARY DRAINFIELDRESERVEDRAINFIELD95'558.72'128.46 '100'100'100'100'100'100'60'60'60'60'60'1177666677777714443 HR FIRE WALLPROP DUMPSTERPROP 5' CONC SIDEWALKPROP 5' CONC SIDEWALKPROP CURBED ISLAND (TYP)PROP VDOT CG-11COMMERCIAL ENTRANCEPROP LOADING ZONEPROP 5' CONC SIDEWALKSTMVARSTM15'STM15'STM15'ENTRANCECONNECTIONTO CONFIRMTO VDOT WP-2STANDARDSPROP SAW CUT LINEFOR ENTRANCE CONNECTIONLIMITS OF MILLAND OVERLAYLAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C200 - Site.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C200 - SITE----->LAYOUT: C200 - OVERALL SITE PLAN C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C200OVERALL SITE PLANSCALE: 1"=50'01005050D SIZE ONLY TAX MAP: 91-A-83KLINES MILL DEVELOPERS III LLCZONED: RAUSE: VACANTRELIANCE ROAD - ROUTE 627VARIABLE WIDTH RIGHT-OF-WAYPOSTED SPEED = 45 MPHHUTTLE ROAD - ROUTE 63640' RIGHT-OF-WAYPOSTED SPEED = 35 MPHLIMITS OF DISTURBANCE=3.98 ACLIMITS OF DISTURBANCE=3.98 ACLIMITS OF DISTURBANCE=3.98 AC10' BUFFER10' BUFFER10' BUFFER5'R5'R5'R5'R5'R5'R5'R5'R5'R5'R5'R5'R5'R5'R5'R5'R35'R29'R25'R29'R29'R20'R PROP CHURCH8,400 SFFFE=680.25PARISHHALL/OFFICE4,600 SFFFE-680.2575'R5'R20'R25'R 25'R45'R5'R OUTFALLPROP DETENTION BASIN(FOR WATER QUANTITY USE ONLY)5'R5'R5'R5'R5'R5'R10'R5'R5' R 35'R 5'R65'REEEEEEEEEEEEEPROP UNDEGROUNDELECTRICAL SERVICE LINEPROP SANITARY LATERALDESIGNED BY OTHERSWWWPRIMARY DRAINFIELDRESERVE DRAINFIELDPROP EMERGENCY SPILLWAYCLASS A1 RIP-RAPELEVATION 666.90L=20' W=10'60' 24'22'22'24'24'30'140'40'95'24'70'24'128.46 ' 20'20'20'20'20'20'20'9'9'9'9'24'16'22'5'30'146'18.16'49.68'17.03'126'15'7.07'36'247.5'156.85'111.51'13.5'10'10'8'8'8'20'9'20'20'45'12' 9' 9'100'100'60'60'60'60'11776666777777144420.57'10'4:14:13 HR FIRE WALLPROP DUMPSTERPROP 5' CONC SIDEWALKPROP SITE LIGHT (TYP)PROP 5' CONC SIDEWALKPROP CURBED ISLAND (TYP)PROP VDOTCG-11COMMERCIALENTRANCEPROP LOADING ZONEPROP 5' CONC SIDEWALKPROP"STOP" SIGNPROP 10' WIDE DRYPOND EMBANKMENTSTMVARSTM15'STM15'STM15'PROP 6" CURB AND GUTTER (TYP)PROP SIGNFIRE LANE / NO PARKING (TYP)LIMITS OF MILLAND OVERLAYCG-12 DETECTABLEWARNING STRIP (TYP)LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C200 - Site.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C200 - SITE----->LAYOUT: C201- HORIZINTAL LAYOUT PLAN C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C201HORIZONTAL LAYOUT PLANSCALE: 1"=30'0603030D SIZE ONLY TAX MAP: 91-A-83ATRACT B1SOCIETY OF SAINT PIUS X, FRONTROYAL VIRGINIA, INCAREA: 9.3806 ACZONED: RAUSE: VACANTTAX MAP: 91-A-83KLINES MILL DEVELOPERS III LLCZONED: RAUSE: VACANTRELIANCE ROAD - ROUTE 627VARIABLE WIDTH RIGHT-OF-WAYPOSTED SPEED = 45 MPHHUTTLE ROAD - ROUTE 63640' RIGHT-OF-WAYPOSTED SPEED = 35 MPH10' BUFFER10' BUFFER10' BUFFERPROP CHURCH8,400 SFFFE=680.25PARISHHALL/OFFICE4,600 SFFFE-680.25EEEEEEEEEEEEEWWW3 HR FIRE WALLLAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C202 - Firelane.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C202 - FIRELANE----->LAYOUT: C202 - FILELANE PLAN C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C202FIRELANE PLANSCALE: 1"=30'0603030D SIZE ONLYCBBACBACBACBBBAFIRE LANE NOTES:1.FIRE LANE SIGNS SHALL BE CONSTRUCTED OF METAL WITH DIMENSIONS OFAPPROXIMATELY TWELVE (12) INCHES BY FIFTEEN (15) INCHES.2.THE SIGNS SHALL BE PAINTED WITH RED LETTERS ON A WHITE BACKGROUNDWITH A THREE-EIGHTS (3/8) INCH RED TRIM STRIP AROUND THE ENTIREOUTER EDGE OF THE SIGN. THE LETTERING ON THE SING SHALL READ "NOPARKING OR STANDING FIRE LANE", WHICH SHALL BE SPACED ON THE SIGNFACE UNIFORMLY. SOLID ARROWS SHALL ALSO BE PAINTED ON THE SIGNS TOPOINT TO AND INDICATE THE DESIGNATED FIRE LANE. THE LETTERING ANDARROW ON THE SIGN SHALL BE IN ACCORDANCE WITH THE TABLE ON THISSHEET.3.SIGNS FOR FIRE LANES SHALL BE POSTED WHERE SHOWN ON THIS SHEET ANDSHALL BE MOUNTED WITH THE BOTTOM OF THE SIGN NO LESS THAN SIX (6)FEET FROM THE GROUND UNLESS OTHERWISE DIRECTED BY THE FIREMARSHALL.4.SIGN POSTS SHALL BE METAL AND SECURELY MOUNTED UNLESS APPROVALFROM THE FIRE MARSHAL'S OFFICE IS OBTAINED PRIOR TO INSTALLATION FORAN ALTERNATIVE METHOD.5.ALL CURB,OUTSIDE OF THE VDOT RIGHT-OF-WAY, WITHIN THE DESIGNATEDFIRE LANES SHALL BE PAINTED YELLOW.CA40822Pumper Fire TruckOverall Length40.000ftOverall Width8.167ftOverall Body Height7.745ftMin Body Ground Clearance0.656ftTrack Width8.167ftLock-to-lock time5.00sMax Wheel Angle45.00° TAX MAP: 91-A-83KLINES MILL DEVELOPERS III LLCZONED: RAUSE: VACANTRELIANCE ROAD - ROUTE 627VARIABLE WIDTH RIGHT-OF-WAYPOSTED SPEED = 45 MPHHUTTLE ROAD - ROUTE 63640' RIGHT-OF-WAYPOSTED SPEED = 35 MPHLIMITS OF DISTURBANCE=3.98 ACLIMITS OF DISTURBANCE=3.98 ACLIMITS OF DISTURBANCE=3.98 AC10' BUFFER10' BUFFER10' BUFFER10' BUFFERPROP CHURCH8,400 SFFFE=680.25PARISHHALL/OFFICE4,600 SFFFE-680.25OUTFALLPROP DETENTION BASIN(FOR WATER QUANTITY USE ONLY)265.65' INTERSECTION SPACING MEASURED FROM TANGENT TO TANGENT 10+6410+00WSE10=668.2146.0' - 12" DUAL WALL HDPE@ 1.00%88.0' - 12" DUAL WALL HDPE @ 1.00%46.7' - 12" DUAL WALL HDPE@ 1.01%44.4' - 18" RCP CL. III @ 2.88%167.8' - 15" DUAL WALL CORRUGATED HDPE @ 3.39%EEEEEEEEEEEEE118.2' - 15" DUAL WALL HDPE @ 4.83%71.5' - 15" DUAL WALL HDPE @ 2.10%20.0' - 15" DUAL WALL HDPE@ 1.00%WSE1 = 664.11WSE2 = 664.71WSE10 665.71WSE100 = 666.74WSE10=675.24WSE10=679.33WSE10=679.39WSE10=674.92FG=66825 FG=66825 FG=66825 FG=66825 STM6STM7STM8STM9STM1STM3STM4STM5STM12STM13STM10STM11PROP UNDEGROUNDELECTRICAL SERVICE LINEPROP SANITARY LATERALDESIGNED BY OTHERSWWWPRIMARY DRAINFIELDRESERVE DRAINFIELDPROP EMERGENCY SPILLWAYCLASS A1 RIP-RAPELEVATION 666.90L=20' W=10'TC=67941 TC=67939 TC=67935 TC=67932 TC=67929 TC=67976 TC=68015 TC=67965 TC=67965 TC=68015 TC=67965 TC=67965 TS=67975 TS=68025 TS=67975 TS=68025 TC=67942 TC=67994 FG=68025 FG=68025 -8.38%-3.94%-2.52%-5.00% -2.92%-0.79%-1.44%-1.80%-1.05%678682 684 686 674676674668664678670668670672674676674676678 664666664666 666668 668666 664666668668666664666668 684 682 686 688 666668666668674672670FG=66250 FG=66509 FG=66500 FG=66250 STM2FG=66250 FG=66250 FG=66500 FG=66500 -2.03%-6.09%-8.58%STM14STM1517.0' - 15" DUAL WALL HDPE@ 1.00%WSE10=676.56TA=66900 TC=67897 FL=68408 FG=67395 TC=67794 TC=67933 TC=67863 TC=67674 TC=67489 TC=67443 TC=67629 TC=67263 TC=67244 TC=67104 TC=67100 TC=67013 TC=66993 TC=67110 TC=67083 TC=67251 TC=67226 TC=67396 TC=67372 TC=67536 TC=67508 TC=67646 TC=67624 TC=67744 TC=67731 TC=67665 TC=67647 TC=67432 TC=67407 TC=67591 TC=67560 TC=67995 TC=67935 TC=67965 TC=67913 TC=67962 TC=67950 TC=68075 TC=68075 TC=68104 TC=68015 TC=67998 TC=67984 TC=67994 FG=68025 FG=68025 FG=68025 FG=68025 FG=68025 FG=68025 FG=68025 FL=67865 FL=67815 HP/FL=68018 TA=68019 TA=68066 TA=67830 TA=67895 TA=67641 TC=67863 TA=67795 TC=67918 TC=67939 TC=67881 TC=67881 TA=67699 TA=67673 TA=67525 TA=67447 TA=67556 TA=67292 TA=66900 FL=66729 TA=66980 ME/FG=66956 ME/FG=66920 ME/FG=67039 TC=68015 TC=68015 TS=68015 TS=68015 TS=68015 TC=68015 TA=67020 TA=67037 ME/FG=66940 FG=66964 FL=67000 TA=66918 TA=66948 TA=66971 TC=67007 FG=67103 TA=67066 TA=67334 FL=66956 TOP=67836 TS=68015 TS=68015 RIM=67925 RIM=67925 TOP=67699 FL=67534 FL=67556 FL=67602 TC=67812 TC=67818 TC=67883 TC=67911 TC=67855 TA=67777 3 HR FIRE WALLTOP=666.804' - 8" PERFORATED HDPE@ 1.00%PROP DUMPSTERPROP 5' CONC SIDEWALKPROP SITE LIGHT (TYP)PROP 5' CONC SIDEWALKPROP CURBED ISLAND (TYP)PROP VDOTCG-11COMMERCIALENTRANCEPROP LOADING ZONEPROP 5' CONC SIDEWALKPROP"STOP" SIGNPROP 10' WIDE DRYPOND EMBANKMENTSTMVARSTM15'STM15'STM15'PROP 6" CURB AND GUTTER (TYP)PROP SIGNFIRE LANE / NO PARKING (TYP)LIMITS OF MILLAND OVERLAYCG-12 DETECTABLEWARNING STRIP (TYP)INSERT B DETAILINSERT A DETAILTC=67997 TC=67985 TS=67975 TC=68015 TC=68013 TS=68025 TS=68025 TS=67965 TA=67965 TS=67975 TC=68014 TS=67965 TS=68015 TC=68025 TA=67965 -2.00% -7.36%-9.21%STM12STM13TS=67597 -2 .00%-3.32%ME/FG=67582 ME/FG=67594 TS=67609 CG-12 DETECTABLEWARNING STRIP (TYP)LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C300 - Grade.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C300 - GRADE----->LAYOUT: C300 - GRADING C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C300GRADING & DRAINAGE PLANSCALE: 1"=30'0603030D SIZE ONLYSPOT ELEVATION LEGENDTOP OF CURBTC=64000TOP OF CONCRETE/SIDEWALKTS=64000TOP OF GRATERIM=64000TOP OF WALLTW=64000BOTTOM OF WALLBW=64000FINISH GRADEFG=64000FLOW LINEFL=64000TA=64000TOP OF ASPHALTTOP OF STRUCTURETOP=64000EX TOPO MAJOREX TOPO MINORPROP TOPO MAJORPROP TOPO MINORGRADING LEGENDEX GIS TOPOINSERT A DETAILSCALE: 1"=10'INSERT B DETAILSCALE: 1"=10' TAX MAP: 91-A-84HARRISON DAVID BYRANZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-13-ATAX MAP: 90-A-60-AKERNS MICHAEL AZONED: RAUSE: RESIDENTIAL265.65' INTERSECTION SPACING MEASURED FROM TANGENT TO TANGENT13+917+228+00 9+00 10+0011+0012+0013+0010+6410+00EEEEEE676 674 668678 67066867067267467667 4676678 666666 668 668 666 664 666668668666666 668 HUTTLE ROAD - ROUTE 63640' RIGHT-OF-WAYCHANNEL SECTION #1CHANNEL SECTION #2ELEVATION STATION6606706806606706807+008+009+0010+0011+0012+0013+0014+0014+25277.2' - SIGHT DISTANCE LEFTPOSTED SPEED LIMIT 35 MPH390' - SIGHT DISTANCE RIGHTPOSTED SPEED LIMIT 35 MPHHEIGHT OF OBJECT = 3.5'HEIGHT OF OBJECT = 3.5'HEIGHT OF OBSERVER = 3.5'PROP. GRADE25'R25'R10+6410+0048'48'80'30'12'12'668670668670672674676674 676668666TA=67447 FL=66729 TA=66980 ME/FG=66956 ME/FG=66920 ME/FG=67039 TA=67020 TA=67037 ME/FG=66940 FG=66964 TC=67007 TA=67066 FL=66956 PROP VDOT CG-11COMMERCIAL ENTRANCEENTRANCE CONNECTION TOCONFIRM TO VDOT WP-2 STANDARDSPROP SAW CUT LINEFOR ENTRANCE CONNECTIONLIMITS OF MILLAND OVERLAYELEVATIONSTATION 67067010+0011+00STA. 10+00ELEV=669.50STA. 10+64ELEV=670.24 PROP. GRADEHUTTLE ROAD CENTERLINEEND ENTRANCE C/L PROFILE -2.95%3.08%-1.00%10+09.53669.2210+19.53669.23LP=10+14.42ELEV=669.15 K=3.67PVI STA=10+52.91PVI ELEV=670.2510+45.41670.0210+60.41670.18HI=10+56.73ELEV=670.20 PVI STA=10+14.53PVI ELEV=669.07LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C301 - Sight.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C301 - SIGHT----->LAYOUT: C301 - SIGHT DISTANCE PROFILE C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C301INTERSECTION SIGHT DISTANCE & ENTRANCE DETAIL SCALE: 1"=50'01005050D SIZE ONLYNOTE:1.A TEMPORARY TRAFFIC CONTROL PLAN WILL BE REQUIREDFOR THE INSTALLATION OF THE ENTRANCE WITHIN THEVDOT RIGHT-OF-WAY.ENTRANCE INTERSECTION SIGHT DISTANCE PLANSCALE: 1"=50'ENTRANCE INTERSECTION SIGHT DISTANCE PROFILEHORZ SCALE: 1"=50'VERT SCALE: 1"=5'14.5'ENTRANCE DETAILSCALE: 1"=20'ENTRANCE CENTERLINE PROFILEHORZ SCALE: 1"=20'VERT SCALE: 1"=2'APPROACHING VEHICLES AT THIS LOCATIONARE ASSUMED TO HAVE A MAXIMUM SPEEDOF 15 MPH AFTER COMPLETING THETURNING MOVEMENT ONTO HUTTLE ROADFROM RELIANCE ROAD.VDOT 2-YR CHANNEL ANALYSISIDChannel InformationFull FlowDesignDesign Flow CharacteristicsVelocityVegetatedManningsSlopeDepthSideslope1Sideslope2BaseVelocityFlowrateFlowrateq/QDepthVelocityAllowedLiningn(ft/ft)(feet)(ZH:1V)(ZH:1V)(feet)(ft/sec)Q (cfs)q (cfs)%(feet)(ft/sec)(ft/sec)TypeSeciton #10.0350.00811.038302.4314.171.6211%0.461.415.00Kentucky BluegrassSection #20.0350.01621.33303.9319.901.628%0.512.105.00Kentucky BluegrassVDOT 10-YR CHANNEL ANALYSISIDChannel InformationFull FlowDesignDesign Flow CharacteristicsManningsSlopeDepthSideslope1Sideslope2BaseVelocityFlowrateFlowrateq/QDepthVelocityn(ft/ft)(feet)(ZH:1V)(ZH:1V)(feet)(ft/sec)Q (cfs)q (cfs)%(feet)(ft/sec)Section #10.0350.00811.038302.4314.172.2716%0.521.54Section #20.0350.01621.33303.9319.902.2711%0.582.28 TAX MAP: 91-A-83KLINES MILL DEVELOPERS III LLCZONED: RAUSE: VACANTRELIANCE ROAD - ROUTE 627VARIABLE WIDTH RIGHT-OF-WAYPOSTED SPEED = 45 MPHHUTTLE ROAD - ROUTE 63640' RIGHT-OF-WAYPOSTED SPEED = 35 MPH10' BUFFER10' BUFFER10' BUFFERPROP CHURCH8,400 SFFFE=680.25PARISHHALL/OFFICE4,600 SFFFE-680.25OUTFALLPROP DETENTION BASIN(FOR WATER QUANTITY USE ONLY)10+0010+20 10+0010+7110+ 0 0 11+0011+81 10+0011+0012+0012+8610+0011+0011+0310+0011+0012+0012+97WSE10=668.2146.0' - 12" DUAL WALL HDPE@ 1.00%88.0' - 12" DUAL WALL HDPE @ 1.00%46.7' - 12" DUAL WALL HDPE@ 1.01%44.4' - 18" RCP CL. III @ 2.88%167.8' - 15" DUAL WALL CORRUGATED HDPE @ 3.39%EEEEEEEEEEEEE118.2' - 15" DUAL WALL HDPE @ 4.83%71.5' - 15" DUAL WALL HDPE @ 2.10%20.0' - 15" DUAL WALL HDPE@ 1.00%DETENTION BASIN SECTION ADETENTION BASIN SECTION BWSE1 = 664.11WSE2 = 664.71WSE10 665.71WSE100 = 666.74WSE10=675.24WSE10=679.33WSE10=679.39WSE10=674.92STM6STM7STM8STM9STM1STM3STM4STM5STM12STM13STM10STM11PROP UNDEGROUNDELECTRICAL SERVICE LINEPROP SANITARY LATERALDESIGNED BY OTHERSWWWPRIMARY DRAINFIELDRESERVE DRAINFIELDPROP EMERGENCY SPILLWAYCLASS A1 RIP-RAPELEVATION 666.90L=20' W=10'PROP WELLPROP 3/4" TYPE "K"COPPER SERVICE LINE678682 684 686 674676674668664678670668670672674676674676678 664666664666 666668 668666 664666668668666664666668 684 682 686 688 666668666668674672670STM210+0010+17STM14STM1517.0' - 15" DUAL WALL HDPE@ 1.00%WSE10=676.563 HR FIRE WALL4' - 8" PERFORATED HDPE@ 1.00%PROP DUMPSTERPROP 5' CONC SIDEWALKPROP SITE LIGHT (TYP)PROP 5' CONC SIDEWALKPROP CURBED ISLAND (TYP)PROP VDOTCG-11COMMERCIALENTRANCEPROP LOADING ZONEPROP 5' CONC SIDEWALKPROP"STOP" SIGNPROP 10' WIDE DRYPOND EMBANKMENTSTMVARSTM15'STM15'STM15'PROP 6" CURB AND GUTTER (TYP)PROP SIGNFIRE LANE / NO PARKING (TYP)LIMITS OF MILLAND OVERLAYCG-12 DETECTABLEWARNING STRIP (TYP)STM-9AREA=0.14 ACC=0.74STM-8AREA=0.07 ACC=0.66STM-15AREA=1.06 ACC=0.53STM-13AREA=0.59 ACC=0.59STM-11AREA=0.33 ACC=0.63STM-5AREA=0.41 ACC=0.56LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C400 - Storm.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C400 - STORM----->LAYOUT: C400 - STORM LAYOUT PLAN C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C400STORM LAYOUT PLANSCALE: 1"=30'0603030D SIZE ONLYSTORM INLET DRAINAGE AREA TABULATIONSLand Cover TypeC FACTORSTM-15STM-13STM-11STM-9STM-8STM-5AREA (AC)C x AAREA (AC)C x AAREA (AC)C x AAREA (AC)C x AAREA (AC)C x AAREA (AC)C x AASPHALT, CONCRETE, AND ROOFS0.900.380.3420.270.2430.340.3060.10.090.040.0360.590.531GRASS AREAS0.350.30.1050.190.06650.380.1330.040.0140.030.01050.450.1575WOODED AREA (OPEN SPACE)0.300.380.1140.130.0390.20.060.430.129Total =1.060.5610.590.3490.920.4990.140.1040.070.0471.470.818COMPOSITE C (TOTAL AREA/TOTAL C x A)=0.530.590.630.740.660.56DRAINAGE AREA RUNOFF SUMMARY (RATIONAL METHOD)DRAINAGE AREAIDCOMPOSIT C2-YR RUNOFF (CFS)10-YR RUNOFF (CFS)AREAFACTORINTENSITYAREARUNOFFINTENSITYAREARUNOFFID"C "(IN/HR)(AC)(CFS)(IN/HR)(AC)(CFS)STM-150.533.661.062.055.511.063.09STM-130.594.660.591.626.510.592.27STM-110.634.660.922.706.510.923.77STM-90.744.660.140.486.510.140.68STM-80.664.660.070.226.510.070.30STM-50.562.981.472.444.201.473.43STM-9STM-8NYLOPLAST 15" DROP IN GRATE INLET CAPACITY CHARTSTORM INLET 10 YEAR WSESTMINLETQPONDINGWSEINLETELEVATIONDEPTH#(ft)(cfs)(ft)(ft)9679.250.680.081679.338679.250.30.144679.39 ELEVATIONSTATION670 68069067068069010+0010+8020.00' OF15" DUAL WALL HDPE@ 1.00%10+20.00 - PIPE MITERED TO SLOPE INV OUT=674.46 (15") 10+00.00 - PIPE MITERED TO SLOPEINV IN=674.26 (15") (FROM STR-13)PROP. GRADESTM13STM12MITER PIPETO SLOPEMITER PIPETO SLOPERIP-RAP OUTLETPROTECTION SEECOMPUTATIONS(SHEET C403)WSE10=675.24HGL10ELEVATION STATION66067068066067068010+0011+0011+2010+00.00 - PIPE MITERED TO SLOPE INV IN=665.54 (15") (FROM STR-11) 10+71.45 - PIPE MITERED TO SLOPE INV OUT=667.04 (15")PROP. GRADESTM11STM10MITER PIPETO SLOPEMITER PIPETO SLOPERIP-RAP OUTLETPROTECTION SEECOMPUTATIONS(SHEET C403)WSE10=668.21HGL10ELEVATIONSTATION650660670 68069065066067068069010+0011+0012+0013+0013+20167.82' OF15" DUAL WALL CORRUGATED HDPE@ 3.39%118.16' OF15" DUAL WALL HDPE@ 4.83%12+85.98 - PIPE MITERED TO SLOPE INV OUT=674.40 (15") 11+67.82 - 48" MANHOLEINV OUT=668.69 (15")INV IN=668.69 (15") (FROM STR-5)PROP. GRADETOP=676.99 STM4STM5MITER PIPETO SLOPEMITER PIPETO SLOPESTM310+00.00 - PIPE MITERED TO SLOPEINV IN=663.00 (15") (FROM STR-4)RIP-RAP OUTLETPROTECTION SEECOMPUTATIONS(SHEET C403)WSE10=674.82HGL10ELEVATION STATION66067068069070066067068069070010+0011+0012+0012+2010+00.00 - PIPE MITERED TO SLOPE INV IN=674.74 (12") (FROM STR-7)46.03" OF12" DUAL WALL HDPE@ 1.00%10+46.03 - 48" MANHOLE INV OUT=675.20 (12") INV IN=675.20 (12") (FROM STR-8)88.00' OF12" DUAL WALL HDPE@ 1.00%11+34.03 - 30" NYLOPLAST BASIN (15" GRATE) INV OUT=676.08 (12") INV IN=676.08 (12") (FROM STR-9)46.75" OF12" DUAL WALL HDPE@ 1.01%11+80.78 - 30" NYLOPLAST BASIN (15" GRATE) INV OUT=676.55 (12") TOP=678.36 STM7TOP=679.25 STM8TOP=679.25 STM9STM6MITER PIPETO SLOPERIP-RAP OUTLETPROTECTION SEECOMPUTATIONS(SHEET C403)WSE10=679.33HGL10WSE10=679.39ELEVATIONSTATION670 68069067068069010+0010+60PROP. GRADE10+00.00 - PIPE MITERED TO SLOPEINV IN=675.34 (15") (FROM STR-15)10+17.04 - PIPE MITERED TO SLOPEINV OUT=675.51 (15")STM15STM1417.04' OF15" DUAL WALL HDPE@ 1.00%MITER PIPETO SLOPERIP-RAP OUTLETPROTECTION SEECOMPUTATIONS(SHEET C403)MITER PIPETO SLOPEWSE10=676.56HGL10LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C400 - Storm.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C400 - STORM----->LAYOUT: C401 - STORM PROFILES C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C401STORM PROFILES & COMPUTATIONS STORM 13 - 12 PROFILEHORZ SCALE: 1"=30'VERT SCALE: 1"=5'STORM 11 - 10 PROFILEHORZ SCALE: 1"=30'VERT SCALE: 1"=5'STORM 13 - 12 (10-YR)STORM 11 - 10 (10-YR)STORM 5 - 3 PROFILEHORZ SCALE: 1"=30'VERT SCALE: 1"=5'STORM 9 - 6 PROFILEHORZ SCALE: 1"=30'VERT SCALE: 1"=5'10 YEAR STORM COMPUTATIONSFROMTODRAINAGERUNOFFCAINLETTOCRAINFALLQINVERT ELEV.LENGTHSLOPEDIANCAPACITYVELOCITYFLOWFLOW TIMEQVVFULLSTRSTRAREACOEFF.INC.ACC.TIME(USE)INTENSITYINCR.KNOWNTOTALUPPERLOWERDEPTHINCR.TOTAL//(ACRES)C(MIN)(MIN)(IN/HR)(CFS)(CFS)(CFS)(FT)(FT)(FT)(%)(IN)(CFS)(FPS)(FT)(MIN)(MIN)QFULLVFULL(FPS)980.140.740.100.1055.006.510.650.65676.55676.0846.751.01%120.0123.883.670.280.215.210.170.744.94870.070.660.050.1555.216.430.320.96676.08675.20881.00%120.0123.874.090.340.365.570.250.834.93760.000.155.576.300.000.95675.2674.7446.031.00%120.0123.874.070.340.195.760.250.834.93541.470.560.820.821515.004.203.443.44674.40668.69118.164.83%150.01215.4310.120.400.1915.190.220.8112.57430.000.8215.194.170.003.42668.69662.00167.823.99%150.01214.019.430.420.300.300.240.8311.42210.0011.1811.18662.5661.2244.42.88%180.01317.8810.680.860.070.070.631.0610.1210-YEAR HGL COMPUTATIONSSTRUCTUREOUTLETJUNCTION LOSSFINALINLETRIM/INLET#HGLDoQoLoSfoHfVoHoQiViQi x ViVi^2/2gHiANGLEKHdHtPlunging FactorShaping FactorHHGLTHROATSHAPPING(FT)(FT)(CFS)(FT)(FT/FT)(FT)(FPS)(FT)(CFS)(FPS)(FT)(DEGREES)(FT)(FT)(FT)(FT)(FT)(FT)ELEV. (FT)YES/NO2662.421.511.1844.40.01130.5010.680.440.000.440.220.72663.14666.80YES4663.001.253.42167.820.00245.699.430.3453.4410.12034.8131.5900.5570.000.901.170.596.28669.28676.99YES5669.691.253.44118.160.00244.7110.120.3980.000.400.520.525.23674.927675.5410.9546.030.00060.034.070.0640.964.0873.9240.2590.091640.580.150.310.400.200.23675.77678.36YES8676.0010.96880.00060.084.090.0650.653.6682.3840.2090.073900.70.150.280.370.180.26676.26679.25YES9676.8810.6546.750.00030.013.670.0520.000.050.070.030.05676.93679.25YESSTORM 15 - 14 (10-YR)STORM 13 - 12 PROFILEHORZ SCALE: 1"=30'VERT SCALE: 1"=5' ELEVATIONSTATION650660 67068065066067068010+0011+0011+40TOP=666.80 STM2STM110+00.00 - ES-1INV IN=661.22 (18") (FROM STR-2)10+44.44 - POND RISER STRUCTUREINV OUT=662.50 (18")INV IN=662.28 (8") (FROM STR-)44.44" OF18" RCP CL. III@ 2.88%RIP-RAP OUTLETPROTECTION SEECOMPUTATIONS(SHEET C403)WSE1=664.11WSE2 = 664.71WSE10=665.71WSE100=666.74PROP. GRADEELEVATION STATION65066067068065066067068010+0011+0012+0013+0013+25WSE1=664.11WSE2 = 664.71WSE10=665.71WSE100=666.74PROP. GRADEPROP DETENTION BASIN(FOR WATER QUANTITY USE ONLY)10+0010+0011+0010+0011+0011+0310+0011+0012+0012+9744.4' - 18" RCP CL. III @ 2.88% 167.8' - 15" DUAL WALL CORRUGATED HDPE @ 3.39% 15" DUAL WALL HDPE @ 2.10%DETENTION BASIN SECTION ADETENTION BASIN SECTION BWSE1 = 664.11WSE2 = 664.71WSE10 665.71WSE100 = 666.74FG=66825 FG=66825 FG=66825 FG=66825 STM1STM3STM10PROP EMERGENCY SPILLWAYCLASS A1 RIP-RAPELEVATION 666.90L=20' W=10'-8.38%6646646666646 6 6 6 6 6 6 6 8 6 6 8 6 6 6 6 6 4 666668 668 666 664 666 668666668666668 672670FG=66250 FG=66509 FG=66500 FG=66250 STM2FG=66250 FG=66250 FG=66500 ELEV=663ELEV=663FG=66500 TA=66900 FG=67395 TC=67674 TC=67489 TC=67443 TC=67629 TC=67263 TC=67244 TC=67104 TC=67100 TC=67013 TC=66993 TC=67110 TC=67083 TA=67895 TA=67641 TA=67556 TA=67292 TA=66900 TA=66918 TA=66948 TA=66971 TC=67007 FG=67103 TOP=666.804' - 8" PERFORATED HDPE@ 1.00%PROP 10' WIDE DRYPOND EMBANKMENTLAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C400 - Storm.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C400 - STORM----->LAYOUT: C402 - STORM PROFILES C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C402STORM PROFILES & COMPUTATIONS DETENTION BASIN SECTION A PROFILEHORZ SCALE: 1"=20'VERT SCALE: 1"=5'DETENTION BASIN SECTION B PROFILEHORZ SCALE: 1"=20'VERT SCALE: 1"=5'DETENTION BASIN GRADING DETAILSCALE: 1"=20'0402020D SIZE ONLY LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C400 - Storm.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C400 - STORM----->LAYOUT: C403 - STORM DETAILS C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C403STORM DETAILS & COMPUTATIONS RISER STRUCTURE DETAIL SCALE: 1"=2'VDOT TRASH RACK DETAILDETENTION BASIN VOLUME COMPUTATIONSDesigned by: ADBStage VS. Storage (Conic Method)ElevationAreaIncremental VolumeTotal Volume(Feet)(Feet)(Acres)(Cubic-Feet)(Acre-Feet)(Cubic-Feet)(Acre-Feet)Forebay Wet662.565.00.00150.0000.000.00006632086.00.0479419.870.0096419.870.00966642989.00.06862524.000.05792943.870.06766654160.00.09553558.410.08176502.280.14936666857.00.15745452.630.125211954.910.27446678630.00.19817726.530.177419681.440.451866810506.00.24129552.640.219329234.080.6711668.2513742.00.31553021.960.069432256.040.7405Total Dry Storag Volume=32256.040.740RISER STRUCTURE ANTI-FLOTATION COMPUTATIONSRiser Structure InformationOpening InformationWall Thickness =0.42ft.Di =4.00ft.CircularDo =4.83ft.Diameter (in)Qty.Hr =5.42ft.Outlet Pipe =181Hb =0.67ft. Orifice 1 =2.751Footing InformationD =6.83ft.Rectangular OpeningsH =0.67ft.Length (ft)Width (ft)Height (ft)Weir 1 =1.750.421.55Hs =1.00ft.Weir 2 =As =18.30sqft.Volume of Water Displaced =123.82cfVolume of Concrete (cf)Weight of Water Displaced = 7,726.07lbsWalls =31.31Base =24.44Weight of Concrete = 9,338.02lbsFill to Outlet Invert Hb =8.38Outlet Pipe =-0.74Weight of Soil on Footing = 688.09lbsOrifice 1 =-0.02Weir 1 =-1.13Safety Factor =1.30Weir 2 =0.00Total Volume =62.25Outfall Protection Computations (Rip-Rap)CULVERT IDPIPE DIA.(IN.)Q(CFS)OUTLETVELOCITY(FPS)RIP-RAPLENGHT(FT)RIP-RAPWIDTH(FT)RIP-RAPTHICKNESS (FT)CLASSSTM 15-14153.09389.251.35A1STM 13-12152.273.2989.251.35A1STM 11-10153.623.4189.251.35A1STM 9-6120.684.07671.35A1STM 5-3153.019.0989.251.35A1STM 2-11810.6310.551213.51.35A1NON CLOGGING LOW FLOW ORIFICE DESIGN COMPUTATIONSFLOW THROUGH STONE:Q = K * AQ = FLOW (CFS)K = HYDRAULIC CONDUCTIVITY (0.5 - 10 FPS FOR 3-6" STONE)A = CROSS-SECTIONAL AREA ((2+1)/2) * 0.67 = 1.00 SQ. FT.Q = 0.5 FPS * 1.0 SQ. FTQ = 0.5 CFSPIPE PERFORATION DESIGN:Q = L * B * Cd* A0SQRT(2gh)L = LENGTHB = # OF HOLESCd = 0.6A0 = AREA OF ORIFICE HOLE (3.14 * 0.031252) = 0.0031 SQ. FT.g = 32.2 FPSh = PRESURE HEAD CHANGE (4 * 0.01) = 0.04 FTQ = 4 FT * 45 * 0.6 * 0.0031 SQRT (2 * 32.2 FPS * 0.04 FT)Q = 0.537 CFS*THE MAX DESIGN FLOW THROUGH THE ORIFICE BEFORE ACTIVATION OF THE RECTANGULAR WEIR IS 0.347 CFS.THEREFOR, 0.347 CFS IS THE MINIMUM FLOW NEEDED THROUGH THE STONE OR PERFORATED PIPE FOR RISER TOOPERATE AS DESIGNED.QMAX = 0.347 CFSQALLOW(STONE) = 0.500 CFSQALLOW(PIPE) = 0.537 CFS TAX MAP: 91-A-83ATRACT B1SOCIETY OF SAINT PIUS X, FRONTROYAL VIRGINIA, INCAREA: 9.3806 ACZONED: RAUSE: VACANTTAX MAP: 91-A-83KLINES MILL DEVELOPERS III LLCZONED: RAUSE: VACANTRELIANCE ROAD - ROUTE 627VARIABLE WIDTH RIGHT-OF-WAYPOSTED SPEED = 45 MPHHUTTLE ROAD - ROUTE 63640' RIGHT-OF-WAYPOSTED SPEED = 35 MPHLIMITS OF DISTURBANCE=3.98 ACLIMITS OF DISTURBANCE=3.98 ACLIMITS OF DISTURBANCE=3.98 AC10' BUFFER10' BUFFER10' BUFFERPROP CHURCH8,400 SFFFE=680.25PARISHHALL/OFFICE4,600 SFFFE-680.25OUTFALLPROP DETENTION BASIN(FOR WATER QUANTITY USE ONLY)265.65' INTERSECTION SPACING MEASURED FROM TANGENT TO TANGENT 46.0' - 12" DUAL WALL HDPE@ 1.00%88.0' - 12" DUAL WALL HDPE @ 1.00%46.7' - 12" DUAL WALL HDPE@ 1.01%44.4' - 18" RCP CL. III @ 2.88%167.8' - 15" DUAL WALL CORRUGATED HDPE @ 3.39%EEEEEEEEEEEEE118.2' - 15" DUAL WALL HDPE @ 4.83%71.5' - 15" DUAL WALL HDPE @ 2.10%20.0' - 15" DUAL WALL HDPE@ 1.00%WSE1 = 664.11WSE2 = 664.71WSE100 = 666.74STM6STM7STM8STM9STM1STM3STM4STM5STM12STM13STM10STM11PROP UNDEGROUNDELECTRICAL SERVICE LINEPROP SANITARY LATERALDESIGNED BY OTHERSWWWPRIMARY DRAINFIELDRESERVE DRAINFIELDPROP EMERGENCY SPILLWAYCLASS A1 RIP-RAPELEVATION 666.90L=20' W=10'PROP WELLPROP 3/4" TYPE "K"COPPER SERVICE LINE678682 684 686 674676674668664678670668670672674676674676678 664666664666 666668 668666 664666668668666664666668 684 682 686 688 666668666668674672670STM2STM14STM1517.0' - 15" DUAL WALL HDPE@ 1.00%3 HR FIRE WALL4' - 8" PERFORATED HDPE@ 1.00%PROP DUMPSTERPROP 5' CONC SIDEWALKPROP SITE LIGHT (TYP)PROP 5' CONC SIDEWALKPROP CURBED ISLAND (TYP)PROP VDOTCG-11COMMERCIALENTRANCEPROP LOADING ZONEPROP 5' CONC SIDEWALKPROP"STOP" SIGNPROP 10' WIDE DRYPOND EMBANKMENTSTMVARSTM15'STM15'STM15'PROP 6" CURB AND GUTTER (TYP)PROP SIGNFIRE LANE / NO PARKING (TYP)LIMITS OF MILLAND OVERLAYCG-12 DETECTABLEWARNING STRIP (TYP)LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C500 - Utility.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C500 - UTILITY----->LAYOUT: C500 - UTILITY PLAN C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C500UTILITY PLANSCALE: 1"=30'0603030D SIZE ONLY LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C600 - EROS NARR.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C600 - EROS NARR----->LAYOUT: C600 - EROS NARR C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C600EROSION & SEDIMENT CONTROL NARRATIVE EROSION & SEDIMENT CONTROL NARRATIVEPROJECT DESCRIPTIONTHIS SITE PLAN IS FOR THE CONSTRUCTION OF A PROPOSED CHURCH AND ASSOCIATED SITE IMPROVEMENTS, INCLUDING TWO ADJOININGBUILDINGS, PARKING AREAS, STORM DRAINAGE, AND SIDEWALK AREAS AROUND THE CHURCH AND ALONG RELIANCE ROAD. THE TOTALDISTURBED AREA (LIMITS OF DISTURBANCE) FOR THIS PROJECT IS 3.94 ACRES. THE TOTAL ONSITE IMPERVIOUS AREA IS 2.01 ACRES WITH THEREMAINING 1.93 ACRES BEING MANAGED TURF THAT WILL BE PERMANENTLY SEEDED. STORMWATER RUNOFF FROM THE SITE WILL BECONVEYED THROUGH A PROPOSED STORM DRAINAGE SYSTEM AND DISCHARGED FROM A DRY POND OUT OF A PROPOSED OUTFALLSTRUCTURE IN ACCORDANCE WITH APPLICABLE REQUIREMENTS.EXISTING SITE CONDITIONSTHE TOPOGRAPHY GENERALLY SLOPES FROM THE SOUTH TOWARD THE NORTH AND NORTHEAST WITH APPROXIMATE GRADES RANGINGFROM 5% TO 7% BASED ON EXISTING CONTOURS. EXISTING DRAINAGE PRIMARILY OCCURS AS SHEET FLOW ACROSS THE SITE WITH RUNOFFCONVEYING TOWARD LOWER ELEVATIONS.ADJACENT PROPERTIESTHIS PROJECT IS BORDERED TO THE NORTH BY HUTTLE ROAD (ROUTE 636). TO THE WEST BY RELIANCE ROAD (ROUTE 627). TO THE SOUTH BYRA-ZONED VACANT PROPERTY. TO THE EAST BY RA-ZONED RESIDENTIAL PROPERTY.OFF-SITE AREASNO OFF-SITE IMPROVEMENTS ARE PROPOSED WITH THIS PLAN. ALL WORK WILL OCCUR WITHIN THE PROJECT LIMITS OF DISTURBANCE ORWITHIN THE EXISTING ROAD RIGHT-OF-WAY AS SHOWN ON THE PLANS. ANY SOIL IMPORTED TO OR EXPORTED FROM THE SITE SHALL BETAKEN TO OR FROM AN APPROVED LOCATION. SEE OFF-SITE MATERIAL NOTE ON THIS SHEET.SOILSTHERE ARE THREE SOIL TYPES LOCATED WITHIN THE PROJECT AREA THAT ARE SHOWN ON THE SOILS PLAN AND SUMMARIZED IN THE SOILSTABLE. THE SOILS MAP AND SUPPORTING INFORMATION ARE PROVIDED ON SHEET C801.CRITICAL EROSION AREASTHERE ARE NO CRITICAL EROSION AREAS LOCATED WITHIN OR AROUND THE PROJECT AREA.PROPOSED EROSION & SEDIMENT CONTROL MEASURESALL EROSION & SEDIMENT CONTROL MEASURES SHALL BE INSTALLED WHERE SHOWN ON THE PHASE I & II EROSION & SEDIMENT CONTROLPLANS, AND IN ACCORDANCE WITH THE CURRENT VERSION OF THE VIRGINIA STORMWATER MANAGEMENT HANDBOOK.EROSION CONTROL MEASURES1.C-ECM-15 OUTLET PROTECTIONOUTLET PROTECTION TAKES THE FORM OF STRUCTURALLY LINED APRONS OR OTHER FORMS OF ENERGY-DISSIPATING DEVICES PLACEDAT THE OUTLETS OF PIPES, CURB OPENINGS, DITCH TURNOUTS, OR PAVED CHANNEL SECTIONS TO SLOW DISCHARGE VELOCITY FROMTHE OUTLET TO PREVENT AN EROSIVE CONDITION.PERIMETER CONTROL MEASURES1.C-PCM-01 SAFETY FENCEA PROTECTIVE BARRIER INSTALLED TO PREVENT ACCESS TO LAND-DISTURBING ACTIVITY OR EROSION CONTROL MEASURE.2.C-PCM-04 SILT FENCESILT FENCE (AND ITS DERIVATIVES WIRE-SUPPORTED (REINFORCED) AND SUPER SILT FENCE) IS A TEMPORARY SEDIMENT BARRIERCONSISTING OF A SYNTHETIC FILTER FABRIC ENTRENCHED AND STRETCHED ACROSS AND ATTACHED TO SUPPORTING POSTS.SEDIMENT CONTROL MEASURES1.C-SCM-03 TEMPORARY STONE CONSTRUCTION ENTRANCEA TEMPORARY CONSTRUCTION ENTRANCE IS A PAD WITH A FABRIC LINER UNDERNEATH THE STONE LOCATED AT POINTS OF VEHICULARINGRESS AND EGRESS ON A CONSTRUCTION SITE. THERE ARE SEVERAL TYPES OF TRACK-OUT CONTROLS THAT MINIMIZE THE AMOUNTOF SEDIMENT, SUCH AS DIRT AND MUD, LEAVING OR BEING TRACKED OUT FROM THE CONSTRUCTION SITE ATTACHED TO VEHICLES.2.C-SCM-04 INLET PROTECTIONINLET PROTECTION IS A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDMENT AREA AROUND A STORM DRAIN INLET OR CURB INLET.5.C-SCM-05 CULVERT INLET PROTECTIONCULVERT INLET PROTECTION IS A SEDIMENT FILTER LOCATED AT THE INLETS OF CULVERT.6.C-SCM-12 TEMPORARY SEDIMENT BASINA TEMPORARY SEDIMENT BASIN IS A TEMPORARY BARRIER OR DAM WITH A CONTROLLED STORMWATER RELEASE STRUCTURE FORMEDBY CONSTRUCTING AN EMBANKMENT OF COMPACTED SOIL ACROSS A DRAINAGEWAY.SURFACE STABILIZATION MEASURES1.C-SSM-01 TREE PRESERVATION AND PROTECTIONTREE PRESERVATION AND PROTECTION IS THE PROTECTION OF DESIRABLE TREES FROM MECHANICAL AND OTHER TYPES OF INJURYDURING LAND DISTURBANCE AND CONSTRUCTION.2.C-SSM-09 TEMPORARY SEEDINGTHE ESTABLISHMENT OF A TEMPORARY VEGETATIVE COVER ON DISTURBED AREAS BY SEEDING WITH APPROPRIATE RAPIDLY GROWINGANNUAL PLANTS.3.C-SSM-10 PERMANENT SEEDING PERMANENT SEEDING IS THE ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER ON DISTURBED AREAS BY PLANTING SEED.4.C-SSM-11 MULCHINGMULCHING IS THE APPLICATION OF PLANT RESIDUE OR OTHER SUITABLE MATERIALS TO THE SOIL SURFACE TO PROTECT THE SEEDBEDAND SOIL FROM RAINDROP IMPACT, PREVENT EROSION, CONSERVE MOISTURE, AND IMPROVE CONDITIONS FOR SEED GERMINATION.MAINTENANCEIN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL. INADDITION THE CONTRACTOR SHALL FOLLOW ALL MAINTENANCE FOR ANY MEASURES PROPOSED HEREON PER THE REQUIREMENTS IN THEVIRGINIA STORMWATER MANAGEMENT HANDBOOK.AT A MINIMUM THE FOLLOWING SHALL BE CHECKED FOR THIS PROJECT.1.THE CONSTRUCTION ENTRANCE SHALL BE CHECKED REGULARLY FOR SIGNS OF TRACKED MATERIAL ONTO THE GRAVEL SURFACE. ANYAREA THAT SHOWS SIGNIFICANT TRACKED MATERIAL SHALL BE REPLACED.2.THE SILT FENCE BARRIER SHALL BE CHECKED REGULARLY FOR UNDERMINING OR DETERIORATION OF THE FABRIC. SEDIMENT SHALL BEREMOVED WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHES HALF WAY TO THE TOP OF THE BARRIER.4.INLET PROTECTION MEASURES SHALL BE INSPECTED AFTER EACH RAINFALL EVENT AND REPAIRED IF NEEDED. SEDIMENT SHALL BEREMOVED WHEN THE SEDIMENT HAS ACCUMULATED TO ONE HALF THE DEPTH OF THE BLOCKS.5.SEEDED AREAS SHALL BE CHECKED REGULARLY TO ENSURE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED ANDRESEEDED AS NEEDED.EROSION & SEDIMENT CONTROL PHASINGPHASE 11.A PRE-CONSTRUCTION MEETING WITH THE E&S INSPECTOR MUST BE HELD PRIOR TO THE START OF ANY LAND DISTURBANCE.2.PRIOR TO THE START OF CLEARING AND GRADING, THE CONTRACTOR SHALL INSTALL THE CONSTRUCTION ENTRANCE, PERIMETER SILTFENCE, TREE PROTECTION FENCE, AND SAFETY FENCE AS SHOWN ON THE PHASE 1 PLAN.3.INSTALL THE TEMPORARY SEDIMENT BASIN AND ASSOCIATED OUTLET STRUCTURE.4.ALL PERIMETER CONTROLS MUST BE IN PLACE AND APPROVED BY THE E&S INSPECTOR PRIOR TO THE START OF DEMOLITION ANDOVERALL GRADING.PHASE 21.ALL PHASE 1 EROSION AND SEDIMENT CONTROL MEASURES THAT ARE NOT IN THE WAY OF CONSTRUCTION SHALL REMAIN IN PLACEAND BE PROPERLY MAINTAINED UNTIL ALL UPSTREAM AREAS ARE STABILIZED.2.CONSTRUCT BUILDING FOUNDATION WALLS AND SLABS.3.INSTALL ALL STORM DRAINAGE INFRASTRUCTURE, INCLUDING STORM SEWER, STRUCTURES, AND OUTLET PROTECTION, AS SHOWN ONTHE PLANS.4.INSTALL INLET PROTECTION AT ALL PROPOSED STORM STRUCTURES IMMEDIATELY UPON INSTALLATION.5.PREPARE AREAS TO BE PAVED AND INSTALL SURFACE AS SPECIFIED ON THE PLANS.6.PERMANENTLY STABILIZE ALL DISTURBED AREAS WITH SEED AND MULCH IN ACCORDANCE WITH THE SPECIFICATIONS.7.AFTER FINAL STABILIZATION AND UPON WRITTEN AUTHORIZATION FROM THE COUNTY INSPECTOR, THE CONTRACTOR SHALL REMOVEALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES WITHIN 30 DAYS.GENERAL EROSION & SEDIMENT CONTROL NOTES1.COORDINATE A PRE-CONSTRUCTION MEETING WITH THE JURISDICTION E&S INSPECTOR AFTER RECEIVING THE LAND DISTURBINGPERMIT. A COPY OF THE STORMWATER POLLUTION PREVENTION PLAN IS REQUIRED TO BE PROVIDED AT PRE-CONSTRUCTION FORREVIEW.2.THE E&S INSPECTOR HAS THE AUTHORITY TO ADD OR DELETE E&S CONTROLS AS NECESSARY IN THE FIELD AS SITE CONDITIONS CHANGE.3.NO EROSION & SEDIMENT CONTROLS MEASURES CAN BE REMOVED WITHOUT WRITTEN AUTHORIZATION FROM THE EROSION ANDSEDIMENT CONTROL INSPECTOR.UTILITY INSTALLATION NOTES1.NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.2.EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.3.EFFLUENT FROM DEWATERING SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, ANDDISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY.4.MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTESTABILIZATION.5.RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE VSMH.6.THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE SAFETY REQUIREMENTS.OFFSITE MATERIAL NOTES1.OFFSITE MATERIAL TRACKING FORM WILL BE REQUIRED FOR ANY FILL MATERIAL BROUGHT ONTO OR TAKEN OFFSITE AND IT SHALL BEINCLUDED AS PART OF THE PROJECT'S CONSTRUCTION GENERAL PERMIT AND NOTED IN THE SWPPP. IF SOIL MATERIAL IS TRANSPORTEDOFFSITE WITHOUT PRIOR APPROVAL BY THE E&S INSPECTOR OR UPDATING THE CONSTRUCTION GENERAL PERMIT, THE SITE WILL BECONSIDERED IN VIOLATION. IF IT IS DETERMINED THAT THE SITE IS IN NONCONFORMANCE WITH THE APPROVED PLAN, LOCALORDINANCES OR THE CONSTRUCTION GENERAL PERMIT, ENFORCEMENT WILL OCCUR. ALL APPLICABLE STATE, FEDERAL AND LOCALAPPROVALS ARE REQUIRED TO BE OBTAINED FOR THE OFFSITE DISPOSAL SITE LOCATIONS.VIRGINIA EROSION AND SEDIMENT CONTROL PLAN MINIMUM STANDARDS (MS-19) CHECKLISTAddressed?9VAC25-875-600 Minimum StandardsDescribe how MS is addressed on PlanYMS1: Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of thesite. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longerthan 14 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year.THE E&S PLAN SHOWS AREAS THAT ARE TO RECEIVETEMPORARY AND PERMANENT SEEDING.YMS2: During construction of the project, soil stock piles and borrow areas shall be stabilized or protected with sediment trapping measures. Theapplicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionallytransported from the project site.A STOCKPILE IS PROPOSED. THESE AREAS SHALL BEADEQUATELY PROTECTED.YMS3: A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not beconsidered established until a ground cover is achieved that is uniform, mature enough to survive and will inhibit erosion.PERMANENT SEEDING IS DESIGNATED AT APPROPRIATEAREAS ON THE PLAN. PHASING ADDRESSES THAT E&SMEASURES ARE NOT TO BE REMOVED UNTIL SEEDING ISESTABLISHED.YMS4: Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step inany land-disturbing activity and shall be made functional before upslope land disturbance takes place.PHASING PLAN DETAILS THAT SEDIMENT BASIN MEASURESARE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY.N/AMS5: Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation.THESE FEATURES ARE NOT PART OF THIS PLAN.YMS6: Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by the trap or basin.a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap shall only control drainage areasless than three acres.b. Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres shall be controlled by asediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area. The outfall system shall, at aminimum, maintain the structural integrity of the basin during a 25-year storm of 24-hour duration. Runoff coefficients used in runoff calculations shallcorrespond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized.THE TEMPORARY SEDIMENT BASIN HAS BEEN SIZED INACCORDANCE WITH THESE REQUIREMENTS.N/AMS7: Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively withinone year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is correctedNO STEEP SLOPES ARE PROPOSED WITH THIS PLAN.YMS8: Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume or slopedrain structure.ALL CONCENTRATED RUN-OFF IS DIRECTED TOADEQUATELY DESIGNED STORM DRAINAGE CONVEYANCESYSTEMS.N/AMS9: Whenever water seeps from a slope face, adequate drainage or other protection shall be providedWATER SEEPS ARE NOT EXPECTED FOR THIS PROJECT.YMS10: All storm sewer inlets that are made operable during construction shall be protected so that sediment-laden water cannot enter the conveyancesystem without first being filtered or otherwise treated to remove sediment.PHASING PLAN INCLUDES PROTECTION OF STORM DRAININLETS DURING CONSTRUCTION.YMS11: Before newly constructed stormwater conveyance channels or pipes are made operational, adequate outlet protection and any requiredtemporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel.OUTLET PROTECTION IN THE FORM OF RIPRAP ISPROVIDED AT STORM DRAIN OUTFALLS.N/AMS12: When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize thework area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams.Earthen fill may be used for these structures if armored by nonerodible cover materials.NO WORK IS PROPOSED IN A LIVE WATERCOURSE WITHTHIS PLAN.N/AMS13: When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular streamcrossing constructed of nonerodible material shall be provided.NO WORK IS PROPOSED IN A LIVE WATERCOURSE WITHTHIS PLAN.N/AMS14: All applicable federal, state and local chapters pertaining to working in or crossing live watercourses shall be met.NO WORK IS PROPOSED IN A LIVE WATERCOURSE WITHTHIS PLAN.N/AMS15: The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed.NO WORK IS PROPOSED IN A LIVE WATERCOURSE WITHTHIS PLAN.YMS16: Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria:a. No more than 500 linear feet of trench may be opened at one time.b. Excavated material shall be placed on the uphill side of trenches.c. Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a mannerthat does not adversely affect flowing streams or off-site property.d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization.e. Restabilization shall be accomplished in accordance with this chapter.f. Applicable safety chapters shall be complied with.UTILITY INSTALLATION NOTES HAVE BEEN ADDED TO THISSHEET.YMS17: Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment byvehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be cleanedthoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposalarea. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well asto larger land- disturbing activities.A CONSTRUCTION ENTRANCE HAS BEEN PROVIDED ON THEPHASING PLANS TO MINIMIZE TRACKING OF SEDIMENTONTO PUBLIC ROADS.YMS18: All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporarymeasures are no longer needed, unless otherwise authorized by the VESCP or VESMP authority. Trapped sediment and the disturbed soil areasresulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation.PHASE 2 SEQUENCE SPECIFICALLY STATES THAT ALLEROSION AND SEDIMENT CONTROL MEASURES ARE TO BEREMOVED WITHIN 30 DAYS OF FINAL ACCEPTANCE.MS19: Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency stormof 24-hour duration in accordance with the following standards and criteria. Stream restoration and relocation projects that incorporate natural channel design concepts are not man-made channels and shall be exempt from any flow rate capacityand velocity requirements for natural or man-made channels:YMS19a: Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate natural or man-made receivingchannel, pipe or storm sewer system. For those sites where runoff is discharged into a pipe or pipe system, downstream stability analyses at the outfallof the pipe or pipe system shall be performed.ALL RUN-OFF IS ROUTED TO AN ADEQUATE CULVERT ORCHANNEL. THE OUTFALL IS THE LIMITS OF ANALYSIS.YMS19b : Adequacy of all channels and pipes shall be verified in the following manner:1) The applicant shall demonstrate that the total drainage area to the point of analysis within the channel is one hundred times greater than thecontributing drainage area of the project in question; or 2) (a) Natural channels shall be analyzed by the use of a two-year storm to verify that stormwaterwill not overtop channel banks nor cause erosion of channel bed or banks. (b) All previously constructed man-made channels shall be analyzed by theuse of a ten-year storm to verify that stormwater will not overtop its banks and by the use of a two-year storm to demonstrate that stormwater will notcause erosion of channel bed or banks; and (c) Pipes and storm sewer systems shall be analyzed by the use of a ten-year storm to verify that stormwaterwill be contained within the pipe or system.THE C700 SERIES SHEETS CONTAIN A NARRATIVE ANDCOMPUTATION DETAILING HOW THESE REQUIREMENTSARE MET.N/AMS19c: If existing natural receiving channels or previously constructed man-made channels or pipes are not adequate, the applicant shall:1) Improve the channels to a condition where a ten-year storm will not overtop the banks and a two-year storm will not cause erosion to channel the bedor banks; or2) Improve the pipe or pipe system to a condition where the ten-year storm is contained within the appurtenances;3) Develop a site design that will not cause the pre-development peak runoff rate from a two year storm to increase when runoff outfalls into a naturalchannel or will not cause the predevelopment peak runoff rate from a ten-year storm to increase when runoff outfalls into a manmade channel; or4) Provide a combination of channel improvement, stormwater detention or other measures which is satisfactory to the VESCP OR VESMP authority toprevent downstream erosion.ALL RECEIVING CHANNELS AND PIPES ARE ADEQUATEN/AMS19d: The applicant shall provide evidence of permission to make the improvements.THERE ARE NO OFFSITE IMPROVEMENTS PROPOSED WITHTHIS PLAN.YMS19e: All hydrologic analyses shall be based on the existing watershed characteristics and the ultimate development condition of the subject project.HYDRAULIC ANALYSIS FOR THIS PROJECT MEETS THISREQUIREMENT SEE THE C700 SHEETS FOR ADDITIONALINFORMATION.YMS19f: If the applicant chooses an option that includes stormwater detention, the applicant shall obtain approval from the VESCP or VESMP authorityfor a plan for maintenance of the detention facilities. the plan shall set forth the maintenance requirements of the facility and the person responsible forperforming the maintenance.A SWM/BMP MAINTENANCE, WHICH WILL INCLUDE THEMAINTENANCE SCHEDULE AND RESPONSIBLE PARTY WILLBE SUBMITTED FOR APPROVAL IF REQUESTED.YMS19g: Outfall from a detention facility shall be discharged to a receiving channel, and energy dissipators shall be placed at the outfall of all detentionfacilities as necessary to provide a stabilized transition from the facility to the receiving channel.ALL SWM FACILITIES THAT DISCHARGE TO AN EXISTINGRECEIVING STORM NETWORK AND HAVE OUTFALLPROTECTION AS REQUIRED.YMS19h: All on-site channels must be verified to be adequate.ALL PROPOSED CHANNELS ARE ADEQUATE.YMS19i: Increased volumes of sheet flows that may cause erosion or sedimentation on adjacent property shall be diverted to a stable outlet, adequatechannel, pipe, or pipe system, or to a detention facility.THE MAJORITY OF RUNOFF IS ROUTED TO A SWMDETENTION FACILITY THEREFORE THERE IS NO INCREASEIN THE VOLUME OF SHEET FLOW FROM THIS PROJECT.N/AMS19j: In applying these stormwater management criteria, individual lots or parcels in a residential, commercial or industrial development shall not beconsidered to be separate development projects. Instead, the development, as a whole, shall be considered to be a single development project.Hydrologic parameters that reflect the ultimate development condition shall be used in all engineering calculations.THIS PROJECT IS NOT PART OF A LARGER PLAN OFDEVELOPMENT.YMS19K: All measures used to protect properties and waterways shall be employed in a manner that minimizes impacts on the physical, chemical, andbiological integrity of rivers, streams, and other waters of the state.THIS PROJECT COMPLIES WITH THIS REQUIREMENT.N/AMS19l: Any plan approved prior to July 1, 2014, that provides for stormwater management that addresses any flow rate capacity and velocityrequirements for natural or man-made channels shall satisfy the flow rate capacity and velocity requirements for natural or man-made channels if thepractices are designed to (i) detain the water quality volume and to release it over 48 hours; (ii) detain and release over a 24-hour period the expectedrainfall resulting from the one year, 24-hour storm; and (iii) reduce the allowable peak flow rate resulting from the 1.5, 2, and 10-year, 24-hour storms to alevel that is less than or equal to the peak flow rate from the site assuming it was in a good forested condition, achieved through multiplication of theforested peak flow rate by a reduction factor that is equal to the runoff volume from the site when it was in a good forested condition divided by the runoffvolume from the site in its proposed condition, and shall be exempt from any flow rate capacity and velocity requirements for natural or man-madechannels as defined in any regulations promulgated pursuant to § 62.1-44.15:28 of the code of Virginia (VESMA) or § 62.1-44.15:54 of the code ofVirginia (ESCL).SEE THE C700 SERIES SHEETS FOR DRAINAGE AREA ANDBMP TREATMENT AREA MAPS, STORMWATERMANAGEMENT NARRATIVE AND COMPUTATIONS THATSHOW COMPLIANCE WITH THE CURRENT DEQREGULATIONS.YMS19m: For plans approved on and after July 1, 2014, the flow rate capacity and velocity requirements of § 62.1-44.15:52 A of the code of Virginia(ESCL) and this subdivision 19 shall be satisfied by compliance with water quantity requirements in the VESMA and attendant regulations, unless suchland-disturbing activities (i) are in accordance with provisions for time limits on applicability of approved design criteria in 9VAC25-875-480 orgrandfatering in 9VAC25-875-490, in which case the flow rate capacity and velocity requirements of § 62.1-44.15:52 a of the code of Virginia (ESCL)shall apply; or (ii) are exempt pursuant to § 62.1-44.15:34 G 2 of the code of Virginia (VESMA).YMS19n: Compliance with the water quantity minimum standards set out in 9VAC25-875-600 shall be deemed to satisfy the requirements of MinimumStandard 19. LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C600 - EROS NARR.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C600 - EROS NARR----->LAYOUT: C601 - EROS DETAILS C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C601EROSION & SEDIMENT CONTROL DETAILS 4.84'1.5'4.97'4.3'5.64'6.83'4'1'TRASH RACK SEE DETAILON THIS SHEET C404.18" OUTFALL PIPE SEE PROFILESHEET C402TOP OF RISERELEV=666.8018" OUTFALL PIPE SEE PROFILE ONSHEET C402.TOP OF RISERELEV=666.80TRASH RACK SEE DETAILON SHEET C404.INSTALL PLATE TO COVER1.75' WEIR(1) 2.25'X2.05' 14" STEEL PLATE W/6-1/2" DIA.OPENING BOLTED TO INSIDE OF RISER STRUCTUREPLATE SHALL BE CENTERED ON WEIR OPENINGINV=665.5INSTALL PLATE WITH 6-1/2" DIA.DEWATERING ORIFICE (INV=665.5)PERFORATED FLEXIBLE TUBING 8"DIA(1) 2.25'X2.05' 14" STEEL PLATE W/6-1/2" DIA.OPENING BOLTED TO INSIDE OF RISER STRUCTUREPLATE SHALL BE CENTERED ON WEIR OPENINGINV=665.52.25'2.05' LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C600 - EROS NARR.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C600 - EROS NARR----->LAYOUT: C602 - EROS DETAILS C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C601EROSION & SEDIMENT CONTROL DETAILS SEDIMENT BASIN RISER STRUCTURE DETAIL SCALE: 1"=2'SEDIMENT BASIN DEWATERING ORIFICE SIZINGS (AVAILABLE DRY STORAGE) = ±18,136 CU. FT. (AT ELEV. 666.80)Q (DRAWDOWN RATE) = S / 21,600 =18,136/21,600 = 0.84 CFSh (AVERAGE HEAD) = (666.80-665.50) / 2 = 0.65 FEETA (ORIFICE AREA) = Q / [(64.32 * h )^0.5 * 0.6] = 0.84 / [(64.32 * 0.65)^0.5 * 0.6] = 0.216 SQ. FT.d (ORIFICE DIAMETER) = 2 * (A/3.14)^0.5 = 2*(0.216/3.14)^0.5 = 0.525 FT.= 6.5" WITH 8.0" FLEXIBLE TUBINGSEDIMENT BASIN DESIGN SUMMARYTHE SEDIMENT BASIN IS TO BE CONSTRUCTED FOLLOWING THE PLANS FOR THESTORMWATER BASIN SHOWN ON SHEET C404 INCLUDING THE OUTFALL PIPEAND OUTFALL STRUCTURE. THE OUTFALL STRUCTURE SHALL BE MODIFIED ASSHOWN ON THIS SHEET WHILE IN USE AS A SEDIMENT BASIN.SEDIMENT BASIN 25 YEAR ANALYSIS SUMMARYSEDIMENT BASIN 2 YEAR ANALYSIS SUMMARYSEDIMENT BASIN REPORTSEDIMENT BASIN DESIGN INFORMATIONPROJECTIMMACULATE HEART OF MARYBASIN No:SB-1LOCATIONTOTAL DRAINAGE AREA TO BASIN:5.03ACRESWET STORAGEMINIMUM REQUIRED VOLUME (67 CY * DA)337.01CYORIFICE ELEVATION665.5FTVOLUME AT ORIFICE ELEVATION341.8CYAVAILABLE VOLUME BEFORE CLEANOUTREQUIRED168.505CYCLEANOUT ELEVATION664.34FTDISTANCE FROM ORIFICE TO CLEANOUT ELEV.1.16FTDRY STORAGEMINIMUM REQUIRED VOLUME (67 CY * DA)337.01CYVOLUME AT RISER CREST671.7CYDIAMETER OF DEWATERING ORIFICE6.5INDIAMETER OF FLEXIBLE TUBING8INBASIN SHAPELENGTH OF FLOW TO EFFECTIVE WIDTH RATIO7.92L:WeIF > 2 BAFFLES ARE NOT REQUIREDYESIF < 2 BAFFLES ARE REQUIREDNARUNOFFINFLOW 2-YEAR PEAK, Q27.736CFSINFLOW 25-YEAR PEAK, Q2518.57CFSRELEASE RATE 2-YEAR PEAK, Q22.59CFSRELEASE RATE 10-YEAR PEAK, Q1012.6CFSRISER DESIGNRISER CREST ELEV666.8ELEVRISER DIAMETER4FTWEIR ELEVATION (Covered)665.25ELEVDEWATERING ORIFICE ELEVATION665.5ELEVDEWATERING ORIFICE DIA.6.5INPOND / EMBANKMENT INFORMATIONDOWNSTREAM TOE MINIMUM662ELEVEMBANKMENT TOP OUTER/INNER668ELEVEMBANKMENT TOP CENTER @ PEAK668.25ELEVEMBANKMENT TOP WIDTH10FTEMERGENCY SPILLWAY ELEV666.9ELEVEMERGENCY SPILLWAY LENGTH20FTBOTTOM OF MAIN POOL662.5ELEVWATER SURFACE ELEVATIONSWET STORAGE665.5ELEV2-YEAR WSE666.89ELEV25-YEAR WSE667.17ELEV TAX MAP: 91-A-83-BJAMES G DOWDY & NANCYA DOWDY TRUSTEEZONED: RAUSE: RESIDENTIALTAX MAP: 91-A-83KLINES MILL DEVELOPERS III LLCZONED: RAUSE: VACANTRELIANCE ROAD - ROUTE 627VARIABLE WIDTH RIGHT-OF-WAYPOSTED SPEED = 45 MPHHUTTLE ROAD - ROUTE 63640' RIGHT-OF-WAYPOSTED SPEED = 35 MPHTAX MAP: 91-A-84HARRISON DAVID BYRANZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-13-AROBBIES COUNTRYCOTTAGE LLC ZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-12-AROBBIES COUNTRYCOTTAGE LLC ZONED: RAUSE: RESIDENTIALTAX MAP: 91-2-1-11-AROBBIES COUNTRYCOTTAGE ZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-10DIMON SAMULE L SRZONED: RAUSE: RESIDENTIALTAX MAP: 90-A-60-AKERNS MICHAEL AZONED: RAUSE: RESIDENTIAL10' BUFFER10' BUFFER10' BUFFER10' BUFFER10' BUFFERSFSFSF SF SF SF SF SFSFSFSFSFSFSFSFSFSF SF SF SF SFTP TP TPTPTPTPTP TPTPTPTPTPTPTPTPTPTPT P TP TP TP TP TP TPTPTPTPTP TP TP TP TPTPTPTPTPTPTPTPTPTP TP TP TP TPTPTPTPSF SFSFSFSFPORTABLETOILET AREACOVERED DUMPSTER AREAMATERIALSTAGINGAREASTOCKPILE AREAPOI-1DA - SEDIMENT BASINAREA=5.03 ACCN=83663668668668 668666665668LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C603 - EROS.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C603 - EROS----->LAYOUT: C603- EROS PH1 C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C603SCALE: 1"=50'01005050D SIZE ONLYEROSION & SEDIMENT CONTROL PLAN PHASE I SFSFSFSFSFSFSFSFSFSFTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPSURFACE STABILIZATION MEASURESPERIMETER CONTROL MEASURESSEDIMENT CONTROL MEASURESSBCESAFSAFSAFTSTSTSTSTSTSTSC-ECM-15 OUTLET PROTECTIONOPOPEROSION CONTROL MEASURESOPCETEMPORARY STONECONSTRUCTION ENTRANCEC-SCM-03C-SCM-12 TEMPORARY SEDIMENT BASINSBTPTPTREE PRESERVATION AND PROTECTIONC-SSM-01TSC-SSM-09 TEMPORARY SEEDINGTSC-PCM-01 SAFETY FENCESAFC-PCM-04 SILT FENCESFSFNOTES:1.EROSION AND SEDIMENT NARRATIVE AND DETAILS PROVIDED ONSHEETS C600 AND C601.2.THE CONTRACTOR SHALL VERIFY THAT ALL CONSTRUCTION VEHICLESLEAVING THE SITE HAVE BEEN CLEANED AS NEED TO REMOVESEDIMENT FROM TIRES AND UNDER THE VEHICLE. A WATER SOURCE,SHALL BE PROVIDED IF TIRE/VEHICLE WASHING IS REQUIRED.3.ALL RUNOFF FROM TIRE/VEHICLE WASHING SHALL BE DIRECTED TO ASEDIMENT TRAPPING MEASURE.4.THE LOCATION OF THE STOCKPILE, PORTABLE TOILETS, COVEREDDUMPSTER, CONCRETE WASHOUT, AND CONSTRUCTIONSTORAGE/STAGING AREA ARE SUBJECT TO CHANGE BASED ON SITECONDITIONS AND CONSTRUCTION SEQUENCING.5.FOR ALL EROSION AND SEDIMENT CONTROL TREATMENT AREASSHOWN ON THIS SHEET A "C" FACTOR OF 0.50 IS USED BECAUSE IT ISASSUMED THAT ALL AREAS ARE TO HAVE BEEN DENUDED FOR GRADINGPURPOSES.6.ALL PERIMETER CONTROL MEASURES SHALL BE INSTALLED AT THELIMITS OF DISTURBANCE THEY ARE SHOWN AS AN OFFSET FROM THELIMITS OF DISTURBANCE ON THE PHASE-1 AND PHASE-2 EROSION ANDSEDIMENT CONTROL SHEETS FOR CLARITY.7.THE LOCATION OF THE STOCKPILE, CONCRETE WASHOUT, PORTABLETOILETS, DUMPSTER, AND STAGING AREA ARE SUBJECT TO CHANGEBASED ON SITE CONDITIONS. THE LOCATION OF THESE ITEMS SHALL BETRACKED ON THE SWPPP THROUGHOUT CONSTRUCTION.8.ALL SILT FENCE SHALL BE WIRE SUPPORTED OR EQUIVALENTCIP***THIS SHEET IS FOR PHASE-1 EROSIONAND SEDIMENT CONTROL ONLY***CW TAX MAP: 91-A-83-BJAMES G DOWDY & NANCYA DOWDY TRUSTEEZONED: RAUSE: RESIDENTIALTAX MAP: 91-A-83KLINES MILL DEVELOPERS III LLCZONED: RAUSE: VACANTRELIANCE ROAD - ROUTE 627VARIABLE WIDTH RIGHT-OF-WAYPOSTED SPEED = 45 MPHHUTTLE ROAD - ROUTE 63640' RIGHT-OF-WAYPOSTED SPEED = 35 MPHTAX MAP: 91-A-84HARRISON DAVID BYRANZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-13-AROBBIES COUNTRYCOTTAGE LLC ZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-12-AROBBIES COUNTRYCOTTAGE LLC ZONED: RAUSE: RESIDENTIALTAX MAP: 91-2-1-11-AROBBIES COUNTRYCOTTAGE ZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-10DIMON SAMULE L SRZONED: RAUSE: RESIDENTIALTAX MAP: 90-A-60-AKERNS MICHAEL AZONED: RAUSE: RESIDENTIAL10' BUFFER10' BUFFER10' BUFFER10' BUFFER10' BUFFERPROP CHURCH8,400 SFFFE=680.25PARISH HALL/OFFICE 4,600 SF FFE-680.25 OUTFALLPROP DETENTION BASIN(FOR WATER QUANTITY USE ONLY)EEEEEEEEWWPRIMARY DRAINFIELDRESERVEDRAINFIELD678682 684 686 674676674668664678670668670672674676674676678 664666664666 666668668666664666668668666 664 666 668 684 682 686 688 6666686666686746726703 HR FIRE WALLSFSFSF SF SF SF SF SFSFSFSFSFSFSFSFSFSF SF SF SF SFTP TP TPTPTPTPTP TPTPTPTPTPTPTPTPTPTPT P TP TP TP TP TP TPTPTPTPTP TP TP TP TPTPTPTPTPTPTPTPTPTP TP TP TP TPTPTPTPSF SFSFSFSFPOI-1POI-1 POST (OFF-SITE DETAINED)AREA=1.59 ACCN=66.1POI-1 POST (ON-SITE DETAINED)AREA=3.67 ACCN=84.1POI-1 POST (ON-SITE BYPASS)AREA=0.31 ACCN=80.4LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C603 - EROS.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C603 - EROS----->LAYOUT: C604 - EROS PH2 C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C604EROSION & SEDIMENT CONTROL PLAN PHASE IISCALE: 1"=50'01005050D SIZE ONLYC-ECM-15 OUTLET PROTECTIONOPC-SCM-04 INLET PROTECTIONIPPSC-SSM-10 PERMANENT SEEDINGPSMUC-SSM-11 MULCHINGMUEROSION CONTROL MEASURESSEDIMENT CONTROL MEASURESSURFACE STABILIZATION MEASURESSFPSMUPSMUPSMUIPIPOPOPOPEROSION & SEDIMENT CONTROLMEASURES INSTALLED IN PHASE IEROSION & SEDIMENT CONTROLMEASURES INSTALLED IN PHASE IISURFACE STABILIZATION MEASURESPERIMETER CONTROL MEASURESSEDIMENT CONTROL MEASURESC-ECM-15 OUTLET PROTECTIONOPEROSION CONTROL MEASURESCETEMPORARY STONECONSTRUCTION ENTRANCEC-SCM-03C-SCM-12 TEMPORARY SEDIMENT BASINSBTPTPTREE PRESERVATION AND PROTECTIONC-SSM-01TSC-SSM-09 TEMPORARY SEEDINGTSC-PCM-01 SAFETY FENCESAFC-PCM-04 SILT FENCESFSFOPC-SCM-05 CULVERT INLET PROTECTIONCIPSFSFSFSFSFSFSFSFSFSFTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPSBCESAFSAFSAFTSTSOPOPCWNOTES:1.EROSION AND SEDIMENT NARRATIVE AND DETAILS PROVIDEDON SHEETS C600 AND C601.2.PRIOR TO THE REMOVAL, CONVERSION, OR CHANGING OF ANYEROSION AND SEDIMENT CONTROL MEASURES INSTALLED PERTHE PHASE-1 PLAN THE CONTRACTOR SHALL OBTAINAPPROVAL FROM THE FAUQUIER COUNTY SITE INSPECTOR.3.ALL PERIMETER CONTROL MEASURES SHALL BE INSTALLED ATTHE LIMITS OF DISTURBANCE THEY ARE SHOWN AS AN OFFSETFROM THE LIMITS OF DISTURBANCE ON THE PHASE-1 ANDPHASE-2 EROSION AND SEDIMENT CONTROL SHEETS FORCLARITY.***THIS SHEET IS FOR PHASE-2 EROSIONAND SEDIMENT CONTROL ONLY***CIPCIPCIPCIPOPCIP TAX MAP: 91-A-83ATRACT B1SOCIETY OF SAINT PIUS X,FRONT ROYAL VIRGINIA, INCAREA: 9.3806 ACZONED: RAUSE: VACANTTAX MAP: 91-A-83-BJAMES G DOWDY & NANCYA DOWDY TRUSTEEZONED: RAUSE: RESIDENTIALTAX MAP: 91-A-83KLINES MILL DEVELOPERS III LLCZONED: RAUSE: VACANT1BRELIANCE ROAD - ROUTE 627VARIABLE WIDTH RIGHT-OF-WAYPOSTED SPEED = 45 MPHHUTTLE ROAD - ROUTE 63640' RIGHT-OF-WAYPOSTED SPEED = 35 MPH1C41D1B1B41DLIMITS OF DISTURBANCE=3.98 ACLIMITS OF DISTURBANCE=3.98 ACLIMITS OF DISTURBANCE=3.98 ACTAX MAP: 91-A-84HARRISON DAVID BYRANZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-13-AROBBIES COUNTRYCOTTAGE LLC ZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-12-AROBBIES COUNTRYCOTTAGE LLC ZONED: RAUSE: RESIDENTIALTAX MAP: 91-2-1-11-AROBBIES COUNTRYCOTTAGE ZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-10DIMON SAMULE L SRZONED: RAUSE: RESIDENTIALTAX MAP: 90-A-60-AKERNS MICHAEL AZONED: RAUSE: RESIDENTIAL10' BUFFER10' BUFFER10' BUFFER10' BUFFER10' BUFFER TC PATHPOI-1 PRE (ON-SITE) SHEETFLOW 100 ' SHALLOW CONCENTRATEDF LOW 3 0 2 'CHANNEL FLOW 334'BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD D D D D D D D D D D D D D DDDDDDDDD D D D D D D D D D D D D D D BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBB BBBBBBBBBBBB B BB B B BB BBBBBBBBBB B B B BBBBBBBB B B B B BBBBBBB TC PATHPOI-1 PRE (ON-SITE) SHEETFLOW 100' SHALLOW CONCENTRATEDFLOW422'POI-1POI-1 POST (OFF-SITE)AREA=1.59 ACCN=66.1POI-1 PRE (ON-SITE)AREA=3.98 ACCN=66.9LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C700 - PRE.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C700 - PRE----->LAYOUT: C700 - PRE C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C700PRE DEVELOPED DRAINAGE AREA MAPSCALE: 1"=50'01005050D SIZE ONLYNOTE:1.THE HATCHED AREAS ON THIS SHEETREPRESENT THE AREAS THAT ARE INCLUDEDIN THE STORMWATER QUANTITY ANALYSIS.THIS INCLUDES ALL AREAS WITHIN THE LIMITSOF DISTURBANCE AS WELL AS OFF SITE AREASTHAT ARE EFFECTED BY THIS DEVELOPMENT.HATCH LEGEND ON-SITEIMPERVIOUS LAND COVER=0.01 ACRESTURF LAND COVER ON-SITE=0.25 ACRESFOREST LAND COVER ON-SITE=3.72 ACRESHATCH LEGEND OFF-SITEIMPERVIOUS LAND COVER OFF-SITE=0.28 ACRESTURF LAND COVER OFF-SITE=0.06 ACRESFOREST LAND COVER OFF-SITE=1.25 ACRESPOI-1 PRE (Tc) COMPUTATIONSOutfall/Drainage Area ID =POI-1 PRE (ONSITE)POI-1 PRE (OFF-SITE DETAINED)SHEETFLOWSurface DescriptionWLUWLUManning's Roughness Coefficent, n0.40.4Flow Length, L100100Two-year 24-hour rainfall, P_22.862.86Land Slope, s0.040.04Travel time (hr)0.2870.287SHALLOW CONCENTRATED FLOWSurface Description (Paved or Unpaved)UnpavedUnpavedFlow Length, L302422Watercourse Slope, s0.040.02Average Velocity, V3.212.28Travel time (hr)0.0260.051CHANNEL FLOWCross sectional area, a3.5623.562Wetted Perimeter, Pw14.2914.29Hydraulic Radius, r0.250.25Channel Slope, s0.030.03Manning's Roughness Coefficent, n0.0350.035V = ((1.49*r^2/3)/n)*s^1/22.922.92Flow Length, L334334Travel time (hr)0.0320.032TOTAL TRAVEL TIMETime of Concentration Calculated (hr)0.3450.370Time of Concentration Calculated (min.)20.6922.21Time of concentration Used (min.)2020 1BRELIANCE ROAD - ROUTE 627VARIABLE WIDTH RIGHT-OF-WAYPOSTED SPEED = 45 MPHHUTTLE ROAD - ROUTE 63640' RIGHT-OF-WAYPOSTED SPEED = 35 MPH1C41D1B1B41D10' BUFFER10' BUFFER10' BUFFER10' BUFFER10' BUFFERPROP CHURCH8,400 SFFFE=680.25PARISH HALL/OFFICE 4,600 SF FFE-680.25 OUTFALLPROP DETENTION BASIN(FOR WATER QUANTITY USE ONLY)10+6410+00EEEEEEEEWWPRIMARY DRAINFIELDRESERVEDRAINFIELDPROP WELL3 HR FIRE WALL SHEETFLOW 76' SHALLOW CONCENTRATEDFLOW400'CHANNEL FLOW 317'SHALLOW CONCENTRATEDFLOW 31' (ONSITE DETAINED) SHEETFLOW 100' TC PATHPOI-1 POST (OFF-SITE DETAINED) TC PATHPOI-1 POST (ON-SITE DETAINED) SHEETFLOW 100' SHALLOW CONCENTRATEDFLOW166'BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD D D D D D D D D D D D D D DDDDDDDDD D D D D D D D D D D D D D D BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBB BBBBBBBBBBBB B BB B B BB BBBBBBBBBB B B B BBBBBBBB B B B B BBBBBBB TC PATHPOI-1 POST (ON-SITE BYPASS)SWM FOREST CONSERVATION ESM'TAREA=2.54 ACPOI-1POI-1 POST (OFF-SITE DETAINED)AREA=1.59 ACCN=66.1POI-1 POST (ON-SITE DETAINED)AREA=3.67 ACCN=84.1POI-1 POST (ON-SITE BYPASS)AREA=0.31 ACCN=80.4LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C701 - Post.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C701 - POST----->LAYOUT: C701 - POST C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C701SCALE: 1"=50'01005050D SIZE ONLYHATCH LEGEND ON-SITEIMPERVIOUS LAND COVER=1.98 ACRESTURF LAND COVER ON-SITE=2.00 ACRESHATCH LEGEND OFF-SITEIMPERVIOUS LAND COVER OFF-SITE=0.28 ACRESTURF LAND COVER OFF-SITE=0.06 ACRESFOREST LAND COVER OFF-SITE=1.25 ACRESPOST DEVELOPED DRAINAGE AREA MAP POI-1 POST (Tc) COMPUTATIONSOutfall/Drainage Area ID =POI-1 POST (OFF-SITEDETAINED)POI-1 POST (ONSITEDETAINED)POI-1 POST (ONSITE BY-PASS)SHEETFLOWSurface DescriptionWLUWLUWLUManning's Roughness Coefficent, n0.40.40.4Flow Length, L10076100Two-year 24-hour rainfall, P_22.862.862.86Land Slope, s0.040.030.06Travel time (hr)0.2870.2580.244SHALLOW CONCENTRATED FLOWSurface Description (Paved or Unpaved)UnpavedUnpavedUnpavedFlow Length, L40031166Watercourse Slope, s0.020.030.1Average Velocity, V2.282.785.05Travel time (hr)0.0490.0030.009CHANNEL FLOWCross sectional area, a1.051.051.05Wetted Perimeter, Pw2.772.772.77Hydraulic Radius, r0.380.380.38Channel Slope, s0.040.040.04Manning's Roughness Coefficent, n0.030.030.03V = ((1.49*r^2/3)/n)*s^1/25.205.205.20Flow Length, L3173170Travel time (hr)0.0170.0170.000TOTAL TRAVEL TIMETime of Concentration Calculated (hr)0.3530.2780.270Time of Concentration Calculated (min.)21.1516.7116.20NOTE:1.THE HATCHING ON THIS SHEET ONLYSHOWS AREAS THAT ARE BEINGANALYZED. THE POST ON-SITE ANDOFF-SITE DETAINED AREAS, AND THEON-SITE BYPASS AREA.SWM FOREST CONSERVATION EASEMENT AREA = 2.54 AC LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C703 - SWM NARR.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C703 - SWM NARR----->LAYOUT: C702 - SWM NARR C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C702STROMWATER MANAGEMENT NARRATIVE POI-1 (PRE)1-YR PEAK FLOW = 1.200 CFS2-YR PEAK FLOW = 2.526 CFS10-YR PEAK FLOW = 7.413 CFSPRE (ONSITE)AREA=3.94 AC.Q1=0.893 CFSQ2=1.859 CFSQ10=5.380 CFSPRE (OFFSITE)AREA=1.64 AC.Q1=0.307 CFSQ2=0.667 CFSQ10=2.033 CFSEXISTING DRAINAGE AREA SCHEMATIC (POI-1)POST (OFFSITE)AREA=1.64 AC.Q1=0.307 CFSQ2=0.667 CFSQ10=2.033 CFSPROPOSED DRAINAGE AREA SCHEMATIC (POI-1)POI-1 (POST)1-YR PEAK FLOW = 0.545 CFS2-YR PEAK FLOW = 1.130 CFS10-YR PEAK FLOW = 6.759 CFSDETENTION BASINPOST (ONSITE BYPASS)AREA=0.31 AC.Q1=0.304 CFSQ2=0.441 CFSQ10=0.851 CFS POST (ONSITE DETAINED)AREA=3.63 AC.Q1=4.695 CFSQ2=6.484 CFSQ10=11.61 CFSENERGY BALANACE COMPUTATIONSPROJECT:IMMACULATE HEART OF MARY CHURCHCOUNTY/TOWN:FREDERICKSTORM EVENT1 Year24-HOUR RAIN FALL DEPTH (P):2.36''POI ID1CommentsONSITE DRAINAGE AREA (PRE) Peak Flow (cfs)0.89From Hydrographs CN, Curve Number67See Sheet C700 (Q), Runoff (in)0.30((P-0.2*((1000/CN)-10))^2)/(P+0.8*((1000/CN)-10)) Drainage Area, Ac3.98See Sheet C700 RV, Runoff Volume (Ac-ft)0.10(Q*DA)/12ONSITE DRAINAGE AREA (PRE FOREST) Peak Flow (cfs)0.89From Hydrographs CN, Curve Number67 (Q), Runoff Depth (in)0.30 RV, Runoff Volume (Ac-Ft)0.10ONSITE DRAIANGE AREA (POST) CN, Curve Number84See Sheet C701 (Q), Runoff (in)1.03((P-0.2*((1000/CN)-10))^2)/(P+0.8*((1000/CN)-10)) Drainage Area, Ac3.98See Sheet C701 RV, Runoff Volume (Ac-ft)0.34(Q*DA)/12OFFSITE DRAINAGE AREA (PRE) Peak Flow (cfs)0.31From Hydrographs CN, Curve Number66See Sheet C700 (Q), Runoff (in)0.28((P-0.2*((1000/CN)-10))^2)/(P+0.8*((1000/CN)-10)) Drainage Area, Ac1.64See Sheet C700 RV, Runoff Volume (Ac-ft)0.47(Q*DA)/12OFFSITE DRAINAGE AREA (POST) Peak Flow (cfs)0.31From Hydrographs CN, Curve Number66See Sheet C701 (Q), Runoff (in)0.28((P-0.2*((1000/CN)-10))^2)/(P+0.8*((1000/CN)-10)) Drainage Area, Ac1.64See Sheet C701 RV, Runoff Volume (Ac-ft)0.47(Q*DA)/12ENERGY BALANCE COMPUTATIONS I.F.0.800.9 if <1 acre otherwise 0.8 Calculated Onsite Allowable Peak Flow (cfs)0.21(I.F.*Peak Flow (PRE)*RVpre/RVpost) Q Forested allowable (cfs)0.26(Peak flow*RVforest/RVpost) Onsite Allowable Peak Flow (cfs)0.26See Notes 1 and 2 Calculated Offsite Allowable Peak Flow (cfs)0.31(RVpreoff/RVpostoff)*Qpreoff Calculated Total Allowable Peak Flow (cfs)0.57See Note 3 Total Post-Developed Peak Flow (cfs)0.55From Hydrographs EB AchievedYesNotes:1. Q Onsite Allowable can not be greater than Q Pre-Development Onsite2. Q Onsite Allowable not required to be less than Q Forested Allowable3. Q Total Allowable = Q Onsite Allowable + Q Offsite AllowableSTORMWATER MANAGEMENT NARRATIVEPRE-DEVELOPED CONDITIONSTHIS SITE IS A PARCEL OF FORESTED AREA AT THE INTERSECTION HUTTLE AND RELIANCE ROAD. THERE ARE NO SIGNS OF ANY PREVIOUSDEVELOPMENT WITHIN THE PROPERTY. THE TOPOGRAPHY WITHIN THE PROJECT AREA IS MILD WITH SLOPES RANGING FROM 1% TO 17%.THE SOILS WITHIN THE PROJECT AREA ARE OF HYDRAULIC GROUPS B AND D. THE ENTIRE PROPERTY DRAINS TO A NATURAL EXISTINGCHANNEL WITHIN THE PARCEL THAT SHOWS SIGNS OF LOCALIZED FLOODING.POST-DEVELOPED CONDITIONSTHIS SITE PLAN IS FOR THE CONSTRUCTION OF A CHURCH WITH A PAVED PARKING LOT. IN ADDITION TO THE PROPOSED CHURCH, THIS SITEPLAN PROPOSES SIDEWALK CONSTRUCTION ALONG RELIANCE ROAD, AND A ENTRANCE FROM HUDDLE ROAD. THE TOTAL DISTURBED AREA(LIMITS OF DISTURBANCE) FOR THIS PROJECT IS 3.98 ACRES. THE TOTAL ONSITE IMPERVIOUS AREA IS 1.98 ACRES WITH THE REMAINING 2.00ACRES OF MANAGED TURF THAT WILL BE PERMANENTLY SEEDED. THE MAJORITY OF THE STORMWATER RUNOFF FROM THE SITE WILL BECONVEYED TO A DRY POND WHICH WILL DISCHARGE THE POST DEVELOPED RUNOFF TO AN EXISTING NATURAL CHANNEL.THE POST DEVELOPED RUNOFF IS ANALYZED AT A SINGLE POINT OF INTEREST IDENTIFIED THROUGHOUT THE PLAN AS POI-1. THIS POINT ISWHERE ALL RUNOFF FROM THE PROJECT AREA IS RELEASED TO AN EXISTING NATURAL CHANNEL.WATER QUALITY REQUIREMENTS:ALL RUNOFF FROM THIS SITE ENTERS AN EXISTING NATURAL SWALE AT POI-1. LOCALIZED FLOODING AT POI-1 OCCURS DUE TO EXISTINGNATURAL SITE CONDITIONS. AT POI-1 THIS PROJECT MEETS THE WATER QUANTITY REQUIREMENTS IN SECTION 9VAC25-875-600 OF THEVIRGINIA EROSION AND STORMWATER MANAGEMENT REGULATIONS.PRE AND POST DEVELOPED DRAINAGE AREA MAPS ARE FOUND ON SHEETS C700 AND C701, THEIR ASSOCIATED LAND COVER TABULATIONSCAN BE FOUND ON THIS SHEET. DRAINAGE AREA SCHEMATICS AND ENERGY BALANCE COMPUTATIONS ARE INCLUDED ON THIS SHEET.SUMMARY REPORTS FROM THE HYDROLOGICAL MODELING SOFTWARE UTILIZED IN THE ANALYSIS OF THIS PROJECT ARE INCLUDED ONSHEETS C704-C705.CHANNEL PROTECTION:THE POST DEVELOPED 1-YEAR PEAK FLOW RATE AT POI-1 FROM ON-SITE RUNOFF, AND OFF-SITE RUNOFF THAT IS EFFECTED BY THISDEVELOPMENT, HAS BEEN REDUCED FROM 1.200 CFS TO 0.545 CFS. THIS REDUCTION IN PEAK FLOW MEETS THE REQUIREMENTS IN SECTIONB(3)(a) OF THE ABOVE REFERENCED STATE ORDINANCE. THE REDUCTION IN PEAK FLOW IS ACHIEVED BY COLLECTING A MAJORITY OF THEPOST DEVELOPED RUNOFF FROM THE SITE ALONG WITH SOME OFFSITE RUNOFF IN A DRY POND PRIOR TO BEING RELEASED THROUGH ANENGINEERED OUTFALL STRUCTURE.FLOOD PROTECTION:THE POST DEVELOPED 10-YEAR PEAK FLOW RATE AT POI-1 FROM ON-SITE RUNOFF, AND OFF-SITE RUNOFF THAT IS EFFECTED BY THISDEVELOPMENT, HAS BEEN REDUCED FROM 7.413 CFS TO 6.759 CFS. THIS REDUCTION IN PEAK FLOW MEETS THE REQUIREMENTS IN SECTIONC(2)(b) OF THE ABOVE REFERENCED STATE ORDINANCE. THE REDUCTION IN PEAK FLOW IS ACHIEVED BY COLLECTING A MAJORITY OF THEPOST DEVELOPED RUNOFF FROM THE SITE ALONG WITH SOME OFFSITE RUNOFF IN AN UNDERGROUND DETENTION BASIN PRIOR TO BEINGRELEASED THROUGH AN ENGINEERED OUTFALL STRUCTURE.WATER QUALITY REQUIREMENTS:THE WATER QUALITY REQUIREMENTS IN SECTION 9VAC25-875-580 ARE MET FOR THIS PROJECT THROUGH THE IMPLEMENTATION OF ANAPPROVED MANUFACTURED TREATMENT DEVICE AND THE PURCHASE OF OFFSITE ALTERNATIVES. THE TOTAL PHOSPHORUS LOADREDUCTION REQUIRED FOR THIS PROJECT IS 2.16LB/YR. 0.44 LB/YR IS TREATED ONSITE BY TURNING 2.54 ACRES INTO A FORESTEDCONSERVATION AREA, AND THE REMAINING 1.73 LB/YR WILL BE PURCHASED AS OFFSITE NUTRIENT CREDITS. VRRM COMPUTATIONS AREPROVIDED ON SHEET C703. THE FORESTED CONSERVATION AREA CAN BE SEEN ON SHEET C701.POI-1 DRAINAGE AREA TABULATIONSLand Cover Type / HSGCURVE NUMBERPOI-1 PRE (ONSITE)POI-1 (OFF-SITE DETAINED)POI-1 POST (ONSITE DETAINED)POI-1 POST (ONSITE BYPASS)AREA (AC)CN x AAREA (AC)CN x AAREA (AC)CN x AAREA (AC)CN x AFOREST (HSG-B)551.6791.851.0256.27FOREST (HSG-D)772.05157.850.2317.71MANAGED TURF (HSG-B)610.2414.640.053.051.0161.610.074.27MANAGED TURF (HSG-D)800.010.800.010.800.7660.800.1612.80IMPERVIOUS (HSG-B)980.010.980.2827.440.7775.460.076.86IMPERVIOUS (HSG-D)981.13110.740.010.98Total =3.98266.121.59105.273.67308.610.3124.91Composite CN=66.966.184.180.4 LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C703 - SWM NARR.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C703 - SWM NARR----->LAYOUT: C703 - VRRM C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C703VRRM VRRM SITE INFORMATIONVRRM SITE SUMMARYVRRM WATER QUALITY COMPLIANCE LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C703 - SWM NARR.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C703 - SWM NARR----->LAYOUT: C704 - STORM COMPS C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C704STORMWATER MANAGEMENT COMPUTATIONS STORMWATER ANALYSIS SUMMARY REPORTSDRY POND REPORTRAINFALL DATA LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C703 - SWM NARR.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C703 - SWM NARR----->LAYOUT: C705 - STORM COMPS C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C705STORMWATER MANAGEMENT COMPUTATIONS DETENTION BASIN ELEVATION VS.TIME GRAPH (1-YR)DETENTION BASIN ELEVATION VS.TIME GRAPH (10-YR)DETENTION BASIN ELEVATION VS.TIME GRAPH (100-YR)DETENTION BASIN FLOW VS.TIME GRAPH (1-YR)DETENTION BASIN FLOW VS.TIME GRAPH (10-YR)DETENTION BASIN FLOW VS.TIME GRAPH (100-YR) C800 BY OTHERS FOR REFERNCE ONLY TAX MAP: 91-A-83-BJAMES G DOWDY & NANCYA DOWDY TRUSTEEZONED: RAUSE: RESIDENTIALTAX MAP: 91-A-83KLINES MILL DEVELOPERS III LLCZONED: RAUSE: VACANT1BRELIANCE ROAD - ROUTE 627VARIABLE WIDTH RIGHT-OF-WAYPOSTED SPEED = 45 MPHHUTTLE ROAD - ROUTE 63640' RIGHT-OF-WAYPOSTED SPEED = 35 MPH1C41D1B1B41DTAX MAP: 91-A-84HARRISON DAVID BYRANZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-13-AROBBIES COUNTRYCOTTAGE LLC ZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-12-AROBBIES COUNTRYCOTTAGE LLC ZONED: RAUSE: RESIDENTIALTAX MAP: 91-2-1-11-AROBBIES COUNTRYCOTTAGE ZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-10DIMON SAMULE L SRZONED: RAUSE: RESIDENTIALTAX MAP: 90-A-60-AKERNS MICHAEL AZONED: RAUSE: RESIDENTIALPROP CHURCH8,400 SFFFE=680.25PARISH HALL/OFFICE 4,600 SF FFE-680.25EEEEEEEE 678682 684 686 674676674668664678670668670672674676674676678 664666664666 666668668666664666668668666 664 666 668 684 682 686 688 6666686666686746726703 HR FIRE WALLLAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C801 - Soils.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C801 - SOILS----->LAYOUT: C801 - SOILS MAP C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C801SCALE: 1"=50'01005050D SIZE ONLYSOILS MAP SOILS TABLEMap UnitSoil NameSlopeDepth toRockWater tableHydrologicGroup1BBerks Channery Silt Loam3-8 percent> 40 inches>80 inchesB1CBerks Channery Silt Loam8-15 percent> 40 inches> 80 inchesB41DWeikert-Berks Channery Silt Loam15-25 percent> 20 inches> 80 inchesD TAX MAP: 91-A-83KLINES MILL DEVELOPERS III LLCZONED: RAUSE: VACANTRELIANCE ROAD - ROUTE 627VARIABLE WIDTH RIGHT-OF-WAYPOSTED SPEED = 45 MPHHUTTLE ROAD - ROUTE 63640' RIGHT-OF-WAYPOSTED SPEED = 35 MPHLIMITS OF DISTURBANCE=3.98 ACLIMITS OF DISTURBANCE=3.98 ACLIMITS OF DISTURBANCE=3.98 ACTAX MAP: 91-A-84HARRISON DAVID BYRANZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-13-AROBBIES COUNTRYCOTTAGE LLC ZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-12-AROBBIES COUNTRYCOTTAGE LLC ZONED: RAUSE: RESIDENTIALTAX MAP: 91-2-1-11-AROBBIES COUNTRYCOTTAGE ZONED: RAUSE: RESIDENTIALTAX MAP: 91-C-1-10DIMON SAMULE L SRZONED: RAUSE: RESIDENTIALTAX MAP: 90-A-60-AKERNS MICHAEL AZONED: RAUSE: RESIDENTIAL10' BUFFER10' BUFFER10' BUFFER10' BUFFER10' BUFFERPROP CHURCH8,400 SFFFE=680.25PARISH HALL/OFFICE 4,600 SF FFE-680.25 265.65' INTERSECTION SPACING MEASURED FROM TANGENT TO TANGENT277.2' SIGHT DISTANCE LEFT (TO VEHICLE THAT HAS JUST COMPLETED THE TURNING MOVEMENT)390' SIGHT DISTANCE RIGHT 13+917+228+009+0010+0011+0012+0013+00EEEEEEEEWW3 HR FIRE WALLLAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C900 - Land.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C900 - LAND----->LAYOUT: C900- LANDSCAPE PLAN C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C900LANDSCAPE PLAN SCALE: 1"=50'01005050D SIZE ONLYNOTE:1.EXISTING VEGETATION ALONG THE PROPERTY PERIMETERSHALL REMAIN TO PROVIDE NATURAL BUFFERING ANDSCREENING IN ACCORDANCE WITH FREDERICK COUNTYZONING ORDINANCE §165-802.08.2.ALL PLANT MATERIAL SHALL MEET THE MINIMUMREQUIREMENTS OF FREDERICK COUNTY ZONINGORDINANCE §165-802.06, INCLUDING SIZE, QUALITY, ANDINSTALLATION STANDARDS.3.ALL TREES SHALL BE LARGE CANOPY SHADE TREES UNLESSOTHERWISE NOTED AND SHALL BE A MINIMUM OF 2.5-INCHCALIPER AT TIME OF PLANTING.4.LANDSCAPING SHALL BE INSTALLED PRIOR TO THE ISSUANCEOF A CERTIFICATE OF OCCUPANCY OR IN ACCORDANCEWITH AN APPROVED LANDSCAPE BOND OR ESCROW.5.EXISTING TREES TO REMAIN SHALL BE PROTECTED DURINGCONSTRUCTION. ANY DAMAGED OR DEAD PLANT MATERIALSHALL BE REPLACED PRIOR TO FINAL ACCEPTANCE.6.THE OWNER, DEVELOPER, AND/OR BUILDER SHALL BERESPONSIBLE FOR MAINTAINING THE PROPOSED SITELANDSCAPING IN A STATE OF GOOD HEALTH AFTERPLANTING.7.HEADLIGHT SCREENING WILL BE REQUIRED IF THE MATURELANDSCAPE THAT IS SHOWN TO BE PRESERVED ALONGHUTTLE ROAD AND RELIANCE ROAD IS DAMAGED,REMOVED OR DONES NOT PROVIDE ADEQUATE SCREENING.1AR1AR1AR1WO1WO1WO1WO1WO1AR1WOPROPOSED LANDSCAPE LEGENDWO — WILLOW OAK (QUERCUS PHELLOS)AR — RED MAPLE (ACER RUBRUM)LANDSCAPE CALCULATIONSTYPE OF LANDSCAPINGORDINANCE SECTIONREQUIREMENTAREA TO BE ADDRESSED# REQ.# PROV.NOTESINTERIOR PARKING LOT TREES§165-202.01.D(13)(b)1 SHADE TREE PER 10 PARKING SPACES113 PARKING SPACES1214TREES PROVIDED IN PARKING ISLANDS AND ADJACENT LANDSCAPEDAREASINTERIOR LANDSCAPING AREA§165-202.01.D(13)(b)MINIMUM 5% INTERIOR LANDSCAPED AREAPARKING LOT AREA (62,290 SQ. FT)≥ 5%9%LANDSCAPED ISLANDS PROVIDED (5,385 SQ. FT.)PERIMETER LANDSCAPING§165-202.01.D(13)(a)1 TREE PER 2,000 SQ. FT OF IMPERVIOUS87,555.6 SQ.FT OF ONSITE IMPERVIOUS44206EXISTING WOODED AREA PRESERVED TO ACCOUNT FOR PERMITERLANDSCAPINGSTREET TREESN/ANOT REQUIREDSITE FRONTAGEN/AN/ASTREET TREE REQUIREMENTS NOT APPLICABLE TO THIS PROJECT(INSTITUTIONAL USE IN RA DISTRICT)PLANT SCHEDULE TABLETreesQuantityKeyCommon NameScientific NameConditionPlant TypeUse10 Yr Canopy (SF Each)10 Yr Canopy Total (SF)9WOWillow OakQuercus phellos2.5" B&BLrg Can TreeInterior Parking2001,8005ARRed MapleAcer rubrum2.5" B&BLrg Can TreeSite / Parking Perimeter2001,0001AR1WO1WO1WOLANDSCAPE CALCULATIONSTOTAL PARCEL AREA = 9.38 ACLIMITS OF DISTURBANCE (LOD) = 3.98 ACIMPERVIOUS AREA = 1.98 ACPERCENT OF PARCEL DISTURBED (LOD / TOTAL PARCEL) = 42%PERCENT LANDSCAPED AREA [1 − (IMPERVIOUS / TOTAL PARCEL)] = 79%PRESERVED TREE LEGENDEX. PIGNUT HICKORY (CARYA GLABRA)EX. WHITE OAK (QUERCUS ALBA)EX. VIRGINIA PINE (PINUS VIRGINIANA)EX. EASTERN RED CEDAR (JUNIPERUS VIRGINIANA)PRESERVED TREES INVENTORY TABLETREEINVENTORY ID#DIAMETER @ 12"ABOVE GRADE(IN.)COMMON NAMEBOTANICAL NAMETREECREDITTOTAL TREESCOUNTED INCOMPUTATIONS17VIRGINIA PINEPINUS VIRGINIANA2228PIGNUT HICKORYCARYA GLABRA24330WHITE OAKQUERCUS ALBA59410VIRGINIA PINEPINUS VIRGINIANA211512VIRGINIA PINEPINUS VIRGINIANA213615VIRGINIA PINEPINUS VIRGINIANA316712PIGNUT HICKORYCARYA GLABRA21888VIRGINIA PINEPINUS VIRGINIANA22097E. RED CEDARJUNIPERUS VIRGINIANA2221016VIRGINIA PINEPINUS VIRGINIANA3251112VIRGINIA PINEPINUS VIRGINIANA2271216VIRGINIA PINEPINUS VIRGINIANA3301310VIRGINIA PINEPINUS VIRGINIANA2321410VIRGINIA PINEPINUS VIRGINIANA2341510VIRGINIA PINEPINUS VIRGINIANA2361614E. RED CEDARJUNIPERUS VIRGINIANA33917VIRGINIA PINEPINUS VIRGINIANA4118VIRGINIA PINEPINUS VIRGINIANA4319PIGNUT HICKORYCARYA GLABRA4720PIGNUT HICKORYCARYA GLABRA5021PIGNUT HICKORYCARYA GLABRA5322PIGNUT HICKORYCARYA GLABRA5523WHITE OAKQUERCUS ALBA5824WHITE OAKQUERCUS ALBA6025WHITE OAKQUERCUS ALBA6226WHITE OAKQUERCUS ALBA6427WHITE OAKQUERCUS ALBA6728WHITE OAKQUERCUS ALBA6929VIRGINIA PINEPINUS VIRGINIANA7130PIGNUT HICKORYCARYA GLABRA7331WHITE OAKQUERCUS ALBA7532PIGNUT HICKORYCARYA GLABRA7733WHITE OAKQUERCUS ALBA8034WHITE OAKQUERCUS ALBA8335WHITE OAKQUERCUS ALBA8536WHITE OAKQUERCUS ALBA8737WHITE OAKQUERCUS ALBA8938WHITE OAKQUERCUS ALBA9139WHITE OAKQUERCUS ALBA9440WHITE OAKQUERCUS ALBA9641WHITE OAKQUERCUS ALBA9942WHITE OAKQUERCUS ALBA10143WHITE OAKQUERCUS ALBA10344WHITE OAKQUERCUS ALBA10545PIGNUT HICKORYCARYA GLABRA10846WHITE OAKQUERCUS ALBA11147PIGNUT HICKORYCARYA GLABRA11448PIGNUT HICKORYCARYA GLABRA11649PIGNUT HICKORYCARYA GLABRA11850PIGNUT HICKORYCARYA GLABRA12151PIGNUT HICKORYCARYA GLABRA12552PIGNUT HICKORYCARYA GLABRA12753PIGNUT HICKORYCARYA GLABRA12954PIGNUT HICKORYCARYA GLABRA13155PIGNUT HICKORYCARYA GLABRA13356PIGNUT HICKORYCARYA GLABRA13657PIGNUT HICKORYCARYA GLABRA13958PIGNUT HICKORYCARYA GLABRA14159WHITE OAKQUERCUS ALBA14360WHITE OAKQUERCUS ALBA14561PIGNUT HICKORYCARYA GLABRA14762PIGNUT HICKORYCARYA GLABRA15163PIGNUT HICKORYCARYA GLABRA15364WHITE OAKQUERCUS ALBA15565PIGNUT HICKORYCARYA GLABRA15766PIGNUT HICKORYCARYA GLABRA15967WHITE OAKQUERCUS ALBA16168PIGNUT HICKORYCARYA GLABRA16569PIGNUT HICKORYCARYA GLABRA16770PIGNUT HICKORYCARYA GLABRA17171WHITE OAKQUERCUS ALBA17372PIGNUT HICKORYCARYA GLABRA17673WHITE OAKQUERCUS ALBA17874PIGNUT HICKORYCARYA GLABRA18075WHITE OAKQUERCUS ALBA18376PIGNUT HICKORYCARYA GLABRA18777PIGNUT HICKORYCARYA GLABRA19178PIGNUT HICKORYCARYA GLABRA19379PIGNUT HICKORYCARYA GLABRA19580WHITE OAKQUERCUS ALBA19881PIGNUT HICKORYCARYA GLABRA20082WHITE OAKQUERCUS ALBA20283WHITE OAKQUERCUS ALBA20484PIGNUT HICKORYCARYA GLABRA206 LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C900 - Land.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C900 - LAND----->LAYOUT: C901- LANDSCAPE DETAILS C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C901LANDSCAPE NOTES & DETAILS *1/2" REINFORCED RUBBER HOSE W/DOUBLE-STRAND 12 GA. GALV. WIRE TWISTEDOR REINFORCED PLASTIC TREE CHAIN"*2 @ 2"X2"X8" HARDWOOD STAKESEXCAVATE HOLE TO A MAX DEPTH OF BALLHEIGHT & MIN OF 2-1/2 TIMES BALL ORCONTAINER WIDTH; 1/8 OF BALL MAY BEABOVE GRADE; EXCAVATE AN ADDITIONALTRENCH AT THE PERIMETER HOLELOOSEN SOIL AROUND ROOTS GENTLY;CUT CIRCLING ROOTSPRUNE ONLY DEAD AND BROKEN BRANCHESCUT & REMOVE BURLAP, BALL WRAP, WIREBASKET & ANY BINDING ROPE OR MATERIALFROM TOP 1/2 AFTER BALL IS IN HOLE3" LAYER SHREDDED HARDWOOD MULCH3" EARTH SAUCERSPECIFIED BACKFILL MIX, SEE NOTES* 1/2" RUBBER HOSE*DOUBLE-STRANDED 12 GA. GALV. WIRE,TWISTED OR REINF. PLASTIC "TREE CHAIN"*3 @ 2"X4"X36" STAKES OR "DUCKBILLS",INSTALLED @ 30° ANGLE, 120° FROM ONEANOTHER*FOR TREES OVER 4" DIA. INSTALL 8" DIA. MIN3' LONG HARDWOOD DEADMEN; SEE DETAILPLANTING DETAILTREES 1-3/4 - 4" DIAMETERDECIDUOUS TREE PLANTING DETAILNOT TO SCALEPLANTING DETAILTREES UP TO TO 10' HEIGHTINSTALL *ITEMS ONLY IF REQUIRED1.Critical Root Zone/Protected Root ZoneA.Tree preservation areas shall be identified on the site plan or construction plansand profiles. A Critical Root Zone (CRZ) or Protected Root Zone (PRZ) shall bedelineated on the plans and clearly marked and protected in the field prior toany land disturbance. The CRZ/PRZ shall be determined as follows:B.For individual trees, the CRZ shall be represented by a concentric circle centeredon the tree trunk with a radius equal in feet to one (1) times the number ofinches of the trunk diameter (i.e., The CRZ for a twenty (20) inch diameter tree istwenty (20) feet).C.When two or more trees are grouped together within a designated treepreservation area, the limit of the PRZ shall be a line the area of tree canopy tobe preserved or conserved that is parallel to and 15 feet from the limits ofclearing and grading.2.General RequirementsA.Prior to any land disturbance, suitable protective barriers, such as Super SiltFence or 14-gauge welded wire fence, shall be erected outside of the CRZ of anytree, or along the limits of clearing and grading of any group of trees, asapplicable, to be preserved (see "Tree Protection Fence" detail, this sheet).Protective barriers shall remain so erected throughout all phases ofconstruction. No grade changes or storage of equipment, materials, debris, orfill shall be allowed within the area protected by the barrier. No natural orman-made materials or liquids (e.g. concrete, stone, gas, oil, paint, chemicals,etc.) shall be disposed of within tree preservation areas. No construction traffic,parking of vehicles, or disposal of liquids is permitted within the CRZ and PRZ.All protective barriers are recommended to display tree protection signageinstalled at a minimum of one sign ever fifty (50) feet. Tree preservation signsshall be posted directly on the tree protection fence or on freestanding stakes infront of the tree protection fence. Tree preservation signs shall be written inboth English and Spanish.B.Tree roots which must be severed shall be cut by a trencher or similarequipment aligned radially to the tree. This method reduces the lateralmovement of the roots during excavation, which if done by other methods coulddamage the intertwined roots of adjacent trees. This effort shall take place andbe complete prior to any land disturbance activities.C.Within four hours of any severance of roots, all tree roots that have beenexposed and/or damaged shall be trimmed cleanly and covered temporarily withmoist peat moss, moist burlap, or other moist biodegradable material to keepthem from drying out until permanent cover can be installed.D.Prior to completion of Phase 1 erosion and sediment control constructionactivity, hazard trees shall be identified by an Urban Forester, Certified Arborist,or Landscape Architect, marked with paint, saw cut, and removed. Trees thatbecome hazard trees following Phase 1 erosion and sediment controlconstruction activity shall also be marked with paint, saw cut, and removed priorto bond release. Tree stumps located within areas of existing canopy andvegetation to be preserved or conserved on open space parcels shall be cut flushand left in place.E.Slopes abutting a CRZ or PRZ shall not have a grade greater/steeper than 2:1 fora distance of five (5) feet outside the CRZ or PRZ, or a retaining wall shall berequired. Any wall constructed within five (5) feet of the CRZ or PRZ shall bereviewed and approved by the County Urban Forester or Director's designee.Grade changes and excavations shall not encroach within the tree CRZ or PRZ,unless approved by the County Urban Forester or Director's designee.F.No toxic materials, including petroleum products, shall be stored within 100 feetof the CRZ or PRZ.G.Sediment, retention, and detention basins shall not be located within the CRZ orPRZ. Such basins shall not discharge directly into the CRZ or PRZ unless thedischarge is transitioned back to sheet flow prior to entering the CRZ or PRZ or isdischarged into an adequate natural channel.3.Pruning MethodsA.All final cuts shall be made sufficiently close to the trunk or parent limb butwithout cutting into the branch collar or leaving a protruding stub, according tothe American National Standards Institute (arboriculture operations standardZ133.1). All necessary pruning cuts must be made to prevent bark from beingtorn from the tree and to facilitate rapid healing. Flush cuts are unacceptable.1.QUALITY ASSURANCE:A.Landscape planting and related work shall be performed by a firm with a minimum of five years experience specializing in this typeand scale of work.B.Applicable Specifications and Standards:Culpeper Zoning Ordinance;Virginia Erosion and Sediment Control Handbook (VESCH);American Joint Committee on Horticultural Nomenclature;American Standard for Nursery Stock, latest edition, American Nursery and Landscape Association (ANLA)Landscape Specification Guidelines for Baltimore Washington Metropolitan Areas, latest edition, by Landscape ContractorsAssociation MD-DC-VA.C. The Contractor shall guarantee all landscape improvements, including sod/seeding, for one full year from the date of initial acceptanceby the owner. Contractor must contact owner at least 10 working days in advance to schedule acceptance inspection(s). Contractormust replace all dead or unacceptable plants during the following planting season.2.SUBMITTALS: Submit the following to the Owner's Representative prior to beginning work:A.Copies of manufacturer's data for all materials required.B.Samples of required mulch material.C.Chemical and mechanical analysis and samples of all existing soil, topsoil, organic matter and soil mix to be used. The analyses shallinclude recommendations for type and amounts of fertilizer and soil amendments to be applied for the proposed plantings.D.Planting schedule showing the dates (earliest and latest) proposed for each type of plant specified, schedule each type of plantingwithin the normal planting seasons for such work. Include requests for any proposed changes in the approved planting season and alist of proposed sources for all plant materials.E.List of proposed sources for all plant material.3.DELIVERY, HANDLING, AND STORAGE:A.Deliver packaged materials in manufacturer's unopened containers or bundles, fully identified with name, brand, type, weight, andanalysis. Store packaged materials in such a manner as to prevent damage or intrusion of foreign matter.B.Dig balled and burlapped (B& B) plants with firm, natural balls of earth, of a diameter not less than that shown on the plant list nor lessthan recommended by the American Standard for Nursery Stock, and of sufficient depth to include the fibrous and feeding roots. B&Bplants will not be accepted if the ball is cracked or broken before or during planting operation.C.Deliver trees and shrubs after preparations for planting have been completed. Do not bend, bind, or tie trees or shrubs in such amanner as to damage bark, break branches or destroy natural shape. If planting is delayed more than 6 hours after delivery, set treesand shrubs in shade, protect from weather and mechanical damage, and keep roots moist by heeling-in bare root stock and coveringplant balls with soil, peat moss or other acceptable material for balled stock. Plants shall be kept well watered and shall not remainunplanted for longer than ten (10) days after delivery.D.Plants shall be lifted and handled from the bottom of the ball only.E.Do not remove container-grown stock from containers until planting time.4.DRAINAGE: Before planting, determine that areas to receive plant material have adequate subdrainage.A.The landscape contractor is responsible for drainage tests as necessary to identify any problems prior to beginning plantingoperations. Upon commencement of planting operations the landscape contractor assumes responsibility for soil conditions.B.Dig planting pits to full depth and dimensions indicated on drawings.C.At bottom of planting pit, excavate rectangular pit 12 inches by 12 inches by 18 inches deep. Quickly pour water into pit to a depth of6 inches (approximately 3-3 3/4 gallon). Note time required for water to be completely absorbed. Divide time noted by 6 to achieveaverage rate of absorption for 1 inch of water. Where rate of absorption exceeds 60 minutes per inch, notify owner immediately fordirections on how to proceed.5.PLANTING DATES: Planting shall be done only within the following dates except as approved by Owner.A.Deciduous Trees and Shrubs: March 1 to May 31 and October 15 to December 15.B.Evergreen Trees, Shrubs and Vines: March 1 to May 31 and September 1 to November 15.C.All plant material shall be guaranteed by the Contractor for a period of 1 year from the date of final acceptance to be in good, healthyand flourishing condition.6.MATERIALS FOR PLANTING:A.Topsoil: shall be a fertile, friable natural loam, uniform in composition, free of stones, lumps, plants and their roots, debris and otherextraneous matter over 1 inch in diameter, capable of sustaining vigorous plant growth. Soil shall be harvested at a single sourcefrom the O and/or A horizons of the soil profile.1)Topsoil shall have a pH range of 5.5 to 7.5.2)Topsoil shall contain 1.5-5% organic matter by dry weight .3)Soil Texture: sandy loam, sandy clay loam with the following particle size distribution:GravelLess than 10%Silt15-30%Clay20-35%4)Chemical Levels shall be:Magnesium Mg60-450 ppmPhosphorus P20530-50 ppmPotassium - K2091-250 ppm5)Soluble Salts / Conductivity - Not to exceed 900 ppm/0.9 mmhos/cm (in soil); not to exceed 3000 ppm/2.5 mmhos/cm (in highorganic mix)6)Cation exchange capacity shall be a minimum of 8 meq/100g.B.Clay Loam to Sandy Clay Loam Soil: shall be a fertile, friable natural loam, uniform in composition, free of stones, lumps, plants andtheir roots, debris and other extraneous matter over 1 inch in diameter, capable of sustaining vigorous plant growth.1)Soil shall have a pH range of 5.5 to 6.5.2)Soil shall contain 2-5% organic content by volume.3)Soil Texture: Clay loam to sandy clay loam with the following particle size distribution:GravelLess than 10%Sand20-50%Silt<35%Clay20-40%4)Chemical Levels shall be:Magnesium Mg60-450 ppmPhosphorus P20530-50 ppmPotassium - K2091-250 ppm5)Soluble Salts/ Conductivity - Not to exceed 900 ppm/0.9 mmhos/cm (in soil); not to exceed 3000 ppm/2.5 mmhos/cm (in highorganic mix)6)Cation exchange capacity shall be 20-35 meq/100g.C.Compost: Compost shall be mature, stable, weed free, and produced by aerobic decomposition of organic matter. Compost feedstockshall be plant matter, such as high lignin forestry products or yard waste (leaves, brush, and yard trimmings).1)The product must not contain any visible refuse or other physical contaminants, substances toxic to plants, or over 5% sand, silt,clay or rock material by dry weight. 2)Compost shall be sampled and tested as required by the Seal of Testing Assurance Program of the United States CompostingCouncil (USCC) and shall meet the physical requirements for compost as determined by USCC.3)The product shall possess no objectionable odors. The product must meet all applicable USEPA CFR, Title 40, Part 503 Standardsfor Class A biosolids. 4)The moisture level shall be such that no visible water or dust is produced when handling the material.D.Composted Pine Bark Fines: Shall be approved composted, ground pine bark having no particle with a dimension greater than 3/4inch. No more than 10% shall be wood.E.Sand: Shall be quartz based sharp concrete sand, ASTM C-33 Fine Aggregate, with a Fines Modulus Index between 2.8 and 3.2.F.Trace Elements: Shall be commercially available slow release materials containing zinc (Zn), Molybdenum (Mo), Copper (Cu), Boron(B), and Magnesium (Mn).G.Fertilizer: A commercial fertilizer for ornamental trees, shrubs and ground cover with an analysis of 10% Nitrogen, 6% Phosphorusand 4% Potassium shall be used. This fertilizer shall be granular with a minimum of 50% of the total Nitrogen in organic form.14-14-14-Osmocote (or approved equal) shall be applied at a rate of 7 lbs. per 1,000 square feet, tilled to a depth of 8 inch, shall beused for perennials.H.Soil Separator: Shall be rot resistant non-woven polypropylene filter fabric, water permeable, and unaffected by freezing and thawing.Acceptable products include: Mirafi 140N, Mirafi Civil Engineering Co., or Stabilenka Type T-80, American Enka Co., Enka, N.C.I.Planter Drainage Fabric: Shall be prefabricated planter drainage fabric Miradrain 9000, a composite system consisting of a Mirafidrainage fabric bonded to a three-dimensional highly impact-resistant plastic core. The core shall have the following attributes:1)Compressive Strength: (ASTM D-1621), 15,000 + PSF.2)Overlaps: Shall be capable of mechanically interlocking so as to prevent separation of the overlaps during backfill.J.Mulch: Shall be shredded hardwood bark for trees and shrubs. Fine bark mulch is to be used for perennial beds.7.PLANT MATERIALS:A.Refer to the Plant List and the plans for specific plant types and quantities. Quantities of plants as drawn on the plans shall governover the plant list quantities. Contractor shall notify landscape architect of any discrepancies prior to final bid negotiation. Contractorshall supply unit prices for all material at time of bidding.B.Plants shall be nursery grown in accordance with good horticultural practices. Plants shall either be obtained from local nurseriesand/or others, which have soil and climatic conditions similar to those in the locality of the project.C.Plants shall be true to species and variety and unless specifically noted otherwise, all plants shall be of specimen quality,exceptionally heavy, symmetrical, tightly-knit plants, so trained or favored in their development and appearance as to be superior inform, number of branches, compactness and symmetry.D.Plants shall be sound, healthy and vigorous, well branched and densely foliated when in leaf, free of disease, insect pests, eggs orlarvae and shall have healthy, well-developed root systems. They shall be free from physical damage or any conditions that wouldprevent thriving health and the desired appearance.E.Trees, which have a damaged or crooked leader, or multiple leaders, unless specified in the plant list, will be rejected. Trees withabrasion of the bark, sun scald, disfiguring knots, or pruning cuts more than 1 1/4 inch diameter which have not completely callused,will be rejected.F.Plants shall conform to measurements specified in the plant schedules except that plants larger than specified may be used ifacceptable to the Landscape Architect or owner. Use of such plants shall not increase the contract price. If larger plants areaccepted, the root ball shall be sized for the larger plant.G.Caliper Measurement: Shall be taken at a point on the trunk 6 inches above natural ground line for trees up to 4 inches diameter, andat a point 12 inches above the natural ground line for trees over 4 inches diameter.H.Plants shall be measured when branches are in the normal position. Height and spread dimensions specified refer to the main bodyof the plant and not from branch tip to tip.I.Where trees are planted in rows or formal groupings, they shall be uniform in size and shape.8. SOIL MIXING PROCEDURES:A.Topsoil used in sand/soil mixes shall be screened or shredded prior to mixing in sands. Maximum clod inclusion for soil mixes shallnot exceed:Clod size (largest dimension)% of the soil mix volumeLess than 1”Unlimited1 to 3 inches20%3 to 6 inches5%>6 inchesLess than 2%B.Source material and soil mix stockpiles shall be protected from rain by covering with filter cloth.9.INSPECTION:A.Examine the areas and conditions where soil mix is to be installed and notify the Landscape Architect of conditions detrimental to theproper and timely completion of the work. Do not proceed with the work until unsatisfactory conditions are corrected to permit properinstallation of the work.B.Cooperate with other Contractors and trades working in and adjacent to other work areas. Examine drawings which showdevelopment of entire project and become familiar with scope of other work required.10.SOIL INSTALLATION - GENERAL PROCEDURES:A.If subgrade soil compaction exceeds 80%, existing soil shall be ripped to a depth of 14 inches to alleviate compaction which has takenplace during construction. Prior to loosening of soil, Contractor must locate existing utilities and coordinate with Owner anyunderground electric lines, drainage pipes, conduits, etc.B.Prepare the subgrade by roughening the top 3” of the subsoil by dragging the teeth of a backhoe bucket across the surface.C.Begin soil installation as soon as subsoil is prepared. Use low impact equipment with track belts, large tires, or low tire pressure tolower compaction and soil damage during installation.D.Monitor compaction during installation and loosen soils as needed if compaction exceeds 80%.E.Install specified soil in 12”-18” thick lifts. Compact each lift sufficiently to reduce settling but not enough to prevent the movement ofwater and feeder roots through the soil. The soils in each lift should feel firm to the foot in all areas and make only slight heel prints.11.INSTALLATION OF SOIL MIX FOR LAWN AREAS ON GRADE:A.Soil Mix for Lawns on Grade: shall consist of 10% compost and 90% topsoil, by volume. These materials must meet specificationsdescribed in Section 6.B.Loosen subgrade lawn areas to a minimum of 3”. Remove stones more than 1-1/2” in any dimension and sticks, roots, rubbish, andother extraneous matter. Limit preparation to areas which will be planted promptly after preparation.C.Spread soil mix for lawn areas on grade to a minimum depth of 6” as required to meet grade and elevations shown on drawings, afterlightly rolling and natural settlement. Allow for sod thickness in areas to be sodded.12.INSTALLATION OF SOIL MIX FOR TREE PITS ON GRADEA.Confirm that native subsoil drains at a rate of at least ½” per hour. If drainage is less than ½” per hour, provide subsurface drainagelines.B.Install 30-36” of Soil Mix for Tree Pit Backfill on Grade:1)Shall consist of clay loam to sandy clay loam soil, sand, and composted pine bark fines at a rate of 5:5:1 to 10:5:1.5 to achieve thefollowing:(a)Clay content of Soil Mix shall be 10-20% of the soil mix, by volume.(b)Minimum amount of coarse to medium sand in the mix shall be 55%(c)Minimum infiltration rate at 80-85% compaction shall be 1-3 inches per hour.C.Composted pine bark fines shall not exceed 10% of the total soil mix by volume.D.Till 4” of compost into the top 6” of the installed Soil Mix.13.INSTALLATION OF SOIL MIX FOR MULCHED SHRUB AND PERENNIAL BEDS:A.Confirm that native subsoil drains at a rate of at least ½” per hour. If drainage is less than ½” per hour, provide subsurface drainagelines.B.Install 14” of Soil Mix for Mulched Shrub and Perennial Beds on Grade:1)Shall consist of clay loam to sandy clay loam soil, sand, and composted pine bark fines at a rate of 5:5:1 to 10:5:1.5 to achieve thefollowing:(a)Clay content of Soil Mix shall be 10-20% of the soil mix, by volume.(b)Minimum amount of coarse to medium sand in the mix shall be 55%(c)Minimum infiltration rate at 80-85% compaction shall be 1-3 inches per hour.2)Composted pine bark fines shall not exceed 10% of the total soil mix by volume.C.Till 4” of compost into the top 6” of the installed Soil Mix.14.EROSION CONTROL MATERIAL AND PLANTING ON STEEP SLOPES:A.Material meeting the requirements of the specifications shall be installed and maintained on the designated areas as shown andspecified. The areas to be covered shall be prepared and fertilized as specified before the erosion material is placed. Immediatelyprior to the planting operations, the material shall be laid evenly, smoothly and in contact with the soil throughout.B.Lay erosion control materials with one inch nominal openings in accordance with manufacturer's instructions. Unroll in direction ofwater flow. Overlap sheets by at least 6 inches. Where strips are to be spliced lengthwise, overlap strips by 8 inches. Upgrade sectionshall be on top of all splices.C.The Contractor shall maintain and protect the erosion control material until the final inspection. Maintenance shall consist of repairsmade necessary by erosion, wind or any other cause. Following the restoration of damaged areas under plant and turf guarantee andestablishment requirements for applicable underlying items; the erosion control material shall be repaired or replaced to meet theoriginal requirements and maintained until the final inspection.15.GENERAL PLANT INSTALLATION:A.Contractor shall lay out and clearly stake all proposed plantings included on this plan. If conflicts arise between actual size of areaand the plans, Contractor shall contact the landscape architect for resolution. Failure to make such conflicts known to the Owner andLandscape Architect will result in Contractor's liability to relocate materials.B.Contractor is responsible for contacting Miss Utility prior to beginning construction for the location of all utility lines. Contractor shallbe liable for damage to any and all public and private utilities.C.Excavation: Excavate all tree pits and planting areas to the width and depth shown in the planting details.D.Center plant in pit and orient for the best visual effect. Set plants plumb and hold rigidly in position until soil has been tamped firmlyaround root ball. Roll back burlap one-third on all B&B material.E.Groups of shrubs shall be placed in a continuous mulch bed with smooth continuous lines. All mulch beds shall follow the contour ofthe plant mass. Trees located within four feet of shrub beds shall share the same mulch bed.F.Mulch within 48 hours after planting and after applying the pre-emergent herbicide, except ground cover areas (which shall haveorganic material placed before planting) with a 2" layer of mulch immediately after planting. All bed lines shall be cut with a smoothconsistent edge to a minimum depth of 3 inches. Keep mulch out of the crowns of shrubs and off buildings, sidewalks, light standards,and other structures.G.All planting areas to conform to specified grades after full settlement has occurred and mulch has been applied. Provide saucersaround tree pits as shown on planting details. Remove all tags, labels, strings, etc. from all plants.H.All trees planted adjacent to walkways and accessible routes shall be limbed up to provide a minimum clear height of 80” over thewalkway / accessible route.16.PERMANENT SEEDING OR SODDING FOR GRASS AREAS:A.Unless otherwise specified in these plans, all disturbed areas within the limits of clearing and grading shall be planted as lawn withpermanent seeding or sodding.B.Lawn Seed or Sod varieties shall be an improved variety turf-type tall fescue blend. The landscape contractor shall select fromvarieties approved by the Maryland or Virginia Department of Agriculture.C.Refer to the Virginia Erosion and Sediment Control Handbook, for guidelines, specifications and installation techniques of seed andsod. TAX MAP: 91-A-83KLINES MILL DEVELOPERS III LLCZONED: RAUSE: VACANTRELIANCE ROAD - ROUTE 627VARIABLE WIDTH RIGHT-OF-WAYPOSTED SPEED = 45 MPHHUTTLE ROAD - ROUTE 63640' RIGHT-OF-WAYPOSTED SPEED = 35 MPH10' BUFFER10' BUFFER10' BUFFERPROP CHURCH8,400 SFFFE=680.25PARISHHALL/OFFICE4,600 SFFFE-680.253 HR FIRE WALLEEEEEDABBBBBBCCCCC0.80.91.01.21.40.92.03.13.02.35.66.33.38.414.315.53.59.919.724.23.49.217.019.73.06.89.32.44.24.63.61.92.51.60.00.10.10.10.10.10.10.10.10.10.20.30.40.40.30.30.20.30.20.20.10.10.20.30.40.10.10.20.40.81.31.51.51.41.21.00.70.50.30.20.40.70.70.10.10.20.30.71.42.63.74.13.93.52.71.70.90.50.31.11.71.50.10.20.50.91.93.86.17.67.46.64.42.51.30.90.72.34.03.30.20.30.50.92.45.08.212.09.05.63.21.71.41.45.67.15.70.50.50.40.81.83.67.914.29.35.43.11.81.92.811.78.00.90.90.50.60.71.22.14.63.41.91.51.52.03.713.78.52.02.11.50.70.91.11.52.22.82.92.31.71.41.51.82.911.58.23.24.14.52.31.01.31.62.22.93.33.53.12.52.01.71.62.27.27.96.45.27.07.74.01.51.82.33.14.35.05.84.83.62.72.11.72.26.57.05.33.26.410.27.92.32.33.04.67.110.38.35.53.72.72.04.58.27.25.31.23.67.011.40.32.62.43.35.59.919.312.67.14.23.23.112.19.15.90.31.43.66.69.53.82.12.33.35.610.220.613.17.24.33.33.814.89.45.50.41.32.84.46.05.11.41.52.13.04.97.812.39.36.03.93.03.012.08.55.00.30.91.72.43.22.10.81.11.72.43.44.96.26.95.44.02.92.22.07.25.94.00.81.01.21.00.50.91.31.82.43.33.73.93.42.62.01.61.33.14.23.52.60.40.60.50.40.70.91.21.82.73.12.31.71.31.00.91.71.91.61.40.20.30.30.40.71.21.72.75.24.21.91.10.70.60.60.90.80.60.10.10.20.50.81.73.76.711.512.26.22.81.30.60.40.50.40.30.10.10.10.20.40.91.73.76.510.110.76.94.01.70.80.40.30.20.10.10.10.10.30.71.43.05.06.77.37.35.13.01.40.80.40.10.10.10.10.10.20.51.01.92.83.53.83.93.22.11.00.50.20.10.10.11.41.51.51.10.60.30.10.10.10.00.10.10.10.20.20.30.30.30.30.20.10.10.10.10.00.00.10.10.20.30.40.60.70.70.50.30.20.10.10.10.10.00.00.10.20.30.50.81.31.71.51.00.60.30.20.10.10.10.00.00.00.00.20.30.40.81.83.85.84.92.61.20.50.30.20.10.10.10.00.00.00.00.20.50.71.33.711.724.317.76.11.80.70.30.20.10.10.10.10.10.00.00.31.00.30.20.20.20.20.20.20.10.10.210.50.50.61.31.92.11.70.80.20.10.37.20.60.83.011.714.94.60.80.20.10.30.60.52.34.59.615.22.61.10.30.10.30.50.42.826.010.10.40.10.31.52.11.34.60.51.01.39.40.40.10.31.78.06.616.10.50.30.31.20.50.10.31.714.321.21.80.50.30.311.20.60.20.31.67.15.51.03.22.50.610.20.80.30.31.31.91.10.918.64.80.51.71.70.40.31.32.11.37.24.20.40.31.57.87.523.26.70.50.31.412.922.49.45.20.60.21.26.65.61.51.90.70.20.20.81.50.90.20.50.91.21.41.61.31.41.61.51.21.00.91.11.20.90.50.10.30.40.30.20.61.22.12.93.43.63.73.53.33.23.23.23.00.10.20.20.20.40.81.73.45.40.10.10.10.20.00.10.10.20.00.00.10.12.7PARKING AREAMAIN DRIVE AISLEMAIN DRIVE AISLEMAIN DRIVE AISLELOADING AREALAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C902 - Lighting.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C902 - LIGHTING----->LAYOUT: C902- LIGHTING PLAN C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C902LIGHTING PLANSCALE: 1"=30'0603030D SIZE ONLYLuminaire ScheduleSymbolQtyLabelTotalWattsMountingHeight1slim22-l-150-150w-4000k-angle-0degrees_ntclr24080331148.3186slim-xs-25w-4000k-angle-0-deg_ntclr24070508146.48.55slim-l-60w-4000k-angle-0-deg_ntclr24060513286141a34t4m-150w-4000k_ntclr24010101_1285.420.55a34t3m-150w-4000k_ntclr24010097713.520.5Calculation SummaryLabelUnitsAvgMaxMinLOADING AREAFc6.3724.20.8PARKING AREAFc3.0220.60.0BACDEPHOTOMETRIC DATA AND COMPUTATIONS ONTHIS SHEET PROVIDED BY OTHERSMAIN DRIVE AISLEFc2.2226.00.0PHOTOMETRIC AREA SEPARATION LINE LAND DEVELOPMENT SERVICES LAND PLANNING CIVIL ENGINEERING DESIGN PROJECT MANAGEMENT 9 N 3RD STREET, SUITE 204 WARRENTON, VA 20186 www.carterrun.com (540) 418-0969SHEET NO.FILENAMEPROJECT #DATESITE PLAN IMMACULATE HEART OF MARY HUTTLE ROAD FREDERICK COUNTY, VIRGINIAJULY 1ST, 2026C902 - Lighting.dwgISSUED FORCONSTRUCTIONC:\USERS\DAKOT\CARTER RUN\CONSULTING - FILES\PROJECT\C999 - SINGLE PROJECT CLIENTS\2025\C999.2525 - IMMACULATE HEART OF MARY\CAD\SUBMISSION\C902 - LIGHTING----->LAYOUT: C903- LIGHTING PLAN DETAILS C999.2525REVISION TRACKING REV #DATE BY DESCRIPTION 1 7/01/2026 ADB ISSUED FOR CONSTRUCTIONADAM D. BAXTERLIC. NO. 05874107/01/2026C903LIGHTING DETAILS