HomeMy WebLinkAboutJeff_Craven_Response to FW Comments P a g e | 1 5/11/2026 Earl Wiley Frederick Water Response to Frederick Water – Nichols Junction Job: B3150 1. Discussed with FW. 2. Easements are now shown and labeled where possible on applicable sheets. 3. Utilities are now shown and labeled where possible on applicable sheets. 4. Extents of water main easement along Queens Way now explained (ROW is other end). 5. Easements are shown on this sheet. 6. Stationing now labeled in light gray one sheet 3. 7. Flushing symbol added to sheets 3 and 10. Detail added to sheet 15. 8. 25 ft of water main before flushing assembly is now shown. 9. This label is on sheet 10. Now Add to sheet 3. 10. This label is on sheet 10. Now Add to sheet 3. 11. Notes were moved to sheet 16. 12. Notes were moved to sheet 16. 13. Notes were moved to sheet 16. 14. See note 4 on sheet 16. 15. This label is on sheet 10. Now Add to sheet 3. 16. Discussed. Unable to make plans searchable without causing other issues, such as text outlined in boxes. 17. The shrubs are outside of the FW easement. 18. The easement is black on sheet 7. 19. Additional information about DI laterals was added to water main profile on sheet 10. 20. Separation label is in the profile. 21. • Exported the model to epanet format and provide to frederick water for further review. • Discussed. Can leave FW Construction Notes on sheet 16. • Provided a table showing all pipes in the model. • Removed energy usage page column. • Brief narrative is now written on sheet 16. • Flow curve is shown on sheet 16. • Provided table showing all nodes in the model. 22. Construction notes were updated Please let me know if you have any questions or need additional information during your review. Respectfully, Jeffrey R. Craven