HomeMy WebLinkAboutResponse to PW Comments (1) P a g e | 1
2/25/2025
Benjamin H. Whitlock
Environmental Program Administrator
Response to Department of Public Works – Nichols Junction
Job: B3150
1. Provide profile of connection from proposed storm structure #1 to downstream storm sewer
system located on Warrior Self Storage property. It appears that proposed storm structure #1
may be the same structure as storm structure #7 proposed on the Warrior Self Storage site plan.
Note that the Warrior Self Storage storm profile depicted on plan sheet 10 differs slightly from
the storm profile included in the Warrior Self Storage site plan (plan dated October 14, 2025)
that was previously approved by Frederick County.
Storm profile now matches the one in the Warrior Self Storage site plan. Corresponding
structures between these plans and Warrior Storage are now labeled as such. See sheet 10.
2. Documentation of both a recorded temporary grading easement and drainage easement on the
Warrior Self Storage property will need to be provided prior to issuance of a land disturbance
permit for this project.
Note was added to sheet 12.
Please let me know if you have any questions or need additional information during your review.
Respectfully,
Jeffrey R. Craven