Loading...
HomeMy WebLinkAboutPublic Works comment reply letter - 12-29-2025 101 Shelby Ct. 540.974.5157 (phone) Email: office@dice-eng.com Winchester, VA 22602 540.723.4868 (fax) December 29, 2025 Mr. Ben Whitlock Dept. of Public Works 107 N. Kent St., Suite 200 Winchester, VA 22601 RE: Green Valley Baptist Church Site Plan (#30-25) Public Works Review Comments Dear Mr. Whitlock: The following represents Dice Engineering, PLC responses to Public Works comments provided via letter, dated August 5, 2025, concerning the Green Valley Baptist Church site plan review. Review comments are shown in bold italics. I am responding on a point-by-point basis to correlate with your comments. 1. Diversion channels are proposed on erosion and sediment control plan. Clarify if diversion channels or temporary diversion dikes are proposed. If diversion channels are proposed, ensure that discharge is properly directed to achieve proposed grading and drainage areas on erosion and sediment control plan. Temporary diversion dikes will be used instead of diversions, therefore the label and symbols have been updated on the Initial E&SC Plan (see sheet C-04), and the erosion and sediment control narrative is revised to reflect the change (see sheet C-15). 2. Vegetated emergency spillway is proposed within earthen fill for detention basin embankment. Spillways proposed in fill must be armored in accordance with Virginia Stormwater Management Handbook specifications. Alternatively, principal spillway may be sized to accommodate emergency flows. Comment noted, the lining of the emergency spillway is revised to now include rip rap in lieu of the previously proposed vegetation w/ matting treatment (see plan sheets C-04 & C-06). 3. Proposed SWM pond should be clearly labeled on plan and detail sheets as “detention basin” in accordance with Virginia Stormwater Management Handbook terminology. The SWM pond is now labeled as a detention basin per the Virginia Stormwater Management Handbook (see plan sheet C-06 and detail sheet C-18). Dept. of Public Works December 29, 2025 RE: Green Valley Baptist Church Site Plan Page 2 If you have any questions or need any additional information, please don’t hesitate to contact me. Thank you for your time and consideration regarding this matter. Sincerely, Dice Engineering, PLC ________________________ Dennie D. Dunlap III, P.E. Principal