RE: Green Valley Baptist Church Site Plan (#30-25)
Public Works Review Comments
Dear Mr. Whitlock:
The following represents Dice Engineering, PLC responses to Public Works comments provided
via letter, dated August 5, 2025, concerning the Green Valley Baptist Church site plan review.
Review comments are shown in bold italics. I am responding on a point-by-point basis to
correlate with your comments.
1. Diversion channels are proposed on erosion and sediment control plan. Clarify if
diversion channels or temporary diversion dikes are proposed. If diversion
channels are proposed, ensure that discharge is properly directed to achieve
proposed grading and drainage areas on erosion and sediment control plan.
Temporary diversion dikes will be used instead of diversions, therefore the label and
symbols have been updated on the Initial E&SC Plan (see sheet C-04), and the erosion
and sediment control narrative is revised to reflect the change (see sheet C-15).
2. Vegetated emergency spillway is proposed within earthen fill for detention basin
embankment. Spillways proposed in fill must be armored in accordance with
Virginia Stormwater Management Handbook specifications. Alternatively, principal
spillway may be sized to accommodate emergency flows. Comment noted, the
lining of the emergency spillway is revised to now include rip rap in lieu of the previously
proposed vegetation w/ matting treatment (see plan sheets C-04 & C-06).
3. Proposed SWM pond should be clearly labeled on plan and detail sheets as
“detention basin” in accordance with Virginia Stormwater Management Handbook
terminology. The SWM pond is now labeled as a detention basin per the Virginia
Stormwater Management Handbook (see plan sheet C-06 and detail sheet C-18).
Dept. of Public Works December 29, 2025
RE: Green Valley Baptist Church Site Plan Page 2
If you have any questions or need any additional information, please don’t hesitate to contact
me. Thank you for your time and consideration regarding this matter.
Sincerely,
Dice Engineering, PLC