HomeMy WebLinkAbout27-25 Site Sherando GreenLAT = N039.044410
LONG = W078.114672
DOUBLE CHURCH RD.FAIRFAX PI
K
E WARRIOR DR.U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS0000.dwg PLOTTED: 10/24/2025 7:53 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001
AS NOTED
TEAM
07-15-2025
DLFAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATE; AND OWNER SHALL
INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES
FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES
ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKLOCATION MAP
Scale: 1" = 2000'
CALL 1-800-552-7001
CALL BEFORE YOU DIG
ALWAYS CALL 811 BEFORE YOU DIG IN VIRGINIA
SECTION 56-265.17 REQUIRES THREE WORKING DAYS
NOTICE TO UTILITIES BEFORE YOU EXCAVATE, DRILL OR
BLAST VIRGINIA UTILITY PROTECTION SERVICE, INC.
TICKET NUMBER(S):
PREPARED BY:
PENNONI ASSOCIATES INC.
117 East Piccadilly Street
Winchester, VA 22601
T 540.667.2139
F 540.665.0493 PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED SITE PLAN #27-25
PREPARED FOR:
OWNER/DEVELOPER
SHERANDO GREEN LLC
605 SOUTH EDEN ST. - SUITE 200
BALTIMORE, MD. 21231
(410) 753-3966
SHERANDO GREEN
TM# 86-A-80
LANDBAY "A" & GROCERY STORE
COMMERCIAL SITE PLAN SP #27-25
OPEQUON DISTRICT - FREDERICK COUNTY, VIRGINIA
ORIG SUBMISSION DATE: JULY 15, 2025
REVISED SUBMISSION DATE: OCTOBER 24, 2025
LOCAL UTILITIES
RAPPAHANNOCK ELECTRIC CO-OP
137 KELLEY COURT
FRONT ROYAL, VIRGINIA 22630
(540) 662-2037
VERIZON
404 HILLANDALE LANE
WINCHESTER, VIRGINIA 22602
(540) 665-3156
COMCAST COMMUNICATIONS
195 RAINVILLE ROAD
WINCHESTER, VIRGINIA 22602
(540) 504-0942
WASHINGTON GAS
350 HILLANDALE LN.
WINCHESTER, VIRGINIA 22602
(540) 868-7913
FREDERICK WATER
315 TASKER ROAD
STEPHENS CITY, VIRGINIA 22655
(540) 868-1061 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTCOVER SHEET CS0000
TOTAL SHEETS 57
DAVID L. FRANK
Lic. No.1061
SITE
SHERANDO
HIGH SCHOOL
10-24-2025
SHEET INDEX
SHEET SHEET TITLE
CS0000 COVER SHEET
CS0001 GENERAL NOTES AND LEGENDS
CS0002 PROJECT DEVELOPMENT SUMMARY
CS0003 PROFFERS
CS0004 PROFFERS
CS1000 EXISTING CONDITIONS
CS2000 EROSION AND SEDIMENT CONTROL NARRATIVE
CS2100 EROSION AND SEDIMENT CONTROL PLAN PHASE I
CS2200 EROSION AND SEDIMENT CONTROL PLAN PHASE II
CS2300 TEMPORARY ACCESS AND STAGING PLAN
CS2500 EROSION AND SEDIMENT CONTROL DETAILS
CS2501 EROSION AND SEDIMENT CONTROL DETAILS
CS2600 EROSION AND SEDIMENT CONTROL - BASIN DETAILS
CS2601 EROSION AND SEDIMENT CONTROL - BASIN CALCULATIONS
CS3000 TRUCK ROUTING PLAN
CS4000 GEOMETRIC & UTILITY PLAN - OVERALL
CS4001 GEOMETRIC & UTILITY PLAN
CS4002 GEOMETRIC & UTILITY PLAN
CS4003 GEOMETRIC & UTILITY PLAN
CS4004 GEOMETRIC & UTILITY PLAN
CS4100 GRADING & DRAINAGE PLAN - OVERALL
CS4101 GRADING & DRAINAGE PLAN
CS4102 GRADING & DRAINAGE PLAN
CS4103 GRADING & DRAINAGE PLAN
CS4104 GRADING & DRAINAGE PLAN
CS4500 SITE DETAILS
CS4501 SITE DETAILS
CS4510 GROCERY STORE STANDARD DETAILS
CS4511 GROCERY STORE STANDARD DETAILS
CS4512 GROCERY STORE STANDARD DETAILS
CS5100 WATERLINE PROFILES
CS5200 SANITARY SEWER PROFILES
CS5400 HYDRAULIC WATER MODEL
CS5401 HYDRAULIC WATER MODEL - FIRE FLOW
CS5500 WATER & SANITARY STANDARD DETAILS
CS6100 STORM DRAIN PROFILES
CS6101 STORM DRAIN PROFILES
CS6150 STORM SEWER CALCULATIONS
CS6151 STORM SEWER CALCULATIONS
CS7000 LANDSCAPE PLAN
CS7500 LANDSCAPE CALCULATIONS
CS7600 AMENITY LANDSCAPE PLAN
CS7601 LANDSCAPING WITH TRUCK ROUTING
CS7700 IRRIGATION PLAN
CS7701 IRRIGATION PLAN DETAILS
CS8001 LIFE SAFETY PLAN
CS8010 ACCESSIBILITY PLAN
CS8011 ACCESSIBILITY DETAILS
CS8100 PHOTOMETRIC PLAN
CS8200 SIGNAGE PLAN - OVERALL
CS8201 SIGNAGE PLAN
CS9000 LEASE AREA PLAN
CS9200 PRE-DEVELOPMENT DRAINAGE MAP
CS9300 POST-DEVELOPMENT DRAINAGE MAP
CS9400 VRRM DRAINAGE MAP
CS9401 MS-19 COMPLIANCE SUMMARY
CS9402 SWM STUDY POINT ANALYSIS
BASE MAPPING & DATA SOURCE NOTES:
THE EXISTING CONDITIONS, FEATURES, PROPERTY INFORMATION AND TOPOGRAPHY ARE AS DEPICTED ON A SURVEY
PREPARED BY PENNONI ASSOCIATES, INC., DATED; 4-27-2023.
THE INITIAL SURVEY WAS PREPARE WITHOUT THE BENEFIT OF A TITLE REPORT.
THIS SURVEY AND PLAN ARE REFERENCED TO:
NAD83 VA NORTH ZONE COORDINATE SYSTEM
NAVD88 DATUM
UNITS = US SURVEY FT.
SUBSEQUENT TO A REVIEW OF FEMA FLOOD INSURANCE RATE MAP NO. 51069C0330E, EFFECTIVE 1-29-2021, THE SITE,
AND LIMITS OF CONSTRUCTION ARE LOCATED IN ZONE X, AN AREA OF MINIMAL FLOOD HAZARD.
SUBSEQUENT TO A REVIEW OF THE NATIONAL WETLANDS INVENTORY, 11-23-2023, THE SITE DEVELOPMENT AREA IS
NOT ENCUMBERED BY STREAMS, WATER BODIES, OR OTHER WETLAND FEATURES. A WETLANDS DELINEATION HAS
NOT BEEN PERFORMED AS A PART OF THIS PROJECT.
PROJECT HISTORY AND PRIOR APPROVALS
·REZONING REZ #13-89
·MASTER DEVELOPMENT PLAN MDP #05-20
·ADJACENT SUBDIVISION PLAN SP #01-21
·SHERANDO PUMP STATION UPGRADE PLAN 10-13-2021 (FW APPROVED)
·TIS & SJR 09-30-2022 (VDOT ACCEPTED)
·VDOT AM-E (ENTRANCE AT WARRIOR)11-13-2023 (VDOT APPROVED)
·SHERANDO GREEN PUBLIC IMPROVEMENT PLAN 04-30-2025 (APPROVED)
WATER & SEWER DEMANDS
THIS COMMERCIAL SITE PLAN PROPOSES GENERAL EXTENSION OF WATER AND SEWER SERVICES INTO SHERANDO
GREEN LANDBAY "A", AND MORE SPECIFICALLY, SERVICE CONNECTIONS FOR A 50K sf GROCERY STORE AND A 8K sf
RETAIL BUILDING. CONSTRUCTION OF ALL GROCERY STORE & RETAIL CONNECTIONS ARE DEPENDENT ON APPROVAL
OF THE SHERANDO GREEN PUBLIC IMPROVEMENT PLAN.
GROCERY WATER / SEWER DEMANDS:
WATER USED FOR IRRIGATION SHALL BE PROVIDED BY THE DOMESTIC SERVICE METER AT THE "8K RETAIL' LOCATION.
A SEPARATE IRRIGATION METER IS NOT REQUIRED.
GROCERY DOMESTIC FLOW = 50,000 SF /12,500 GPD
RETAIL DOMESTIC FLOW =8,000 SF / 3,000 GPD (INCLUDES IRRIGATION FLOW: 1,000 GPD)
TOTAL FLOWS (SITE PLAN)= 15,500 GPD
PUMP STATION UPGRADE
THE EXISTING PUMP STATION UPGRADE WILL BE FULLY CONSTRUCTED, OPERATIONAL AND ACCEPTED FOR THE START
OF THE ONE (1) YEAR WARRANTY PERIOD PRIOR TO THE ACCEPTANCE OF APPLICATION AND PAYMENT FOR THE 90th
RESIDENTIAL METER IN FAIRFAX DOWNS OR PRIOR TO THE METERING & OCCUPANCY OF THE FIRST COMMERCIAL SITE
PLAN FOR SHERANDO GREEN.
RESPONSIBLE LAND DISTURBER
THE RESPONSIBLE LAND DISTURBER IS THAT PARTY RESPONSIBLE FOR CARRYING
OUT THE LAND DISTURBING ACTIVITY AS SET FORTH IN THE PLANS.
NAME:_____________________________________________________
CERTIFICATION #:___________________________________________
DATE: _____________________________________________________
APPROVED BY FREDERICK COUNTY ZONING ADMINISTRATOR
SITE PLAN VALID FOR FIVE YEARS FROM APPROVAL DATE
________________________________________________________________________________
APPROVED BY DATE
PLAN REVIEW TRACKING
06-16-2025 PLAN, FIRE, GIS, INSP
07-15-2025 FW
07-17-2025 INSP (APPROVAL)
08-22-2025 FIRE, GIS, PW
09-02-2025 GIS (APPROVAL)
09-19-2025 FIRE (APPROVAL)
09-22-2025 VDH, VDOT
09-25-2025 FW, PW
09-29-2025 VDOT (APPROVAL)
10-10-2025 VDH (APPROVAL)
10-17-2025 PW (APPROVAL)
10-20-2025 FW
10-23-2025 FW (APPROVAL)
U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS0001.dwg PLOTTED: 10/24/2025 7:53 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001
AS NOTED
TEAM
07-15-2025
DLFAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTGENERAL NOTES AND LEGENDS CS0001
TOTAL SHEETS 57
10-24-2025
DAVID L. FRANK
Lic. No.1061
GENERAL CONSTRUCTION NOTES
1.THE CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR AND EQUIPMENT AND PERFORM ALL WORK INCLUDING
RESTORATION FOR ALL IMPROVEMENTS SHOWN OR IMPLIED AS NECESSARY FOR THE COMPLETED FACILITY READY
FOR USE. UNLESS OTHERWISE NOTED, SPECIFICATIONS FOR ALL WORK TO BE IN ACCORDANCE WITH APPLICABLE
STANDARDS AND CONSTRUCTION SPECIFICATIONS OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION, VIRGINIA
DEPARTMENT OF HEALTH, ECONOMIC DEVELOPMENT AUTHORITY, AND THE CONTRACT DOCUMENTS.
2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION STAKEOUT. ALL DIMENSIONS, ELEVATIONS
AND LOCATIONS SHALL BE VERIFIED IN THE FIELD BY EACH CONTRACTOR PRIOR TO BEGINNING THE WORK. THE
ENGINEER WILL APPROVE ALL CUT SHEETS.
3.CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO THE HOURS OF 8:00 AM TO 5:00 PM.
4.ANY UNUSUAL SUBSURFACE CONDITIONS ENCOUNTERED DURING THE COURSE OF THE WORK SHALL BE
IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER AND/OR THE OWNER.
5.CONTRACTOR TO OBTAIN, AT HIS EXPENSE, ALL PERMITS REQUIRED OF THIS WORK PRIOR TO COMMENCING
CONSTRUCTION AND SHALL FAITHFULLY ADHERE TO THE PERMIT CONDITIONS IMPOSED.
6.ALL GRADING FOR IMPROVEMENTS TO BE CONFINED TO THE PROJECT AREA. ANY WORK PERFORMED OFFSITE IS
THE CONTRACTOR'S RESPONSIBILITY.
7.CUTSHEETS SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION. ALL CUTSHEETS
SHOULD SHOW EXISTING GROUND ELEVATIONS AT CENTERLINE OF UTILITY, STRUCTURE OR ROAD, AND OFFSET HUB
ELEVATION.
8.LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING
THE EXACT LOCATION, VERTICALLY AND HORIZONTALLY, OF THE UTILITIES PRIOR TO ANY EXCAVATION OR
CONSTRUCTION. THE CONTRACTOR SHALL CONTACT "MISS UTILITY" AND ALL APPLICABLE UTILITY COMPANIES FOR
CLEARANCE PRIOR TO EXCAVATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADHERING TO THE
COMMONWEALTH OF VIRGINIA UNDERGROUND UTILITY DAMAGE PREVENTION ACT, CHAPTER 10, TITLE 56 OF THE
CODE OF VIRGINIA.
9.CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING AND MAINTAINING ALL EROSION AND SEDIMENT
CONTROL MEASURES NECESSARY DURING CONSTRUCTION IN ACCORDANCE WITH CURRENT STATE AND LOCAL
REGULATIONS. DISTURBED AREAS SHALL NOT REMAIN DENUDED FOR MORE THAN SEVEN (7) CALENDAR DAYS WHEN
CONSTRUCTION IS NOT IN PROGRESS. DURING CONSTRUCTION, ALL STORM SEWER INLETS SHALL BE PROTECTED
BY INLET PROTECTION, AND SHALL BE MAINTAINED AND MODIFIED AS REQUIRED BY CONSTRUCTION PROGRESS.
CONTRACTOR SHALL CONTACT THE COUNTY BUILDING INSPECTIONS OFFICE AT (540) 636-9973 TO SCHEDULE
INSPECTIONS.
10.CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING MUD FROM TRUCKS AND/OR OTHER EQUIPMENT
PRIOR TO ENTERING PUBLIC STREETS AND/OR EXISTING PARKING LOTS AND OTHER PAVED AREAS. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS, ALLAY DUST, AND TO TAKE WHATEVER MEASURES
NECESSARY TO ENSURE THAT THE STREETS ARE MAINTAINED IN A CLEAN, MUD AND DUST FREE CONDITION AT ALL
TIMES.
11.ANY STREET OR UTILITIES DAMAGED BY CONTRACTOR OR SUB-CONTRACTOR SHALL BE SOLE RESPONSIBILITY OF
THE PRIMARY CONTRACTOR AND PROPERLY AND IMMEDIATELY REPAIRED BY THE CONTRACTOR. SUCH REPAIRS
SHALL BE TO RESTORE THE ORIGINAL CONDITION, IN COMPLIANCE WITH THE UTILITY OWNER'S, STATE'S, COUNTY'S
OR CITY'S CONSTRUCTION STANDARDS & SPECIFICATIONS, AND TO THE SATISFACTION OF THE UTILITY OWNER'S
INSPECTOR.
12.ALL PRE-CAST CONCRETE STRUCTURES SHALL BE A MINIMUM 4000 PSI AT 28 DAYS.
13.THE CONTRACTOR IS RESPONSIBLE FOR ADJUSTMENT OF ALL UTILITY BOXES, VAULTS, OR OTHER APPURTENANCES
TO NEW FINISHED GRADE ELEVATIONS.
14.CONTRACTOR TO RELOCATE ALL SIGNS AND UTILITIES REQUIRED FOR THIS WORK.
15.ANY PLANNED DISRUPTIONS OF OR TIE INS TO EXISTING UTILITIES SHALL BE COORDINATED WITH THE APPROPRIATE
UTILITY OWNER. WITH THE EXCEPTION OF EMERGENCIES, THERE SHALL BE A MINIMUM OF 24 HOURS NOTICE GIVEN
BY THE CONTRACTOR TO ALL RESIDENTIAL, COMMERCIAL, AND INDUSTRIAL UTILITY USERS AFFECTED BY UTILITY
INTERRUPTIONS.
16.THE UNAUTHORIZED USE OF WATER WITHOUT DUE COMPENSATION IS ILLEGAL. NO PERSON SHALL CONNECT TO OR
DO ANY WORK ON THAT PORTION OF THE SYSTEM OWNED BY THE TOWN UNLESS WRITTEN AUTHORIZATION IS
RECEIVED PRIOR TO COMMENCING WORK.
17.CONSTRUCTION LIMITS SHALL BE PROPERTY LINES OR AS INDICATED BY PLAN REQUIREMENTS AND SHALL BE
STAKED OR FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION.
18.CONSTRUCTION SHALL CONFORM TO THE AMERICAN WITH DISABILITIES ACT (ADA) REQUIREMENTS.
19.REGISTERED LAND DISTURBER TO SUBMIT REPORTS TO BUILDING INSPECTOR ON A REGULAR BASIS AS REQUIRED
BY FREDERICK COUNTY.
20.THE CONTRACTOR SHALL COORDINATE WITH THE INDIVIDUAL LOT OWNERS TO RELOCATE THE EXISTING MAIL
BOXES THAT ARE AFFECTED BY THE PROPOSED IMPROVEMENTS.
21.ALL UTILITIES WILL BE LOCATED UNDERGROUND.
22.TEST PITS ARE REQUIRED ON ALL FREDERICK WATER / FCSA OWNED SEWER AND WATER LINES AS NEEDED AND
REQUIRED BY THEIR STANDARDS AND SPECIFICATIONS AND OR AS DIRECTED BY THEIR INSPECTOR.
23.FIELD ADJUSTMENTS TO FREDERICK WATER / FCSA INFRASTRUCTURE SHALL BE AS REQUIRED BY THE FREDERICK
WATER INSPECTOR'S REQUIREMENTS.
24.EXISTING MANHOLE FRAMES AND COVERS AND VALVE BOXES AND COVERS TO REMAIN SHALL BE ADJUSTED OR
RECONSTRUCTED, AS NECESSARY, TO MATCH FINISHED GRADES.
25.VDOT EROSION AND SEDIMENT CONTROL CONTRACTOR CERTIFICATION IS REQUIRED.
FIRE AND RESCUE
1. BURNING OF CONSTRUCTION DEBRIS AND CLEARING AND GRUBBING DEBRIS ON SITE IS PROHIBITED.
2. ACCESS FOR EMERGENCY VEHICLES MUST BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION.
VDOT GENERAL NOTES
VIRGINIA DEPARTMENT OF TRANSPORTATION - STAUNTON DISTRICT - REV. JUNE 19, 2013
V1.ALL WORK ON THIS PROJECT SHALL CONFORM TO THE CURRENT EDITIONS OF AND LATEST REVISIONS TO THE
VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) ROAD AND BRIDGE SPECIFICATIONS AND STANDARDS, THE
VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS, AND ANY OTHER APPLICABLE STATE, FEDERAL OR
LOCAL REGULATIONS. IN CASE OF A DISCREPANCY OR CONFLICT BETWEEN THE STANDARDS OR SPECIFICATIONS
AND REGULATIONS, THE MOST STRINGENT SHALL GOVERN.
V2.ALL CONSTRUCTION SHALL COMPLY WITH THE LATEST U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION (OSHA), AND VIRGINIA OCCUPATIONAL SAFETY & HEALTH (VOSH) RULES AND
REGULATIONS.
V3.WHEN WORKING WITHIN VDOT RIGHT-OF-WAY, ALL TRAFFIC CONTROL, WHETHER PERMANENT OR TEMPORARY,
SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF VDOT'S WORK AREA PROTECTION MANUAL. A
TRANSPORTATION MANAGEMENT PLAN NEEDS TO BE SUBMITTED FOR APPROVAL AND LAND USE PERMIT ISSUED
PRIOR TO ANY EXECUTION OF WORK WITHIN THE VDOT RIGHT OF WAY.
V4 THE DEVELOPER SHALL BE RESPONSIBLE FOR RELOCATING, AT HIS EXPENSE, ANY AND ALL UTILITIES, INCLUDING
TRAFFIC SIGNAL POLES, JUNCTION BOXES, CONTROLLERS, ETC., OWNED BY VDOT OR PRIVATE / PUBLIC UTILITY
COMPANIES. IT IS THE SOLE RESPONSIBILITY OF THE DEVELOPER TO LOCATE AND IDENTIFY UTILITY FACILITIES OR
ITEMS THAT MAY BE IN CONFLICT WITH THE PROPOSED CONSTRUCTION ACTIVITY. VDOT APPROVAL OF THESE PLANS
DOES NOT INDEMNIFY THE DEVELOPER FROM THIS RESPONSIBILITY.
V5.DESIGN FEATURES RELATING TO FIELD CONSTRUCTION, REGULATIONS, AND CONTROL OR SAFETY OF TRAFFIC MAY
BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY VDOT. ANY ADDITIONAL EXPENSE INCURRED AS A RESULT OF
ANY FIELD REVISION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER.
V6.IF REQUIRED BY THE LOCAL VDOT LAND DEVELOPMENT OFFICE, A PRE-CONSTRUCTION CONFERENCE SHALL BE
ARRANGED AND HELD BY THE ENGINEER AND/OR DEVELOPER WITH THE ATTENDANCE OF THE CONTRACTOR (S),
VARIOUS COUNTY AGENCIES, UTILITY COMPANIES AND VDOT PRIOR TO INITIATION OF WORK.
V7.THE CONTRACTOR SHALL NOTIFY THE LOCAL VDOT LAND DEVELOPMENT OFFICE WHEN WORK IS TO BEGIN OR
CEASE FOR ANY UNDETERMINED LENGTH OF TIME. VDOT REQUIRES AND SHALL RECEIVE 48 HOURS ADVANCE
NOTICE PRIOR TO ANY REQUIRED OR REQUESTED INSPECTION.
V8. THE CONTRACTOR SHALL NOTIFY THE TRAFFIC OPERATIONS CENTER AT (540) 332-9500 FOR ANY TRAFFIC CONTROL
PLAN THAT IMPACTS A VDOT MAINTAINED INTERSTATE OR PRIMARY ROADWAY TO PROVIDE NOTIFICATION OF THE
INSTALLATION AND REMOVAL OF THE WORK ZONE.
V9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A VDOT PERMITTED TEMPORARY CONSTRUCTION
ENTRANCE(S) IN ACCORDANCE WITH SECTION 3.02 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK.
FURTHERMORE, ACCESS TO OTHER PROPERTIES AFFECTED BY THIS PROJECT SHALL BE MAINTAINED THROUGH
CONSTRUCTION.
V10.CONTRACTOR SHALL ENSURE ADEQUATE DRAINAGE IS ACHIEVED AND MAINTAINED ON THE SITE DURING AND AT
THE END OF CONSTRUCTION.
V11. ALL WATER AND SEWER LINES WITHIN EXISTING OR PROPOSED VDOT RIGHT-OF-WAY SHALL HAVE A MINIMUM
THIRTY-SIX (36) INCHES COVER AND WHEN POSSIBLE SHALL BE INSTALLED UNDER ROADWAY DRAINAGE FACILITIES
AT CONFLICT POINTS.
V12.ANY UNUSUAL SUBSURFACE CONDITIONS (E.G., UNSUITABLE SOILS, SPRINGS, SINKHOLES, VOIDS, CAVES, ETC.)
ENCOUNTERED DURING THE COURSE OF CONSTRUCTION SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF
THE ENGINEER AND VDOT. WORK SHALL CEASE IN THAT VICINITY UNTIL AN ADEQUATE DESIGN CAN BE DETERMINED
BY THE ENGINEER AND APPROVED BY VDOT.
V13.ALL FILL AREAS, BORROW MATERIAL AND UNDERCUT AREAS SHALL BE INSPECTED AND APPROVED BY A VDOT
REPRESENTATIVE PRIOR TO PLACEMENT OF FILL. A VDOT REPRESENTATIVE SHALL BE PRESENT TO INSURE THE
SOIL SAMPLE(S) OBTAINED FOR CBR'S IS REPRESENTATIVE OF THE LOCATION. WHEN SOIL SAMPLES ARE SUBMITTED
TO PRIVATE LABORATORIES FOR TESTING, THE SAMPLES SHALL BE CLEARLY IDENTIFIED AND LABELED AS
BELONGING TO A PROJECT TO BE ACCEPTED BY VDOT AND THAT TESTING SHALL BE PERFORMED IN ACCORDANCE
WITH ALL APPLICABLE VDOT STANDARDS AND PROCEDURES.
V14.ALL ROADWAY FILL, BASE, SUBGRADE MATERIAL, AND BACKFILL IN UTILITY/STORM SEWER TRENCHES SHALL BE
COMPACTED IN ACCORDANCE WITH THE LIFT THICKNESSES, DENSITY AND MOISTURE REQUIREMENTS AS SPECIFIED
IN THE CURRENT VDOT ROAD AND BRIDGE SPECIFICATIONS. CERTIFIED COPIES OF TEST REPORTS SHALL BE
SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE.
V15.VDOT STANDARD CD AND UD UNDERDRAINS SHALL BE INSTALLED WHERE INDICATED ON THESE PLANS AND/OR AS
SPECIFIED BY VDOT.
V16. A POST INSTALLATION VISUAL/VIDEO CAMERA INSPECTION SHALL BE CONDUCTED BY THE CONTRACTOR ON ALL
PIPES IDENTIFIED ON THE PLANS AS STORM SEWER PIPE AND A SELECT NUMBER OF PIPE CULVERTS. FOR PIPE
CULVERTS, A MINIMUM OF ONE PIPE INSTALLATION FOR EACH SIZE OF EACH MATERIAL TYPE WILL BE INSPECTED OR
TEN PERCENT OF THE TOTAL AMOUNT FOR EACH SIZE AND MATERIAL TYPE SUMMARIZED. ALL PIPE INSTALLATIONS
ON THE PLANS NOT IDENTIFIED AS STORM SEWER PIPE SHALL BE CONSIDERED AS CULVERT PIPE FOR INSPECTION
PURPOSES. ADDITIONAL TESTING MAY BE REQUIRED AS DIRECTED BY THE AREA LAND USE ENGINEER OR THEIR
REPRESENTATIVE.
V17.THE INSTALLATION OF ANY ENTRANCES AND MAILBOXES WITHIN ANY DEDICATED STREET RIGHT-OF-WAY SHALL
MEET VDOT MINIMUM DESIGN STANDARDS AND IS THE RESPONSIBILITY OF THE DEVELOPER.
V18.PRIOR TO VDOT ACCEPTANCE OF ANY STREETS, ALL REQUIRED STREET SIGNAGE AND/OR PAVEMENT MARKINGS
SHALL BE INSTALLED BY THE DEVELOPER IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES.
V19.THE DEVELOPER SHALL PROVIDE THE VDOT LAND DEVELOPMENT OFFICE WITH A LIST OF ALL MATERIAL SOURCES
PRIOR TO THE START OF CONSTRUCTION. COPIES OF ALL INVOICES FOR MATERIALS UTILIZED WITHIN ANY
DEDICATED STREET RIGHT-OF-WAY MUST BE PROVIDED TO THE LOCAL VDOT LAND DEVELOPMENT OFFICE PRIOR
TO ACCEPTANCE OF THE WORK. UNIT AND TOTAL PRICES MAY BE OBSCURED.
V20.AGGREGATE BASE AND SUBBASE MATERIALS SHALL BE PLACED ON SUBGRADE BY MEANS OF A MECHANICAL
SPREADER. DENSITY WILL BE DETERMINED USING THE DENSITY CONTROL STRIP IN ACCORDANCE WITH SECTION 304
OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS AND VTM-10. A CERTIFIED COMPACTION TECHNICIAN SHALL
PERFORM THESE TESTS. CERTIFIED COPIES OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS
SPECIFIED OTHERWISE. IN ADDITION TO CHECKING STONE DEPTHS, A VDOT REPRESENTATIVE SHALL BE NOTIFIED
AND GIVEN THE OPPORTUNITY TO BE PRESENT DURING THE CONSTRUCTION AND TESTING OF THE DENSITY
CONTROL STRIP.
V21.ASPHALT CONCRETE PAVEMENTS SHALL BE PLACED IN ACCORDANCE WITH SECTION 315 OF THE VDOT ROAD AND
BRIDGE SPECIFICATIONS. DENSITY SHALL BE DETERMINED USING THE DENSITY CONTROL STRIP AS SPECIFIED IN
SECTION 315 AND VTM-76. A CERTIFIED COMPACTION TECHNICIAN SHALL PERFORM THESE TESTS. CERTIFIED COPIES
OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE. A VDOT REPRESENTATIVE
SHALL BE NOTIFIED AND GIVEN THE OPPORTUNITY TO BE PRESENT DURING THE CONSTRUCTION AND TESTING OF
THE CONTROL STRIP.
V22.IN ACCORDANCE WITH SECTION 302.03, THE FOUNDATIONS FOR PIPE CULVERTS THIRTY-SIX (36) INCHES AND
LARGER SHALL BE EXPLORED BELOW THE BOTTOM OF THE EXCAVATION TO DETERMINE THE TYPE AND CONDITION
OF THE FOUNDATION. THE CONTRACTOR SHALL REPORT FINDINGS OF FOUNDATION EXPLORATION TO THE
ENGINEER AND VDOT FOR APPROVAL PRIOR TO PLACING PIPE. FOUNDATION DESIGNS SHALL COMPLY WITH VDOT
ROAD AND BRIDGE STANDARD PB-1. WHERE SOFT, YIELDING, OR OTHERWISE UNSUITABLE FOUNDATION IS
ENCOUNTERED, THE FOUNDATION DESIGN AND/OR NEED FOR FOUNDATION STABILIZATION SHALL BE DETERMINED
BY THE ENGINEER AND APPROVED BY VDOT.
V23.VDOT STANDARD GUARDRAIL SHALL BE INSTALLED WHERE WARRANTED AND/OR AS PROPOSED ON THESE PLANS IN
ACCORDANCE WITH VDOT'S INSTALLATION CRITERIA. FINAL APPROVAL OF THE GUARDRAIL LAYOUT TO BE GIVEN BY
VDOT AFTER GRADING IS MOSTLY COMPLETE.
V24.APPROVAL OF THESE PLANS SHALL EXPIRE FIVE (5) YEARS FROM THE DATE OF THE APPROVAL LETTER.
V25.VDOT STANDARD CG-12 CURB RAMPS SHALL BE INSTALLED WHERE INDICATED ON THESE PLANS AND/OR AS
SPECIFIED BY VDOT.
V26.THE FOUNDATIONS FOR ALL BOX CULVERTS SHALL BE INVESTIGATED BY MEANS OF EXPLORATORY BORINGS
ADVANCED BELOW PROPOSED FOUNDATION ELEVATION TO DETERMINE THE TYPE AND CONDITION OF THE
FOUNDATION. THE CONTRACTOR SHALL SUBMIT COPIES OF BOREHOLE LOGS AND REPORT FINDINGS OF
FOUNDATION EXPLORATION TO THE ENGINEER AND VDOT FOR APPROVAL PRIOR TO CONSTRUCTING BOX.
FOUNDATION DESIGNS SHALL COMPLY WITH VDOT ROAD AND BRIDGE STANDARD PB-1. CONTRARY TO THE
STANDARD, WHERE ROCK IS ENCOUNTERED AND CAST-IN-PLACE BOX IS PROPOSED, THE THICKNESS OF BEDDING
SHALL BE SIX (6) INCHES. WHERE SOFT, YIELDING, OR OTHERWISE UNSUITABLE FOUNDATION IS ENCOUNTERED, THE
FOUNDATION DESIGN AND/OR NEED FOR FOUNDATION STABILIZATION SHALL BE DETERMINED BY THE ENGINEER
AND APPROVED BY VDOT.
TEST HOLE .........................
BUILDING WALL .....................
DOOR LOCATION .....................
LIMITS OF GRADING .................
BENCHMARK .........................
PROPOSED
CG-6R
TREE LINE .........................
TREE ..............................
SANITARY STRUCTURE LABEL ..........
WATER METER .......................
SPOT SHOT .........................
SIGN ..............................
FIRE HYDRANT ......................
STREET LIGHT ......................
UTILITY POLE ......................
WATER VALVE .......................
TRAFFIC SIGNAL POLE ...............
FENCE LINE ........................
UNDERGROUND TELEPHONE .............
OVERHEAD TELEPHONE ................
UNDERGROUND ELECTRIC ..............
OVERHEAD ELECTRIC .................
STORM STRUCTURE LABEL .............
GAS LINE ..........................
WATERMAIN .........................
SANITARY SEWER ....................
STORM SEWER .......................
EDGE OF PAVEMENT ..................
CURB AND GUTTER ...................
CONTOURS ..........................
STREET CENTERLINE .................
PROPERTY LINE .....................
24
LEGEND
TRANS.CG-6
EXISTING
24
RW RWRECLAIM WATERMAIN ..................RW RW
S
DD
WATERLINE TO BE REMOVED..................
RECLAIMED WATERLINE TO BE REMOVED
STORM SEWER TO BE REMOVED............
PAVEMENT TO BE REMOVED....................
FREDERICK WATER
CONSTRUCTION NOTES - 06-18-2024
1.FREDERICK WATER'S WATER AND SEWER STANDARDS AND SPECIFICATIONS ARE AVAILABLE AT
WWW.FREDERICKWATER.COM
2.THE CONTRACTOR SHALL ADHERE TO FREDERICK WATER STANDARDS AND SPECIFICATIONS IN EFFECT AT THE
TIME OF CONSTRUCTION.
3.THE CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE FREDERICK WATER INSPECTOR
PRIOR TO COMMENCING INSTALLATION OF ANY WATER OR SEWER FACILITIES. CONTRACTOR SHALL ALSO
ARRANGE FOR INSPECTION OF SAID FACILITIES BY FREDERICK WATER. OIL WATER SEPARATORS AND/OR GREASE
TRAPS MAY BE REQUIRED BY FREDERICK OR CLARKE COUNTY BUILDING INSPECTIONS. BOTH FREDERICK OR
CLARKE COUNTY BUILDING INSPECTIONS AND FREDERICK WATER WILL INSPECT THE INSTALLATION OF THOSE
FACILITIES. BOTH INSPECTIONS SHALL BE SCHEDULED BY CONTRACTOR.
4.THE CONTRACTOR SHALL CONNECT A NEW SEWER LINE TO AN EXISTING MANHOLE BY CORE DRILLING THE
MANHOLE.
5.A NEW WATER (OR FORCED SEWER) MAIN SHALL BE CONNECTED TO AN EXISTING MAIN BY A CUT-IN TEE WITH
ACCOMPANYING VALVES.
6.EXACT LOCATIONS OF WATER AND SEWER SERVICES ON NEW LINES ARE TO BE COORDINATED WITH FREDERICK
WATER'S INSPECTOR.
a.ADJUST FREDERICK WATER FACILITIES TO GRADE AS REQUIRED BY THE FREDERICK WATER INSPECTOR.
7.FREDERICK WATER'S MAINTENANCE DIVISION SHALL FURNISH AND INSTALL ALL WATER METERS THROUGH 2
INCH IN SIZE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE METER BOX ASSEMBLY INSTALLED
CORRECTLY.
BEFORE A PERMANENT METER IS INSTALLED:
a.THE METER BOX, WITH ITS FRAME AND COVER, MUST BE PROPERLY ALIGNED WITH THE YOKE BAR.
b.THE FRAME AND COVER SHALL BE SET TO FINAL GRADE.
c.THE DISTANCE BETWEEN THE TOP OF THE COVER AND THE YOKE BAR SHALL BE BETWEEN 20 AND 23
INCHES.
d.ALL COMPONENTS OF THE METER BOX ASSEMBLY SHALL BE IN PROPER WORKING ORDER.
8.FOR SERVICES THAT CONNECT TO EXISTING LINES:
a.FREDERICK WATER SHALL FURNISH AND INSTALL:
i. ALL ⅝”X¾”, ¾”, 1”, 1½” AND 2” WATER SERVICES
ii. ALL SEWER SERVICES.
b.THE OWNER/DEVELOPER SHALL:
i. COORDINATE (OR HAVE THE CONTRACTOR COORDINATE) THE LOCATION OF THE SERVICE LATERAL
WITH FREDERICK WATER'S ENGINEERING ASSISTANT.
ii. SUBMIT AN APPLICATION FOR SERVICE AND PAY THE REQUIRED FEES.
9.ALL WATER SERVICE LINES MUST HAVE A BACKFLOW PREVENTION ASSEMBLY (DOUBLE CHECK VALVE OR RPZ, AS
REQUIRED). THE ASSEMBLY MUST MEET ASSE STANDARD NUMBER 1015 OR 1013.
10.ALL FIRE LINES MUST HAVE A BACKFLOW PREVENTION ASSEMBLY (DETECTOR DOUBLE CHECK VALVE OR RPZ, AS
REQUIRED). THE ASSEMBLY SHALL MEET ASSE STANDARD NUMBER 1048 OR 1047. ANY PRIVATELY OWNED FIRE
LINE, INTERIOR OR EXTERIOR, SHALL ALSO HAVE A FIRE SERVICE METER. THIS ASSEMBLY SHALL BE INSTALLED
IMMEDIATELY BEFORE THE BACKFLOW PREVENTION UNIT. RADIO READ REMOTES ARE REQUIRED.
11.FREDERICK WATER SHALL REVIEW THE MECHANICAL PLAN(S) FOR DESIGN AND MATERIAL APPROVAL OF A
BUILDING'S:
a.DOMESTIC WATER METER AND ITS BACKFLOW PREVENTION DEVICE, AND/OR ITS
b.FIRE SERVICE LINE'S WATER METER AND BACKFLOW PREVENTION DEVICE.
12.DEQ MUST ALSO APPROVE SEWER PUMP STATIONS. FREDERICK WATER REQUIRES A COPY OF DEQ'S CERTIFICATE
TO OPERATE AND A COPY OF THE STATION'S DEQ APPROVED O&M MANUAL. THESE DOCUMENTS MUST BE
RECEIVED BEFORE SUBSTANTIAL COMPLETION IS ISSUED AND WATER METERS RELEASED.
13.VALVES, MANHOLES, ARV'S AND OTHER FREDERICK WATER SURFACE FEATURES SHALL NOT BE PLACED IN CURB
AND GUTTER, NOR SLOPED PORTION OF HANDICAPPED RAMPS, CONTRACTOR SHALL COORDINATE LOCATIONS
WITH THE FREDERICK WATER INSPECTOR.
14.IRRIGATION LINES AND DEVICES, LIGHT POLES, TRANSFORMERS, JUNCTION BOXES, PEDESTALS, OTHER
OBSTACLES AND ALL DRY UTILITIES SHALL NOT BE PLACED IN FREDERICK WATER EASEMENTS. PERPENDICULAR
IRRIGATION LINES AND DRY UTILITIES CROSSINGS ARE PERMITTED WITH 18” MINIMUM VERTICAL SEPARATION.
15.WITH REGARD TO WATER MAIN CUT-IN CONNECTIONS AND WHERE APPLICABLE, THE CONTRACTOR SHALL;
a.TEST PIT EXISTING WATER MAINS PER FREDERICK WATER INSPECTOR'S REQUIREMENTS
b.INSTALL JOINT RESTRAINTS ON EXISTING WATER MAIN PER CURRENT FREDERICK WATER REQUIREMENTS
PRIOR TO SHUT DOWN
c.PREPARE WORK AS FAR IN ADVANCE AS POSSIBLE TO MINIMIZE SHUT DOWN TIME
d.HAVE SUFFICIENT RESOURCES ON-SITE TO ACCOMPLISH TASKS PER FREDERICK WATER INSPECTOR'S
REQUIREMENTS
e.PREPARE A WATER SHUT DOWN PLAN SATISFACTORY TO THE FREDERICK WATER INSPECTOR, FIREWATCH,
NIGHTTIME WORK ETC. MAYBE REQUIRED
f.SCHEDULE SHUTDOWN WITH THE FREDERICK WATER INSPECTOR, FREDERICK COUNTY FIRE MARSHAL, AND
ALL AFFECTED CUSTOMERS AT LEAST (7) DAYS IN ADVANCE, AND MAKE PREPARATIONS AS REQUIRED BY ALL
PARTY'S
g.PERFORM ALL WORK WITH ONE SHUT DOWN UNLESS APPROVED BY THE FREDERICK WATER INSPECTOR
16.WITH REGARD TO TEST-PIT LOCATIONS OF EXISTING MAIN, AND WHERE APPLICABLE, THE CONTRACTOR SHALL;
a.COORDINATE A MEETING WITH THE FREDERICK WATER INSPECTOR AT LEAST SEVEN (7) WORKING DAYS
PRIOR TO GROUND DISTURBING ACTIVITIES.
b.EXERCISE EXTREME CAUTION WHILE TRAVELING OR WORKING OVER OR NEAR EXISTING FREDERICK WATER
FACILITIES.
c.TEST PIT EXISTING FREDERICK WATER FACILITIES TO CONFIRM THAT MINIMUM COVER OF 36" HAS BEEN
PROVIDED.
d.TEST PIT REPORTS SHALL BE PROVIDED TO THE OWNER'S ENGINEER.
e.PERFORM ALL WORK PER THE FREDERICK WATER INSPECTOR'S REQUIREMENTS
17.WHERE APPLICABLE, FREDERICK WATER FACILITIES & APPURTENANCES NOTED ON THE PLANS "TO BE REMOVED",
SHALL BE FURNISHED TO THE FREDERICK WATER INSPECTOR.
18.BRINE DISCHARGES FROM ION-EXCHANGE WATER SOFTENERS SHALL NOT BE DISCHARGED TO THE SANITARY
SEWER SYSTEM.
19.CONTRACTOR SHALL PROVIDE ONE REMOTE PRESSURE AND TEMPERATURE MONITORING FIRE HYDRANT AND
COORDINATE THE LOCATION WITH THE FREDERICK WATER INSPECTOR
U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS0002.dwg PLOTTED: 10/24/2025 7:53 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001
AS NOTED
TEAM
07-15-2025
DLFAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTPROJECT DEVELOPMENT SUMMARY CS0002
TOTAL SHEETS 57
10-24-2025
DAVID L. FRANK
Lic. No.1061
____________________________________________________
SITE DEVELOPMENT NOTES
1.THE EXISTING CONDITIONS, FEATURES, PROPERTY INFORMATION AND ARE AS
DEPICTED ON ALTA SURVEY PREPARED BY TRIAD ENGINERRING, INC AND DATED;
MARCH 25, 2022. TOPOGRAPHY IS AS DEPICTED ON AN AERIAL SURVEY PREPARED
BY TUCK MAPPING SOLUTIONS AND DATED; MARCH 9, 2022.
2.THIS SURVEY AND PLAN ARE REFERENCED TO NAD83 VA NORTH ZONE
COORDINATE SYSTEM AND NAVD88 DATUM, UNITS = US SURVEY FT.
3.SUBSEQUENT TO REVIEW OF FEMA FLOOD INSURANCE RATE MAP NO. 51069C0210E,
EFFECTIVE 1/29/2021, THE LIMITS OF CONSTRUCTION ARE LOCATED IN ZONE X, AN
AREA OF MINIMAL FLOOD HAZARD.
4.BASED ON A REVIEW OF THE NATIONAL WETLANDS INVENTORY, THE PROJECT SITE
DOES NOT APPEAR TO BE ENCUMBERED BY WETLANDS OR STREAMS. A
WETLANDS FIELD DELINEATION WAS NOT PROVIDED FOR THIS PROJECT.
5.COMMERCIAL IMPROVEMENTS SHALL BE SERVED BY PUBLIC WATER AND SANITARY
SEWER.
6.RECORDATION OF THE COMMERCIAL SUBDIVISION PLAT IS REQUIRED PRIOR TO
ISSUANCE OF A BUILDING PERMIT.
BUILDING OFFICIAL- PERMITS REQUIRED (VUSBC 108.2)
A.ACCESSORY STRUCTURE FOR ANYTHING OTHER THAN A SHED <256 SQ. FT.
B.MONUMENT SIGNS (ENGINEERING)
C.STREET LIGHT POLE BASES (ENGINEERING OR MANUFACTURE'S SPEC FOR
1,500 PSF. SOIL AND 90MPH WIND)
D.RETAINING WALLS WITH ≥3' UNBALANCED FILL
E.SWIMMING POOLS & SWIMMING POOL BARRIERS (FENCE)
F.FLAG POLES >30' HEIGHT
G.ANY STRUCTURAL SLABS
H.TANKS (CHEMICAL / SIZE / QUANTITY)
·CURRENT WIND SPEED IS 115 MPH FOR COMPLIANCE WITH THE BUILDING
CODE. 2018 VCC CHAPTER 16 CS0002 NOTE C
DEVELOPER
SHERANDO GREEN LLC
605 SOUTH EDEN ST. - SUITE 200
BALTIMORE, MD. 21231
(410) 753-3966
PROPERTY SUMMARY
ADDRESS 606 FAIRFAX PIKE
STEPHENS CITY, VIRGINIA 22655
PARCEL OWNER SHERANDO GREEN, LLC
TAX MAP TM 86-A-80
EXISTING ZONING B-2
CURRENT USE VACANT
PROPOSED USE COMMERCIAL
ORIGINAL PARCEL AREA 19.93 AC
R/W DEDICATION 1.05 AC
NEW PARCEL AREA 18.88 AC
TOTAL DEVELOPED LAND AREA 18.88 AC
DISTURBED AREAS
ON-SITE 17.91 AC.
OFF-SITE 0.04 AC.
TOTAL DISTURBED AREA 17.95 AC.
FLOOR AREA CALCULATIONS
TOTAL GROUND FLOOR AREA 58,800 SF (50,800 SF GROCERY + 8,000 SF RETAIL)
TOTAL FLOOR AREA 58,800 SF
TOTAL LOT AREA 469,514 SF
F.A.R.0.13 (1.0 MAX F.A.R. ALLOWED)
BUILDING HEIGHT
MAXIMUM PROVIDED
BUILDING HEIGHT 35' MAX HT 35'
24'-3" 8K RETAIL
BUILDING SETBACKS
MINIMUM REQUIRED MINIMUM PROVIDED
FROM PRIMARY/ARTERIAL 50'403.18'
FROM COLLECTOR/MINOR 35'115.79'
SIDE N/A 727.65'
REAR N/A 121.02'
PARKING SETBACKS
MINIMUM REQUIRED MINIMUM PROVIDED
ROAD/STREET 10'22.5'
ALL OTHER PL 5'N/A
PARKING CALCULATIONS
REQUIRED PROVIDED
(1 SPACES / 200 SF)
58,800 SF / 200 SF 294 330
HC SPACES 7 (1 VAN)15 (15 VAN)
LOADING SPACES
(1 SPACE / FIRST 10,000 SF BLDG)
(1 SPACE / 30,000 SF THEREAFTER)
58,800 SF / 70,000 SF 3 3
OPEN / GREEN SPACE CALCULATIONS
PARCEL 1 AREA 10.77 AC
IMPERVIOUS AREA 7.32 AC (68%)
OPEN / GREEN SPACE 3.45 AC (32%) (REQUIRED 15%)
LANDSCAPING
_____________________________________________________________________
50 ADDITIONAL 6' DECIDUOUS TREES ARE REQUIRED TO FULFILL
PROFFER B(1) OF RZ#13-89
WATER & SEWER DEMANDS
WATER AND SEWER DEMANDS ARE SHOWN ON SHEET CS0000
FREDERICK COUNTY INSPECTIONS DEPT. PROJECT
NOTES:
1.BUILDING SHALL COMPLY WITH THE VIRGINIA UNIFORM STATEWIDE BUILDING
CODE. OTHER CODES THAT APPLY ARE ICC/ANSI A117.1. ACCESSIBLE AND
USABLE BUILDINGS AND FACILITIES, INTERNATIONAL FIRE CODE 2018,
VIRGINIA ENERGY CODE, THE VIRGINIA MECHANICAL CODE, THE VIRGINIA
PLUMBING CODE AND THE NEC.
2.ALL REQUIRED EXITS SHALL MEET ANSI A117.1. EXITS SHALL TERMINATE AT A
PUBLIC WAY. A DETAILED FIRE EXITING PLAN SHALL BE PROVIDED WITH THE
BUILDING PLANS TO IDENTIFY THE LOCATION AND TRAVEL DISTANCE TO THE
ACCESSIBLE EXITS. NEW EXITS MAY NEED TO MEET ANSI A117.1.
3.AN ACCESSIBLE ROUTE SHALL BE PROVIDED TO THE FACILITY AND TO THE
MAIN ENTRANCE. HANDICAP PARKING SHALL COMPLY WITH ANSI A117.1. VAN
ACCESSIBLE PARKING SHALL HAVE A MINIMUM OF 11' WIDTH WITH 5'
UNLOADING AREA OR A MINIMUM OF 8' UNLOADING AREA WITH AN 8' WIDTH.
MAXIMUM 2% SLOPE REQUIRED FOR PARKING AND UNLOADING. MAXIMUM
THRESHOLD AT DOOR SHALL NOT EXCEED ½”. WALKWAYS SHALL NOT
EXCEED 5% SLOPE. SLOPES EXCEEDING 5% SHALL BE DESIGNED AS RAMPS.
ACCESSIBLE PARKING AND UNLOADING AREA SHALL HAVE A STRIPED AREA
LEADING TO ENTRANCE WHEN TRAVELING OVER VEHICULAR.
4.PLEASE NOTE THE REQUIREMENTS IN CHAPTER 17 OF VCC FOR SPECIAL
INSPECTION REQUIREMENTS ON THE TYPE OF STRUCTURE (SOILS,
CONCRETE, ETC.).
U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS0003.dwg PLOTTED: 10/24/2025 7:53 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001
AS NOTED
TEAM
07-15-2025
DLFAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTPROFFERS CS0003
TOTAL SHEETS 57
10-24-2025
DAVID L. FRANK
Lic. No.1061
U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS0003.dwg PLOTTED: 10/24/2025 7:53 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001
AS NOTED
TEAM
07-15-2025
DLFAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTPROFFERS CS0004
TOTAL SHEETS 57
10-24-2025
DAVID L. FRANK
Lic. No.1061
7557
5
4
756757755
751752752
752
753
754
756
750
749
751
752
753745750746747748749750
750
750
748
749751
7
5
1
751
7
5
2
7
5
3
750 749751752753754
75
0 755748
748 74975
1
75
2
75
3
75
4
7567507557477
4
7747 74774874874874975175275375475675675675675675775775875874074074
5
7457507
5
0 75575573973974174174
2
74274
3
743744744746
7467
4
7
747 7477477
4
7
747748748
7
4
8
748 7487
4
8
749
74
9
74
9
74975
1
7517527527
5
3
7537547
5
4
756
7567537
5
3
7
5
4
75475
5
7
5
4
756757750746747748749751752752753753754
754755735
740 745736737 738
739
741742743744746747748
735
740
745
745
736
737
738
739
741
742
743
744 746746747747
747747 748748745
7
4
57507
5
5
7
5
5
755 7557
5
5
74374474
6
746
747
7
4
7
7477
4
8
748
74874974974974
9
7497
5
1752752752753753
7
5
3
7
5
47457
4
4
745
74574574
5
75
0
750
750
750750
750
750
755
760
76074174174274
2743
74
3744
74
4
746746
746
746
746747
7
4
7
7
4
7747747
74874874874
8
7
4
8
748
748748
7487497497
4
9
749
749749
749
749749
7497
4
9
749
749
751
751
75175
1751752752752
752
752
753753
753
754754754
756
756
756
757
757
757
758
758
758
759
759PIN 86-A-80
SHERANDO GREEN LLC
INST# 230004459
19.93 AC
ZONE B2
IRF
IRF
IRF
IRF
IRF
IRF CAP
IRF
IRF
IPF IRF
IPF
FH
92SHEDSIGN
CG-6 EOP EOPCG-6CG-6EOPCG-6CG-6CG-6CG-6PIN 86-A-80
SHERANDO GREEN LLC
INST# 230004459
19.93 AC
ZONE B2
LOT
6
2
LOT
6
3
LOT
6
4 LOT
2
LOT
3
LOT
4
LOT
5
LOT
6
2
LOT
6
3
LOT
70
LOT
71
LOT
72
LOT
73
LOT
7
4
LOT
7
5
LOT
7
6
LOT
7
7
LOT
6
4
LOT
1
LOT
9
3 S 06°
10
'
25
"
E
148
.51
'C14C15L19C16L20
C17
N 61°
1
7
'
0
8
"
W
3
5
2
.
3
3
'
L25
EX. 4" GAS10+0011+0010+0011+00BER
K
E
L
E
Y
S
T
.
0+50
15+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+
0
0
29+00
29+79PI 18+24.83PC 27+39.98PT 28+10.78PC 28+16.63PT 28+84.39L23
300'
R
300'
RL24L22L21S 61°
2
5
'
2
9
"
E
1
6
2
.
3
7
'
L26C1
8C19C13
L15 C12C18
N 61°
1
7
'
0
8
"
W
2
8
1
.
3
7
'ROWFAIRFAX PIKE
RT-277
SHREWSBURY WAYFAIRFAX PIKE
RT-277 WARRIOR DR.RTE-719FAIRFAX PIKE
RT-277
ROW ROW ROW ROW
GS-11 SHLD (8')S. WARRIOR DR.LOCAL ROADLEXINGTON CT.GS-11 SHLD (8')GS-11 SHLD (8')GS-11 SHLD (8')MS-1AMS-1A90'R100'R
CG-6
14
21
22
13
24A
2324
25
14A
115
C5A
113
23A
131
116
112
114
102
301A
C6A
C3A
C6
C5
C3
C4A
103
C4
100B
300
101
EX13
F94
13A
45A
100A
F93
F98
F96
F97
100C
F44 30" HERCP15" H
D
P
E
24" HDPE
24"
RCP
CL
I
I
I
15" HDP
E30"
HDPE15" HDPE18" HDPE
24" HDPE24" HDPE24"
HDPE
15" HDPE
30" HDPE30"
HDPE30" HDPE2
4
"
R
C
P
C
L
I
I
I15" RCP CL III15" HDPE
15" HDPE
15" HDPE15" HDPE2
4
"
R
C
P
C
L
I
I
I
23" x 14" HERCP
15" H
D
P
E
18" H
D
P
E 15" HDPE18"
H
D
P
E
15
"
R
C
P
C
L
I
I
I
15" RCP CL III4"
D
I
P24" HDPE15" RCP CL III15" HDPEFHFH
WSR=400.00'
JB-S1
JB-S1
JB-S2
JB-S4
JB-S3
JB-S1
JB-S2
JB
-
S
4JB-S2JB-S1
SWITCH GEARSWITCH GEARJBOX
JBOX
JBOX
JB-S2
JB-S4
B2 ZONING
RA ZONING
U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS1000.dwg PLOTTED: 10/24/2025 7:56 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001
AS NOTED
TEAM
07-15-2025
DLFAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100'
GRAPHIC SCALE 1"=50'
APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTEXISTING CONDITIONS CS1000
TOTAL SHEETS 57 NORTH
10-24-2025
DAVID L. FRANK
Lic. No.1061
U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS2000.dwg PLOTTED: 10/24/2025 7:56 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001
AS NOTED
TEAM
07-15-2025
DLFAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTEROSION AND SEDIMENT CONTROL NARRATIVE CS2000
TOTAL SHEETS 57
10-24-2025
DAVID L. FRANK
Lic. No.1061
Erosion and Sediment Control Narrative
Project Description
The proposed project site is in The Town of Stephens City, located in Frederick County, Virginia within the
Opequon Magisterial District. This site is located east of interstate 81 and south of Fairfax Pike (RT 277). Public
right-of-way frontage (Shrewsbury Way) borders the property along the west side and is also accessible on the
north, south and east (Fairfax Pike, Berkeley Street and Warrior Drive respectively). The property identification
number for this project is 86-A-80 and it is currently zoned B2.
This project proposes a 50,800 sf grocery store and an 8,000 sf retail building. Associated improvements include
a parking lot, access drives, storm drains, grading, water & sanitary sewer, lighting and landscaping. The
approximate disturbed area for this project is 17.95 acres.
Existing Site Conditions
Slopes range from approximately 2% to 20% and the site generally drains from north to south. There is
approximately a 22' difference in elevation between the highest (elev.≈ 762) and lowest (elev.≈ 740) points. The
site is wooded / scrub shrub and fields.
Adjacent Property
The project is bisected by Shrewsbury Way and bound by Fairfax Pike to the north, Berkeley Street to the south,
Warrior Drive to the east and WEC 97A-22 Investment Trust on the west.
Offsite Areas:
Off-site areas associated with this project include utility extensions in public roads.
Stockpile Areas
The stockpiles will have to be kept out of the proposed grading area and to stay clear of all construction activity.
Stockpiles will be stabilized with temporary vegetation and protected with silt fence to prevent soil loss and
sediment transport from the stockpiles.
Soils
See this sheet for an Overall Soils Map, HSG Group Classifications and a Map Unit Legend. (SL - USDA Web
Soils Survey). The Physical propoerties of each soil type are summarized also. A Complete NRCS Soils Report
is included with the "SWM Data Package".
Geology
Martinsburg Formation underlies the project site.
Critical areas
Critical areas include 2:1 cut slopes onsite.
No wetlands exist on site.
Erosion and sediment control measures
Unless otherwise indicated, all vegetative and structural erosion and sediment control measures shall be
constructed and maintained according to the minimum standards and specifications of the Virginia Erosion and
Sediment Control Handbook.
Structural Measures
The Sediment Basin, Sediment Traps, sediment barriers and other measures shown on the plans intended to trap
sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional before
upslope land disturbance takes place.
Every effort shall be made to prevent silt from running off the site during construction.
Temporary seeding (3.31) and/or permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater)
and as needed to stabilize disturbed areas.
Phase I:
A Construction Entrance (3.02) shall be installed at the location shown on the Phase I plan to prevent mud and
debris from being tracked onto roadways.
Install Silt Fence (3.05) and Super Silt Fence as shown on the plans to intercept and detain small amounts of
runoff from disturbed areas during construction in order to prevent sediment from leaving the site.
Install temporary Sediment Basins (3.14) as a Phase 1A control measure prior to clearing the site. It shall detain
sediment-laden runoff from disturbed areas in "wet" and "dry" storage for the required 6 hour draw down time,
allowing suspended sediments to "settle out" prior to leaving the site.
Install Diversion Dikes (3.09) as shown on plans to divert surface runoff away from work areas and contain onsite
runoff to erosion and sediment control practices.
Install a Diversion (3.12) as shown on plans to divert surface runoff around site.
Outlet Protection (3.18) shall be placed on the outlets of all storm sewer pipes and culverts to reduce erosion,
undercutting and velocities.
Block & gravel Curb Inlet Protection sediment filters (3.07-8) shall be installed as shown on the plans to prevent
sediment from entering the existing storm system.
Culvert Inlet Protection (3.08) shall be installed as shown on the plans to prevent sediment from entering the
existing storm system.
Roughen surface of slopes 3:1 or greater maximum 2:1 slope. (3.29) in preparation for temporary or permanent
seeding.
Temporary seeding (3.31) and/or permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater)
and all other disturbed areas to stabilize disturbed areas.
Install Dust Control Measures (3.39) to prevent surface and air movement of dust.
Phase II:
All controls installed in Phase I shall remain until the area they support site is stabilized.
Install Check Dams (3.20) to reduce velocity of concentrated water flows.
Convert Sediment Basin 1 and 4 to permanent swm facilities with the sediment control inspectors approval.
Permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater) and as needed to stabilize
disturbed areas.
Soil Stabilization Blankets and Matting (3.36) shall be placed on all disturbed slopes 4:1 or steeper
Vegetative Measures
Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade
is reached on any portion of the site. Temporary soil stabilization shall be applied within seven (7) days to
denuded areas that may not be at final grade but will remain dormant for longer than fourteen (14) days.
Permanent soil stabilization shall be applied to all areas that are to be left dormant for more than six (6) months.
Soil that has been stockpiled shall be surrounded with silt fence and protected by mulch and/or temporary
vegetation immediately after grading.
All earth berms, dams, dikes, diversions and Sediment Trap embankments are to be machine-compacted,
immediately seeded and mulched (hay mulch or straw) for temporary and/or permanent vegetative cover within
five (5) days after grading.
Management Strategies
Construction shall be sequenced such that grading operations will begin and end as quickly as possible.
The site superintendent shall be responsible for the installation and maintenance of all erosion and sediment
control measures. Maintenance of these measures throughout the project are critical to the effectiveness of the
program.
After areas above controls have been stabilized, the controls shall be cleaned up and removed at the direction of
the Frederick County inspector.
All cut and fill slopes are to be seeded and mulched within five (5) days of completion of grading. Cut and fill
slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be
eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing
measures until the problem is corrected.
Erosion and Sediment Control Narrative (Continued)
Management Strategies (Continiued)
Drainage swales shall be stabilized with check dams until vegetation has been well established, at which time the
check dams shall be removed.
Concentrated runoff shall not flow down cut or fill slopes unless contained within a temporary or permanent
channel, flume, or slope drain structure.
Whenever water seeps from a slope face, drainage or other protection shall be provided.
All storm sewer inlets that are made operable during construction shall be protected so that sediment-laden water
cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment.
Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize
the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a
paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall
be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street
washing shall be allowed only after sediment is removed in this manner.
All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization
or after the temporary measures are no longer needed, unless otherwise authorized by the local program
authority. Trapped sediment and the disturbed soils areas resulting from the disposition of temporary measures
shall be permanently stabilized to prevent further erosion and sedimentation.
Devices listed above are considered minimum erosion and sediment controls. Additional control measures may
be necessary due to contractor phasing or other unforeseen conditions. It is the contractor's responsibility to
provide additional measures to those shown, as needed, in order to control erosion and contain sediment on site.
All measures shall be installed according to the standards and specifications in the Virginia Erosion and Sediment
Control Handbook (VESCH). Any changes made to this plan must be resubmitted for approval without exception.
Maintenance
All control measures shall be inspected daily by the site superintendent or his representative and within 24 hours
after any storm event greater than 0.5 inches of rain per 24 hour period. Any damaged structural measures are to
be repaired by the end of the day. Seeded areas shall be checked regularly to ensure that a good stand of grass
is maintained. All areas shall be fertilized and reseeded as needed until grass is established.
Trapped sediment is to be removed as required to maintain 50% trap efficiency and disposed of by spreading on
site.
Gravel outlets shall be checked regularly for sediment build-up. If the gravel outlet is clogged by sediment, it shall
be removed and cleaned or replaced immediately.
The contractor is responsible for keeping existing public roads in a clean, dust and mud free, condition at all times.
Permanent Stabilization
All areas disturbed by construction shall be stabilized with permanent seeding immediately following final grading.
Seeding shall be done according to standard and specification no. 3.32 of the VESCH. Permanent stabilization is
defined as 90% uniform coverage on the entire site, ability to inhibit erosion and mature enough to survive,
including 2-3 inch cuttings.
Phases of Land Disturbance Activities
1.Mandatory pre-construction conference shall be scheduled as required by regulations.
2.Clearing and grubbing for sediment control devices only.
3.Installation of all Phase I erosion & sediment control devices.
4.Obtain county inspector approval.
5.Clear site.
6.Restoration and stabilization of disturbed areas.
7.Remove all erosion & sediment control measures with the approval of the inspector.
Long Term Maintenance and Repair Plan
Mowing: all grasses should be mowed at least twice each year. Grasses such as tall fescue should be mowed in
early summer after emergence of the heads on cool season grasses. They should be mowed again in the early
fall to prevent seeds of annual weeds from maturing. Mowing of legumes such as sericea lespedeza and crown
vetch can be permitted to grow on the dam or in any part of the emergency spillway.
Liming and fertilizing: the soil should be sampled according to recommended procedures at least once every 4
years. The sample should be tested at a qualified soil testing laboratory. Lime and fertilizer should be applied in
accordance with recommendations based on the tests.
Replanting and over seeding: if vegetation covers less than 40% of the soil surface, lime, fertilize and seed in
accordance with current recommendations for new seeding. If vegetation covers more than 40% but less than
70% of the soil surface, lime fertilize and over seed in accordance with current recommendations.
Removing trash and debris: trash, litter and vegetation (other than grass) will be removed as needed (but no less
than two times per year) to prevent obstruction to the flow of water, to prevent movement of trash and litter to
downstream properties, to maintain the integrity of the structure, to provide an attractive appearance and to
minimize water pollution.
Removing sediment: soil materials (including clay, silt, sand and gravel) will be removed before the detention pool
loses 10% of the designed storage capacity.
Sediment disposal: sediment disposal should be in accordance with current procedures for disposal of sediment.
Where required by the appropriate authorities, the sediment will be tested for appropriate pollutants at the owner's
expense before it is removed from the pond.
Repairs: repair slides, slumps and eroded areas promptly and in a workmanlike manner trash racks, pipes,
headwalls, etc. Will be maintained, repaired and/or replaced as needed to maintain the integrity of the structure.
Exposed metal surfaces will be painted to minimize damage due to rust.
Maintenance inspections: the owner will be responsible for inspecting each stormwater management structure
after each significant rainfall. Once each year a representative of will jointly inspect each stormwater
management structure. Appropriate action will be taken to ensure appropriate maintenance. All maintenance
costs will be borne by the owner. Where structures are to be maintained by more than one party, allocation of
costs will be in accordance with terms set forth in the maintenance agreement. Keys to locked access points shall
be available to personnel upon request.
Maintenance records: the landowner, or someone designated by the landowner, shall inspect the detention pond
within 24 hours after each rainfall event of one inch or more of rain. The owner or the designee shall keep written
records of these inspections. The records shall also include maintenance and repairs performed. Copies of these
records shall be provided to the county upon request.
The water quality features shall not be modified in any way without prior approval by Frederick County.
·Topsoil shall be spread at a minimum depth of 4".
·Pulverized agricultural limestone shall be incorporated into soil at a rate of 92 lbs. Per 1000 s.f. (2 tons
per acre).
·Fertilize with 10-20-10 at a rate of 12 lbs. Per 1000 s.f. (500 lbs. Per acre). Seed mix shall consist of
90% kentucky 31 tall fescue and 10% kentucky bluegrass applied at the rate of 200 lbs. Per acre.
Minimum Construction Standards
An erosion and sediment control program adopted with this plan must be consistent with the VESCH for
9VAC25-840-40 minimum standards:
1.Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final
grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to
denuded areas that may not be at final grade but will remain dormant for longer than 14 days. Permanent
stabilization shall be applied to areas that are to be left dormant for more than one year.
2.During construction of the project, soil stock piles and borrow areas shall be stabilized or protected with
sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization
of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the project site.
3.A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized.
Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature
enough to survive and will inhibit erosion.
4.Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap
sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional before
upslope land disturbance takes place.
5.Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions
immediately after installation.
6.Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area
to be served by the trap or basin.
a.The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the
trap shall only control drainage areas less than three acres.
b.Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to
three acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134
cubic yards per acre of drainage area. The outfall system shall, at a minimum, maintain the structural integrity of the
basin during a 100-year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond
to a bare earth condition or those conditions expected to exist while the sediment basin is utilized.
7.Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are
found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope
stabilizing measures until the problem is corrected.
8.Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or
permanent channel, flume or slope drain structure.
9.Whenever water seeps from a slope face, adequate drainage or other protection shall be provided.
10.All storm sewer inlets that are made operable during construction shall be protected so that sediment-laden
water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment.
11.Before newly constructed stormwater conveyance channels or pipes are made operational, adequate outlet
protection and any required temporary or permanent channel lining shall be installed in both the conveyance
channel and receiving channel.
12.When work in a live watercourse is performed, precautions shall be taken to minimize encroachment,
control sediment transport and stabilize the work area to the greatest extent possible during construction.
Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for
these structures if armored by nonerodible cover materials.
13.When a live watercourse must be crossed by construction vehicles more than twice in any six-month period,
a temporary vehicular stream crossing constructed of nonerodible material shall be provided.
14.All applicable federal, state and local requirements pertaining to working in or crossing live watercourses
shall be met.
15.The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is
completed.
16.Underground utility lines shall be installed in accordance with the following standards in addition to other
applicable criteria:
a.No more than 500 linear feet of trench may be opened at one time.
b.Excavated material shall be placed on the uphill side of trenches.
c.Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping
device, or both, and discharged in a manner that does not adversely affect flowing streams or off-site property.
d.Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote
stabilization.
e.Restabilization shall be accomplished in accordance with this chapter.
f.Applicable safety requirements shall be complied with.
17.Where construction vehicle access routes intersect paved or public roads, provisions shall be made to
minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported
onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment
shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area.
Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to
individual development lots as well as to larger land-disturbing activities.
18.All temporary erosion and sediment control measures shall be removed within 30 days after final site
stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the VESCP
authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall
be permanently stabilized to prevent further erosion and sedimentation.
Minimum Construction Standards (Continued)
19.Properties and waterways downstream from development sites shall be protected from sediment deposition,
erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated
frequency storm of 24-hour duration in accordance with the following standards and criteria. Stream restoration and
relocation projects that incorporate natural channel design concepts are not man-made channels and shall be
exempt from any flow rate capacity and velocity requirements for natural or man-made channels:
a.Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate
natural or man-made receiving channel, pipe or storm sewer system. For those sites where runoff is discharged into
a pipe or pipe system, downstream stability analyses at the outfall of the pipe or pipe system shall be performed.
b.Adequacy of all channels and pipes shall be verified in the following manner:
(1)The applicant shall demonstrate that the total drainage area to the point of analysis within the channel is
one hundred times greater than the contributing drainage area of the project in question; or
(2)(a) Natural channels shall be analyzed by the use of a two-year storm to verify that stormwater will not
overtop channel banks nor cause erosion of channel bed or banks.
(b)All previously constructed man-made channels shall be analyzed by the use of a 10-year storm to
verify that stormwater will not overtop its banks and by the use of a two-year storm to demonstrate that
stormwater will not cause erosion of channel bed or banks; and
(c)Pipes and storm sewer systems shall be analyzed by the use of a 10-year storm to verify that
stormwater will be contained within the pipe or system.
c.If existing natural receiving channels or previously constructed man-made channels or pipes are not
adequate, the applicant shall:
(1)Improve the channels to a condition where a 10-year storm will not overtop the banks and a two-year storm
will not cause erosion to the channel, the bed, or the banks; or
(2)Improve the pipe or pipe system to a condition where the 10-year storm is contained within the
appurtenances;
(3)Develop a site design that will not cause the pre-development peak runoff rate from a two-year storm to
increase when runoff outfalls into a natural channel or will not cause the pre-development peak runoff rate from a
10-year storm to increase when runoff outfalls into a man-made channel; or
(4)Provide a combination of channel improvement, stormwater detention or other measures which is
satisfactory to the VESCP authority to prevent downstream erosion.
d.The applicant shall provide evidence of permission to make the improvements.
e.All hydrologic analyses shall be based on the existing watershed characteristics and the ultimate
development condition of the subject project.
f.If the applicant chooses an option that includes stormwater detention, he shall obtain approval from the
VESCP of a plan for maintenance of the detention facilities. The plan shall set forth the maintenance requirements of
the facility and the person responsible for performing the maintenance.
g.Outfall from a detention facility shall be discharged to a receiving channel, and energy dissipators shall be
placed at the outfall of all detention facilities as necessary to provide a stabilized transition from the facility to the
receiving channel.
h.All on-site channels must be verified to be adequate.
i.Increased volumes of sheet flows that may cause erosion or sedimentation on adjacent property shall be
diverted to a stable outlet, adequate channel, pipe or pipe system, or to a detention facility.
j.In applying these stormwater management criteria, individual lots or parcels in a residential, commercial or
industrial development shall not be considered to be separate development projects. Instead, the development, as a
whole, shall be considered to be a single development project. Hydrologic parameters that reflect the ultimate
development condition shall be used in all engineering calculations.
k.All measures used to protect properties and waterways shall be employed in a manner which minimizes
impacts on the physical, chemical and biological integrity of rivers, streams and other waters of the state.
l.Any plan approved prior to July 1, 2014, that provides for stormwater management that addresses any flow
rate capacity and velocity requirements for natural or man-made channels shall satisfy the flow rate capacity and
velocity requirements for natural or man-made channels if the practices are designed to (i) detain the water quality
volume and to release it over 48 hours; (ii) detain and release over a 24-hour period the expected rainfall resulting
from the one year, 24-hour storm; and (iii) reduce the allowable peak flow rate resulting from the 1.5, 2, and 10-year,
24-hour storms to a level that is less than or equal to the peak flow rate from the site assuming it was in a good
forested condition, achieved through multiplication of the forested peak flow rate by a reduction factor that is equal
to the runoff volume from the site when it was in a good forested condition divided by the runoff volume from the
site in its proposed condition, and shall be exempt from any flow rate capacity and velocity requirements for natural
or man-made channels as defined in any regulations promulgated pursuant to § 62.1-44.15:54 or 62.1-44.15:65 of the
Act.
m.For plans approved on and after July 1, 2014, the flow rate capacity and velocity requirements of §
62.1-44.15:52 A of the Act and this subsection shall be satisfied by compliance with water quantity requirements in
the Stormwater Management Act (§ 62.1-44.15:24 et seq. of the Code of Virginia) and attendant regulations, unless
such land-disturbing activities are in accordance with 9VAC25-870-48 of the Virginia Stormwater Management
Program (VSMP) Regulation or are exempt pursuant to subdivision C 7 of § 62.1-44.15:34 of the Act.
n.Compliance with the water quantity minimum standards set out in 9VAC25-870-66 of the Virginia Stormwater
Management Program (VSMP) Regulation shall be deemed to satisfy the requirements of this subdivision 19.
Table C-ECM-13-6 Requirements for Filter Fabric Used with Riprap
Physical Property Test Method Requirements
Grab Tensile ASTM D4632 250 lbs.
Grab Elongation ASTM D4632 15%
Trapezoid Tear ASTM D4533 90 lbs.
CBR Puncture Resistance ASTM D6241 900 lbs.
Apparent Opening Size ASTM D4751 40 U.S. Sieve
Table C-SSM-10-6 Suggested and Example Site-Specific Seeding
Mixtures for Appalachian/Mountain Area
Site Condition Seed Mix Apply Rate
(lbs/ac)
Min Care Lawn
Commercial or Residential
Turf-Type Tall Fescue (90-100%)
Improved Perennial Ryegrass* (0-10%)
Kentucky Bluegrass * (0-10%)
150 - 200
High-Maintenance Lawn
Bluegrass – minimum of three to five varieties
from VCIA list for use in Virginia
Improved VCIA Turf-Type Tall Fescue
125
150 – 200
General Slope (3H:1V or less)
Tall Fescue****
Red Top and/or Hard Fescue
White Clover and/or Birdsfoot Trefoil***
Seasonal Nurse Crop **
50 – 75
10 – 20
10 – 20
30 – 40
General Slope (3H:1V or less)
Tall Fescue****
Red Top or Hard Fescue
Annual Lespedeza
White Clover and/or Birdsfoot Trefoil***
Seasonal Nurse Crop **
50 – 75
10 – 20
10 – 15
10 – 20
30 – 40
* Perennial ryegrass will germinate faster and at lower soil temperatures than fescue, thereby
providing cover and erosion resistance for seedbed.
** Use seasonal nurse crop in accordance with seeding dates as stated below:
March 1 through May 15 – annual/cereal rye
May 16 through August 15 – foxtail/German millet
August 16 through February 28 – annual/cereal rye
*** All legume seed must be properly inoculated. Legumes recommended unless periodic N
fertilization maintenance intended.
Flatpea at 20 lbs/acre may be utilized where warranted. All legume seed must be properly
inoculated. Weeping lovegrass may also be included in any slope or low-maintenance mixture
during warmer seeding periods; add 10 to 20 lbs/acre in mixes.
**** Increase seeding rate if Kentucky 31 is used rather than VCIA/VDOT improved varieties.
Note: Seed mixes are suggested and subject to modification based on site-specific conditions by an
agronomist or other qualified revegetation professionals. All seed rates expressed as PLS (Pure
Live Seed; see Table C-SSM-10-9).
IRF
IRF
IRF
IRF
IRF
IRF CAP
IRF
IRF
IPF IRF
IPF
FH
92SHEDSIGN
CG-6 EOP EOPCG-6CG-6EOPCG-6CG-6CG-6CG-6LOT
6
2
LOT
6
3
LOT
6
4 LOT
2
LOT
3
LOT
4
LOT
5
LOT
6
2
LOT
6
3
LOT
70
LOT
71
LOT
72
LOT
73
LOT
7
4
LOT
7
5
LOT
7
6
LOT
7
7
LOT
6
4
LOT
1
LOT
9
3 S 06°
10
'
25
"
E
148
.51
'C14C15L19C16L20
C17
N 61°
1
7
'
0
8
"
W
3
5
2
.
3
3
'
L25
EX. 4" GASBER
K
E
L
E
Y
S
T
.
0+50
L23L24
L22
L21S 61°
2
5
'
2
9
"
E
1
6
2
.
3
7
'
L26C1
8C19C13
L15 C12C18
N 61°
1
7
'
0
8
"
W
2
8
1
.
3
7
'ROWFAIRFAX PIKE
RT-277
SHREWSBURY WAYFAIRFAX PIKE
RT-277 WARRIOR DR.RTE-719FAIRFAX PIKE
RT-277
ROW ROW ROW ROW
S. WARRIOR DR.LOCAL ROADLEXINGTON CT.14
21
22
13
24A
2324
25
14A
115
C5A
113
23A
131
116
112
114
102
301A
C6A
C3A
C6
C5
C3
C4A
103
C4
100B
300
101
EX13
F94
13A
45A
100A
F93
F98
F96
F97
100C
F44
FHFH
WSJB-S1
JB-S1
JB-S2
JB-S4
JB-S3
JB-S1
JB-S2
JB
-
S
4JB-S2JB-S1
SWITCH GEARSWITCH GEARJBOX
JBOX
JBOX
JB-S2
JB-S4
750
748748
748
748
752
752
740
750
74
2744746748752
754
756
75
6750748748752754756758746
750748752754
7547507507507487487487527527527547547
5
4
754754
75475
6756
740
740740
750 750
736
736738
738742
742
742744
744
744746
746
746746748748
748748750756
7547
5
4
7
5
4
756756758TO SB-3
TOTAL AREA = 4.64 AC.
756
7547
5
4
7
5
4
756756758750
748748
748
748
752
752
740
750
74
2744746748752
754
756
75
6750748748752754756758746
750748752754
7547507507507487487487527527527547547
5
4
754754
75475
6756750 75
0
750
744744746 746
748748 75
2
752754
75
4
750750
750
750
746
746
7
4
6
746
748748748748748
748748
748748
748
752
754
756
756
758758
7
5
4
754754756740750742744746748748
7
4
8
748
7
4
8752
744750752754754754750
744
746
748
752
744
746
DEMOLISH WEIR
& ABANDON STR
C6 - C6A IN PLACE
MAINTAIN EX
DIVERSION TO SB 3
MAINTAIN EX
DIVERSION TO SB 3
MAINTAIN EX PERIMETER
CHANNEL TO SB 1
MAINTAIN EX
PERIMETER
CHANNEL TO SB 1
TO SB-1
TOTAL AREA = 11.47 AC.
TS
DC
DC
IP
IP
OP
SB3
SB1
DC
TS
TS
IP
IP
IP
IP
IP
IP
IP
IP
OP
OP
OP
IP
IP
DC
TS
CE
SF
SF
SF
SF
SF
PHASE I PERIMETER CONTROL NOTES:
LAND BAY A WAS MASS GRADED PER THE "SHERANDO GREEN PIP"
PLAN, ESTABLISHING THE EXISTING CONDITION FOR THIS PHASE I E&S
PLAN.
THE EXISTING GRADE PROVIDES PERIMETER CONTROL FOR FURTHER
DEVELOPMENT ACROSS LAND BAY A.
THE WET POND TO BE CONSTRUCTED PER THE "SHERANDO GREEN PIP"
PLAN MUST CONTINUE TO FUNCTION AS A SEDIMENT BASIN (SB 1), UNTIL
ALL AREAS WITHIN IN ITS CONTRIBUTING DRAINAGE AREA HAVE BEEN
CONSTRUCTED AND STABILIZED.
MAINTAIN SEDIMENT BASIN 3 PER THE "SHERANDO GREEN PIP" PLAN.
LOD
LOD
LOD
LOD
LOD
LOD PER COMMON PLAN
OF DEVELOPMENT (TYP)
DISTURBED AREA PER
THIS SITE PLAN (TYP)
DISTURBED AREA PER
THIS SITE PLAN (TYP)
DISTURBED AREA PER
THIS SITE PLAN (TYP)
DISTURBED AREA PER
THIS SITE PLAN (TYP)
LOD
LOD PER
COMMON PLAN OF
DEVELOPMENT (TYP)
LOD
LOD PER COMMON PLAN
OF DEVELOPMENT (TYP)
LOD
LOD PER COMMON PLAN
OF DEVELOPMENT (TYP)
LOD
LOD PER COMMON PLAN
OF DEVELOPMENT (TYP)U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS2100.dwg PLOTTED: 10/24/2025 7:58 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001
AS NOTED
TEAM
07-15-2025
DLFAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100'
GRAPHIC SCALE 1"=50'
APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTEROSION AND SEDIMENT CONTROL PLAN PHASE I CS2100
TOTAL SHEETS 57 NORTH
10-24-2025
DAVID L. FRANK
Lic. No.1061
3.02 TEMPORARY STONE
CONSTRUCTION ENTRANCE CE
LIMITS OF DISTURBANCE LOD
EROSION AND SEDIMENT
CONTROL LEGEND
NO.TITLE KEY SYMBOL
3.31 TEMPORARY SEEDING TS TS
3.14 TEMPORARY SEDIMENT
BASIN SB SB
3.29 SURFACE
ROUGHENING SR SR
3.09 TEMPORARY
DIVERSION DIKE DD
DD
3.07 STORM DRAIN
INLET PROTECTION IP
3.18 OUTLET PROTECTION OP
3.39 DUST CONTROL DC DC
7557
5
4
756757755
751752752
752
753
754
756
750
749
751
752
753745750746747748749750
750
750
748
749751
7
5
1
751
7
5
2
7
5
3
750 749751752753754
75
0 755748
748 74975
1
75
2
75
3
75
4
7567507557477
4
7747 74774874874874975175275375475675675675675675775775875874074074
5
7457507
5
0 75575573973974174174
2
74274
3
743744744746
7467
4
7
747 7477477
4
7
747748748
7
4
8
748 7487
4
8
749
74
9
74
9
74975
1
7517527527
5
3
7537547
5
4
756
7567537
5
3
7
5
4
75475
5
7
5
4
756757750746747748749751752752753753754
754755735
740 745736737 738
739
741742743744746747748
735
740
745
745
736
737
738
739
741
742
743
744 746746747747
747747 748748745
7
4
57507
5
5
7
5
5
755 7557
5
5
74374474
6
746
747
7
4
7
7477
4
8
748
74874974974974
9
7497
5
1752752752753753
7
5
3
7
5
47457
4
4
745
74574574
5
75
0
750
750
750750
750
750
755
760
76074174174274
2743
74
3744
74
4
746746
746
746
746747
7
4
7
7
4
7747747
74874874874
8
7
4
8
748
748748
7487497497
4
9
749
749749
749
749749
7497
4
9
749
749
751
751
75175
1751752752752
752
752
753753
753
754754754
756
756
756
757
757
757
758
758
758
759
759IRF
IRF
IRF
IRF
IRF
IRF CAP
IRF
IRF
IPF IRF
IPF
FH
92SHEDSIGN
CG-6 EOP EOPCG-6CG-6EOPCG-6CG-6CG-6CG-6LOT
6
2
LOT
6
3
LOT
6
4 LOT
2
LOT
3
LOT
4
LOT
5
LOT
6
2
LOT
6
3
LOT
70
LOT
71
LOT
72
LOT
73
LOT
7
4
LOT
7
5
LOT
7
6
LOT
7
7
LOT
6
4
LOT
1
LOT
9
3 EX. 4" GAS10+0011+0010+0011+00BER
K
E
L
E
Y
S
T
.
0+5010+0011+0015+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+
0
0
29+00
29+79PI 18+24.83PC 27+39.98PT 28+10.78PC 28+16.63PT 28+84.39300'
R
300'
RROWFAIRFAX PIKE
RT-277
SHREWSBURY WAYFAIRFAX PIKE
RT-277 WARRIOR DR.RTE-719FAIRFAX PIKE
RT-277
ROW ROW ROW ROW
S. WARRIOR DR.LOCAL ROADLEXINGTON CT.90'R100'R
14
21
22
13
24A
2324
25
14A
115
113
23A
131
116
112
114
102
301A
C3A C3
C4A
103
C4
100B
300
101
EX13
F94
13A
45A
100A
F93
F98
F96
F97
100C
F44 30" HERCP15" H
D
P
E
24" HDPE
24"
RCP
CL
I
I
I
15" HDP
E30"
HDPE15" HDPE18" HDPE
24" HDPE24" HDPE24"
HDPE
15" HDPE
30" HDPE30"
HDPE30" HDPE2
4
"
R
C
P
C
L
I
I
I15" RCP CL III15" HDPE
15" HDPE
15" HDPE15" HDPE2
4
"
R
C
P
C
L
I
I
I
23" x 14" HERCP
15" H
D
P
E
18" H
D
P
E 15" HDPE18"
H
D
P
E
15
"
R
C
P
C
L
I
I
I
15" RCP CL III4"
D
I
P24" HDPE15" RCP CL III15" HDPEFHFH
WSJB-S1
JB-S1
JB-S2
JB-S4
JB-S3
JB-S1
JB-S2
JB
-
S
4JB-S2JB-S1
SWITCH GEARSWITCH GEARJBOX
JBOX
JBOX
JB-S2
JB-S4
B2 ZONING
RA ZONING
125
RETAIL
8,000 SF
SPRINKLERED
FF=751.50 (NAVD 88)
PROTOTYPE 50
GROCERY STORE
50,800 SF
DRIVE-THRU PHARMACY
WELL CONDITION (FLIPPED)
SPRINKLERED
FF=751.50 (NAVD 88)
PYLON SIGN A
WITHIN OUTPARCEL 1
(SIGN PERMIT REQ.)
209
252
262
254
253
208
211 210
142
124
231207
141
206
221
123
127
205
122
114R
204 15" HDPE18" HDPE15" HDPE24"
H
D
P
E
15" HDPE 15" HDPE15" HDPE
24" HDPE24" HDPE24" HDPE
24" HDPE15" HDPE18" HDPE18
"
H
D
P
E
18" HDPE18" HDPE
18" HDPE
24" HDPE24" HDPE15" HDPEPYLON SIGN
B
WITHIN
PHASE II
TRACT
NORTH
(SIGN
PERMIT
REQ.)
24" HDPE
MONUMENT SIGN A
(SIGN PERMIT REQ.)
115R
126
207A
261
263 264
255
241
212 18" HDPE18
"
H
D
P
E
15" HDPE15" HDPE232
15"
H
D
P
E
251
11B
11C
10B CHAIRMANWAYOZZIE
L
A
N
E
PUBLIX WAY
15" HDPE18" HD
P
E
18" HDPE15" HDPE18" HDPE
18" HDPE
304R
2
4
"
H
D
P
E
15" HDPE
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
OP
OP
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
45 50
HP
IP
49 88
HP
TO EX STR 45A
DA = 0.23 Ac.
TO STR 241
DA = 0.52 Ac.TO STR 124
DA = 0.47 Ac.
TO STR 125
DA = 0.29 Ac.
TO STR 123
DA = 0.39 Ac.
TO STR 232
DA = 0.29 Ac.
TO STR 127
DA = 0.41 Ac.
TO STR 141
DA = 0.33 Ac.
TO STR 142
DA = 0.28 Ac.
TO STR 115R
DA = 0.56 Ac.
IP
IP
IP
IP
IP
IP
IP IP
OP
IP
OP
TO STR 212
DA = 0.31 Ac.
TO STR 255
DA = 0.78 Ac.
TO STR 263
DA = 0.58 Ac.
TO STR 304R
DA = 1.62 Ac.
TO STR 204
DA = 0.48 Ac.
TO STR 205
DA = 0.18 Ac.
TO EX
STR 302
DA = 0.20 Ac.
TO STR 206
DA = 0.31 Ac.
TO STR 231
DA = 0.16 Ac.
TO STR 207
DA = 0.15 Ac.TO STR 221DA = 0.11 Ac.TO STR 208DA = 0.08 Ac.TO STR 210DA = 0.06 Ac.TO STR 207A
DA = 0.44 Ac.
TO STR 209
DA = 0.01 Ac.
TO STR 122
DA = 0.71 Ac.
TO STR 114R
DA = 0.22 Ac.
TO STR EX 112
DA = 0.08 Ac.
TO ROOF LEADERS
DA = 1.36 Ac.TO STR 211DA = 0.07 Ac.TO STR 252DA = 0.08 Ac.TO STR
2
6
4
DA = 0.12
A
c
.
TO STR
2
6
2
DA = 0.14
A
c
.
TO SUMP PUMP
DA = 0.06 Ac.TO ST
R EX 113
DA = 0.10 Ac.TO STR EX131DA = 0.10 Ac.TO STR EX116DA = 0.34 Ac.TO STR 11C
DA = 1.18 Ac.
TO FLUME
DA = 0.26 Ac.
TO FLUME
DA = 0.16 Ac.
TO FLUME
DA = 0.20 Ac.
TO EX WET POND
DA = 1.38 Ac.
TO
E
X
S
T
R
9
8
DA
=
0
.
5
2
A
c
.
TO
E
X
S
T
R
9
7
DA
=
0
.
4
8
A
c
.
TO E
X
S
T
R
2
0
3
DA =
0
.
2
3
A
c
.
TO EX STR 103
DA = 0.23 Ac.
TO EX STR 13A
DA = 0.38 Ac.TO EX STR 96DA = 0.20 Ac.TO EX STR 93DA = 0.10 Ac.TO STR C4A
DA = 1.88 Ac.
TO STR C3A
DA = 0.81 Ac.
TO EX STR 202
DA = 0.17 Ac.
TO EX
STR 303
DA = 0.28 Ac.
TO STR 254
DA = 0.27 Ac.
TO STR 253
DA = 0.28 Ac.
TO STR 10B
DA = 1.46 Ac.
TO STR EX23
DA = 0.39 Ac.TO STR EX23ADA = 0.09 Ac.TO STR EX22
DA = 0.06 Ac.
TO STR EX21
DA = 0.07 Ac.
TO STR EX12
DA = 0.36 Ac.
TO STR EX13
DA = 0.34 Ac.
TO STR EX11
DA = 0.12 Ac.
TO STR EX10
DA = 0.25 Ac.
TO STR EX402
DA = 0.12 Ac.
TO STR EX9
DA = 0.23 Ac.
TO STR EX8
DA = 0.25 Ac.
TO STR EX8B
DA = 0.30 Ac.
TO STR EX11A
DA = 0.17 Ac.
TO STR EX43
DA = 0.42 Ac.
TO STR EX24
DA = 0.23 Ac.
TO STR EX24A
DA = 0.56 Ac.
TO STR EX44
DA = 0.25 Ac.7507
5
0
750750750749749751751 750750755
751752
7
5
3
75
4
7507507507
5
0
7507507507507
5
0
750 750749749751751750750
75
0
75
0750 75075
0
75
0
75
0750 750751751 751751751
7
5
1
75
1
751
751751752752
752
752
75
2
752 7527527
5
3
7
5
3
752
752752752
751 751751
752
752
752 752752
753
753
753
753
753
754 754
754 752752
752753
753
753753
754754
750
750750748
7
4
8
749
7497
4
9751751 751752752
753753
75475
4
7
5
0 7507507507507
5
0
74974
9 751751751751751
752752753
753
7
5
3
753
75
3
754
75
4
754
75
4
7547
5
4
750
750
749 749750750
750
75
1 751751
751
751
752 752752
753750
755
755
751752
753753
753
754 7
5
4
754
750
751752753753750750 750750
750
7
5
0
748
7487497497497
4
9
749
749
75
1
751
751
75
1751
751752752 752
752
752752753753 75375
3
7
5
3
753
753753753 753754750
750751 75
1
750
750
750
749 749750748749750
748
749
748
748
74
9
7
5
0
750750
754
75
5
755
752752
752 752
7
5
3
753
754
7
5
4
7
5
4755
75075075
0
7
5
1
7517517
5
2
7
5
3
750749749751752753754748748
748
748
749749 749
747
748749 749
748
748
748
748
748
749 7487487497497497
4
9
747
747748749
LOD
LOD
LOD
LOD
LOD
LOD PER COMMON PLAN
OF DEVELOPMENT (TYP)
DISTURBED AREA PER
THIS SITE PLAN (TYP)
DISTURBED AREA PER
THIS SITE PLAN (TYP)
DISTURBED AREA PER
THIS SITE PLAN (TYP)
DISTURBED AREA PER
THIS SITE PLAN (TYP)
LOD
LOD PER
COMMON PLAN OF
DEVELOPMENT (TYP)
LOD
LOD PER COMMON PLAN
OF DEVELOPMENT (TYP)
LOD
LOD PER COMMON PLAN
OF DEVELOPMENT (TYP)
LOD
LOD PER COMMON PLAN
OF DEVELOPMENT (TYP)U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS2200.dwg PLOTTED: 10/24/2025 8:03 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001
AS NOTED
TEAM
07-15-2025
DLFAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100'
GRAPHIC SCALE 1"=50'
APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTEROSION AND SEDIMENT CONTROL PLAN PHASE II CS2200
TOTAL SHEETS 57 NORTH
10-24-2025
DAVID L. FRANK
Lic. No.1061
3.02 TEMPORARY STONE
CONSTRUCTION ENTRANCE CE
DRAINAGE DIVIDES
EROSION AND SEDIMENT
CONTROL LEGEND
NO.TITLE KEY SYMBOL
3.07 STORM DRAIN
INLET PROTECTION IP
3.18 OUTLET PROTECTION OP
LIMITS OF DISTURBANCE LOD
7547557
5
4
756757755
751752752
752
753
754
756
750
749
751
752
753745750746747748749750
750
750749
751
7
5
1
751
7
5
2
7
5
3
74074074
5
7457507
5
0 75575573973974174174
2
7427
43
743744744746
7467
4
7
747 7477477
4
7
747748748
7
4
8
748 7487
4
8
749
74
9
74
9
74975
1
7517527527
5
3
7537547
5
4
7567577537
5
3
7
5
4
75475
5
7
5
3
7
5
4
756757750746747748749751752752753753754
754755735
740 745736737 738
739
741742743744746747748
735
740
745
745
736
737
738
739
741
742
743
744 746746747747
747747 748748745
7
4
57507
5
5
7
5
5
755 7557
5
5
74374474
6
746
747
7
4
7
7477
4
8
748
74874974974974
9
7497
5
1752752752753753
7
5
3
7
5
4
745
74574574
5
75
0
750
750
750750
750
750
755
760
76074174174274
2743
74
3744
74
4
746746
746
746
746747
7
4
7
7
4
7747747
74874874874
8
7
4
8
748
748748
7487497497
4
9
749
749749
749
749749
7497
4
9
749
749
751
751
75175
175175
2752752
752
752
753753
753
754754754
756
756
756
757
757
757
758
758
758
758
759
759IRF
IRF
IRF
IRF
IRF
IRF
FH
92SHEDCG-6PIN 86-A-80
SHERANDO GREEN LLC
INST# 230004459
19.93 AC
ZONE B2
LOT
6
2
LOT
6
3
LOT
6
4 LOT
2
LOT
3
LOT
4
LOT
5
LOT
6
2
LOT
6
3
LOT
70
LOT
71
LOT
72
LOT
73
LOT
7
4
LOT
7
5
LOT
7
6
LOT
7
7
LOT
6
4
LOT
1
LOT
9
3 S 06°
10
'
25
"
E
148
.51
'C14C15L19C16L20
C17
N 61°
1
7
'
0
8
"
W
3
5
2
.
3
3
'
L25
EX. 4" GAS10+0011+0010+0011+00BER
K
E
L
E
Y
S
T
.
0+5010+0011+00L23
L24L22
L21S 61°
2
5
'
2
9
"
E
1
6
2
.
3
7
'
L26C1
8C19C13
L15 C12C18
N 61°
1
7
'
0
8
"
W
2
8
1
.
3
7
'ROWSHREWSBURY WAYROW ROW ROW ROW
S. WARRIOR DR.MS-1AMS-1A90'R100'RFHFH
WSR=400.00'
JB-S1
JB-S1
JB-S2
JB-S4
JB-S3
JB-S1
JB-S2
JB
-
S
4JB-S2JB-S1
SWITCH GEARSWITCH GEARJBOX
JBOX
JBOX
JB-S2
JB-S4
B2 ZONING
RA ZONING
CE
COMPACTED
ALL WEATHER TRUCK ROUTE
COMPACTED
CONSTRUCTION STAGING AREA
(15' MIN FROM BLDG)15'CE
WB-67 - Interstate Semi-TrailerTO TEMP CULVERT XING (3 TO 4)
DA = 4.21 AC.
C = 0.85
I10 = 6.49
Tc = 5 Mins
23.22 CFS
40' TE
M
P
GRAV
E
L
ENTR
A
N
C
E
755
754753752
751
40' TE
M
P
GRAV
E
L
ENTR
A
N
C
E
7
5
0
7
4
9
7
4
8 745745741743751
75
0
749
748
750
746 745 744
747
743 742745740170' OF 30" HDPE
@ 1.00%740.80
INV
739.10
INV
95' OF 30" HDPE
@ 1.00%
742.00
INV
742.95
INV
TO TEMP CULVERT XING (1 TO 2)
DA = 2.10 AC.
(6.31 AC TOTAL)
C = 0.85
I10 = 6.49
Tc = 5 Mins
34.81 CFS
4
3
1
2
741 740739 738
737
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS2300.dwg PLOTTED: 10/24/2025 8:06 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001
AS NOTED
TEAM
07-15-2025
DLFAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100'
GRAPHIC SCALE 1"=50'
APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTTEMPORARY ACCESS AND STAGING PLAN CS2300
TOTAL SHEETS 57 NORTH
10-24-2025
DAVID L. FRANK
Lic. No.1061
NOTES:
1. THIS ROAD IS TO BE MAINTAINED UNTIL SUCH TIME AS PERMANENT ACCESS IS AVAILABLE.
2. CONTRACTOR IS RESPONSIBLE TO PROVIDE TEMPORARY/PERMANENT STABILIZATION, STAGING AREAS, AND
MAINTENANCE OF TRAFFIC IN ANY OTHER AREAS DEEMED NECESSARY TO COMPLETE WORK, BUT NOT SPECIFICALLY
DEPICTED ON THE TEMPORARY SITE ACCESS AND STAGING PLAN.
ALL WEATHER TRUCK ROUTE
NTS
COMPACTED SUBGRADE
12" STONE (# 3)
12" STONE (# 57)
U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS2500.dwg PLOTTED: 10/24/2025 8:06 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001
AS NOTED
TEAM
07-15-2025
DLFAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTEROSION AND SEDIMENT CONTROL DETAILS CS2500
TOTAL SHEETS 57
10-24-2025
DAVID L. FRANK
Lic. No.1061
U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS2500.dwg PLOTTED: 10/24/2025 8:06 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001
AS NOTED
TEAM
07-15-2025
DLFAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493
APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTEROSION AND SEDIMENT CONTROL DETAILS CS2501
TOTAL SHEETS 57
10-24-2025
DAVID L. FRANK
Lic. No.1061
Sediment Trap
Key Design Aspects
Trap Number ST-1
Type (stone weir/pipe)stone
Drainage area 0.60 Ac.
Wet Storage Req 41 CY
Wet Storage Prov 54 CY (65'x15'x1.5')
Dry Storage Req 41 CY
Dry Storage Prov
Weir Width 4'
Pipe Diameter N/A
Weir/Pipe Elevations 756.00
Dry Storage Depth 0.50
Embankment Top 757.00
Trap Bottom Ele 754.00
ST-2
stone
1.62 Ac.
109 CY
109 CY
10'
N/A
755.90
1.00
756.90
753.40
ST-3
stone
0.56 Ac.
38 CY
38 CY
4'
N/A
754.70
0.50
755.70
752.70
45 CY (55'x15'x1.5')125 CY (90'x25'x1.5')
Top Width 2'2'2'
Cleanout Ele 754.80 754.20 752.1
Wet Storage Depth 1.50 1.50 1.50
97 CY (5,200'x.5')222 CY (6,020'x1.0')75 CY (4,075'x.5')