Loading...
HomeMy WebLinkAbout27-25 Site Sherando GreenLAT = N039.044410 LONG = W078.114672 DOUBLE CHURCH RD.FAIRFAX PI K E WARRIOR DR.U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS0000.dwg PLOTTED: 10/24/2025 7:53 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001 AS NOTED TEAM 07-15-2025 DLFAPPROVED BY DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKLOCATION MAP Scale: 1" = 2000' CALL 1-800-552-7001 CALL BEFORE YOU DIG ALWAYS CALL 811 BEFORE YOU DIG IN VIRGINIA SECTION 56-265.17 REQUIRES THREE WORKING DAYS NOTICE TO UTILITIES BEFORE YOU EXCAVATE, DRILL OR BLAST VIRGINIA UTILITY PROTECTION SERVICE, INC. TICKET NUMBER(S): PREPARED BY: PENNONI ASSOCIATES INC. 117 East Piccadilly Street Winchester, VA 22601 T 540.667.2139 F 540.665.0493 PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED SITE PLAN #27-25 PREPARED FOR: OWNER/DEVELOPER SHERANDO GREEN LLC 605 SOUTH EDEN ST. - SUITE 200 BALTIMORE, MD. 21231 (410) 753-3966 SHERANDO GREEN TM# 86-A-80 LANDBAY "A" & GROCERY STORE COMMERCIAL SITE PLAN SP #27-25 OPEQUON DISTRICT - FREDERICK COUNTY, VIRGINIA ORIG SUBMISSION DATE: JULY 15, 2025 REVISED SUBMISSION DATE: OCTOBER 24, 2025 LOCAL UTILITIES RAPPAHANNOCK ELECTRIC CO-OP 137 KELLEY COURT FRONT ROYAL, VIRGINIA 22630 (540) 662-2037 VERIZON 404 HILLANDALE LANE WINCHESTER, VIRGINIA 22602 (540) 665-3156 COMCAST COMMUNICATIONS 195 RAINVILLE ROAD WINCHESTER, VIRGINIA 22602 (540) 504-0942 WASHINGTON GAS 350 HILLANDALE LN. WINCHESTER, VIRGINIA 22602 (540) 868-7913 FREDERICK WATER 315 TASKER ROAD STEPHENS CITY, VIRGINIA 22655 (540) 868-1061 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTCOVER SHEET CS0000 TOTAL SHEETS 57 DAVID L. FRANK Lic. No.1061 SITE SHERANDO HIGH SCHOOL          10-24-2025 SHEET INDEX SHEET SHEET TITLE CS0000 COVER SHEET CS0001 GENERAL NOTES AND LEGENDS CS0002 PROJECT DEVELOPMENT SUMMARY CS0003 PROFFERS CS0004 PROFFERS CS1000 EXISTING CONDITIONS CS2000 EROSION AND SEDIMENT CONTROL NARRATIVE CS2100 EROSION AND SEDIMENT CONTROL PLAN PHASE I CS2200 EROSION AND SEDIMENT CONTROL PLAN PHASE II CS2300 TEMPORARY ACCESS AND STAGING PLAN CS2500 EROSION AND SEDIMENT CONTROL DETAILS CS2501 EROSION AND SEDIMENT CONTROL DETAILS CS2600 EROSION AND SEDIMENT CONTROL - BASIN DETAILS CS2601 EROSION AND SEDIMENT CONTROL - BASIN CALCULATIONS CS3000 TRUCK ROUTING PLAN CS4000 GEOMETRIC & UTILITY PLAN - OVERALL CS4001 GEOMETRIC & UTILITY PLAN CS4002 GEOMETRIC & UTILITY PLAN CS4003 GEOMETRIC & UTILITY PLAN CS4004 GEOMETRIC & UTILITY PLAN CS4100 GRADING & DRAINAGE PLAN - OVERALL CS4101 GRADING & DRAINAGE PLAN CS4102 GRADING & DRAINAGE PLAN CS4103 GRADING & DRAINAGE PLAN CS4104 GRADING & DRAINAGE PLAN CS4500 SITE DETAILS CS4501 SITE DETAILS CS4510 GROCERY STORE STANDARD DETAILS CS4511 GROCERY STORE STANDARD DETAILS CS4512 GROCERY STORE STANDARD DETAILS CS5100 WATERLINE PROFILES CS5200 SANITARY SEWER PROFILES CS5400 HYDRAULIC WATER MODEL CS5401 HYDRAULIC WATER MODEL - FIRE FLOW CS5500 WATER & SANITARY STANDARD DETAILS CS6100 STORM DRAIN PROFILES CS6101 STORM DRAIN PROFILES CS6150 STORM SEWER CALCULATIONS CS6151 STORM SEWER CALCULATIONS CS7000 LANDSCAPE PLAN CS7500 LANDSCAPE CALCULATIONS CS7600 AMENITY LANDSCAPE PLAN CS7601 LANDSCAPING WITH TRUCK ROUTING CS7700 IRRIGATION PLAN CS7701 IRRIGATION PLAN DETAILS CS8001 LIFE SAFETY PLAN CS8010 ACCESSIBILITY PLAN CS8011 ACCESSIBILITY DETAILS CS8100 PHOTOMETRIC PLAN CS8200 SIGNAGE PLAN - OVERALL CS8201 SIGNAGE PLAN CS9000 LEASE AREA PLAN CS9200 PRE-DEVELOPMENT DRAINAGE MAP CS9300 POST-DEVELOPMENT DRAINAGE MAP CS9400 VRRM DRAINAGE MAP CS9401 MS-19 COMPLIANCE SUMMARY CS9402 SWM STUDY POINT ANALYSIS BASE MAPPING & DATA SOURCE NOTES: THE EXISTING CONDITIONS, FEATURES, PROPERTY INFORMATION AND TOPOGRAPHY ARE AS DEPICTED ON A SURVEY PREPARED BY PENNONI ASSOCIATES, INC., DATED; 4-27-2023. THE INITIAL SURVEY WAS PREPARE WITHOUT THE BENEFIT OF A TITLE REPORT. THIS SURVEY AND PLAN ARE REFERENCED TO: NAD83 VA NORTH ZONE COORDINATE SYSTEM NAVD88 DATUM UNITS = US SURVEY FT. SUBSEQUENT TO A REVIEW OF FEMA FLOOD INSURANCE RATE MAP NO. 51069C0330E, EFFECTIVE 1-29-2021, THE SITE, AND LIMITS OF CONSTRUCTION ARE LOCATED IN ZONE X, AN AREA OF MINIMAL FLOOD HAZARD. SUBSEQUENT TO A REVIEW OF THE NATIONAL WETLANDS INVENTORY, 11-23-2023, THE SITE DEVELOPMENT AREA IS NOT ENCUMBERED BY STREAMS, WATER BODIES, OR OTHER WETLAND FEATURES. A WETLANDS DELINEATION HAS NOT BEEN PERFORMED AS A PART OF THIS PROJECT. PROJECT HISTORY AND PRIOR APPROVALS ·REZONING REZ #13-89 ·MASTER DEVELOPMENT PLAN MDP #05-20 ·ADJACENT SUBDIVISION PLAN SP #01-21 ·SHERANDO PUMP STATION UPGRADE PLAN 10-13-2021 (FW APPROVED) ·TIS & SJR 09-30-2022 (VDOT ACCEPTED) ·VDOT AM-E (ENTRANCE AT WARRIOR)11-13-2023 (VDOT APPROVED) ·SHERANDO GREEN PUBLIC IMPROVEMENT PLAN 04-30-2025 (APPROVED) WATER & SEWER DEMANDS THIS COMMERCIAL SITE PLAN PROPOSES GENERAL EXTENSION OF WATER AND SEWER SERVICES INTO SHERANDO GREEN LANDBAY "A", AND MORE SPECIFICALLY, SERVICE CONNECTIONS FOR A 50K sf GROCERY STORE AND A 8K sf RETAIL BUILDING. CONSTRUCTION OF ALL GROCERY STORE & RETAIL CONNECTIONS ARE DEPENDENT ON APPROVAL OF THE SHERANDO GREEN PUBLIC IMPROVEMENT PLAN. GROCERY WATER / SEWER DEMANDS: WATER USED FOR IRRIGATION SHALL BE PROVIDED BY THE DOMESTIC SERVICE METER AT THE "8K RETAIL' LOCATION. A SEPARATE IRRIGATION METER IS NOT REQUIRED. GROCERY DOMESTIC FLOW = 50,000 SF /12,500 GPD RETAIL DOMESTIC FLOW =8,000 SF / 3,000 GPD (INCLUDES IRRIGATION FLOW: 1,000 GPD) TOTAL FLOWS (SITE PLAN)= 15,500 GPD PUMP STATION UPGRADE THE EXISTING PUMP STATION UPGRADE WILL BE FULLY CONSTRUCTED, OPERATIONAL AND ACCEPTED FOR THE START OF THE ONE (1) YEAR WARRANTY PERIOD PRIOR TO THE ACCEPTANCE OF APPLICATION AND PAYMENT FOR THE 90th RESIDENTIAL METER IN FAIRFAX DOWNS OR PRIOR TO THE METERING & OCCUPANCY OF THE FIRST COMMERCIAL SITE PLAN FOR SHERANDO GREEN. RESPONSIBLE LAND DISTURBER THE RESPONSIBLE LAND DISTURBER IS THAT PARTY RESPONSIBLE FOR CARRYING OUT THE LAND DISTURBING ACTIVITY AS SET FORTH IN THE PLANS. NAME:_____________________________________________________ CERTIFICATION #:___________________________________________ DATE: _____________________________________________________ APPROVED BY FREDERICK COUNTY ZONING ADMINISTRATOR SITE PLAN VALID FOR FIVE YEARS FROM APPROVAL DATE ________________________________________________________________________________ APPROVED BY DATE PLAN REVIEW TRACKING 06-16-2025 PLAN, FIRE, GIS, INSP 07-15-2025 FW 07-17-2025 INSP (APPROVAL) 08-22-2025 FIRE, GIS, PW 09-02-2025 GIS (APPROVAL) 09-19-2025 FIRE (APPROVAL) 09-22-2025 VDH, VDOT 09-25-2025 FW, PW 09-29-2025 VDOT (APPROVAL) 10-10-2025 VDH (APPROVAL) 10-17-2025 PW (APPROVAL) 10-20-2025 FW 10-23-2025 FW (APPROVAL) U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS0001.dwg PLOTTED: 10/24/2025 7:53 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001 AS NOTED TEAM 07-15-2025 DLFAPPROVED BY DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTGENERAL NOTES AND LEGENDS CS0001 TOTAL SHEETS 57          10-24-2025 DAVID L. FRANK Lic. No.1061 GENERAL CONSTRUCTION NOTES 1.THE CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR AND EQUIPMENT AND PERFORM ALL WORK INCLUDING RESTORATION FOR ALL IMPROVEMENTS SHOWN OR IMPLIED AS NECESSARY FOR THE COMPLETED FACILITY READY FOR USE. UNLESS OTHERWISE NOTED, SPECIFICATIONS FOR ALL WORK TO BE IN ACCORDANCE WITH APPLICABLE STANDARDS AND CONSTRUCTION SPECIFICATIONS OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION, VIRGINIA DEPARTMENT OF HEALTH, ECONOMIC DEVELOPMENT AUTHORITY, AND THE CONTRACT DOCUMENTS. 2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION STAKEOUT. ALL DIMENSIONS, ELEVATIONS AND LOCATIONS SHALL BE VERIFIED IN THE FIELD BY EACH CONTRACTOR PRIOR TO BEGINNING THE WORK. THE ENGINEER WILL APPROVE ALL CUT SHEETS. 3.CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO THE HOURS OF 8:00 AM TO 5:00 PM. 4.ANY UNUSUAL SUBSURFACE CONDITIONS ENCOUNTERED DURING THE COURSE OF THE WORK SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER AND/OR THE OWNER. 5.CONTRACTOR TO OBTAIN, AT HIS EXPENSE, ALL PERMITS REQUIRED OF THIS WORK PRIOR TO COMMENCING CONSTRUCTION AND SHALL FAITHFULLY ADHERE TO THE PERMIT CONDITIONS IMPOSED. 6.ALL GRADING FOR IMPROVEMENTS TO BE CONFINED TO THE PROJECT AREA. ANY WORK PERFORMED OFFSITE IS THE CONTRACTOR'S RESPONSIBILITY. 7.CUTSHEETS SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION. ALL CUTSHEETS SHOULD SHOW EXISTING GROUND ELEVATIONS AT CENTERLINE OF UTILITY, STRUCTURE OR ROAD, AND OFFSET HUB ELEVATION. 8.LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING THE EXACT LOCATION, VERTICALLY AND HORIZONTALLY, OF THE UTILITIES PRIOR TO ANY EXCAVATION OR CONSTRUCTION. THE CONTRACTOR SHALL CONTACT "MISS UTILITY" AND ALL APPLICABLE UTILITY COMPANIES FOR CLEARANCE PRIOR TO EXCAVATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADHERING TO THE COMMONWEALTH OF VIRGINIA UNDERGROUND UTILITY DAMAGE PREVENTION ACT, CHAPTER 10, TITLE 56 OF THE CODE OF VIRGINIA. 9.CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING AND MAINTAINING ALL EROSION AND SEDIMENT CONTROL MEASURES NECESSARY DURING CONSTRUCTION IN ACCORDANCE WITH CURRENT STATE AND LOCAL REGULATIONS. DISTURBED AREAS SHALL NOT REMAIN DENUDED FOR MORE THAN SEVEN (7) CALENDAR DAYS WHEN CONSTRUCTION IS NOT IN PROGRESS. DURING CONSTRUCTION, ALL STORM SEWER INLETS SHALL BE PROTECTED BY INLET PROTECTION, AND SHALL BE MAINTAINED AND MODIFIED AS REQUIRED BY CONSTRUCTION PROGRESS. CONTRACTOR SHALL CONTACT THE COUNTY BUILDING INSPECTIONS OFFICE AT (540) 636-9973 TO SCHEDULE INSPECTIONS. 10.CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING MUD FROM TRUCKS AND/OR OTHER EQUIPMENT PRIOR TO ENTERING PUBLIC STREETS AND/OR EXISTING PARKING LOTS AND OTHER PAVED AREAS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS, ALLAY DUST, AND TO TAKE WHATEVER MEASURES NECESSARY TO ENSURE THAT THE STREETS ARE MAINTAINED IN A CLEAN, MUD AND DUST FREE CONDITION AT ALL TIMES. 11.ANY STREET OR UTILITIES DAMAGED BY CONTRACTOR OR SUB-CONTRACTOR SHALL BE SOLE RESPONSIBILITY OF THE PRIMARY CONTRACTOR AND PROPERLY AND IMMEDIATELY REPAIRED BY THE CONTRACTOR. SUCH REPAIRS SHALL BE TO RESTORE THE ORIGINAL CONDITION, IN COMPLIANCE WITH THE UTILITY OWNER'S, STATE'S, COUNTY'S OR CITY'S CONSTRUCTION STANDARDS & SPECIFICATIONS, AND TO THE SATISFACTION OF THE UTILITY OWNER'S INSPECTOR. 12.ALL PRE-CAST CONCRETE STRUCTURES SHALL BE A MINIMUM 4000 PSI AT 28 DAYS. 13.THE CONTRACTOR IS RESPONSIBLE FOR ADJUSTMENT OF ALL UTILITY BOXES, VAULTS, OR OTHER APPURTENANCES TO NEW FINISHED GRADE ELEVATIONS. 14.CONTRACTOR TO RELOCATE ALL SIGNS AND UTILITIES REQUIRED FOR THIS WORK. 15.ANY PLANNED DISRUPTIONS OF OR TIE INS TO EXISTING UTILITIES SHALL BE COORDINATED WITH THE APPROPRIATE UTILITY OWNER. WITH THE EXCEPTION OF EMERGENCIES, THERE SHALL BE A MINIMUM OF 24 HOURS NOTICE GIVEN BY THE CONTRACTOR TO ALL RESIDENTIAL, COMMERCIAL, AND INDUSTRIAL UTILITY USERS AFFECTED BY UTILITY INTERRUPTIONS. 16.THE UNAUTHORIZED USE OF WATER WITHOUT DUE COMPENSATION IS ILLEGAL. NO PERSON SHALL CONNECT TO OR DO ANY WORK ON THAT PORTION OF THE SYSTEM OWNED BY THE TOWN UNLESS WRITTEN AUTHORIZATION IS RECEIVED PRIOR TO COMMENCING WORK. 17.CONSTRUCTION LIMITS SHALL BE PROPERTY LINES OR AS INDICATED BY PLAN REQUIREMENTS AND SHALL BE STAKED OR FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. 18.CONSTRUCTION SHALL CONFORM TO THE AMERICAN WITH DISABILITIES ACT (ADA) REQUIREMENTS. 19.REGISTERED LAND DISTURBER TO SUBMIT REPORTS TO BUILDING INSPECTOR ON A REGULAR BASIS AS REQUIRED BY FREDERICK COUNTY. 20.THE CONTRACTOR SHALL COORDINATE WITH THE INDIVIDUAL LOT OWNERS TO RELOCATE THE EXISTING MAIL BOXES THAT ARE AFFECTED BY THE PROPOSED IMPROVEMENTS. 21.ALL UTILITIES WILL BE LOCATED UNDERGROUND. 22.TEST PITS ARE REQUIRED ON ALL FREDERICK WATER / FCSA OWNED SEWER AND WATER LINES AS NEEDED AND REQUIRED BY THEIR STANDARDS AND SPECIFICATIONS AND OR AS DIRECTED BY THEIR INSPECTOR. 23.FIELD ADJUSTMENTS TO FREDERICK WATER / FCSA INFRASTRUCTURE SHALL BE AS REQUIRED BY THE FREDERICK WATER INSPECTOR'S REQUIREMENTS. 24.EXISTING MANHOLE FRAMES AND COVERS AND VALVE BOXES AND COVERS TO REMAIN SHALL BE ADJUSTED OR RECONSTRUCTED, AS NECESSARY, TO MATCH FINISHED GRADES. 25.VDOT EROSION AND SEDIMENT CONTROL CONTRACTOR CERTIFICATION IS REQUIRED. FIRE AND RESCUE 1. BURNING OF CONSTRUCTION DEBRIS AND CLEARING AND GRUBBING DEBRIS ON SITE IS PROHIBITED. 2. ACCESS FOR EMERGENCY VEHICLES MUST BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION. VDOT GENERAL NOTES VIRGINIA DEPARTMENT OF TRANSPORTATION - STAUNTON DISTRICT - REV. JUNE 19, 2013 V1.ALL WORK ON THIS PROJECT SHALL CONFORM TO THE CURRENT EDITIONS OF AND LATEST REVISIONS TO THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) ROAD AND BRIDGE SPECIFICATIONS AND STANDARDS, THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS, AND ANY OTHER APPLICABLE STATE, FEDERAL OR LOCAL REGULATIONS. IN CASE OF A DISCREPANCY OR CONFLICT BETWEEN THE STANDARDS OR SPECIFICATIONS AND REGULATIONS, THE MOST STRINGENT SHALL GOVERN. V2.ALL CONSTRUCTION SHALL COMPLY WITH THE LATEST U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), AND VIRGINIA OCCUPATIONAL SAFETY & HEALTH (VOSH) RULES AND REGULATIONS. V3.WHEN WORKING WITHIN VDOT RIGHT-OF-WAY, ALL TRAFFIC CONTROL, WHETHER PERMANENT OR TEMPORARY, SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF VDOT'S WORK AREA PROTECTION MANUAL. A TRANSPORTATION MANAGEMENT PLAN NEEDS TO BE SUBMITTED FOR APPROVAL AND LAND USE PERMIT ISSUED PRIOR TO ANY EXECUTION OF WORK WITHIN THE VDOT RIGHT OF WAY. V4 THE DEVELOPER SHALL BE RESPONSIBLE FOR RELOCATING, AT HIS EXPENSE, ANY AND ALL UTILITIES, INCLUDING TRAFFIC SIGNAL POLES, JUNCTION BOXES, CONTROLLERS, ETC., OWNED BY VDOT OR PRIVATE / PUBLIC UTILITY COMPANIES. IT IS THE SOLE RESPONSIBILITY OF THE DEVELOPER TO LOCATE AND IDENTIFY UTILITY FACILITIES OR ITEMS THAT MAY BE IN CONFLICT WITH THE PROPOSED CONSTRUCTION ACTIVITY. VDOT APPROVAL OF THESE PLANS DOES NOT INDEMNIFY THE DEVELOPER FROM THIS RESPONSIBILITY. V5.DESIGN FEATURES RELATING TO FIELD CONSTRUCTION, REGULATIONS, AND CONTROL OR SAFETY OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY VDOT. ANY ADDITIONAL EXPENSE INCURRED AS A RESULT OF ANY FIELD REVISION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. V6.IF REQUIRED BY THE LOCAL VDOT LAND DEVELOPMENT OFFICE, A PRE-CONSTRUCTION CONFERENCE SHALL BE ARRANGED AND HELD BY THE ENGINEER AND/OR DEVELOPER WITH THE ATTENDANCE OF THE CONTRACTOR (S), VARIOUS COUNTY AGENCIES, UTILITY COMPANIES AND VDOT PRIOR TO INITIATION OF WORK. V7.THE CONTRACTOR SHALL NOTIFY THE LOCAL VDOT LAND DEVELOPMENT OFFICE WHEN WORK IS TO BEGIN OR CEASE FOR ANY UNDETERMINED LENGTH OF TIME. VDOT REQUIRES AND SHALL RECEIVE 48 HOURS ADVANCE NOTICE PRIOR TO ANY REQUIRED OR REQUESTED INSPECTION. V8. THE CONTRACTOR SHALL NOTIFY THE TRAFFIC OPERATIONS CENTER AT (540) 332-9500 FOR ANY TRAFFIC CONTROL PLAN THAT IMPACTS A VDOT MAINTAINED INTERSTATE OR PRIMARY ROADWAY TO PROVIDE NOTIFICATION OF THE INSTALLATION AND REMOVAL OF THE WORK ZONE. V9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A VDOT PERMITTED TEMPORARY CONSTRUCTION ENTRANCE(S) IN ACCORDANCE WITH SECTION 3.02 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. FURTHERMORE, ACCESS TO OTHER PROPERTIES AFFECTED BY THIS PROJECT SHALL BE MAINTAINED THROUGH CONSTRUCTION. V10.CONTRACTOR SHALL ENSURE ADEQUATE DRAINAGE IS ACHIEVED AND MAINTAINED ON THE SITE DURING AND AT THE END OF CONSTRUCTION. V11. ALL WATER AND SEWER LINES WITHIN EXISTING OR PROPOSED VDOT RIGHT-OF-WAY SHALL HAVE A MINIMUM THIRTY-SIX (36) INCHES COVER AND WHEN POSSIBLE SHALL BE INSTALLED UNDER ROADWAY DRAINAGE FACILITIES AT CONFLICT POINTS. V12.ANY UNUSUAL SUBSURFACE CONDITIONS (E.G., UNSUITABLE SOILS, SPRINGS, SINKHOLES, VOIDS, CAVES, ETC.) ENCOUNTERED DURING THE COURSE OF CONSTRUCTION SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER AND VDOT. WORK SHALL CEASE IN THAT VICINITY UNTIL AN ADEQUATE DESIGN CAN BE DETERMINED BY THE ENGINEER AND APPROVED BY VDOT. V13.ALL FILL AREAS, BORROW MATERIAL AND UNDERCUT AREAS SHALL BE INSPECTED AND APPROVED BY A VDOT REPRESENTATIVE PRIOR TO PLACEMENT OF FILL. A VDOT REPRESENTATIVE SHALL BE PRESENT TO INSURE THE SOIL SAMPLE(S) OBTAINED FOR CBR'S IS REPRESENTATIVE OF THE LOCATION. WHEN SOIL SAMPLES ARE SUBMITTED TO PRIVATE LABORATORIES FOR TESTING, THE SAMPLES SHALL BE CLEARLY IDENTIFIED AND LABELED AS BELONGING TO A PROJECT TO BE ACCEPTED BY VDOT AND THAT TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE VDOT STANDARDS AND PROCEDURES. V14.ALL ROADWAY FILL, BASE, SUBGRADE MATERIAL, AND BACKFILL IN UTILITY/STORM SEWER TRENCHES SHALL BE COMPACTED IN ACCORDANCE WITH THE LIFT THICKNESSES, DENSITY AND MOISTURE REQUIREMENTS AS SPECIFIED IN THE CURRENT VDOT ROAD AND BRIDGE SPECIFICATIONS. CERTIFIED COPIES OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE. V15.VDOT STANDARD CD AND UD UNDERDRAINS SHALL BE INSTALLED WHERE INDICATED ON THESE PLANS AND/OR AS SPECIFIED BY VDOT. V16. A POST INSTALLATION VISUAL/VIDEO CAMERA INSPECTION SHALL BE CONDUCTED BY THE CONTRACTOR ON ALL PIPES IDENTIFIED ON THE PLANS AS STORM SEWER PIPE AND A SELECT NUMBER OF PIPE CULVERTS. FOR PIPE CULVERTS, A MINIMUM OF ONE PIPE INSTALLATION FOR EACH SIZE OF EACH MATERIAL TYPE WILL BE INSPECTED OR TEN PERCENT OF THE TOTAL AMOUNT FOR EACH SIZE AND MATERIAL TYPE SUMMARIZED. ALL PIPE INSTALLATIONS ON THE PLANS NOT IDENTIFIED AS STORM SEWER PIPE SHALL BE CONSIDERED AS CULVERT PIPE FOR INSPECTION PURPOSES. ADDITIONAL TESTING MAY BE REQUIRED AS DIRECTED BY THE AREA LAND USE ENGINEER OR THEIR REPRESENTATIVE. V17.THE INSTALLATION OF ANY ENTRANCES AND MAILBOXES WITHIN ANY DEDICATED STREET RIGHT-OF-WAY SHALL MEET VDOT MINIMUM DESIGN STANDARDS AND IS THE RESPONSIBILITY OF THE DEVELOPER. V18.PRIOR TO VDOT ACCEPTANCE OF ANY STREETS, ALL REQUIRED STREET SIGNAGE AND/OR PAVEMENT MARKINGS SHALL BE INSTALLED BY THE DEVELOPER IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. V19.THE DEVELOPER SHALL PROVIDE THE VDOT LAND DEVELOPMENT OFFICE WITH A LIST OF ALL MATERIAL SOURCES PRIOR TO THE START OF CONSTRUCTION. COPIES OF ALL INVOICES FOR MATERIALS UTILIZED WITHIN ANY DEDICATED STREET RIGHT-OF-WAY MUST BE PROVIDED TO THE LOCAL VDOT LAND DEVELOPMENT OFFICE PRIOR TO ACCEPTANCE OF THE WORK. UNIT AND TOTAL PRICES MAY BE OBSCURED. V20.AGGREGATE BASE AND SUBBASE MATERIALS SHALL BE PLACED ON SUBGRADE BY MEANS OF A MECHANICAL SPREADER. DENSITY WILL BE DETERMINED USING THE DENSITY CONTROL STRIP IN ACCORDANCE WITH SECTION 304 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS AND VTM-10. A CERTIFIED COMPACTION TECHNICIAN SHALL PERFORM THESE TESTS. CERTIFIED COPIES OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE. IN ADDITION TO CHECKING STONE DEPTHS, A VDOT REPRESENTATIVE SHALL BE NOTIFIED AND GIVEN THE OPPORTUNITY TO BE PRESENT DURING THE CONSTRUCTION AND TESTING OF THE DENSITY CONTROL STRIP. V21.ASPHALT CONCRETE PAVEMENTS SHALL BE PLACED IN ACCORDANCE WITH SECTION 315 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS. DENSITY SHALL BE DETERMINED USING THE DENSITY CONTROL STRIP AS SPECIFIED IN SECTION 315 AND VTM-76. A CERTIFIED COMPACTION TECHNICIAN SHALL PERFORM THESE TESTS. CERTIFIED COPIES OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE. A VDOT REPRESENTATIVE SHALL BE NOTIFIED AND GIVEN THE OPPORTUNITY TO BE PRESENT DURING THE CONSTRUCTION AND TESTING OF THE CONTROL STRIP. V22.IN ACCORDANCE WITH SECTION 302.03, THE FOUNDATIONS FOR PIPE CULVERTS THIRTY-SIX (36) INCHES AND LARGER SHALL BE EXPLORED BELOW THE BOTTOM OF THE EXCAVATION TO DETERMINE THE TYPE AND CONDITION OF THE FOUNDATION. THE CONTRACTOR SHALL REPORT FINDINGS OF FOUNDATION EXPLORATION TO THE ENGINEER AND VDOT FOR APPROVAL PRIOR TO PLACING PIPE. FOUNDATION DESIGNS SHALL COMPLY WITH VDOT ROAD AND BRIDGE STANDARD PB-1. WHERE SOFT, YIELDING, OR OTHERWISE UNSUITABLE FOUNDATION IS ENCOUNTERED, THE FOUNDATION DESIGN AND/OR NEED FOR FOUNDATION STABILIZATION SHALL BE DETERMINED BY THE ENGINEER AND APPROVED BY VDOT. V23.VDOT STANDARD GUARDRAIL SHALL BE INSTALLED WHERE WARRANTED AND/OR AS PROPOSED ON THESE PLANS IN ACCORDANCE WITH VDOT'S INSTALLATION CRITERIA. FINAL APPROVAL OF THE GUARDRAIL LAYOUT TO BE GIVEN BY VDOT AFTER GRADING IS MOSTLY COMPLETE. V24.APPROVAL OF THESE PLANS SHALL EXPIRE FIVE (5) YEARS FROM THE DATE OF THE APPROVAL LETTER. V25.VDOT STANDARD CG-12 CURB RAMPS SHALL BE INSTALLED WHERE INDICATED ON THESE PLANS AND/OR AS SPECIFIED BY VDOT. V26.THE FOUNDATIONS FOR ALL BOX CULVERTS SHALL BE INVESTIGATED BY MEANS OF EXPLORATORY BORINGS ADVANCED BELOW PROPOSED FOUNDATION ELEVATION TO DETERMINE THE TYPE AND CONDITION OF THE FOUNDATION. THE CONTRACTOR SHALL SUBMIT COPIES OF BOREHOLE LOGS AND REPORT FINDINGS OF FOUNDATION EXPLORATION TO THE ENGINEER AND VDOT FOR APPROVAL PRIOR TO CONSTRUCTING BOX. FOUNDATION DESIGNS SHALL COMPLY WITH VDOT ROAD AND BRIDGE STANDARD PB-1. CONTRARY TO THE STANDARD, WHERE ROCK IS ENCOUNTERED AND CAST-IN-PLACE BOX IS PROPOSED, THE THICKNESS OF BEDDING SHALL BE SIX (6) INCHES. WHERE SOFT, YIELDING, OR OTHERWISE UNSUITABLE FOUNDATION IS ENCOUNTERED, THE FOUNDATION DESIGN AND/OR NEED FOR FOUNDATION STABILIZATION SHALL BE DETERMINED BY THE ENGINEER AND APPROVED BY VDOT. TEST HOLE ......................... BUILDING WALL ..................... DOOR LOCATION ..................... LIMITS OF GRADING ................. BENCHMARK ......................... PROPOSED CG-6R TREE LINE ......................... TREE .............................. SANITARY STRUCTURE LABEL .......... WATER METER ....................... SPOT SHOT ......................... SIGN .............................. FIRE HYDRANT ...................... STREET LIGHT ...................... UTILITY POLE ...................... WATER VALVE ....................... TRAFFIC SIGNAL POLE ............... FENCE LINE ........................ UNDERGROUND TELEPHONE ............. OVERHEAD TELEPHONE ................ UNDERGROUND ELECTRIC .............. OVERHEAD ELECTRIC ................. STORM STRUCTURE LABEL ............. GAS LINE .......................... WATERMAIN ......................... SANITARY SEWER .................... STORM SEWER ....................... EDGE OF PAVEMENT .................. CURB AND GUTTER ................... CONTOURS .......................... STREET CENTERLINE ................. PROPERTY LINE ..................... 24 LEGEND TRANS.CG-6 EXISTING 24 RW RWRECLAIM WATERMAIN ..................RW RW S DD WATERLINE TO BE REMOVED.................. RECLAIMED WATERLINE TO BE REMOVED STORM SEWER TO BE REMOVED............ PAVEMENT TO BE REMOVED.................... FREDERICK WATER CONSTRUCTION NOTES - 06-18-2024 1.FREDERICK WATER'S WATER AND SEWER STANDARDS AND SPECIFICATIONS ARE AVAILABLE AT WWW.FREDERICKWATER.COM 2.THE CONTRACTOR SHALL ADHERE TO FREDERICK WATER STANDARDS AND SPECIFICATIONS IN EFFECT AT THE TIME OF CONSTRUCTION. 3.THE CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE FREDERICK WATER INSPECTOR PRIOR TO COMMENCING INSTALLATION OF ANY WATER OR SEWER FACILITIES. CONTRACTOR SHALL ALSO ARRANGE FOR INSPECTION OF SAID FACILITIES BY FREDERICK WATER. OIL WATER SEPARATORS AND/OR GREASE TRAPS MAY BE REQUIRED BY FREDERICK OR CLARKE COUNTY BUILDING INSPECTIONS. BOTH FREDERICK OR CLARKE COUNTY BUILDING INSPECTIONS AND FREDERICK WATER WILL INSPECT THE INSTALLATION OF THOSE FACILITIES. BOTH INSPECTIONS SHALL BE SCHEDULED BY CONTRACTOR. 4.THE CONTRACTOR SHALL CONNECT A NEW SEWER LINE TO AN EXISTING MANHOLE BY CORE DRILLING THE MANHOLE. 5.A NEW WATER (OR FORCED SEWER) MAIN SHALL BE CONNECTED TO AN EXISTING MAIN BY A CUT-IN TEE WITH ACCOMPANYING VALVES. 6.EXACT LOCATIONS OF WATER AND SEWER SERVICES ON NEW LINES ARE TO BE COORDINATED WITH FREDERICK WATER'S INSPECTOR. a.ADJUST FREDERICK WATER FACILITIES TO GRADE AS REQUIRED BY THE FREDERICK WATER INSPECTOR. 7.FREDERICK WATER'S MAINTENANCE DIVISION SHALL FURNISH AND INSTALL ALL WATER METERS THROUGH 2 INCH IN SIZE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE METER BOX ASSEMBLY INSTALLED CORRECTLY. BEFORE A PERMANENT METER IS INSTALLED: a.THE METER BOX, WITH ITS FRAME AND COVER, MUST BE PROPERLY ALIGNED WITH THE YOKE BAR. b.THE FRAME AND COVER SHALL BE SET TO FINAL GRADE. c.THE DISTANCE BETWEEN THE TOP OF THE COVER AND THE YOKE BAR SHALL BE BETWEEN 20 AND 23 INCHES. d.ALL COMPONENTS OF THE METER BOX ASSEMBLY SHALL BE IN PROPER WORKING ORDER. 8.FOR SERVICES THAT CONNECT TO EXISTING LINES: a.FREDERICK WATER SHALL FURNISH AND INSTALL: i. ALL ⅝”X¾”, ¾”, 1”, 1½” AND 2” WATER SERVICES ii. ALL SEWER SERVICES. b.THE OWNER/DEVELOPER SHALL: i. COORDINATE (OR HAVE THE CONTRACTOR COORDINATE) THE LOCATION OF THE SERVICE LATERAL WITH FREDERICK WATER'S ENGINEERING ASSISTANT. ii. SUBMIT AN APPLICATION FOR SERVICE AND PAY THE REQUIRED FEES. 9.ALL WATER SERVICE LINES MUST HAVE A BACKFLOW PREVENTION ASSEMBLY (DOUBLE CHECK VALVE OR RPZ, AS REQUIRED). THE ASSEMBLY MUST MEET ASSE STANDARD NUMBER 1015 OR 1013. 10.ALL FIRE LINES MUST HAVE A BACKFLOW PREVENTION ASSEMBLY (DETECTOR DOUBLE CHECK VALVE OR RPZ, AS REQUIRED). THE ASSEMBLY SHALL MEET ASSE STANDARD NUMBER 1048 OR 1047. ANY PRIVATELY OWNED FIRE LINE, INTERIOR OR EXTERIOR, SHALL ALSO HAVE A FIRE SERVICE METER. THIS ASSEMBLY SHALL BE INSTALLED IMMEDIATELY BEFORE THE BACKFLOW PREVENTION UNIT. RADIO READ REMOTES ARE REQUIRED. 11.FREDERICK WATER SHALL REVIEW THE MECHANICAL PLAN(S) FOR DESIGN AND MATERIAL APPROVAL OF A BUILDING'S: a.DOMESTIC WATER METER AND ITS BACKFLOW PREVENTION DEVICE, AND/OR ITS b.FIRE SERVICE LINE'S WATER METER AND BACKFLOW PREVENTION DEVICE. 12.DEQ MUST ALSO APPROVE SEWER PUMP STATIONS. FREDERICK WATER REQUIRES A COPY OF DEQ'S CERTIFICATE TO OPERATE AND A COPY OF THE STATION'S DEQ APPROVED O&M MANUAL. THESE DOCUMENTS MUST BE RECEIVED BEFORE SUBSTANTIAL COMPLETION IS ISSUED AND WATER METERS RELEASED. 13.VALVES, MANHOLES, ARV'S AND OTHER FREDERICK WATER SURFACE FEATURES SHALL NOT BE PLACED IN CURB AND GUTTER, NOR SLOPED PORTION OF HANDICAPPED RAMPS, CONTRACTOR SHALL COORDINATE LOCATIONS WITH THE FREDERICK WATER INSPECTOR. 14.IRRIGATION LINES AND DEVICES, LIGHT POLES, TRANSFORMERS, JUNCTION BOXES, PEDESTALS, OTHER OBSTACLES AND ALL DRY UTILITIES SHALL NOT BE PLACED IN FREDERICK WATER EASEMENTS. PERPENDICULAR IRRIGATION LINES AND DRY UTILITIES CROSSINGS ARE PERMITTED WITH 18” MINIMUM VERTICAL SEPARATION. 15.WITH REGARD TO WATER MAIN CUT-IN CONNECTIONS AND WHERE APPLICABLE, THE CONTRACTOR SHALL; a.TEST PIT EXISTING WATER MAINS PER FREDERICK WATER INSPECTOR'S REQUIREMENTS b.INSTALL JOINT RESTRAINTS ON EXISTING WATER MAIN PER CURRENT FREDERICK WATER REQUIREMENTS PRIOR TO SHUT DOWN c.PREPARE WORK AS FAR IN ADVANCE AS POSSIBLE TO MINIMIZE SHUT DOWN TIME d.HAVE SUFFICIENT RESOURCES ON-SITE TO ACCOMPLISH TASKS PER FREDERICK WATER INSPECTOR'S REQUIREMENTS e.PREPARE A WATER SHUT DOWN PLAN SATISFACTORY TO THE FREDERICK WATER INSPECTOR, FIREWATCH, NIGHTTIME WORK ETC. MAYBE REQUIRED f.SCHEDULE SHUTDOWN WITH THE FREDERICK WATER INSPECTOR, FREDERICK COUNTY FIRE MARSHAL, AND ALL AFFECTED CUSTOMERS AT LEAST (7) DAYS IN ADVANCE, AND MAKE PREPARATIONS AS REQUIRED BY ALL PARTY'S g.PERFORM ALL WORK WITH ONE SHUT DOWN UNLESS APPROVED BY THE FREDERICK WATER INSPECTOR 16.WITH REGARD TO TEST-PIT LOCATIONS OF EXISTING MAIN, AND WHERE APPLICABLE, THE CONTRACTOR SHALL; a.COORDINATE A MEETING WITH THE FREDERICK WATER INSPECTOR AT LEAST SEVEN (7) WORKING DAYS PRIOR TO GROUND DISTURBING ACTIVITIES. b.EXERCISE EXTREME CAUTION WHILE TRAVELING OR WORKING OVER OR NEAR EXISTING FREDERICK WATER FACILITIES. c.TEST PIT EXISTING FREDERICK WATER FACILITIES TO CONFIRM THAT MINIMUM COVER OF 36" HAS BEEN PROVIDED. d.TEST PIT REPORTS SHALL BE PROVIDED TO THE OWNER'S ENGINEER. e.PERFORM ALL WORK PER THE FREDERICK WATER INSPECTOR'S REQUIREMENTS 17.WHERE APPLICABLE, FREDERICK WATER FACILITIES & APPURTENANCES NOTED ON THE PLANS "TO BE REMOVED", SHALL BE FURNISHED TO THE FREDERICK WATER INSPECTOR. 18.BRINE DISCHARGES FROM ION-EXCHANGE WATER SOFTENERS SHALL NOT BE DISCHARGED TO THE SANITARY SEWER SYSTEM. 19.CONTRACTOR SHALL PROVIDE ONE REMOTE PRESSURE AND TEMPERATURE MONITORING FIRE HYDRANT AND COORDINATE THE LOCATION WITH THE FREDERICK WATER INSPECTOR U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS0002.dwg PLOTTED: 10/24/2025 7:53 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001 AS NOTED TEAM 07-15-2025 DLFAPPROVED BY DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTPROJECT DEVELOPMENT SUMMARY CS0002 TOTAL SHEETS 57          10-24-2025 DAVID L. FRANK Lic. No.1061 ____________________________________________________ SITE DEVELOPMENT NOTES 1.THE EXISTING CONDITIONS, FEATURES, PROPERTY INFORMATION AND ARE AS DEPICTED ON ALTA SURVEY PREPARED BY TRIAD ENGINERRING, INC AND DATED; MARCH 25, 2022. TOPOGRAPHY IS AS DEPICTED ON AN AERIAL SURVEY PREPARED BY TUCK MAPPING SOLUTIONS AND DATED; MARCH 9, 2022. 2.THIS SURVEY AND PLAN ARE REFERENCED TO NAD83 VA NORTH ZONE COORDINATE SYSTEM AND NAVD88 DATUM, UNITS = US SURVEY FT. 3.SUBSEQUENT TO REVIEW OF FEMA FLOOD INSURANCE RATE MAP NO. 51069C0210E, EFFECTIVE 1/29/2021, THE LIMITS OF CONSTRUCTION ARE LOCATED IN ZONE X, AN AREA OF MINIMAL FLOOD HAZARD. 4.BASED ON A REVIEW OF THE NATIONAL WETLANDS INVENTORY, THE PROJECT SITE DOES NOT APPEAR TO BE ENCUMBERED BY WETLANDS OR STREAMS. A WETLANDS FIELD DELINEATION WAS NOT PROVIDED FOR THIS PROJECT. 5.COMMERCIAL IMPROVEMENTS SHALL BE SERVED BY PUBLIC WATER AND SANITARY SEWER. 6.RECORDATION OF THE COMMERCIAL SUBDIVISION PLAT IS REQUIRED PRIOR TO ISSUANCE OF A BUILDING PERMIT. BUILDING OFFICIAL- PERMITS REQUIRED (VUSBC 108.2) A.ACCESSORY STRUCTURE FOR ANYTHING OTHER THAN A SHED <256 SQ. FT. B.MONUMENT SIGNS (ENGINEERING) C.STREET LIGHT POLE BASES (ENGINEERING OR MANUFACTURE'S SPEC FOR 1,500 PSF. SOIL AND 90MPH WIND) D.RETAINING WALLS WITH ≥3' UNBALANCED FILL E.SWIMMING POOLS & SWIMMING POOL BARRIERS (FENCE) F.FLAG POLES >30' HEIGHT G.ANY STRUCTURAL SLABS H.TANKS (CHEMICAL / SIZE / QUANTITY) ·CURRENT WIND SPEED IS 115 MPH FOR COMPLIANCE WITH THE BUILDING CODE. 2018 VCC CHAPTER 16 CS0002 NOTE C DEVELOPER SHERANDO GREEN LLC 605 SOUTH EDEN ST. - SUITE 200 BALTIMORE, MD. 21231 (410) 753-3966 PROPERTY SUMMARY ADDRESS 606 FAIRFAX PIKE STEPHENS CITY, VIRGINIA 22655 PARCEL OWNER SHERANDO GREEN, LLC TAX MAP TM 86-A-80 EXISTING ZONING B-2 CURRENT USE VACANT PROPOSED USE COMMERCIAL ORIGINAL PARCEL AREA 19.93 AC R/W DEDICATION 1.05 AC NEW PARCEL AREA 18.88 AC TOTAL DEVELOPED LAND AREA 18.88 AC DISTURBED AREAS ON-SITE 17.91 AC. OFF-SITE 0.04 AC. TOTAL DISTURBED AREA 17.95 AC. FLOOR AREA CALCULATIONS TOTAL GROUND FLOOR AREA 58,800 SF (50,800 SF GROCERY + 8,000 SF RETAIL) TOTAL FLOOR AREA 58,800 SF TOTAL LOT AREA 469,514 SF F.A.R.0.13 (1.0 MAX F.A.R. ALLOWED) BUILDING HEIGHT MAXIMUM PROVIDED BUILDING HEIGHT 35' MAX HT 35' 24'-3" 8K RETAIL BUILDING SETBACKS MINIMUM REQUIRED MINIMUM PROVIDED FROM PRIMARY/ARTERIAL 50'403.18' FROM COLLECTOR/MINOR 35'115.79' SIDE N/A 727.65' REAR N/A 121.02' PARKING SETBACKS MINIMUM REQUIRED MINIMUM PROVIDED ROAD/STREET 10'22.5' ALL OTHER PL 5'N/A PARKING CALCULATIONS REQUIRED PROVIDED (1 SPACES / 200 SF) 58,800 SF / 200 SF 294 330 HC SPACES 7 (1 VAN)15 (15 VAN) LOADING SPACES (1 SPACE / FIRST 10,000 SF BLDG) (1 SPACE / 30,000 SF THEREAFTER) 58,800 SF / 70,000 SF 3 3 OPEN / GREEN SPACE CALCULATIONS PARCEL 1 AREA 10.77 AC IMPERVIOUS AREA 7.32 AC (68%) OPEN / GREEN SPACE 3.45 AC (32%) (REQUIRED 15%) LANDSCAPING _____________________________________________________________________ 50 ADDITIONAL 6' DECIDUOUS TREES ARE REQUIRED TO FULFILL PROFFER B(1) OF RZ#13-89 WATER & SEWER DEMANDS WATER AND SEWER DEMANDS ARE SHOWN ON SHEET CS0000 FREDERICK COUNTY INSPECTIONS DEPT. PROJECT NOTES: 1.BUILDING SHALL COMPLY WITH THE VIRGINIA UNIFORM STATEWIDE BUILDING CODE. OTHER CODES THAT APPLY ARE ICC/ANSI A117.1. ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES, INTERNATIONAL FIRE CODE 2018, VIRGINIA ENERGY CODE, THE VIRGINIA MECHANICAL CODE, THE VIRGINIA PLUMBING CODE AND THE NEC. 2.ALL REQUIRED EXITS SHALL MEET ANSI A117.1. EXITS SHALL TERMINATE AT A PUBLIC WAY. A DETAILED FIRE EXITING PLAN SHALL BE PROVIDED WITH THE BUILDING PLANS TO IDENTIFY THE LOCATION AND TRAVEL DISTANCE TO THE ACCESSIBLE EXITS. NEW EXITS MAY NEED TO MEET ANSI A117.1. 3.AN ACCESSIBLE ROUTE SHALL BE PROVIDED TO THE FACILITY AND TO THE MAIN ENTRANCE. HANDICAP PARKING SHALL COMPLY WITH ANSI A117.1. VAN ACCESSIBLE PARKING SHALL HAVE A MINIMUM OF 11' WIDTH WITH 5' UNLOADING AREA OR A MINIMUM OF 8' UNLOADING AREA WITH AN 8' WIDTH. MAXIMUM 2% SLOPE REQUIRED FOR PARKING AND UNLOADING. MAXIMUM THRESHOLD AT DOOR SHALL NOT EXCEED ½”. WALKWAYS SHALL NOT EXCEED 5% SLOPE. SLOPES EXCEEDING 5% SHALL BE DESIGNED AS RAMPS. ACCESSIBLE PARKING AND UNLOADING AREA SHALL HAVE A STRIPED AREA LEADING TO ENTRANCE WHEN TRAVELING OVER VEHICULAR. 4.PLEASE NOTE THE REQUIREMENTS IN CHAPTER 17 OF VCC FOR SPECIAL INSPECTION REQUIREMENTS ON THE TYPE OF STRUCTURE (SOILS, CONCRETE, ETC.). U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS0003.dwg PLOTTED: 10/24/2025 7:53 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001 AS NOTED TEAM 07-15-2025 DLFAPPROVED BY DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTPROFFERS CS0003 TOTAL SHEETS 57          10-24-2025 DAVID L. FRANK Lic. No.1061 U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS0003.dwg PLOTTED: 10/24/2025 7:53 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001 AS NOTED TEAM 07-15-2025 DLFAPPROVED BY DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTPROFFERS CS0004 TOTAL SHEETS 57          10-24-2025 DAVID L. FRANK Lic. No.1061 7557 5 4 756757755 751752752 752 753 754 756 750 749 751 752 753745750746747748749750 750 750 748 749751 7 5 1 751 7 5 2 7 5 3 750 749751752753754 75 0 755748 748 74975 1 75 2 75 3 75 4 7567507557477 4 7747 74774874874874975175275375475675675675675675775775875874074074 5 7457507 5 0 75575573973974174174 2 74274 3 743744744746 7467 4 7 747 7477477 4 7 747748748 7 4 8 748 7487 4 8 749 74 9 74 9 74975 1 7517527527 5 3 7537547 5 4 756 7567537 5 3 7 5 4 75475 5 7 5 4 756757750746747748749751752752753753754 754755735 740 745736737 738 739 741742743744746747748 735 740 745 745 736 737 738 739 741 742 743 744 746746747747 747747 748748745 7 4 57507 5 5 7 5 5 755 7557 5 5 74374474 6 746 747 7 4 7 7477 4 8 748 74874974974974 9 7497 5 1752752752753753 7 5 3 7 5 47457 4 4 745 74574574 5 75 0 750 750 750750 750 750 755 760 76074174174274 2743 74 3744 74 4 746746 746 746 746747 7 4 7 7 4 7747747 74874874874 8 7 4 8 748 748748 7487497497 4 9 749 749749 749 749749 7497 4 9 749 749 751 751 75175 1751752752752 752 752 753753 753 754754754 756 756 756 757 757 757 758 758 758 759 759PIN 86-A-80 SHERANDO GREEN LLC INST# 230004459 19.93 AC ZONE B2 IRF IRF IRF IRF IRF IRF CAP IRF IRF IPF IRF IPF FH 92SHEDSIGN CG-6 EOP EOPCG-6CG-6EOPCG-6CG-6CG-6CG-6PIN 86-A-80 SHERANDO GREEN LLC INST# 230004459 19.93 AC ZONE B2 LOT 6 2 LOT 6 3 LOT 6 4 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 2 LOT 6 3 LOT 70 LOT 71 LOT 72 LOT 73 LOT 7 4 LOT 7 5 LOT 7 6 LOT 7 7 LOT 6 4 LOT 1 LOT 9 3 S 06° 10 ' 25 " E 148 .51 'C14C15L19C16L20 C17 N 61° 1 7 ' 0 8 " W 3 5 2 . 3 3 ' L25 EX. 4" GAS10+0011+0010+0011+00BER K E L E Y S T . 0+50 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+ 0 0 29+00 29+79PI 18+24.83PC 27+39.98PT 28+10.78PC 28+16.63PT 28+84.39L23 300' R 300' RL24L22L21S 61° 2 5 ' 2 9 " E 1 6 2 . 3 7 ' L26C1 8C19C13 L15 C12C18 N 61° 1 7 ' 0 8 " W 2 8 1 . 3 7 'ROWFAIRFAX PIKE RT-277 SHREWSBURY WAYFAIRFAX PIKE RT-277 WARRIOR DR.RTE-719FAIRFAX PIKE RT-277 ROW ROW ROW ROW GS-11 SHLD (8')S. WARRIOR DR.LOCAL ROADLEXINGTON CT.GS-11 SHLD (8')GS-11 SHLD (8')GS-11 SHLD (8')MS-1AMS-1A90'R100'R CG-6 14 21 22 13 24A 2324 25 14A 115 C5A 113 23A 131 116 112 114 102 301A C6A C3A C6 C5 C3 C4A 103 C4 100B 300 101 EX13 F94 13A 45A 100A F93 F98 F96 F97 100C F44 30" HERCP15" H D P E 24" HDPE 24" RCP CL I I I 15" HDP E30" HDPE15" HDPE18" HDPE 24" HDPE24" HDPE24" HDPE 15" HDPE 30" HDPE30" HDPE30" HDPE2 4 " R C P C L I I I15" RCP CL III15" HDPE 15" HDPE 15" HDPE15" HDPE2 4 " R C P C L I I I 23" x 14" HERCP 15" H D P E 18" H D P E 15" HDPE18" H D P E 15 " R C P C L I I I 15" RCP CL III4" D I P24" HDPE15" RCP CL III15" HDPEFHFH WSR=400.00' JB-S1 JB-S1 JB-S2 JB-S4 JB-S3 JB-S1 JB-S2 JB - S 4JB-S2JB-S1 SWITCH GEARSWITCH GEARJBOX JBOX JBOX JB-S2 JB-S4 B2 ZONING RA ZONING U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS1000.dwg PLOTTED: 10/24/2025 7:56 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001 AS NOTED TEAM 07-15-2025 DLFAPPROVED BY DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100' GRAPHIC SCALE 1"=50' APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTEXISTING CONDITIONS CS1000 TOTAL SHEETS 57 NORTH         10-24-2025 DAVID L. FRANK Lic. No.1061 U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS2000.dwg PLOTTED: 10/24/2025 7:56 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001 AS NOTED TEAM 07-15-2025 DLFAPPROVED BY DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTEROSION AND SEDIMENT CONTROL NARRATIVE CS2000 TOTAL SHEETS 57          10-24-2025 DAVID L. FRANK Lic. No.1061 Erosion and Sediment Control Narrative Project Description The proposed project site is in The Town of Stephens City, located in Frederick County, Virginia within the Opequon Magisterial District. This site is located east of interstate 81 and south of Fairfax Pike (RT 277). Public right-of-way frontage (Shrewsbury Way) borders the property along the west side and is also accessible on the north, south and east (Fairfax Pike, Berkeley Street and Warrior Drive respectively). The property identification number for this project is 86-A-80 and it is currently zoned B2. This project proposes a 50,800 sf grocery store and an 8,000 sf retail building. Associated improvements include a parking lot, access drives, storm drains, grading, water & sanitary sewer, lighting and landscaping. The approximate disturbed area for this project is 17.95 acres. Existing Site Conditions Slopes range from approximately 2% to 20% and the site generally drains from north to south. There is approximately a 22' difference in elevation between the highest (elev.≈ 762) and lowest (elev.≈ 740) points. The site is wooded / scrub shrub and fields. Adjacent Property The project is bisected by Shrewsbury Way and bound by Fairfax Pike to the north, Berkeley Street to the south, Warrior Drive to the east and WEC 97A-22 Investment Trust on the west. Offsite Areas: Off-site areas associated with this project include utility extensions in public roads. Stockpile Areas The stockpiles will have to be kept out of the proposed grading area and to stay clear of all construction activity. Stockpiles will be stabilized with temporary vegetation and protected with silt fence to prevent soil loss and sediment transport from the stockpiles. Soils See this sheet for an Overall Soils Map, HSG Group Classifications and a Map Unit Legend. (SL - USDA Web Soils Survey). The Physical propoerties of each soil type are summarized also. A Complete NRCS Soils Report is included with the "SWM Data Package". Geology Martinsburg Formation underlies the project site. Critical areas Critical areas include 2:1 cut slopes onsite. No wetlands exist on site. Erosion and sediment control measures Unless otherwise indicated, all vegetative and structural erosion and sediment control measures shall be constructed and maintained according to the minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook. Structural Measures The Sediment Basin, Sediment Traps, sediment barriers and other measures shown on the plans intended to trap sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional before upslope land disturbance takes place. Every effort shall be made to prevent silt from running off the site during construction. Temporary seeding (3.31) and/or permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater) and as needed to stabilize disturbed areas. Phase I: A Construction Entrance (3.02) shall be installed at the location shown on the Phase I plan to prevent mud and debris from being tracked onto roadways. Install Silt Fence (3.05) and Super Silt Fence as shown on the plans to intercept and detain small amounts of runoff from disturbed areas during construction in order to prevent sediment from leaving the site. Install temporary Sediment Basins (3.14) as a Phase 1A control measure prior to clearing the site. It shall detain sediment-laden runoff from disturbed areas in "wet" and "dry" storage for the required 6 hour draw down time, allowing suspended sediments to "settle out" prior to leaving the site. Install Diversion Dikes (3.09) as shown on plans to divert surface runoff away from work areas and contain onsite runoff to erosion and sediment control practices. Install a Diversion (3.12) as shown on plans to divert surface runoff around site. Outlet Protection (3.18) shall be placed on the outlets of all storm sewer pipes and culverts to reduce erosion, undercutting and velocities. Block & gravel Curb Inlet Protection sediment filters (3.07-8) shall be installed as shown on the plans to prevent sediment from entering the existing storm system. Culvert Inlet Protection (3.08) shall be installed as shown on the plans to prevent sediment from entering the existing storm system. Roughen surface of slopes 3:1 or greater maximum 2:1 slope. (3.29) in preparation for temporary or permanent seeding. Temporary seeding (3.31) and/or permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater) and all other disturbed areas to stabilize disturbed areas. Install Dust Control Measures (3.39) to prevent surface and air movement of dust. Phase II: All controls installed in Phase I shall remain until the area they support site is stabilized. Install Check Dams (3.20) to reduce velocity of concentrated water flows. Convert Sediment Basin 1 and 4 to permanent swm facilities with the sediment control inspectors approval. Permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater) and as needed to stabilize disturbed areas. Soil Stabilization Blankets and Matting (3.36) shall be placed on all disturbed slopes 4:1 or steeper Vegetative Measures Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven (7) days to denuded areas that may not be at final grade but will remain dormant for longer than fourteen (14) days. Permanent soil stabilization shall be applied to all areas that are to be left dormant for more than six (6) months. Soil that has been stockpiled shall be surrounded with silt fence and protected by mulch and/or temporary vegetation immediately after grading. All earth berms, dams, dikes, diversions and Sediment Trap embankments are to be machine-compacted, immediately seeded and mulched (hay mulch or straw) for temporary and/or permanent vegetative cover within five (5) days after grading. Management Strategies Construction shall be sequenced such that grading operations will begin and end as quickly as possible. The site superintendent shall be responsible for the installation and maintenance of all erosion and sediment control measures. Maintenance of these measures throughout the project are critical to the effectiveness of the program. After areas above controls have been stabilized, the controls shall be cleaned up and removed at the direction of the Frederick County inspector. All cut and fill slopes are to be seeded and mulched within five (5) days of completion of grading. Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. Erosion and Sediment Control Narrative (Continued) Management Strategies (Continiued) Drainage swales shall be stabilized with check dams until vegetation has been well established, at which time the check dams shall be removed. Concentrated runoff shall not flow down cut or fill slopes unless contained within a temporary or permanent channel, flume, or slope drain structure. Whenever water seeps from a slope face, drainage or other protection shall be provided. All storm sewer inlets that are made operable during construction shall be protected so that sediment-laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soils areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. Devices listed above are considered minimum erosion and sediment controls. Additional control measures may be necessary due to contractor phasing or other unforeseen conditions. It is the contractor's responsibility to provide additional measures to those shown, as needed, in order to control erosion and contain sediment on site. All measures shall be installed according to the standards and specifications in the Virginia Erosion and Sediment Control Handbook (VESCH). Any changes made to this plan must be resubmitted for approval without exception. Maintenance All control measures shall be inspected daily by the site superintendent or his representative and within 24 hours after any storm event greater than 0.5 inches of rain per 24 hour period. Any damaged structural measures are to be repaired by the end of the day. Seeded areas shall be checked regularly to ensure that a good stand of grass is maintained. All areas shall be fertilized and reseeded as needed until grass is established. Trapped sediment is to be removed as required to maintain 50% trap efficiency and disposed of by spreading on site. Gravel outlets shall be checked regularly for sediment build-up. If the gravel outlet is clogged by sediment, it shall be removed and cleaned or replaced immediately. The contractor is responsible for keeping existing public roads in a clean, dust and mud free, condition at all times. Permanent Stabilization All areas disturbed by construction shall be stabilized with permanent seeding immediately following final grading. Seeding shall be done according to standard and specification no. 3.32 of the VESCH. Permanent stabilization is defined as 90% uniform coverage on the entire site, ability to inhibit erosion and mature enough to survive, including 2-3 inch cuttings. Phases of Land Disturbance Activities 1.Mandatory pre-construction conference shall be scheduled as required by regulations. 2.Clearing and grubbing for sediment control devices only. 3.Installation of all Phase I erosion & sediment control devices. 4.Obtain county inspector approval. 5.Clear site. 6.Restoration and stabilization of disturbed areas. 7.Remove all erosion & sediment control measures with the approval of the inspector. Long Term Maintenance and Repair Plan Mowing: all grasses should be mowed at least twice each year. Grasses such as tall fescue should be mowed in early summer after emergence of the heads on cool season grasses. They should be mowed again in the early fall to prevent seeds of annual weeds from maturing. Mowing of legumes such as sericea lespedeza and crown vetch can be permitted to grow on the dam or in any part of the emergency spillway. Liming and fertilizing: the soil should be sampled according to recommended procedures at least once every 4 years. The sample should be tested at a qualified soil testing laboratory. Lime and fertilizer should be applied in accordance with recommendations based on the tests. Replanting and over seeding: if vegetation covers less than 40% of the soil surface, lime, fertilize and seed in accordance with current recommendations for new seeding. If vegetation covers more than 40% but less than 70% of the soil surface, lime fertilize and over seed in accordance with current recommendations. Removing trash and debris: trash, litter and vegetation (other than grass) will be removed as needed (but no less than two times per year) to prevent obstruction to the flow of water, to prevent movement of trash and litter to downstream properties, to maintain the integrity of the structure, to provide an attractive appearance and to minimize water pollution. Removing sediment: soil materials (including clay, silt, sand and gravel) will be removed before the detention pool loses 10% of the designed storage capacity. Sediment disposal: sediment disposal should be in accordance with current procedures for disposal of sediment. Where required by the appropriate authorities, the sediment will be tested for appropriate pollutants at the owner's expense before it is removed from the pond. Repairs: repair slides, slumps and eroded areas promptly and in a workmanlike manner trash racks, pipes, headwalls, etc. Will be maintained, repaired and/or replaced as needed to maintain the integrity of the structure. Exposed metal surfaces will be painted to minimize damage due to rust. Maintenance inspections: the owner will be responsible for inspecting each stormwater management structure after each significant rainfall. Once each year a representative of will jointly inspect each stormwater management structure. Appropriate action will be taken to ensure appropriate maintenance. All maintenance costs will be borne by the owner. Where structures are to be maintained by more than one party, allocation of costs will be in accordance with terms set forth in the maintenance agreement. Keys to locked access points shall be available to personnel upon request. Maintenance records: the landowner, or someone designated by the landowner, shall inspect the detention pond within 24 hours after each rainfall event of one inch or more of rain. The owner or the designee shall keep written records of these inspections. The records shall also include maintenance and repairs performed. Copies of these records shall be provided to the county upon request. The water quality features shall not be modified in any way without prior approval by Frederick County. ·Topsoil shall be spread at a minimum depth of 4". ·Pulverized agricultural limestone shall be incorporated into soil at a rate of 92 lbs. Per 1000 s.f. (2 tons per acre). ·Fertilize with 10-20-10 at a rate of 12 lbs. Per 1000 s.f. (500 lbs. Per acre). Seed mix shall consist of 90% kentucky 31 tall fescue and 10% kentucky bluegrass applied at the rate of 200 lbs. Per acre. Minimum Construction Standards An erosion and sediment control program adopted with this plan must be consistent with the VESCH for 9VAC25-840-40 minimum standards: 1.Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. 2.During construction of the project, soil stock piles and borrow areas shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the project site. 3.A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive and will inhibit erosion. 4.Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional before upslope land disturbance takes place. 5.Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6.Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by the trap or basin. a.The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap shall only control drainage areas less than three acres. b.Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area. The outfall system shall, at a minimum, maintain the structural integrity of the basin during a 100-year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. 7.Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8.Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume or slope drain structure. 9.Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10.All storm sewer inlets that are made operable during construction shall be protected so that sediment-laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11.Before newly constructed stormwater conveyance channels or pipes are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12.When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13.When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular stream crossing constructed of nonerodible material shall be provided. 14.All applicable federal, state and local requirements pertaining to working in or crossing live watercourses shall be met. 15.The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16.Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: a.No more than 500 linear feet of trench may be opened at one time. b.Excavated material shall be placed on the uphill side of trenches. c.Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off-site property. d.Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e.Restabilization shall be accomplished in accordance with this chapter. f.Applicable safety requirements shall be complied with. 17.Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well as to larger land-disturbing activities. 18.All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the VESCP authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. Minimum Construction Standards (Continued) 19.Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency storm of 24-hour duration in accordance with the following standards and criteria. Stream restoration and relocation projects that incorporate natural channel design concepts are not man-made channels and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels: a.Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate natural or man-made receiving channel, pipe or storm sewer system. For those sites where runoff is discharged into a pipe or pipe system, downstream stability analyses at the outfall of the pipe or pipe system shall be performed. b.Adequacy of all channels and pipes shall be verified in the following manner: (1)The applicant shall demonstrate that the total drainage area to the point of analysis within the channel is one hundred times greater than the contributing drainage area of the project in question; or (2)(a) Natural channels shall be analyzed by the use of a two-year storm to verify that stormwater will not overtop channel banks nor cause erosion of channel bed or banks. (b)All previously constructed man-made channels shall be analyzed by the use of a 10-year storm to verify that stormwater will not overtop its banks and by the use of a two-year storm to demonstrate that stormwater will not cause erosion of channel bed or banks; and (c)Pipes and storm sewer systems shall be analyzed by the use of a 10-year storm to verify that stormwater will be contained within the pipe or system. c.If existing natural receiving channels or previously constructed man-made channels or pipes are not adequate, the applicant shall: (1)Improve the channels to a condition where a 10-year storm will not overtop the banks and a two-year storm will not cause erosion to the channel, the bed, or the banks; or (2)Improve the pipe or pipe system to a condition where the 10-year storm is contained within the appurtenances; (3)Develop a site design that will not cause the pre-development peak runoff rate from a two-year storm to increase when runoff outfalls into a natural channel or will not cause the pre-development peak runoff rate from a 10-year storm to increase when runoff outfalls into a man-made channel; or (4)Provide a combination of channel improvement, stormwater detention or other measures which is satisfactory to the VESCP authority to prevent downstream erosion. d.The applicant shall provide evidence of permission to make the improvements. e.All hydrologic analyses shall be based on the existing watershed characteristics and the ultimate development condition of the subject project. f.If the applicant chooses an option that includes stormwater detention, he shall obtain approval from the VESCP of a plan for maintenance of the detention facilities. The plan shall set forth the maintenance requirements of the facility and the person responsible for performing the maintenance. g.Outfall from a detention facility shall be discharged to a receiving channel, and energy dissipators shall be placed at the outfall of all detention facilities as necessary to provide a stabilized transition from the facility to the receiving channel. h.All on-site channels must be verified to be adequate. i.Increased volumes of sheet flows that may cause erosion or sedimentation on adjacent property shall be diverted to a stable outlet, adequate channel, pipe or pipe system, or to a detention facility. j.In applying these stormwater management criteria, individual lots or parcels in a residential, commercial or industrial development shall not be considered to be separate development projects. Instead, the development, as a whole, shall be considered to be a single development project. Hydrologic parameters that reflect the ultimate development condition shall be used in all engineering calculations. k.All measures used to protect properties and waterways shall be employed in a manner which minimizes impacts on the physical, chemical and biological integrity of rivers, streams and other waters of the state. l.Any plan approved prior to July 1, 2014, that provides for stormwater management that addresses any flow rate capacity and velocity requirements for natural or man-made channels shall satisfy the flow rate capacity and velocity requirements for natural or man-made channels if the practices are designed to (i) detain the water quality volume and to release it over 48 hours; (ii) detain and release over a 24-hour period the expected rainfall resulting from the one year, 24-hour storm; and (iii) reduce the allowable peak flow rate resulting from the 1.5, 2, and 10-year, 24-hour storms to a level that is less than or equal to the peak flow rate from the site assuming it was in a good forested condition, achieved through multiplication of the forested peak flow rate by a reduction factor that is equal to the runoff volume from the site when it was in a good forested condition divided by the runoff volume from the site in its proposed condition, and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels as defined in any regulations promulgated pursuant to § 62.1-44.15:54 or 62.1-44.15:65 of the Act. m.For plans approved on and after July 1, 2014, the flow rate capacity and velocity requirements of § 62.1-44.15:52 A of the Act and this subsection shall be satisfied by compliance with water quantity requirements in the Stormwater Management Act (§ 62.1-44.15:24 et seq. of the Code of Virginia) and attendant regulations, unless such land-disturbing activities are in accordance with 9VAC25-870-48 of the Virginia Stormwater Management Program (VSMP) Regulation or are exempt pursuant to subdivision C 7 of § 62.1-44.15:34 of the Act. n.Compliance with the water quantity minimum standards set out in 9VAC25-870-66 of the Virginia Stormwater Management Program (VSMP) Regulation shall be deemed to satisfy the requirements of this subdivision 19. Table C-ECM-13-6 Requirements for Filter Fabric Used with Riprap Physical Property Test Method Requirements Grab Tensile ASTM D4632 250 lbs. Grab Elongation ASTM D4632 15% Trapezoid Tear ASTM D4533 90 lbs. CBR Puncture Resistance ASTM D6241 900 lbs. Apparent Opening Size ASTM D4751 40 U.S. Sieve Table C-SSM-10-6 Suggested and Example Site-Specific Seeding Mixtures for Appalachian/Mountain Area Site Condition Seed Mix Apply Rate (lbs/ac) Min Care Lawn Commercial or Residential Turf-Type Tall Fescue (90-100%) Improved Perennial Ryegrass* (0-10%) Kentucky Bluegrass * (0-10%) 150 - 200 High-Maintenance Lawn Bluegrass – minimum of three to five varieties from VCIA list for use in Virginia Improved VCIA Turf-Type Tall Fescue 125 150 – 200 General Slope (3H:1V or less) Tall Fescue**** Red Top and/or Hard Fescue White Clover and/or Birdsfoot Trefoil*** Seasonal Nurse Crop ** 50 – 75 10 – 20 10 – 20 30 – 40 General Slope (3H:1V or less) Tall Fescue**** Red Top or Hard Fescue Annual Lespedeza White Clover and/or Birdsfoot Trefoil*** Seasonal Nurse Crop ** 50 – 75 10 – 20 10 – 15 10 – 20 30 – 40 * Perennial ryegrass will germinate faster and at lower soil temperatures than fescue, thereby providing cover and erosion resistance for seedbed. ** Use seasonal nurse crop in accordance with seeding dates as stated below: March 1 through May 15 – annual/cereal rye May 16 through August 15 – foxtail/German millet August 16 through February 28 – annual/cereal rye *** All legume seed must be properly inoculated. Legumes recommended unless periodic N fertilization maintenance intended. Flatpea at 20 lbs/acre may be utilized where warranted. All legume seed must be properly inoculated. Weeping lovegrass may also be included in any slope or low-maintenance mixture during warmer seeding periods; add 10 to 20 lbs/acre in mixes. **** Increase seeding rate if Kentucky 31 is used rather than VCIA/VDOT improved varieties. Note: Seed mixes are suggested and subject to modification based on site-specific conditions by an agronomist or other qualified revegetation professionals. All seed rates expressed as PLS (Pure Live Seed; see Table C-SSM-10-9). IRF IRF IRF IRF IRF IRF CAP IRF IRF IPF IRF IPF FH 92SHEDSIGN CG-6 EOP EOPCG-6CG-6EOPCG-6CG-6CG-6CG-6LOT 6 2 LOT 6 3 LOT 6 4 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 2 LOT 6 3 LOT 70 LOT 71 LOT 72 LOT 73 LOT 7 4 LOT 7 5 LOT 7 6 LOT 7 7 LOT 6 4 LOT 1 LOT 9 3 S 06° 10 ' 25 " E 148 .51 'C14C15L19C16L20 C17 N 61° 1 7 ' 0 8 " W 3 5 2 . 3 3 ' L25 EX. 4" GASBER K E L E Y S T . 0+50 L23L24 L22 L21S 61° 2 5 ' 2 9 " E 1 6 2 . 3 7 ' L26C1 8C19C13 L15 C12C18 N 61° 1 7 ' 0 8 " W 2 8 1 . 3 7 'ROWFAIRFAX PIKE RT-277 SHREWSBURY WAYFAIRFAX PIKE RT-277 WARRIOR DR.RTE-719FAIRFAX PIKE RT-277 ROW ROW ROW ROW S. WARRIOR DR.LOCAL ROADLEXINGTON CT.14 21 22 13 24A 2324 25 14A 115 C5A 113 23A 131 116 112 114 102 301A C6A C3A C6 C5 C3 C4A 103 C4 100B 300 101 EX13 F94 13A 45A 100A F93 F98 F96 F97 100C F44 FHFH WSJB-S1 JB-S1 JB-S2 JB-S4 JB-S3 JB-S1 JB-S2 JB - S 4JB-S2JB-S1 SWITCH GEARSWITCH GEARJBOX JBOX JBOX JB-S2 JB-S4 750 748748 748 748 752 752 740 750 74 2744746748752 754 756 75 6750748748752754756758746 750748752754 7547507507507487487487527527527547547 5 4 754754 75475 6756 740 740740 750 750 736 736738 738742 742 742744 744 744746 746 746746748748 748748750756 7547 5 4 7 5 4 756756758TO SB-3 TOTAL AREA = 4.64 AC. 756 7547 5 4 7 5 4 756756758750 748748 748 748 752 752 740 750 74 2744746748752 754 756 75 6750748748752754756758746 750748752754 7547507507507487487487527527527547547 5 4 754754 75475 6756750 75 0 750 744744746 746 748748 75 2 752754 75 4 750750 750 750 746 746 7 4 6 746 748748748748748 748748 748748 748 752 754 756 756 758758 7 5 4 754754756740750742744746748748 7 4 8 748 7 4 8752 744750752754754754750 744 746 748 752 744 746 DEMOLISH WEIR & ABANDON STR C6 - C6A IN PLACE MAINTAIN EX DIVERSION TO SB 3 MAINTAIN EX DIVERSION TO SB 3 MAINTAIN EX PERIMETER CHANNEL TO SB 1 MAINTAIN EX PERIMETER CHANNEL TO SB 1 TO SB-1 TOTAL AREA = 11.47 AC. TS DC DC IP IP OP SB3 SB1 DC TS TS IP IP IP IP IP IP IP IP OP OP OP IP IP DC TS CE SF SF SF SF SF PHASE I PERIMETER CONTROL NOTES: LAND BAY A WAS MASS GRADED PER THE "SHERANDO GREEN PIP" PLAN, ESTABLISHING THE EXISTING CONDITION FOR THIS PHASE I E&S PLAN. THE EXISTING GRADE PROVIDES PERIMETER CONTROL FOR FURTHER DEVELOPMENT ACROSS LAND BAY A. THE WET POND TO BE CONSTRUCTED PER THE "SHERANDO GREEN PIP" PLAN MUST CONTINUE TO FUNCTION AS A SEDIMENT BASIN (SB 1), UNTIL ALL AREAS WITHIN IN ITS CONTRIBUTING DRAINAGE AREA HAVE BEEN CONSTRUCTED AND STABILIZED. MAINTAIN SEDIMENT BASIN 3 PER THE "SHERANDO GREEN PIP" PLAN. LOD LOD LOD LOD LOD LOD PER COMMON PLAN OF DEVELOPMENT (TYP) DISTURBED AREA PER THIS SITE PLAN (TYP) DISTURBED AREA PER THIS SITE PLAN (TYP) DISTURBED AREA PER THIS SITE PLAN (TYP) DISTURBED AREA PER THIS SITE PLAN (TYP) LOD LOD PER COMMON PLAN OF DEVELOPMENT (TYP) LOD LOD PER COMMON PLAN OF DEVELOPMENT (TYP) LOD LOD PER COMMON PLAN OF DEVELOPMENT (TYP) LOD LOD PER COMMON PLAN OF DEVELOPMENT (TYP)U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS2100.dwg PLOTTED: 10/24/2025 7:58 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001 AS NOTED TEAM 07-15-2025 DLFAPPROVED BY DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100' GRAPHIC SCALE 1"=50' APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTEROSION AND SEDIMENT CONTROL PLAN PHASE I CS2100 TOTAL SHEETS 57 NORTH         10-24-2025 DAVID L. FRANK Lic. No.1061 3.02 TEMPORARY STONE CONSTRUCTION ENTRANCE CE LIMITS OF DISTURBANCE LOD EROSION AND SEDIMENT CONTROL LEGEND NO.TITLE KEY SYMBOL 3.31 TEMPORARY SEEDING TS TS 3.14 TEMPORARY SEDIMENT BASIN SB SB 3.29 SURFACE ROUGHENING SR SR 3.09 TEMPORARY DIVERSION DIKE DD DD 3.07 STORM DRAIN INLET PROTECTION IP 3.18 OUTLET PROTECTION OP 3.39 DUST CONTROL DC DC 7557 5 4 756757755 751752752 752 753 754 756 750 749 751 752 753745750746747748749750 750 750 748 749751 7 5 1 751 7 5 2 7 5 3 750 749751752753754 75 0 755748 748 74975 1 75 2 75 3 75 4 7567507557477 4 7747 74774874874874975175275375475675675675675675775775875874074074 5 7457507 5 0 75575573973974174174 2 74274 3 743744744746 7467 4 7 747 7477477 4 7 747748748 7 4 8 748 7487 4 8 749 74 9 74 9 74975 1 7517527527 5 3 7537547 5 4 756 7567537 5 3 7 5 4 75475 5 7 5 4 756757750746747748749751752752753753754 754755735 740 745736737 738 739 741742743744746747748 735 740 745 745 736 737 738 739 741 742 743 744 746746747747 747747 748748745 7 4 57507 5 5 7 5 5 755 7557 5 5 74374474 6 746 747 7 4 7 7477 4 8 748 74874974974974 9 7497 5 1752752752753753 7 5 3 7 5 47457 4 4 745 74574574 5 75 0 750 750 750750 750 750 755 760 76074174174274 2743 74 3744 74 4 746746 746 746 746747 7 4 7 7 4 7747747 74874874874 8 7 4 8 748 748748 7487497497 4 9 749 749749 749 749749 7497 4 9 749 749 751 751 75175 1751752752752 752 752 753753 753 754754754 756 756 756 757 757 757 758 758 758 759 759IRF IRF IRF IRF IRF IRF CAP IRF IRF IPF IRF IPF FH 92SHEDSIGN CG-6 EOP EOPCG-6CG-6EOPCG-6CG-6CG-6CG-6LOT 6 2 LOT 6 3 LOT 6 4 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 2 LOT 6 3 LOT 70 LOT 71 LOT 72 LOT 73 LOT 7 4 LOT 7 5 LOT 7 6 LOT 7 7 LOT 6 4 LOT 1 LOT 9 3 EX. 4" GAS10+0011+0010+0011+00BER K E L E Y S T . 0+5010+0011+0015+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+ 0 0 29+00 29+79PI 18+24.83PC 27+39.98PT 28+10.78PC 28+16.63PT 28+84.39300' R 300' RROWFAIRFAX PIKE RT-277 SHREWSBURY WAYFAIRFAX PIKE RT-277 WARRIOR DR.RTE-719FAIRFAX PIKE RT-277 ROW ROW ROW ROW S. WARRIOR DR.LOCAL ROADLEXINGTON CT.90'R100'R 14 21 22 13 24A 2324 25 14A 115 113 23A 131 116 112 114 102 301A C3A C3 C4A 103 C4 100B 300 101 EX13 F94 13A 45A 100A F93 F98 F96 F97 100C F44 30" HERCP15" H D P E 24" HDPE 24" RCP CL I I I 15" HDP E30" HDPE15" HDPE18" HDPE 24" HDPE24" HDPE24" HDPE 15" HDPE 30" HDPE30" HDPE30" HDPE2 4 " R C P C L I I I15" RCP CL III15" HDPE 15" HDPE 15" HDPE15" HDPE2 4 " R C P C L I I I 23" x 14" HERCP 15" H D P E 18" H D P E 15" HDPE18" H D P E 15 " R C P C L I I I 15" RCP CL III4" D I P24" HDPE15" RCP CL III15" HDPEFHFH WSJB-S1 JB-S1 JB-S2 JB-S4 JB-S3 JB-S1 JB-S2 JB - S 4JB-S2JB-S1 SWITCH GEARSWITCH GEARJBOX JBOX JBOX JB-S2 JB-S4 B2 ZONING RA ZONING 125 RETAIL 8,000 SF SPRINKLERED FF=751.50 (NAVD 88) PROTOTYPE 50 GROCERY STORE 50,800 SF DRIVE-THRU PHARMACY WELL CONDITION (FLIPPED) SPRINKLERED FF=751.50 (NAVD 88) PYLON SIGN A WITHIN OUTPARCEL 1 (SIGN PERMIT REQ.) 209 252 262 254 253 208 211 210 142 124 231207 141 206 221 123 127 205 122 114R 204 15" HDPE18" HDPE15" HDPE24" H D P E 15" HDPE 15" HDPE15" HDPE 24" HDPE24" HDPE24" HDPE 24" HDPE15" HDPE18" HDPE18 " H D P E 18" HDPE18" HDPE 18" HDPE 24" HDPE24" HDPE15" HDPEPYLON SIGN B WITHIN PHASE II TRACT NORTH (SIGN PERMIT REQ.) 24" HDPE MONUMENT SIGN A (SIGN PERMIT REQ.) 115R 126 207A 261 263 264 255 241 212 18" HDPE18 " H D P E 15" HDPE15" HDPE232 15" H D P E 251 11B 11C 10B CHAIRMANWAYOZZIE L A N E PUBLIX WAY 15" HDPE18" HD P E 18" HDPE15" HDPE18" HDPE 18" HDPE 304R 2 4 " H D P E 15" HDPE IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP OP OP PS PS PS PS PS PS PS PS PS PS 45 50 HP IP 49 88 HP TO EX STR 45A DA = 0.23 Ac. TO STR 241 DA = 0.52 Ac.TO STR 124 DA = 0.47 Ac. TO STR 125 DA = 0.29 Ac. TO STR 123 DA = 0.39 Ac. TO STR 232 DA = 0.29 Ac. TO STR 127 DA = 0.41 Ac. TO STR 141 DA = 0.33 Ac. TO STR 142 DA = 0.28 Ac. TO STR 115R DA = 0.56 Ac. IP IP IP IP IP IP IP IP OP IP OP TO STR 212 DA = 0.31 Ac. TO STR 255 DA = 0.78 Ac. TO STR 263 DA = 0.58 Ac. TO STR 304R DA = 1.62 Ac. TO STR 204 DA = 0.48 Ac. TO STR 205 DA = 0.18 Ac. TO EX STR 302 DA = 0.20 Ac. TO STR 206 DA = 0.31 Ac. TO STR 231 DA = 0.16 Ac. TO STR 207 DA = 0.15 Ac.TO STR 221DA = 0.11 Ac.TO STR 208DA = 0.08 Ac.TO STR 210DA = 0.06 Ac.TO STR 207A DA = 0.44 Ac. TO STR 209 DA = 0.01 Ac. TO STR 122 DA = 0.71 Ac. TO STR 114R DA = 0.22 Ac. TO STR EX 112 DA = 0.08 Ac. TO ROOF LEADERS DA = 1.36 Ac.TO STR 211DA = 0.07 Ac.TO STR 252DA = 0.08 Ac.TO STR 2 6 4 DA = 0.12 A c . TO STR 2 6 2 DA = 0.14 A c . TO SUMP PUMP DA = 0.06 Ac.TO ST R EX 113 DA = 0.10 Ac.TO STR EX131DA = 0.10 Ac.TO STR EX116DA = 0.34 Ac.TO STR 11C DA = 1.18 Ac. TO FLUME DA = 0.26 Ac. TO FLUME DA = 0.16 Ac. TO FLUME DA = 0.20 Ac. TO EX WET POND DA = 1.38 Ac. TO E X S T R 9 8 DA = 0 . 5 2 A c . TO E X S T R 9 7 DA = 0 . 4 8 A c . TO E X S T R 2 0 3 DA = 0 . 2 3 A c . TO EX STR 103 DA = 0.23 Ac. TO EX STR 13A DA = 0.38 Ac.TO EX STR 96DA = 0.20 Ac.TO EX STR 93DA = 0.10 Ac.TO STR C4A DA = 1.88 Ac. TO STR C3A DA = 0.81 Ac. TO EX STR 202 DA = 0.17 Ac. TO EX STR 303 DA = 0.28 Ac. TO STR 254 DA = 0.27 Ac. TO STR 253 DA = 0.28 Ac. TO STR 10B DA = 1.46 Ac. TO STR EX23 DA = 0.39 Ac.TO STR EX23ADA = 0.09 Ac.TO STR EX22 DA = 0.06 Ac. TO STR EX21 DA = 0.07 Ac. TO STR EX12 DA = 0.36 Ac. TO STR EX13 DA = 0.34 Ac. TO STR EX11 DA = 0.12 Ac. TO STR EX10 DA = 0.25 Ac. TO STR EX402 DA = 0.12 Ac. TO STR EX9 DA = 0.23 Ac. TO STR EX8 DA = 0.25 Ac. TO STR EX8B DA = 0.30 Ac. TO STR EX11A DA = 0.17 Ac. TO STR EX43 DA = 0.42 Ac. TO STR EX24 DA = 0.23 Ac. TO STR EX24A DA = 0.56 Ac. TO STR EX44 DA = 0.25 Ac.7507 5 0 750750750749749751751 750750755 751752 7 5 3 75 4 7507507507 5 0 7507507507507 5 0 750 750749749751751750750 75 0 75 0750 75075 0 75 0 75 0750 750751751 751751751 7 5 1 75 1 751 751751752752 752 752 75 2 752 7527527 5 3 7 5 3 752 752752752 751 751751 752 752 752 752752 753 753 753 753 753 754 754 754 752752 752753 753 753753 754754 750 750750748 7 4 8 749 7497 4 9751751 751752752 753753 75475 4 7 5 0 7507507507507 5 0 74974 9 751751751751751 752752753 753 7 5 3 753 75 3 754 75 4 754 75 4 7547 5 4 750 750 749 749750750 750 75 1 751751 751 751 752 752752 753750 755 755 751752 753753 753 754 7 5 4 754 750 751752753753750750 750750 750 7 5 0 748 7487497497497 4 9 749 749 75 1 751 751 75 1751 751752752 752 752 752752753753 75375 3 7 5 3 753 753753753 753754750 750751 75 1 750 750 750 749 749750748749750 748 749 748 748 74 9 7 5 0 750750 754 75 5 755 752752 752 752 7 5 3 753 754 7 5 4 7 5 4755 75075075 0 7 5 1 7517517 5 2 7 5 3 750749749751752753754748748 748 748 749749 749 747 748749 749 748 748 748 748 748 749 7487487497497497 4 9 747 747748749 LOD LOD LOD LOD LOD LOD PER COMMON PLAN OF DEVELOPMENT (TYP) DISTURBED AREA PER THIS SITE PLAN (TYP) DISTURBED AREA PER THIS SITE PLAN (TYP) DISTURBED AREA PER THIS SITE PLAN (TYP) DISTURBED AREA PER THIS SITE PLAN (TYP) LOD LOD PER COMMON PLAN OF DEVELOPMENT (TYP) LOD LOD PER COMMON PLAN OF DEVELOPMENT (TYP) LOD LOD PER COMMON PLAN OF DEVELOPMENT (TYP) LOD LOD PER COMMON PLAN OF DEVELOPMENT (TYP)U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS2200.dwg PLOTTED: 10/24/2025 8:03 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001 AS NOTED TEAM 07-15-2025 DLFAPPROVED BY DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100' GRAPHIC SCALE 1"=50' APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTEROSION AND SEDIMENT CONTROL PLAN PHASE II CS2200 TOTAL SHEETS 57 NORTH         10-24-2025 DAVID L. FRANK Lic. No.1061 3.02 TEMPORARY STONE CONSTRUCTION ENTRANCE CE DRAINAGE DIVIDES EROSION AND SEDIMENT CONTROL LEGEND NO.TITLE KEY SYMBOL 3.07 STORM DRAIN INLET PROTECTION IP 3.18 OUTLET PROTECTION OP LIMITS OF DISTURBANCE LOD 7547557 5 4 756757755 751752752 752 753 754 756 750 749 751 752 753745750746747748749750 750 750749 751 7 5 1 751 7 5 2 7 5 3 74074074 5 7457507 5 0 75575573973974174174 2 7427 43 743744744746 7467 4 7 747 7477477 4 7 747748748 7 4 8 748 7487 4 8 749 74 9 74 9 74975 1 7517527527 5 3 7537547 5 4 7567577537 5 3 7 5 4 75475 5 7 5 3 7 5 4 756757750746747748749751752752753753754 754755735 740 745736737 738 739 741742743744746747748 735 740 745 745 736 737 738 739 741 742 743 744 746746747747 747747 748748745 7 4 57507 5 5 7 5 5 755 7557 5 5 74374474 6 746 747 7 4 7 7477 4 8 748 74874974974974 9 7497 5 1752752752753753 7 5 3 7 5 4 745 74574574 5 75 0 750 750 750750 750 750 755 760 76074174174274 2743 74 3744 74 4 746746 746 746 746747 7 4 7 7 4 7747747 74874874874 8 7 4 8 748 748748 7487497497 4 9 749 749749 749 749749 7497 4 9 749 749 751 751 75175 175175 2752752 752 752 753753 753 754754754 756 756 756 757 757 757 758 758 758 758 759 759IRF IRF IRF IRF IRF IRF FH 92SHEDCG-6PIN 86-A-80 SHERANDO GREEN LLC INST# 230004459 19.93 AC ZONE B2 LOT 6 2 LOT 6 3 LOT 6 4 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 2 LOT 6 3 LOT 70 LOT 71 LOT 72 LOT 73 LOT 7 4 LOT 7 5 LOT 7 6 LOT 7 7 LOT 6 4 LOT 1 LOT 9 3 S 06° 10 ' 25 " E 148 .51 'C14C15L19C16L20 C17 N 61° 1 7 ' 0 8 " W 3 5 2 . 3 3 ' L25 EX. 4" GAS10+0011+0010+0011+00BER K E L E Y S T . 0+5010+0011+00L23 L24L22 L21S 61° 2 5 ' 2 9 " E 1 6 2 . 3 7 ' L26C1 8C19C13 L15 C12C18 N 61° 1 7 ' 0 8 " W 2 8 1 . 3 7 'ROWSHREWSBURY WAYROW ROW ROW ROW S. WARRIOR DR.MS-1AMS-1A90'R100'RFHFH WSR=400.00' JB-S1 JB-S1 JB-S2 JB-S4 JB-S3 JB-S1 JB-S2 JB - S 4JB-S2JB-S1 SWITCH GEARSWITCH GEARJBOX JBOX JBOX JB-S2 JB-S4 B2 ZONING RA ZONING CE COMPACTED ALL WEATHER TRUCK ROUTE COMPACTED CONSTRUCTION STAGING AREA (15' MIN FROM BLDG)15'CE WB-67 - Interstate Semi-TrailerTO TEMP CULVERT XING (3 TO 4) DA = 4.21 AC. C = 0.85 I10 = 6.49 Tc = 5 Mins 23.22 CFS 40' TE M P GRAV E L ENTR A N C E 755 754753752 751 40' TE M P GRAV E L ENTR A N C E 7 5 0 7 4 9 7 4 8 745745741743751 75 0 749 748 750 746 745 744 747 743 742745740170' OF 30" HDPE @ 1.00%740.80 INV 739.10 INV 95' OF 30" HDPE @ 1.00% 742.00 INV 742.95 INV TO TEMP CULVERT XING (1 TO 2) DA = 2.10 AC. (6.31 AC TOTAL) C = 0.85 I10 = 6.49 Tc = 5 Mins 34.81 CFS 4 3 1 2 741 740739 738 737 LOD LOD LOD LOD LOD LOD LOD LOD LOD U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS2300.dwg PLOTTED: 10/24/2025 8:06 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001 AS NOTED TEAM 07-15-2025 DLFAPPROVED BY DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100' GRAPHIC SCALE 1"=50' APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTTEMPORARY ACCESS AND STAGING PLAN CS2300 TOTAL SHEETS 57 NORTH         10-24-2025 DAVID L. FRANK Lic. No.1061 NOTES: 1. THIS ROAD IS TO BE MAINTAINED UNTIL SUCH TIME AS PERMANENT ACCESS IS AVAILABLE. 2. CONTRACTOR IS RESPONSIBLE TO PROVIDE TEMPORARY/PERMANENT STABILIZATION, STAGING AREAS, AND MAINTENANCE OF TRAFFIC IN ANY OTHER AREAS DEEMED NECESSARY TO COMPLETE WORK, BUT NOT SPECIFICALLY DEPICTED ON THE TEMPORARY SITE ACCESS AND STAGING PLAN. ALL WEATHER TRUCK ROUTE NTS COMPACTED SUBGRADE 12" STONE (# 3) 12" STONE (# 57) U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS2500.dwg PLOTTED: 10/24/2025 8:06 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001 AS NOTED TEAM 07-15-2025 DLFAPPROVED BY DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTEROSION AND SEDIMENT CONTROL DETAILS CS2500 TOTAL SHEETS 57          10-24-2025 DAVID L. FRANK Lic. No.1061 U:\Accounts\SEGAL\SEGAL23001 - Sherando Green Infrastructure\DESIGN\_SHEETS\SP_LB-A\CS2500.dwg PLOTTED: 10/24/2025 8:06 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSSEGAL24001 AS NOTED TEAM 07-15-2025 DLFAPPROVED BY DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN #27-25 SHERANDO GREEN LLC605 SOUTH EDEN ST. - SUITE 200 | BALTIMORE, MD. 21231SHERANDO GREENTM# 86-A-80SITE DEVELOPMENT PLAN - LAND BAY A606 FAIRFAX PK. | STEPHENS CITY, VA. 22655OPEQUON DISTRICTEROSION AND SEDIMENT CONTROL DETAILS CS2501 TOTAL SHEETS 57          10-24-2025 DAVID L. FRANK Lic. No.1061 Sediment Trap Key Design Aspects Trap Number ST-1 Type (stone weir/pipe)stone Drainage area 0.60 Ac. Wet Storage Req 41 CY Wet Storage Prov 54 CY (65'x15'x1.5') Dry Storage Req 41 CY Dry Storage Prov Weir Width 4' Pipe Diameter N/A Weir/Pipe Elevations 756.00 Dry Storage Depth 0.50 Embankment Top 757.00 Trap Bottom Ele 754.00 ST-2 stone 1.62 Ac. 109 CY 109 CY 10' N/A 755.90 1.00 756.90 753.40 ST-3 stone 0.56 Ac. 38 CY 38 CY 4' N/A 754.70 0.50 755.70 752.70 45 CY (55'x15'x1.5')125 CY (90'x25'x1.5') Top Width 2'2'2' Cleanout Ele 754.80 754.20 752.1 Wet Storage Depth 1.50 1.50 1.50 97 CY (5,200'x.5')222 CY (6,020'x1.0')75 CY (4,075'x.5')