RE: Site Plan Comments – Jordan Springs Elementary School Expansion
Frederick County, Virginia
Dear Mr. Brzezynski:
Upon review of the site plan dated July 1st, 2025, Frederick County Public Works
recommends approval of the subject plan.
**Effective July 1, 2025, all plans submitted for review will need to comply with the DEQ
VRRM 4.1 and the new stormwater handbook. I have included the link below to access the new
stormwater handbook. The plans and all details must be updated to comply with the new
stormwater handbook requirements.**
https://online.encodeplus.com/regs/deq-va/index.aspx
Sincerely,
Benjamin H. Whitlock Joe C. Wilder
Environmental Program Administrator Director of Public Works
JCW/
cc: Planning and Development
file
From: Spielman, Ryan (VDOT) <Joseph.Spielman@vdot.virginia.gov> Sent: Monday, July 7, 2025 12:57 PM To: Christopher Mulholland; David Frank Cc: Tyler Klein; Amy Feltner; Kayla Peloquin; Funkhouser, Rhonda (VDOT) Subject: Jordan Springs ES - Bldg Expansion -VDOT review Chris, A VDOT review has been conducted for the revision of the Jordan Springs Elementary
School - Building Expansion Site Plan plan dated, July 1, 2025. Based off the review of the
revised drawings, the site plan is approved by our office. · Our review and comments are general in nature . Should details be overlooked
during plan review or conditions in the field exist such that additional measures are
warranted, such measures shall be completed to the satis faction of the
department.
· Materials used and methods of construction s hall adhere to the current observed VDOT Road and Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control Devices, and Land Use Permit Special Provisions. · A preconstruction conference shall be held by the engineer and/or the
developer with the attendance of the contractor, variou s County agencies, utility
companies, and VDOT prior to initiation of work.
· All drainage is to be carried within the rig ht-of-way in ditch lines or gutters
along the street to a pipe or drainage easement.
· Any construction related changes to the approved plan must come through the design engineer to VDOT for approval. Please allo w a minimum of 5 business
days for VDOT review.
· A Land Use Permit shall be obtained before any work is performed on the State’s right-of-way. The permit is issued by this o ffice and may require application
fees, the salary & expenses of a State assigned inspecto r, and surety bond
coverage. · Please submit an electronic copy of the plans to this office for file and permitting. If you have any questions or need further information, please do not hesitate to contact me. Ryan
Joseph Ryan Spielman Land Development Engineer / Edinburg Residency Virginia Department of Transportation 540-535-1829 joseph.spielman@vdot.virginia.gov