Loading...
HomeMy WebLinkAbout25-25 Correspondence(P=ennonim LETTER OF TRANSMITTAL 117 East Piccadilly Street DATE: 12-03-2025 j JOB NO. RRMMX24001 Winchester, VA 22601 TO: Frederick County Tel: 540-667-2139 Dept. of Planning & Development Fax: 540 — 665 - 0493 107 North Kent Street, 2nd Floor Winchester, VA 22601 ATTENTION: Amy Feltner FROM: Dan Brzezynski RE: I Jordan Springs ES — Building Expansion SP#25-25 (Rev 1) WE ARE SENDING YOU ® Attached Via: ❑ Plans ❑ the following items: COPIES DESCRIPTION 2 Set of approved Slip Sheets for SP# 25-25 — Revision #1 1 Revision #1 Summary of Changes Memo THESE ARE TRANSMITTED as checked below: ❑ For Review and Comments ® For Your Approval ❑ For Your Use REMARKS COPY TO RECEIVED BY ❑ As Requested Pennon jl December 3, 2025 Memorandum Frederick County Public Schools Jordan Springs ES - Building Expansion Sub'ect: Revision #1 to Approved Site Plan# 5-25 The building expansion project has gone through a value engineering period which reduced costs where appropriate. As such, some modifications to the approved civil site plan were necessary. These changes have been accepted by the Frederick County Planning Dept (12/3/2025) & at their request are being distributed to you as well. A download link and 2 sets of physical hard copies (slip sheets only) are being sent to the following, as requested by Planning staff. • Frederick County Planning & Zoning Dept. • Frederick County Public Works Dept. • Frederick County Building Inspections Dept. • Frederick County Fire Marshal Below is a summary of changes made to the Civil Site Plan. Changes are clouded and the revision block noted - Significant Change - - Reduction of Building Expansion in Area "C" (Gymnasium) of 483 SF Subsequent adjustments and updates are as follows: • Adjust Bldg. Setback dimension and tabulations • Update Open Space calculations (0.01 Ac) • Update GFA / Floor Area Calculations • FAR calculations are unaffected by 483 SF reduction. • Reduction of Proposed and Total Impervious Area (0.01 Ac.) (SWM unaffected, no changes warranted) • 1 C/O and a Portion of roof drain leader, no longer require demolition. Modifications: • Elimination of awnings at to doorways at Area "C" (Gymnasium) and reduction of associated conc swlk outside doorways • Elimination of concrete "mow strip" along perimeter of building expansions (Areas A, B, C) Elimination of proposed concrete under existing building overhangs (South) • Switch ornamental fencing to chain link fence and removal of associated details. Please contact me should you have any questions or require further information. Sincerely, Dan Brzezynski, PE Pennoni 117 East Piccadilly Street I Winchester, VA 22601 Direct: +1 540-771-2090 www.pennoni.com I DBrzezynski@Pennoni.com 117 East Piccadilly Street T. 540-667-2139 www.pennoni.com Winchester, VA 22601 Page 1 of 1 Amy Feltner From: Adam Hounshell Sent: Wednesday, December 3, 2025 9:28 AM To: Amy Feltner Subject: RE: '[External]'RE: '[External]'RE: '[External]'Jordan Springs Elementary School Expansion (SP#25-25) Slip sheet would be fine. We would have no additional comments for the indicated changes. Lt. Adam Hounshell Assistant Fire Marshal Frederick County Fire & Rescue 1080 Coverstone Dr. Winchester, VA 22602 (540)665-6350 From: Amy Feltner <alight@fcva.us> Sent: Wednesday, December 3, 2025 8:53 AM To: Ben Whitlock <bwhitlock@fcva.us>; Adam Hounshell <ahounshe@fcva.us>; Johnathan Lee <johnathan.lee@fcva.us> Subject: FW: '[External]'RE: '[External]'RE: '[External]'Jordan Springs Elementary School Expansion (SP#25-25) Would the agencies (you) be ok if this was a slip sheet to a site plan? Or would you prefer a minor site plan submittal to provide comments? Below are the modifications to the site. I understand all agencies would need a copy but do you want it treated as a submission to provide comments? Amy From: Christopher Mulholland <,;Mulholland@Pennoni.com> Sent: Tuesday, November 25, 2025 9:40 AM To: Amy Feltner <alight@fcva.us>; Johnathan Lee <iohnathan.lee@fcva.us> Cc: Chris Phillips <cphillips@rrmm.com>; Trevon Beutler <thPutler@rrmm.c >; Dan Brzezynski <DBrzez nski Pennoni.com> Subject: '[External]'RE: '[External]'RE: '[External]'Jordan Springs Elementary School Expansion (SP#25-25) Amy, I've attached clouded slip sheets for SP# 25-25; Revision #1. There's one significant change, and a collection of modifications, all of which are driven by the owner's desire to reduce construction costs for the project. Significant Change: 1. Reduction of Building Expansion in Area "C" (Gymnasium) of 483 SF. Subsequent adjustments and updates are as follows... a. Adjust Bldg. Setback dimension and tabulations b. Update Open Space calculations (0.01 Ac) c. Update GFA / Floor Area Calculations d. FAR calculations unaffected by 483 SF reduction. e. Reduction of Proposed and Total Impervious Area (0.01 Ac.) (SWM unaffected, no changes warranted) f. 1 C/O and a Portion of roof drain leader, no longer require demolition. Modifications: 1. Elimination of awnings at to doorways at Area "C" (Gymnasium) and reduction of associated conc swlk outside doorways 2. Elimination of concrete "mow strip" along perimeter of building expansions (Areas A, B, C) 3. Elimination of proposed concrete under existing building overhangs (South) 4. Switch ornamental fencing to chain link fence and removal of associated details. If these changes are acceptable, please let us know how many sets of slip sheets you'd like for your record sets. I can leave the clouds on or turn them off based on your preference. These changes will be reflected on the Architects submission to the building official next week but will not be clouded in that drawing set. Please call with any questions. Thankyou. Christopher Mulholland Pennoni 117 East Piccadilly Street I Winchester, VA 22601 Direct: +1 540-771-20941 Mobile: +1 540-409-7089 www.pennoni.com I CMulhollandOPennoni,c From: Trevon Beutler <tbeutler@rrmm.com> Sent: Monday, November 24, 2025 8:38 AM To: Amy Feltner <alight@fcva.us>; Dan Brzezynski <DBrzezynski@Pennoni.com>; Johnathan Lee <iohnathan.lee fcva.us> Cc: Christopher Mulholland <CMulholland@Pennoni.com>; Chris Phillips <cphillips@rrmm.com> Subject: RE: '[External]'RE: '[External]'Jordan Springs Elementary School Expansion (SP#25-25) Amy, John, It was not listed as optional or phased in the original plan. This small room has been omitted as part of a cost reduction measure by FCPS since the project received site plan approval. Please advise f this change will require updated drawings for review and how you would like us to proceed. Thanks, Trevon Beutler RRMM ARCHITECTS 28 Church Ave. SW Roanoke, VA 24011 P:540-278-2156 tbeutler@rrmm.com www.rrmm.com From: Amy Feltner <alight@fcva.us> Sent: Friday, November 21, 2025 3:12 PM To: Trevon Beutler <tbeutler@rrmm.com>; Dan Brzezynski <DBrzezynski@Pennoni.com>; Johnathan Lee <iohnathan.lee fcva.us> Cc: Christopher Mulholland <CMulholland@Pennoni.com>; Chris Phillips <cphillips@rrmm.com> Subject: RE: '[External]'RE: '[External]'Jordan Springs Elementary School Expansion (SP#25-25) Was it labeled "optional" or "phased" on the original site plan? Amy From: Trevon Beutler <tbeutler rrmm.com> Sent: Friday, November 21, 2025 3:08 PM To: Amy Feltner <aliRht@fcva.us>; Dan Brzezynski <DBrzezynski@Pen noni.com>; Johnathan Lee <iohnathan.lee@fcva.us> Cc: Christopher Mulholland <CMulholland@Pennoni.com>; Chris Phillips <cphil lips@ rrmm.com> Subject: '[External]'RE: '[External]'Jordan Springs Elementary School Expansion (SP#25-25) Amy, The small external storage room has been omitted. Please advise how you would like us to proceed. Thanks, Trevon Beutler RRMM ARCHITECTS 28 Church Ave. SW Roanoke, VA 24011 P:540-278-2156 tbeutler@rrmrn.com www_rrmm.com From: Amy Feltner <alieht@fcva.us> Sent: Friday, November 21, 2025 3:00 PM To: Dan Brzezynski <DBrzezynski@Pennoni.com>; Johnathan Lee <'ohnathan.lee fcva.us> Cc: Christopher Mulholland <CMulholland Pennoni.com>; Trevon Beutler <tbeutler@rrmm.com> Subject: RE:'[External]'Jordan Springs Elementary School Expansion (SP#25-25) Dan, Can you please clarify what changed on the site plan to warrant a revised plan? Thanks Amy From: Dan Brzezynski <DBrzezynski@Pennoni.com> Sent: Friday, November 21, 2025 2:27 PM To: Johnathan Lee <iohnathan.lee@fcva.us> Cc: Christopher Mulholland <CMulholland Pennoni.com>; Trevon Beutler <tbeutleroa rrmm.com>; Amy Feltner <alight@fcva.us> Subject: '[External]'Jorda n Springs Elementary School Expansion (SP#25-25) Good Afternoon John, I believe you are aware that the Jordan Springs Elementary School Expansion project is currently undergoing a VE process, of which you are expecting a new drawing submittal package shortly. With respect to the Site Plan side of things, none of the proposed VE changes would typically warrant any sort of application for plan revision based on their size or change in land disturbance. I also understand however that the VE changes will result in a site plan package submitted to you as part of the building permit that would not match the approved Site Plan drawings. I'm hoping we could remedy this by simply replacing the effected sheets in the approved site plan or by simply providing the new sheets to the Planning & Zoning Department that they can then add to the County's file. I've copied Amy Feltner on this email as well for her confirmation on the best, most efficient path forward. Please let me know what avenue you think will be best, I know FCPS and this building permit package are on a very tight timeline. Thanks again & have a great weekend. Dan Brzezynski, PE Pennoni 117 East Piccadilly Street I Winchester, VA 22601 Direct: +1 540-771-2090 www.pennoni.com I DBrzezynskiC@Pennoni.com What's Possible Podcast Episode 2 Disclaimer The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. This email has been scanned for viruses and malware, and may have been automatically archived by Mimecast, a leader in email security and cyber resilience. Mimecast integrates email defenses with brand protection, security awareness training, web security, compliance and other essential capabilities. Mimecast helps protect large and small organizations from malicious activity, human error and technology failure; and to lead the movement toward building a more resilient world. To find out more, visit our website. Disclaimer The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. This email has been scanned for viruses and malware, and may have been automatically archived by Mimecast, a leader in email security and cyber resilience. Mimecast integrates email defenses with brand protection, security awareness training, web security, compliance and other essential capabilities. Mimecast helps protect large and small organizations from malicious activity, human error and technology failure; and to lead the movement toward building a more resilient world. To find out more, visit our website. Amy Feltner From: Johnathan Lee Sent: Wednesday, December 3, 2025 10:28 AM To: Amy Feltner, Ben Whitlock; Adam Hounshell Subject: RE: '[External]'RE: '[External]'RE: '[External]'Jordan Springs Elementary School Expansion (SP#25-25) I'm OK with slip sheet for the site plan revision. Johnathan Lee Senior Design Review Specialist From: Amy Feltner <alight@fcva.us> Sent: Wednesday, December 3, 2025 8:53 AM To: Ben Whitlock <bwhitlock@fcva.us>; Adam Hounshell <ahounshe@fcva.us>; Johnathan Lee <johnathan.lee@fcva.us> Subject: FW:'[External]'RE: '[External]'RE: '[External]'Jordan Springs Elementary School Expansion (SP#25-25) Would the agencies (you) be ok if this was a slip sheet to a site plan? Or would you prefer a minor site plan submittal to provide comments? Below are the modifications to the site. I understand all agencies would need a copy but do you want it treated as a submission to provide comments? Amy From: Christopher Mulholland <CMt -)Iland@Pennoni.com> Sent: Tuesday, November 25, 2025 9:40 AM To: Amy Feltner <alight@fcva.us>; Johnathan Lee <iohnathan.lee@fcva.us> Cc: Chris Phillips <cphillips@rrmm.com>; Trevon Beutler <tbeutler@rrmm.cor, >; Dan Brzezynski < )BrzezYr,*i Pennoni.corr> Subject: '[External]'RE: '[External]'RE: '[External]'Jordan Springs Elementary School Expansion (SP#25-25) Amy, I've attached clouded slip sheets for SP# 25-25; Revision #1. There's one significant change, and a collection of modifications, all of which are driven by the owner's desire to reduce construction costs for the project. Significant Change: 1. Reduction of Building Expansion in Area "C" (Gymnasium) of 483 SF. Subsequent adjustments and updates are as follows... a. Adjust Bldg. Setback dimension and tabulations b. Update Open Space calculations (0.01 Ac) c. Update GFA / Floor Area Calculations d. FAR calculations unaffected by 483 SF reduction. e. Reduction of Proposed and Total Impervious Area (0.01 Ac.) (SWM unaffected, no changes warranted) f. 1 C/O and a Portion of roof drain leader, no longer require demolition. Modifications: 1. Elimination of awnings at to doorways at Area "C" (Gymnasium) and reduction of associated conc swlk outside doorways 2. Elimination of concrete "mow strip" along perimeter of building expansions (Areas A, B, C) 3. Elimination of proposed concrete under existing building overhangs (South) 4. Switch ornamental fencing to chain link fence and removal of associated details. If these changes are acceptable, please let us know how many sets of slip sheets you'd like for your record sets. I can leave the clouds on or turn them off based on your preference. These changes will be reflected on the Architects submission to the building official next week but will not be clouded in that drawing set. Please call with any questions. Thankyou. Vnriswpher Mulholland Pennoni 117 East Piccadilly Street I Winchester, VA 22601 Direct: +1 540-771-20941 Mobile: +1 540-409-7089 ww.pennoni.com I CM Iholland Pennoni.com From: Trevon Beutler <tbeutler r > Sent: Monday, November 24, 2025 8:38 AM To: Amy Feltner <alight@fcva.us>; Dan Brzezynski < Brzezynski@Pennoni.com>; Johnathan Lee <johnathan.lee@fcva.us> Cc: Christopher Mulholland <CMulholland(4)Pennoni.c(,—>; Chris Phillips <cphillips@rrmm.com> Subject: RE: '[External]'RE: '[External]'Jordan Springs Elementary School Expansion (SP#25-25) Amy, John, It was not listed as optional or phased in the original plan. This small room has been omitted as part of a cost reduction measure by FCPS since the project received site plan approval. Please advise f this change will require updated drawings for review and how you would like us to proceed. Thanks, Trevon Beutler RRMM ARCHITECTS 28 Church Ave. SW Roanoke, VA 24011 P: 540-278-2156 --jeutler rrmm.com www.rrmm.corsi From: Amy Feltner <alight@fcva.us> Sent: Friday, November 21, 2025 3:12 PM To: Trevon Beutler <tbeutler rrmm.com>; Dan Brzezynski < .:ezynskiO)Pennoni.com>; Johnathan Lee <iohnathan.lee fcva.us> Cc: Christopher Mulholland <CMulholland@Pennoni.com>; Chris Phillips <cphillips@rrmm.com> Subject: RE:'[External]'RE:'[External]'Jordan Springs Elementary School Expansion (SP#25-25) Was it labeled "optional" or "phased" on the original site plan? Amy From: Trevon Beutler <tbeutler@rrmm.com> Sent: Friday, November 21, 2025 3:08 PM To: Amy Feltner <alight@fcva.us>; Dan Brzezynski < )Brzezynski@Pennoni.corr.>; Johnathan Lee <iohnathan.lee@fcva.us> Cc: Christopher Mulholland <CMulholland Pennoni.com>; Chris Phillips <cphillips@rrmm.com> Subject: '[External]'RE: '[External]'Jordan Springs Elementary School Expansion (SP#25-25) Amy, The small external storage room has been omitted. Please advise how you would like us to proceed. Thanks, Trevon Beutler RRMM ARCHITECTS 28 Church Ave. SW Roanoke, VA 24011 P: 540-278-2156 tbeutler r- m.com www.rrmm.com From: Amy Feltner <alight@fcva.us> Sent: Friday, November 21, 2025 3:00 PM To: Dan Brzezynski <DBrzez nski Pennoni.con.>; Johnathan Lee <, nathan.lee@fcva.us> Cc: Christopher Mulholland <CMulholland@Pennoni.c >; Trevon Beutler <~beutler@rrr -om> Subject: RE: '[External]'Jordan Springs Elementary School Expansion (SP#25-25) Dan, Can you please clarify what changed on the site plan to warrant a revised plan? Thanks Amy From: Dan Brzezynski <DBrzezynski Pennoni.com> Sent: Friday, November 21, 2025 2:27 PM To: Johnathan Lee <iohnathan.lee fcva.us> Cc: Christopher Mulholland <^Mulholland Pennoni.cr >; Trevon Beutler <tbeutler@rrmm.com>; Amy Feltner <alight@fcva.us> Subject: '[External]'Jordan Springs Elementary School Expansion (SP#25-25) Good Afternoon John, I believe you are aware that the Jordan Springs Elementary School Expansion project is currently undergoing a VE process, of which you are expecting a new drawing submittal package shortly. With respect to the Site Plan side of things, none of the proposed VE changes would typically warrant any sort of application for plan revision based on their size or change in land disturbance. I also understand however that the VE changes will result in a site plan package submitted to you as part of the building permit that would not match the approved Site Plan drawings. I'm hoping we could remedy this by simply replacing the effected sheets in the approved site plan or by simply providing the new sheets to the Planning & Zoning Department that they can then add to the County's file. I've copied Amy Feltner on this email as well for her confirmation on the best, most efficient path forward. Please let me know what avenue you think will be best, I know FCPS and this building permit package are on a very tight timeline. Thanks again & have a great weekend. Dan Brzezynski, PE Pennoni 117 East Piccadilly Street I Winchester, VA 22601 Direct: +1 540-771-2090 www.pennoni.com I DBrzez nski Pennoni.c m What's Possible Podcast Episode 2 Disclaimer The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. This email has been scanned for viruses and malware, and may have been automatically archived by Mimecast, a leader in email security and cyber resilience. Mimecast integrates email defenses with brand protection, security awareness training, web security, compliance and other essential capabilities. Mimecast helps protect large and small organizations from malicious activity, human error and technology failure; and to lead the movement toward building a more resilient world. To find out more, visit our website. Disclaimer The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. This email has been scanned for viruses and malware, and may have been automatically archived by Mimecast, a leader in email security and cyber resilience. Mimecast integrates email defenses with brand protection, security awareness training, web security, compliance and other essential capabilities. Mimecast helps protect large and small organizations from malicious activity, human error and technology failure; and to lead the movement toward building a more resilient world. To find out more, visit our website. 4