HomeMy WebLinkAbout23-25 Site PlanSHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
TACO BELL - WINCHESTER
FREDERICK COUNTY, VIRGINIA
GAINESBORO MAGISTERIAL DISTRICT
1.OWNER:
PRIMAX PROPERTIES, LLC
1100 E. MOREHEAD STREET
CHARLOTTE, NC 28204
2.DEVELOPER:
RESTAURANT PROPERTY INVESTORS II, LLC
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VA 23451
TEL: 757.412.0112
CONTACT: YIANNI ACHILLEOS
3.PLANS DEVELOPED BY:
SEKIV SOLUTIONS, LLC
14207 POND CHASE PLACE
MIDLOTHIAN, VIRGINIA 23113
TELE: 804.955.5572
CONTACT: STUART LITTLE, PE
4.LEGAL REFERENCE
PARCEL ID: 52-A-F1
ZONING: B-2
ZONING CASE: REZ #03-03
GENERAL BUSINESS
5.TOTAL AREA: 2.40 AC.
DISTURBED AREA: 0.87 AC.
6.USE: EXISTING: UNDEVELOPED
PROPOSED: FAST FOOD RESTAURANT
7.UTILITIES:
WATER: FREDERICK WATER 540.868.1061
SEWER: FREDERICK WATER 540.868.1061
POWER: SVEC 540.450.0111
PHONE/ INTERNET: COMCAST BUSINESS SUPPORT 855.281.5738
8.APPROXIMATE UTILITIES DEMAND
WATER - 5,000 GPD (DOMESTIC AND IRRIGATION)
SEWER - 4,000 GPD
9.SOURCE OF TOPOGRAPHY AND SURVEY:
HALDER SURVEYS, PC.
10400 CHESTER ROAD,
CHESTER, VA 23831
(804) 748-8707
10.DATUM REFERENCE FOR ELEVATION:
VIRGINIA STATE PLANE NAD83 SOUTH ZONE
11.MAXIMUM ALLOWED STRUCTURE HEIGHT: 35'
PROPOSED STRUCTURE HEIGHT: ±25'
12.YARD REQUIREMENTS:
FRONT YARD = 35'
SIDE YARD = N/A
REAR YARD = N/A
13.BUILDING AREA:
PROPOSED: 2,558 S.F. 1-FLOOR RESTAURANT
FAR = 0.024
MAXIMUM ALLOWED FAR = 1.0
14.SITE TABULATION:
BUILDINGS 2,558 SQ FT 2.4% OF SITE
IMPERVIOUS 69,900 SQ FT 66.9% OF SITE
OPEN SPACE 32,085 SQ FT 30.7% OF SITE
TOTAL 104,544 SQ FT
15.PARKING SCHEDULE:
USE: DRIVE THRU RESTAURANT
1.4 SPACE PER 100 SQUARE FEET OF SEATING AREA
MINIMUM 90 FT STACK IN DRIVE THRU
REQUIRED PARKING: SEATING AREA: 850 SF / 100 SF X 1.4 SPACES = 12 SPACES REQUIRED
HANDICAP: 2 SPACES (FOR 26 TO 50 PARKING SPACES)
PROVIDED: 34 TOTAL SPACES PROVIDED (INCLUDING 2 HANDICAP SPACES)
DRIVE THRU STACK- 140 FT
16.FLOOD ZONE: THE REFERENCED PROPERTY LIES WITHIN "ZONE X" (AREAS DETERMINED
OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN) ACCORDING TO THE FEMA FLOOD
INSURANCE RATE MAP NUMBER 51069C0204E JANUARY 29, 2021.
17.THERE ARE NO WETLANDS DISTURBANCES ASSOCIATED WITH THIS PROPOSED LAND
DISTURBANCE ACTIVITY.
18.THE LIMITS OF THE PROJECT SITE ARE LOCATED OUTSIDE OF THE CHESAPEAKE BAY
PRESERVATION AREA.
19.TRIP GENERATION DATA:
USE: FAST-FOOD RESTAURANT W/ DRIVE-THRU WINDOW
ITE CODE: 934
TOTAL DAILY TRIPS: 1,269
PM PEAK HOUR TRIPS: IN: 45 OUT: 41
RESPONSIBLE LAND DISTURBER
SIGNATURE
NAME (PRINT)DATE
CONTACT #CERTIFICATION #
APPROVAL/SIGNATURE PANEL
APPROVED BY THE FREDERICK COUNTY ZONING ADMINISTRATOR
COVER SHEET
C-001
MISS UTILITY OF VIRGINIA
CONTRACTOR SHALL CALL "MISS UTILITY" 48 HOURS PRIOR TO THE START OF EXCAVATION.
CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES SHOWN ON
PLANS IN AREAS OF CONSTRUCTION PRIOR TO STARTING WORK. CONTACT THE ENGINEER
IMMEDIATELY IF THE LOCATION OR ELEVATION IS DIFFERENT FROM THAT SHOWN ON THE PLAN, IF THERE
APPEARS TO BE A CONFLICT, AND/OR UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON PLAN.
CONTACT MISS UTILITY OF VIRGINIA: 1-800-552-7001 (TOLL FREE) OR 811.
VIRGINIA STORMWATER MANAGMENT PROGRAM COMPLIANCE
THIS PROJECT COMPLIES WITH VSMP PART II B CRITERIA BY DEMONSTRATING FOLLOWING:
9VAC25-875-590 (WATER QUALITY)
REQUIREMENTS ARE SATISFIED WITH AN EXISTING REGIONAL BMP THAT WAS DESIGNED AND SIZED BASED ON THIS
PARCEL BEING DEVELOPED.
9VAC25-875-710 (STREAM CHANNEL EROSION)
REQUIREMENTS ARE SATISFIED WITH AN EXISTING REGIONAL BMP THAT WAS DESIGNED AND SIZED BASED ON THIS
PARCEL BEING DEVELOPED.
9VAC25-875-720 (FLOOD PROTECTION)
REQUIREMENTS ARE SATISFIED WITH AN EXISTING REGIONAL BMP THAT WAS DESIGNED AND SIZED BASED ON THIS
PARCEL BEING DEVELOPED.
SITE
Sheet List Table
Sheet Number Sheet Title
C-001 COVER SHEET
C-002 REZONING CASE
C-003 ARCHITECTURAL ELEVATIONS
C-100 ALTA SURVEY
C-101 EXISTING CONDITIONS & PH. 1 E&S PLAN
C-102 LAYOUT & UTILITY PLAN
C-103 GRADING, DRAINAGE & PH. 2 E&SC PLAN
C-201 PROFILES
C-501 SITE NOTES & DETAILS
C-502 DRIVE THRU DETAILS
C-503 DUMPSTER ENCLOSURE DETAILS
C-504 EROSION AND SEDIMENT CONTROL DETAILS
C-505 EROSION & SEDIMENT CONTROL NOTES
C-506 UTILITY NOTES & DETAILS
C-701 STORM SEWER DRAINAGE AREA MAP & CALCULATIONS
L-101 LANDSCAPE PLAN
L-102 LANDSCAPE NOTES & DETAILS
L-103 IRRIGATION PLAN
Ll-101 LIGHTING PLAN
Ll-102 LIGHTING NOTES & DETAILS
#23-25
NOTE: SITE PLAN VALID FOR FIVE (5) YEARS FROM APPROVAL DATE
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
REZONING CASE
C-002
#23-25
REZONING CASE PROFFERS3REZONING CASE REZONING CASE21 REZONING CASE PROFFERS4
REZONING CASE PROFFERS5 REZONING CASE PROFERS6 FREDERICK COUNTY REZONING MAP7
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
ARCHITECTURAL
ELEVATIONS
C-003
#23-25
ARCHITECTURAL APPROVAL LETTER
NOTE: ARCHITECTURAL ELEVATIONS FOR REFERENCE ONLY
ALTA SURVEY
C-100
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
LIMITS OF
DISTURBANCE
= 0.87 AC.WATWATWATWATWATWATWATWAT WAT WAT WAT WAT WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
0
SCALE 1"=20'
40'20'
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
1.A PRE-CONSTRUCTION CONFERENCE IS MANDATORY BEFORE ANY WORK IS
DONE AT THE SITE. ARRANGE A MEETING WITH A CERTIFIED RESPONSIBLE LAND
DISTURBER (CRLD), OWNER, ENGINEER, AND COUNTY E&S INSPECTOR. THE
OWNER MUST GIVE THE COUNTY INSPECTOR 48 HOURS NOTIFICATION TO
SCHEDULE AN ON-SITE PRE-CONSTRUCTION MEETING FOR THE ISSUANCE OF A
LAND DISTURBANCE PERMIT.
2.INSTALL THE TEMPORARY CONSTRUCTION ENTRANCE PER THIS DRAWING. WASH
MUD AND DEBRIS FROM ALL CONSTRUCTION EQUIPMENT AND VEHICLES PRIOR
TO LEAVING THE CONSTRUCTION AREA.
3.INSTALL EXTERIOR/PERIMTER SILT FENCE ACCORDING TO THIS DRAWING. DISTURB
ONLY THE PORTION OF THE SITE NEEDED TO INSTALL PERIMETER EROSION
CONTROL DEVICES IN ACCORDANCE WITH THE REGULATIONS IN THE VA E&S
HANDBOOK. DISTURBANCE OUTSIDE OF THE PRELIMINARY LIMITS OF DISTURBANCE
IS NOT ALLOWED UNTIL ALL PERIMETER MEASURES ARE INSTALLED AND
FUNCTIONING.
4.CLEAR AND GRUB SITE TO FINAL LIMITS OF DISTURBANCE. TEMPORARILY
STOCKPILE SOIL ON SITE. STOCKPILES SHALL REMAIN IN PLACE NO LONGER THAN
1 YEAR FROM THE PLAN APPROVAL DATE. STABILIZE ALL STOCKPILES WITH
TEMPORARY SEEDING AND A PERIMETER OF SILT FENCE.
5.ONCE ALL PHASE 1 EROSION AND SEDIMENT CONTROL MEASURES ARE INSTALLED,
THE ENVIRONMENTAL ENGINEERING INSPECTOR AND THE CERTIFIED RESPONSIBLE
LAND DISTURBER (CRLD) MUST MEET ON-SITE TO INSPECT THE EROSION AND
SEDIMENT CONTROL MEASURES BEFORE PROCEEDING TO PHASE 2.
PHASE 1 SEQUENCE OF CONSTRUCTION21EROSION CONTROL LEGEND
X
CE
SF
CONSTRUCTION ENTRANCE
SILT FENCE
TS TEMPORARY SEEDING
PERMANENT SEEDINGPS
IP INLET PROTECTION
MISS UTILITY OF VIRGINIA
CONTRACTOR SHALL CALL "MISS UTILITY" 48 HOURS PRIOR
TO THE START OF EXCAVATION. CONTRACTOR SHALL
VERIFY LOCATION AND ELEVATION OF ALL
UNDERGROUND UTILITIES SHOWN ON PLANS IN AREAS OF
CONSTRUCTION PRIOR TO STARTING WORK. CONTACT THE
ENGINEER IMMEDIATELY IF THE LOCATION OR ELEVATION IS
DIFFERENT FROM THAT SHOWN ON THE PLAN, IF THERE
APPEARS TO BE A CONFLICT, AND/OR UPON DISCOVERY
OF ANY UTILITY NOT SHOWN ON PLAN. CONTACT MISS
UTILITY OF VIRGINIA: 1-800-552-7001 (TOLL FREE)
DEMOLITION NOTE
THE DEMOLITION PLAN PROVIDED IS AN ATTEMPT TO DELINEATE ITEMS THAT
CURRENTLY EXIST ON SITE THAT NEED TO BE DEMOLISHED OR ALTERED AS PART
OF THE IMPROVEMENTS. THE CONTRACTOR SHALL WALK THE EXISTING SITE,
FAMILIARIZE HIMSELF WITH THE CURRENT CONDITIONS, AND COORDINATE THE
DEMOLITION PLAN WITH THE LAYOUT, GRADING, AND UTILITY IMPROVEMENTS
WITH THE ACTUAL FIELD CONDITIONS TO ENSURE THAT ALL ITEMS TO BE
DEMOLISHED OR ALTERED ARE ACCOUNTED FOR PRIOR TO COMMENCING
CONSTRUCTION. ITEMS NOT SPECIFICALLY DENOTED TO BE REMOVED ON THE
DEMOLITION PLAN BUT REQUIRED TO BE FOR THE IMPROVEMENTS MAY IMPACT
THE CONTRACTOR'S MEANS AND METHODS, SEQUENCING AND SCHEDULING.
EXISTING
CONDITIONS & PH. 1
E&S PLAN
C-101
WATWATWATWATWATWATWATWAT WAT WAT WAT WAT WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WATTACO BELLLG502" PVC (PRIVATE)
WATERLINE
CLEARANCE
BAR WITH
BOLLARD
DUMPSTER
ENCLOSURE
CG-12
RAMP
ADA SIGNS
W/ WHEEL
STOPS
4" PVC SDR 35
SAN. SWR.
(PRIVATE)
1" WATER SERVICE WITH 5/8"
IRRIGATION METER WITH
BACKFLOW PREVENTER
AND HEATED & INSULATED
ENCLOSURE
2" WATER SERVICE WITH 1
1/2" DOMESTIC METER
BACKFLOW PREVENTER TO
BE LOCATED IN BUILDING)
11" CURB ALONG
FACE OF BLDG. SEE
DTL. SHEET C2.0
W
W
W
W
SAN
SANSANSANTRAFFIC
RATED C.O.
C.O.
4" PVC SDR 35
SAN. SWR.
(PRIVATE)
GREASE
TRAP
BOLLARD
BOLLARD
MENU BOARD AND
ORDER STATION AND
BOLLARDS
9
8
8
9UGEUGEUGE
UGEUGEUGEUGTUGTUGTUGTUGTUGTUGE
UGE
UGT
UGT
APPROX. LOCATION OF
UNDERGROUND
COMMUNICATION LINE
& UNDERGROUND
ELECTRIC SERVICE
APPROX. LOCATION
OF TRANFSFORMER
24'
18'
18'
24'
18'
18'
10' TYP.
10'
8'
10'
11'
11'
12'
15'
12'
24'
30.71'
R15'
R5'
R5'
R15'
R10'
R100'
R15'
R30'
R5'R15'
R10'
R5'
R5'
R10'
R5'
R5'
22.7'
36'
R20'
R15'
R5'
R5'
R5'
R5'
R5'
R5'
27'
27'
10'
10'
TAP THROUGH METER SETTING
BY FREDERICK WATER, FINAL
RESTORATION BY CONTRACTOR
CONNECT TO EX.
SANITARY SEWER
REMOVE EXISTING
CAP AND EXTEND
APPROX. LIMITS OF
PAVEMENT REPLACEMENT
APPROX. LIMITS OF
PAVEMENT REPLACEMENT
APPROXIMATE LOCATION OF
±10' X ±5' MONUMENTAL SIGN.
OAH OF 12' FINAL SIGN DESIGN
AND LOCATION TO BE
PERMITTED SEPARATELY.
FIRE LANE
STRIPING
FIRE LANE
STRIPING
FIRE SIGN TYPE
MODIFIED "D"
FIRE SIGN TYPE
MODIFIED "D"
FIRE SIGN TYPE
MODIFIED "D"
FIRE SIGN TYPE
MODIFIED "D"
TAP THROUGH METER SETTING
BY FREDERICK WATER, FINAL
RESTORATION BY CONTRACTOR
12'
10'
4'
0
SCALE 1"=20'
40'20'
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
ELECTRICAL NOTE:
CONTRACTOR SHALL BE RESPONSIBLE FOR
PROVIDING 2-4" PVC CONDUITS WITH PULL
STRING FROM UTILITY POLE TO PAD MOUNTED
TRANSFORMER FOR PRIMARY SERVICE.
TRANSFORMER PAD TO BE CONSTRUCTED BY
CONTRACTOR. CONTRACTOR SHALL COORDINATE
WITH UTILITY COMPANY ON SIZE AND LOCATION.
TRANSFORMER TO BE SET BY UTILITY COMPANY.
CONTRACTOR TO PROVIDE SECONDARY SERVICE
FROM TRANSFORMER TO MDP WITH 3-4" PVC
CONDUITS. CONTRACTOR TO INSTALL METER AND
MAKE FINAL CONNECTION.
LAYOUT & UTILITY
PLAN
C-102
FREDERICK WATER NOTES:
1.VALVES, MANHOLES, ARV’S AND OTHER FREDERICK WATER
SURFACE FEATURES SHALL NOT BE PLACED IN CURB AND
GUTTER, NOR SLOPED PORTION OF HANDICAPPED RAMPS.
CONTRACTOR SHALL COORDINATE LOCATIONS WITH THE
FREDERICK WATER INSPECTOR.
2.IRRIGATION LINES AND DEVICES, LIGHT POLES, TRANSFORMERS,
JUNCTION BOXES, PEDESTALS, OTHER OBSTACLES AND ALL DRY
UTILITIES SHALL NOT BE PLACED ON FREDERICK WATER
EASEMENTS. PERPENDICULAR IRRIGATION LINES AND DRY
UTILITY CROSSINGS ARE PERMITTED WITH 18" MINIMUM
VERTICAL SEPARATION.
3.RETAINING WALLS AND THEIR TIE BACKS SUCH AS GEO GRID OR
OTHER SUPPORTS SHALL NOT BE PLACED IN FREDERICK WATER
EASEMENTS CONTRACTOR SHALL TEST PIT AS REQUIRED AND
ADJUST ALL EXISTING FREDERICK WATER FACILITIES TO GRADE
PER THE FREDERICK WATER INSPECTORS REQUIREMENTS.
4.6" SEWER LATERALS ARE REQUIRED TO BE CONNECTED TO A
MANHOLE.
LIMITS OF
DISTURBANCE
= 0.87 AC.WATWATWATWATWATWATWATWAT WAT WAT WAT WAT WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WATTACO BELLLG50W
W
W
W
SAN
SANSANSANUGEUGEUGEUGEUGEUGEUGTUGTUGTUGTUGTUGTUGE
UGE
UGT
UGT
APPROX. LIMITS OF
PAVEMENT REPLACEMENT
APPROX. LIMITS OF
PAVEMENT REPLACEMENT
8428458
4
7 844842841840TC
838.13'
TC
838.44'
TC
844.34'
TC
838.12'
TC
839.29'
TC
839.29'
TC
839.16'
TC
839.16'
TC
839.42'
TC
839.50'
TC
839.62'
TC
839.36'
TC
839.60'
TC
840.97'
TC
841.19'
TC
841.46'TC
842.27'
TC
842.66'
TC
843.19'
TC
844.27'
TC
844.43'
TC
844.58'
TC
841.39'
TC
840.20'
TC
840.08'
TC
841.34'
TC
841.54'
TC
841.57'
TC
839.87'
TC
839.90'
TC
841.81'
TC
841.64'
TC
840.55'
TC
840.38'
TC
840.41'
TC
840.62'
TC
841.69'
TC
841.84'
TC
843.38'
TC
842.98'TC
842.73'
TC
842.82'
TC
842.97'
TC
843.50'
TC
843.50'
TC
843.28'
TC
843.09'
TC
843.09'
TC
843.03'
TC
843.03'
TC
842.94'
TC
842.80'
TC
842.91'
TC
843.15'
842.61'
842.61'
843.50'
843.50'
843.50'
843.50'
843.50'
843.50'
843.50'
844.13'
844.13'
843.84'
843.84'
TC
843.38'
TC
842.88'
TC
842.88'
TC
843.38'
843.38'843.46'
843.45'843.38'
843.45'
843.46'
843.46'
843.45'
843.45'
TC
839.77'
IP
PS
PS
PS
PS
IP
IP
IP
IP
6" ROOF DRAIN
1
2
3
4
5
EX1
EX2
F.F. ELEV: 843.50'0
SCALE 1"=20'
40'20'SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
1. BEGIN DEMOLITION AND GRADING OPERATIONS. PHASE I MEASURES SHALL BE
MAINTAINED OR REPLACED AS AREAS ARE STABILIZED AND ONCE STORM SEWER
IS INSTALLED AND FUNCTIONING WITH INLET PROTECTION.
2. STRIP SITE TO FINAL LIMITS OF DISTURBANCE.
4. ENSURE THAT POSITIVE DRAINAGE IS MAINTAINED AND ALL DRAINAGE IS
DIVERTED TO THE PERIMETER EROSION CONTROL MEASURES. MAINTAIN ALL
EROSION CONTROL MEASURES.
5. GRADE BUILDING PAD AND BEGIN BUILDING CONSTRUCTION. COMPLETE SITE
WORK CONSTRUCTION INCLUDING STORM SEWER, CURB AND GUTTER, INLET
PROTECTION, AND TEMPORARY AND PERMANENT SEEDING FOR STABILIZATION.
6. PLACE PAVEMENT AND STABILIZE ANY PROBLEM AREAS ON SITE.
7. PLACE TOPSOIL ON LANDSCAPE AREAS. SEED AND MULCH ALL DENUDED
AREAS.
8. DO NOT REMOVE EROSION CONTROL MEASURES UNTIL ALL CONTRIBUTING
AREAS HAVE BEEN PERMANENTLY STABILIZED. REMOVE ALL TEMPORARY EROSION
AND SEDIMENT CONTROL MEASURES. NOTIFY THE FREDERICK COUNTY EROSION
CONTROL INSPECTOR BEFORE THE EROSION AND SEDIMENT CONTROL MEASURES
ARE REMOVED.
2 PHASE II SEQUENCE OF CONSTRUCTION
GRADING,
DRAINAGE & PH. 2
E&SC PLAN
C-103
1 EROSION CONTROL LEGEND
X
CE
SF
CONSTRUCTION ENTRANCE
SILT FENCE
TS TEMPORARY SEEDING
PERMANENT SEEDINGPS
IP INLET PROTECTION
820
825
830
835
840
845
850
855
820
825
830
835
840
845
850
855
847.0843.2843.0840.4839.3838.6839.3839.1838.39+75 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+0016+00
820
825
830
835
840
845
850
855
820
825
830
835
840
845
850
855
825
830
835
840
845
850
855
860
825
830
835
840
845
850
855
860
EX PIPE 1-2
175.28' OF
36" CL. III RCP
@ 1.91%EX STR 1STA 13+98.34TOP 835.00INV IN 832.25 (PIPE 4-5)INV OUT 830.50 (EX PIPE 1-2)PIPE 4-5
160.69' OF
15" CL. III RCP
@ 0.50%STR 4STA 12+37.65TOP 839.16INV IN 833.15 (PIPE 3-4)INV IN 833.15 (PIPE 5-4)INV OUT 833.05 (PIPE 4-5)PIPE 3-4
86.21' OF
15" CL. III RCP
@ 0.50%STR 3STA 11+51.44TOP 839.16INV IN 833.68 (PIPE 2-3)INV OUT 833.58 (PIPE 3-4)PIPE
2
-
3
65.71
'
O
F
15" C
L
.
I
I
I
R
C
P
@ 3.0
0
%STR 2STA 10+85.73TOP 841.19INV IN 835.75 (PIPE 1-2)INV OUT 835.65 (PIPE 2-3)PIPE
1
-
2
85.73
'
O
F
15" C
L
.
I
I
I
R
C
P
@ 3.0
0
%STR 1STA 10+00.00TOP 842.66INV OUT 838.32 (PIPE 1-2)EX STR 2STA 15+73.62TOP 831.91INV IN 827.15 (EX PIPE 1-2)839.5838.8838.3838.0838.1837.4837.419+75 20+00 20+50 21+0021+00STR 4STA 12+37.65TOP 839.16INV IN 833.15 (PIPE 3-4)INV IN 833.15 (PIPE 5-4)INV OUT 833.05 (PIPE 4-5)PIPE 5-4
71.19' O
F
15" CL. I
I
I
R
C
P
@ 2.00%STR 5STA 20+00.00TOP 839.77INV OUT 834.57 (PIPE 5-4)EXISTING GROUND
PROPOSED
GROUND
PROPOSED
GROUND
EXISTING
GROUND
839.2839.0838.9838.5838.7839.0839.4839.9840.5841.6842.7843.5843.619+75 20+00 20+50 21+00 21+50 22+00 22+5022+62.83BLDG OUTINV 841.50GREASE TRAPTOP 843.50INV. 841.31COTOP 843.50INV. 841.49COTOP 841.66INV. 839.09CONNECT TO EX.
SAN. SEWER
ASSUMED INV: 831.37
CONTRACTOR TO FIELD VERIFY
INVERT AND NOTIFY ENGINEER IF
CHANGES ARE REQUIRED
PROFILE SCALE
0
0
50
5
4" 45° BEND
PROFILE SCALE
0
0
50
5
PROFILE SCALE
0
0
50
5
EXIS.
SANITARY
LATERAL
157.1
6'
O
F
4" PV
C
@ 4.9
1
%
45.32'
O
F
4" PV
C
@ 4.9
1
%
18.63' OF
4" PVC
@ 1.04%
PROPOSED
GROUND
EXISTING GROUND
PROPOSED
STORM SEWER
1'
PROPOSED
SANITARY SEWER
2.0
STORM SEWER STR. 1 - EX. STR. 1 STORM SEWER STR. 5 - STR. 4
SANITARY SEWER
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
PROFILES
C-201FIRE HYDRANT FLOW CURVE1 FLOW CURVE MAP2
FIRE FLOW 1,500 GPM
RESIDUAL PRESSURE - ±48 PSI
SITE NOTES
& DETAILS
C-501
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
IDENTIFY SPACES BY ABOVE
GRADE SIGNS AS RESERVED
FOR PHYSICALLY DISABLED
PERSONS. PROVIDE ONE (1)
STD. R7-8 SIGN AT EACH
PARKING SPACE INDICATED
ON SITE PLAN. SIGN SHALL
BE ALUMINUM (PAINTED
WHITE) WITH GREEN LETTERS
AND INTERNATIONAL
WHEELCHAIR
SYMBOL. SECURE SIGN ON
STEEL POST 1-1/2" DIAMETER
PAINTED BLACK SET IN
MINIMUM
2' OF CONCRETE.
7-1/2"
IMBEDDED 24" IN GROUND
ANCHOR WITH 5/8" REBAR
5"
DUMPSTER SERVICE SIGN
W/ GALVANIZED
CARRIAGE BOLTS.
ATTACHED TO FENCE
SIGN FACE TO BE
NOTE:
SIGN TO BE MOUNTED ON GATE OF
FENCING SURROUNDING DUMPSTER
**SERVICE IS LIMITED BECAUSE
DUMPSTER IS LOCATED WITHIN
1000' OF RESIDENTIAL PROPERTY
22"
12"
SIGN WILL BE ALUMINUM WITH
AND RED LETTERING.
PAINTED WHITE BACKGROUND
AT LEAST 4 FEET ABOVE FINISH GRADE.
NO SCALE
PAVEMENT
EXISTING EX. E/P1
No Scale
4
No Scale
VDOT STD. CG-6 CURB & GUTTER
7
No Scale
PRECAST BUMPER BLOCK 8
No Scale
SIDEWALK CONTROL JOINT DETAIL 9
No Scale
VDOT LAP JOINT DETAIL
No Scale
12
No Scale
DUMPSTER SERVICE SIGN 13
No Scale
PARKING SIGNS FOR THE DISABLED
1,200 GALLON GREASE TRAP
No Scale
LIGHT DUTY PAVEMENT SECTION6
No Scale
14 CONCRETE SIDEWALK DETAIL
11
No Scale
HEAVY DUTY ASPHALT PAVEMENT SECTION2
No Scale
HEAVY DUTY CONCRETE PAVEMENT SECTION10
2" CLEAR4 X 4 6/6 WWF
6" - 21A AGG.
6" PORTLAND CEMENT 4,000 PSI
CONC. AIR ENTRAINED (BLACK
TO MATCH ASPHALT)
16
No Scale
BOLLARD DETAIL @ 11" CURB
11"
FACE OF BUILDING
1/2" EXP. JT. MATERIAL AND SEALANT
DRIVE THRU PAVEMENT
CONC. CURB (INSTALL ALONG BLDG FACE)
1/2" RADIUS
#4 REBAR CONT.
DOWNSPOUT
SLOPE
6" PVC RAINLEADER PIPE; RE: CIVIL
#4 VERT. REBAR DOWELS
@ 24" O.C.6"24"15 SIDEWALK INLAY DETAIL
3
4"
6"
12"6"
4" MIN.
15"
MIN.
6"
18"
MAX.
712"
No Scale
CG-2 "EXTRUDED" CURB WITH REAR FOOTER
17
No Scale
5
No Scale
11" CURB DETAIL
No Scale
PAINTED TRAFFIC ARROWS
NOTES:
1. PRECAST UNITS ARE APPROVED FOR USE PER ABOVE DESIGN AND
DIMENSIONS.
2. BITUMASTIC COATING ON BOTTOM AND ALL SIDES (EXTERIOR ONLY).
3. LOCAL STANDARD CODE SHALL APPLY IF REQUIREMENTS EXCEED THIS
STANDARD DETAIL.
8"
3"3"
18"
12"1 1/2"
7"
1'-6"
10"
10'-0"
5'-0"
1'-6"
3"
4'-6"
3"
1'-6"
FIRE LANE GUIDELINE
NOTE: ALL FIRE SIGNS ARE TO BE MOUNTED SEVEN (7) FEET FROM THE BOTTOM OF ALL
SIGNS TO THE TOP OF THE GRADE.
GREASE TRAP / OIL WATER SEPARATOR NOTES:
1.TANK SECTIONS SHALL BE BOLTED TOGETHER.
2.WATERTIGHT BOLT DOWN FRAME AND
COVERS ARE REQUIRED.
3.PENETRATIONS SHALL HAVE BOOTS.
4.TANK, COMPONENTS, AND INSTALLATION
SHALL BE TRAFFIC RATED.
5.CONTRACTOR SHALL COORDINATE
INSTALLATION AND INSPECTIONS WITH BOTH
FREDERICK COUNTY INSPECTIONS
DEPARTMENT AND FREDERICK WATER.
CLEARANCE BAR,
SEE DETAIL 5 FOR
FOOTING DETAILBOLLARD, SEE
DETAIL 3 2'-2"2'-0 1/4"1'-0 "RIGHT ISO VIEW
FACE OF CURB9'-6"1" ANCHOR BOLTS
MIN. EMBEDMENT
24"
T.O. FOOTING
1/2" DIA RIGID CONDUIT TO
POWER (FOR CANOPY ONLY)
GRADE
STEEL PLATE
STEEL TUBE
1" DIA. ANCHOR
BOLT
7"
11"7"11"CLEARANCE BAR FOOTING
NOTE:
REFER TO CURRENT CUT
SHEETS FOR FOOTING
BOLT DETAILS
2" MIN.12" MIN.FOUNDATION IS SUBJECT TO
APPROVAL BY THE
STRUCTURAL ENGINEER
NOTE:
ALL CONDUIT TO BE MIN. 12"
BELOW GRADE AT LOCAL FROST
DEPTH AND PROJECT 3" ABOVE
FOUNDATION
PREFERRED 8"X8" ANCHOR PATTERN IS
SUBJECT TO APPROVAL BY THE
STRUCTURAL ENGINEER
ANCHOR PLATE
(3)1" CONDUITS
8"
FOUNDATION IS SUBJECT TO APPROVAL
BY THE STRUCTURAL ENGINEER8"CONDUIT SCHEDULE
DEVICE POWER DATA
DIRECTIONAL
SPEAKER POST
MENU BOARD
(1) 3/4"
(1) 1"
(1) 1"
-
(1) 1"
PREVIEW BOARD
NOTE:
ALL CONDUIT TO BE MIN. 12"
BELOW GRADE AT LOCAL FROST
DEPTH AND PROJECT 3" ABOVE
FOUNDATION
NOTE:
BOLT PATTERN PROVIDED AS
EXAMPLE - OBTAIN ANCHOR
BOLT TEMPLATE FROM
SUPPLIER OPTIONAL (1) 1"
(2) 1"
(2) 1"
GRADE
MENU BOARD - (3) CAT 6
PREVIEW BOARD - (2) CAT 6
SPEAKER POST - (1) CAT 6
•
•
•
1.
2.
3.
4.
5.
6.
SOW FOR DMB INSTALL AND VENDORS
RSCS TO SUPPLY DMB AND CABLE
SIGN VENDOR TO SUPPLY ANCHOR BOLTS AND BOLT PATTERN TO GC.
SITE SURVEY - SIGN VENDOR
NEW BUILD
TRENCHING/ CONDUIT- GC
FORMING/ FOUNDATION/ ANCHOR BOLTS - GC
DMB INSTALL - SIGN VENDOR
DMB CABLE PULL - SIGN VENDOR
DMB FINAL CONNECTION AND SYSTEM CHECK - SIGN VENDOR
ELECTRICAL - PULL BY GC - DEDICATED CIRCUIT
10' 0"
9' 9"
4' 0"
1' 6"10" X 10"X1 1/4"
THICK STEEL PLATE
5"X5"X1 1/4"
STEEL TUBE
1 1/4" DIA. HOLE
FOR 1" DIA.
ANCHOR BOLT7"
10"7"10"CANOPY FOOTING
SPEAKER
POST
- FOUNDATION IS SUBJECT
TO APPROVAL BY THE
STRUCTURAL ENGINEER
B.O.C.
DRIVE THRU
DETAILS
C-502
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
1
No Scale
CANOPY AND SPEAKER FOOTING 2
No Scale
ENLARGED MENU BOARD DETAIL 3
No Scale
DRIVE THRU ELEMENT BOLLARD DETAIL
4
No Scale
CLEARANCE BAR PLACEMENT DETAIL 6
No Scale
MENU BOARD FOOTING DETAIL5
No Scale
CLEARANCE BAR AND CANOPY FOOTING DETAIL
NOTE:
CONTRACTOR SHALL COORDINATE WITH
ELECTRICAL ENGINEER AND VENDOR FOR
APPROPRIATE DATA AND POWER REQUIREMENTS
FOR MENU BOARD, ORDER CONFIRMATION
BOARD, CANOPY & LOOP DETECTION SYSTEM
6" STEEL PIPE BOLLARD
FILLED WITH CONCRETE
3"3'-0"2'-6"12" CONCRETE
FOOTING
6" WIDE x 24" DEEP
CONCRETE CURB
SURFACE OF
DRIVE THRU LANE
PAVEMENT
FINISH SURFACE
CL1'-4"2'-10"2'-8"3'-7"77°80'-0" TO CENTER
OF D/T WINDOW
NOTES
1.ALL AREAS OF THE MB MUST BE VISIBLE TO DRIVER
LOCATED AT SPEAKER POST. ASSUME DRIVERS
LOCATION IS 24" FROM FACE OF CURB, CENTERED ON
SPEAKER POST.
2.CENTER OF MB TO BE 5'-6" TO 9'-0" FROM DRIVERS
POINT OF VIEW.
3.PROVIDE (2) 1" CONDUITS FROM BUILDING TO SPEAKER
POST FOR LOW VOLTAGE WIRING
FACE OF CURB
6" DIA. CONCRETE FILLED
30" HIGH BOLLARD. SEE
DETAIL 8/C1.0
SPEAKER POST w/ DT
HEARING IMPAIRED
SIGNAGE, SEE 4/C1.0
FOR FOOTING DETAIL
CANOPY, SEE DETAIL
4/C1.0 FOR FOOTING
DETAIL
CENTER POINT OF BASE.
SEE DETAIL 3/C1.0 FOR
FOOTING DETAIL
DIGITAL MENU BOARD
(60.7" WIDE) WITH FRONT
SWING UP ACCESS
ESTIMATED POSITION OF
DRIVERS HEAD ALIGNED
WITH CENTER OF OCB.
OUTLINE OF CANOPY
ABOVE
CLCLCL CLCL
CL
CL
SLOPE 1/2"6"
DUMPSTER LAYOUT PLAN9DUMPSTER LAYOUT PLAN7GATE DETAILS
GATE POST FOOTINGS82BOLLARD DETAILSSECTION @ WALL ENCLOSURE WALL1
SCHEDULE4ENCLOSURE NOTES3
6 REAR ELEVATION
5 FRONT ELEVATION
GUARDPOST BOLLARD DETAIL14'-0"3'-0"3"18" DIA.
CONCRETE
FOOTING
PAVEMENT
SURFACE
6" DIA. SCH. 40 STEEL
POST FILLED WITH
CONCRETE AND PAINTED
CAUTION YELLOW
CONCAVE TOP
CONCRETE SURFACE
GATE HARDWARE: ALL HARDWARE AND
ACCESSORIES SHALL BE HEAVY GALVANIZED.
GATE STOP: MUSHROOM TYPE OR FLUSH
PLATE WITH ANCHORS SET IN CONCRETE TO
ENGAGE THE CENTER DROP ROD OR
PLUNGER BAR.
GATE NOTES: (4) EQUAL WIDE X 8'-0" HIGH
MTL. GATES, TYPE 'B' 1 1/2" DECKING, 22GA.
W/ T.S. 1 X .1875 BAR CROSS BRACING WELD
AND GRIND SMOOTH ALL CONNECTIONS,
TYP. PRIME AND PAINT ALL STEEL
COMPONENTS.
1 JAMB DETAIL
SEE GATE HINGE DETAIL
5" DIA. SCHEDULE 80 PIPE
COLUMN
SLOPE TOP OF
FOOTING
1/2" EXP. JT.
AROUND
FOOTING
GROUT SOLID W/
CONCRETE
2 GATE HINGE DETAIL
3"
GATE LATCH3
6"3"3"3"
1"X1" STEEL BAR SPACER
WELDED TO 6" DIA. x 6"
HINGE & 2"x2"x1/4" ANGLE
GATE FRAME
6" DIA. SCHEDULE 80 PIPE
HINGE
5" DIA. SCHEDULE 80
GREASE ZERK ON TOP AND
BOTTOM HINGE
1"2"
TYPE 'B' 1 1/2" DECKING
TACK WELD TO FRAME
GATE HANDLE4
3/4" Ø SOLID STEEL SLIDE
BOLT
1"Ø GALV. PIPE, FASTEN /
WELD TO GATE FRAME -
TYP.
3"6"3/4" Ø SOLID STEEL GATE
HANDLE - WELD TO 2X2
ANGLE GATE FRAME 36"
ABOVE GRADE
2X ANGLE GATE FRAME
1" CROSS BRACE
GATE POST / HINGE
2X ANGLE GATE FRAME 22 GA.
GATE LATCH
SLAB, SEE PLAN
BELOW LOCAL
FROST DEPTH
#5 VERT. BAR
@ 16" O.C.
#5'S
#4'S REBAR CONT. EA. WAY @ 24" O.C.
#5'S CONT. AT TOP AND MID HEIGHT
(18" MIN)
STD. HOOK
ROUND TOP
2'-0"3" CLR.8'-0"GATE HANDLE
8"X 8"X 16"
SPLIT-FACE CMU, WITH
COLOR INFUSED TO
MATCH BUILDING
8X8X16 COLOR INFUSED SPLIT FACE CMU BLOCK
3/4" STEEL DROP RODS & HOLES
1"
5"GATE FRAME
1" DIA. X 1" DEEP SLEEVE IN
PAVEMENT FOR CANE BOLT
AT CLOSED & 90° OPEN
POSITIONS
1" DIA. STEEL GUIDES
WELDED TO GATE
FRAME
24" x 5" CANE
BOLT (3/4" DIA.)
CANE BOLT
REST
±3"2'-0"CANE BOLT (1 PER GATE)5
1'-0"5"5" SCH. 80 STL
POST, GROUTED
SOLID
6" SCH. 80 X 3" HINGE
SUPPORT, WELD TO POST
(5) #4 TIES @
8" O.C.
(8) #5 VERTS
@ 11" O.C.
TYP. 3/4" EXP. JT.4"4"4"
30"2'-6"6" SCH. 80 X 6"
HINGE W/ GREASE
ZIRK
6" SCH. 80 X 6" HINGE
(2) #5 VERT. CONT. INTO
GATE POST FOOTING
30" WIDE
POST
FOOTING
5"
CL
8"3'-6"THICKENED EDGE
CONC. PAVEMENT
7"SECTION @ WALLS
CMU WALL
WALL
FOOTING
INSTALL GATE
POST, GATE
POST FOOTING,
AND CMU WALL
FOOTING PRIOR
TO INSTALLING
CMU BLOCK
PLAN VIEW @ WALLS
#5 VERT. CONT. INTO
GATE POST FOOTING
4"4"
5" SCH. 80 STL
POST, GROUTED
SOLID
CMU WALL
EDGE OF WALL FOOTING
3/4" EXP. JT. BETWEEN
POST FOOTING AND
CONC. PAVEMENT
(5) #4 TIES @
8" O.C.
(8) #5 VERTS.
SPACED
EVENLY5"8"DBL. GATE POST FOOTING
5" SCH. 80
STL POSTS,
GROUTED
SOLID
2'-6"2'-6"3'-2"2'-6"
4"4"4"4"(5) #4 TIES @
8" O.C.
(10) #5 VERTS.
SPACED
EVENLY
#6 SMOOTH DOWELS &
CAPS, 18" LONG @ 24" O.C.
6" PIPE, FILLED
W/ CONCRETE.
TOP OF PIPE: 4'
ABOVE SLAB,
SEE DETAIL B
THICKENED EDGE /
FOOTING FOR
WALLS
5"
5"1'-4"1'-4"7" CONCRETE PAVEMENT W/
THICKENED EDGE, 28 DAY
MIN. COMPRESSION
STRENGTH OF 4,000 PSI
WITH #4 CONT. E.W. @ 24"
O.C.
SUB-GRADE PER
GEOTECHNICAL ENGINEER'S
RECOMMENDATIONS.
24" WIDE X 12"
THICKENED EDGE
GATE STOPS AT
ALL CLOSED GATE
LOCATIONS.SEE
NOTES.
POST FOOTING (TYP.) -
INSTALL TYP. 3
4" EXP. JT.
BETWEEN ALL POST
FOOTINGS AND CONC.
PAVEMENT
2'-6"3'-2"1'-3"1'-3"23'-4"22'-0"4'-6"10'-2"5'-8"3'-4"5'-0"11'-4"
15'-4"
6" DIAMETER BOLLARD (TYP.)
4'-8"10'-6" CLEAR10'-6" CLEAR8" SPLIT FACE CMU INFUSED WITH COLORTO MATCH SW 6122 "CAMELBACK"8'-0"
T.O. CMU
8'-0"
T.O. CMU
18 GA. CLEANED, PRIMED, &
PAINTED METAL GATE. (BOX RIB)
8" CMU INFUSED WITH BUILDING COLOR
5" SCH. 80 STL POST,
GROUTED SOLID
DROP RODS
SIMILAR TO LATCH
8" SPLIT FACE CMU INFUSED WITH BUILDING
COLOR SW 6122 "CAMELBACK"
6" SCH. 80 X 3" HINGE SUPPORT, WELD TO POST 3'-5"6'-0"6'-10"4'-6"6'-0"SEE SITE PLAN
METAL GATES,
SEE DETAIL C
PROVIDE 24" WIDE X 12"
THICKENED EDGE ON 7"
CONCRETE SLAB - ENTIRE
PERIMETER.
7" CONCRETE PAVEMENT W/ 24"
WIDE X 12" THICKENED EDGE
AROUND ENTIRE PERIMETER, 28
DAY MIN. COMPRESSION STRENGTH
OF 4,000 PSI WITH #4 CONT. E.W. @
24" O.C.
SUB-GRADE PER GEOTECHNICAL
ENGINEER'S RECOMMENDATIONS.
CONCRETE NOTES:
1. INSTALL 1/2" EXP. JT. MATERIAL AND SEALANT
BETWEEN CONCRETE SLABS
2. INSTALL CONTROL JT'S AT MAX. 10' O.C. IN SLABS
1" STEEL PIPE
DROP ROD HOLES
AT ALL OPEN GATE
LOCATIONS 1'-3"10'-134"8"10'-014"1'-3"POST FOOTING (TYP.) -
INSTALL TYP. 3
4" EXP. JT.
BETWEEN ALL POST
FOOTINGS AND CONC.
PAVEMENT
2 BRICK SHERWIN WILLIAMS RE: ARCH. DRAWINGS
1 GATE COLOR SHERWIN WILLIAMS RE: ARCH. DRAWINGS
3 PIPE BOLLARDS SHERWIN WILLIAMS RE: ARCH. DRAWINGS
AREA COLORSYMBOLMANUFACTURER
NOTE: PAINT CMU TO MATCH BRICK
DUMPSTER
ENCLOSURE
DETAILS
C-503
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
EROSION AND SEDIMENT CONTROL LEGEND
EROSION AND
SEDIMENT CONTROL
DETAILS
C-504
EROSION CONTROL TRENCHING DETAIL
SOILS MAP & LEGEND
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
MDLQWHQDQFH
All erosion and sediment control structures, systems and practices shall be maintained, inspected, and
repaired as needed to ensure continued performance of their intended function. Any needed repairs will be
made immediately to maintain all practices as designed. In general, all erosion and sediment control
measures shall be checked at least every 14 days and after each rain event over 0.5 inches of precipitation.
The following items shall be checked in particular:
The construction entrance shall be checked to ensure that the stone does not become clogged with mud.
The seeded areas shall be checked every 2 days to ensure that a good stand of grass is maintained. Grassed
areas should be fertilized and reseeded as needed.
Silt fence shall be checked for undermining or deterioration of the fabric. Sediment will be removed from
behind the sediment fence when it becomes about 0.5 ft. deep at the fence. The sediment fence will be
repaired as necessary to maintain a barrier.
All seeded areas will be fertilized, reseeded as necessary, and mulched according to specifications in the
vegetative plan to maintain a vigorous, dense vegetative cover.
Specific requirements related to inspection and maintenance of each erosion control measure is discussed in
the VE&SCH Standards and Specifications. The contractor will be responsible for maintenance of all erosion
control measures to the satisfaction of local review authorities, as well as the installation of additional
measures as needed to ensure that sediment-laden runoff does not leave the site.
IQVSHFWLRQ
Disturbed areas of the construction site that have not been finally stabilized, areas used for storage of
materials that are exposed to precipitation, structural control measures, and locations where vehicles enter or
exit the site shall be inspected at least once every 14 calendar days and within 48 hours of the end of a storm
event that is 0.5 inches or greater. In those areas that have been finished, temporarily stabilized, or runoff is
unlikely due to winter conditions, inspections shall take place at least once a month.
Disturbed areas and areas used for storage of materials that are exposed to precipitation shall be inspected
for evidence of, or the potential for, pollutants entering the drainage system. Erosion and sediment control
measures shall be checked to see they are operating correctly. At accessible discharge points, inspection
shall take place to ensure these control measures are effective at preventing significant impacts to receiving
waters. Nearby downstream locations shall be inspected if discharge points are inaccessible. Sites of vehicle
entrance or exit shall be inspected for evidence of offsite sediment tracking.
If existing control measures or Best Management Practices (BMPs) require modification or additional
measures, such changes shall be made within 7 calendar days of the inspection or before the next anticipated
storm event, as implementation is practicable.
Include inspection reports of all stormwater and erosion & sediment control measures along with any required
actions as a result of inspections, with the stormwater pollution prevention plan. These reports shall include
the name and qualifications of the inspector, dates of inspection, major observations and actions taken in
response to inspections. Major observations include the location of discharge of sediment or pollutant from the
site, locations of BMPs that need to be maintained, locations of BMPs that failed to operate or proved
inadequate, and locations where additional BMPs are needed that didn't exist at the time of inspection. These
reports shall include incidents of noncompliance. If the report does not include any noncompliance incidents,
the report shall contain a certification that the facility is in compliance with the stormwater pollution prevention
plan and permit.
NON-STORM WATER DISCHAR*ES
No other stormwater discharges other than those regulated by the Virginia Department of Environmental
Quality (DEQ) and permitted by the VSMP General Permit Registration Statement for Discharges from
Construction Activities are anticipated during this project.
CERTIFICATION
The contractor will prepare a certification statement for compliance to the approved erosion and sediment
control plan. All contractors and subcontractors involved in the implementation of stormwater and erosion &
sediment control measures must agree with and sign the certification statement, and maintain this document
in the record log.
APPROXIMATE CONSTRUCTION SE4UENCE
1.Obtain Site Plan approval and other applicable local and state permits.
2.Hold the pre-construction conference at least one week prior to starting construction.
3.Install perimeter erosion and sediment control devices. All erosion and sediment control practices will be
inspected weekly and after rainfall events, and any needed repairs will be made immediately.
4.Rough grade the roadway, parking lot and other applicable portions of the site and stockpile topsoil in
designated areas. Leave the surface slightly roughened and vegetate and mulch immediately.
5.Install utility lines
6.Place stone base and base asphalt course mix on the parking and entrance as required.
7.Complete final paving for entrance and parking area.
8.Complete final grading of grounds, topsoil critical areas, and permanently vegetate, landscape, and mulch.
9.After the site is stabilized, remove all temporary measures and install permanent vegetation on the
disturbed areas.
1.PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO
DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON
ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED
WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE
BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT
STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT
FOR MORE THAN ONE YEAR.
2.DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW
AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING
MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION
AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS
BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT
SITE.
3.A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED
AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION
SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS
ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT
EROSION.
4.SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND
OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS
A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE
FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
5.STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH
AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION.
6.SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND
CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY
THE TRAP OR BASIN.
a.THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC
YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL
DRAINAGE AREAS LESS THAN THREE ACRES.
b.SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW
FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL
BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY
OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE
AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE
STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR
DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL
CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS
EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED.
7.CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER
THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING
EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE
PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE
PROBLEM IS CORRECTED.
8.CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES
UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT
CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.
9.WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR
OTHER PROTECTION SHALL BE PROVIDED.
10.ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING
CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER
CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR
OTHERWISE TREATED TO REMOVE SEDIMENT.
11.BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR
PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY
REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED
IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
12.WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL
BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT
AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING
CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE
CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE
USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER
MATERIALS.
13.WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES
MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR
STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE
PROVIDED.
14.ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO
WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET.
15.THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY
AFTER WORK IN THE WATERCOURSE IS COMPLETED.
16.UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE
FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA:
a.NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
b.EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
c.EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED
THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND
DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING
STREAMS OR OFF-SITE PROPERTY.
d.MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY
COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION.
e.RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS
CHAPTER.
f.APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH.
17.WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR
PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF
SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE
SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE
ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY.
SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR
SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA.
STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN
THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT
LOTS AS WELL AS TO LARGER LAND-DISTURBING ACTIVITIES.
18.ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE
TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE
AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE
DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY
MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION
AND SEDIMENTATION.
19.PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES
SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE
DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF
STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR
DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND
CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT
INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE
CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND
VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS:
a.CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE
SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR
MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR
THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM,
DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE
SYSTEM SHALL BE PERFORMED.
b.ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE
FOLLOWING MANNER:
(1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA
TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES
GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN
QUESTION; OR
(2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A
TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP
CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS.
(B) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE
ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT
STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A
TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE
EROSION OF CHANNEL BED OR BANKS; AND
(C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF
A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED
WITHIN THE PIPE OR SYSTEM.
c.IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED
MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL:
(1) IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM
WILL NOT OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE
EROSION TO THE CHANNEL, THE BED, OR THE BANKS; OR
(2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE
TEN-YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES;
(3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE-DEVELOPMENT
PEAK RUNOFF RATE FROM A TWO-YEAR STORM TO INCREASE WHEN
RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE
PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TEN-YEAR STORM TO
INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL; OR
(4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER
DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE VESCP
AUTHORITY TO PREVENT DOWNSTREAM EROSION.
d.THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE
IMPROVEMENTS.
e.ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED
CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT CONDITION OF THE
SUBJECT PROJECT.
f.IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER
DETENTION, HE SHALL OBTAIN APPROVAL FROM THE VESCP OF A PLAN FOR
MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE
MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON
RESPONSIBLE FOR PERFORMING THE MAINTENANCE.
g.OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A
RECEIVING CHANNEL, AND ENERGY DISSIPATORS SHALL BE PLACED AT THE
OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A
STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL.
h.ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE.
i.INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR
SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE
OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION
FACILITY.
j.IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS
OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT
SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS.
INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A
SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT
THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING
CALCULATIONS.
k.ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE
EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL,
CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER
WATERS OF THE STATE.
l.ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR
STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY
AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS
SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR
NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (I)
DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (II)
DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL
RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (III) REDUCE THE
ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR,
24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK
FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED
CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK
FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF
VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION
DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED
CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND
VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS
DEFINED IN ANY REGULATIONS PROMULGATED PURSUANT TO § 62.1-44.15:54
OR 62.1-44.15:65 OF THE ACT.
m.FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE
CAPACITY AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT
AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER
QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§
62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT
REGULATIONS, UNLESS SUCH LAND-DISTURBING ACTIVITIES ARE IN
ACCORDANCE WITH 9VAC25-870-48 OF THE VIRGINIA STORMWATER
MANAGEMENT PROGRAM (VSMP) REGULATIONS.
n.COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN
9VAC25-870-66 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM
(VSMP) REGULATIONS SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF
SUBDIVISION 19 OF THIS SUBSECTION.
•
•
•
•
E[LVWLQJ SLWH CRQGLWLRQV
The grades generally slope from West side of the site to the East, with an average slope ranging
from approximately 2% to10%. There are no known current erosion problems that exist on the site.
OFF-SITE AREAS
No “off-site” areas will be disturbed by this project. If it is necessary to import borrow material or
dispose of surplus material, the contractor will be responsible for providing an approved VSM
Permitted Site for the off-site borrow or waste areas.
ADJACENT AREAS
The construction area is contained within the parcel located on Crock Wells Mill Dr. The area is
bordered to the North by Wal-Mart Dr, to the South by Crock Wells Mill Dr. Drainage from the site
flows overland from the top of the site into an existing storm sewer system and outfalls into an
existing BMP within the shopping center.
SRLOV
Soils on-site consist of Frederick-Poplimento loams and slopes ranging from 7 to 15 percent. See
sheet C-504 for soils map and legend.
CULWLFDO EROSION AUHDV
There are no critical erosion areas on site.
OWKHU PRWHQWLDO PROOXWLRQ VRXUFHV
Other potential pollution sources include on-site fueling storage and operations for construction
equipment, as well as the storage of fertilizer on-site used in establishing temporary and permanent
seeding.
DLVFKDUJH IURP LQGXVWULDO DFWLYLW\
No discharges from industrial activities are anticipated on this project other than normal construction
practices.
EURVLRQ AQG SHGLPHQW CRQWURO MHDVXUHV
The Phase 1 and Phase 2 erosion and sediment control measures will be designed to retain
sediment on-site to the maximum extent practicable. All perimeter erosion control measures must be
properly selected, installed, and maintained in accordance with the manufacturers' specifications and
good engineering practices. If periodic inspections or other information indicates a control has been
used inappropriately or incorrectly, the contractor must replace or modify the control for site specific
situations. If sediment escapes the construction site, off-site accumulations of sediment must be
removed at a frequency sufficient to minimize off-site impacts (e.g. construction related sediment in
streets could be washed into storm sewers by the next rain and pose a safety hazard to users of
surrounding access drives). Sediment must be removed from sediment traps when design capacity
has been reduced by 50%. Litter, construction debris, and construction chemicals exposed to
stormwater shall be prevented from becoming a pollutant source for stormwater discharges by
screening outfalls and picking up litter daily.
STRUCTURAL PRACTICES
The following measures will be used to control erosion and sediment-laden runoff on this project. See
the Erosion & Sediment Control Plans for locations of specific erosion control measures.
Construction Entrance: Used to reduce mud and sediment tracked onto adjacent roads (VE&SCH
Standard and Spec. 3.02). If mud or sediment is transported onto a paved road surface, the road
shall be cleaned thoroughly at the end of each day. Sediment and mud shall be removed from the
roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing
shall be allowed only after sediment and mud are removed in this manner.
Silt Fence: Used to intercept and detain small amounts of sediment from disturbed areas during
construction operations and to prevent sediment from leaving the site (VE&SCH Standard and Spec.
3.05).
Storm Drain Inlet Protection: Used to prevent sediment from entering storm drainage systems prior to
permanent stabilization of the disturbed area (VE&SCH Standard and Spec. 3.07).
Temporary Seeding: Applied to denuded areas within seven days after final grade is reached on any
portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas
that may not be at final grade but will remain dormant (undisturbed) for longer than 30 days
(VE&SCH Standard and Spec. 3.31).
Permanent Seeding: Used to establish vegetative cover and to reduce silt runoff for any areas not
paved or roofed. Permanent stabilization shall be applied to areas that are to be left dormant for
more than one year (VE&SCH Standard and Spec. 3.32).
VE*ETATIVE PUDFWLFHV
Topsoil will be stripped from areas to be graded and stockpiled for later use. Stockpile locations will
be located within the construction limits on-site and are to stabilized with temporary vegetation.
Once site improvements are installed and the site is to be stabilized, apply the a minimum of 3" of
topsoil to areas to be landscaped. Topsoil shall be tested to ensure a minimum organic matter of
1.5% by weight, and a PH of 6.0 - 7.5. Topsoiled areas shall be limed and fertilized in accordance
with table 3-31B provided in the plan set.
The contractor will submit a supplementary erosion and sediment control plan to the Owner and
Shenandoah County for review and approval covering any off-site stockpile areas prior to any off-site
activities commence.
SWDELOL]DWLRQ PUDFWLFHV
No specific schedule other than those guidelines provided in the VE&SCH descriptions for vegetative
practices will be used for temporary and permanent seeding measures. Rip-rap used for areas
requiring outlet protection will be placed within two days after the outlet structures are functional.
Contractor will maintain a record of all major grading activities, temporary or permanent construction
activities, and when stabilization measures are implemented. This record shall be kept throughout
the duration of the project. The contractor will ensure that these records are maintained, updated and
become a permanent part of this overall plan.
Construction will be sequenced so that grading operations can begin and end as quickly as possible.
Stabilization measures shall be implemented on disturbed areas as soon as practicable. Upon
reaching final grade, all graded slopes must be immediately seeded and fertilized to ensure proper
stabilization. Permanent seeding shall be installed within 7 days of reaching final grade. Denuded
areas which are not at final grade but which will remain dormant for more than 14 days shall be
temporarily seeded. Areas that are not to be disturbed must be clearly marked with flagging or
signage
After the construction is completed, the site will be permanently stabilized with a combination of
building expansion improvements, pavement, landscaping, and permanent seeding in accordance
with VE&SCH Standard and Specification 3.32.
SWRUPZDWHU RXQRII CRQVLGHUDWLRQV
Stormwater runoff will be collected from the proposed access drives and parking lot and conveyed
through a system of stormwater piping prior to entering the existing storm sewer system. For
compliance with MS-19 requirements, refer to sheet C-703 for Flood and Channel Protection
summaries.
EROSION &
SEDIMENT CONTROL
NOTES
C-505
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
FIRE WATER DESIGN CALCULATIONS3
TACO BELL - WINCHESTER
SEKIV SOLUTIONS, LLC.5/20/25
S. LITTLE
TYPE VB
1
2,558 SF
0 SF
0 SF
2,558 SF
1,500 GPM
2 HOURS
X
1,500 GPM
1 REQUIRED, 1 EXISTING ADJACENT TO SITE ENTRANCE
500
DOMESTIC METER SIZER FORM IRRIGATION METER SIZER FORM21
3
6
1
3
3
6.6
9.0
16.0
105.0
36.0
180.6
45
1 1/2" METER
TACO BELL WINCHESTER
COMMERCIAL
TACO BELL WINCHESTER
COMMERCIAL
15
5/8" METER
2 8.0
UTILITY NOTES &
DETAILS
C-506
FREDERICK WATER CONSTRUCTION NOTES4
FREDERICK WATER METER DETAIL5 FREDERICK WATER GRAVITY SEWER CLEAN OUT DETAIL6 FREDERICK WATER GRAVITY SEWER LATERAL DETAIL7 FREDERICK WATER METER DEATIL8
W
W
W
W
SAN
SANSANSANUGEUGEUGEUGEUGEUGEUGTUGTUGTUGTUGTUGTUGE
UGE
UGT
UGT
8428458
4
7 8448428418406" ROOF DRAIN
1
2
3
4
5
EX1
EX2
0
SCALE 1"=20'
40'20'
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
STORM SEWER
DRAINAGE AREA
MAP &
CALCULATIONS
C-701
0.70
0.34 AC.
1
0.53
0.08 AC.
2
0.86
0.16 AC.
3
0.86
0.14 AC.
4
0.69
0.14 AC.
5
WATWATWATWATWATWATWATWAT WAT WAT WAT WAT WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
W
W
W
W
SAN
SANSANSANUGEUGEUGEUGEUGEUGEUGTUGTUGTUGTUGTUGTUGE
UGE
UGT
UGT
8428458
4
7 84484284184023,262 SF LANDSCAPED AREA
10,503 SF
LANDSCAPED AREA
317 SF LANDSCAPED
AREA
317 SF LANDSCAPED
AREA
LANDSCAPE PLAN
L-101
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
0
SCALE 1"=20'
40'20'
NOTES:
1. NO TREES OR SHRUBS TO BE PLANTED IN THE FW EASEMENTS.
2. IRRIGATION LINES AND DEVICES, LIGHT POLES, TRANSFORMERS,
JUNCTION BOXES, PEDESTALS, OTHER OBSTACLES AND ALL DRY
UTILITIES SHALL NOT BE PLACED ON FREDERICK WATER EASEMENTS;
PERPENDICULAR IRRIGATION LINES AND DRY UTILITY CROSSINGS
ARE PERMITTED WITH 18" MINIMUM VERTICAL SEPARATION.
LANDSCAPE NOTES &
DETAILS
L-102
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
PRE-CONSTRUCTION
1.CONTRACTOR IS RESPONSIBLE FOR CONTACTING "MISS UTILITY" AT 1.800.552.7001 FOR LOCATION OF ALL UTILITY LINES. TREES SHALL BE LOCATED A MINIMUM OF 5 FEET FROM SEWER/WATER CONNECTIONS.
NOTIFY LANDSCAPE ARCHITECT OF CONFLICTS.
2.VERIFY ALL PLANT MATERIAL QUANTITIES ON THE PLAN PRIOR TO BIDDING, PLANT LIST TOTALS ARE FOR CONVENIENCE ONLY AND SHALL BE VERIFIED PRIOR TO BIDDING.
3.PROVIDE PLANT MATERIALS OF QUANTITY, SIZE, GENUS, SPECIES, AND VARIETY INDICATED ON PLANS.
4.ALL PLANT MATERIALS AND INSTALLATION SHALL COMPLY WITH RECOMMENDATIONS AND REQUIREMENTS OF ANSI Z60.1 "AMERICAN STANDARD FOR NURSERY STOCK".
5.IF SPECIFIED PLANT MATERIAL IS NOT OBTAINABLE, SUBMIT PROOF OF NON AVAILABILITY TO THE ARCHITECTS, TOGETHER WITH PROPOSAL FOR USE OF EQUIVALENT MATERIAL.
6.PROVIDE AND INSTALL ALL PLANTS AS IN ACCORDANCE WITH DETAILS AND CONTRACT SPECIFICATIONS.
CONSTRUCTION/INSTALLATION
1.LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY PLANTS AND MATERIALS THAT ARE IN AN UNHEALTHY OR UNSIGHTLY CONDITION, AS WELL AS PLANTS AND MATERIALS THAT DO NOT CONFORM TO
ANSI Z60.1 "AMERICAN STANDARD FOR NURSERY STOCK".
2.LABEL AT LEAST ONE TREE AND ONE SHRUB OF EACH VARIETY AND CALIPER WITH A SECURELY ATTACHED, WATERPROOF TAG BEARING THE DESIGNATION OF BOTANICAL AND COMMON NAME.
3.INSTALL LANDSCAPE PLANTINGS AT ENTRANCES/EXITS AND PARKING AREAS ACCORDING TO PLANS SO THAT MATERIALS WILL NOT INTERFERE WITH SIGHT DISTANCES.
4.CONTRACTOR IS RESPONSIBLE FOR WATERING ALL PLANT MATERIAL DURING INSTALLATION AND UNTIL FINAL INSPECTION AND ACCEPTANCE BY OWNER.
5.CONTRACTOR SHALL NOTIFY OWNER OF CONDITIONS WHICH AFFECTS THE GUARANTEE.
INSPECTIONS/GUARANTEE
1.UPON COMPLETION OF LANDSCAPE INSTALLATION, THE LANDSCAPE CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR WHO WILL VERIFY COMPLETENESS, INCLUDING THE REPLACEMENT OF ALL DEAD
PLANT MATERIAL.
2.CONTRACTOR IS RESPONSIBLE FOR SCHEDULING A FINAL INSPECTION BY THE LANDSCAPE ARCHITECT.
3.ALL EXTERIOR PLANT MATERIALS SHALL BE GUARANTEED FOR ONE FULL YEAR AFTER DATE OF FINAL INSPECTION AGAINST DEFECTS INCLUDING DEATH AND UNSATISFACTORY GROWTH. DEFECTS RESULTING FROM
NEGLECT BY THE OWNER, ABUSE OR DAMAGE BY OTHERS, OR UNUSUAL PHENOMENA OR INCIDENTS WHICH ARE BEYOND THE CONTRACTORS CONTROL ARE NOT THE RESPONSIBILITY OF THE CONTRACTOR.
4.PLANT MATERIAL QUANTITIES AND SIZES WILL BE INSPECTED FOR COMPLIANCE WITH APPROVED PLANS BY A SITE PLAN REVIEW AGENT OF THE PLANNING DEPARTMENT PRIOR TO THE RELEASE OF THE CERTIFICATE
OF OCCUPANCY.
5.REMOVE ALL GUY WIRES AND STAKES 12 MONTHS AFTER INSTALLATION.
No Scale
PLANTING SCHEDULE
No Scale
LANDSCAPING NOTES1
No Scale
5 DECIDUOUS TREE PLANTING AND STAKING DETAIL
No Scale4EVERGREN TREE PLANTING AND STAKING DETAIL
No Scale
6 SHRUB PLANTING DETAIL
PRE-CONSTRUCTION
1.CONTRACTOR IS RESPONSIBLE FOR CONTACTING "MISS UTILITY" AT 1.800.552.7001 FOR LOCATION OF ALL UTILITY LINES. TREES SHALL BE LOCATED A MINIMUM OF 5 FEET FROM SEWER/WATER CONNECTIONS.
NOTIFY LANDSCAPE ARCHITECT OF CONFLICTS.
2.VERIFY ALL PLANT MATERIAL QUANTITIES ON THE PLAN PRIOR TO BIDDING, PLANT LIST TOTALS ARE FOR CONVENIENCE ONLY AND SHALL BE VERIFIED PRIOR TO BIDDING.
3.PROVIDE PLANT MATERIALS OF QUANTITY, SIZE, GENUS, SPECIES, AND VARIETY INDICATED ON PLANS.
4.ALL PLANT MATERIALS AND INSTALLATION SHALL COMPLY WITH RECOMMENDATIONS AND REQUIREMENTS OF ANSI Z60.1 "AMERICAN STANDARD FOR NURSERY STOCK".
5.IF SPECIFIED PLANT MATERIAL IS NOT OBTAINABLE, SUBMIT PROOF OF NON AVAILABILITY TO THE ARCHITECTS, TOGETHER WITH PROPOSAL FOR USE OF EQUIVALENT MATERIAL.
6.PROVIDE AND INSTALL ALL PLANTS AS IN ACCORDANCE WITH DETAILS AND CONTRACT SPECIFICATIONS.
CONSTRUCTION/INSTALLATION
1.LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY PLANTS AND MATERIALS THAT ARE IN AN UNHEALTHY OR UNSIGHTLY CONDITION, AS WELL AS PLANTS AND MATERIALS THAT DO NOT CONFORM TO
ANSI Z60.1 "AMERICAN STANDARD FOR NURSERY STOCK".
2.LABEL AT LEAST ONE TREE AND ONE SHRUB OF EACH VARIETY AND CALIPER WITH A SECURELY ATTACHED, WATERPROOF TAG BEARING THE DESIGNATION OF BOTANICAL AND COMMON NAME.
3.INSTALL LANDSCAPE PLANTINGS AT ENTRANCES/EXITS AND PARKING AREAS ACCORDING TO PLANS SO THAT MATERIALS WILL NOT INTERFERE WITH SIGHT DISTANCES.
4.CONTRACTOR IS RESPONSIBLE FOR WATERING ALL PLANT MATERIAL DURING INSTALLATION AND UNTIL FINAL INSPECTION AND ACCEPTANCE BY OWNER.
5.CONTRACTOR SHALL NOTIFY OWNER OF CONDITIONS WHICH AFFECTS THE GUARANTEE.
INSPECTIONS/GUARANTEE
1.UPON COMPLETION OF LANDSCAPE INSTALLATION, THE LANDSCAPE CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR WHO WILL VERIFY COMPLETENESS, INCLUDING THE REPLACEMENT OF ALL DEAD
PLANT MATERIAL.
2.CONTRACTOR IS RESPONSIBLE FOR SCHEDULING A FINAL INSPECTION BY THE LANDSCAPE ARCHITECT.
3.ALL EXTERIOR PLANT MATERIALS SHALL BE GUARANTEED FOR ONE FULL YEAR AFTER DATE OF FINAL INSPECTION AGAINST DEFECTS INCLUDING DEATH AND UNSATISFACTORY GROWTH. DEFECTS RESULTING FROM
NEGLECT BY THE OWNER, ABUSE OR DAMAGE BY OTHERS, OR UNUSUAL PHENOMENA OR INCIDENTS WHICH ARE BEYOND THE CONTRACTORS CONTROL ARE NOT THE RESPONSIBILITY OF THE CONTRACTOR.
4.PLANT MATERIAL QUANTITIES AND SIZES WILL BE INSPECTED FOR COMPLIANCE WITH APPROVED PLANS BY A SITE PLAN REVIEW AGENT OF THE PLANNING DEPARTMENT PRIOR TO THE RELEASE OF THE CERTIFICATE
OF OCCUPANCY.
5.REMOVE ALL GUY WIRES AND STAKES 12 MONTHS AFTER INSTALLATION.
No Scale
3 PLANTING SCHEDULE
10 EACH 24" TALL CONT.FULL, DENSE
7 EACH RED SUNSET RED MAPLE 1-1/4" CALACER RUBRUM 'RED SUNSET'B&B SINGLE LEADER
SOFT TOUCH HOLLY7 EACH 24" TALLILEX CRENATA 'SOFT TOUCH'CONT.FULL, DENSE
11 EACH REDBUDCERCIS CANADENSIS'CONT.3 STEM MAX
SYMBOL SCIENTIFIC NAME SIZEQTY.
PLANTING SCHEDULE
10 EACH BARBERRY SPP.1 GAL.
SPANISH BAYONET
BARBERRY
YUCCA ALOIFOLIA
COMMON NAME TYPE
CONT.
CONT.
REMARKS
FULL, DENSE
9 EACH YUCCA FLACCIDA 18" TALLADAMS NEEDLE CONT.
SHRUBS
SMALL SHRUBS
10 EACH 4" POT POT PLANT 3' OC
GROUND COVER
3" DEPTHTENNESSEE RIVER ROCK
DOUBLE SHREDDED HARDWOOD MULCH
PLANT 24" OC
PLANT 15" OC
3" DEPTH
TREES
18 EACH CARISSA HOLLYILEX CORNUTA 'CARISSA'CONT.FULL, DENSE
GOLDEN MOP FALSE CYPRESS4 EACH CHAMAECYPARIS PISIFERA 'GOLDEN MOP'CONT.FULL, DENSE
4 EACH RED GRANITE BOULDER 12"-36"TO MATCH TENNESSEE RIVER ROCK
LANDSCAPE FEATURE
SOD (FESCUE/BLUEGRASS MIX)
COLOR AS BROWN
PROVIDE OWNER A SAMPLE
FOR APPROVAL
RINSE IN BED
FOLLOWING
INSTALLATION
1"-3" DIA.
18" TALL
18" TALL
18" TALL
10 EACH
10 EACH
LIRIOPE VARIEGATED 18" TALLLIRIOPE MUSCARI 'VARIEGATA'CONT.PLANT 15" OC
ATTACH FLAGS TO EACH GUY
WIRE 30" ABOVE FINISHED GRADE
3" DOUBLE SHREDDED HARDWOOD MULCH
GALVANIZED WIRE GUY
6" SAUCER
12 GAUGE
REMOVE TAGS, LABELS, AND PLASTIC SLEEVING
DO NOT STAKE UNLESS SPECIFIED (SEE COMMENTS)
DO NOT WRAP TRUNK
KEEP AWAY FROM TRUNK
SCARIFY SIDES BEFORE PLANTING
PRUNE SUCKERS
8' 2X2 HARDWOOD STAKE
3-2X2 HARDWOOD STAKES
12 GAUGE GALVANIZED WIRE
BACKFILL PLANTING PIT WITH NATIVE SOIL
EXCEPT IN AREAS OF HEAVY CLAY. ADD
GOOD QUALITY TOPSOIL TO NATIVE SOIL.
1:1 SLOPE ON SIDES OF PLANTING HOLE
TAMP SOIL AROUND ROOTBALL
BASE FIRMLY WITH FOOT PRESSURE
SO THAT ROOTBALL DOES NOT
SHIFT.
PLACE ROOTBALL ON UNEXCAVATED
OR TAMPED SOIL.
SET TOP OF ROOTBALL FLUSH TO GRADE OR 1-2"
HIGHER IN SLOWLY DRAINING SOILS. DO NOT
COVER THE TOP OF THE ROOTBALL WITH SOIL.
REMOVE BROKEN, BADLY DEFORMED, OR
CROSS-BRANCHES. BEGIN A REGULAR PRUNING
PROGRAM DURING THE 2ND OR 3RD YEAR AFTER
PLANTING.
MARK THE NORTH SIDE OF TREE IN NURSERY &
ROTATE TREE TO FACE NORTH AT THE SITE.
ROOT BALL
1/2" RUBBER HOSE
CUT AWAY ALL BALLING ROPES REMOVE BURLAP
OR WIRE BASKET FROM TOP 1/3 OF BALL, OR
REMOVE CONTAINER AND CUT CIRCLING ROOTS IF
CONTAINER-GROWN, OR AS MUCH BURLAP AS
POSSIBLE IF FIELD-GROWN.
4" PERFORATED CORRUGATED PLASTIC PIPE; CAP
FLUSH WITH MULCH
KEEP AWAY FROM TRUNK
3" SHREDDED HARDWOOD MULCH
6" SAUCER
BURLAP FROM TOP 1/3 OF BALL
REMOVE ALL STRING, WIRE, AND
SCARIFY BOTTOM AND SIDES OF PIT
INSTALL SHRUBS SO THAT TOP OF THE
ROOTBALL IS AT THE SAME GRADE AS
ORIGINALLY GROWN OR 1-2" ABOVE IN
POOR DRAINING SOILS. DO NOT
COVER THE TOP OF THE ROOTBALL WITH
SOIL.
PROVIDE MULCH UP AND OVER SAUCER
REMOVE ALL DEAD, BROKEN, DISEASED AND
WEAK BRANCHES AT TIME OF PLANTING.
DIAMETER
TWICE ROOTBALL2'-6" MIN.RUBBER HOSE
TAMP SOIL AROUND ROOTBALL
BASE FIRMLY WITH FOOT
PRESSURE SO THAT ROOTBALL
DOES NOT SHIFT.
BACKFILL WITH EXISTING SOIL. IN SANDY
LOAM SOILS, ADD 20% MAXIMUM (BY VOLUME)
COMPOSTED ORGANIC MATERIAL TO THE
EXISTING SOIL. PARTIALLY BACKFILL, WATER
TO SETTLE SOIL, FINISH BACKFILLING.
2X2 HARDWOOD STAKE
KEPT AWAY FROM TRUNK
12 GAUGE
6" SAUCER
GALVANIZED WIRE GUY
SHREDDED HARDWOOD
MULCH (MIN. 3" DEPTH)
MARK THE NORTH SIDE OF TREE IN NURSERY
& ROTATE TREE TO FACE NORTH AT THE SITE,
WHENEVER POSSIBLE.
SET TOP OF ROOTBALL FLUSH TO GRADE OR
1-2" HIGHER IN SLOWLY DRAINING SOILS. DO
NOT COVER THE TOP OF THE ROOTBALL WITH
SOIL.
PLACE ROOTBALL ON UNEXCAVATED
OR TAMPED SOIL.
1:1 SLOPE ON SIDES OF PLANTING
HOLE
PRUNE SUCKERS
SCARIFY SIDES BEFORE PLANTING
DO NOT WRAP TRUNK
DO NOT STAKE UNLESS NECESSARY (SEE NOTES)
REMOVE TAGS, LABELS, AND PLASTIC SLEEVING
CUT AWAY ALL BALLING ROPES REMOVE
BURLAP OR WIRE BASKET FROM TOP 1/3 OF
BALL, OR REMOVE CONTAINER AND CUT
CIRCLING ROOTS IF CONTAINER-GROWN, OR AS
MUCH BURLAP AS POSSIBLE IF FIELD-GROWN.
No Scale
LANDSCAPING CALCULATIONS2
20 EACH CARISSA HOLLYILEX CORNUTA 'CARISSA'CONT.FULL, DENSE36" TALL
LANDSCAPING CALCULATIONS
TYPE REQUIREMENTS CALCULATION PROVIDED
PERIMITER LANDSCAPING 1 TREE PER 2,000 SF OF IMPERVIOUS AREA 25,334 SF / 2000 SF = 12.7 = 13 TREES 13 TREES
INTERIOR LANDSCAPING 1 SHADE TREE PER 10 SPACES 34 SPACES / 10 = 3.4 = 4 TREES 4 SHADE TREES
MINIMUM LANDSCAPED AREA 15% OF PARCEL AREA 55,232 X 15% = 8,284 SF 23,262 SF
INTERIOR LANDSCAPE REQUIREMENTS 5% OF THE INTERIOR PORTIONS OF A
PARKING LOT
10,502 X 5% = 525 SF 634 SF
4 USED FOR INTERNAL REQUIREMENTS.
6 USED FOR PERIMETER REQUIREMENTS.
7 USED FOR PERIMETER REQUIREMENTS.
1-1/4" CAL
SHRUBS TO BE USED FOR HEADLIGHT
SCREENING.
NOTE:
CALIPER IS MEASURED SIX INCHES ABOVE
THE GROUND UP TO AND INCLUDING
FOUR-INCH CALIPER SIZE AND 12 INCHES
ABOVE THE GROUND FOR LARGER SIZES.
FALSE SPIREA SORBARIA SORBIFOLIA
INDIAN HAWTHORNRHAPHIOLEPIS INDICA
WATWATWATWATWATWATWATW
W
W
W
SAN
SANSANSANUGEUGEUGEUGEUGEUGEUGTUGTUGTUGTUGTUGTUGE
UGE
UGT
UGT
8428458
4
7 84484284184023,262 SF LANDSCAPED AREA
10,503 SF
LANDSCAPED AREA
317 SF LANDSCAPED
AREA
317 SF LANDSCAPED
AREA
IRRIGATION PLAN
L-103
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
0
SCALE 1"=20'
40'20'
IRRIGATION NOTES AND LEGEND3
CONTRACTOR SHALL DETERMINE CONNECTION
POINT TO DOMESTIC FOR IRRIGATION SUPPLY.
IRRIGATION DESIGN WILL BE COMPLETED BY THE
IRRIGATION CONTRACTOR
CONTRACTOR SHALL SUBMIT IRRIGATION DESIGN TO
ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION.
DESIGN SHALL INCLUDE PRODUCT MANUFACTURER
INFORMATION, FLOW RATES, PIPING SIZE AND
LAYOUT, HEAD LAYOUT SHOWING SPRAY COVERAGE,
AND PVC SLEEVING LOCATIONS.
REMOTE CONTROL VALVE
SPRAY HEADS
ATMOSPHERIC VAC BREAKER
PR/PRESSURE VAC. BRKR.
NO SCALE
IRRIGATION NOTES4
NO SCALE
IRRIGATION NOTES AND LEGEND2
NO SCALE
NO SCALE
IRRIGATION PLAN1
WATWATWATWATWATWATWATWAT WAT WAT WAT WAT WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
WAT
W
W
W
W
SAN
SANSANSANUGEUGEUGEUGEUGEUGEUGTUGTUGTUGTUGTUGTUGE
UGE
UGT
UGT
8428458
4
7 844842841840Luminaire Schedule
Symbol Qty Label Arrangement Description
7 A SINGLE MRM-LED-24L-SIL-FT-40-70CRI MOUNTED AT 25'
2 B BACK-BACK MRM-LED-24L-SIL-FT-40-70CRI MOUNTED AT 25'
Calculation Summary
Label Units Avg Max Min Avg/Min Max/Min
-Fc N.A.N.A.N.A.N.A.N.A.
DRIVE THRU SURFACE Fc 5.55 7.9 3.8 1.46 2.08
PARKING LOT SURFACE Fc 5.44 10.2 3.2 1.70 3.19
B
B
A
A
A
A
A
A
A
0.2
0.3
0.5
0.8
1.1
1.4
1.6
1.8
2.0
2.1
2.2
2.2
2.1
2.0
1.9
1.9
1.9
1.9
1.9
2.0
2.0
1.9
1.8
1.6
1.4
1.2
1.0
0.8
0.6
0.4
0.3
0.2
0.1
0.1
0.1
0.1
0.2
0.4
0.6
1.1
1.4
1.7
2.0
2.3
2.6
2.7
2.8
2.8
2.7
2.6
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.4
2.3
2.1
1.9
1.6
1.4
1.2
0.9
0.6
0.3
0.2
0.2
0.1
0.1
0.1
0.3
0.5
0.8
1.3
1.8
2.1
2.3
2.7
3.1
3.3
3.4
3.4
3.3
3.3
3.3
3.2
3.2
3.1
3.1
3.1
3.0
2.9
2.8
2.6
2.3
2.0
1.8
1.5
1.2
0.8
0.4
0.3
0.2
0.2
0.2
0.1
0.5
0.6
0.9
1.6
2.3
2.5
2.7
3.1
3.5
3.9
4.0
3.9
3.9
3.8
3.8
3.8
3.7
3.7
3.6
3.5
3.5
3.4
3.3
3.1
2.8
2.4
2.2
2.0
1.6
1.0
0.6
0.5
0.4
0.3
0.2
0.2
0.7
0.9
1.2
2.0
3.0
3.2
3.3
3.5
3.9
4.2
4.1
4.1
4.1
4.2
4.3
4.3
4.1
3.9
3.8
3.7
3.7
3.7
3.7
3.6
3.2
3.0
2.9
2.8
2.2
1.4
1.0
0.7
0.5
0.4
0.3
0.2
1.0
1.3
1.8
2.6
4.3
4.3
4.0
3.9
4.2
4.6
4.2
4.3
4.6
5.3
5.8
5.8
5.5
4.7
4.2
3.8
3.8
4.0
4.2
4.0
3.8
3.7
3.8
3.9
2.9
2.0
1.5
1.1
0.8
0.5
0.3
0.2
1.2
1.9
2.5
3.4
5.8
5.7
5.0
4.6
4.7
4.6
4.4
4.6
5.2
6.3
7.2
7.4
6.7
5.6
4.6
4.1
4.1
4.3
4.6
4.5
4.4
4.7
5.1
5.5
3.8
2.9
2.2
1.6
0.9
0.5
0.3
0.2
1.2
2.3
3.0
4.2
6.7
6.7
5.9
5.4
5.4
5.0
5.0
5.2
6.2
7.9
9.4
9.6
8.7
6.8
5.3
4.7
4.6
4.8
5.1
5.0
5.0
5.7
6.5
7.2
4.8
3.8
2.9
2.0
1.1
0.6
0.4
0.3
1.2
2.3
3.0
4.4
7.0
7.0
6.4
5.8
4.9
5.3
5.5
5.9
7.1
8.8
10.0
10.2
9.3
7.6
6.1
5.3
5.0
5.1
5.4
5.4
5.6
6.5
7.3
7.8
5.6
4.5
1.5
1.0
0.6
0.4
0.3
0.2
1.3
1.9
2.7
3.9
6.5
6.7
6.4
5.0
6.9
8.5
9.9
10.0
9.1
7.1
5.6
5.0
4.9
5.2
5.6
5.6
5.9
6.6
7.5
8.1
5.8
4.8
3.8
2.5
1.4
0.9
0.7
0.5
1.2
1.5
2.3
3.5
5.4
5.6
5.5
5.4
5.4
6.5
7.4
7.6
7.1
5.9
5.0
4.6
4.7
5.1
5.6
5.8
6.0
6.4
7.0
7.5
5.8
5.1
4.2
2.8
1.8
1.2
0.9
0.6
1.1
1.4
2.0
3.4
4.8
5.2
5.5
5.5
4.8
5.6
6.2
6.2
5.8
5.1
4.6
4.4
4.7
5.1
5.6
5.9
6.1
6.3
6.4
6.8
6.2
6.0
4.9
3.1
2.2
1.6
1.0
0.6
1.1
1.5
2.1
3.5
5.1
5.4
5.7
5.6
4.6
4.7
4.7
4.7
4.6
4.5
4.5
4.6
4.8
5.2
5.6
6.0
6.2
6.3
6.3
6.7
6.9
7.3
5.8
3.7
2.7
2.1
1.1
0.7
1.3
1.7
2.5
3.8
6.0
6.2
6.1
5.7
4.5
4.4
4.4
4.4
4.5
4.5
4.6
4.7
5.0
5.2
5.7
6.0
6.3
6.4
6.3
6.9
7.3
7.9
6.3
4.2
2.9
2.1
1.1
0.7
1.4
2.2
3.1
4.4
7.2
7.3
6.8
6.0
4.3
4.2
4.2
4.2
4.3
4.4
4.5
4.7
5.0
5.3
5.6
6.0
6.4
6.5
6.3
6.7
7.1
7.9
6.3
4.1
2.8
2.2
1.2
0.8
1.3
2.6
3.5
5.0
7.7
7.9
7.3
6.3
4.1
4.0
4.0
4.0
4.1
4.3
4.4
4.6
4.9
5.2
5.5
5.9
6.4
6.5
6.2
6.2
6.5
7.2
6.0
3.4
2.5
2.0
1.3
0.9
1.4
2.5
3.4
4.9
7.6
7.8
7.2
6.2
4.1
4.0
4.0
4.0
4.1
4.3
4.4
4.6
4.8
5.1
5.4
5.7
6.2
6.4
6.0
5.9
5.9
6.3
5.5
3.3
2.3
1.8
1.4
1.0
1.4
2.1
2.9
4.2
6.9
7.1
6.6
5.9
4.4
4.3
4.3
4.3
4.4
4.4
4.5
4.6
4.7
4.9
5.1
5.5
6.0
6.2
5.8
5.7
5.9
6.3
5.6
3.4
2.4
1.9
1.5
1.1
1.2
1.6
2.4
3.7
5.7
6.0
6.0
5.6
4.5
4.5
4.5
4.4
4.4
4.4
4.4
4.4
4.5
4.6
4.9
5.2
5.7
6.0
5.7
5.8
6.4
7.3
6.3
4.0
2.9
2.3
1.6
1.1
1.1
1.4
2.0
3.5
4.9
5.3
5.6
5.4
4.7
4.9
4.9
4.9
4.8
4.5
4.3
4.2
4.2
4.3
4.6
5.0
5.5
5.7
5.7
6.0
6.9
8.0
6.8
4.7
3.3
2.7
1.6
1.2
1.1
1.4
2.1
3.4
4.9
5.2
5.4
5.3
5.0
5.9
6.7
6.7
6.0
5.1
4.5
4.1
4.0
4.2
4.5
4.9
5.4
5.5
5.6
6.1
6.9
8.1
6.9
4.9
3.6
2.9
1.8
1.3
1.2
1.6
2.4
3.7
5.8
5.8
5.4
5.2
5.5
6.9
8.3
8.3
7.5
6.0
4.8
4.2
4.2
4.3
4.6
4.9
5.2
5.5
5.3
5.8
6.5
7.6
6.6
4.6
3.6
3.0
2.0
1.5
1.3
2.1
2.8
4.0
6.8
6.8
6.3
5.9
4.9
5.4
5.5
5.8
7.0
8.8
10.1
10.2
9.1
7.0
5.4
4.7
4.5
4.5
4.6
4.8
5.2
5.4
5.2
5.4
5.8
6.4
5.8
4.1
3.4
2.8
2.2
1.6
1.2
2.4
3.1
4.4
6.9
6.9
6.3
5.7
4.9
5.3
5.5
5.9
7.1
8.7
10.0
10.2
9.1
7.2
5.7
4.8
4.5
4.4
4.5
4.8
5.1
5.3
5.3
5.3
5.5
5.6
5.2
4.0
3.2
2.7
2.2
1.7
1.2
2.2
2.8
4.1
6.5
6.5
5.7
5.2
5.2
4.9
4.9
5.2
6.0
7.6
8.9
8.9
8.0
6.1
4.7
4.1
3.9
4.0
4.3
4.5
4.7
4.9
4.9
4.9
4.9
4.9
4.5
3.7
3.0
2.5
2.1
1.6
1.2
1.7
2.3
3.1
5.4
5.4
4.8
4.4
4.6
4.5
4.4
4.6
5.1
6.0
6.8
6.9
6.1
4.9
4.1
3.6
3.5
3.6
3.8
4.0
4.3
4.5
4.6
4.8
4.9
4.8
4.2
3.4
2.7
2.2
1.8
1.5
0.9
1.1
1.6
2.4
3.9
4.0
3.8
3.8
4.1
4.5
4.2
4.3
4.5
5.0
5.2
5.1
4.9
4.2
3.7
3.3
3.3
3.4
3.5
3.7
3.9
4.2
4.6
5.2
5.6
5.3
4.5
3.5
2.7
2.0
1.7
1.3
0.6
0.8
1.1
1.9
2.8
3.0
3.1
3.4
3.8
4.2
4.1
4.1
4.1
4.0
4.0
3.9
3.8
3.6
3.4
3.3
3.2
3.2
3.3
3.4
3.7
4.1
4.9
5.9
6.3
6.1
5.1
3.8
2.7
2.0
1.6
1.2
0.4
0.6
0.9
1.5
2.1
2.4
2.6
3.0
3.5
3.8
3.9
3.8
3.7
3.7
3.6
3.5
3.4
3.3
3.1
3.0
2.9
2.9
3.0
3.1
3.4
3.9
5.0
6.2
6.5
6.4
5.4
3.8
2.6
1.9
1.4
1.1
0.3
0.4
0.7
1.2
1.7
2.0
2.3
2.6
3.0
3.2
3.3
3.3
3.1
3.0
2.9
2.8
2.7
2.6
2.6
2.5
2.4
2.4
2.5
2.5
2.6
2.8
3.2
3.7
4.3
4.0
3.1
2.4
1.9
1.4
1.1
0.8
0.2
0.3
0.6
1.0
1.4
1.6
1.9
2.2
2.4
2.6
2.6
2.6
2.5
2.4
2.3
2.2
2.1
2.0
2.0
2.0
1.9
1.9
1.8
1.8
1.8
1.9
2.2
2.7
3.0
2.8
2.3
1.6
1.1
0.8
0.7
0.5
0.2
0.3
0.5
0.8
1.1
1.3
1.5
1.7
1.8
2.0
2.0
2.0
1.9
1.8
1.7
1.6
1.6
1.5
1.5
1.5
1.4
1.4
1.3
1.2
1.2
1.4
1.6
2.0
2.3
2.1
1.6
1.1
0.8
0.5
0.4
0.3
0.2
0.2
0.4
0.6
0.8
0.9
1.1
1.2
1.4
1.4
1.5
1.5
1.4
1.3
1.2
1.2
1.1
1.1
1.1
1.1
1.0
1.0
0.9
0.9
1.0
1.1
1.2
1.4
1.2
1.2
1.2
0.9
0.6
0.4
0.3
0.2
LIGHTING PLAN
Ll-101
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS
0
SCALE 1"=20'
40'20'
ELECTRICAL NOTE:
CONTRACTOR SHALL BE RESPONSIBLE FOR
PROVIDING 2-4" PVC CONDUITS WITH PULL
STRING FROM UTILITY POLE TO PAD MOUNTED
TRANSFORMER FOR PRIMARY SERVICE.
TRANSFORMER PAD TO BE CONSTRUCTED BY
CONTRACTOR. CONTRACTOR SHALL COORDINATE
WITH UTILITY COMPANY ON SIZE AND LOCATION.
TRANSFORMER TO BE SET BY UTILITY COMPANY.
CONTRACTOR TO PROVIDE SECONDARY SERVICE
FROM TRANSFORMER TO MDP WITH 3-4" PVC
CONDUITS. CONTRACTOR TO INSTALL METER AND
MAKE FINAL CONNECTION.
NOTE:
ALL OUTDOOR LIGHTING FIXTURES SHALL BE
DESIGNED, SHIELDED, AIMED, LOCATED
AND MAINTAINED TO SHIELD ADJACENT
PROPERTIES AND TO NOT PRODUCE GLARE
ONTO ADJACENT PROPERTIES OR ROAD
RIGHTS-OF-WAY. PARKING LOT FIXTURES
AND LIGHT FIXTURES ON BUILDINGS SHALL BE
FULL-CUTOFF FIXTURES” PER §165-201.07(B).
LIGHTING NOTES
& DETAILS
Ll-102
SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION
DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL -
WINCHESTER
Lic. No. 39974
Stuart G. Little
8/8/2025
RESTAURANT PROPERTY
INVESTORS II, LLC.
2242 W. GREAT NECK ROAD
VIRGINIA BEACH, VIRGINIA 23451
ATTN : YIANNI ACHILLEOS
TELEPHONE : 757.412.0112
FREDERICK COUNTY, VIRGINIA
7/17/25 COUNTY COMMENTS
7/31/25 COUNTY COMMENTS
8/8/25 COUNTY COMMENTS