Loading...
HomeMy WebLinkAbout23-25 Site PlanSHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS TACO BELL - WINCHESTER FREDERICK COUNTY, VIRGINIA GAINESBORO MAGISTERIAL DISTRICT 1.OWNER: PRIMAX PROPERTIES, LLC 1100 E. MOREHEAD STREET CHARLOTTE, NC 28204 2.DEVELOPER: RESTAURANT PROPERTY INVESTORS II, LLC 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VA 23451 TEL: 757.412.0112 CONTACT: YIANNI ACHILLEOS 3.PLANS DEVELOPED BY: SEKIV SOLUTIONS, LLC 14207 POND CHASE PLACE MIDLOTHIAN, VIRGINIA 23113 TELE: 804.955.5572 CONTACT: STUART LITTLE, PE 4.LEGAL REFERENCE PARCEL ID: 52-A-F1 ZONING: B-2 ZONING CASE: REZ #03-03 GENERAL BUSINESS 5.TOTAL AREA: 2.40 AC. DISTURBED AREA: 0.87 AC. 6.USE: EXISTING: UNDEVELOPED PROPOSED: FAST FOOD RESTAURANT 7.UTILITIES: WATER: FREDERICK WATER 540.868.1061 SEWER: FREDERICK WATER 540.868.1061 POWER: SVEC 540.450.0111 PHONE/ INTERNET: COMCAST BUSINESS SUPPORT 855.281.5738 8.APPROXIMATE UTILITIES DEMAND WATER - 5,000 GPD (DOMESTIC AND IRRIGATION) SEWER - 4,000 GPD 9.SOURCE OF TOPOGRAPHY AND SURVEY: HALDER SURVEYS, PC. 10400 CHESTER ROAD, CHESTER, VA 23831 (804) 748-8707 10.DATUM REFERENCE FOR ELEVATION: VIRGINIA STATE PLANE NAD83 SOUTH ZONE 11.MAXIMUM ALLOWED STRUCTURE HEIGHT: 35' PROPOSED STRUCTURE HEIGHT: ±25' 12.YARD REQUIREMENTS: FRONT YARD = 35' SIDE YARD = N/A REAR YARD = N/A 13.BUILDING AREA: PROPOSED: 2,558 S.F. 1-FLOOR RESTAURANT FAR = 0.024 MAXIMUM ALLOWED FAR = 1.0 14.SITE TABULATION: BUILDINGS 2,558 SQ FT 2.4% OF SITE IMPERVIOUS 69,900 SQ FT 66.9% OF SITE OPEN SPACE 32,085 SQ FT 30.7% OF SITE TOTAL 104,544 SQ FT 15.PARKING SCHEDULE: USE: DRIVE THRU RESTAURANT 1.4 SPACE PER 100 SQUARE FEET OF SEATING AREA MINIMUM 90 FT STACK IN DRIVE THRU REQUIRED PARKING: SEATING AREA: 850 SF / 100 SF X 1.4 SPACES = 12 SPACES REQUIRED HANDICAP: 2 SPACES (FOR 26 TO 50 PARKING SPACES) PROVIDED: 34 TOTAL SPACES PROVIDED (INCLUDING 2 HANDICAP SPACES) DRIVE THRU STACK- 140 FT 16.FLOOD ZONE: THE REFERENCED PROPERTY LIES WITHIN "ZONE X" (AREAS DETERMINED OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN) ACCORDING TO THE FEMA FLOOD INSURANCE RATE MAP NUMBER 51069C0204E JANUARY 29, 2021. 17.THERE ARE NO WETLANDS DISTURBANCES ASSOCIATED WITH THIS PROPOSED LAND DISTURBANCE ACTIVITY. 18.THE LIMITS OF THE PROJECT SITE ARE LOCATED OUTSIDE OF THE CHESAPEAKE BAY PRESERVATION AREA. 19.TRIP GENERATION DATA: USE: FAST-FOOD RESTAURANT W/ DRIVE-THRU WINDOW ITE CODE: 934 TOTAL DAILY TRIPS: 1,269 PM PEAK HOUR TRIPS: IN: 45 OUT: 41 RESPONSIBLE LAND DISTURBER SIGNATURE NAME (PRINT)DATE CONTACT #CERTIFICATION # APPROVAL/SIGNATURE PANEL APPROVED BY THE FREDERICK COUNTY ZONING ADMINISTRATOR COVER SHEET C-001 MISS UTILITY OF VIRGINIA CONTRACTOR SHALL CALL "MISS UTILITY" 48 HOURS PRIOR TO THE START OF EXCAVATION. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES SHOWN ON PLANS IN AREAS OF CONSTRUCTION PRIOR TO STARTING WORK. CONTACT THE ENGINEER IMMEDIATELY IF THE LOCATION OR ELEVATION IS DIFFERENT FROM THAT SHOWN ON THE PLAN, IF THERE APPEARS TO BE A CONFLICT, AND/OR UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON PLAN. CONTACT MISS UTILITY OF VIRGINIA: 1-800-552-7001 (TOLL FREE) OR 811. VIRGINIA STORMWATER MANAGMENT PROGRAM COMPLIANCE THIS PROJECT COMPLIES WITH VSMP PART II B CRITERIA BY DEMONSTRATING FOLLOWING: 9VAC25-875-590 (WATER QUALITY) REQUIREMENTS ARE SATISFIED WITH AN EXISTING REGIONAL BMP THAT WAS DESIGNED AND SIZED BASED ON THIS PARCEL BEING DEVELOPED. 9VAC25-875-710 (STREAM CHANNEL EROSION) REQUIREMENTS ARE SATISFIED WITH AN EXISTING REGIONAL BMP THAT WAS DESIGNED AND SIZED BASED ON THIS PARCEL BEING DEVELOPED. 9VAC25-875-720 (FLOOD PROTECTION) REQUIREMENTS ARE SATISFIED WITH AN EXISTING REGIONAL BMP THAT WAS DESIGNED AND SIZED BASED ON THIS PARCEL BEING DEVELOPED. SITE Sheet List Table Sheet Number Sheet Title C-001 COVER SHEET C-002 REZONING CASE C-003 ARCHITECTURAL ELEVATIONS C-100 ALTA SURVEY C-101 EXISTING CONDITIONS & PH. 1 E&S PLAN C-102 LAYOUT & UTILITY PLAN C-103 GRADING, DRAINAGE & PH. 2 E&SC PLAN C-201 PROFILES C-501 SITE NOTES & DETAILS C-502 DRIVE THRU DETAILS C-503 DUMPSTER ENCLOSURE DETAILS C-504 EROSION AND SEDIMENT CONTROL DETAILS C-505 EROSION & SEDIMENT CONTROL NOTES C-506 UTILITY NOTES & DETAILS C-701 STORM SEWER DRAINAGE AREA MAP & CALCULATIONS L-101 LANDSCAPE PLAN L-102 LANDSCAPE NOTES & DETAILS L-103 IRRIGATION PLAN Ll-101 LIGHTING PLAN Ll-102 LIGHTING NOTES & DETAILS #23-25 NOTE: SITE PLAN VALID FOR FIVE (5) YEARS FROM APPROVAL DATE SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS REZONING CASE C-002 #23-25 REZONING CASE PROFFERS3REZONING CASE REZONING CASE21 REZONING CASE PROFFERS4 REZONING CASE PROFFERS5 REZONING CASE PROFERS6 FREDERICK COUNTY REZONING MAP7 SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS ARCHITECTURAL ELEVATIONS C-003 #23-25 ARCHITECTURAL APPROVAL LETTER NOTE: ARCHITECTURAL ELEVATIONS FOR REFERENCE ONLY ALTA SURVEY C-100 SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS LIMITS OF DISTURBANCE = 0.87 AC.WATWATWATWATWATWATWATWAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT 0 SCALE 1"=20' 40'20' SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS 1.A PRE-CONSTRUCTION CONFERENCE IS MANDATORY BEFORE ANY WORK IS DONE AT THE SITE. ARRANGE A MEETING WITH A CERTIFIED RESPONSIBLE LAND DISTURBER (CRLD), OWNER, ENGINEER, AND COUNTY E&S INSPECTOR. THE OWNER MUST GIVE THE COUNTY INSPECTOR 48 HOURS NOTIFICATION TO SCHEDULE AN ON-SITE PRE-CONSTRUCTION MEETING FOR THE ISSUANCE OF A LAND DISTURBANCE PERMIT. 2.INSTALL THE TEMPORARY CONSTRUCTION ENTRANCE PER THIS DRAWING. WASH MUD AND DEBRIS FROM ALL CONSTRUCTION EQUIPMENT AND VEHICLES PRIOR TO LEAVING THE CONSTRUCTION AREA. 3.INSTALL EXTERIOR/PERIMTER SILT FENCE ACCORDING TO THIS DRAWING. DISTURB ONLY THE PORTION OF THE SITE NEEDED TO INSTALL PERIMETER EROSION CONTROL DEVICES IN ACCORDANCE WITH THE REGULATIONS IN THE VA E&S HANDBOOK. DISTURBANCE OUTSIDE OF THE PRELIMINARY LIMITS OF DISTURBANCE IS NOT ALLOWED UNTIL ALL PERIMETER MEASURES ARE INSTALLED AND FUNCTIONING. 4.CLEAR AND GRUB SITE TO FINAL LIMITS OF DISTURBANCE. TEMPORARILY STOCKPILE SOIL ON SITE. STOCKPILES SHALL REMAIN IN PLACE NO LONGER THAN 1 YEAR FROM THE PLAN APPROVAL DATE. STABILIZE ALL STOCKPILES WITH TEMPORARY SEEDING AND A PERIMETER OF SILT FENCE. 5.ONCE ALL PHASE 1 EROSION AND SEDIMENT CONTROL MEASURES ARE INSTALLED, THE ENVIRONMENTAL ENGINEERING INSPECTOR AND THE CERTIFIED RESPONSIBLE LAND DISTURBER (CRLD) MUST MEET ON-SITE TO INSPECT THE EROSION AND SEDIMENT CONTROL MEASURES BEFORE PROCEEDING TO PHASE 2. PHASE 1 SEQUENCE OF CONSTRUCTION21EROSION CONTROL LEGEND X CE SF CONSTRUCTION ENTRANCE SILT FENCE TS TEMPORARY SEEDING PERMANENT SEEDINGPS IP INLET PROTECTION MISS UTILITY OF VIRGINIA CONTRACTOR SHALL CALL "MISS UTILITY" 48 HOURS PRIOR TO THE START OF EXCAVATION. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES SHOWN ON PLANS IN AREAS OF CONSTRUCTION PRIOR TO STARTING WORK. CONTACT THE ENGINEER IMMEDIATELY IF THE LOCATION OR ELEVATION IS DIFFERENT FROM THAT SHOWN ON THE PLAN, IF THERE APPEARS TO BE A CONFLICT, AND/OR UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON PLAN. CONTACT MISS UTILITY OF VIRGINIA: 1-800-552-7001 (TOLL FREE) DEMOLITION NOTE THE DEMOLITION PLAN PROVIDED IS AN ATTEMPT TO DELINEATE ITEMS THAT CURRENTLY EXIST ON SITE THAT NEED TO BE DEMOLISHED OR ALTERED AS PART OF THE IMPROVEMENTS.  THE CONTRACTOR SHALL WALK THE EXISTING SITE, FAMILIARIZE HIMSELF WITH THE CURRENT CONDITIONS, AND COORDINATE THE DEMOLITION PLAN WITH THE LAYOUT, GRADING, AND UTILITY IMPROVEMENTS WITH THE ACTUAL FIELD CONDITIONS TO ENSURE THAT ALL ITEMS TO BE DEMOLISHED OR ALTERED ARE ACCOUNTED FOR PRIOR TO COMMENCING CONSTRUCTION. ITEMS NOT SPECIFICALLY DENOTED TO BE REMOVED ON THE DEMOLITION PLAN BUT REQUIRED TO BE FOR THE IMPROVEMENTS MAY IMPACT THE CONTRACTOR'S MEANS AND METHODS, SEQUENCING AND SCHEDULING.  EXISTING CONDITIONS & PH. 1 E&S PLAN C-101 WATWATWATWATWATWATWATWAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WATTACO BELLLG502" PVC (PRIVATE) WATERLINE CLEARANCE BAR WITH BOLLARD DUMPSTER ENCLOSURE CG-12 RAMP ADA SIGNS W/ WHEEL STOPS 4" PVC SDR 35 SAN. SWR. (PRIVATE) 1" WATER SERVICE WITH 5/8" IRRIGATION METER WITH BACKFLOW PREVENTER AND HEATED & INSULATED ENCLOSURE 2" WATER SERVICE WITH 1 1/2" DOMESTIC METER BACKFLOW PREVENTER TO BE LOCATED IN BUILDING) 11" CURB ALONG FACE OF BLDG. SEE DTL. SHEET C2.0 W W W W SAN SANSANSANTRAFFIC RATED C.O. C.O. 4" PVC SDR 35 SAN. SWR. (PRIVATE) GREASE TRAP BOLLARD BOLLARD MENU BOARD AND ORDER STATION AND BOLLARDS 9 8 8 9UGEUGEUGE UGEUGEUGEUGTUGTUGTUGTUGTUGTUGE UGE UGT UGT APPROX. LOCATION OF UNDERGROUND COMMUNICATION LINE & UNDERGROUND ELECTRIC SERVICE APPROX. LOCATION OF TRANFSFORMER 24' 18' 18' 24' 18' 18' 10' TYP. 10' 8' 10' 11' 11' 12' 15' 12' 24' 30.71' R15' R5' R5' R15' R10' R100' R15' R30' R5'R15' R10' R5' R5' R10' R5' R5' 22.7' 36' R20' R15' R5' R5' R5' R5' R5' R5' 27' 27' 10' 10' TAP THROUGH METER SETTING BY FREDERICK WATER, FINAL RESTORATION BY CONTRACTOR CONNECT TO EX. SANITARY SEWER REMOVE EXISTING CAP AND EXTEND APPROX. LIMITS OF PAVEMENT REPLACEMENT APPROX. LIMITS OF PAVEMENT REPLACEMENT APPROXIMATE LOCATION OF ±10' X ±5' MONUMENTAL SIGN. OAH OF 12' FINAL SIGN DESIGN AND LOCATION TO BE PERMITTED SEPARATELY. FIRE LANE STRIPING FIRE LANE STRIPING FIRE SIGN TYPE MODIFIED "D" FIRE SIGN TYPE MODIFIED "D" FIRE SIGN TYPE MODIFIED "D" FIRE SIGN TYPE MODIFIED "D" TAP THROUGH METER SETTING BY FREDERICK WATER, FINAL RESTORATION BY CONTRACTOR 12' 10' 4' 0 SCALE 1"=20' 40'20' SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS ELECTRICAL NOTE: CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING 2-4" PVC CONDUITS WITH PULL STRING FROM UTILITY POLE TO PAD MOUNTED TRANSFORMER FOR PRIMARY SERVICE. TRANSFORMER PAD TO BE CONSTRUCTED BY CONTRACTOR. CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANY ON SIZE AND LOCATION. TRANSFORMER TO BE SET BY UTILITY COMPANY. CONTRACTOR TO PROVIDE SECONDARY SERVICE FROM TRANSFORMER TO MDP WITH 3-4" PVC CONDUITS. CONTRACTOR TO INSTALL METER AND MAKE FINAL CONNECTION. LAYOUT & UTILITY PLAN C-102 FREDERICK WATER NOTES: 1.VALVES, MANHOLES, ARV’S AND OTHER FREDERICK WATER SURFACE FEATURES SHALL NOT BE PLACED IN CURB AND GUTTER, NOR SLOPED PORTION OF HANDICAPPED RAMPS. CONTRACTOR SHALL COORDINATE LOCATIONS WITH THE FREDERICK WATER INSPECTOR. 2.IRRIGATION LINES AND DEVICES, LIGHT POLES, TRANSFORMERS, JUNCTION BOXES, PEDESTALS, OTHER OBSTACLES AND ALL DRY UTILITIES SHALL NOT BE PLACED ON FREDERICK WATER EASEMENTS. PERPENDICULAR IRRIGATION LINES AND DRY UTILITY CROSSINGS ARE PERMITTED WITH 18" MINIMUM VERTICAL SEPARATION. 3.RETAINING WALLS AND THEIR TIE BACKS SUCH AS GEO GRID OR OTHER SUPPORTS SHALL NOT BE PLACED IN FREDERICK WATER EASEMENTS CONTRACTOR SHALL TEST PIT AS REQUIRED AND ADJUST ALL EXISTING FREDERICK WATER FACILITIES TO GRADE PER THE FREDERICK WATER INSPECTORS REQUIREMENTS. 4.6" SEWER LATERALS ARE REQUIRED TO BE CONNECTED TO A MANHOLE. LIMITS OF DISTURBANCE = 0.87 AC.WATWATWATWATWATWATWATWAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WATTACO BELLLG50W W W W SAN SANSANSANUGEUGEUGEUGEUGEUGEUGTUGTUGTUGTUGTUGTUGE UGE UGT UGT APPROX. LIMITS OF PAVEMENT REPLACEMENT APPROX. LIMITS OF PAVEMENT REPLACEMENT 8428458 4 7 844842841840TC 838.13' TC 838.44' TC 844.34' TC 838.12' TC 839.29' TC 839.29' TC 839.16' TC 839.16' TC 839.42' TC 839.50' TC 839.62' TC 839.36' TC 839.60' TC 840.97' TC 841.19' TC 841.46'TC 842.27' TC 842.66' TC 843.19' TC 844.27' TC 844.43' TC 844.58' TC 841.39' TC 840.20' TC 840.08' TC 841.34' TC 841.54' TC 841.57' TC 839.87' TC 839.90' TC 841.81' TC 841.64' TC 840.55' TC 840.38' TC 840.41' TC 840.62' TC 841.69' TC 841.84' TC 843.38' TC 842.98'TC 842.73' TC 842.82' TC 842.97' TC 843.50' TC 843.50' TC 843.28' TC 843.09' TC 843.09' TC 843.03' TC 843.03' TC 842.94' TC 842.80' TC 842.91' TC 843.15' 842.61' 842.61' 843.50' 843.50' 843.50' 843.50' 843.50' 843.50' 843.50' 844.13' 844.13' 843.84' 843.84' TC 843.38' TC 842.88' TC 842.88' TC 843.38' 843.38'843.46' 843.45'843.38' 843.45' 843.46' 843.46' 843.45' 843.45' TC 839.77' IP PS PS PS PS IP IP IP IP 6" ROOF DRAIN 1 2 3 4 5 EX1 EX2 F.F. ELEV: 843.50'0 SCALE 1"=20' 40'20'SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS 1. BEGIN DEMOLITION AND GRADING OPERATIONS. PHASE I MEASURES SHALL BE MAINTAINED OR REPLACED AS AREAS ARE STABILIZED AND ONCE STORM SEWER IS INSTALLED AND FUNCTIONING WITH INLET PROTECTION. 2. STRIP SITE TO FINAL LIMITS OF DISTURBANCE. 4. ENSURE THAT POSITIVE DRAINAGE IS MAINTAINED AND ALL DRAINAGE IS DIVERTED TO THE PERIMETER EROSION CONTROL MEASURES. MAINTAIN ALL EROSION CONTROL MEASURES. 5. GRADE BUILDING PAD AND BEGIN BUILDING CONSTRUCTION. COMPLETE SITE WORK CONSTRUCTION INCLUDING STORM SEWER, CURB AND GUTTER, INLET PROTECTION, AND TEMPORARY AND PERMANENT SEEDING FOR STABILIZATION. 6. PLACE PAVEMENT AND STABILIZE ANY PROBLEM AREAS ON SITE. 7. PLACE TOPSOIL ON LANDSCAPE AREAS. SEED AND MULCH ALL DENUDED AREAS. 8. DO NOT REMOVE EROSION CONTROL MEASURES UNTIL ALL CONTRIBUTING AREAS HAVE BEEN PERMANENTLY STABILIZED. REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES. NOTIFY THE FREDERICK COUNTY EROSION CONTROL INSPECTOR BEFORE THE EROSION AND SEDIMENT CONTROL MEASURES ARE REMOVED. 2 PHASE II SEQUENCE OF CONSTRUCTION GRADING, DRAINAGE & PH. 2 E&SC PLAN C-103 1 EROSION CONTROL LEGEND X CE SF CONSTRUCTION ENTRANCE SILT FENCE TS TEMPORARY SEEDING PERMANENT SEEDINGPS IP INLET PROTECTION 820 825 830 835 840 845 850 855 820 825 830 835 840 845 850 855 847.0843.2843.0840.4839.3838.6839.3839.1838.39+75 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+0016+00 820 825 830 835 840 845 850 855 820 825 830 835 840 845 850 855 825 830 835 840 845 850 855 860 825 830 835 840 845 850 855 860 EX PIPE 1-2 175.28' OF 36" CL. III RCP @ 1.91%EX STR 1STA 13+98.34TOP 835.00INV IN 832.25 (PIPE 4-5)INV OUT 830.50 (EX PIPE 1-2)PIPE 4-5 160.69' OF 15" CL. III RCP @ 0.50%STR 4STA 12+37.65TOP 839.16INV IN 833.15 (PIPE 3-4)INV IN 833.15 (PIPE 5-4)INV OUT 833.05 (PIPE 4-5)PIPE 3-4 86.21' OF 15" CL. III RCP @ 0.50%STR 3STA 11+51.44TOP 839.16INV IN 833.68 (PIPE 2-3)INV OUT 833.58 (PIPE 3-4)PIPE 2 - 3 65.71 ' O F 15" C L . I I I R C P @ 3.0 0 %STR 2STA 10+85.73TOP 841.19INV IN 835.75 (PIPE 1-2)INV OUT 835.65 (PIPE 2-3)PIPE 1 - 2 85.73 ' O F 15" C L . I I I R C P @ 3.0 0 %STR 1STA 10+00.00TOP 842.66INV OUT 838.32 (PIPE 1-2)EX STR 2STA 15+73.62TOP 831.91INV IN 827.15 (EX PIPE 1-2)839.5838.8838.3838.0838.1837.4837.419+75 20+00 20+50 21+0021+00STR 4STA 12+37.65TOP 839.16INV IN 833.15 (PIPE 3-4)INV IN 833.15 (PIPE 5-4)INV OUT 833.05 (PIPE 4-5)PIPE 5-4 71.19' O F 15" CL. I I I R C P @ 2.00%STR 5STA 20+00.00TOP 839.77INV OUT 834.57 (PIPE 5-4)EXISTING GROUND PROPOSED GROUND PROPOSED GROUND EXISTING GROUND 839.2839.0838.9838.5838.7839.0839.4839.9840.5841.6842.7843.5843.619+75 20+00 20+50 21+00 21+50 22+00 22+5022+62.83BLDG OUTINV 841.50GREASE TRAPTOP 843.50INV. 841.31COTOP 843.50INV. 841.49COTOP 841.66INV. 839.09CONNECT TO EX. SAN. SEWER ASSUMED INV: 831.37 CONTRACTOR TO FIELD VERIFY INVERT AND NOTIFY ENGINEER IF CHANGES ARE REQUIRED PROFILE SCALE 0 0 50 5 4" 45° BEND PROFILE SCALE 0 0 50 5 PROFILE SCALE 0 0 50 5 EXIS. SANITARY LATERAL 157.1 6' O F 4" PV C @ 4.9 1 % 45.32' O F 4" PV C @ 4.9 1 % 18.63' OF 4" PVC @ 1.04% PROPOSED GROUND EXISTING GROUND PROPOSED STORM SEWER 1' PROPOSED SANITARY SEWER 2.0 STORM SEWER STR. 1 - EX. STR. 1 STORM SEWER STR. 5 - STR. 4 SANITARY SEWER SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS PROFILES C-201FIRE HYDRANT FLOW CURVE1 FLOW CURVE MAP2 FIRE FLOW 1,500 GPM RESIDUAL PRESSURE - ±48 PSI SITE NOTES & DETAILS C-501 SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS IDENTIFY SPACES BY ABOVE GRADE SIGNS AS RESERVED FOR PHYSICALLY DISABLED PERSONS. PROVIDE ONE (1) STD. R7-8 SIGN AT EACH PARKING SPACE INDICATED ON SITE PLAN. SIGN SHALL BE ALUMINUM (PAINTED WHITE) WITH GREEN LETTERS AND INTERNATIONAL WHEELCHAIR SYMBOL. SECURE SIGN ON STEEL POST 1-1/2" DIAMETER PAINTED BLACK SET IN MINIMUM 2' OF CONCRETE. 7-1/2" IMBEDDED 24" IN GROUND ANCHOR WITH 5/8" REBAR 5" DUMPSTER SERVICE SIGN W/ GALVANIZED CARRIAGE BOLTS. ATTACHED TO FENCE SIGN FACE TO BE NOTE: SIGN TO BE MOUNTED ON GATE OF FENCING SURROUNDING DUMPSTER **SERVICE IS LIMITED BECAUSE DUMPSTER IS LOCATED WITHIN 1000' OF RESIDENTIAL PROPERTY 22" 12" SIGN WILL BE ALUMINUM WITH AND RED LETTERING. PAINTED WHITE BACKGROUND AT LEAST 4 FEET ABOVE FINISH GRADE. NO SCALE PAVEMENT EXISTING EX. E/P1 No Scale 4 No Scale VDOT STD. CG-6 CURB & GUTTER 7 No Scale PRECAST BUMPER BLOCK 8 No Scale SIDEWALK CONTROL JOINT DETAIL 9 No Scale VDOT LAP JOINT DETAIL No Scale 12 No Scale DUMPSTER SERVICE SIGN 13 No Scale PARKING SIGNS FOR THE DISABLED 1,200 GALLON GREASE TRAP No Scale LIGHT DUTY PAVEMENT SECTION6 No Scale 14 CONCRETE SIDEWALK DETAIL 11 No Scale HEAVY DUTY ASPHALT PAVEMENT SECTION2 No Scale HEAVY DUTY CONCRETE PAVEMENT SECTION10 2" CLEAR4 X 4 6/6 WWF 6" - 21A AGG. 6" PORTLAND CEMENT 4,000 PSI CONC. AIR ENTRAINED (BLACK TO MATCH ASPHALT) 16 No Scale BOLLARD DETAIL @ 11" CURB 11" FACE OF BUILDING 1/2" EXP. JT. MATERIAL AND SEALANT DRIVE THRU PAVEMENT CONC. CURB (INSTALL ALONG BLDG FACE) 1/2" RADIUS #4 REBAR CONT. DOWNSPOUT SLOPE 6" PVC RAINLEADER PIPE; RE: CIVIL #4 VERT. REBAR DOWELS @ 24" O.C.6"24"15 SIDEWALK INLAY DETAIL 3 4" 6" 12"6" 4" MIN. 15" MIN. 6" 18" MAX. 712" No Scale CG-2 "EXTRUDED" CURB WITH REAR FOOTER 17 No Scale 5 No Scale 11" CURB DETAIL No Scale PAINTED TRAFFIC ARROWS NOTES: 1. PRECAST UNITS ARE APPROVED FOR USE PER ABOVE DESIGN AND DIMENSIONS. 2. BITUMASTIC COATING ON BOTTOM AND ALL SIDES (EXTERIOR ONLY). 3. LOCAL STANDARD CODE SHALL APPLY IF REQUIREMENTS EXCEED THIS STANDARD DETAIL. 8" 3"3" 18" 12"1 1/2" 7" 1'-6" 10" 10'-0" 5'-0" 1'-6" 3" 4'-6" 3" 1'-6" FIRE LANE GUIDELINE NOTE: ALL FIRE SIGNS ARE TO BE MOUNTED SEVEN (7) FEET FROM THE BOTTOM OF ALL SIGNS TO THE TOP OF THE GRADE. GREASE TRAP / OIL WATER SEPARATOR NOTES: 1.TANK SECTIONS SHALL BE BOLTED TOGETHER. 2.WATERTIGHT BOLT DOWN FRAME AND COVERS ARE REQUIRED. 3.PENETRATIONS SHALL HAVE BOOTS. 4.TANK, COMPONENTS, AND INSTALLATION SHALL BE TRAFFIC RATED. 5.CONTRACTOR SHALL COORDINATE INSTALLATION AND INSPECTIONS WITH BOTH FREDERICK COUNTY INSPECTIONS DEPARTMENT AND FREDERICK WATER. CLEARANCE BAR, SEE DETAIL 5 FOR FOOTING DETAILBOLLARD, SEE DETAIL 3 2'-2"2'-0 1/4"1'-0 "RIGHT ISO VIEW FACE OF CURB9'-6"1" ANCHOR BOLTS MIN. EMBEDMENT 24" T.O. FOOTING 1/2" DIA RIGID CONDUIT TO POWER (FOR CANOPY ONLY) GRADE STEEL PLATE STEEL TUBE 1" DIA. ANCHOR BOLT 7" 11"7"11"CLEARANCE BAR FOOTING NOTE: REFER TO CURRENT CUT SHEETS FOR FOOTING BOLT DETAILS 2" MIN.12" MIN.FOUNDATION IS SUBJECT TO APPROVAL BY THE STRUCTURAL ENGINEER NOTE: ALL CONDUIT TO BE MIN. 12" BELOW GRADE AT LOCAL FROST DEPTH AND PROJECT 3" ABOVE FOUNDATION PREFERRED 8"X8" ANCHOR PATTERN IS SUBJECT TO APPROVAL BY THE STRUCTURAL ENGINEER ANCHOR PLATE (3)1" CONDUITS 8" FOUNDATION IS SUBJECT TO APPROVAL BY THE STRUCTURAL ENGINEER8"‎CONDUIT SCHEDULE DEVICE POWER DATA DIRECTIONAL SPEAKER POST MENU BOARD (1) 3/4" (1) 1" (1) 1" - (1) 1" PREVIEW BOARD NOTE: ALL CONDUIT TO BE MIN. 12" BELOW GRADE AT LOCAL FROST DEPTH AND PROJECT 3" ABOVE FOUNDATION NOTE: BOLT PATTERN PROVIDED AS EXAMPLE - OBTAIN ANCHOR BOLT TEMPLATE FROM SUPPLIER OPTIONAL (1) 1" (2) 1" (2) 1" GRADE MENU BOARD - (3) CAT 6 PREVIEW BOARD - (2) CAT 6 SPEAKER POST - (1) CAT 6 • • • 1. 2. 3. 4. 5. 6. SOW FOR DMB INSTALL AND VENDORS RSCS TO SUPPLY DMB AND CABLE SIGN VENDOR TO SUPPLY ANCHOR BOLTS AND BOLT PATTERN TO GC. SITE SURVEY - SIGN VENDOR NEW BUILD TRENCHING/ CONDUIT- GC FORMING/ FOUNDATION/ ANCHOR BOLTS - GC DMB INSTALL - SIGN VENDOR DMB CABLE PULL - SIGN VENDOR DMB FINAL CONNECTION AND SYSTEM CHECK - SIGN VENDOR ELECTRICAL - PULL BY GC - DEDICATED CIRCUIT 10' 0" 9' 9" 4' 0" 1' 6"10" X 10"X1 1/4" THICK STEEL PLATE 5"X5"X1 1/4" STEEL TUBE 1 1/4" DIA. HOLE FOR 1" DIA. ANCHOR BOLT7" 10"7"10"CANOPY FOOTING SPEAKER POST - FOUNDATION IS SUBJECT TO APPROVAL BY THE STRUCTURAL ENGINEER B.O.C. DRIVE THRU DETAILS C-502 SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS 1 No Scale CANOPY AND SPEAKER FOOTING 2 No Scale ENLARGED MENU BOARD DETAIL 3 No Scale DRIVE THRU ELEMENT BOLLARD DETAIL 4 No Scale CLEARANCE BAR PLACEMENT DETAIL 6 No Scale MENU BOARD FOOTING DETAIL5 No Scale CLEARANCE BAR AND CANOPY FOOTING DETAIL NOTE: CONTRACTOR SHALL COORDINATE WITH ELECTRICAL ENGINEER AND VENDOR FOR APPROPRIATE DATA AND POWER REQUIREMENTS FOR MENU BOARD, ORDER CONFIRMATION BOARD, CANOPY & LOOP DETECTION SYSTEM 6" STEEL PIPE BOLLARD FILLED WITH CONCRETE 3"3'-0"2'-6"12" CONCRETE FOOTING 6" WIDE x 24" DEEP CONCRETE CURB SURFACE OF DRIVE THRU LANE PAVEMENT FINISH SURFACE CL1'-4"2'-10"2'-8"3'-7"77°80'-0" TO CENTER OF D/T WINDOW NOTES 1.ALL AREAS OF THE MB MUST BE VISIBLE TO DRIVER LOCATED AT SPEAKER POST. ASSUME DRIVERS LOCATION IS 24" FROM FACE OF CURB, CENTERED ON SPEAKER POST. 2.CENTER OF MB TO BE 5'-6" TO 9'-0" FROM DRIVERS POINT OF VIEW. 3.PROVIDE (2) 1" CONDUITS FROM BUILDING TO SPEAKER POST FOR LOW VOLTAGE WIRING FACE OF CURB 6" DIA. CONCRETE FILLED 30" HIGH BOLLARD. SEE DETAIL 8/C1.0 SPEAKER POST w/ DT HEARING IMPAIRED SIGNAGE, SEE 4/C1.0 FOR FOOTING DETAIL CANOPY, SEE DETAIL 4/C1.0 FOR FOOTING DETAIL CENTER POINT OF BASE. SEE DETAIL 3/C1.0 FOR FOOTING DETAIL DIGITAL MENU BOARD (60.7" WIDE) WITH FRONT SWING UP ACCESS ESTIMATED POSITION OF DRIVERS HEAD ALIGNED WITH CENTER OF OCB. OUTLINE OF CANOPY ABOVE CLCLCL CLCL CL CL SLOPE 1/2"6" DUMPSTER LAYOUT PLAN9DUMPSTER LAYOUT PLAN7GATE DETAILS GATE POST FOOTINGS82BOLLARD DETAILSSECTION @ WALL ENCLOSURE WALL1 SCHEDULE4ENCLOSURE NOTES3 6 REAR ELEVATION 5 FRONT ELEVATION GUARDPOST BOLLARD DETAIL14'-0"3'-0"3"18" DIA. CONCRETE FOOTING PAVEMENT SURFACE 6" DIA. SCH. 40 STEEL POST FILLED WITH CONCRETE AND PAINTED CAUTION YELLOW CONCAVE TOP CONCRETE SURFACE GATE HARDWARE: ALL HARDWARE AND ACCESSORIES SHALL BE HEAVY GALVANIZED. GATE STOP: MUSHROOM TYPE OR FLUSH PLATE WITH ANCHORS SET IN CONCRETE TO ENGAGE THE CENTER DROP ROD OR PLUNGER BAR. GATE NOTES: (4) EQUAL WIDE X 8'-0" HIGH MTL. GATES, TYPE 'B' 1 1/2" DECKING, 22GA. W/ T.S. 1 X .1875 BAR CROSS BRACING WELD AND GRIND SMOOTH ALL CONNECTIONS, TYP. PRIME AND PAINT ALL STEEL COMPONENTS. 1 JAMB DETAIL SEE GATE HINGE DETAIL 5" DIA. SCHEDULE 80 PIPE COLUMN SLOPE TOP OF FOOTING 1/2" EXP. JT. AROUND FOOTING GROUT SOLID W/ CONCRETE 2 GATE HINGE DETAIL 3" GATE LATCH3 6"3"3"3" 1"X1" STEEL BAR SPACER WELDED TO 6" DIA. x 6" HINGE & 2"x2"x1/4" ANGLE GATE FRAME 6" DIA. SCHEDULE 80 PIPE HINGE 5" DIA. SCHEDULE 80 GREASE ZERK ON TOP AND BOTTOM HINGE 1"2" TYPE 'B' 1 1/2" DECKING TACK WELD TO FRAME GATE HANDLE4 3/4" Ø SOLID STEEL SLIDE BOLT 1"Ø GALV. PIPE, FASTEN / WELD TO GATE FRAME - TYP. 3"6"3/4" Ø SOLID STEEL GATE HANDLE - WELD TO 2X2 ANGLE GATE FRAME 36" ABOVE GRADE 2X ANGLE GATE FRAME 1" CROSS BRACE GATE POST / HINGE 2X ANGLE GATE FRAME 22 GA. GATE LATCH SLAB, SEE PLAN BELOW LOCAL FROST DEPTH #5 VERT. BAR @ 16" O.C. #5'S #4'S REBAR CONT. EA. WAY @ 24" O.C. #5'S CONT. AT TOP AND MID HEIGHT (18" MIN) STD. HOOK ROUND TOP 2'-0"3" CLR.8'-0"GATE HANDLE 8"X 8"X 16" SPLIT-FACE CMU, WITH COLOR INFUSED TO MATCH BUILDING 8X8X16 COLOR INFUSED SPLIT FACE CMU BLOCK 3/4" STEEL DROP RODS & HOLES 1" 5"GATE FRAME 1" DIA. X 1" DEEP SLEEVE IN PAVEMENT FOR CANE BOLT AT CLOSED & 90° OPEN POSITIONS 1" DIA. STEEL GUIDES WELDED TO GATE FRAME 24" x 5" CANE BOLT (3/4" DIA.) CANE BOLT REST ±3"2'-0"CANE BOLT (1 PER GATE)5 1'-0"5"5" SCH. 80 STL POST, GROUTED SOLID 6" SCH. 80 X 3" HINGE SUPPORT, WELD TO POST (5) #4 TIES @ 8" O.C. (8) #5 VERTS @ 11" O.C. TYP. 3/4" EXP. JT.4"4"4" 30"2'-6"6" SCH. 80 X 6" HINGE W/ GREASE ZIRK 6" SCH. 80 X 6" HINGE (2) #5 VERT. CONT. INTO GATE POST FOOTING 30" WIDE POST FOOTING 5" CL 8"3'-6"THICKENED EDGE CONC. PAVEMENT 7"SECTION @ WALLS CMU WALL WALL FOOTING INSTALL GATE POST, GATE POST FOOTING, AND CMU WALL FOOTING PRIOR TO INSTALLING CMU BLOCK PLAN VIEW @ WALLS #5 VERT. CONT. INTO GATE POST FOOTING 4"4" 5" SCH. 80 STL POST, GROUTED SOLID CMU WALL EDGE OF WALL FOOTING 3/4" EXP. JT. BETWEEN POST FOOTING AND CONC. PAVEMENT (5) #4 TIES @ 8" O.C. (8) #5 VERTS. SPACED EVENLY5"8"DBL. GATE POST FOOTING 5" SCH. 80 STL POSTS, GROUTED SOLID 2'-6"2'-6"3'-2"2'-6" 4"4"4"4"(5) #4 TIES @ 8" O.C. (10) #5 VERTS. SPACED EVENLY #6 SMOOTH DOWELS & CAPS, 18" LONG @ 24" O.C. 6" PIPE, FILLED W/ CONCRETE. TOP OF PIPE: 4' ABOVE SLAB, SEE DETAIL B THICKENED EDGE / FOOTING FOR WALLS 5" 5"1'-4"1'-4"7" CONCRETE PAVEMENT W/ THICKENED EDGE, 28 DAY MIN. COMPRESSION STRENGTH OF 4,000 PSI WITH #4 CONT. E.W. @ 24" O.C. SUB-GRADE PER GEOTECHNICAL ENGINEER'S RECOMMENDATIONS. 24" WIDE X 12" THICKENED EDGE GATE STOPS AT ALL CLOSED GATE LOCATIONS.SEE NOTES. POST FOOTING (TYP.) - INSTALL TYP. 3 4" EXP. JT. BETWEEN ALL POST FOOTINGS AND CONC. PAVEMENT 2'-6"3'-2"1'-3"1'-3"23'-4"22'-0"4'-6"10'-2"5'-8"3'-4"5'-0"11'-4" 15'-4" 6" DIAMETER BOLLARD (TYP.) 4'-8"10'-6" CLEAR10'-6" CLEAR8" SPLIT FACE CMU INFUSED WITH COLORTO MATCH SW 6122 "CAMELBACK"8'-0" T.O. CMU 8'-0" T.O. CMU 18 GA. CLEANED, PRIMED, & PAINTED METAL GATE. (BOX RIB) 8" CMU INFUSED WITH BUILDING COLOR 5" SCH. 80 STL POST, GROUTED SOLID DROP RODS SIMILAR TO LATCH 8" SPLIT FACE CMU INFUSED WITH BUILDING COLOR SW 6122 "CAMELBACK" 6" SCH. 80 X 3" HINGE SUPPORT, WELD TO POST 3'-5"6'-0"6'-10"4'-6"6'-0"SEE SITE PLAN METAL GATES, SEE DETAIL C PROVIDE 24" WIDE X 12" THICKENED EDGE ON 7" CONCRETE SLAB - ENTIRE PERIMETER. 7" CONCRETE PAVEMENT W/ 24" WIDE X 12" THICKENED EDGE AROUND ENTIRE PERIMETER, 28 DAY MIN. COMPRESSION STRENGTH OF 4,000 PSI WITH #4 CONT. E.W. @ 24" O.C. SUB-GRADE PER GEOTECHNICAL ENGINEER'S RECOMMENDATIONS. CONCRETE NOTES: 1. INSTALL 1/2" EXP. JT. MATERIAL AND SEALANT BETWEEN CONCRETE SLABS 2. INSTALL CONTROL JT'S AT MAX. 10' O.C. IN SLABS 1" STEEL PIPE DROP ROD HOLES AT ALL OPEN GATE LOCATIONS 1'-3"10'-134"8"10'-014"1'-3"POST FOOTING (TYP.) - INSTALL TYP. 3 4" EXP. JT. BETWEEN ALL POST FOOTINGS AND CONC. PAVEMENT 2 BRICK SHERWIN WILLIAMS RE: ARCH. DRAWINGS 1 GATE COLOR SHERWIN WILLIAMS RE: ARCH. DRAWINGS 3 PIPE BOLLARDS SHERWIN WILLIAMS RE: ARCH. DRAWINGS AREA COLORSYMBOLMANUFACTURER NOTE: PAINT CMU TO MATCH BRICK DUMPSTER ENCLOSURE DETAILS C-503 SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS EROSION AND SEDIMENT CONTROL LEGEND EROSION AND SEDIMENT CONTROL DETAILS C-504 EROSION CONTROL TRENCHING DETAIL SOILS MAP & LEGEND SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS MDLQWHQDQFH All erosion and sediment control structures, systems and practices shall be maintained, inspected, and repaired as needed to ensure continued performance of their intended function. Any needed repairs will be made immediately to maintain all practices as designed. In general, all erosion and sediment control measures shall be checked at least every 14 days and after each rain event over 0.5 inches of precipitation. The following items shall be checked in particular: The construction entrance shall be checked to ensure that the stone does not become clogged with mud. The seeded areas shall be checked every 2 days to ensure that a good stand of grass is maintained. Grassed areas should be fertilized and reseeded as needed. Silt fence shall be checked for undermining or deterioration of the fabric. Sediment will be removed from behind the sediment fence when it becomes about 0.5 ft. deep at the fence. The sediment fence will be repaired as necessary to maintain a barrier. All seeded areas will be fertilized, reseeded as necessary, and mulched according to specifications in the vegetative plan to maintain a vigorous, dense vegetative cover. Specific requirements related to inspection and maintenance of each erosion control measure is discussed in the VE&SCH Standards and Specifications. The contractor will be responsible for maintenance of all erosion control measures to the satisfaction of local review authorities, as well as the installation of additional measures as needed to ensure that sediment-laden runoff does not leave the site. IQVSHFWLRQ Disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, structural control measures, and locations where vehicles enter or exit the site shall be inspected at least once every 14 calendar days and within 48 hours of the end of a storm event that is 0.5 inches or greater. In those areas that have been finished, temporarily stabilized, or runoff is unlikely due to winter conditions, inspections shall take place at least once a month. Disturbed areas and areas used for storage of materials that are exposed to precipitation shall be inspected for evidence of, or the potential for, pollutants entering the drainage system. Erosion and sediment control measures shall be checked to see they are operating correctly. At accessible discharge points, inspection shall take place to ensure these control measures are effective at preventing significant impacts to receiving waters. Nearby downstream locations shall be inspected if discharge points are inaccessible. Sites of vehicle entrance or exit shall be inspected for evidence of offsite sediment tracking. If existing control measures or Best Management Practices (BMPs) require modification or additional measures, such changes shall be made within 7 calendar days of the inspection or before the next anticipated storm event, as implementation is practicable. Include inspection reports of all stormwater and erosion & sediment control measures along with any required actions as a result of inspections, with the stormwater pollution prevention plan. These reports shall include the name and qualifications of the inspector, dates of inspection, major observations and actions taken in response to inspections. Major observations include the location of discharge of sediment or pollutant from the site, locations of BMPs that need to be maintained, locations of BMPs that failed to operate or proved inadequate, and locations where additional BMPs are needed that didn't exist at the time of inspection. These reports shall include incidents of noncompliance. If the report does not include any noncompliance incidents, the report shall contain a certification that the facility is in compliance with the stormwater pollution prevention plan and permit. NON-STORM WATER DISCHAR*ES No other stormwater discharges other than those regulated by the Virginia Department of Environmental Quality (DEQ) and permitted by the VSMP General Permit Registration Statement for Discharges from Construction Activities are anticipated during this project. CERTIFICATION The contractor will prepare a certification statement for compliance to the approved erosion and sediment control plan. All contractors and subcontractors involved in the implementation of stormwater and erosion & sediment control measures must agree with and sign the certification statement, and maintain this document in the record log. APPROXIMATE CONSTRUCTION SE4UENCE 1.Obtain Site Plan approval and other applicable local and state permits. 2.Hold the pre-construction conference at least one week prior to starting construction. 3.Install perimeter erosion and sediment control devices. All erosion and sediment control practices will be inspected weekly and after rainfall events, and any needed repairs will be made immediately. 4.Rough grade the roadway, parking lot and other applicable portions of the site and stockpile topsoil in designated areas. Leave the surface slightly roughened and vegetate and mulch immediately. 5.Install utility lines 6.Place stone base and base asphalt course mix on the parking and entrance as required. 7.Complete final paving for entrance and parking area. 8.Complete final grading of grounds, topsoil critical areas, and permanently vegetate, landscape, and mulch. 9.After the site is stabilized, remove all temporary measures and install permanent vegetation on the disturbed areas. 1.PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 2.DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. 3.A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. 4.SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 5.STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 6.SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. a.THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. b.SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. 7.CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. 8.CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. 9.WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. 10.ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 11.BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. 12.WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. 13.WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. 14.ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. 15.THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. 16.UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: a.NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. b.EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. c.EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY. d.MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. e.RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS CHAPTER. f.APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH. 17.WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND-DISTURBING ACTIVITIES. 18.ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 19.PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS: a.CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. b.ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER: (1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR (2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS. (B) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND (C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM. c.IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL: (1) IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL, THE BED, OR THE BANKS; OR (2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES; (3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TEN-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL; OR (4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE VESCP AUTHORITY TO PREVENT DOWNSTREAM EROSION. d.THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS. e.ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT CONDITION OF THE SUBJECT PROJECT. f.IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN APPROVAL FROM THE VESCP OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE. g.OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATORS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL. h.ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE. i.INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY. j.IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS. k.ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE. l.ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (I) DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (II) DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (III) REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY REGULATIONS PROMULGATED PURSUANT TO § 62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT. m.FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§ 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH LAND-DISTURBING ACTIVITIES ARE IN ACCORDANCE WITH 9VAC25-870-48 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS. n.COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF SUBDIVISION 19 OF THIS SUBSECTION. • • • • E[LVWLQJ SLWH CRQGLWLRQV The grades generally slope from West side of the site to the East, with an average slope ranging from approximately 2% to10%. There are no known current erosion problems that exist on the site. OFF-SITE AREAS No “off-site” areas will be disturbed by this project. If it is necessary to import borrow material or dispose of surplus material, the contractor will be responsible for providing an approved VSM Permitted Site for the off-site borrow or waste areas. ADJACENT AREAS The construction area is contained within the parcel located on Crock Wells Mill Dr. The area is bordered to the North by Wal-Mart Dr, to the South by Crock Wells Mill Dr. Drainage from the site flows overland from the top of the site into an existing storm sewer system and outfalls into an existing BMP within the shopping center. SRLOV Soils on-site consist of Frederick-Poplimento loams and slopes ranging from 7 to 15 percent. See sheet C-504 for soils map and legend. CULWLFDO EROSION AUHDV There are no critical erosion areas on site. OWKHU PRWHQWLDO PROOXWLRQ VRXUFHV Other potential pollution sources include on-site fueling storage and operations for construction equipment, as well as the storage of fertilizer on-site used in establishing temporary and permanent seeding. DLVFKDUJH IURP LQGXVWULDO DFWLYLW\ No discharges from industrial activities are anticipated on this project other than normal construction practices. EURVLRQ AQG SHGLPHQW CRQWURO MHDVXUHV The Phase 1 and Phase 2 erosion and sediment control measures will be designed to retain sediment on-site to the maximum extent practicable. All perimeter erosion control measures must be properly selected, installed, and maintained in accordance with the manufacturers' specifications and good engineering practices. If periodic inspections or other information indicates a control has been used inappropriately or incorrectly, the contractor must replace or modify the control for site specific situations. If sediment escapes the construction site, off-site accumulations of sediment must be removed at a frequency sufficient to minimize off-site impacts (e.g. construction related sediment in streets could be washed into storm sewers by the next rain and pose a safety hazard to users of surrounding access drives). Sediment must be removed from sediment traps when design capacity has been reduced by 50%. Litter, construction debris, and construction chemicals exposed to stormwater shall be prevented from becoming a pollutant source for stormwater discharges by screening outfalls and picking up litter daily. STRUCTURAL PRACTICES The following measures will be used to control erosion and sediment-laden runoff on this project. See the Erosion & Sediment Control Plans for locations of specific erosion control measures. Construction Entrance: Used to reduce mud and sediment tracked onto adjacent roads (VE&SCH Standard and Spec. 3.02). If mud or sediment is transported onto a paved road surface, the road shall be cleaned thoroughly at the end of each day. Sediment and mud shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment and mud are removed in this manner. Silt Fence: Used to intercept and detain small amounts of sediment from disturbed areas during construction operations and to prevent sediment from leaving the site (VE&SCH Standard and Spec. 3.05). Storm Drain Inlet Protection: Used to prevent sediment from entering storm drainage systems prior to permanent stabilization of the disturbed area (VE&SCH Standard and Spec. 3.07). Temporary Seeding: Applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant (undisturbed) for longer than 30 days (VE&SCH Standard and Spec. 3.31). Permanent Seeding: Used to establish vegetative cover and to reduce silt runoff for any areas not paved or roofed. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year (VE&SCH Standard and Spec. 3.32). VE*ETATIVE PUDFWLFHV Topsoil will be stripped from areas to be graded and stockpiled for later use. Stockpile locations will be located within the construction limits on-site and are to stabilized with temporary vegetation. Once site improvements are installed and the site is to be stabilized, apply the a minimum of 3" of topsoil to areas to be landscaped. Topsoil shall be tested to ensure a minimum organic matter of 1.5% by weight, and a PH of 6.0 - 7.5. Topsoiled areas shall be limed and fertilized in accordance with table 3-31B provided in the plan set. The contractor will submit a supplementary erosion and sediment control plan to the Owner and Shenandoah County for review and approval covering any off-site stockpile areas prior to any off-site activities commence. SWDELOL]DWLRQ PUDFWLFHV No specific schedule other than those guidelines provided in the VE&SCH descriptions for vegetative practices will be used for temporary and permanent seeding measures. Rip-rap used for areas requiring outlet protection will be placed within two days after the outlet structures are functional. Contractor will maintain a record of all major grading activities, temporary or permanent construction activities, and when stabilization measures are implemented. This record shall be kept throughout the duration of the project. The contractor will ensure that these records are maintained, updated and become a permanent part of this overall plan. Construction will be sequenced so that grading operations can begin and end as quickly as possible. Stabilization measures shall be implemented on disturbed areas as soon as practicable. Upon reaching final grade, all graded slopes must be immediately seeded and fertilized to ensure proper stabilization. Permanent seeding shall be installed within 7 days of reaching final grade. Denuded areas which are not at final grade but which will remain dormant for more than 14 days shall be temporarily seeded. Areas that are not to be disturbed must be clearly marked with flagging or signage After the construction is completed, the site will be permanently stabilized with a combination of building expansion improvements, pavement, landscaping, and permanent seeding in accordance with VE&SCH Standard and Specification 3.32. SWRUPZDWHU RXQRII CRQVLGHUDWLRQV Stormwater runoff will be collected from the proposed access drives and parking lot and conveyed through a system of stormwater piping prior to entering the existing storm sewer system. For compliance with MS-19 requirements, refer to sheet C-703 for Flood and Channel Protection summaries. EROSION & SEDIMENT CONTROL NOTES C-505 SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS FIRE WATER DESIGN CALCULATIONS3 TACO BELL - WINCHESTER SEKIV SOLUTIONS, LLC.5/20/25 S. LITTLE TYPE VB 1 2,558 SF 0 SF 0 SF 2,558 SF 1,500 GPM 2 HOURS X 1,500 GPM 1 REQUIRED, 1 EXISTING ADJACENT TO SITE ENTRANCE 500 DOMESTIC METER SIZER FORM IRRIGATION METER SIZER FORM21 3 6 1 3 3 6.6 9.0 16.0 105.0 36.0 180.6 45 1 1/2" METER TACO BELL WINCHESTER COMMERCIAL TACO BELL WINCHESTER COMMERCIAL 15 5/8" METER 2 8.0 UTILITY NOTES & DETAILS C-506 FREDERICK WATER CONSTRUCTION NOTES4 FREDERICK WATER METER DETAIL5 FREDERICK WATER GRAVITY SEWER CLEAN OUT DETAIL6 FREDERICK WATER GRAVITY SEWER LATERAL DETAIL7 FREDERICK WATER METER DEATIL8 W W W W SAN SANSANSANUGEUGEUGEUGEUGEUGEUGTUGTUGTUGTUGTUGTUGE UGE UGT UGT 8428458 4 7 8448428418406" ROOF DRAIN 1 2 3 4 5 EX1 EX2 0 SCALE 1"=20' 40'20' SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS STORM SEWER DRAINAGE AREA MAP & CALCULATIONS C-701 0.70 0.34 AC. 1 0.53 0.08 AC. 2 0.86 0.16 AC. 3 0.86 0.14 AC. 4 0.69 0.14 AC. 5 WATWATWATWATWATWATWATWAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT W W W W SAN SANSANSANUGEUGEUGEUGEUGEUGEUGTUGTUGTUGTUGTUGTUGE UGE UGT UGT 8428458 4 7 84484284184023,262 SF LANDSCAPED AREA 10,503 SF LANDSCAPED AREA 317 SF LANDSCAPED AREA 317 SF LANDSCAPED AREA LANDSCAPE PLAN L-101 SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS 0 SCALE 1"=20' 40'20' NOTES: 1. NO TREES OR SHRUBS TO BE PLANTED IN THE FW EASEMENTS. 2. IRRIGATION LINES AND DEVICES, LIGHT POLES, TRANSFORMERS, JUNCTION BOXES, PEDESTALS, OTHER OBSTACLES AND ALL DRY UTILITIES SHALL NOT BE PLACED ON FREDERICK WATER EASEMENTS; PERPENDICULAR IRRIGATION LINES AND DRY UTILITY CROSSINGS ARE PERMITTED WITH 18" MINIMUM VERTICAL SEPARATION. LANDSCAPE NOTES & DETAILS L-102 SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS PRE-CONSTRUCTION 1.CONTRACTOR IS RESPONSIBLE FOR CONTACTING "MISS UTILITY" AT 1.800.552.7001 FOR LOCATION OF ALL UTILITY LINES. TREES SHALL BE LOCATED A MINIMUM OF 5 FEET FROM SEWER/WATER CONNECTIONS. NOTIFY LANDSCAPE ARCHITECT OF CONFLICTS. 2.VERIFY ALL PLANT MATERIAL QUANTITIES ON THE PLAN PRIOR TO BIDDING, PLANT LIST TOTALS ARE FOR CONVENIENCE ONLY AND SHALL BE VERIFIED PRIOR TO BIDDING. 3.PROVIDE PLANT MATERIALS OF QUANTITY, SIZE, GENUS, SPECIES, AND VARIETY INDICATED ON PLANS. 4.ALL PLANT MATERIALS AND INSTALLATION SHALL COMPLY WITH RECOMMENDATIONS AND REQUIREMENTS OF ANSI Z60.1 "AMERICAN STANDARD FOR NURSERY STOCK". 5.IF SPECIFIED PLANT MATERIAL IS NOT OBTAINABLE, SUBMIT PROOF OF NON AVAILABILITY TO THE ARCHITECTS, TOGETHER WITH PROPOSAL FOR USE OF EQUIVALENT MATERIAL. 6.PROVIDE AND INSTALL ALL PLANTS AS IN ACCORDANCE WITH DETAILS AND CONTRACT SPECIFICATIONS. CONSTRUCTION/INSTALLATION 1.LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY PLANTS AND MATERIALS THAT ARE IN AN UNHEALTHY OR UNSIGHTLY CONDITION, AS WELL AS PLANTS AND MATERIALS THAT DO NOT CONFORM TO ANSI Z60.1 "AMERICAN STANDARD FOR NURSERY STOCK". 2.LABEL AT LEAST ONE TREE AND ONE SHRUB OF EACH VARIETY AND CALIPER WITH A SECURELY ATTACHED, WATERPROOF TAG BEARING THE DESIGNATION OF BOTANICAL AND COMMON NAME. 3.INSTALL LANDSCAPE PLANTINGS AT ENTRANCES/EXITS AND PARKING AREAS ACCORDING TO PLANS SO THAT MATERIALS WILL NOT INTERFERE WITH SIGHT DISTANCES. 4.CONTRACTOR IS RESPONSIBLE FOR WATERING ALL PLANT MATERIAL DURING INSTALLATION AND UNTIL FINAL INSPECTION AND ACCEPTANCE BY OWNER. 5.CONTRACTOR SHALL NOTIFY OWNER OF CONDITIONS WHICH AFFECTS THE GUARANTEE. INSPECTIONS/GUARANTEE 1.UPON COMPLETION OF LANDSCAPE INSTALLATION, THE LANDSCAPE CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR WHO WILL VERIFY COMPLETENESS, INCLUDING THE REPLACEMENT OF ALL DEAD PLANT MATERIAL. 2.CONTRACTOR IS RESPONSIBLE FOR SCHEDULING A FINAL INSPECTION BY THE LANDSCAPE ARCHITECT. 3.ALL EXTERIOR PLANT MATERIALS SHALL BE GUARANTEED FOR ONE FULL YEAR AFTER DATE OF FINAL INSPECTION AGAINST DEFECTS INCLUDING DEATH AND UNSATISFACTORY GROWTH. DEFECTS RESULTING FROM NEGLECT BY THE OWNER, ABUSE OR DAMAGE BY OTHERS, OR UNUSUAL PHENOMENA OR INCIDENTS WHICH ARE BEYOND THE CONTRACTORS CONTROL ARE NOT THE RESPONSIBILITY OF THE CONTRACTOR. 4.PLANT MATERIAL QUANTITIES AND SIZES WILL BE INSPECTED FOR COMPLIANCE WITH APPROVED PLANS BY A SITE PLAN REVIEW AGENT OF THE PLANNING DEPARTMENT PRIOR TO THE RELEASE OF THE CERTIFICATE OF OCCUPANCY. 5.REMOVE ALL GUY WIRES AND STAKES 12 MONTHS AFTER INSTALLATION. No Scale PLANTING SCHEDULE No Scale LANDSCAPING NOTES1 No Scale 5 DECIDUOUS TREE PLANTING AND STAKING DETAIL No Scale4EVERGREN TREE PLANTING AND STAKING DETAIL No Scale 6 SHRUB PLANTING DETAIL PRE-CONSTRUCTION 1.CONTRACTOR IS RESPONSIBLE FOR CONTACTING "MISS UTILITY" AT 1.800.552.7001 FOR LOCATION OF ALL UTILITY LINES. TREES SHALL BE LOCATED A MINIMUM OF 5 FEET FROM SEWER/WATER CONNECTIONS. NOTIFY LANDSCAPE ARCHITECT OF CONFLICTS. 2.VERIFY ALL PLANT MATERIAL QUANTITIES ON THE PLAN PRIOR TO BIDDING, PLANT LIST TOTALS ARE FOR CONVENIENCE ONLY AND SHALL BE VERIFIED PRIOR TO BIDDING. 3.PROVIDE PLANT MATERIALS OF QUANTITY, SIZE, GENUS, SPECIES, AND VARIETY INDICATED ON PLANS. 4.ALL PLANT MATERIALS AND INSTALLATION SHALL COMPLY WITH RECOMMENDATIONS AND REQUIREMENTS OF ANSI Z60.1 "AMERICAN STANDARD FOR NURSERY STOCK". 5.IF SPECIFIED PLANT MATERIAL IS NOT OBTAINABLE, SUBMIT PROOF OF NON AVAILABILITY TO THE ARCHITECTS, TOGETHER WITH PROPOSAL FOR USE OF EQUIVALENT MATERIAL. 6.PROVIDE AND INSTALL ALL PLANTS AS IN ACCORDANCE WITH DETAILS AND CONTRACT SPECIFICATIONS. CONSTRUCTION/INSTALLATION 1.LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY PLANTS AND MATERIALS THAT ARE IN AN UNHEALTHY OR UNSIGHTLY CONDITION, AS WELL AS PLANTS AND MATERIALS THAT DO NOT CONFORM TO ANSI Z60.1 "AMERICAN STANDARD FOR NURSERY STOCK". 2.LABEL AT LEAST ONE TREE AND ONE SHRUB OF EACH VARIETY AND CALIPER WITH A SECURELY ATTACHED, WATERPROOF TAG BEARING THE DESIGNATION OF BOTANICAL AND COMMON NAME. 3.INSTALL LANDSCAPE PLANTINGS AT ENTRANCES/EXITS AND PARKING AREAS ACCORDING TO PLANS SO THAT MATERIALS WILL NOT INTERFERE WITH SIGHT DISTANCES. 4.CONTRACTOR IS RESPONSIBLE FOR WATERING ALL PLANT MATERIAL DURING INSTALLATION AND UNTIL FINAL INSPECTION AND ACCEPTANCE BY OWNER. 5.CONTRACTOR SHALL NOTIFY OWNER OF CONDITIONS WHICH AFFECTS THE GUARANTEE. INSPECTIONS/GUARANTEE 1.UPON COMPLETION OF LANDSCAPE INSTALLATION, THE LANDSCAPE CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR WHO WILL VERIFY COMPLETENESS, INCLUDING THE REPLACEMENT OF ALL DEAD PLANT MATERIAL. 2.CONTRACTOR IS RESPONSIBLE FOR SCHEDULING A FINAL INSPECTION BY THE LANDSCAPE ARCHITECT. 3.ALL EXTERIOR PLANT MATERIALS SHALL BE GUARANTEED FOR ONE FULL YEAR AFTER DATE OF FINAL INSPECTION AGAINST DEFECTS INCLUDING DEATH AND UNSATISFACTORY GROWTH. DEFECTS RESULTING FROM NEGLECT BY THE OWNER, ABUSE OR DAMAGE BY OTHERS, OR UNUSUAL PHENOMENA OR INCIDENTS WHICH ARE BEYOND THE CONTRACTORS CONTROL ARE NOT THE RESPONSIBILITY OF THE CONTRACTOR. 4.PLANT MATERIAL QUANTITIES AND SIZES WILL BE INSPECTED FOR COMPLIANCE WITH APPROVED PLANS BY A SITE PLAN REVIEW AGENT OF THE PLANNING DEPARTMENT PRIOR TO THE RELEASE OF THE CERTIFICATE OF OCCUPANCY. 5.REMOVE ALL GUY WIRES AND STAKES 12 MONTHS AFTER INSTALLATION. No Scale 3 PLANTING SCHEDULE 10 EACH 24" TALL CONT.FULL, DENSE 7 EACH RED SUNSET RED MAPLE 1-1/4" CALACER RUBRUM 'RED SUNSET'B&B SINGLE LEADER SOFT TOUCH HOLLY7 EACH 24" TALLILEX CRENATA 'SOFT TOUCH'CONT.FULL, DENSE 11 EACH REDBUDCERCIS CANADENSIS'CONT.3 STEM MAX SYMBOL SCIENTIFIC NAME SIZEQTY. PLANTING SCHEDULE 10 EACH BARBERRY SPP.1 GAL. SPANISH BAYONET BARBERRY YUCCA ALOIFOLIA COMMON NAME TYPE CONT. CONT. REMARKS FULL, DENSE 9 EACH YUCCA FLACCIDA 18" TALLADAMS NEEDLE CONT. SHRUBS SMALL SHRUBS 10 EACH 4" POT POT PLANT 3' OC GROUND COVER 3" DEPTHTENNESSEE RIVER ROCK DOUBLE SHREDDED HARDWOOD MULCH PLANT 24" OC PLANT 15" OC 3" DEPTH TREES 18 EACH CARISSA HOLLYILEX CORNUTA 'CARISSA'CONT.FULL, DENSE GOLDEN MOP FALSE CYPRESS4 EACH CHAMAECYPARIS PISIFERA 'GOLDEN MOP'CONT.FULL, DENSE 4 EACH RED GRANITE BOULDER 12"-36"TO MATCH TENNESSEE RIVER ROCK LANDSCAPE FEATURE SOD (FESCUE/BLUEGRASS MIX) COLOR AS BROWN PROVIDE OWNER A SAMPLE FOR APPROVAL RINSE IN BED FOLLOWING INSTALLATION 1"-3" DIA. 18" TALL 18" TALL 18" TALL 10 EACH 10 EACH LIRIOPE VARIEGATED 18" TALLLIRIOPE MUSCARI 'VARIEGATA'CONT.PLANT 15" OC ATTACH FLAGS TO EACH GUY WIRE 30" ABOVE FINISHED GRADE 3" DOUBLE SHREDDED HARDWOOD MULCH GALVANIZED WIRE GUY 6" SAUCER 12 GAUGE REMOVE TAGS, LABELS, AND PLASTIC SLEEVING DO NOT STAKE UNLESS SPECIFIED (SEE COMMENTS) DO NOT WRAP TRUNK KEEP AWAY FROM TRUNK SCARIFY SIDES BEFORE PLANTING PRUNE SUCKERS 8' 2X2 HARDWOOD STAKE 3-2X2 HARDWOOD STAKES 12 GAUGE GALVANIZED WIRE BACKFILL PLANTING PIT WITH NATIVE SOIL EXCEPT IN AREAS OF HEAVY CLAY. ADD GOOD QUALITY TOPSOIL TO NATIVE SOIL. 1:1 SLOPE ON SIDES OF PLANTING HOLE TAMP SOIL AROUND ROOTBALL BASE FIRMLY WITH FOOT PRESSURE SO THAT ROOTBALL DOES NOT SHIFT. PLACE ROOTBALL ON UNEXCAVATED OR TAMPED SOIL. SET TOP OF ROOTBALL FLUSH TO GRADE OR 1-2" HIGHER IN SLOWLY DRAINING SOILS. DO NOT COVER THE TOP OF THE ROOTBALL WITH SOIL. REMOVE BROKEN, BADLY DEFORMED, OR CROSS-BRANCHES. BEGIN A REGULAR PRUNING PROGRAM DURING THE 2ND OR 3RD YEAR AFTER PLANTING. MARK THE NORTH SIDE OF TREE IN NURSERY & ROTATE TREE TO FACE NORTH AT THE SITE. ROOT BALL 1/2" RUBBER HOSE CUT AWAY ALL BALLING ROPES REMOVE BURLAP OR WIRE BASKET FROM TOP 1/3 OF BALL, OR REMOVE CONTAINER AND CUT CIRCLING ROOTS IF CONTAINER-GROWN, OR AS MUCH BURLAP AS POSSIBLE IF FIELD-GROWN. 4" PERFORATED CORRUGATED PLASTIC PIPE; CAP FLUSH WITH MULCH KEEP AWAY FROM TRUNK 3" SHREDDED HARDWOOD MULCH 6" SAUCER BURLAP FROM TOP 1/3 OF BALL REMOVE ALL STRING, WIRE, AND SCARIFY BOTTOM AND SIDES OF PIT INSTALL SHRUBS SO THAT TOP OF THE ROOTBALL IS AT THE SAME GRADE AS ORIGINALLY GROWN OR 1-2" ABOVE IN POOR DRAINING SOILS. DO NOT COVER THE TOP OF THE ROOTBALL WITH SOIL. PROVIDE MULCH UP AND OVER SAUCER REMOVE ALL DEAD, BROKEN, DISEASED AND WEAK BRANCHES AT TIME OF PLANTING. DIAMETER TWICE ROOTBALL2'-6" MIN.RUBBER HOSE TAMP SOIL AROUND ROOTBALL BASE FIRMLY WITH FOOT PRESSURE SO THAT ROOTBALL DOES NOT SHIFT. BACKFILL WITH EXISTING SOIL. IN SANDY LOAM SOILS, ADD 20% MAXIMUM (BY VOLUME) COMPOSTED ORGANIC MATERIAL TO THE EXISTING SOIL. PARTIALLY BACKFILL, WATER TO SETTLE SOIL, FINISH BACKFILLING. 2X2 HARDWOOD STAKE KEPT AWAY FROM TRUNK 12 GAUGE 6" SAUCER GALVANIZED WIRE GUY SHREDDED HARDWOOD MULCH (MIN. 3" DEPTH) MARK THE NORTH SIDE OF TREE IN NURSERY & ROTATE TREE TO FACE NORTH AT THE SITE, WHENEVER POSSIBLE. SET TOP OF ROOTBALL FLUSH TO GRADE OR 1-2" HIGHER IN SLOWLY DRAINING SOILS. DO NOT COVER THE TOP OF THE ROOTBALL WITH SOIL. PLACE ROOTBALL ON UNEXCAVATED OR TAMPED SOIL. 1:1 SLOPE ON SIDES OF PLANTING HOLE PRUNE SUCKERS SCARIFY SIDES BEFORE PLANTING DO NOT WRAP TRUNK DO NOT STAKE UNLESS NECESSARY (SEE NOTES) REMOVE TAGS, LABELS, AND PLASTIC SLEEVING CUT AWAY ALL BALLING ROPES REMOVE BURLAP OR WIRE BASKET FROM TOP 1/3 OF BALL, OR REMOVE CONTAINER AND CUT CIRCLING ROOTS IF CONTAINER-GROWN, OR AS MUCH BURLAP AS POSSIBLE IF FIELD-GROWN. No Scale LANDSCAPING CALCULATIONS2 20 EACH CARISSA HOLLYILEX CORNUTA 'CARISSA'CONT.FULL, DENSE36" TALL LANDSCAPING CALCULATIONS TYPE REQUIREMENTS CALCULATION PROVIDED PERIMITER LANDSCAPING 1 TREE PER 2,000 SF OF IMPERVIOUS AREA 25,334 SF / 2000 SF = 12.7 = 13 TREES 13 TREES INTERIOR LANDSCAPING 1 SHADE TREE PER 10 SPACES 34 SPACES / 10 = 3.4 = 4 TREES 4 SHADE TREES MINIMUM LANDSCAPED AREA 15% OF PARCEL AREA 55,232 X 15% = 8,284 SF 23,262 SF INTERIOR LANDSCAPE REQUIREMENTS 5% OF THE INTERIOR PORTIONS OF A PARKING LOT 10,502 X 5% = 525 SF 634 SF 4 USED FOR INTERNAL REQUIREMENTS. 6 USED FOR PERIMETER REQUIREMENTS. 7 USED FOR PERIMETER REQUIREMENTS. 1-1/4" CAL SHRUBS TO BE USED FOR HEADLIGHT SCREENING. NOTE: CALIPER IS MEASURED SIX INCHES ABOVE THE GROUND UP TO AND INCLUDING FOUR-INCH CALIPER SIZE AND 12 INCHES ABOVE THE GROUND FOR LARGER SIZES. FALSE SPIREA SORBARIA SORBIFOLIA INDIAN HAWTHORNRHAPHIOLEPIS INDICA WATWATWATWATWATWATWATW W W W SAN SANSANSANUGEUGEUGEUGEUGEUGEUGTUGTUGTUGTUGTUGTUGE UGE UGT UGT 8428458 4 7 84484284184023,262 SF LANDSCAPED AREA 10,503 SF LANDSCAPED AREA 317 SF LANDSCAPED AREA 317 SF LANDSCAPED AREA IRRIGATION PLAN L-103 SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS 0 SCALE 1"=20' 40'20' IRRIGATION NOTES AND LEGEND3 CONTRACTOR SHALL DETERMINE CONNECTION POINT TO DOMESTIC FOR IRRIGATION SUPPLY. IRRIGATION DESIGN WILL BE COMPLETED BY THE IRRIGATION CONTRACTOR CONTRACTOR SHALL SUBMIT IRRIGATION DESIGN TO ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION. DESIGN SHALL INCLUDE PRODUCT MANUFACTURER INFORMATION, FLOW RATES, PIPING SIZE AND LAYOUT, HEAD LAYOUT SHOWING SPRAY COVERAGE, AND PVC SLEEVING LOCATIONS. REMOTE CONTROL VALVE SPRAY HEADS ATMOSPHERIC VAC BREAKER PR/PRESSURE VAC. BRKR. NO SCALE IRRIGATION NOTES4 NO SCALE IRRIGATION NOTES AND LEGEND2 NO SCALE NO SCALE IRRIGATION PLAN1 WATWATWATWATWATWATWATWAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT W W W W SAN SANSANSANUGEUGEUGEUGEUGEUGEUGTUGTUGTUGTUGTUGTUGE UGE UGT UGT 8428458 4 7 844842841840Luminaire Schedule Symbol Qty Label Arrangement Description 7 A SINGLE MRM-LED-24L-SIL-FT-40-70CRI MOUNTED AT 25' 2 B BACK-BACK MRM-LED-24L-SIL-FT-40-70CRI MOUNTED AT 25' Calculation Summary Label Units Avg Max Min Avg/Min Max/Min -Fc N.A.N.A.N.A.N.A.N.A. DRIVE THRU SURFACE Fc 5.55 7.9 3.8 1.46 2.08 PARKING LOT SURFACE Fc 5.44 10.2 3.2 1.70 3.19 B B A A A A A A A 0.2 0.3 0.5 0.8 1.1 1.4 1.6 1.8 2.0 2.1 2.2 2.2 2.1 2.0 1.9 1.9 1.9 1.9 1.9 2.0 2.0 1.9 1.8 1.6 1.4 1.2 1.0 0.8 0.6 0.4 0.3 0.2 0.1 0.1 0.1 0.1 0.2 0.4 0.6 1.1 1.4 1.7 2.0 2.3 2.6 2.7 2.8 2.8 2.7 2.6 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.4 2.3 2.1 1.9 1.6 1.4 1.2 0.9 0.6 0.3 0.2 0.2 0.1 0.1 0.1 0.3 0.5 0.8 1.3 1.8 2.1 2.3 2.7 3.1 3.3 3.4 3.4 3.3 3.3 3.3 3.2 3.2 3.1 3.1 3.1 3.0 2.9 2.8 2.6 2.3 2.0 1.8 1.5 1.2 0.8 0.4 0.3 0.2 0.2 0.2 0.1 0.5 0.6 0.9 1.6 2.3 2.5 2.7 3.1 3.5 3.9 4.0 3.9 3.9 3.8 3.8 3.8 3.7 3.7 3.6 3.5 3.5 3.4 3.3 3.1 2.8 2.4 2.2 2.0 1.6 1.0 0.6 0.5 0.4 0.3 0.2 0.2 0.7 0.9 1.2 2.0 3.0 3.2 3.3 3.5 3.9 4.2 4.1 4.1 4.1 4.2 4.3 4.3 4.1 3.9 3.8 3.7 3.7 3.7 3.7 3.6 3.2 3.0 2.9 2.8 2.2 1.4 1.0 0.7 0.5 0.4 0.3 0.2 1.0 1.3 1.8 2.6 4.3 4.3 4.0 3.9 4.2 4.6 4.2 4.3 4.6 5.3 5.8 5.8 5.5 4.7 4.2 3.8 3.8 4.0 4.2 4.0 3.8 3.7 3.8 3.9 2.9 2.0 1.5 1.1 0.8 0.5 0.3 0.2 1.2 1.9 2.5 3.4 5.8 5.7 5.0 4.6 4.7 4.6 4.4 4.6 5.2 6.3 7.2 7.4 6.7 5.6 4.6 4.1 4.1 4.3 4.6 4.5 4.4 4.7 5.1 5.5 3.8 2.9 2.2 1.6 0.9 0.5 0.3 0.2 1.2 2.3 3.0 4.2 6.7 6.7 5.9 5.4 5.4 5.0 5.0 5.2 6.2 7.9 9.4 9.6 8.7 6.8 5.3 4.7 4.6 4.8 5.1 5.0 5.0 5.7 6.5 7.2 4.8 3.8 2.9 2.0 1.1 0.6 0.4 0.3 1.2 2.3 3.0 4.4 7.0 7.0 6.4 5.8 4.9 5.3 5.5 5.9 7.1 8.8 10.0 10.2 9.3 7.6 6.1 5.3 5.0 5.1 5.4 5.4 5.6 6.5 7.3 7.8 5.6 4.5 1.5 1.0 0.6 0.4 0.3 0.2 1.3 1.9 2.7 3.9 6.5 6.7 6.4 5.0 6.9 8.5 9.9 10.0 9.1 7.1 5.6 5.0 4.9 5.2 5.6 5.6 5.9 6.6 7.5 8.1 5.8 4.8 3.8 2.5 1.4 0.9 0.7 0.5 1.2 1.5 2.3 3.5 5.4 5.6 5.5 5.4 5.4 6.5 7.4 7.6 7.1 5.9 5.0 4.6 4.7 5.1 5.6 5.8 6.0 6.4 7.0 7.5 5.8 5.1 4.2 2.8 1.8 1.2 0.9 0.6 1.1 1.4 2.0 3.4 4.8 5.2 5.5 5.5 4.8 5.6 6.2 6.2 5.8 5.1 4.6 4.4 4.7 5.1 5.6 5.9 6.1 6.3 6.4 6.8 6.2 6.0 4.9 3.1 2.2 1.6 1.0 0.6 1.1 1.5 2.1 3.5 5.1 5.4 5.7 5.6 4.6 4.7 4.7 4.7 4.6 4.5 4.5 4.6 4.8 5.2 5.6 6.0 6.2 6.3 6.3 6.7 6.9 7.3 5.8 3.7 2.7 2.1 1.1 0.7 1.3 1.7 2.5 3.8 6.0 6.2 6.1 5.7 4.5 4.4 4.4 4.4 4.5 4.5 4.6 4.7 5.0 5.2 5.7 6.0 6.3 6.4 6.3 6.9 7.3 7.9 6.3 4.2 2.9 2.1 1.1 0.7 1.4 2.2 3.1 4.4 7.2 7.3 6.8 6.0 4.3 4.2 4.2 4.2 4.3 4.4 4.5 4.7 5.0 5.3 5.6 6.0 6.4 6.5 6.3 6.7 7.1 7.9 6.3 4.1 2.8 2.2 1.2 0.8 1.3 2.6 3.5 5.0 7.7 7.9 7.3 6.3 4.1 4.0 4.0 4.0 4.1 4.3 4.4 4.6 4.9 5.2 5.5 5.9 6.4 6.5 6.2 6.2 6.5 7.2 6.0 3.4 2.5 2.0 1.3 0.9 1.4 2.5 3.4 4.9 7.6 7.8 7.2 6.2 4.1 4.0 4.0 4.0 4.1 4.3 4.4 4.6 4.8 5.1 5.4 5.7 6.2 6.4 6.0 5.9 5.9 6.3 5.5 3.3 2.3 1.8 1.4 1.0 1.4 2.1 2.9 4.2 6.9 7.1 6.6 5.9 4.4 4.3 4.3 4.3 4.4 4.4 4.5 4.6 4.7 4.9 5.1 5.5 6.0 6.2 5.8 5.7 5.9 6.3 5.6 3.4 2.4 1.9 1.5 1.1 1.2 1.6 2.4 3.7 5.7 6.0 6.0 5.6 4.5 4.5 4.5 4.4 4.4 4.4 4.4 4.4 4.5 4.6 4.9 5.2 5.7 6.0 5.7 5.8 6.4 7.3 6.3 4.0 2.9 2.3 1.6 1.1 1.1 1.4 2.0 3.5 4.9 5.3 5.6 5.4 4.7 4.9 4.9 4.9 4.8 4.5 4.3 4.2 4.2 4.3 4.6 5.0 5.5 5.7 5.7 6.0 6.9 8.0 6.8 4.7 3.3 2.7 1.6 1.2 1.1 1.4 2.1 3.4 4.9 5.2 5.4 5.3 5.0 5.9 6.7 6.7 6.0 5.1 4.5 4.1 4.0 4.2 4.5 4.9 5.4 5.5 5.6 6.1 6.9 8.1 6.9 4.9 3.6 2.9 1.8 1.3 1.2 1.6 2.4 3.7 5.8 5.8 5.4 5.2 5.5 6.9 8.3 8.3 7.5 6.0 4.8 4.2 4.2 4.3 4.6 4.9 5.2 5.5 5.3 5.8 6.5 7.6 6.6 4.6 3.6 3.0 2.0 1.5 1.3 2.1 2.8 4.0 6.8 6.8 6.3 5.9 4.9 5.4 5.5 5.8 7.0 8.8 10.1 10.2 9.1 7.0 5.4 4.7 4.5 4.5 4.6 4.8 5.2 5.4 5.2 5.4 5.8 6.4 5.8 4.1 3.4 2.8 2.2 1.6 1.2 2.4 3.1 4.4 6.9 6.9 6.3 5.7 4.9 5.3 5.5 5.9 7.1 8.7 10.0 10.2 9.1 7.2 5.7 4.8 4.5 4.4 4.5 4.8 5.1 5.3 5.3 5.3 5.5 5.6 5.2 4.0 3.2 2.7 2.2 1.7 1.2 2.2 2.8 4.1 6.5 6.5 5.7 5.2 5.2 4.9 4.9 5.2 6.0 7.6 8.9 8.9 8.0 6.1 4.7 4.1 3.9 4.0 4.3 4.5 4.7 4.9 4.9 4.9 4.9 4.9 4.5 3.7 3.0 2.5 2.1 1.6 1.2 1.7 2.3 3.1 5.4 5.4 4.8 4.4 4.6 4.5 4.4 4.6 5.1 6.0 6.8 6.9 6.1 4.9 4.1 3.6 3.5 3.6 3.8 4.0 4.3 4.5 4.6 4.8 4.9 4.8 4.2 3.4 2.7 2.2 1.8 1.5 0.9 1.1 1.6 2.4 3.9 4.0 3.8 3.8 4.1 4.5 4.2 4.3 4.5 5.0 5.2 5.1 4.9 4.2 3.7 3.3 3.3 3.4 3.5 3.7 3.9 4.2 4.6 5.2 5.6 5.3 4.5 3.5 2.7 2.0 1.7 1.3 0.6 0.8 1.1 1.9 2.8 3.0 3.1 3.4 3.8 4.2 4.1 4.1 4.1 4.0 4.0 3.9 3.8 3.6 3.4 3.3 3.2 3.2 3.3 3.4 3.7 4.1 4.9 5.9 6.3 6.1 5.1 3.8 2.7 2.0 1.6 1.2 0.4 0.6 0.9 1.5 2.1 2.4 2.6 3.0 3.5 3.8 3.9 3.8 3.7 3.7 3.6 3.5 3.4 3.3 3.1 3.0 2.9 2.9 3.0 3.1 3.4 3.9 5.0 6.2 6.5 6.4 5.4 3.8 2.6 1.9 1.4 1.1 0.3 0.4 0.7 1.2 1.7 2.0 2.3 2.6 3.0 3.2 3.3 3.3 3.1 3.0 2.9 2.8 2.7 2.6 2.6 2.5 2.4 2.4 2.5 2.5 2.6 2.8 3.2 3.7 4.3 4.0 3.1 2.4 1.9 1.4 1.1 0.8 0.2 0.3 0.6 1.0 1.4 1.6 1.9 2.2 2.4 2.6 2.6 2.6 2.5 2.4 2.3 2.2 2.1 2.0 2.0 2.0 1.9 1.9 1.8 1.8 1.8 1.9 2.2 2.7 3.0 2.8 2.3 1.6 1.1 0.8 0.7 0.5 0.2 0.3 0.5 0.8 1.1 1.3 1.5 1.7 1.8 2.0 2.0 2.0 1.9 1.8 1.7 1.6 1.6 1.5 1.5 1.5 1.4 1.4 1.3 1.2 1.2 1.4 1.6 2.0 2.3 2.1 1.6 1.1 0.8 0.5 0.4 0.3 0.2 0.2 0.4 0.6 0.8 0.9 1.1 1.2 1.4 1.4 1.5 1.5 1.4 1.3 1.2 1.2 1.1 1.1 1.1 1.1 1.0 1.0 0.9 0.9 1.0 1.1 1.2 1.4 1.2 1.2 1.2 0.9 0.6 0.4 0.3 0.2 LIGHTING PLAN Ll-101 SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS 0 SCALE 1"=20' 40'20' ELECTRICAL NOTE: CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING 2-4" PVC CONDUITS WITH PULL STRING FROM UTILITY POLE TO PAD MOUNTED TRANSFORMER FOR PRIMARY SERVICE. TRANSFORMER PAD TO BE CONSTRUCTED BY CONTRACTOR. CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANY ON SIZE AND LOCATION. TRANSFORMER TO BE SET BY UTILITY COMPANY. CONTRACTOR TO PROVIDE SECONDARY SERVICE FROM TRANSFORMER TO MDP WITH 3-4" PVC CONDUITS. CONTRACTOR TO INSTALL METER AND MAKE FINAL CONNECTION. NOTE: ALL OUTDOOR LIGHTING FIXTURES SHALL BE DESIGNED, SHIELDED, AIMED, LOCATED AND MAINTAINED TO SHIELD ADJACENT PROPERTIES AND TO NOT PRODUCE GLARE ONTO ADJACENT PROPERTIES OR ROAD RIGHTS-OF-WAY. PARKING LOT FIXTURES AND LIGHT FIXTURES ON BUILDINGS SHALL BE FULL-CUTOFF FIXTURES” PER §165-201.07(B). LIGHTING NOTES & DETAILS Ll-102 SHEET NO.SCALE :PROJECT NO. :PROJECT MANAGER : DATE DESCRIPTION DATE :MAY 20, 2025 QUALITY ASSURANCE : REVISION BLOCK14207 POND CHASE PLACE | MIDLOTHIAN , VA | 23113TELEPHONE NO. 804.938.8864 |www.sekivsolutions.comsekivsolutionsOPTIMIZING YOUR DEVELOPMENT WORLD-STUART LITTLESTIG OWENSGAINESBORO DISTRICTAS SHOWNTACO BELL - WINCHESTER Lic. No. 39974 Stuart G. Little 8/8/2025 RESTAURANT PROPERTY INVESTORS II, LLC. 2242 W. GREAT NECK ROAD VIRGINIA BEACH, VIRGINIA 23451 ATTN : YIANNI ACHILLEOS TELEPHONE : 757.412.0112 FREDERICK COUNTY, VIRGINIA 7/17/25 COUNTY COMMENTS 7/31/25 COUNTY COMMENTS 8/8/25 COUNTY COMMENTS