Loading...
HomeMy WebLinkAbout07-25 Planning Comment Response PROGRAMMING AND PLANNING CIVIL ENGINEERING LANDSCAPE ARCHITECTURE SURVEY AND MAPPING SECURITY CONSULTING www.gordon.us.com 4501 Daly Drive, Suite 200, Chantilly, VA 20151 — Phone: (703) 263-1900 January 26, 2026 Mr. Eric Bittner Planner II Frederick County Department of Planning & Development 107 N. Kent Street Winchester, VA 22601 Re: County # (MDP) #07-25 Project Name: Enclave at Tasker Gordon Project: 3629-0302 Dear Mr. Bittner: The following is in response to your letter dated January 5, 2026: 1. General Comments: a. Add the Master Development Plan reference number 07-25 to the cover sheet. Response: The MDP number 07-25 has been added to the cover sheet. See Sheet 1. b. Streetlights are required within the residential portion. (144-19) Response: Streetlights have been shown at all intersections per Frederick County Part II General Legislation Section 144-19 Streetlights. Final streetlight locations are subject to final engineering and are to be provided with future Subdivision Plan. c. The completion of residential phase 2 has a total of 129 units. The community center, pool, and basketball court must be completed before the 100th building permit can be issued. Response: Comment acknowledged. The community center, pool, and basketball court will be completed prior to submission of the project’s 100th building permit application. d. The completion of residential phase 2 has a total of 129 units. The community center, pool, and basketball court must be completed before the 100th building permit can be issued. Response: Comment acknowledged. e. Include reference to previously approved MDP (02-07). Response: A reference to previously approved MDP (02-07) has been added to the cover sheet under the Reference Applications. Please see Sheet 1. f. Include as a note proffer 1.3 of REZ #09-06. Response: A note has been added to reference proffer 1.3 of REZ #09-06. Please see Mr. Eric Bittner Frederick County Planning and Development The Enclave at Tasker January 26, 2026 Page 2 Programming and Planning | Civil Engineering | Landscape Architecture | Survey and Mapping | Security Consulting Sheets 7 and 8. g. Clarify phasing between commercial and residential, which will be proceeding first. Response: A note has been added to clarify the sequence of phasing. Phase 1 commercial and residential to occur in conjunction, and to be followed by Phase 2, 3, and 4 residential. Phase 2 commercial will be the last phase of the project. Please see Sheet 3. h. Include a history of all land divisions that have occurred in relation to the tract since the adoption of this requirement. Response: A history of land divisions has now been provided. Please see Sheet 1. 2. Transportation: a. Sidewalks shall conform to VDOT standards (144-18C) Response: A sidewalk detail and sidewalk notes have been provided to ensure all sidewalks conform to VDOT standards. Please see Sheet 4. b. Identify the proposed sidewalks on sheet 6 within the development. Response: Sidewalks have been labeled for the residential portion of the project. Please see Sheets 6 and 7. c. Identify parking areas and driveways. Response: Parking areas and driveways have now been shown. Please see Sheets 6 and 7. d. Include parking calculations. Response: Parking calculations have been provided. Please see Sheet 1. e. Sidewalks are required in the B2 district. Response: A note has been added to ensure sidewalks are provided along all roads in the B2 district. Roads in the commercial district are subject to final engineering, and design is to be provided with Final Site Plan. Please see Sheets 7 and 8. 3. Landscaping and Open Space: a. The road efficiency buffer must be a minimum of 20’ at maturity. (165-203.02(E)(3) Response: A note has been added to ensure evergreen trees reach a minimum 20’ at Mr. Eric Bittner Frederick County Planning and Development The Enclave at Tasker January 26, 2026 Page 3 Programming and Planning | Civil Engineering | Landscape Architecture | Survey and Mapping | Security Consulting maturity, per FC Zoning Ordinance Section 165-203.02.E(3). Please see Sheet 4. b. Remove the community center and active recreational facilities from the open space on Sheet 5. Response: The community center and active recreational facilities have been removed from the open space. Please see Sheet 5. c. Include open space calculations. Response: Open space calculations for the RP Residential Performance District have been provided. Please see Sheet 5. d. The B2 district requires a minimum 15% open space on each lot. Response: A note has been provided to ensure a minimum of 15% open space is provided for each lot in the B2 district. An open space diagram of the B2 district is to be provided with future Final Site Plan. Please see Sheet 5. e. The approximate acreage in common open space, in each use and house type and in roads, streets or right-of-way for each phase and the total development. Only the residential is currently included. Response: Approximate acreage of right-of-way and roads/streets to be proposed in Phase 1 Commercial has been provided. Total common open space and total amount of roads/streets to be proposed in the B2 district is subject to final engineering, and to be provided with future Final Site Plan. A minimum of 15% open space is to be provided with each lot in the B2 district. Please see Sheet 3. Please feel free to contact me at 703-263-1900 or by email at cmason@gordon.us.com if you should have any further questions. Sincerely, Gordon Curtis Mason, PE Director