HomeMy WebLinkAbout52-25 Carmeuse Eastern Site SignedU:\Accounts\CRMUL\CRMUL25001 - Eastern Berm Preliminary Engineering\DESIGN\_SHEETS\PE\CS0000.dwg PLOTTED: 4/16/2026 9:38 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSCRMUL25002
AS NOTED
RAS
08-20-2025
DMBAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATE; AND OWNER SHALL
INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES
FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES
ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKLOCATION MAP
Scale: 1" = 2000'
CALL 1-800-552-7001
CALL BEFORE YOU DIG
ALWAYS CALL 811 BEFORE YOU DIG IN VIRGINIA
SECTION 56-265.17 REQUIRES THREE WORKING DAYS
NOTICE TO UTILITIES BEFORE YOU EXCAVATE, DRILL OR
BLAST VIRGINIA UTILITY PROTECTION SERVICE, INC.
TICKET NUMBER(S):
PREPARED BY:
PENNONI ASSOCIATES INC.
117 East Piccadilly Street
Winchester, VA 22601
T 540.667.2139
F 540.665.0493 PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED SITE PLAN
PREPARED FOR:
OWNER/DEVELOPER
O-N MINERALS (CHEMSTONE) COMPANY - C/O CARMEUSE LIME & STONE, INC.
6920 POINTE INVERNESS WAY, SUITE 301
FORT WAYNE, INDIANA 46804-7926
(540) 662-3855
CARMEUSE EASTERN BERM PROJECT
SITE PLAN
SP# 52-25
PIN: 34-A-11 - STONEWALL DISTRICT - FREDERICK COUNTY, VIRGINIA
ORIG SUBMISSION: NOVEMBER 21, 2025
REVISED SUBMISSION: APRIL 14, 2026
O-N MINERALS (CHEMSTONE) COMPANY - C/O CARMEUSE LIME & STONE, INC.6920 POINTE INVERNESS WAY, SUITE 301 | FORT WAYNE, INDIANA 46804-7926CARMEUSE EASTERN BERM PROJECT 508 QUARRY LANE | CLEARBROOK, VIRGINIA 22624PIN: 34-A-11 - STONEWALL DISTRICTCOVER SHEET CS0000
TOTAL SHEETS 15 04-14-2026 RESPONSIBLE LAND DISTURBER
THE RESPONSIBLE LAND DISTURBER IS THAT PARTY RESPONSIBLE FOR CARRYING
OUT THE LAND DISTURBING ACTIVITY AS SET FORTH IN THE PLANS.
NAME:_____________________________________________________
CERTIFICATION #:___________________________________________
DATE: _____________________________________________________
APPROVED BY FREDERICK COUNTY ZONING ADMINISTRATOR
APPROVAL VALID FOR 5 YEARS.
________________________________________________________________________________
APPROVED BY DATE
SITE
LOCAL UTILITIES IN FREDERICK COUNTY
RAPPAHANNOCK ELECTRIC CO-OP
137 KELLEY COURT
FRONT ROYAL, VIRGINIA 22630
(540) 662-2037
VERIZON
404 HILLANDALE LANE
WINCHESTER, VIRGINIA 22602
(540) 665-3156
COMCAST COMMUNICATIONS
195 RAINVILLE ROAD
WINCHESTER, VIRGINIA 22602
(540) 504-0942
WASHINGTON GAS
350 HILLANDALE LN.
WINCHESTER, VIRGINIA 22602
(540) 868-7913
FREDERICK WATER
315 TASKER ROAD
STEPHENS CITY, VIRGINIA 22655
(540) 868-1061
SHEET INDEX
SHEET TITLE
CS0000 COVER SHEET
CS0001 GENERAL NOTES & E&S NARRATIVE
CS1000 EXISTING CONDITIONS (OVERALL)
CS1001 EXISTING CONDITIONS
CS1002 EXISTING CONDITIONS
CS2100 EROSION & SEDIMENT CONTROL - PHASE I
CS2101 EROSION & SEDIMENT CONTROL - PHASE I
CS2200 EROSION & SEDIMENT CONTROL - PHASE II & GRADING PLAN
CS2201 EROSION & SEDIMENT CONTROL - PHASE II & GRADING PLAN
CS4001 BERM PROFILE
CS4002 BERM PROFILE
CS4500 E&S DETAILS
CS4501 E&S DETAILS
CS6100 STORM SEWER DESIGN
CS7000 LANDSCAPING PLAN & DETAILS
Excavation Notes
1)Quarry excavation shall be no closer than 100 feet from any property
zoned RA, RP, R4, R5 or MH1.
2)No quarry excavation shall be located closer than 200 feet from any
dwelling or platted residential subdivision. (§165-608.05(B)(2)).
3)Quarry excavation shall be no closer than 100 feet from any road, street,
or highway right-of-way. The Board of Supervisors may reduce the
required front setback for quarry excavation to 50 feet if it determines that,
through the use of measures, such as landscaping or screening, the
effective protection afforded to adjacent properties has not been reduced.
(§165-608.05(A)(2)).
Machinery Notes
4)All crushing or screening machinery shall be set back at least 300 feet
from any property boundary. (165-608.05(B)(3).
Photometric Plan
No lighting is proposed.
U:\Accounts\CRMUL\CRMUL25001 - Eastern Berm Preliminary Engineering\DESIGN\_SHEETS\PE\CS0001.dwg PLOTTED: 4/16/2026 9:38 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSCRMUL25002
AS NOTED
RAS
08-20-2025
DMBAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN O-N MINERALS (CHEMSTONE) COMPANY - C/O CARMEUSE LIME & STONE, INC.6920 POINTE INVERNESS WAY, SUITE 301 | FORT WAYNE, INDIANA 46804-7926CARMEUSE EASTERN BERM PROJECT 508 QUARRY LANE | CLEARBROOK, VIRGINIA 22624PIN: 34-A-11 - STONEWALL DISTRICTGENERAL NOTES & E&S NARRATIVE CS0001
TOTAL SHEETS 15 04-14-2026 9VAC25-840-40. Minimum standards.
A VESCP must be consistent with the following criteria, techniques and methods:
1.Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is
reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that
may not be at final grade but will remain dormant for longer than 14 days. Permanent stabilization shall be applied to
areas that are to be left dormant for more than one year.
2.During construction of the project, soil stock piles and borrow areas shall be stabilized or protected with sediment
trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil
stockpiles on site as well as borrow areas and soil intentionally transported from the project site.
3.A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent
vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive
and will inhibit erosion.
4.Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be
constructed as a first step in any land-disturbing activity and shall be made functional before upslope land disturbance
takes place.
5.Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after
installation.
6.Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be
served by the trap or basin.
a.The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the
trap shall only control drainage areas less than three acres.
b.Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three
acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic
yards per acre of drainage area. The outfall system shall, at a minimum, maintain the structural integrity of the basin
during a 25-year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare
earth condition or those conditions expected to exist while the sediment basin is utilized.
7.Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to
be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing
measures until the problem is corrected.
8.Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent
channel, flume or slope drain structure.
9.Whenever water seeps from a slope face, adequate drainage or other protection shall be provided.
10.All storm sewer inlets that are made operable during construction shall be protected so that sediment-laden
water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment.
11.Before newly constructed stormwater conveyance channels or pipes are made operational, adequate outlet
protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and
receiving channel.
12.When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control
sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material
shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored
by nonerodible cover materials.
13.When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a
temporary vehicular stream crossing constructed of nonerodible material shall be provided.
14.All applicable federal, state and local requirements pertaining to working in or crossing live watercourses shall
be met.
15.The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed.
16.Underground utility lines shall be installed in accordance with the following standards in addition to other
applicable criteria:
a.No more than 500 linear feet of trench may be opened at one time.
b.Excavated material shall be placed on the uphill side of trenches.
c.Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device,
or both, and discharged in a manner that does not adversely affect flowing streams or off-site property.
d.Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote
stabilization.
e.Restabilization shall be accomplished in accordance with this chapter.
f.Applicable safety requirements shall be complied with.
17.Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize
the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or
public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed
from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be
allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well as
to larger land-disturbing activities.
18.All temporary erosion and sediment control measures shall be removed within 30 days after final site
stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the VESCP authority.
Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be
permanently stabilized to prevent further erosion and sedimentation.
19.Properties and waterways downstream from development sites shall be protected from sediment deposition,
erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency
storm of 24-hour duration in accordance with the following standards and criteria. Stream restoration and relocation
projects that incorporate natural channel design concepts are not man-made channels and shall be exempt from any flow
rate capacity and velocity requirements for natural or man-made channels:
a.Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate
natural or man-made receiving channel, pipe or storm sewer system. For those sites where runoff is discharged into a
pipe or pipe system, downstream stability analyses at the outfall of the pipe or pipe system shall be performed.
b.Adequacy of all channels and pipes shall be verified in the following manner:
(1)The applicant shall demonstrate that the total drainage area to the point of analysis within the channel is 100
times greater than the contributing drainage area of the project in question;
(2)(a) Natural channels shall be analyzed by the use of a two-year storm to verify that stormwater will not overtop
channel banks nor cause erosion of channel bed or banks.
(b)All previously constructed man-made channels shall be analyzed by the use of a 10-year storm to verify that
stormwater will not overtop its banks and by the use of a two-year storm to demonstrate that stormwater will not cause
erosion of channel bed or banks; and
(c)Pipes and storm sewer systems shall be analyzed by the use of a 10-year storm to verify that stormwater will
be contained within the pipe or system.
c.If existing natural receiving channels or previously constructed man-made channels or pipes are not adequate,
the applicant shall:
(1)Improve the channels to a condition where a 10-year storm will not overtop the banks and a two-year storm will
not cause erosion to the channel, the bed, or the banks.
(2)Improve the pipe or pipe system to a condition where the 10-year storm is contained within the appurtenances;
(3)Develop a site design that will not cause the pre-development peak runoff rate from a two year storm to
increase when runoff outfalls into a natural channel or will not cause the pre-development peak runoff rate from a
10-year storm to increase when runoff outfalls into a man-made channel; or
(4)provide a combination of channel improvement, stormwater detention or other measures which is satisfactory to
the VESCP authority to prevent downstream erosion
d.The applicant shall provide evidence of permission to make the improvements.
e.All hydrologic analyses shall be based on the existing watershed characteristics and the ultimate development
condition of the subject project.
f.If the applicant chooses an option that includes stormwater detention, he shall obtain approval from the VESCP
of a plan for maintenance of the detention facilities. The plan shall set forth the maintenance requirements of the
facility and the person responsible for performing the maintenance.
g.Outfall from a detention facility shall be discharged to a receiving channel, and energy dissipaters shall be
placed at the outfall of all detention facilities as necessary to provide a stabilized transition from the facility to the
receiving channel.
h.All on-site channels must be verified to be adequate.
i.Increased volumes of sheet flows that may cause erosion or sedimentation on adjacent
property shall be diverted to a stable outlet, adequate channel, pipe or pipe system, or to a
detention facility.
j.In applying these stormwater management criteria, individual lots or parcels in a residential,
commercial or industrial development shall not be considered to be separate development
projects. Instead, the development, as a whole, shall be considered to be a single development
project. Hydrologic parameters that reflect the ultimate development condition shall be used in all
engineering calculations.
k.All measures used to protect properties and waterways shall be employed in a manner which
minimizes impacts on the physical, chemical and biological integrity of rivers, streams and other
waters of the state.
l.Any plan approved prior to July 1, 2014, that provides for stormwater management that
addresses any flow rate capacity and velocity requirements for natural or man-made channels
shall satisfy the flow rate capacity and velocity requirements for natural or man-made channels if
the practices are designed to (i) detain the water quality volume and to release it over 48 hours; (ii)
detain and release over a 24-hour period the expected rainfall resulting from the one year, 24-hour
storm; and (iii) reduce the allowable peak flow rate resulting from the 1.5, 2, and 10-year, 24-hour
storms to a level that is less than or equal to the peak flow rate from the site assuming it was in a
good forested condition, achieved through multiplication of the forested peak flow rate by a
reduction factor that is equal to the runoff volume from the site when it was in a good forested
condition divided by the runoff volume from the site in its proposed condition, and shall be exempt
from any flow rate capacity and velocity requirements for natural or man-made channels as
defined in any regulations promulgated pursuant to § 62.1-44.15:54 or 62.1-44.15:65 of the Act.
m.For plans approved on and after July 1, 2014, the flow rate capacity and velocity
requirements of § 62.1-44.15:52 A of the Act and this subsection shall be satisfied by compliance
with water quantity requirements in the Stormwater Management Act (§ 62.1-44.15:24 et seq. of
the Code of Virginia) and attendant regulations, unless such land-disturbing activities (i) are in
accordance with provisions for time limits on applicability of approved design criteria in
9VAC25-870-47 or grandfathering in 9VAC25-870-48 of the Virginia Stormwater Management
Program (VSMP) Regulation, in which case the flow rate capacity and velocity requirements of §
62.1-44.15:52 A of the Act shall apply, or (ii) are exempt pursuant to § 62.1-44.15:34 C 7 of the
Act.
n.Compliance with the water quantity minimum standards set out in 9VAC25-870-66 of the
Virginia Stormwater Management Program (VSMP) Regulation shall be deemed to satisfy the
requirements of this subdivision 19.
EROSION AND SEDIMENT CONTROL NARRATIVE
PROJECT DESCRIPTION
THIS SITE IS LOCATED IN NORTHEASTERN FREDERICK COUNTY, VIRGINIA NORTH OF BRUCE TOWN ROAD, EAST OF ROUTE 11,
SOUTH OF GRACE CHURCH ROAD, AND ADJOINED ON THE EAST SIDE BY RESIDENTIAL LOTS. THE BERM IS WHOLLY
CONTAINED WITHIN THE EXISTING CARMEUSE QUARRY OPERATION. THE LAND DISTURBANCE FOR THIS PROJECT IS 16.66
ACRES.
EXISTING SITE CONDITIONS
THE SITE IS LOCATED ON ONE PARCEL WHICH IS 98.72 ACRES IN SIZE. THIS PROJECT CONSISTS OF ONE DISTURBED AREA FOR THE
BERM. THE DISTURBED AREA FOR THE BERM IS 16.66 ACRES, GENERALLY DRAINS TO SOUTH & EAST, CONTAINS SLOPES BETWEEN
25% TO 50%, AND ELEVATIONS RANGING FROM 616.00 TO 642.00.
ADJACENT PROPERTY
SUBJECT PROPERTY IS SIDED BY AN EM ZONED PROPERTY ON THE WEST, MULTIPLE ZONED EM PROPERTIES TO THE SOUTH, MULTIPLE
ZONED RURAL AREAS DISTRICT (RA) TO THE EAST, AND EM TO THE NORTH.
OFF-SITE AREAS
NO OFF-SITE AREAS WILL BE DISTURBED FOR THIS PROJECT.
SOILS
SOILS INFORMATION IS PROVIDED IN THE SOILS MAP ON THIS SHEET.
CRITICAL AREAS
THE BERM IS CONSIDERED A CRITICAL AREA AND CONSISTS OF 3:1 SLOPES OR GREATER. THESE SLOPES HAVE THE
POTENTIAL FOR GREATER EROSION AND SHALL BE IMMEDIATELY STABILIZED AFTER REACHING FINAL GRADE.
EROSION AND SEDIMENT CONTROL MEASURES
UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL
BE CONSTRUCTED AND MAINTAINED ACCORDING TO THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA
EROSION AND SEDIMENT CONTROL HANDBOOK.
STRUCTURAL MEASURES
SEDIMENT BASINS AND TRAPS, SEDIMENT BARRIERS AND OTHER MEASURES SHOWN ON THE PLANS INTENDED TO TRAP
SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL
BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
PHASE I & II:
SILT FENCE WITH WIRE SUPPORT (3.05) SHALL BE INSTALLED AS SHOWN ON THE PLANS TO FILTER RUNOFF FROM
DISTURBED AREAS BEFORE IT LEAVES THE SITE.
CULVERT INLET PROTECTION (3.08) WITH STONE COMBINATION SHALL BE INSTALLED AS SHOWN ON PLANS TO FILTER
RUNOFF BEFORE IT LEAVES THE SITE.
OUTLET PROTECTION (3.18) SHALL BE INSTALLED AT OUTLET STRUCTURES TO MINIMIZE POTENTIAL FOR DOWNSTREAM
EROSION BY REDUCING THE VELOCITY AND ENERGY OF CONCENTRATED STORMWATER FLOWS.
TEMPORARY SEEDING (3.31) AND/OR PERMANENT SEEDING (3.32) SHALL BE PLACED ON ALL CRITICAL SLOPES (3:1 OR
GREATER) AND AS NEEDED TO STABILIZE DISTURBED AREAS.
VEGETATIVE MEASURES
PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN (7) DAYS AFTER
FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN
SEVEN (7) DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN
FOURTEEN (14) DAYS. PERMANENT SOIL STABILIZATION SHALL BE APPLIED TO ALL AREAS THAT ARE TO BE LEFT DORMANT
FOR MORE THAN SIX (6) MONTHS.
SOIL THAT HAS BEEN STOCKPILED SHALL BE SURROUNDED WITH SILT FENCE AND PROTECTED BY MULCH AND/OR
TEMPORARY VEGETATION IMMEDIATELY AFTER GRADING.
ALL EARTH BERMS, DAMS, DIKES, DIVERSIONS AND SEDIMENT TRAP EMBANKMENTS ARE TO BE MACHINE-COMPACTED,
IMMEDIATELY SEEDED AND MULCHED (HAY MULCH OR STRAW) FOR TEMPORARY AND/OR PERMANENT VEGETATIVE COVER
WITHIN FIVE (5) DAYS AFTER GRADING.
MANAGEMENT STRATEGIES
CONSTRUCTION SHALL BE SEQUENCED SUCH THAT GRADING OPERATIONS WILL BEGIN AND END AS QUICKLY AS POSSIBLE.
THE SITE SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION AND
SEDIMENT CONTROL MEASURES. MAINTENANCE OF THESE MEASURES THROUGHOUT THE PROJECT ARE CRITICAL TO THE
EFFECTIVENESS OF THE PROGRAM.
AFTER AREAS ABOVE CONTROLS HAVE BEEN STABILIZED, THE CONTROLS SHALL BE CLEANED UP AND REMOVED AT THE
DIRECTION OF THE FREDERICK COUNTY INSPECTOR.
ALL CUT AND FILL SLOPES ARE TO BE SEEDED AND MULCHED WITHIN FIVE (5) DAYS OF COMPLETION OF GRADING. CUT AND
FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE
FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH
ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.
DRAINAGE SWALES SHALL BE STABILIZED WITH CHECK DAMS UNTIL VEGETATION HAS BEEN WELL ESTABLISHED, AT WHICH
TIME THE CHECK DAMS SHALL BE REMOVED.
CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE
TEMPORARY OR PERMANENT CHANNEL, FLUME, OR SLOPE DRAIN STRUCTURE.
WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED.
ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT
SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE
TREATED TO REMOVE SEDIMENT.
WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO
MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS
TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE
END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO
A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS
MANNER.
ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE
STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE
LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOILS AREAS RESULTING FROM THE DISPOSITION
OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION.
DEVICES LISTED ABOVE ARE CONSIDERED MINIMUM EROSION AND SEDIMENT CONTROLS. ADDITIONAL CONTROL
MEASURES MAY BE NECESSARY DUE TO CONTRACTOR PHASING OR OTHER UNFORESEEN CONDITIONS. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADDITIONAL MEASURES TO THOSE SHOWN, AS NEEDED, IN ORDER TO
CONTROL EROSION AND CONTAIN SEDIMENT ON SITE. ALL MEASURES SHALL BE INSTALLED ACCORDING TO THE
STANDARDS AND SPECIFICATIONS IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK.(VESCH) ANY CHANGES
MADE TO THIS PLAN MUST BE RESUBMITTED FOR APPROVAL WITHOUT EXCEPTION.
MAINTENANCE
ALL CONTROL MEASURES SHALL BE INSPECTED DAILY BY THE SITE SUPERINTENDENT OR HIS REPRESENTATIVE AND WITHIN
24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.5 INCHES OF RAIN PER 24 HOUR PERIOD. ANY DAMAGED
STRUCTURAL MEASURES ARE TO BE REPAIRED BY THE END OF THE DAY. SEEDED AREAS SHALL BE CHECKED REGULARLY
TO ENSURE THAT A GOOD STAND OF GRASS IS MAINTAINED. ALL AREAS SHALL BE FERTILIZED AND RESEEDED AS NEEDED
UNTIL GRASS IS ESTABLISHED.
TRAPPED SEDIMENT IS TO BE REMOVED AS REQUIRED TO MAINTAIN 50% TRAP EFFICIENCY AND DISPOSED OF BY
SPREADING ON SITE.
GRAVEL OUTLETS SHALL BE CHECKED REGULARLY FOR SEDIMENT BUILD-UP. IF THE GRAVEL OUTLET IS CLOGGED BY
SEDIMENT, IT SHALL BE REMOVED AND CLEANED OR REPLACED IMMEDIATELY.
THE CONTRACTOR IS RESPONSIBLE FOR KEEPING EXISTING PUBLIC ROADS IN A CLEAN, DUST AND MUD FREE, CONDITION
AT ALL TIMES.
PERMANENT STABILIZATION
ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING
FINAL GRADING. SEEDING SHALL BE DONE ACCORDING TO STANDARD AND SPECIFICATION NO. 3.32 OF THE VESCH.
PERMANENT STABILIZATION IS DEFINED AS 90% UNIFORM COVERAGE ON THE ENTIRE SITE, ABILITY TO INHIBIT EROSION
AND MATURE ENOUGH TO SURVIVE, INCLUDING 2-3 INCH CUTTINGS.
GENERAL CONSTRUCTION NOTES
1.THE CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR AND EQUIPMENT AND PERFORM ALL WORK INCLUDING
RESTORATION FOR ALL IMPROVEMENTS SHOWN OR IMPLIED AS NECESSARY FOR THE COMPLETED FACILITY READY
FOR USE. UNLESS OTHERWISE NOTED, SPECIFICATIONS FOR ALL WORK TO BE IN ACCORDANCE WITH APPLICABLE
STANDARDS AND CONSTRUCTION SPECIFICATIONS OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION, VIRGINIA
DEPARTMENT OF HEALTH, ECONOMIC DEVELOPMENT AUTHORITY, AND THE CONTRACT DOCUMENTS.
2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION STAKEOUT. ALL DIMENSIONS, ELEVATIONS AND
LOCATIONS SHALL BE VERIFIED IN THE FIELD BY EACH CONTRACTOR PRIOR TO BEGINNING THE WORK. THE ENGINEER
WILL APPROVE ALL CUT SHEETS.
3.CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO THE HOURS OF 7:00 AM TO 5:00 PM. EXCEPTIONS TO BE APPROVED
BY OWNER.
4.ANY UNUSUAL SUBSURFACE CONDITIONS ENCOUNTERED DURING THE COURSE OF THE WORK SHALL BE IMMEDIATELY
BROUGHT TO THE ATTENTION OF THE ENGINEER AND/OR THE OWNER.
5.CONTRACTOR TO OBTAIN, AT HIS EXPENSE, ALL PERMITS REQUIRED OF THIS WORK PRIOR TO COMMENCING
CONSTRUCTION AND SHALL FAITHFULLY ADHERE TO THE PERMIT CONDITIONS IMPOSED.
6.ALL GRADING FOR IMPROVEMENTS TO BE CONFINED TO THE PROJECT AREA. ANY WORK PERFORMED OFFSITE IS THE
CONTRACTOR'S RESPONSIBILITY.
7.CUTSHEETS SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION. ALL CUTSHEETS
SHOULD SHOW EXISTING GROUND ELEVATIONS AT CENTERLINE OF UTILITY, STRUCTURE OR ROAD, AND OFFSET HUB
ELEVATION.
8.LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING
THE EXACT LOCATION, VERTICALLY AND HORIZONTALLY, OF THE UTILITIES PRIOR TO ANY EXCAVATION OR
CONSTRUCTION. THE CONTRACTOR SHALL CONTACT "MISS UTILITY" AND ALL APPLICABLE UTILITY COMPANIES FOR
CLEARANCE PRIOR TO EXCAVATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADHERING TO THE
COMMONWEALTH OF VIRGINIA UNDERGROUND UTILITY DAMAGE PREVENTION ACT, CHAPTER 10, TITLE 56 OF THE
CODE OF VIRGINIA.
9.CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING AND MAINTAINING ALL EROSION AND SEDIMENT CONTROL
MEASURES NECESSARY DURING CONSTRUCTION IN ACCORDANCE WITH CURRENT STATE AND LOCAL REGULATIONS.
DISTURBED AREAS SHALL NOT REMAIN DENUDED FOR MORE THAN SEVEN (7) CALENDAR DAYS WHEN CONSTRUCTION
IS NOT IN PROGRESS. DURING CONSTRUCTION, ALL STORM SEWER INLETS SHALL BE PROTECTED BY INLET
PROTECTION, AND SHALL BE MAINTAINED AND MODIFIED AS REQUIRED BY CONSTRUCTION PROGRESS.
10.CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING MUD FROM TRUCKS AND/OR OTHER EQUIPMENT
PRIOR TO ENTERING PUBLIC STREETS AND/OR EXISTING PARKING LOTS AND OTHER PAVED AREAS. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS, ALLAY DUST, AND TO TAKE WHATEVER MEASURES NECESSARY
TO ENSURE THAT THE STREETS ARE MAINTAINED IN A CLEAN, MUD AND DUST FREE CONDITION AT ALL TIMES.
11.ANY STREET OR UTILITIES DAMAGED BY CONTRACTOR OR SUB-CONTRACTOR SHALL BE SOLE RESPONSIBILITY OF THE
PRIMARY CONTRACTOR AND PROPERLY AND IMMEDIATELY REPAIRED BY THE CONTRACTOR. SUCH REPAIRS SHALL BE
TO THE ORIGINAL CONDITION, IN COMPLIANCE WITH THE TOWN'S CONSTRUCTION STANDARDS & SPECIFICATIONS, AND
TO THE SATISFACTION OF THE TOWN INSPECTOR.
12.ALL PRE-CAST CONCRETE STRUCTURES SHALL BE A MINIMUM 4000 PSI AT 28 DAYS.
13.THE CONTRACTOR IS RESPONSIBLE FOR ADJUSTMENT OF ALL UTILITY BOXES, VAULTS, OR OTHER APPURTENANCES
TO NEW FINISHED GRADE ELEVATIONS.
14.CONTRACTOR TO RELOCATE ALL SIGNS AND UTILITIES REQUIRED FOR THIS WORK.
15.ANY PLANNED DISRUPTIONS OF OR TIE INS TO EXISTING UTILITIES SHALL BE COORDINATED WITH THE APPROPRIATE
UTILITY OWNER. WITH THE EXCEPTION OF EMERGENCIES, THERE SHALL BE A MINIMUM OF 24 HOURS NOTICE GIVEN
BY THE CONTRACTOR TO ALL RESIDENTIAL, COMMERCIAL, AND INDUSTRIAL UTILITY USERS AFFECTED BY UTILITY
INTERRUPTIONS.
16.THE UNAUTHORIZED USE OF WATER WITHOUT DUE COMPENSATION IS ILLEGAL. NO PERSON SHALL CONNECT TO OR
DO ANY WORK ON THAT PORTION OF THE SYSTEM OWNED BY THE TOWN UNLESS WRITTEN AUTHORIZATION IS
RECEIVED PRIOR TO COMMENCING WORK.
17.CONSTRUCTION LIMITS SHALL BE PROPERTY LINES OR AS INDICATED BY PLAN REQUIREMENTS AND SHALL BE STAKED
OR FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION.
18.CONSTRUCTION SHALL CONFORM TO THE AMERICAN WITH DISABILITIES ACT (ADA) REQUIREMENTS.
STORM WATER MANAGEMENT NARRATIVE
THIS PROPERTY IS UTILIZED FOR MINING OPERATIONS AND THE PURPOSE OF THIS PLAN IS RESULTANT OF THOSE OPERATIONS.
PURSUANT TO 9VAC25-875-90A5 THIS LAND DISTURBANCE IS EXEMPT FROM THE STORMWATER REQUIREMENTS OF 9VAC25-875.
ADDITIONALLY, THESE OPERATIONS ARE FURTHER REGULATED BY THE VIRGINIA ENERGY CODE FOR STORMWATER DISCHARGES.
630624626628632620
630
622624626
628
632
6
2
0
62
0 6286286306
3
2
634
636
618620 62
0
6146146
2
0
62
06186226
2
46266
2
8
63
06326
3
4
6
3
6
63
8
64
0
64
2
640
638
636
634 632610
61
0
6
2
0
630
612
612
614
614
616
616
618
62
2
62
4
62
6
62
8
6
2
2622 624
62
0
6
2
0
62262
2
620
618
616
61
4 614612
610
60
8
60
6
606
610618620
620
630
622
624
626
628
632634628
S 30°07'28" W 805.12'S 30°53'22" W 970.41'
N 30°32'33" E 1411.95' (TOTAL)N 58°56'45" W 690.04'N 30°32'33" E 750.00'
N 14°12'
0
6
"
W
3
5
5
.
1
3
'
N 30°32'33" E 721.67'
N 31°00'06" E 938.99'PIN 34-8-1-17O-N MINERALS (CHEMSTONE) COMPANYINST. 160002869PIN 34-A-11A
O-N MINERALS (CHEMSTONE) COMPANY
DB 931 PG 1182
VA.
SEC
.
RTE
.
672
-
BRUCETOWN
ROAD
(VAR
IABLE
W
IDTH
R
/W
)DB 679
PG
536TURKEY RUNIRF
POINT OF BEGINNING
IRF
IRFIRF S 56°20'26" E 193.18'S 61°27'26" E 587.05'S 71°01'26" E 547.35
'C1S
8
8
°
2
4
'
2
7
"
W
5
3
2
.
8
8
'
S
8
8
°
5
6
'
4
3
"
W
5
2
0
.
4
7
'
IRF
S 60°46'26" E 531.84'IRS
PIN 34-A-11
O-N MINERALS (CHEMSTONE) COMPANY
98.7768 ACRES
ZONED: EM
(EXTRACTIVE MANUFACTURING DISTRICT)
AREA NOT
SUBJECT TO LAND
DISTURBANCE
300.00'100.00'100.00'300.00'PROPERTY EXCAVATION SEPARATION
(SEE CS0000 (1))
CRUSHING OR SCREENING MACHINERY SETBACK (SEE CS0000 (4))ROAD EXCAVA
T
ION
SEPARA
T
ION
(SEE
CS
0
0
0
0
(
3
)
)CRUSHING
OR
SCREEN
ING
MACH
INERY
SE
TBACK
(SEE
CS
0
0
0
0
(
4
)
)
2
0
0
'
RAD
IUS
DWE
L
L
ING
EXCAVA
T
IONSEPARAT
ION
(SEE
CS
0
0
0
0
(
2
)
)
200' RADIUS DWELLING EXCAVATION
SEPARATION (SEE CS0000 (2))200.00'200.00'U:\Accounts\CRMUL\CRMUL25001 - Eastern Berm Preliminary Engineering\DESIGN\_SHEETS\PE\CS1000.dwg PLOTTED: 4/16/2026 9:38 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSCRMUL25002
AS NOTED
RAS
08-20-2025
DMBAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 150'300'
GRAPHIC SCALE 1"=150'
APPROVED SITE PLAN O-N MINERALS (CHEMSTONE) COMPANY - C/O CARMEUSE LIME & STONE, INC.6920 POINTE INVERNESS WAY, SUITE 301 | FORT WAYNE, INDIANA 46804-7926CARMEUSE EASTERN BERM PROJECT 508 QUARRY LANE | CLEARBROOK, VIRGINIA 22624PIN: 34-A-11 - STONEWALL DISTRICTEXISTING CONDITIONS (OVERALL) CS1000
TOTAL SHEETS 15
NOR
T
H
04-14-2026
632
6206306
2
2
62
46266
2
8632
620
622622624
6206226226206346
2
8 PIN 34-A-15SONYA L. MAYINST. 200015758VA.
S
E
C.
R
T
E.
6
7
2 -
B
R
U
C
E
T
O
W
N
R
O
A
D
(VARI
A
B
L
E
WI
D
T
H
R/
W)
DB 6
7
9
P
G
5
3
6
C1IRF IRSPIN 34-
A-
1
1
O-N MI
N
E
R
A
L
S (
C
H
E
M
S
T
O
N
E)
C
O
M
P
A
N
Y
98.77
6
8
A
C
R
E
S
ZONE
D:
E
M
(EXTR
A
C
TI
V
E
M
A
N
U
F
A
C
T
U
RI
N
G
DI
S
T
RI
C
T)PIN 34-A-11AO-N MINERALS (CHEMSTONE) COMPANYDB 931 PG 1182EDGE
O
F
P
A
V
E
M
E
N
T
2
7
"
C
M
P
1
6
"
C
M
P
PIN 34-
A-
2
0
O-N MI
N
E
R
A
L
S (
C
H
E
M
S
T
O
N
E)
C
O
M
P
A
N
Y
DB 20
4
1
P
G
0
PIN 34-
A-
1
9
SONY
A
L.
M
A
Y
DB 9 P
G
0
PIN 34-
A-
1
8
O-N MI
N
E
R
A
L
S (
C
H
E
M
S
T
O
N
E)
C
O
M
P
A
N
Y
DB 20
4
1
P
G
0
PIN 34-
A-
1
7
TERR
Y
L.
M
O
N
G
O
L
D
&
KELLY
J.
M
O
N
G
O
L
D
DB 90
0
1
P
G
0
PIN 33-
A-
1
3
4
BROO
K
S
E
LI
J
A
H
&
TAYL
O
R
G
A
B
RI
E
L
L
A
LAMB
E
R
T
Y
E
NI
S
E
L
DB 51
7
6
P
G
0
PIN 33-
A-
1
3
5
HESS
M
A
X
DI
L
L
A
R
D
B
R
Y
A
N
DB 44
9
1
P
G
0
PIN 33-
A-
1
3
6
O-N MI
N
E
R
A
L
S (
C
H
E
M
S
T
O
N
E)
C
O
M
P
A
N
Y
DB 20
4
1
P
G
0
CENT
E
R
LI
N
E
P
O
T
O
M
A
C
E
DI
S
O
N
E
A
S
E
M
E
N
T
DB 63
7
P
G
2
7
0
20' TRI
M
MI
N
G
RI
G
H
T
S
B
O
T
H
SI
D
E
S
O
F
C
E
N
T
E
R
LI
N
E100.00'300.00'ROAD
E
X
C
A
V
ATI
O
N
S
E
P
A
R
ATI
O
N (
S
E
E
C
S0000 (3))
CRUS
HI
N
G
O
R
S
C
R
E
E
NI
N
G
M
A
C
HI
N
E
R
Y
S
E
T
B
A
C
K (
S
E
E
C
S0000 (4))200' RADI
U
S
D
W
ELLI
N
G
E
X
C
A
V
ATI
O
N
SEPA
R
ATI
O
N (
S
E
E
C
S0000 (2))200.00'200.00'U:\Accounts\CRMUL\CRMUL25001 - Eastern Berm Preliminary Engineering\DESIGN\_SHEETS\PE\CS1000.dwg PLOTTED: 4/16/2026 9:40 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSCRMUL25002
AS NOTED
RAS
08-20-2025
DMBAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100'
GRAPHIC SCALE 1"=50'
MATCHLINE SEE: CS1002 APPROVED SITE PLAN O-N MINERALS (CHEMSTONE) COMPANY - C/O CARMEUSE LIME & STONE, INC.6920 POINTE INVERNESS WAY, SUITE 301 | FORT WAYNE, INDIANA 46804-7926CARMEUSE EASTERN BERM PROJECT 508 QUARRY LANE | CLEARBROOK, VIRGINIA 22624PIN: 34-A-11 - STONEWALL DISTRICTEXISTING CONDITIONS CS1001
TOTAL SHEETS 15 NORTH 04-14-2026
63062462662863262
0 6286286306
3
2
634
636
618620 62
0
6146146
2
0 620618634
PIN 34-A-13
CYNTHIA L. BENNER
DB 817 PG 486
PIN 34-A-24K
LOT 1-C
ALEXANDER W. BUTLER,
DOUGLAS W. BUTLER,
KEVIN W. BUTLER
INST. 070012137
IRF
IRF
EX. 50' SHENANDOAH
GAS COMPANY ESM'T
DB 234 PG 480300.00'100.00'PROPERTY EXCAVATION SEPARATION (SEE CS0000 (1))
CRUSHING OR SCREENING MACHINERY SETBACK (SEE CS0000 (4))
200' RADIUS DWELLING EXCAVATION
SEPARATION (SEE CS0000 (2))200.00'U:\Accounts\CRMUL\CRMUL25001 - Eastern Berm Preliminary Engineering\DESIGN\_SHEETS\PE\CS1000.dwg PLOTTED: 4/16/2026 9:41 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSCRMUL25002
AS NOTED
RAS
08-20-2025
DMBAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100'
GRAPHIC SCALE 1"=50'
MATCHLINESEE CS1001 APPROVED SITE PLAN O-N MINERALS (CHEMSTONE) COMPANY - C/O CARMEUSE LIME & STONE, INC.6920 POINTE INVERNESS WAY, SUITE 301 | FORT WAYNE, INDIANA 46804-7926CARMEUSE EASTERN BERM PROJECT 508 QUARRY LANE | CLEARBROOK, VIRGINIA 22624PIN: 34-A-11 - STONEWALL DISTRICTEXISTING CONDITIONS CS1002
TOTAL SHEETS 15
NOR
T
H
04-14-2026
632
6206306
2
2
62
46266
2
8632
620
622622624
6206226226206346
2
8 PIN 34-A-15SONYA L. MAYINST. 200015758VA.
S
E
C.
R
T
E.
6
7
2 -
B
R
U
C
E
T
O
W
N
R
O
A
D
(VARI
A
B
L
E
WI
D
T
H
R/
W)
DB 6
7
9
P
G
5
3
6
POINT OF BEGINNINGC1IRF IRSPIN 34-
A-
1
1
O-N MI
N
E
R
A
L
S (
C
H
E
M
S
T
O
N
E)
C
O
M
P
A
N
Y
98.77
6
8
A
C
R
E
S
ZONE
D:
E
M
(EXTR
A
C
TI
V
E
M
A
N
U
F
A
C
T
U
RI
N
G
DI
S
T
RI
C
T)PIN 34-A-11AO-N MINERALS (CHEMSTONE) COMPANYDB 931 PG 1182EDGE
O
F
P
A
V
E
M
E
N
T
2
7
"
C
M
P
1
6
"
C
M
P
PIN 34-
A-
2
0
O-N MI
N
E
R
A
L
S (
C
H
E
M
S
T
O
N
E)
C
O
M
P
A
N
Y
DB 20
4
1
P
G
0
PIN 34-
A-
1
9
SONY
A
L.
M
A
Y
DB 9 P
G
0
PIN 34-
A-
1
8
O-N MI
N
E
R
A
L
S (
C
H
E
M
S
T
O
N
E)
C
O
M
P
A
N
Y
DB 20
4
1
P
G
0
PIN 34-
A-
1
7
TERR
Y
L.
M
O
N
G
O
L
D
&
KELLY
J.
M
O
N
G
O
L
D
DB 90
0
1
P
G
0
PIN 33-
A-
1
3
4
BROO
K
S
E
LI
J
A
H
&
TAYL
O
R
G
A
B
RI
E
L
L
A
LAMB
E
R
T
Y
E
NI
S
E
L
DB 51
7
6
P
G
0
PIN 33-
A-
1
3
5
HESS
M
A
X
DI
L
L
A
R
D
B
R
Y
A
N
DB 44
9
1
P
G
0
PIN 33-
A-
1
3
6
O-N MI
N
E
R
A
L
S (
C
H
E
M
S
T
O
N
E)
C
O
M
P
A
N
Y
DB 20
4
1
P
G
0
CENT
E
R
LI
N
E
P
O
T
O
M
A
C
E
DI
S
O
N
E
A
S
E
M
E
N
T
DB 63
7
P
G
2
7
0
20' TRI
M
MI
N
G
RI
G
H
T
S
B
O
T
H
SI
D
E
S
O
F
C
E
N
T
E
R
LI
N
E100.00'300.00'ROAD
E
X
C
A
V
ATI
O
N
S
E
P
A
R
ATI
O
N (
S
E
E
C
S0000 (3))
CRUS
HI
N
G
O
R
S
C
R
E
E
NI
N
G
M
A
C
HI
N
E
R
Y
S
E
T
B
A
C
K (
S
E
E
C
S0000 (4))200' RADI
U
S
D
W
ELLI
N
G
E
X
C
A
V
ATI
O
N
SEPA
R
ATI
O
N (
S
E
E
C
S0000 (2))200.00'200.00'DC
TS
SSF
SSF
CE
DA = 7.15
A
C.
C = 0.35
DA = 5.02
A
C.
C = 0.35
DA = 1.05
A
C.
C = 0.35
OFFSIT
E
D
A = 0.53
A
C.
C = 0.35
OFFSIT
E
D
A = 0.49
A
C.
C = 0.35
TS
TS
LOD
U:\Accounts\CRMUL\CRMUL25001 - Eastern Berm Preliminary Engineering\DESIGN\_SHEETS\PE\CS2100.dwg PLOTTED: 4/16/2026 9:40 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSCRMUL25002
AS NOTED
RAS
08-20-2025
DMBAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100'
GRAPHIC SCALE 1"=50'
CS2101 APPROVED SITE PLAN O-N MINERALS (CHEMSTONE) COMPANY - C/O CARMEUSE LIME & STONE, INC.6920 POINTE INVERNESS WAY, SUITE 301 | FORT WAYNE, INDIANA 46804-7926CARMEUSE EASTERN BERM PROJECT 508 QUARRY LANE | CLEARBROOK, VIRGINIA 22624PIN: 34-A-11 - STONEWALL DISTRICTEROSION & SEDIMENT CONTROL - PHASE I CS2100
TOTAL SHEETS 15 NORTH 04-14-2026 ECM-15 OUTLET PROTECTION OP
DUST CONTROL DC DC
SCM-05 CULVERT INLET
PROTECTION CIP
EROSION AND SEDIMENT
CONTROL LEGEND
NO.TITLE KEY SYMBOL
SCM-03 TEMPORARY STONE
CONSTRUCTION ENTRANCE CE
SOIL STABILIZATION
BLANKETS AND MATTING B/MSSM-05
SSM-09 TEMPORARY SEEDING TS TS
LIMITS OF DISTURBANCE LOD
PCM-04-5 SUPER SILT FENCE SSF
63062462662863262
0 6286286306
3
2
634
636
618620 6
2
0
6146146
2
0 620618634
PIN 34-A-13
CYNTHIA L. BENNER
DB 817 PG 486
PIN 34-A-24K
LOT 1-C
ALEXANDER W. BUTLER,
DOUGLAS W. BUTLER,
KEVIN W. BUTLER
INST. 070012137
IRF
IRF
EX. 50' SHENANDOAH
GAS COMPANY ESM'T
DB 234 PG 480300.00'100.00'PROPERTY EXCAVATION SEPARATION (SEE CS0000 (1))
CRUSHING OR SCREENING MACHINERY SETBACK (SEE CS0000 (4))
200' RADIUS DWELLING EXCAVATION
SEPARATION (SEE CS0000 (2))200.00'DC
SSF
DA = 7.89 AC.
C = 0.35 DA = 5.49 AC.
C = 0.35
DA = 7.64 AC.
C = 0.35
DA
=
1
.
0
5
AC
.
TS
TS
SSF
LOD
LOD
U:\Accounts\CRMUL\CRMUL25001 - Eastern Berm Preliminary Engineering\DESIGN\_SHEETS\PE\CS2100.dwg PLOTTED: 4/16/2026 9:40 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSCRMUL25002
AS NOTED
RAS
08-20-2025
DMBAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100'
GRAPHIC SCALE 1"=50'
CS2100 APPROVED SITE PLAN O-N MINERALS (CHEMSTONE) COMPANY - C/O CARMEUSE LIME & STONE, INC.6920 POINTE INVERNESS WAY, SUITE 301 | FORT WAYNE, INDIANA 46804-7926CARMEUSE EASTERN BERM PROJECT 508 QUARRY LANE | CLEARBROOK, VIRGINIA 22624PIN: 34-A-11 - STONEWALL DISTRICTEROSION & SEDIMENT CONTROL - PHASE I CS2101
TOTAL SHEETS 15
NOR
T
H
04-14-2026
62262462662863063263463663864064264264063863663463262264264063863663463263062862462262062262062662662863025.00'15.00'TOP
O
F
B
E
R
M
4:12:13300+LOD
3100+0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00ENTR
A
N
C
E
F
E
A
T
U
R
E/
SI
G
N624624 6286306246266286306' 4-BOAR
D
F
E
N
C
E:
±1,250'25.00'8' PRIVACYFENCE: ±750'DOUBLE SWING GATE632
6206306
2
2
62
46266
2
8632
620
622622624
6206226226206346
2
8 PIN 34-A-15SONYA L. MAYINST. 200015758VA.
S
E
C.
R
T
E.
6
7
2 -
B
R
U
C
E
T
O
W
N
R
O
A
D
(VARI
A
B
L
E
WI
D
T
H
R/
W)
DB 6
7
9
P
G
5
3
6
C1IRF IRSPIN 34-
A-
1
1
O-N MI
N
E
R
A
L
S (
C
H
E
M
S
T
O
N
E)
C
O
M
P
A
N
Y
98.77
6
8
A
C
R
E
S
ZONE
D:
E
M
(EXTR
A
C
TI
V
E
M
A
N
U
F
A
C
T
U
RI
N
G
DI
S
T
RI
C
T)PIN 34-A-11AO-N MINERALS (CHEMSTONE) COMPANYDB 931 PG 1182EDGE
O
F
P
A
V
E
M
E
N
T
2
7
"
C
M
P
1
6
"
C
M
P
PIN 34-
A-
2
0
O-N MI
N
E
R
A
L
S (
C
H
E
M
S
T
O
N
E)
C
O
M
P
A
N
Y
DB 20
4
1
P
G
0
PIN 34-
A-
1
9
SONY
A
L.
M
A
Y
DB 9 P
G
0
PIN 34-
A-
1
8
O-N MI
N
E
R
A
L
S (
C
H
E
M
S
T
O
N
E)
C
O
M
P
A
N
Y
DB 20
4
1
P
G
0
PIN 34-
A-
1
7
TERR
Y
L.
M
O
N
G
O
L
D
&
KELLY
J.
M
O
N
G
O
L
D
DB 90
0
1
P
G
0
PIN 33-
A-
1
3
4
BROO
K
S
E
LI
J
A
H
&
TAYL
O
R
G
A
B
RI
E
L
L
A
LAMB
E
R
T
Y
E
NI
S
E
L
DB 51
7
6
P
G
0
PIN 33-
A-
1
3
5
HESS
M
A
X
DI
L
L
A
R
D
B
R
Y
A
N
DB 44
9
1
P
G
0
PIN 33-
A-
1
3
6
O-N MI
N
E
R
A
L
S (
C
H
E
M
S
T
O
N
E)
C
O
M
P
A
N
Y
DB 20
4
1
P
G
0
CENT
E
R
LI
N
E
P
O
T
O
M
A
C
E
DI
S
O
N
E
A
S
E
M
E
N
T
DB 63
7
P
G
2
7
0
20' TRI
M
MI
N
G
RI
G
H
T
S
B
O
T
H
SI
D
E
S
O
F
C
E
N
T
E
R
LI
N
E100.00'300.00'ROAD
E
X
C
A
V
ATI
O
N
S
E
P
A
R
ATI
O
N (
S
E
E
C
S0000 (3))
CRUS
HI
N
G
O
R
S
C
R
E
E
NI
N
G
M
A
C
HI
N
E
R
Y
S
E
T
B
A
C
K (
S
E
E
C
S0000 (4))200' RADI
U
S
D
W
ELLI
N
G
E
X
C
A
V
ATI
O
N
SEPA
R
ATI
O
N (
S
E
E
C
S0000 (2))200.00'200.00'CIPBM
BM
SSFSSFCE
DA = 5.11
A
C.
C = 0.35
DA = 3.74
A
C.
C = 0.35
DA = 2.57
A
C.
C = 0.35DA = 0.36 AC.C = 0.35DA = 0.69 AC.C = 0.35DA = 1.77
A
C.
C = 0.35OP2.1
2
1
5
4
'
O
F
1
8
"
H
D
P
E
@
1
.
0
0
%INV. = 622.30INV. = 620.
75"CULV
E
R
T 1"
PLUN
G
E
P
O
O
L 1
QUARRY
SIDEBERM HEIGHT
20' MINIMUM 2:14:1"PUBLIC"
SIDE BEYOND
QUARRY
10'
TOP OF BERM
BERM TYPICAL SECTION
NOT TO SCALE
U:\Accounts\CRMUL\CRMUL25001 - Eastern Berm Preliminary Engineering\DESIGN\_SHEETS\PE\CS2200.dwg PLOTTED: 4/16/2026 9:38 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSCRMUL25002
AS NOTED
RAS
08-20-2025
DMBAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100'
GRAPHIC SCALE 1"=50'
CS2201
APPROVED SITE PLAN O-N MINERALS (CHEMSTONE) COMPANY - C/O CARMEUSE LIME & STONE, INC.6920 POINTE INVERNESS WAY, SUITE 301 | FORT WAYNE, INDIANA 46804-7926CARMEUSE EASTERN BERM PROJECT 508 QUARRY LANE | CLEARBROOK, VIRGINIA 22624PIN: 34-A-11 - STONEWALL DISTRICTEROSION & SEDIMENT CONTROL - PHASE II & GRADINGPLAN CS2200
TOTAL SHEETS 15 NORTH 04-14-2026 NOTE: STEEPER SLOPES MAY BE PERMITTED WITH
APPROPRIATE GEOTECHNICAL DESIGN AND APPROVAL BY
FREDERICK COUNTY
622
624
626
628
630
632
634
636
638
640
642
622
624
626
628
630
632
634
636
620
638
640
642
642640638636634632630
628
626
624622
620
642
640638636634632
630
628626624
EXISTING
TREELINE
618
622
624
626
628
630632
4:1
3300
+
LOD
15+00
16+00 17+00 18+00 19+00 20+00 21+00
22+00 23+00
24+00
25+00 26+00
27+00 28+0029+0030+0030+18628626
624
622
624
626
628
6' AMERICAN WIRE FENCE: ±1,722'63062462662863262
0 6286286306
3
2
634
636
618620 62
0
6146146
2
0 620618634
PIN 34-A-13
CYNTHIA L. BENNER
DB 817 PG 486
PIN 34-A-24K
LOT 1-C
ALEXANDER W. BUTLER,
DOUGLAS W. BUTLER,
KEVIN W. BUTLER
INST. 070012137
IRF
IRF
EX. 50' SHENANDOAH
GAS COMPANY ESM'T
DB 234 PG 480300.00'100.00'PROPERTY EXCAVATION SEPARATION (SEE CS0000 (1))
CRUSHING OR SCREENING MACHINERY SETBACK (SEE CS0000 (4))
200' RADIUS DWELLING EXCAVATION
SEPARATION (SEE CS0000 (2))200.00'OP
CIP
BM
BM
BM
SSF
SSF
BM
DA = 17.84 AC.
C = 0.35
DA = 0.36 AC.
DA = 1.00 AC.
C = 0.35
DA = 1.03 AC.
C = 0.35
DA = 1.15 AC.
C = 0.35
1.1
1
340'
O
F
4
8
"
H
D
P
E
@
0
.
5
0
%
INV. = 621.70
PLUNGE POOL 2
"CULVERT 2"
INV. = 620.00
U:\Accounts\CRMUL\CRMUL25001 - Eastern Berm Preliminary Engineering\DESIGN\_SHEETS\PE\CS2200.dwg PLOTTED: 4/16/2026 9:41 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSCRMUL25002
AS NOTED
RAS
08-20-2025
DMBAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100'
GRAPHIC SCALE 1"=50'
CS2200 APPROVED SITE PLAN O-N MINERALS (CHEMSTONE) COMPANY - C/O CARMEUSE LIME & STONE, INC.6920 POINTE INVERNESS WAY, SUITE 301 | FORT WAYNE, INDIANA 46804-7926CARMEUSE EASTERN BERM PROJECT 508 QUARRY LANE | CLEARBROOK, VIRGINIA 22624PIN: 34-A-11 - STONEWALL DISTRICTEROSION & SEDIMENT CONTROL - PHASE II & GRADINGPLAN CS2201
TOTAL SHEETS 15
NOR
T
H
04-14-2026
6206306226
2
4626628632
620622
622
624
620
622
622
PIN 34-A-15SONYA L. MAYINST. 200015758VA. SEC. RTE. 672 - BRUCETOWN ROAD
(VARIABLE WIDTH R/W)
DB 679 PG 536
C1IRF IRSPIN 34-A-11
O-N MINERALS (CHEMSTONE) COMPANY
98.7768 ACRES
ZONED: EM
(EXTRACTIVE MANUFACTURING DISTRICT)
EDGE OF PAVEMENT 27" CMP16" CMPPIN 34-A-20
O-N MINERALS (CHEMSTONE) COMPANYPIN 34-A-19
PIN 33-A-136
O-N MINERALS (CHEMSTONE) COMPANY
DB 2041 PG 0
CENTERLINE POTOMAC EDISON EASEMENT
DB 637 PG 270
20' TRIMMING RIGHTS BOTH SIDES OF CENTERLINE 100.00'300.00'ROAD EXCAVATION SEPARATION (SEE CS0000 (3))
CRUSHING OR SCREENING MACHINERY SETBACK (SEE CS0000 (4))
200' RADIUS DWELLING EXCAVATION
SEPARATION (SEE CS0000 (2))200.00'200.00'6
2
4
62
2
622
620
620
622 630
628
622624620620
620
622
622622
620
626
628626
6226
2
2
624
622
624
626
628
630
632
634
636
638
640
642
642640638636634632
622
642640638636634632630628
624
630622624
622
620
622
620
62
4
626626 626 628 630
25.00'15.00'TOP OF BERM
4:1
2:1 3300+LOD
3100
+
0+00
1+00
2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+0014+0015+00ENTRANCE FEATURE/SIGN
624
624
622
628 630
624626628630
6' 4-BOARD FENCE: ±1,250'25.00'DOUBL
E
S
WI
N
G
G
A
T
E
2.1
2154' OF 18" HDPE @ 1.00%
INV. = 622.30
INV. = 620.75
"CULVERT 1"
PLUNGE POOL 1
600
605
610
615
620
625
630
635
640
645
650
0+00620.3620.25620.3620.340+50620.3620.35620.5620.531+00620.7620.69621.0621.031+50621.6621.62622.3622.262+00622.7622.73623.0622.962+50623.3623.30623.2623.223+00623.2623.17623.6623.563+50623.7623.74624.2624.164+00624.7624.74624.9624.864+50624.5624.48624.1624.055+00624.2624.20624.3624.305+50624.7624.65624.9624.886+00625.1625.06625.1625.086+50625.6625.59626.4626.407+00627.3627.34628.2628.217+50628.5628.54628.2628.158+00627.6627.61627.4627.438+50627.0627.02626.1626.099+00625.0625.00624.0624.039+50623.0623.04622.0622.0110+00621.2621.18620.4620.4110+50620.8620.76621.9621.9011+00623.5623.50624.9624.9411+50625.8625.80626.3626.3512+00626.9626.87627.1627.1212+50627.0626.97627.1627.1113+00627.4627.42627.7627.7413+50628.0627.98628.4628.4314+00628.9628.89629.5629.4714+50629.9629.87630.1630.1215+00629.6629.64EX. GRADE
FIN. GRADE
STRM XING STA. 10+24.5218" HDPE INV=620.82U:\Accounts\CRMUL\CRMUL25001 - Eastern Berm Preliminary Engineering\DESIGN\_SHEETS\PE\CS4000.dwg PLOTTED: 4/16/2026 9:40 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSCRMUL25002
AS NOTED
RAS
08-20-2025
DMBAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100'
GRAPHIC SCALE 1"=50'
APPROVED SITE PLAN O-N MINERALS (CHEMSTONE) COMPANY - C/O CARMEUSE LIME & STONE, INC.6920 POINTE INVERNESS WAY, SUITE 301 | FORT WAYNE, INDIANA 46804-7926CARMEUSE EASTERN BERM PROJECT 508 QUARRY LANE | CLEARBROOK, VIRGINIA 22624PIN: 34-A-11 - STONEWALL DISTRICTBERM PROFILE CS4001
TOTAL SHEETS 15 NORTH 04-14-2026 00 50'100'
GRAPHIC SCALE 1"=50'CS4002C
S
4
0
0
2
63062462662863262
0 6286286306
3
2
618620 6
2
0
6146146
2
0 620618622IRF
IRF
EX. 50' SHENANDOAH
GAS COMPANY ESM'T
DB 234 PG 480300.00'100.00'PROPERTY EXCAVATION SEPARATION (SEE CS0000 (1))
CRUSHING OR SCREENING MACHINERY SETBACK (SEE CS0000 (4))
200' RADIUS DWELLING EXCAVATION
SEPARATION (SEE CS0000 (2))200.00'630
632
622
624
626
628
630
632
634
636
638
640
642
622
624
626
628
630
632
634
636
620
638
640
642
6426246266286
2
2
630
6
3
0
6
3
0
6
3
2
62062262
4
62
6
628
630
63
2
634
636
622
6
2
0
618616614614616618620622
618
6206226246
2
6628 622624626628632
618620622
624640638636634632630
628
626
624622
620
642
640638636634632
630
628626624
EXISTING
TREELINE
618
622622
624
626
6286
2
66246
2
2
62
0622624626
628
630632
4:1
00
LOD
15+00
16+00 17+00 18+00 19+00 20+00 21+00
22+00 23+00
24+00
25+00 26+00
27+00 28+0029+0030+0030+18628626
624
622
624
626
628
6' AMERICAN WIRE FENCE: ±1,722'
1.1
1
340'
O
F
4
8
"
H
D
P
E
@
0
.
5
0
%
INV. = 621.70
PLUNGE POOL 2
"CULVERT 2"
INV. = 620.00
600
605
610
615
620
625
630
635
640
645
650
14+50629.9629.87630.1630.1215+00629.6629.64629.1629.1315+50627.9627.89626.5626.4716+00625.0625.02623.2623.2516+50622.1622.08621.7621.6517+00621.7621.66622.1622.0817+50623.1623.14624.6624.6318+00625.9625.86627.0627.0318+50628.1628.13628.6628.5519+00628.7628.73628.9628.9119+50628.6628.64628.1628.0620+00627.3627.33626.7626.6820+50624.9624.93623.2623.2021+00621.4621.36620.1620.0721+50619.4619.44619.4619.3722+00619.7619.75620.4620.4322+50621.5621.48622.5622.5023+00623.1623.08623.4623.3823+50623.1623.09622.4622.4124+00621.5621.51620.3620.3424+50619.0619.00617.6617.6425+00616.6616.62616.1616.1425+50615.9615.95616.9616.9026+00618.3618.33619.7619.7326+50621.3621.30622.7622.7427+00624.0624.03625.3625.2727+50626.3626.27626.8626.7828+00626.8626.76627.0627.0228+50626.9626.85627.0627.0129+00627.6627.60628.5628.5029+50629.5629.5429+75630.7630.69EX. GRADE
FIN. GRADE
STRM XING STA. 27+59.9648" HDPE INV=616.38U:\Accounts\CRMUL\CRMUL25001 - Eastern Berm Preliminary Engineering\DESIGN\_SHEETS\PE\CS4000.dwg PLOTTED: 4/16/2026 9:40 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSCRMUL25002
AS NOTED
RAS
08-20-2025
DMBAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100'
GRAPHIC SCALE 1"=50'
APPROVED SITE PLAN O-N MINERALS (CHEMSTONE) COMPANY - C/O CARMEUSE LIME & STONE, INC.6920 POINTE INVERNESS WAY, SUITE 301 | FORT WAYNE, INDIANA 46804-7926CARMEUSE EASTERN BERM PROJECT 508 QUARRY LANE | CLEARBROOK, VIRGINIA 22624PIN: 34-A-11 - STONEWALL DISTRICTBERM PROFILE CS4002
TOTAL SHEETS 15
NOR
T
H
04-14-2026 00 50'100'
GRAPHIC SCALE 1"=50'CS4001CS4001
U:\Accounts\CRMUL\CRMUL25001 - Eastern Berm Preliminary Engineering\DESIGN\_SHEETS\PE\CS4500.dwg PLOTTED: 4/16/2026 9:40 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSCRMUL25002
AS NOTED
RAS
08-20-2025
DMBAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN O-N MINERALS (CHEMSTONE) COMPANY - C/O CARMEUSE LIME & STONE, INC.6920 POINTE INVERNESS WAY, SUITE 301 | FORT WAYNE, INDIANA 46804-7926CARMEUSE EASTERN BERM PROJECT 508 QUARRY LANE | CLEARBROOK, VIRGINIA 22624PIN: 34-A-11 - STONEWALL DISTRICTE&S DETAILS CS4500
TOTAL SHEETS 15 04-14-2026
U:\Accounts\CRMUL\CRMUL25001 - Eastern Berm Preliminary Engineering\DESIGN\_SHEETS\PE\CS4501.dwg PLOTTED: 4/16/2026 9:41 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSCRMUL25002
AS NOTED
RAS
08-20-2025
DMBAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN O-N MINERALS (CHEMSTONE) COMPANY - C/O CARMEUSE LIME & STONE, INC.6920 POINTE INVERNESS WAY, SUITE 301 | FORT WAYNE, INDIANA 46804-7926CARMEUSE EASTERN BERM PROJECT 508 QUARRY LANE | CLEARBROOK, VIRGINIA 22624PIN: 34-A-11 - STONEWALL DISTRICTE&S DETAILS CS4501
TOTAL SHEETS 15 04-14-2026
U:\Accounts\CRMUL\CRMUL25001 - Eastern Berm Preliminary Engineering\DESIGN\_SHEETS\PE\CS6100.dwg PLOTTED: 4/16/2026 9:41 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSCRMUL25002
AS NOTED
RAS
08-20-2025
DMBAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 50'100'
GRAPHIC SCALE 1"=50'
APPROVED SITE PLAN O-N MINERALS (CHEMSTONE) COMPANY - C/O CARMEUSE LIME & STONE, INC.6920 POINTE INVERNESS WAY, SUITE 301 | FORT WAYNE, INDIANA 46804-7926CARMEUSE EASTERN BERM PROJECT 508 QUARRY LANE | CLEARBROOK, VIRGINIA 22624PIN: 34-A-11 - STONEWALL DISTRICTSTORM SEWER DESIGN CS6100
TOTAL SHEETS 15 04-14-2026 CULVERT 1 - DESIGN REPORT CULVERT 2 - DESIGN REPORT
CULVERT 1 CULVERT 2
DESIGN PARAMETERS:
B = 14.0'
C = 18.0'
D = 1.7'
E = d = 4.0'
F = 1.0'
Rip-Rap Size = 0.85' (d50)
DESIGN PARAMETERS:
B = 9.0'
C = 10.5'
D = 1.2'
E = d = 1.5'
F = 1.0'
Rip-Rap Size = 0.60' (d50)
(10 YR)
(100 YR)
(10 YR)
(100 YR)
63
0
62
462
6
628
6
3
2
6206306226
2
4626628632
620
620
62
8 628630
632634636 618
6
2
0
620
61
4614 620
620 618622
624
626
622
622
624
620
620
622
622 620618616614
614 612610
620630622624
626628632
634
6
28
S 30°07'28" W 805.12'S 30°53'22" W 970.41'N 30°32'33" E 750.00'N 14°12'06" W 355.13'N 30°32'33" E 721.67'VA. SEC. RTE. 672 - BRUCETOWN ROAD
(VARIABLE WIDTH R/W)
DB 679 PG 536
C1 S 88°24'27" W 532.88'S 88°56'43" W 520.47'EDGE OF PAVEMENT 27" CMP16" CMPEX. 50' SHENANDOAHGAS COMPANY ESM'TDB 234 PG 480300.00'100.00'100.00'300.00'PROPERTY EXCAVATION SEPARATION(SEE CS0000 (1))CRUSHING OR SCREENING MACHINERY SETBACK (SEE CS0000 (4))ROAD EXCAVATION SEPARATION
(SEE CS0000 (3))
CRUSHING OR SCREENING MACHINERY SETBACK (SEE CS0000 (4))
200' RADIUS DWELLING EXCAVATION
SEPARATION (SEE CS0000 (2))200' RADIUS DWELLING EXCAVATIONSEPARATION (SEE CS0000 (2))200.00'200.00'BERM LANDSCAPING
LIMITS OF DISTURBANCE
6' 4-BOARD FENCE: ±1,250'6' AMERICAN WIRE FENCE: ±1,722'DOUBL
E
S
WI
N
G
G
A
T
E
8' PRIVACY FENCE
:
±
7
5
0
'U:\Accounts\CRMUL\CRMUL25001 - Eastern Berm Preliminary Engineering\DESIGN\_SHEETS\PE\CS7000.dwg PLOTTED: 4/16/2026 9:38 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSCRMUL25002
AS NOTED
RAS
08-20-2025
DMBAPPROVED BY
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 APPROVED SITE PLAN O-N MINERALS (CHEMSTONE) COMPANY - C/O CARMEUSE LIME & STONE, INC.6920 POINTE INVERNESS WAY, SUITE 301 | FORT WAYNE, INDIANA 46804-7926CARMEUSE EASTERN BERM PROJECT 508 QUARRY LANE | CLEARBROOK, VIRGINIA 22624PIN: 34-A-11 - STONEWALL DISTRICTLANDSCAPING PLAN & DETAILS CS7000
TOTAL SHEETS 15 04-14-2026 BERM PLANTING CALCULATIONS:
BERM LENGTH = 2,900 LF.
PLANTINGS PROPOSED @ 18.5 PLANTINGS PER 100 LF. = 537
SEED PLANTING DETAIL
MEDIUM DECIDUOUS PLANT LIST:
HORNBEAM AMERICAN
HOPHORNBEAM, EASTERN
CHINKAPIN
SASSAFRAS
PERSIMMON
LARGE DECIDUOUS PLANT LIST:
OAK
MAPLE, RED
BLACKGUM
HACKBERRY CELTUS OCCIDENTALIS
POPLAR, YELLOW, TULIP
SYCAMORE
200.00'
SEEDLING PLANTING INSTRUCTIONS:
BRUSH ASIDE LOOSE ORGANIC MATERIAL SUCH AS LEAVES,
GRASS, ETC., IT CAN DECOMPOSE AND LEAVE AIR SPACES.
ROOTS WILL DRY OUT WHEN THEY GROW INTO THESE SPACES.
OPEN UP THE HOLE, MAKING SURE THE HOLE IS DEEP ENOUGH
FOR THE ROOTS TO BE FULLY EXTENDED. IF ROOTS ARE
CURLED OR BUNCHED UP, THE TREE WILL NOT BE ABLE TO
TAKE UP WATER CORRECTLY, WILL OFTEN WEAKEN AND DIE,
OR MAY BLOW DOWN LATER DUE TO POOR ROOT STRUCTURE.
TAKE A TREE OUT OF PLANTING BAG OR BUCKET ONLY AFTER
HOLE IS READY. WHEN EXPOSED, THE FINE ROOTS CAN DRY
OUT IN AS LITTLE AS 30 SECONDS.
HOLD THE SEEDLING IN PLACE IN THE HOLE, MAKING SURE THE
ROOTS ARE STRAIGHT, FULLY EXTENDED AND THAT THE TREE
IS NEITHER TOO SHALLOW OR TOO DEEP IN THE HOLE.
FILL HOLE, ALLOWING SOIL TO FALL IN AROUND THE ROOTS.
TAMP WITH HANDS OR WITH YOUR HEEL. FILL WITH MORE SOIL
IF NECESSARY, AND TAMP.
LANDSCAPE NOTES:
ALL PLANTINGS SHALL CONFORM WITH 165-36B OF THE
FREDERICK COUNTY ZONING ORDINANCE (PLANT SELECTION,
PLANTING PROCEDURE, AND MAINTENANCE).
ANY PLANT SUBSTITUTIONS MUST BE APPROVED IN WRITING BY
THE FREDERICK COUNTY PLANNING DEPARTMENT.
PLANT SPACINGPLANT SPECIES GROUPS
30' O.C.
40' O.C.
BERM
QUANTITY
142
74
SIZE
3 GAL. CONTAINERS
2" CALIPER
TOTALS 216
QUARRY SIDE
TOP OF BERM
FRONT OF BERM ('PUBLIC' SIDE)
TYPICAL PLANTING SECTION
NOTES:
A MINIMUM OF 12" COMPACTED TOP SOIL REQUIRED IN AREAS
TO BE PLANTED WITH TREES.
MINIMUM OF 3 SPECIES TO BE USED FROM EACH PLANT GROUP.
TREES ARE TO BE PLANTED IN GROUPS OF 3 OR MORE OF ONE
SPECIES OF PLANT.
EVERGREENS AND LARGE DECIDUOUS TO BE PLANTED ON
LOWER 2/3 OF THE BERM.
SMALL TO MEDIUM PLANTS TO BE PLANTED IN THE UPPER 1/2
OF BERM.
TO ENSURE SPECIES DIVERSITY, WITHIN EACH 200 LF OF BERM
THERE SHALL BE AT LEAST 3 SPECIES FROM EACH PLANTING
GROUP, WITH NO ONE SPECIES EXCEEDING 40% OF THE
PLANTINGS WITHIN IT'S GROUP, WITHIN ANY 200 LF SECTION.
00 150'300'
GRAPHIC SCALE 1"=150'
NOTE:
REMAINDER OF THE FRONT SIDE AND TOP OF BERM SHALL BE
PERMANENTLY SEEDED AND MAINTAINED AS LAWN.
BERM LANDSCAPING & FENCING EXHIBIT