Loading...
HomeMy WebLinkAbout09-25 MDP Comments 3.6.206COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 March 6, 2026 Zach Judy, P.E. (via email to: zjudy@greenwayeng.com) Greenway Engineering Inc. 151 Windy Hill Lane Winchester, Virginia 22602 Re: Review Comments for MDP #09-25 – Eddy’s Lane Property Identification Number (PIN): 55-4-2 Dear Zach: Thank you for providing the opportunity to review this Master Development Plan (MDP). Please adequately address each of the comments listed below prior to resubmission of the MDP: Review Comments: 1. Sheet 1: a) Application number: Add the application reference number, 09-25. Addressed. 2. Sheet 2: a) PIN: Sheet 2 has the incorrect PIN. Addressed. b) Phasing: Provide the schedule and approximate location of any proposed phasing. Addressed. c) TDR Instrument number: Provide the TDR instrument number and sending property. Addressed. 3. Sheet 4: a) Proposed Topography: Provide the proposed topography. Addressed. b) Rt 37 ROW: Provide the justification for the proposed dedication not aligning with the Eastern Road Plan. Addressed. c) Road Plan Trail: Provide the trail identified in the Eastern Road Plan for the portion of the property. Partially addressed. The trail must be identified and included with the project. d) Recreational units: Identify the potential locations for the recreational units, and general statement of the types of recreational facilities to be provided. Partially addressed. The identified recreation area appears to small to adequately facilitate 3 units of recreational requirements. e) Open Space: The open space of total site area tabulations table and the provided open space in required open space are inconsistent. Addressed. f) Inter-parcel connections: Extend streets connecting to adjacent parcels (§165-202.04 & §144-17(B)(2)). g) Street Lights: Streetlights are required per §144-19. Addressed. 4. Sheet 5: a) Eddy’s Lane Typical: The Eddy’s Lane improvements were removed. Return the improvements. 5. General Comments: a) Agency Comments: Address the comments provided by the other review agencies. b) Re-review Fee: Submit the $500 re-review fee. Additional comments may be provided on subsequent submission. After you have revised the MDP, please resubmit it digitally so that staff may verify the plan address the above comments. Once the revised MDP has been reviewed, staff will notify you to submit at least four (4) hard copies of the final plan set and a digital (PDF) copy for final approval and signature. Please do not hesitate to contact me with questions regarding this letter. Sincerely, Eric Bittner Planner II EB/pd Cc: Zach Campbell, Eddy’s Lane Terra VA LP (Zach@terrafoundrypartners.com)