Loading...
HomeMy WebLinkAbout03-25 Review Comments 7-16COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 July 16, 2025 Devon Taylor (via email: dtaylor@mragta.com) Morris & Ritchie Associates, Inc. 205 East Hirst Road, Suite 106 Purcellville, Virginia 20132 Re: Review Comments for Master Development Plan #03-25 — Winchester 50 LLC (Dulles Electric) Property Identification Number (PIN): 64-10-2 Dear Devon: Thank you for providing the opportunity to review this Master Development Plan (MDP). Please adequately address each of the comments listed below prior to resubmission of the Master Development Plan: Review Comments: (1) Cover Sheet: a) Reference Number. Add the Master Development Plan reference #03- 25. b) Previous Plan Approvals. Add reference to any other plan or master development plan approved by the County for the site. Please indicate the previous Site Plan [SP# 01-22] and specify Master Development Plan (MDP) applications [MDP #06-93]. (2) Conceptual Plan: a) Conceptual Plan and adjacent parcels. The MDP shall include the subject property, as well as all contiguous land under single or common ownership. (§ 165-801.02 (B)). Property Identification Number (PIN) # 64- 10-1 is a vacant parcel and has been noted as a phase of construction which will require a separate MDP for the stated Phase 2. The additional parcel, PIN # 64-A-89, also under common ownership shall be included in the MDP design as well. All property line setback measurements shall be added to all parcels. b) Utilities. The proposed location and arrangement of all proposed and existing utility systems to serve the properties (interior). (§ 165- 801.05(C)(3)). c) Topography. The existing contours are identified but the future 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 topography or proposed topography is not identified on the plan. (§ 165-801- 05(A)(6)). d) Roads, Streets, and Right-of-way. The MDP shall reflect all existing, approved, or planned public roadways, streets or rights -of -way within 2,000 feet of the boundaries of the project. The MDP shall reflect the required area and include US Route 50 (Millwood Pike), Costello Drive, and Prince Frederick Drive roadways, as well as the existing entrances. e) WinFred Metropolitan Plan. The goal of the US 522 realignment project is to move the majority of current 522 traffic from the interchange area to Prince Frederick Drive. Provide a note on PIN #64-10-1 western boundary of the future inter -parcel connections to PIN #64-8-2 and a separate inter - parcel connection onto PIN # 64-A-4A. f) Prince Frederick Drive. The Comprehensive Plan identifies Prince Frederick Drive as an improved minor arterial road and location of the future Route 522 realignment. Whenever a property proposed for development abuts one side of an existing or platted public street, the developer shall dedicate '/2 of the total right-of-way necessary to meet the right of way expansion. (§144-17(E)). Please also provide the necessary right-of-way dedication for Prince Frederick Drive on both PIN #64-A-89 and PIN #64-10-2. See also sidewalk/trail requirements below. g) The location and extent of proposed buffers. The location and extent of proposed buffers required by this chapter, with statements, profiles, cross sections or examples, clearly specifying the screening to be provided shall be provided on the MDP. (§165-801-05 (C)(6)). The additional plantings are in addition to the landscaping requirements specified in § 165- 202.02.01(D)(13) of the Frederick County Zoning Ordinance. The additional landscaping shall include flowering plants and ornamental grass planted in mulch beds along the north side of the property line. h) Sidewalks and Pedestrian Walkways. Safe pedestrian walkways shall be provided to all uses on land included in a master plan or site plan approved by Frederick County. Sidewalks and multi -use trails shall be provided in conformance with adopted Comprehensive Plan policies for present and future roadway classifications and/or approved master development plans. Sidewalks shall be installed in the right-of-way and adjacent to the boundary of the right-of-way of all proposed and existing streets and shall contain adequate handicapped ramps at all intersections at intervals acceptable to the Virginia Department of Transportation. There shall be a minimum of a two -foot -wide grass strip or swale between the street edge and the sidewalk, where sidewalks are required. Sidewalks shall be a minimum of five (5) feet wide; multi -use trails shall be a minimum of ten (10) feet wide (§165- 203.02(D)). A 5-foot (FT) wide sidewalk is required along Costello Drive and Prince Frederick Drive. Additionally, the Comprehensive Plan identifies Prince Frederick Drive as a roadway requiring a multi -use trail. Ensure the location of the enhanced landscaping, the 10' wide hike/bike trail, the utility area, and the grass area can be placed within the right-of- way and adjacent to the boundary of the right-of-way as required. The responsibility and the cost and construction are borne by the property owner/developer. Remove the note that the trail is "by others". Agency Approvals Comment sheets (approvals) are required from the following agencies: the Frederick County Engineer (Public Works), Building Inspections, the Fire Marshal, the GIS Department, Frederick Water, Winchester Regional Airport, and the Virginia Department of Transportation (VDOT). Additional comments mai be provided on subsequent submission. After you have revised the MDP, please resubmit one (1) hard copy so that staff may verify the plan address the above comments along with all review agency comments (approvals). Once the revised MDP has been reviewed, staff will notify you to submit at least five (5) hard copies of the final plan set and a digital (PDF) copy for final approval and signature. Please do not hesitate to contact me with questions regarding this letter. Sincerely, X6, � � �le , Amy Feltner Planner ALF/pd cc: Winchester 50, LLC, 3016 Williams Drive, Suite 100, Fairfax, Virginia 22031