Loading...
HomeMy WebLinkAbout05-26 PC Staff Report - July REZONING #05-26 Clearbrook Rentals, LLC Staff Report for the Planning Commission Prepared: June 22, 2026 Staff Contact: Eric Bittner, Planner II Executive Summary: Meeting Schedule Planning Commission: June 3, 2026 Planning Commission July 1, 2026 Action: Public Hearing; Deferred Action: Public Hearing, Pending Board of Supervisors: July 8, 2026 Action: Public Hearing; Pending Property Information Property Identification Number (PIN) 33-A-93 Address 4489 Martinsburg Pike, Winchester Magisterial District Stonewall Acreage +/- 0.56-acres Zoning & Present Land Use Zoning: B2 (General Business) with proffers Land Use: Commercial Proposed Zoning B2 with revised proffers Adjoining Property Zoning & Present Land Use North: RA (Rural Area) District Land Use: Vacant South: RA (Rural Area) District Land Use: Residential East: RA (Rural Area) District Land Use: Residential West: B3 (Industrial Transition) District Land Use: Automative Repair Proposed Use This is a request to rezone +/-0.56-acres from B2 (General Business) Zoning District with proffers to B2 Zoning District with revised proffers. The proposed proffers would enable “health care services” as a permitted use. Positives Concerns The proposed rezoning does not otherwise change the existing zoning or the property, B2, and remains in conformance with the Comprehensive Plan. The proposed rezoning does not further the land use policies of the NELUP and the designated long range land use category. 9 Page 2 of 4 The proposed Right-of-Way advances the Eastern Road Plan. Review Agency Comments: Review Agency Comment Date Comment Summary Status Virginia Department of Transportation (VDOT) 01/29/2026 “VDOT has no comments on the rezoning.” Frederick Water 2/18/2026 No comment Frederick County Inspections 2/3/2026 “No comment.” Frederick County Public Works 1/29/2026 “No comments- no proposed changes to grading or stormwater infrastructure.” Frederick County Fire Marshal 1/30/2026 “Approved, no existing fire department features to be removed without the permission of the Fire Official.” Frederick County Attorney 02/18/2026 No comment. Legal form. Planning & Zoning Staff Analysis: Site History: A rezoning application (REZ #05-01) was approved by the Board of Supervisors on September 12, 2001, which rezoned the property from the RA (Rural Area) Zoning District to B3 (Industrial Transition) Zoning District and B2 (General Business) Zoning District with proffers, restricting some uses, including health services, and providing a cash proffer to mitigate Fire and Rescue impacts. The existing structure was built in 2011 in conformance with an approved site plan, SP #27-10. The proposed rezoning would keep the zoning designation, B2, but amend the approved proffer statement to add “health care services” as a permitted use The proposed use was proffered out of 10 Page 3 of 4 being permitted in the previous rezoning but is otherwise already considered a permitted use in the B2 (General Business District). Comprehensive Plan Conformance: The Comprehensive Plan (adopted November 2021) and the Northeast Land Use Area Plan provide guidance on the future development of the subject property. The Plan identifies the subject properties with a “mixed use industrial office” (MUIO) land use designation and as being within the limits of the Urban Development Area (UDA). The Northeast Land Use Area Plan describes the future environment envisioned for the mixes use industrial office. “These areas are intended to develop with targeted growth sectors identified by the County’s Economic Development Authority (EDA), as well as similar industries that are likely to bring higher wages, professional and/or technology jobs. Uses which significantly contribute to air, noise, and light pollution as well as business that create large volumes of truck traffic are discouraged in these areas. Consideration of uses outside the identified targeted businesses should only be considered if they are secondary and complementary to these targeted businesses.” The intent of the B2 zoning district is described in §165-604.01 as: “…[providing] large areas for a variety of business, office and service uses. General business areas are located on arterial highways at major intersections and at interchange areas. Businesses allowed involve frequent and direct access by the general public but not heavy truck traffic on a constant basis other than that required for delivery of retail goods. General business areas should have direct access to major thoroughfares and should be properly separated from residential areas. Adequate frontage and depth should be provided, and access should be properly controlled to promote safety and orderly development. Nuisance factors are to be avoided. …” The proposal for additional allowed use (health care services) does not otherwise further the plan policy for MUIO and is not identified as an EDA targeted industry in the Comprehensive Plan. The B2 Zoning District is also not typically associated with the planned land use. However, given the existing zoning of the property is B2, the proposed rezoning does not otherwise modify the current use of the property as “commercial.” Transportation & Site Access: Martinsburg Pike is identified in the Eastern Road Plan as an “improved major collector,” as part of the rezoning, additional right-of-way for the ultimate condition is proffered to be dedicated. The property has no other road frontage. 11 Page 4 of 4 Proffer Statement, Generalized Development Plan (GDP), & Impact Analysis: Proffers (February 23, 2026) Staff Comment A) Land Use Restrictions Allows “Health Care Services, Including Skilled Nursing Facilities,” as a permitted use. B) Access Management Restricts access to a shared entrance. Proffers 10’ of ROW. C) Structural Development Limitation Restricts building size to 3,000 sq. Ft. D) Monetary Contributions to Offset Impact of Development The proffer statement fully implements the adopted Board of Supervisors policy on monetary proffers for commercial/industrial square footage. This is a rezoning requiring a public hearing. Following a public hearing, Staff are seeking a recommendation from the Planning Commission to forward to the Board of Supervisors on this rezoning application. 12