HomeMy WebLinkAbout06-25 Comments3URMHFW 1DPHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
$FUHDJH'LVWXUEHG$UHD$FUHDJHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
3,1V BBBBBBBBBBBBBBBBBBB
$GGUHVV RU JHQHUDO ORFDWLRQ
([LVWLQJ=RQLQJBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
3URSRVHG8VHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
6WDII 1DPH(PDLO$GGUHVV BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
$JHQF\ 1DPH&RPSOHWLQJ&RPPHQWVVHOHFW RQH
BBBB)UHGHULFN:DWHU
BBBB9LUJLQLD'HSDUWPHQWRI7UDQVSRUWDWLRQ
BBBB:LQFKHVWHU5HJLRQDO$LUSRUW
BBBB9LUJLQLD'HSDUWPHQWRI+HDOWK
BBBB+LVWRULF5HVRXUFHV$GYLVRU\%RDUG
BBBB)UHGHULFN&RXQW\)&3XEOLF6FKRROV
BBBB)&3XEOLF:RUNV
BBBB)&,QVSHFWLRQV
BBBB)&)LUH0DUVKDO
BBBB)&3DUNV 5HFUHDWLRQ
BBBB)&&RXQW\$WWRUQH\
BBBB2WKHU6SHFLI\ BBBBBBBBBBBBBBBBBBBBBBBBB
5HYLHZHU 1DPH(PDLO $GGUHVV BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
5HYLHZ$JHQF\&RPPHQWV
&RPPHQWV WKDW PD\ QRW ILW LQWKH ER[ VKRXOGEH DWWDFKHGWRWKH FRYHUVKHHW RQ DJHQF\RUGHSDUWPHQW OHWWHUKHDG
5HVXEPLVVLRQWRDGGUHVVFRPPHQWVUHTXHVWHG"<BBBBBBBRU1BBBBBB
5(48(677)2550$67(55'(9(/230(1770'33/$11&200(1766
Crosspointe Center (revises approved MDP #17-06)
574.39
75-A-89, 89A, 90, 91, 92, 94, 95 & 96
East of Route 37 terminus with Tasker Road
RP & B2
Residential & Commercial
M. Tyler Klein, AICP (tklein@fcva.us)
Michael Newlin - mnewlin@frederickwater.com
Sheet MDP-09, 10: Show existing FW easements and lines. Specifically, the 20" distribution main in the northern part of the project area.
The MDP does not include specific information about water and sewer demands or water and sewer infrastructure. Frederick Water will provide comments regarding water and
and sewer service and proposed facilities during Site Plan review.
3URMHFW 1DPHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
$FUHDJH'LVWXUEHG$UHD$FUHDJHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
3,1V BBBBBBBBBBBBBBBBBBB
$GGUHVV RU JHQHUDO ORFDWLRQ
([LVWLQJ=RQLQJBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
3URSRVHG8VHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
6WDII 1DPH(PDLO$GGUHVV BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
$JHQF\ 1DPH&RPSOHWLQJ&RPPHQWVVHOHFW RQH
BBBB)UHGHULFN:DWHU
BBBB9LUJLQLD'HSDUWPHQWRI7UDQVSRUWDWLRQ
BBBB:LQFKHVWHU5HJLRQDO$LUSRUW
BBBB9LUJLQLD'HSDUWPHQWRI+HDOWK
BBBB+LVWRULF5HVRXUFHV$GYLVRU\%RDUG
BBBB)UHGHULFN&RXQW\)&3XEOLF6FKRROV
BBBB)&3XEOLF:RUNV
BBBB)&,QVSHFWLRQV
BBBB)&)LUH0DUVKDO
BBBB)&3DUNV 5HFUHDWLRQ
BBBB)&&RXQW\$WWRUQH\
BBBB2WKHU6SHFLI\ BBBBBBBBBBBBBBBBBBBBBBBBB
5HYLHZHU 1DPH(PDLO $GGUHVV BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
5HYLHZ$JHQF\&RPPHQWV
&RPPHQWV WKDW PD\ QRW ILW LQWKH ER[ VKRXOGEH DWWDFKHGWRWKH FRYHUVKHHW RQ DJHQF\RUGHSDUWPHQW OHWWHUKHDG
5HVXEPLVVLRQWRDGGUHVVFRPPHQWVUHTXHVWHG"<BBBBBBBRU1BBBBBB
5(48(677)2550$67(55'(9(/230(1770'33/$11&200(1766
Crosspointe Center (revises approved MDP #17-06)
574.39
75-A-89, 89A, 90, 91, 92, 94, 95 & 96
East of Route 37 terminus with Tasker Road
RP & B2
Residential & Commercial
M. Tyler Klein, AICP (tklein@fcva.us)
Jon Turkel - jturkel@fcva.us
Trails along Warrior, Tasker, and 37 should continue to end of property lines in anticipation of future extensions.
✔
✔
3URMHFW 1DPHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
$FUHDJH'LVWXUEHG$UHD$FUHDJHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
3,1V BBBBBBBBBBBBBBBBBBB
$GGUHVV RU JHQHUDO ORFDWLRQ
([LVWLQJ=RQLQJBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
3URSRVHG8VHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
6WDII 1DPH(PDLO$GGUHVV BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
$JHQF\ 1DPH&RPSOHWLQJ&RPPHQWVVHOHFW RQH
BBBB)UHGHULFN:DWHU
BBBB9LUJLQLD'HSDUWPHQWRI7UDQVSRUWDWLRQ
BBBB:LQFKHVWHU5HJLRQDO$LUSRUW
BBBB9LUJLQLD'HSDUWPHQWRI+HDOWK
BBBB+LVWRULF5HVRXUFHV$GYLVRU\%RDUG
BBBB)UHGHULFN&RXQW\)&3XEOLF6FKRROV
BBBB)&3XEOLF:RUNV
BBBB)&,QVSHFWLRQV
BBBB)&)LUH0DUVKDO
BBBB)&3DUNV 5HFUHDWLRQ
BBBB)&&RXQW\$WWRUQH\
BBBB2WKHU6SHFLI\ BBBBBBBBBBBBBBBBBBBBBBBBB
5HYLHZHU 1DPH(PDLO $GGUHVV BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
5HYLHZ$JHQF\&RPPHQWV
&RPPHQWV WKDW PD\ QRW ILW LQWKH ER[ VKRXOGEH DWWDFKHGWRWKH FRYHUVKHHW RQ DJHQF\RUGHSDUWPHQW OHWWHUKHDG
5HVXEPLVVLRQWRDGGUHVVFRPPHQWVUHTXHVWHG"<BBBBBBBRU1BBBBBB
5(48(677)2550$67(55'(9(/230(1770'33/$11&200(1766
Crosspointe Center (revises approved MDP #17-06)
574.39
75-A-89, 89A, 90, 91, 92, 94, 95 & 96
East of Route 37 terminus with Tasker Road
RP & B2
Residential & Commercial
M. Tyler Klein, AICP (tklein@fcva.us)
bwhitlock@fcva.us
A comprehensive review of erosion & sediment control and stormwater will take place at time of plan submission. Site design must meet
current stormwater design standards and requirements.
✔
✔
3URMHFW 1DPHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
$FUHDJH'LVWXUEHG$UHD$FUHDJHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
3,1V BBBBBBBBBBBBBBBBBBB
$GGUHVV RU JHQHUDO ORFDWLRQ
([LVWLQJ=RQLQJBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
3URSRVHG8VHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
6WDII 1DPH(PDLO$GGUHVV BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
$JHQF\ 1DPH&RPSOHWLQJ&RPPHQWVVHOHFW RQH
BBBB)UHGHULFN:DWHU
BBBB9LUJLQLD'HSDUWPHQWRI7UDQVSRUWDWLRQ
BBBB:LQFKHVWHU5HJLRQDO$LUSRUW
BBBB9LUJLQLD'HSDUWPHQWRI+HDOWK
BBBB+LVWRULF5HVRXUFHV$GYLVRU\%RDUG
BBBB)UHGHULFN&RXQW\)&3XEOLF6FKRROV
BBBB)&3XEOLF:RUNV
BBBB)&,QVSHFWLRQV
BBBB)&)LUH0DUVKDO
BBBB)&3DUNV 5HFUHDWLRQ
BBBB)&&RXQW\$WWRUQH\
BBBB2WKHU6SHFLI\ BBBBBBBBBBBBBBBBBBBBBBBBB
5HYLHZHU 1DPH(PDLO $GGUHVV BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
5HYLHZ$JHQF\&RPPHQWV
&RPPHQWV WKDW PD\ QRW ILW LQWKH ER[ VKRXOGEH DWWDFKHGWRWKH FRYHUVKHHW RQ DJHQF\RUGHSDUWPHQW OHWWHUKHDG
5HVXEPLVVLRQWRDGGUHVVFRPPHQWVUHTXHVWHG"<BBBBBBBRU1BBBBBB
5(48(677)2550$67(55'(9(/230(1770'33/$11&200(1766
Crosspointe Center (revises approved MDP #17-06)
574.39
75-A-89, 89A, 90, 91, 92, 94, 95 & 96
East of Route 37 terminus with Tasker Road
RP & B2
Residential & Commercial
M. Tyler Klein, AICP (tklein@fcva.us)
Ryan Spielman joseph.spielman@vdot.virginia.gov
VDOT has no comments on the MDP and look forward to reviewing the site plan.
✔
✔
Planning and Construction Department Wayne Lee, Coordinator of
Planning and Construction
leew@fcpsk12.net
1415 Amherst Street https://www.frederickcountyschoolsva.net/ 540-662-3889 ext. 88249
P.O. Box 3508
Winchester, Virginia 22604-2546
December 18, 2025
Mr. Tyler Klein
Senior Planner
Frederick County Department of Planning and Development
107 N. Kent St.
Winchester, VA 22601
Re: Crosspointe Center Master Development Plan Revision Application
Dear Tyler:
Frederick County Public Schools has reviewed the Crosspointe Center Master Development Plan
Revision application. We offer the following comments:
1. The development includes private streets. As our buses don’t travel down private streets, students
who live there will need to walk to a public street to meet the bus at a location to be designated by our
Transportation Department.
2. While we are aware that this application is for Crosspointe Center, we do see on the development
plan, in the Villages at Artrip, that the proposed school site is 18 acres with a mix of gentle and steep
slopes. Under the current stormwater management regulations, 18 acres is too small for a 100,000
square foot, 700 student elementary school. Twenty-five acres would be more suitable.
3. Our understanding of the timing of access to the elementary school site is that roads would not be
built to it for more than 20 years, assuming that Villages at Artrip will be built in sequence with
Crosspointe Center and that Crosspointe Center will build at a pace of less than 75 units per year.
This timing is difficult. We think that we will need an elementary school site within 15 years, perhaps
even 12 years.
Please feel free to contact me at leew@fcpsk12.net or 540-662-3888 x88249 if you have any questions or
comments.
Sincerely,
K. Wayne Lee, Jr., ALEP
Coordinator of Planning and Construction
Cc: Dr. George Hummer, Superintendent of Schools
Mr. Ben Thompson, Assistant Superintendent for Administration
Mr. Logan Sheppard, Director of Planning and Construction
Mr. Kevin Kenney, Assistant Director of Planning and Construction
Mr. JR Hollen, Director of Transportation
Mr. Calvin Davis, Assistant Director of Transportation
Project Name:________________________________________________
Acreage (Disturbed Area Acreage): _______________________________
PIN(s): __________________
Address (or general location):
Existing Zoning: ___________________________________________________
Proposed Use: ____________________________________________________
Staff Name (Email Address): _________________________________________
Agency Name Completing Comments (select one):
____ Frederick Water
____ Virginia Department of Transportation
____ Winchester Regional Airport
____ Virginia Department of Health
____ Historic Resources Advisory Board
____ Frederick County (FC) Public Schools
____ FC Public Works
____ FC Inspections
____ FC Fire Marshal
____ FC Parks & Recreation
____ FC County Attorney
____ Other (Specify): ________________________
Reviewer Name (Email Address): _____________________________________________________
Review Agency Comments:
*Comments that may not fit in the box should be attached to the cover sheet on agency or department letterhead.
Resubmission to address comments requested? Y _____ or N _____
REQUEST FOR MASTER DEVELOPMENT (MDP) PLAN COMMENTS
Crosspointe Center (revises approved MDP #17-06)
574.39
75-A-89, 89A, 90, 91, 92, 94, 95 & 96
East of Route 37 terminus with Tasker Road
RP & B2
Residential & Commercial
M. Tyler Klein, AICP (tklein@fcva.us)
FC GIS
Andrew Farrar afarrar@fcva.us 540-665-5614
See attached comments regarding street names and addressing.
4
4
________________________________________________________________________________________
Frederick County Information Technologies, 107 North Kent Street, Winchester, VA 22601, (540)665-5614
INFORMATION TECHNOLOGIES
COUNTY OF FREDERICK, VIRGINIA
MDP COMMENTS
Crosspointe Center MDP 06-25
DATE: 1/16/2026
SUBDIVISION: Crosspointe Center
STAFF MEMBER: Andrew Farrar, GIS Manager
APPLICANT: Pennoni Associates, Inc
117 East Piccadilly St, Suite 200
Winchester, VA 22601
540-771-2087
dfrank@pennoni.com
GIS COMMENTS:
See below comments regarding street names and structure addressing:
Tasker Road name has limited ranging available for addresses between Hillandale Ln and
Warrior Dr, but can be used up to its connection with Warrior Dr, assuming a limited number of
structures will be addressed directly off of Tasker Rd. If there are a large amounts of structures
directly fronting or accessed off of Tasker, a new name for that section of Tasker would need to
be worked out.
Warrior Drive name has plenty of ranging available for addresses north of current Wakeland
Manor terminus, and can be used assuming that connection will be completed in the future as
shown in the Villages at Artrip section here.
Street segment opposite of Hillandale Ln, between two Tasker connections, will require a new
name. No further address ranging available to extend Hillandale.
Chinkapin Drive name has ranging available to its north to continue into Crosspointe as an
interparcel connection.
Will need to see more detailed road layouts within the land bays to determine additional street
name and addressing requirements.
fmo@fcva.us
Fax: 540-678-4739Phone: 540-665-6350
Winchester, VA 22602
1080 Coverstone Drive
Frederick County Fire and Rescue Department
Office of the Fire Marshal
Engineering Firm :
Pennoni Associates, Inc.
Crosspointe Center
000 Tasker Road
Business Name
Printed Date: 01/12/2026
Plan Review
Master Development
Status: Approved
General Information
12/05/2025Received Date:
12/16/2025
12/17/2025
Review Begin Date:
Review End Date:
2.0000Hours:
Property Use:
Occupancy Type:
New ConstructionReview Cause:
Activity Number:I1210153
Comments:
All future development shall comply with the Frederick County Fire Prevention Code and all other applicable codes.
Adam Hounshell
Lieutenant/Assistant Fire Marshal
Page 1 of 1