HomeMy WebLinkAbout03-26 BOS Staff Report REZONING #03-26
Snowden Bridge Station Interstate Overlay
Staff Report for the Planning Commission
Prepared: June 1, 2026
Staff Contact: Eric Bittner, Planner II
Executive Summary:
Meeting Schedule
Planning Commission: May 6, 2026 Action: Recommend Approval
Board of Supervisors: June 10, 2026 Action: Pending
Property Information
Property Identification Number (PIN) 43-A-150
Address 1818 Martinsburg Pike, Winchester
Magisterial District Stonewall
Acreage +/- 1.61acres
Zoning & Present Land Use Zoning: B2 (General Business) with proffers
Land Use: Commercial
Proposed Zoning B2 (General Business) with proffers and with
Interstate Area (IA) Overlay District
Adjoining Property Zoning & Present Land Use
North: B2 (General District) District Land Use: Commercial
South: B2 (General Business) District Land Use: Commercial
East: B2 (General Business) District Land Use: Vacant
West: B2 (General Business) District Land Use: Commercial
Proposed Use
This is a request to rezone 1.61± acres from B2 (General Business) Zoning District with
proffers to B2 Zoning District with proffers and to the Interstate Area (IA) Overlay District.
The proposal is intended to allow for an interstate sign to display gasoline prices above the
standard height limit of the district.
Positives
Concerns
The proposed rezoning is in conformance
with the Comprehensive Plan and advances
the Northeast Frederick Area Plan for
interstate businesses.
While the property does not adjoin any
properties that would trigger an increased
setback, it is near residential uses, which the
proposal could impact. While the applicant is
proposing a sign approximately 46 feet in
Page 2 of 7
height, if approved, a sign could be allowed
approximately 110 feet in height.
Review Agency Comments:
Review Agency
Comment
Date
Comment Summary Status
Virginia
Department of
Transportation
(VDOT)
4/1/2026 “VDOT has no comments.”
Frederick County
Inspections
3/2/2026 “No comment.”
Frederick County
Public Works
3/17/2026 “No comments- no proposed changes
to grading or stormwater
infrastructure.”
Frederick County
Fire Marshal
3/16/2026
“All applicable sections of the
Frederick County Fire Prevention
Code Shall apply to any and all future
development.”
Frederick County
Attorney
4/2/2026
“The proffer statement meets the
requirements of the Frederick County
Zoning Ordinance and the Code of
Virginia and is legally sufficient as
proposed for recordation. “
Legal form.
Planning & Zoning Staff Analysis:
Site History:
The property has an approved site plan (SP#02-23) approved for a 5,800 square foot convenience
store with gasoline fueling stations. The property was rezoned in 2022 (REZ#01-22; approved
06/22/2022) and was changed from the M1(Light Industrial) Zoning District to the B2 (General
Business) Zoning District with proffers.
The property is currently permitted one monument sign which is capped at 25’. The Interstate Area
(IA) Overlay District would permit an additional monument sign regulated by §165-704.05.I.(2);
this code section assigns sign heights by interchange area and is capped by height above of mean
sea level. The site’s location near Exit 317 allows a maximum business sign height of 815’ above
Page 3 of 7
mean sea level. At current grading based on the County’s Geographic Informational Systems
(GIS), if approved, the property could have a sign approximately ±105’ in height.
Comprehensive Plan Conformance:
The Comprehensive Plan (adopted November 2021) and the Northeast Frederick Area Plan
provide guidance on the future development of the subject property. The Plan identifies the subject
properties with a “business” land use designation and as being within the limits of the Urban
Development Area (UDA). The property is in the “Interstate and Martinsburg Pike Commercial
and Industrial Areas” sub-area. The Northeast Frederick Area Plan provides guidance on the
development patterns for this area as follows.
“…Properties west of the rail corridor may be well suited to meet community needs for
anchor retail, and further study of these properties may be appropriate to determine
whether the inclusion of residential uses would be necessary to support such activity.
Existing residential uses are located along Martinsburg Pike, in close proximity to
transition in the future to higher intensity uses, development applications should seek to
mitigate their impact on these residences near term.
The site is also located in close proximity to Exit 317, and the plan offers the following guidance
regarding development in this area.
“Located at highly visible locations on interstate interchanges, these areas should be
designed to accommodate and promote highway commercial land uses particular effort
must be made to ensure that access management for the supporting transportation network
is a key priority as the function of the Interstate and Primary road network is critical. As
these areas are highly visible, building and site design should be of a high quality to ensure
that these areas put forth an attractive view for both residents and visitors; enhanced
buffers and screening are also important along Interstate 81 and adjoining roadways.”
The intent of the Interstate Area Overlay Zoning District is described in §165-604.01 as
“… to provide commercial businesses within an identified area the ability to utilize business
signs that are in excess of the limits specified in § 165-201.06 of this chapter. This flexibility
is provided to inform the traveling public of business service opportunities at specific
interstate interchange areas. The standards within this Part 704 are designed to allow for
additional visibility for commercial businesses while minimizing negative impacts to view
sheds, the traveling public and residential properties that are adjacent to or within the
proximity of the overlay district. Established boundaries are based on reasonable sight
distances and policies set forth in the Comprehensive Plan and are intended to designate
each interstate interchange area and provide guidance for considering the addition of
subsequent properties.”
Given the property’s current zoning of B2 (General Business), the future land use designation
(“business”), and proximity to Exit 317/I-81, the Interstate Area (IA) Overlay District may align
with the policies contained in the Comprehensive Plan. Consideration should be given to the
residential uses close to the property and the impact on those residences should be adequately
Page 4 of 7
mitigated. The proposed sign currently conforms to minimum zoning requirements for a minimum
setback of 10 feet, being sited at 11 feet from Martinsburg Pike (Route 11) but is disproportionately
close to the adjoining roadway in comparison to other IA Overlay District Signs along the same
corridor, the closest neighboring sign at 1544 Martinsburg Pike, the Wawa gas station and
convenience store, is located ±196’ from Martinsburg Pike.
Transportation & Site Access:
The request does not propose any alterations to the current approved entrances. Proffer
Statement, Generalized Development Plan (GDP), & Impact Analysis:
All proffers from the previously approved rezoning (REZ#01-22) are proposed to remain
unaltered, with the exception of Proffer 2.C.
Proffers
(June 2, 2022)
Staff Comment
2. C. Land Use Restrictions The proffer prevents no more than two signs
being erected on the property, with only one
sign to be subject to the Interstate Area
Overlay Design Requirements.
Below are the sketch plan of the location and the proposed sign. Staff note that there is no
condition requiring the sign to match the proposal. While the proposed plan is a 46’ 3” sign, a
±110’ high sign would be permitted on the property.
Page 5 of 7
Page 6 of 7
Planning Commission Summary and Action From 5/6/2026 Public Hearing:
The Planning Commission held a public hearing during their regular meeting on May 6, 2026.
The Planning Commission suggested the applicant provide a statement from the Battlefield
Association that they have no concern with the proposed sign height.
The Planning Commission recommended approval of the proposed rezoning application (12-0).
This is a rezoning requiring a public hearing.
Following a public hearing, staff is seeking a decision from the Board of Supervisors on this
rezoning application.