Loading...
HomeMy WebLinkAbout32-25 Site PlanTHIS PLAN DOES NOT GUARANTEE THE EXISTENCE OR NON-EXISTENCE OF UTILITIES WITHIN THE WORK LIMITS. CALL MISS UTILITY AT 811 OR 1-800-552-7001 BEFORE DIGGING. EACH “PERSON” AS DEFINED IN THE UNDERGROUND UTILITY DAMAGE PREVENTION ACT MUST PROVIDE THEIR OWN NOTICE OF EXCAVATION. SUBCONTRACTORS MAY NOT WORK UNDER ANOTHER COMPANY’S TICKET UNLESS THEY ARE UNDER THE DIRECT SUPERVISION OF THE COMPANY THAT PROVIDED THE NOTICE OF EXCAVATION. ALLOW REQUIRED TIME FOR MARKING – BEGIN EXCAVATION ONLY AFTER CHECKING THE POSITIVE RESPONSE SYSTEM. EXCAVATION MAY BEGIN WHEN: ALL NOTIFIED UTILITIES HAVE EITHER MARKED THEIR LINES OR REPORTED THAT THEY HAVE NO FACILITIES IN THE AREA OF EXCAVATION OR THE MARKING PERIOD HAS EXPIRED (AFTER 7:00 AM ON THE THIRD WORKING DAY AFTER NOTICE TO THE CENTER.) OR MISS UTILITY INFORMS YOU THAT NO MEMBER OPERATORS NEED TO BE NOTIFIED OF THE EXCAVATION. YOU WILL STILL GET A TICKET NUMBER! RESPECT THE MARKS – PROTECT AND PRESERVE THE MARKINGS FROM THE TIME EXCAVATION BEGINS UNTIL THE WORK IS COMPLETED. CALL MISS UTILITY TO UPDATE THE TICKET IF WORK WILL CONTINUE PAST 15 DAYS OR IF THE MARKS BECOME ILLEGIBLE DUE TO TIME, WEATHER, CONSTRUCTION OR ANY OTHER CAUSE. EXCAVATE CAREFULLY – IF THE EXCAVATION IS WITHIN 2 FEET OF A MARKED UTILITY LINE, EXPOSE THE UTILITY LINE BY HAND DIGGING AND KEEP ALL MECHANIZED EQUIPMENT AT LEAST 2 FEET AWAY FROM THE EXTREMITIES OF THE UTILITY.C1.01 GENERAL NOTES SOR SOR GV GT STORM INLET STORM DRAIN STORM STRUCTURE CABLE PEDESTAL TELEPHONE/COMMUNICATION PEDESTAL SANITARY SEWER CLEANOUT SANITARY SEWER MANHOLE GAS VALVE GAS TAP GAS GAS LINE SANITARY SEWER LINE PROPERTY LINE ExW WATER LINE ELECTRICAL ET ELECTRICAL TRANSFORMER UTILITY POLE LIGHT POLE WATER METER OVERHEAD ELECTRIC GATE/FENCE P.K. NAIL FOUND IRON PIN FIRE HYDRANT WATER VALVE EXISTING LEGEND EXISTING INLET LABEL CATCHMENT AREA CATCHMENT OUTLET OHE OHE V T TV S E SS GV GT CURB INLET STORM DRAIN CABLE PEDESTAL TELEPHONE/COMMUNICATION PEDESTAL SANITARY SEWER CLEANOUT SANITARY SEWER MANHOLE GAS VALVE GAS TAP GAS GAS LINE SANITARY SEWER LINE W WATER LINE ELECTRICAL ELECTRICAL TRANSFORMER UTILITY POLE LIGHT POLE WATER METER OVERHEAD ELECTRIC GATE/FENCE POST FIRE HYDRANT WATER VALVE PROPOSED LEGEND INLET LABEL CATCHMENT AREA CATCHMENT OUTLET OHE OHE SS SS V T TV E SS STANDARD PROJECT LINETYPES X PROPERTY LINE EXISTING CONTOUR (MAJOR) EXISTING CONTOUR (MINOR) 1440 PROPOSED CONTOUR (MAJOR) 1439 PROPOSED CONTOUR (MINOR) DROP INLET GATE VALVE INTERIOR LOT LINE SETBACK 30" CURB AND GUTTER (STD CG-6) WALL DRAINAGE REVERSE CURB AND GUTTER (STD CG-6R) CALCULATED OPEN SPACE 6" CURB (STD CG-2) DUMPSTER ASPHALT ACCESSIBLE PARKING CONCRETE ADJACENT LOT LINE LIMITS OF DISTURBANCE CURB AND GUTTER EDGE OF PAVEMENT CO LOD >> MAILBOX WELL RPARPA WETLAND NOTE: PROJECT STANDARDS SHOWN ABOVE ARE GENERAL LINETYPES AND SYMBOLS USED AMONG A VARIETY OF PROJECTS. NOT ALL INFORMATION SHOWN ABOVE MAY BE APPLICABLE TO THIS PLAN SET. CONTACT DESIGN FIRM TO CONFIRM ANY DIFFERENTIATION OR CONFLICTING INFORMATION. CALCULATED BUFFER YARD Project number: Date: Drawn by: Checked by: August 4, 2025 No.Description DateMINOR SITE PLAN SP # XX-25SHEETZ STORE #186Renovation Project1503 N Frederick PikeWinchester, Virginia 22603Frederick County, Stonewall DistrictRevisions: Monteverde Engineering & Design Studio 2 5 0 E . E l i z a b e t h S t , S u i t e 1 1 4 • H a r r i s o n b u r g , V A 2 2 8 0 2 5 4 0 .2 2 8 .0 2 0 2 | w w w .m o n t e v e r d e d e s i g n s .c o m 25023C APPROVED FOR CONSTRUCTION 1.AHJ Comments 9/18/2025 FIRE DEPARTMENT CONNECTIONFDC E/T GENERAL NOTES (ALL MAY NOT APPLY): 1.WORK IN THIS PROJECT SHALL CONFORM TO THE LATEST EDITIONS OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) ROAD AND BRIDGE SPECIFICATIONS, THE VDOT ROAD AND BRIDGE STANDARDS, THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS, THE VIRGINIA STORMWATER MANAGEMENT HANDBOOK, THE VIRGINIA STORMWATER MANAGEMENT REGULATIONS AND THE FREDERICK ZONING ORDINANCE. IN THE EVENT OF CONFLICT BETWEEN ANY OF THESE STANDARDS, SPECIFICATIONS OR PLANS, THE MOST STRINGENT SHALL GOVERN. ALL UTILITIES TO BE DEDICATED TO THE FREDERICK COUNTY WATER AND/OR SANITARY SEWER SYSTEM SHALL BE CONSTRUCTED AND TESTED TO CONFORM TO COMMONWEALTH OF VIRGINIA/STATE BOARD OF HEALTH WATERWORKS AND/OR SEWERAGE REGULATIONS AND THE FREDERICK COUNTY DESIGN AND CONSTRUCTION STANDARDS MANUAL. 2.EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED CONTINUOUSLY, RELOCATED WHEN AND AS NECESSARY, AND SHALL BE CHECKED AFTER EVERY RAINFALL. SEEDED AREAS SHALL BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED, RESEEDED AND MULCHED AS NECESSARY TO OBTAIN A DENSE STAND OF GRASS. 3.ALL DRAIN INLETS SHALL BE PROTECTED FROM SILTATION. INEFFECTIVE PROTECTION DEVICES SHALL BE IMMEDIATELY REPLACED AND THE INLET CLEANED. FLUSHING IS NOT AN ACCEPTABLE METHOD OF CLEANING. 4.WHEN THE CRUSHED STONE CONSTRUCTION ENTRANCE HAS BEEN COVERED WITH SOIL OR HAS BEEN PUSHED INTO THE SOIL BY CONSTRUCTION TRAFFIC, IT SHALL BE REPLACED WITH A DEPTH OF STONE EQUAL TO THAT OF ORIGINAL APPLICATION. 5.THE LOCATION OF EXISTING UTILITIES AS SHOWN IS APPROXIMATE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL PUBLIC OR PRIVATE UTILITIES THAT LIE IN OR ADJACENT TO THE CONSTRUCTION SITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING, AT HIS EXPENSE, ALL EXISTING UTILITIES DAMAGED DURING CONSTRUCTION. 6.FORTY-EIGHT (48) HOURS PRIOR TO ANY EXCAVATION CALL MISS UTILITY 1 (800) 552-7001. 7.ALL UNDERGROUND FACILITIES LOCATED WITHIN RIGHTS-OF-WAY SHALL BE INSTALLED PRIOR TO THE PLACEMENT OF ANY PART OF THE PAVEMENT STRUCTURE. 8.INSTALLATION OF CONCRETE STORM PIPE SHALL COMPLY WITH VDOT STANDARD DRAWING PB-1. 9.ALL MATERIALS USED FOR FILL OR BACK-FILL SHALL BE FREE OF WOOD, ROOTS, ROCKS, BOULDERS OR ANY OTHER NON-COMPACTABLE SOIL TYPE MATERIAL. UNSATISFACTORY MATERIALS ALSO INCLUDE MAN-MADE FILLS AND REFUSE DEBRIS DERIVED FROM ANY SOURCE. 10.SATISFACTORY MATERIAL FOR USE AS FILL FOR PUBLIC STREETS INCLUDE MATERIAL CLASSIFIED IN ASTM D-2487 AS GW, GP, GM, GC, SW, SP, SM, SC, ML, AND CL GROUPS. THE MOISTURE CONTENT SHALL BE CONTROLLED WITHIN PLUS OR MINUS 2 PERCENTAGE POINTS OF OPTIMUM TO FACILITATE COMPACTION. GENERALLY, UNSATISFACTORY MATERIALS INCLUDE MATERIALS CLASSIFIED IN ASTM D-2487 AS PT, CH, MH, OL, OH, AND ANY SOIL TOO WET TO FACILITATE COMPACTION. CH AND MH SOILS MAY BE USED SUBJECT TO APPROVAL OF THE CITY ENGINEER. SOILS SHALL HAVE A MINIMUM DRY DENSITY OF 92LB/CUBIC FOOT PER ASTM D-698 AND SHALL HAVE A PLASTICITY INDEX LESS THAN 12. 11.COMPACTION OF FILL MATERIAL UNDER BUILDING SLABS SHALL BE BASED UPON RECOMMENDATIONS OF SOILS ENGINEER AFTER COMPLETION OF STANDARD PROCTOR TEST AND SHALL MEET BEARING REQUIREMENTS OF ARCHITECT FOR BUILDINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TESTING. 12.MATERIALS USED TO CONSTRUCT EMBANKMENTS FOR ANY PURPOSE, BACK-FILL AROUND DRAINAGE STRUCTURES OR IN UTILITY TRENCHES OR ANY OTHER DEPRESSION REQUIRING FILL OR BACK-FILL SHALL BE COMPACTED TO 95% OF MAXIMUM DENSITY AS DETERMINED BY THE STANDARD PROCTOR TEST AS SET OUT IN ASTM STANDARD D-698. THE CONTRACTOR SHALL, PRIOR TO ANY OPERATIONS INVOLVING FILLING OR BACKFILLING, SUBMIT THE RESULT OF THE PROCTOR TEST TO THE CITY’S ON-SITE INSPECTOR TOGETHER WITH A CERTIFICATION THAT THE SOIL TESTED IN REPRESENTATIVE OF THE MATERIALS TO BE USED ON THE PROJECT. TESTS SHALL BE CONDUCTED BY A CERTIFIED MATERIALS TESTING LABORATORY AND THE CERTIFICATIONS MADE BY A LICENSED PROFESSIONAL ENGINEER REPRESENTING THE LABORATORY. 13.CERTIFICATIONS FOR MATERIALS INCLUDING, BUT NOT LIMITED TO STONE, CONCRETE, PIPES, PRECAST UNITS, HANDRAILS, STABILIZATION MATS, TRAFFIC SIGNAL ITEMS, MUST BE PROVIDED TO THE CITY’S ON-SITE INSPECTOR AND APPROVED BY THE INSPECTOR PRIOR TO INSTALLATION. SEE INSPECTOR FOR MATERIALS CERTIFICATION CHECKLIST. 14.EMBANKMENT FILL AND TRENCH BACK-FILL SHALL BE PLACED IN LIFTS AT A MAXIMUM UNCOMPACTED DEPTH OF 8-INCHES AND 6-INCHES, RESPECTIVELY. DENSITY TESTS SHALL BE CONDUCTED AT THE FOLLOWING MINIMUM FREQUENCIES: (a)EMBANKMENT FOR ROADS, STREETS, DAMS, ETC.: ONE TEST PER LIFT PER 10,000 SQUARE FEET OF LIFT. (b)BACK-FILL AROUND STRUCTURES AND IN TRENCHES: ONE TEST PER LIFT PER 500 LINEAL FEET OF TRENCH. 15.COMPACTION TESTS FOR STREET PAVEMENT STRUCTURE SHALL BE MADE IN CUT AND FILL AREAS AT THE FOLLOWING MINIMUM FREQUENCIES: (a)SUB-GRADE: ONE TEST PER LANE PER 500 LINEAL FEET. (b)STONE BASE: ONE TEST PER LANE PER 6” COMPACTED LIFT PER 500 LINEAL FEET. (c)HOT ASPHALTIC CONCRETE: ONE TEST PER LANE PER LIFT PER 500 LINEAL FEET. 16.ALL EXCAVATIONS, INCLUDING TRENCHES, SHALL BE KEPT DRY TO PROTECT THEIR INTEGRITY. 17.TEST RESULTS SHALL BE SUBMITTED TO THE COUNTY ENGINEER AND ENGINEER OF RECORD. FAILURE TO CONDUCT DENSITY TESTS AND SUBMIT TEST RESULTS SHALL BE CAUSE FOR NONACCEPTANCE OF THE FACILITY. TESTS SHALL BE CONDUCTED AT THE SOLE COST OF THE DEVELOPER OR HIS AGENT. 18.COMBINATION UNDER-DRAINS TYPE CD-1 SHALL BE INSTALLED AT THE LOWER END OF THE CUT SECTIONS. UNDER-DRAINS TYPE CD-2 SHALL BE INSTALLED AT THE LOW POINT OF ALL VERTICAL CURVES. 19.STANDARD UD-1 AND UD-3 UNDER-DRAINS SHALL BE INSTALLED WHERE INDICATED ON PLANS ON FURTHER WHERE DETERMINED NECESSARY IN THE FIELD BY THE COUNTY INSPECTORS. 20.COUNTY INSPECTORS HAVE FULL AUTHORITY TO REJECT FILL OR BACKFILL MATERIALS, REQUIRE UNDERCUTTING OR SUB GRADE STABILIZATION, REQUIRE PROVISIONS FOR SUB DRAINAGE, OR REQUIRE OTHER MEASURES WHICH AFFECT THE INTEGRITY OF ROAD AND UTILITY CONSTRUCTION. FAILURE TO COMPLY WITH INSPECTORS’ DIRECTIVES SHALL BE CAUSE FOR NON-ACCEPTANCE OF THE FACILITY. 21.TRAFFIC CONTROL ON PUBLIC STREETS SHALL BE IN CONFORMANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND AS FURTHER DIRECTED BY COUNTY INSPECTORS. COUNTY INSPECTORS MUST BE NOTIFIED 24-HOURS IN ADVANCE OF ANY PLANNED WORK OR ACTIVITY IN CITY RIGHT-OF-WAY THAT REQUIRES FLAGGING, LANE CLOSURE OR STREET CLOSURE. ALL SIGNAGE AND OTHER CONTROL DEVICES SHALL BE IN PLACE BEFORE SUCH ACTIVITIES CAN COMMENCE. 22.ANY DISCREPANCIES FOUND BETWEEN THE DRAWINGS AND SPECIFICATIONS AND SITE CONDITIONS OR ANY INCONSISTENCIES OR AMBIGUITIES IN DRAWINGS OR SPECIFICATIONS SHALL BE IMMEDIATELY REPORTED TO THE ENGINEER OF RECORD, IN WRITING, WHO SHALL PROMPTLY ADDRESS SUCH INCONSISTENCIES OR AMBIGUITIES. WORK DONE BY THE CONTRACTOR AFTER HIS DISCOVERY OF SUCH DISCREPANCIES, INCONSISTENCIES OR AMBIGUITIES SHALL BE DONE AT THE CONTRACTOR’S RISK. 23.A PRECONSTRUCTION CONFERENCE SHALL BE HELD PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL ARRANGE THE MEETING WITH THE COUNTY ENGINEER. AT THIS TIME, THE CONTRACTOR SHALL PROVIDE A SCHEDULE AND TRAFFIC CONTROL PLAN FOR WORK WITHIN THE COUNTY RIGHT-OF-WAY. 24.INSTALL COUNTY STANDARD STREET CENTERLINE MONUMENTS WHERE REQUIRED FOR NEW STREETS. 25.IF TRAFFIC SIGNAL PLANS HAVE BEEN REVISED OR CHANGED SINCE APPROVAL, THE DEVELOPER MUST PROVIDE TO THE DIRECTOR OF PUBLIC WORKS AS-BUILT DRAWINGS REFLECTING CHANGES. PROVISION OF AS-BUILT DRAWINGS IS A CONDITION OF BOND RELEASE. VDOT GENERAL NOTES: V1. ALL WORK ON THIS PROJECT SHALL CONFORM TO THE CURRENT EDITIONS OF AND LATEST REVISIONS TO THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) ROAD AND BRIDGE SPECIFICATIONS AND STANDARDS, THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS, AND ANY OTHER APPLICABLE STATE, FEDERAL OR LOCAL REGULATIONS. IN CASE OF A DISCREPANCY OR CONFLICT BETWEEN THE STANDARDS OR SPECIFICATIONS AND REGULATIONS, THE MOST STRINGENT SHALL GOVERN. V2. ALL CONSTRUCTION SHALL COMPLY WITH THE LATEST U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), AND VIRGINIA OCCUPATIONAL SAFETY & HEALTH (VOSH) RULES AND REGULATIONS. V3. WHEN WORKING WITHIN VDOT RIGHT-OF-WAY, ALL TRAFFIC CONTROL, WHETHER PERMANENT OR TEMPORARY, SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF VDOT’S WORK AREA PROTECTION MANUAL. A TRANSPORTATION MANAGEMENT PLAN NEEDS TO BE SUBMITTED FOR APPROVAL AND LAND USE PERMIT ISSUED PRIOR TO ANY EXECUTION OF WORK WITHIN THE VDOT RIGHT OF WAY. V4 THE DEVELOPER SHALL BE RESPONSIBLE FOR RELOCATING, AT HIS EXPENSE, ANY AND ALL UTILITIES, INCLUDING TRAFFIC SIGNAL POLES, JUNCTION BOXES, CONTROLLERS, ETC., OWNED BY VDOT OR PRIVATE / PUBLIC UTILITY COMPANIES. IT IS THE SOLE RESPONSIBILITY OF THE DEVELOPER TO LOCATE AND IDENTIFY UTILITY FACILITIES OR ITEMS THAT MAY BE IN CONFLICT WITH THE PROPOSED CONSTRUCTION ACTIVITY. VDOT APPROVAL OF THESE PLANS DOES NOT INDEMNIFY THE DEVELOPER FROM THIS RESPONSIBILITY. V5. DESIGN FEATURES RELATING TO FIELD CONSTRUCTION, REGULATIONS, AND CONTROL OR SAFETY OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY VDOT. ANY ADDITIONAL EXPENSE INCURRED AS A RESULT OF ANY FIELD REVISION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. V6. IF REQUIRED BY THE LOCAL VDOT LAND DEVELOPMENT OFFICE, A PRE-CONSTRUCTION CONFERENCE SHALL BE ARRANGED AND HELD BY THE ENGINEER AND/OR DEVELOPER WITH THE ATTENDANCE OF THE CONTRACTOR (S), VARIOUS COUNTY AGENCIES, UTILITY COMPANIES AND VDOT PRIOR TO INITIATION OF WORK. V7. THE CONTRACTOR SHALL NOTIFY THE LOCAL VDOT LAND DEVELOPMENT OFFICE WHEN WORK IS TO BEGIN OR CEASE FOR ANY UNDETERMINED LENGTH OF TIME. VDOT REQUIRES AND SHALL RECEIVE 48 HOURS ADVANCE NOTICE PRIOR TO ANY REQUIRED OR REQUESTED INSPECTION. V8. THE CONTRACTOR SHALL NOTIFY THE TRAFFIC OPERATIONS CENTER AT (540) 332-9500 FOR ANY TRAFFIC CONTROL PLAN THAT IMPACTS A VDOT MAINTAINED INTERSTATE OR PRIMARY ROADWAY TO PROVIDE NOTIFICATION OF THE INSTALLATION AND REMOVAL OF THE WORK ZONE. V9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A VDOT PERMITTED TEMPORARY CONSTRUCTION ENTRANCE(S) IN ACCORDANCE WITH SECTION 3.02 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. FURTHERMORE, ACCESS TO OTHER PROPERTIES AFFECTED BY THIS PROJECT SHALL BE MAINTAINED THROUGH CONSTRUCTION. V10. CONTRACTOR SHALL ENSURE ADEQUATE DRAINAGE IS ACHIEVED AND MAINTAINED ON THE SITE DURING AND AT THE END OF CONSTRUCTION. V11. ALL WATER AND SEWER LINES WITHIN EXISTING OR PROPOSED VDOT RIGHT-OF-WAY SHALL HAVE A MINIMUM THIRTY-SIX (36) INCHES COVER AND WHEN POSSIBLE SHALL BE INSTALLED UNDER ROADWAY DRAINAGE FACILITIES AT CONFLICT POINTS. V12. ANY UNUSUAL SUBSURFACE CONDITIONS (E.G., UNSUITABLE SOILS, SPRINGS, SINKHOLES, VOIDS, CAVES, ETC.) ENCOUNTERED DURING THE COURSE OF CONSTRUCTION SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER AND VDOT. WORK SHALL CEASE IN THAT VICINITY UNTIL AN ADEQUATE DESIGN CAN BE DETERMINED BY THE ENGINEER AND APPROVED BY VDOT. V13. ALL FILL AREAS, BORROW MATERIAL AND UNDERCUT AREAS SHALL BE INSPECTED AND APPROVED BY A VDOT REPRESENTATIVE PRIOR TO PLACEMENT OF FILL. A VDOT REPRESENTATIVE SHALL BE PRESENT TO INSURE THE SOIL SAMPLE(S) OBTAINED FOR CBR’S IS REPRESENTATIVE OF THE LOCATION. WHEN SOIL SAMPLES ARE SUBMITTED TO PRIVATE LABORATORIES FOR TESTING, THE SAMPLES SHALL BE CLEARLY IDENTIFIED AND LABELED AS BELONGING TO A PROJECT TO BE ACCEPTED BY VDOT AND THAT TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE VDOT STANDARDS AND PROCEDURES. V14. ALL ROADWAY FILL, BASE, SUBGRADE MATERIAL, AND BACKFILL IN UTILITY/STORM SEWER TRENCHES SHALL BE COMPACTED IN ACCORDANCE WITH THE LIFT THICKNESSES, DENSITY AND MOISTURE REQUIREMENTS AS SPECIFIED IN THE CURRENT VDOT ROAD AND BRIDGE SPECIFICATIONS. CERTIFIED COPIES OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE. V15. VDOT STANDARD CD AND UD UNDERDRAINS SHALL BE INSTALLED WHERE INDICATED ON THESE PLANS AND/OR AS SPECIFIED BY VDOT. V16. A POST INSTALLATION VISUAL/VIDEO CAMERA INSPECTION SHALL BE CONDUCTED BY THE CONTRACTOR ON ALL PIPES IDENTIFIED ON THE PLANS AS STORM SEWER PIPE AND A SELECT NUMBER OF PIPE CULVERTS. FOR PIPE CULVERTS, A MINIMUM OF ONE PIPE INSTALLATION FOR EACH SIZE OF EACH MATERIAL TYPE WILL BE INSPECTED OR TEN PERCENT OF THE TOTAL AMOUNT FOR EACH SIZE AND MATERIAL TYPE SUMMARIZED. ALL PIPE INSTALLATIONS ON THE PLANS NOT IDENTIFIED AS STORM SEWER PIPE SHALL BE CONSIDERED AS CULVERT PIPE FOR INSPECTION PURPOSES. ADDITIONAL TESTING MAY BE REQUIRED AS DIRECTED BY THE AREA LAND USE ENGINEER OR THEIR REPRESENTATIVE. V17. THE INSTALLATION OF ANY ENTRANCES AND MAILBOXES WITHIN ANY DEDICATED STREET RIGHT-OF-WAY SHALL MEET VDOT MINIMUM DESIGN STANDARDS AND IS THE RESPONSIBILITY OF THE DEVELOPER. V18. PRIOR TO VDOT ACCEPTANCE OF ANY STREETS, ALL REQUIRED STREET SIGNAGE AND/OR PAVEMENT MARKINGS SHALL BE INSTALLED BY THE DEVELOPER IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. V19. THE DEVELOPER SHALL PROVIDE THE VDOT LAND DEVELOPMENT OFFICE WITH A LIST OF ALL MATERIAL SOURCES PRIOR TO THE START OF CONSTRUCTION. COPIES OF ALL INVOICES FOR MATERIALS UTILIZED WITHIN ANY DEDICATED STREET RIGHT-OF-WAY MUST BE PROVIDED TO THE LOCAL VDOT LAND DEVELOPMENT OFFICE PRIOR TO ACCEPTANCE OF THE WORK. UNIT AND TOTAL PRICES MAY BE OBSCURED. V20. AGGREGATE BASE AND SUBBASE MATERIALS SHALL BE PLACED ON SUBGRADE BY MEANS OF A MECHANICAL SPREADER. DENSITY WILL BE DETERMINED USING THE DENSITY CONTROL STRIP IN ACCORDANCE WITH SECTION 304 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS AND VTM-10. A CERTIFIED COMPACTION TECHNICIAN SHALL PERFORM THESE TESTS. CERTIFIED COPIES OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE. IN ADDITION TO CHECKING STONE DEPTHS, A VDOT REPRESENTATIVE SHALL BE NOTIFIED AND GIVEN THE OPPORTUNITY TO BE PRESENT DURING THE CONSTRUCTION AND TESTING OF THE DENSITY CONTROL STRIP. V21. ASPHALT CONCRETE PAVEMENTS SHALL BE PLACED IN ACCORDANCE WITH SECTION 315 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS. DENSITY SHALL BE DETERMINED USING THE DENSITY CONTROL STRIP AS SPECIFIED IN SECTION 315 AND VTM-76. A CERTIFIED COMPACTION TECHNICIAN SHALL PERFORM THESE tests.CERTIFIED COPIES OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE. A VDOT REPRESENTATIVE SHALL BE NOTIFIED AND GIVEN THE OPPORTUNITY TO BE PRESENT DURING THE CONSTRUCTION AND TESTING OF THE CONTROL STRIP. V22. IN ACCORDANCE WITH SECTION 302.03, THE FOUNDATIONS FOR PIPE CULVERTS THIRTY-SIX (36) INCHES AND LARGER SHALL BE EXPLORED BELOW THE BOTTOM OF THE EXCAVATION TO DETERMINE THE TYPE AND CONDITION OF THE FOUNDATION. THE CONTRACTOR SHALL REPORT FINDINGS OF FOUNDATION EXPLORATION TO THE ENGINEER AND VDOT FOR APPROVAL PRIOR TO PLACING PIPE. FOUNDATION DESIGNS SHALL COMPLY WITH VDOT ROAD AND BRIDGE STANDARD PB-1. WHERE SOFT, YIELDING, OR OTHERWISE UNSUITABLE FOUNDATION IS ENCOUNTERED, THE FOUNDATION DESIGN AND/OR NEED FOR FOUNDATION STABILIZATION SHALL BE DETERMINED BY THE ENGINEER AND APPROVED BY VDOT. V23. VDOT STANDARD GUARDRAIL SHALL BE INSTALLED WHERE WARRANTED AND/OR AS PROPOSED ON THESE PLANS IN ACCORDANCE WITH VDOT’S INSTALLATION CRITERIA. FINAL APPROVAL OF THE GUARDRAIL LAYOUT TO BE GIVEN BY VDOT AFTER GRADING IS MOSTLY COMPLETE. V24. APPROVAL OF THESE PLANS SHALL EXPIRE FIVE (5) YEARS FROM THE DATE OF THE APPROVAL LETTER. V25. VDOT STANDARD CG-12 CURB RAMPS SHALL BE INSTALLED WHERE INDICATED ON THESE PLANS AND/OR AS SPECIFIED BY VDOT. V26. THE FOUNDATIONS FOR ALL BOX CULVERTS SHALL BE INVESTIGATED BY MEANS OF EXPLORATORY BORINGS ADVANCED BELOW PROPOSED FOUNDATION ELEVATION TO DETERMINE THE TYPE AND CONDITION OF THE FOUNDATION. THE CONTRACTOR SHALL SUBMIT COPIES OF BOREHOLE LOGS AND REPORT FINDINGS OF FOUNDATION EXPLORATION TO THE ENGINEER AND VDOT FOR APPROVAL PRIOR TO CONSTRUCTING BOX. FOUNDATION DESIGNS SHALL COMPLY WITH VDOT ROAD AND BRIDGE STANDARD PB-1. CONTRARY TO THE STANDARD, WHERE ROCK IS ENCOUNTERED AND CAST-IN-PLACE BOX IS PROPOSED, THE THICKNESS OF BEDDING SHALL BE SIX (6) INCHES. WHERE SOFT, YIELDING, OR OTHERWISE UNSUITABLE FOUNDATION IS ENCOUNTERED, THE FOUNDATION DESIGN AND/OR NEED FOR FOUNDATION STABILIZATION SHALL BE DETERMINED BY THE ENGINEER AND APPROVED BY VDOT. # 32-25 U.S. ROUTE 522 NORTH FREDERICK PIKE (VARIABLE WIDTH R/W)FOX DRIVE(VARIABLE WIDTH R/W)PIN 42-A-196 1.797 ACRES ZONED: B2 USE: COMMERCIAL EXISTING ONE STORY BRICK BUILDING "SHEETZ" (STORE 186) LINE BEARING DISTANCE L1 S 86°09'40" E 1.50' L2 S 69°37'50" E 1.56' L1 L2N 20°22'10" E 236.22'S 69°40'00" E 89.37' N 69°37'50" W 232.50' N 67°57'20" E 47.32'55.19'S 70°26'10" E S 65°30'16" E 44.61' S 3 5 ° 0 0 ' 4 0 " E 8 1 . 5 3 'S 03°50'20" W 149.55'S 03°50'20" W 42.59'N 86°41' 2 5 " W 1 2 1 . 6 0' LINE TABLE EX. FIRE HYDRANT W/ BOLLARDS C2.01 EXISTING CONDITIONS Feet 0 20 40 SCALE: 1" = 20'-0" SOR SOR Project number: Date: Drawn by: Checked by: August 4, 2025 No.Description DateMINOR SITE PLAN SP # XX-25SHEETZ STORE #186Renovation Project1503 N Frederick PikeWinchester, Virginia 22603Frederick County, Stonewall DistrictRevisions: Monteverde Engineering & Design Studio 2 5 0 E . E l i z a b e t h S t , S u i t e 1 1 4 • H a r r i s o n b u r g , V A 2 2 8 0 2 5 4 0 .2 2 8 .0 2 0 2 | w w w .m o n t e v e r d e d e s i g n s .c o m 25023C APPROVED FOR CONSTRUCTION 1.AHJ Comments 9/18/2025 SURVEY NOTES 1. TOPOGRAPHIC INFORMATION SHOWN HEREON IS BASED ON AN ACTUAL FIELD SURVEY COMPLETED MAY 19, 2025 BY MARSH & LEGGE LAND SURVEYORS, UNDER THE CARE OF MARK LEGGE, LS. 2. BOUNDARY INFORMATION SHOWN IS BASED ON A BOUNDARY LINE ADJUSTMENT PLAT DATED SEPTEMBER 30, 1993 MADE BY H. BRUCE EDENS, L.S. RECORDED IN DEED BOOK 808 AT PAGE 775 AND ORIENTED TO THE SURVEY BASED ON PROPERTY CORNERS FOUND. 3. ANY UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND SUPPLEMENTED WITH INFORMATION FROM EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. CONTRACTOR SHALL FIELD VERIFY ALL UTILITY LOCATIONS PERTINENT TO CONSTRUCTION PRIOR TO DIGGING. 4. HORIZONTAL ORIENTATION IS BASED ON VA. NAD 83 NORTH ZONE STATE GRID; VERTICAL DATUM IS BASED ON NAVD 88 ELEVATIONS ESTABLISHED USING GPS METHODS. # 32-25 U.S. ROUTE 522 NORTH FREDERICK PIKE (VARIABLE WIDTH R/W)FOX DRIVE(VARIABLE WIDTH R/W)EXISTING ONE STORY BRICK BUILDING "SHEETZ" (STORE 186) L1 L2N 20°22'10" E 236.22'S 69°40'00" E 89.37' N 69°37'50" W 232.50' N 67°57'20" E 47.32'55.19'S 70°26'10" E S 65°30'16" E 44.61' S 3 5 ° 0 0 ' 4 0 " E 8 1 . 5 3 'S 03°50'20" W 149.55'S 03°50'20" W 42.59'N 86°41' 2 5 " W 1 2 1 . 6 0' UST FIELD TO REMAIN, PROTECT AND PRESERVE PAD AND ALL TANK LIDS PROTECT & PRESERVE TRANSFORMER PAD PRESERVE LANDSCAPE REMOVE AND REPLACE EX. GREASE TRAP, REFER TO C4.01 PRESERVE SIGNAGE DEMO EX. FREESTANDING SIGN. COORD. WITH OWNER FOR ANY SALVAGE REQUIERMENTS. REPLACE EX. SWM STR#3, REFER TO C6.01 REMOVE AND DISPOSE OF FURNITURE PROTECT AND PRESERVE SANITARY CLEANOUT (TYP) REMOVE AND PRESERVE PEDESTAL, REPLACE UPON PROJECT COMPLETION SAWCUT ASPHALT-CONCRETE INTERFACE IF/AS NECESSARY TO CREATE CLEAN LINE FOR RE-POUR SAWCUT ASPHALT-CONCRETE INTERFACE IF/AS NECESSARY TO CREATE CLEAN LINE FOR RE-POUR SAWCUT ASPHALT-CONCRETE INTERFACE IF/AS NECESSARY TO CREATE CLEAN LINE FOR RE-POUR SAWCUT ASPHALT-CONCRETE INTERFACE IF/AS NECESSARY TO CREATE CLEAN LINE FOR RE-POUR SAWCUT ASPHALT-CONCRETE INTERFACE IF/AS NECESSARY TO CREATE CLEAN LINE FOR RE-POUR PROTECT AND PRESERVE SANITARY STR / LID REPLACE EX. SWM STR#1, REFER TO C6.01 PROTECT AND PRESERVE EX. SWM STR#2 PROTECT & PRESERVE DUMPSTER PAD & ENCLOSURE; REPLACE DOORS ONLY PROTECT & PRESERVE WALL, DEMO ONLY SIDEWALK AND RAILING PRESERVE AND PROTECT GAS METER PROTECT AND PRESERVE EX. FLAGPOLE & LIGHT DEMO EX. AIR MACHINE AND CAP CONDUIT FEED DEMO ALL EX. LIGHT POLES AND FIXTURES; PROTECT AND PRESERVE POLE BASES (TYP) REMOVE 2 HOLLY SHRUBS, REFER TO C7.01 FOR REPLACEMENT PLANTINGS ~220 SF DISTURBANCE REMOVE 10 CHERRY LAURELS, REFER TO C7.01 FOR REPLACEMENT PLANTINGS ~400 SF DISTURBANCE REMOVE SHRUBS AND TREE, REFER TO C7.01 FOR REPLACEMENT PLANTINGS ~230 SF DISTURBANCE INSTALL CURB INLET & TIE INTO EX. STORM SYSTEM, REFER TO SHEET C6.01 ~220 SF DISTURBANCE EXTEND LANDSCAPE ISLANDS TO ACCOMDATE ENTRANCE MODIFICATION AND ADD PARKING, REFER TO C4.01 ~1570 SF DISTURBANCE DEMOLITION LEGEND CONCRETE CURBING & PAVING TO BE REMOVED CANOPY / OVERHANG AREA TO BE REMOVED DEMOLITION NOTES: 1.NO LAND DISTURBING ACTIVITY SHALL OCCUR PRIOR TO OBTAINING A LAND DISTURBANCE PERMIT. 2.ALL WASTES AND UNSUITABLE MATERIALS ARE TO BE LEGALLY DISPOSED OF BY CONTRACTOR, NO BURNING, BURIAL, DISCHARGE, OR DUMPING IS ALLOWED ON SITE. 3.CONTRACTOR RESPONSIBLE FOR COORDINATING WITH ALL APPLICABLE UTILITY COMPANIES AND OWNER AS NECESSARY DURING CONSTRUCTION AND DURING RELOCATION OF EXISTING UTILITIES. 4.CONTRACTOR TO NOTIFY ENGINEER AND APPLICABLE UTILITY SERVICE PROVIDER OF ANY CONFLICTS WITH UNDERGROUND UTILITIES. 5.CONTRACTOR TO SUPPLY FREDERICK COUNTY WITH THE NAME AND CERTIFICATION NUMBER OF THE RESPONSIBLE LAND DISTURBER AND POST THE LAND DISTURBANCE BOND AT THE AMOUNT SET BY THE COUNTY WHEN OBTAINING THE LAND DISTURBANCE PERMIT. 6.CONTRACTOR RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMIT, BONDS, AND FEES AT CONTRACTORS EXPENSE FOR THIS PROJECT THAT HAVE NOT BEEN OBTAINED BY OWNER. CONTRACTOR SHALL COORDINATE WITH OWNER. 7.DEMOLITION CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN THE FIELD. ANY DISCREPANCIES FOUND SHALL BE REPORTED TO OWNER AND CIVIL ENGINEER PRIOR TO ANY SUBMISSION OF BIDS. 8.ALL PORTIONS OF WORK SHALL BE DONE IN ACCORDANCE WITH ALL LOCAL, STATE, AND NATIONAL CODES (ORDINANCES AND STANDARDS). 9.CONTRACTOR TO ESTABLISH AND PROPERLY FLAG EXTERIOR PROPERTY LINES PRIOR TO DEMOLITION. 10.DEMOLITION CONTRACTOR TO ACQUIRE ALL NECESSARY PERMITS TO COMPLETE DEMOLITION. VERIFY WITH THE COUNTY BUILDING DEPARTMENT, ZONING, RIGHT OF WAY, AND ALL OTHER GOVERNING AUTHORITIES. 11.DEMOLITION CONTRACTOR TO NOTIFY UTILITY NOTIFICATION CENTER NO LESS THAN 48 HOURS OR MORE THAN FIVE WORKING DAYS PRIOR TO DEMOLITION OF EXISTING UTILITIES AS REQUIRED BY LOCAL UTILITIES. 12.DEMOLITION CONTRACTOR TO PROVIDE ALL BARRICADES, SCAFFOLDING, AND OTHER MEANS OF PROTECTION REQUIRED TO COMPLY WITH ALL STATE LAWS, AND LOCAL MUNICIPAL ORDINANCES TO SAFEGUARD AGAINST INJURY TO PERSONS AND/OR DAMAGE TO ADJOINING PROPERTIES. 13.ANY FILL MATERIAL REQUIRED SHALL BE CLEAN, NO CONCRETE RUBBLE, ORGANIC MATTER, DEMOLITION DEBRIS, STONES LARGER THAN 2 INCHES IN ANY DIRECTION, ETC. 14.CONTRACTOR RESPONSIBLE FOR REPAIRING ANY DAMAGED SITE ELEMENTS NOT SPECIFICALLY PLANNED FOR DEMOLITION. 15.CURBING AND PAVEMENT DEMO EDGES SHALL BE SAWCUT, IF/AS NECESSARY TO ENSURE SMOOTH TIE-INS UPON REPAVING. 16.DISTURBED AREA AS SHOWN EQUALS ~2,740 SF. EXISTING BASE STONE SHALL REMAIN IN-PLACE FOR PROPOSED REPAVING AREAS IF OF SUFFICIENT DEPTH AND QUALITY, AND SHALL REMAIN FREE OF FINES. CONTRACTOR SHALL ENSURE TOTAL LAND DISTURBANCE ASSOCIATED WITH PROJECT IS KEPT BELOW 10,000 SF. 17.ALL TREES AND DECORATIVE LANDSCAPING OUTSIDE OF DEMO LIMITS SHALL BE PRESERVED. IF DAMAGED BY DEMOLITION OR CONSTRUCTION ACTIVITIES, THEY SHALL BE REPLACED IN KIND. C2.02 DEMOLITION PLAN SOR SOR Project number: Date: Drawn by: Checked by: August 4, 2025 No.Description DateMINOR SITE PLAN SP # XX-25SHEETZ STORE #186Renovation Project1503 N Frederick PikeWinchester, Virginia 22603Frederick County, Stonewall DistrictRevisions: Monteverde Engineering & Design Studio 2 5 0 E . E l i z a b e t h S t , S u i t e 1 1 4 • H a r r i s o n b u r g , V A 2 2 8 0 2 5 4 0 .2 2 8 .0 2 0 2 | w w w .m o n t e v e r d e d e s i g n s .c o m 25023C APPROVED FOR CONSTRUCTION 1.AHJ Comments 9/18/2025 Feet 0 20 40 SCALE: 1" = 20'-0" UNDER-CANOPY CONCRETE TO BE REMOVED, PRESERVING FUEL ISLANDS NOTE: ALL UNDERGROUND FACILITIES, INCLUDING ALL TANKS AND PIPING, SHALL REMAIN IN-PLACE UNLESS OTHERWISE NOTED. # 32-25 U.S. ROUTE 522 NORTH FREDERICK PIKE (VARIABLE WIDTH R/W)FOX DRIVE(VARIABLE WIDTH R/W)EXISTING ONE STORY BRICK BUILDING "SHEETZ" (STORE 186) 65.0' 10.0' (TYP) 35.5' 30.0' 54.5' 50.0' 42.4' 2.6' 65.0'8.0' 8.0' 1 2 3 4 5 6789101112 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 5.0' 5.0' 5.0' R4.0' R4.0' R6.0' R15.0' R15.0' R100.0' R4.0' R4.0' R12.0' R2.0' R2.0' R6.0'R4.0'R4.0'R15.0' R4.0' R4.0' R6.0' R10.0' R15.0' R10.0' 32 31 33 34 35 36 4"x4" BUMPER POST (TYP) NEW DUMPSTER ENCL. GATE & FENCE, REFER TO BUILDING PLANS CG-2 (TYP) CATCH CURB (TYP) VANISHING CURB OVER 16 LF (TYP), REFER TO C6.01 FOR SPOT GRADES PAVEMENT FLUSH WITH S/W (TYP, ALL SPACES ON BLDG PERIMETER) NEW RAILING, REFER TO BLDG PLAN NEW FENCING, REFER TO BLDG PLAN 20.0' (TYP) 25 LF CURB CUT WITH 2'-WIDE CONC. APRON / GUTTER EXTENSION (MATCH EXISTING, 6" RISE OVER 2 LF) POUR NEW CONCRETE AGAINST SAWCUT W/ EXPANSION JOINT (TYP) POUR NEW CONC. AGAINST PRESERVED FUEL ISLANDS WITH EXPANSION JOINT (TYP) ADJUST RIMS TO ALL EX. STRUCTURES TO BE FLUSH W/ NEW CONC. (TYP) 52.0' AIR MACHINE W/ RECESSED CURB, COORD ELEC FEED WITH OWNER. SEE DETAIL, C9.01 NEW 6" BOLLARD, CENTERD 9" FROM BACK OF CURB AND PLACED 48" O.C. (TYP) FREESTANDING SIGN, TO BE PERMITTED SEPARATELY. COORD ELEC FEED WITH OWNER. POUR NEW CONC. AGAINST EX. UST FIELD / CAP WITH EXPANSION JOINT PROPOSED 2000 GALLON GREASE INTERCEPTOR, PLUMB TO FIT EX. LATERALS. SEE DETAIL SHEET C9.01 POUR NEW CURB AGAINST SAWCUT W/ EXPANSION JOINT (TYP) ALL POLES / LIGHT FIXTURES SHALL BE REPLACED, POLE BASES SHALL BE PRESERVED AND RE-UTILIZED. REFER TO C8.01. NEW FENCING, REFER TO BLDG PLAN NEW ENTRANCE VESTIBULE, REFER TO BUILDING PLANS EXTERIOR FURNITURE & EQUIPMENT (TYP), BY OWNERS; SHOWN FOR REF ONLY 50' FRONT SETBACK 35' FRONT SETBACK 50' FRONT SETBACK 35' FRONT SETBACK SPILL CURB (TYP), WARP TO DRAIN TO Ex. DI SPILL CURB (TYP) Ex. 1" SERVICE METER, REPURPOSED FOR IRRIGATION VDOT CG-6 WITHIN R/W (TYP), ENTRANCES SHALL ADHERE TO CG-11 REQUIREMENTS VDOT CG-6 WITHIN R/W (TYP), ENTRANCES SHALL ADHERE TO CG-11 REQUIREMENTS37 38 39 40 41 50 ' F R O N T S E T B A C K Ex. 1.5" DOMESTIC WATER/SEWER METER PROPOSED 20' FREDERICK WATER EASEMENT PROPOSED 20' FREDERICK WATER EASEMENT 16.0' R4.0' R10.0' R40.0' R10.0' R15.0' VARIABLE FREDERICK WATER EASEMENT SITE PLAN NOTES: 1.NEW PAVEMENT SHALL BE MADE FLUSH WITH ADJACENT FOR SMOOTH TIE-INS. 2.A SEPARATE SIGN PERMIT IS REQUIRED FOR ALL SIGNS. 3.A MAINTENANCE OF TRAFFIC (MOT) PLAN MUST BE SUBMITTED TO AND APPROVED BY VDOT PRIOR TO ISSUANCE OF VDOT LAND USE PERMIT FOR WORK WITHIN PUBLIC RIGHT-OF-WAY. SHOULDER CLOSURES SHALL BE IN ACCORDANCE WITH WAPM TTC-4.2. 4.ALL PARKING SPACES SURROUNDING BUILDING SHALL BE FLUSH WITH PAVEMENT. WIPE DOWN 6" CURB OVER LENGTH OF PARKING STALL. 5.COLOR AND PATTERN OF STAMPED CONCRETE SIDEWALK SURROUNDING CONVENIENCE STORE SHALL BE COORDINATED WITH ARCHITECT/OWNER. 6.BUMPERPOSTS SURROUNDING CONVENIENCE STORE SHALL BE SET TWO (2) PER STALL, 5.0' SPACING ON CENTER. 7.BOLLARDS SURROUNDING CONVENIENCE STORE SHALL BE 6" IN DIAMETER AND SPACED 20.0' ON CENTER. 8.HEAVY DUTY CONCRETE SHALL BE UTILIZED FOR ENTIRETY OF NEW PAVING LIMITS. LIGHT DUTY SHALL BE USED ONLY FOR PEDESTRIAN-ONLY SIDEWALKS. REFER TO CONCRETE SPECIFICATION ON C9.01. 9.CONTRACTOR SHALL UPGRADE THE EXISTING WATER SERVICE TO COMPLY WITH CURRENT REQUIREMENTS, INCLUDING BUT NOT LIMITED TO REPLACING THE BACKFLOW PREVENTER. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH FREDERICK COUNTY WATER INSPECTOR REQUIREMENTS. 10.ALL PAVEMENT STRIPING SHALL BE TYPE A PAINT. 11.CONTRACTOR SHALL PROVIDE MOT PLAN TO VDOT FOR REVIEW AND APPROVAL PRIOR TO WORK WITHIN PUBLIC R/W. MOT PLAN SHALL INCLUDE TTC-4.2, STATIONARY OPERATION ON A SHOULDER, AT A MINIMUM; SEE DETAIL, SHEET C9.02. C4.01 SITE LAYOUT SOR SOR Project number: Date: Drawn by: Checked by: August 4, 2025 No.Description DateMINOR SITE PLAN SP # XX-25SHEETZ STORE #186Renovation Project1503 N Frederick PikeWinchester, Virginia 22603Frederick County, Stonewall DistrictRevisions: Monteverde Engineering & Design Studio 2 5 0 E . E l i z a b e t h S t , S u i t e 1 1 4 • H a r r i s o n b u r g , V A 2 2 8 0 2 5 4 0 .2 2 8 .0 2 0 2 | w w w .m o n t e v e r d e d e s i g n s .c o m 25023C APPROVED FOR CONSTRUCTION 1.AHJ Comments 9/18/2025 LIGHT DUTY CONCRETE HEAVY DUTY CONCRETE Feet 0 20 40 SCALE: 1" = 20'-0" BRICK SIDEWALK FREDERICK WATER NOTES: 1.VALVES, MANHOLES, ARV’S AND OTHER FREDERICK WATER SURFACE FEATURES SHALL NOT BE PLACED IN CURB AND GUTTER, NOR SLOPED PORTION OF HANDICAPPED RAMPS. CONTRACTOR SHALL COORDINATE LOCATIONS WITH THE FREDERICK WATER INSPECTOR 2.IRRIGATION LINES AND DEVICES, LIGHT POLES, TRANSFORMERS, JUNCTION BOXES, PEDESTALS, OTHER OBSTACLES AND ALL DRY UTILITIES SHALL NOT BE PLACED ON FREDERICK WATER EASEMENTS. PERPENDICULAR IRRIGATION LINES AND DRY UTILITY CROSSINGS ARE PERMITTED WITH 18" MINIMUM VERTICAL SEPARATION 3.RETAINING WALLS AND THEIR TIE BACKS SUCH AS GEO GRID OR OTHER SUPPORTS SHALL NOT BE PLACED IN FREDERICK WATER EASEMENTS 4.CONTRACTOR SHALL TEST PIT AS REQUIRED AND ADJUST ALL EXISTING FREDERICK WATER FACILITIES TO GRADE PER THE FREDERICK WATER INSPECTORS REQUIREMENTS 5.IF EXISTING FREDERICK WATER FACILITIES ARE REMOVED, THE REMOVED ITEMS AND RELATED MATERIALS SHALL BE REPLACED WITH NEW MATERIALS. REMOVED MATERIALS SHALL BE FURNISHED TO THE FREDERICK WATER INSPECTOR GREASE TRAP/OIL WATER SEPARATOR NOTES: 1.TANK SECTIONS SHALL BE BOLTED TOGETHER 2.WATERTIGHT BOLT DOWN FRAME AND COVERS ARE REQUIRED 3.PENETRATIONS SHALL HAVE BOOTS 4.TANK, COMPONENTS, AND INSTALLATION SHALL BE TRAFFIC RATED 5.CONTRACTOR SHALL COORDINATE INSTALLATION AND INSPECTIONS WITH BOTH FREDERICK COUNTY INSPECTIONS DEPARTMENT AND FREDERICK WATER AVERAGE DAILY WATER AND SEWER USAGE = 3,500 GPD MAX DAILY WATER AND SEWER USAGE = 8,750 GPD AVERAGE DAILY IRRIGATION USAGE = ~100 GPD # 32-25 U.S. ROUTE 522 NORTH FREDERICK PIKE (VARIABLE WIDTH R/W)FOX DRIVE(VARIABLE WIDTH R/W)EXISTING ONE STORY BRICK BUILDING "SHEETZ" (STORE 186) L1 L2N 20°22'10" E 236.22'S 69°40'00" E 89.37' N 69°37'50" W 232.50' N 67°57'20" E 47.32'55.19'S 70°26'10" E S 65°30'16" E 44.61' S 3 5 ° 0 0 ' 4 0 " E 8 1 . 5 3 'S 03°50'20" W 149.55'S 03°50'20" W 42.59'N 86°41' 2 5 " W 1 2 1 . 6 0' EX. FIRE HYDRANT W/ BOLLARDS FFE: 24.90825824823 824825 8238238 2 2 822825822823 824825825 824 822821824TC ~ 26.65 (MATCH EX.) TC ~ 24.12 (MATCH EX.) TC ~ 20.73 (MATCH EX.) TC ~ 22.15 (MATCH EX.) TC ~ 22.93 (MATCH EX.) TC ~ 26.31 (MATCH EX.) TC ~ 25.86 (MATCH EX.) TC: 26.00 TC: 25.85 TC: 24.45 TC: 24.70 TC: 26.20 TC: 26.50 TC: 24.85 (HP) TC: 21.55 TC: 21.55 TC: 21.45 TC: 22.15 TC: 22.45 (HP) TC: 21.90 TC: 21.50 TC ~ 20.42 (MATCH EX.) TC ~ 20.90 (MATCH EX.) TC: 21.25 TC: 22.15 TS: 24.65TC: 24.50 TC: 24.35 (FULL CURB) TC: 23.00 TC: 23.55 TC: 24.60 TC: 24.30 TC: 24.65 (FULL CURB) TC: 24.00 TS: 24.65 TS: 24.65 TP: 23.85 TS: 24.65 TC: 24.50 (FULL CURB) TC: 24.65 (FULL CURB) TC: 23.95 (HP) TP: 24.35 TP: 24.35 TC: 22.90 (LP)TC: 22.15 APPROXIMATE FLOW LINE LOCATION, CONTRACTOR TO ENSURE POSITIVE DRAINAGE TC: 23.35 TS: 24.65 REPLACE DI-1 WITH NEW STRUCTURE, PRESERVING TOP/GRATE IF DEEMED TO BE IN SATISFACTORY CONDITION (COORD WITH OWNER). STRUC.= B-1 (48") WITH ST-1 RIM ELEV = 822.72 INV. OUT = 820.72 (12"; FIELD VERIFY ELEV.) SUMP = 817.72 SNOUT = 18R, PLACED ON OUTFALL REPLACE DI-1 WITH NEW BASE, PRESERVING TOP/GRATE IF DEEMED TO BE IN SATISFACTORY CONDITION (COORD WITH OWNER). STRUC.= B-1 (48") WITH ST-1 RIM ELEV = 821.25 INV. IN = 819.45 (6"; FIELD VERIFY ELEV.) INV. OUT = 818.95 (12"; FIELD VERIFY ELEV.) SUMP = 815.95 SNOUT = 18R, PLACED ON OUTFALL TC ~ 20.53 (MATCH EX.) TC: 21.00 TC ~ 20.96 82 1 TC: 21.90 (HP) TC: 21.95 TC: 21.70 TC: 23.60 TC: 23.85 TC: 21.35 INSTALL CURB INLET. STRUC.= MH-1 W/ DI-3C TOP, 6' LENGTH RIM ELEV = 820.49 INV. OUT = 816.82 (12" HDPE) TC ~ 20.66 (MATCH EX.) 41.0 LF 12"-DIA ADS N-12 HDPE @ 5.3% SLOPE INV IN = 816.82 INV OUT = 814.65 COORDINATE GUY WIRE RELOCATION WITH UTILITY OWNER Project number: Date: Drawn by: Checked by: August 4, 2025 No.Description DateMINOR SITE PLAN SP # XX-25SHEETZ STORE #186Renovation Project1503 N Frederick PikeWinchester, Virginia 22603Frederick County, Stonewall DistrictRevisions: Monteverde Engineering & Design Studio 2 5 0 E . E l i z a b e t h S t , S u i t e 1 1 4 • H a r r i s o n b u r g , V A 2 2 8 0 2 5 4 0 .2 2 8 .0 2 0 2 | w w w .m o n t e v e r d e d e s i g n s .c o m 25023C APPROVED FOR CONSTRUCTION 1.AHJ Comments 9/18/2025 C6.01 GRADING & SWM PLAN Feet 0 20 40 SCALE: 1" = 20'-0" SOR SOR RETAINING WALL NOTES: 1.WALLS SHALL BE CONSTRUCTED WITH SEGMENTAL BLOCK UNITS (ANCHOR DIAMOND PRO OR EQUAL AS APPROVED BY OWNER) WITH GEOSYNTHETIC REINFORCING WHERE REQUIRED BY DESIGN. SET TOP AND BOTTOM OF WALL PER GRADES INDICATED ON PLANS. THE DESIGN OF THE WALLS SHALL BE DELEGATED. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND CALCULATIONS SEALED BY AN ENGINEER LICENSED IN THE COMMONWEALTH OF VIRGINIA FOR APPROVAL PRIOR TO CONSTRUCTION. 2.WALLS SHALL BE CONSTRUCTED USING SM OR MORE GRANULAR BACKFILL WITH AN MAX ACTIVE EQUIVALENT FLUID PRESSURE OF 32 PSF PER FOOT OF HEIGHT. GEOTECHNICAL ENGINEER OF RECORD SHALL APPROVE BACKFILL PRIOR TO CONSTRUCTION. 3.ANY PORTION OF THE RETAINING WALL OVER THREE (3) FEET IN HEIGHT SHALL INCLUDE A FENCE (NOT SHOWN ON THESE PLANS) AT LEAST FORTY-TWO (42) INCHES HIGH ALONG THE TOP TO PROTECT PERSONS FROM INJURY DUE TO FALLING. THE FENCE TYPE AND LAYOUT SHALL BE APPROVED BY THE OWNER PRIOR TO CONSTRUCTION. FENCE INSTALLATION TO UTILIZE SLEEVE-IT FENCE POST ANCHORING SYSTEM. 4.PROVIDE AN INTERNAL DRAINAGE SYSTEM DESIGNED TO REMOVE INCIDENTAL WATER THAT INFILTRATES INTO THE SOIL BEHIND THE WALL. 5.GROUND WATER CAN BE PRESENT WITHIN THE SOIL DUE TO SURFACE INFILTRATION OR WATER TABLE FLUCTUATION. IF GROUND WATER IS ENCOUNTERED DURING CONSTRUCTION, AN ADEQUATE DRAINAGE SYSTEM MUST BE INSTALLED. GRADING NOTES: 1.MAXIMUM SLOPE AND CROSS-SLOPE ALLOWANCES STATED ON THE ACCESSIBILITY NOTES SECTION OF THIS PLAN SET SHALL GOVERN ALL OTHER DIRECTION PROVIDED ON THIS GRADING PLAN. CONTRACTOR SHALL NOTIFY ENGINEER IF ANY CONFLICT IS DISCOVERED BETWEEN SPOT GRADES, CONTOURS, VARIOUS SLOPE AND CROSS-SLOPE REQUIREMENTS, ETC., PRIOR TO CONSTRUCTION OF AFFECTED AREA. 2.CONTRACTOR SHALL WARP GUTTER PLAN LOCATED IN PATH OF ACCESSIBLE ROUTE IMMEDIATELY ADJACENT TO ANY CG-12, SUCH THAT SLOPE OF GUTTER PAN IS 5% MAX. SWM STRUCTURE NOTES: 1.REPLACEMENT DI-1 STRUCTURES SHALL INCLUDE FULL REPLACEMENT OF BASE, CAST TO REPLICATE EXISTING INVERTS. CONTRACTOR SHALL FIELD VERIFY INVERT LOCATIONS AND ELEVATIONS PRIOR TO ORDERING OF MATERIALS. CONE (IF ANY) AND TOP MAY BE PRESERVED AND RE-USED IF FOUND TO BE IN SATISFACTORY CONDITION; CONDITION SHALL BE REVIEWED WITH OWNER'S REP PRIOR TO DETERMINATION. 2.SNOUTS ARE TO BE INSTALLED PER MANUFACTURER SPECIFICATIONS, AS GENERALLY DETAILED IN THIS PLAN SET. REFER TO SHEET C9.02. # 32-25 PROPOSED 2000 GALLON GREASE INTERCEPTOR, PLUMB TO FIT EX. LATERALS. SEE DETAIL SHEET C9.01 50' FRONT SETBACK 35' FRONT SETBACK 50' FRONT SETBACK 35' FRONT SETBACK 50 ' F R O N T S E T B A C K FOX DRIVE(VARIABLE WIDTH R/W)EXISTING ONE STORY BRICK BUILDING "SHEETZ" (STORE 186) L1 L2N 20°22'10" E 236.22'S 69°40'00" E 89.37' N 69°37'50" W 232.50' N 67°57'20" E 47.32'55.19'S 70°26'10" E S 65°30'16" E 44.61' S 3 5 ° 0 0 ' 4 0 " E 8 1 . 5 3 'S 03°50'20" W 149.55'S 03°50'20" W 42.59'N 86°41' 2 5 " W 1 2 1 . 6 0' BS (15) IVS (3) IVS (3) HP (6) IVN (4) CA (2) CK (1) 20' FREDERICK WATER EASEMENT (ALL SHRUBS WITHIN EASEMENT MUST BE EQUIPPED WITH ROOT GUARD. SEE NOTE 10, THIS SHEET). BS (13) FREDERICK WATER EASEMENT (ALL SHRUBS WITHIN EASEMENT MUST BE EQUIPPED WITH ROOT GUARD. SEE NOTE 10, THIS SHEET) C7.01 LANDSCAPE PLAN OP SOR Feet 0 20 40SET TREE TRUNK STRAIGHT UPRIGHT. NEVER CUT TREE LEADER. PRUNE DAMAGED OR BROKEN BRANCHES. MAINTAIN NATURAL SHAPE WIRE TREE TO STAKES. WIRE THAT WRAPS AROUND TREE TO BE ENCLOSED IN RUBBER HOSE (2) 8' LONG, 2" DIA. SOUND WOOD STAKES SET 180° APART. ALLOW FOR NATURAL SWAY. KRAFT WRAP FOR TREES 2" CALIPER AND LARGER SET ROOT COLLAR AT FINISH GRADE. DIG TREE PIT TO NECESSARY DEPTH FOR PROPER ROOT COLLAR PLACEMENT. 3" MULCH LAYER. DO NOT PLACE MULCH WITHIN 4" OF ROOT COLLAR. 3" HIGH SAUCER WATERING RING AROUND ENTIRE TREE REMOVE ALL BURLAP FROM ROOT BALL BEFORE PLANTING PLANTING MIX PLACED IN 12" LIFTS. TAMP LIGHTLY, COMPACT TO MAX. 85% DENSITY. PLANTING SOIL TO BE MIN. 12-INCH DEPTH. PLACE ROOT BALL ON TOP OF DIRT MOUND LEAVING 6" DEEP TRENCH AROUND EDGE OF TREE PIT AS SHOWN PRUNE TO MAINTAIN NATURAL SHAPE SET ROOT COLLAR AT FINISH GRADE 3" MULCH LAYER. DO NOT PLACE MULCH WITHIN 4" OF MAIN STEM OF SHRUB 3" HIGH SAUCER WATERING RING AROUND ENTIRE SHRUB REMOVE ALL BURLAP BEFORE PLANTING PLANTING MIX PLACED IN 6" LIFTS. TAMP LIGHTLY, COMPACT TO MAX. 85% DENSITY. PLANTING SOIL TO BE MIN. 12-INCH DEPTH. PLACE ROOT BALL ON TOP OF DIRT MOUND LEAVING TRENCH AROUND EDGE OF TREE PIT AS SHOWN SET SHRUB STRAIGHT UPRIGHT 1 TREE DETAIL NTS 2 SHRUB DETAIL NTS 3 GRASS/PERENNIAL DETAIL NTS MIN. 2X BALL WIDTH MIN. 2X BALL WIDTH GROUND COVER, PERENNIAL OR GRASS EQUAL SPACING BETWEEN ALL PLANTS, STAGGER ROWS 3" MULCH LAYER SPECIFIED PLANTING MIX, 12-INCH MIN. DEPTH. LOOSEN ROOTS, CUT MATTED OR ENCIRCLING ROOTS AND SPREAD OUT EVENLY PREPARED, SCARIFIED SUBSOIL12" MIN. 12" MIN. 12" MIN. PLANT SCHEDULE BOTANICAL NAME (COMMON NAME)QUANTITY SIZE SPACING REMARKS TREE SHRUBS SYMBOL CK HP HYDRANGEA PANICULATA (BOBO PANICLE HYDRANGEA)6 3 GAL. 18" MIN. HT AS SHOWN IVS ITEA VIRGINICA "SPRICH" (LITTLE HENRY DWARF SWEETSPIRE)6 3 GAL. 18" MIN. HT AS SHOWN PLANTING NOTES: 1.EXACT LOCATION OF UNDERGROUND UTILITIES SHALL BE VERIFIED IN THE FIELD BY THE INSTALLER. PLANTINGS SHALL BE ADJUSTED AS NECESSARY TO AVOID CONFLICT WITH UTILITIES. 2.SUBSOIL CONDITIONS AND ADDITIONAL SUBSURFACE DRAINAGE REQUIREMENTS SHALL BE DETERMINED IN THE FIELD BY THE INSTALLER. ANY CONDITIONS DETRIMENTAL TO THE GROWTH AND HEALTH OF PROPOSED PLANT MATERIALS SHALL BE ADJUSTED TO MEET SITE CONDITIONS AND BROUGHT TO THE ATTENTION OF THE PROJECT MANAGER PRIOR TO PLANTING. 3.PLANT MATERIAL SHALL BE PLANTED SO AS TO BEAR THE SAME RELATIONSHIP TO GRADE AS IN THE FIELD OR CONTAINER IT WAS GROWN IN. 4.THE INSTALLER SHALL STAKE OUT ALL TREE, SHRUB AND BED EDGE LOCATIONS FOR THE PROJECT MANAGERS APPROVAL PRIOR TO BEGINNING PLANTING OPERATIONS. NOTIFY PROJECT MANAGER IF FIELD CONDITIONS WARRANT ADJUSTMENT OF PLANT LOCATIONS. 5.MULCH ALL DISTURBED AREAS WITH A MINIMUM OF 3" DEEP LAYER OF (DOUBLE) SHREDDED HARDWOOD BARK MULCH, OR PINE STRAW AS SHOWN ON PLANS. ALL DISTURBED SOIL SURFACES SHALL BE COVERED EITHER WITH LAWNS, PLANTS, OR MULCH. 6.BED LINES SHALL CONFORM TO CONFIGURATION SHOWN ON THE PLANS. BED LINES SHALL MEET CURBS, WALKS, BUILDINGS, ETC. AT RIGHT ANGLES UNLESS SHOWN OTHERWISE. 7.IN CASE OF A DISCREPANCY BETWEEN THE PLANT COUNT ON THE PLANT LIST AND THE NUMBER OF PLANTS SHOWN ON THE PLAN, THE NUMBER OF PLANTS ACTUALLY DRAWN SHALL BE THE NUMBER REQUIRED. 8.ALL PLANT MATERIAL TO MEET STANDARDS FOR SIZE AND QUALITY. 9.LANDSCAPING SHALL NOT IMPEDE SIGHT DISTANCES OR BE PLANTED WITHIN UTILITY EASEMENTS. 10.SULFUR-COATED GEOTEXTILE FABRIC SHALL BE PLACED AS ROOT GUARD 12" UNDERNEATH ALL SHRUBS LOCATED WITHIN PROPOSED FREDERICK WATER EASEMENT. Project number: Date: Drawn by: Checked by: August 4, 2025 No.Description DateMINOR SITE PLAN SP # XX-25SHEETZ STORE #186Renovation Project1503 N Frederick PikeWinchester, Virginia 22603Frederick County, Stonewall DistrictRevisions: Monteverde Engineering & Design Studio 2 5 0 E . E l i z a b e t h S t , S u i t e 1 1 4 • H a r r i s o n b u r g , V A 2 2 8 0 2 5 4 0 .2 2 8 .0 2 0 2 | w w w .m o n t e v e r d e d e s i g n s .c o m 25023C APPROVED FOR CONSTRUCTION 1.AHJ Comments 9/18/2025 1 1.5" CAL. 8' MIN. HT.AS SHOWNCORNUS KOUSA (KOUSA DOGWOOD) CAN BE PLANTED B&BAS SHOWNBSBUXUS SEMPERVIRENS "ELEGANTISSIMA" (ELEGANTISSIMA VARIEGATED BOXWOOD)15 5 GAL. 36" MIN. HT. PLANT B&B, SINGLE STEM TRUNK CAN BE PLANTED B&B ILEX VOMITORIA "NANA" (DWARF YAUPON HOLLY)4 3 GAL. 18" MIN. HT.CAN BE PLANTED B&BAS SHOWNIVN CA CLETHRA ALNIFOLIA (SWEET PEPPERBUSH)2 3 GAL. 18" MIN. HT.CAN BE PLANTED B&BAS SHOWN CAN BE PLANTED B&B ·SPECIES LISTED HEREIN MAY BE SUBSTITUTED SO LONG AS FORM AND CHARACTERISTIC REMAIN THE SAME AND SPECIES ARE ON THE APPROVED LIST WITHIN THE COUNTY ZONING ORDINANCE. CONTRACTOR SHALL COORDINATE CHANGES WITH OWNER, ENGINEER OR LANDSCAPE ARCHITECT BEFORE INSTALLATION. ·ALL EVERGREEN SHRUBS FOR PARKING SCREENING TO BE MINIMUM 36" HEIGHT AT TIME OF PLANTING PER CITY CODE. # 32-25 C9.01 SITE DETAILS SOR SOR Project number: Date: Drawn by: Checked by: August 4, 2025 No.Description DateMINOR SITE PLAN SP # XX-25SHEETZ STORE #186Renovation Project1503 N Frederick PikeWinchester, Virginia 22603Frederick County, Stonewall DistrictRevisions: Monteverde Engineering & Design Studio 2 5 0 E . E l i z a b e t h S t , S u i t e 1 1 4 • H a r r i s o n b u r g , V A 2 2 8 0 2 5 4 0 .2 2 8 .0 2 0 2 | w w w .m o n t e v e r d e d e s i g n s .c o m 25023C APPROVED FOR CONSTRUCTION 1.AHJ Comments 9/18/2025 · GREASE TRAP/OIL WATER SEPARATOR NOTES: 1.TANK SECTIONS SHALL BE BOLTED TOGETHER 2.WATERTIGHT BOLT DOWN FRAME AND COVERS ARE REQUIRED 3.PENETRATIONS SHALL HAVE BOOTS 4.TANK, COMPONENTS, AND INSTALLATION SHALL BE TRAFFIC RATED 5.CONTRACTOR SHALL COORDINATE INSTALLATION AND INSPECTIONS WITH BOTH FREDERICK COUNTY INSPECTIONS DEPARTMENT AND FREDERICK WATER # 32-25 C9.02 SWM DETAILS SOR SOR Project number: Date: Drawn by: Checked by: August 4, 2025 No.Description DateMINOR SITE PLAN SP # XX-25SHEETZ STORE #186Renovation Project1503 N Frederick PikeWinchester, Virginia 22603Frederick County, Stonewall DistrictRevisions: Monteverde Engineering & Design Studio 2 5 0 E . E l i z a b e t h S t , S u i t e 1 1 4 • H a r r i s o n b u r g , V A 2 2 8 0 2 5 4 0 .2 2 8 .0 2 0 2 | w w w .m o n t e v e r d e d e s i g n s .c o m 25023C APPROVED FOR CONSTRUCTION 1.AHJ Comments 9/18/2025 # 32-25