HomeMy WebLinkAbout01-26 CommentsCOUNTY of FREDERICK
Department of Planning and Development
540/ 665-5651
Fax: 540/ 665-6395
Jan 5, 2025
Chris Stephenson,
Morris & Ritchie Associates Inc.
205 E. Hirst Rd, St. 106
Purcelville, VA 20132
RE: Proposed Rezoning for 700 Ross Street
Property Identification Numbers (PIN): 54G-1-13A
Dear Mr. Stephenson:
Planning and Development staff had the opportunity to review the draft rezoning application
(REZ). This application seeks to rezone approximately +/0.20 acres from the B2 (General Business)
Zoning District with proffers to the B2 Zoning District with proffers to a 12-unit hotel. The subject
property is located at 700 Ross Street in the Stonewall Magisterial District. Prior to formal
submission to the County, please ensure that these comments and all review agency comments are
adequately addressed. At a minimum, a letter describing how each of the agencies and their
comments have been addressed should be included as part of the submission.
• Comprehensive Plan Conformance. The Comprehensive Plan (adopted November 2021)
and the Northeast Frederick Land Use Plan (NELUP) provide guidance on the future
development of the subject property. The Plan identifies the subject properties with a
“residential” land use designation and as being within the limits of the Urban Development
Area (UDA). Section §165-402.01 of the Frederick County Zoning Ordinance speaks to
the intent of the residential land use classification by shaping the intent of the zoning
district intended to implement it. “…intended to provide for a compatible mixture of quality
residential housing types within the Urban Development Area, consistent with the
residential land use policies of the Comprehensive Plan.”
The proposed rezoning does not implement uses typically associated with the “residential”
land use designation in the Comprehensive Plan, However, staff recognize that the intended
use is intended to maximize the subject parcel’s strategic location adjacent to the Hampton
Inn, City of Winchester, and adjoining areas identified with a “business” land use designation.
As such, this makes it desirable for extending the existing use. The consolidation of residential
uses and mixed-use nature of the surrounding area does provide the opportunity for
complementary business uses. Careful consideration should be given to the B2 district uses
permitted (and prohibited) through the rezoning and their appropriateness to address retail and
convenience-type needs for nearby residences.
• General Development Plan. The site does not identify pavement area or parking. The
parking may be addressed through shared parking of the adjacent parking lot serving the
Hampton Inn.
• Transportation. The submitted Impacts Analysis estimated the 3,956’ hotel would
generate 75 trips day. However, the proffer statement does not restrict the use of the
property to only a hotel establishment (as assumed in the analysis) and allows many other
B2 (General Business) Zoning District uses, some of which may have a significant
transportation impact on the transportation network (for example convenience store with
fueling stations). The applicant should consider including a prohibited land uses list to
preclude uses that are not conducive to the neighborhood.
Extending the sidewalk from Ross Street and a pedestrian crossing may be necessary along
Ross Street.
The proposed transportation improvements for site access appear to be sufficient.
County Staff will continue to coordinate with VDOT staff on the traffic impacts as it relates
to the rezoning proposal.
• Proffer Statement. The following revisions are offered for consideration as it relates to
the proffer statement dated November 26, 2025:
• Proffer C may still be desirable if additional parking lot spaces are anticipated on
the parcel.
• Other Application Materials & Fee. Based on the fees adopted by the Board of
Supervisors, the rezoning fee for this rezoning application would be $5,020.
All the above comments and reviewing agency comments should be appropriately addressed before
staff can accept this rezoning application for a public hearing. The Applicant should verify with
Planning & Development staff application completeness prior to final submission.
Please feel free to contact me with questions regarding this application.
Sincerely,
Eric Bittner,
Planner II
Cc: Jason Aikens, (jason@aikensgroup.com)
Project Name: ________________________________________________
Acreage: ___________
PIN(s): __________________
Address (or general location):
Existing Zoning District: ____________________________________________
Proposed Zoning District: ___________________________________________
Staff Name (Email Address): _________________________________________
Agency Name Completing Comments (select one):
____ Frederick Water
____ Virginia Department of Transportation
____ Winchester Regional Airport
____ Virginia Department of Health
____ Historic Resources Advisory Board
____ Frederick County (FC) Public Schools
____ FC Public Works
____ FC Inspections
____ FC Fire Marshal
____ FC Parks & Recreation
____ FC County Attorney
____ Other (Specify): ________________________
Resubmission to address comments requested? Y _____ or N _____
REQUEST FOR REZONING COMMENTS
Reviewer Name (Email Address): _____________________________________________________
Review Agency Comments:
*Comments that may not fit in the box should be attached to the cover sheet on agency or department letterhead.
Project Name: ________________________________________________
Acreage: ___________
PIN(s): __________________
Address (or general location):
Existing Zoning District: ____________________________________________
Proposed Zoning District: ___________________________________________
Staff Name (Email Address): _________________________________________
Agency Name Completing Comments (select one):
____ Frederick Water
____ Virginia Department of Transportation
____ Winchester Regional Airport
____ Virginia Department of Health
____ Historic Resources Advisory Board
____ Frederick County (FC) Public Schools
____ FC Public Works
____ FC Inspections
____ FC Fire Marshal
____ FC Parks & Recreation
____ FC County Attorney
____ Other (Specify): ________________________
Resubmission to address comments requested? Y _____ or N _____
REQUEST FOR REZONING COMMENTS
Reviewer Name (Email Address): _____________________________________________________
Review Agency Comments:
*Comments that may not fit in the box should be attached to the cover sheet on agency or department letterhead.
Project Name: ________________________________________________
Acreage: ___________
PIN(s): __________________
Address (or general location):
Existing Zoning District: ____________________________________________
Proposed Zoning District: ___________________________________________
Staff Name (Email Address): _________________________________________
Agency Name Completing Comments (select one):
____ Frederick Water
____ Virginia Department of Transportation
____ Winchester Regional Airport
____ Virginia Department of Health
____ Historic Resources Advisory Board
____ Frederick County (FC) Public Schools
____ FC Public Works
____ FC Inspections
____ FC Fire Marshal
____ FC Parks & Recreation
____ FC County Attorney
____ Other (Specify): ________________________
Resubmission to address comments requested? Y _____ or N _____
REQUEST FOR REZONING COMMENTS
Reviewer Name (Email Address): _____________________________________________________
Review Agency Comments:
*Comments that may not fit in the box should be attached to the cover sheet on agency or department letterhead.
3URMHFW 1DPH BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
$FUHDJHBBBBBBBBBBBBB
3,1V BBBBBBBBBBBBBBBBBBB
$GGUHVV RU JHQHUDO ORFDWLRQ
([LVWLQJ=RQLQJ'LVWULFWBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
3URSRVHG=RQLQJ'LVWULFWBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
6WDII 1DPH(PDLO$GGUHVV BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
$JHQF\ 1DPH&RPSOHWLQJ&RPPHQWVVHOHFW RQH
BBBB)UHGHULFN:DWHU
BBBB9LUJLQLD'HSDUWPHQWRI7UDQVSRUWDWLRQ
BBBB:LQFKHVWHU5HJLRQDO$LUSRUW
BBBB9LUJLQLD'HSDUWPHQWRI+HDOWK
BBBB+LVWRULF5HVRXUFHV$GYLVRU\%RDUG
BBBB)UHGHULFN&RXQW\)&3XEOLF6FKRROV
BBBB)&3XEOLF:RUNV
BBBB)&,QVSHFWLRQV
BBBB)&)LUH0DUVKDO
BBBB)&3DUNV 5HFUHDWLRQ
BBBB)&&RXQW\$WWRUQH\
BBBB2WKHU6SHFLI\ BBBBBBBBBBBBBBBBBBBBBBBBB
5HVXEPLVVLRQWRDGGUHVVFRPPHQWVUHTXHVWHG"<BBBBBBBRU1BBBBBB
5(48(677)2555(=21,1**&200(176
5HYLHZHU 1DPH(PDLO $GGUHVV BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
5HYLHZ$JHQF\&RPPHQWV
&RPPHQWV WKDW PD\ QRW ILW LQWKH ER[ VKRXOGEH DWWDFKHGWRWKH FRYHUVKHHW RQ DJHQF\RUGHSDUWPHQW OHWWHUKHDG
700 Ross Street
.20
54-G-1-13-A
700 Ross Street
B2(with proffers)
B2(with Proffers
eric.bittner@fcva.us
Andrew Fox (andrew.fox@fcva.us)
The proffer statement meets the requirements of the Frederick County Zoning Ordinance and the Code of Virginia and is legally sufficient
as proposed for recordation. I have not reviewed the substance of the proffers as to whether the proffers are suitable and appropriate for this
specific development, as my understanding is that review is being undertaken by staff and the Planning Commission.
✔
✔