HomeMy WebLinkAbout07-25 Comments revised 01.12.26
DEPARTMENT OF TRANSPORTATION
Staunton/Edinburg Land Development
14031 Old Valley Pike
Edinburg, VA 22824
January 12, 2026
Mr. Klein,
This office has completed our review of the Madison 277 rezoning application submitted by
Valley Engineering on behalf of Madison II, LLC including the most recent revisions to the
proffer statement dated December 15, 2025. This application proposes to rezone the
property identified as Tax Map # 87-A-15 from the RA district to the R4 district. We offer the
following items for the County’s consideration of this rezoning:
VDOT has reviewed the Traffic Impact Analysis (TIA) submitted by the applicant and we
are in general concurrence with the conclusions put forward by this analysis. The
transportation mitigations identified in the TIA include EB/WB left turn lanes at the
intersection of Fairfax Pike (Route 277) and Hudson Hollow Road/White Oak Road
(Route 636) as well as improvements to the intersection of Fairfax Pike (Route 277) and
Route 340/522 including adding an additional NB left turn lane (dual left). The developer
has proffered to construct the required improvements at the intersection of Route 277 and
Route 636 and no mitigations are proffered for the intersection of Route 277 and 522/340.
The current proffers identify all internal roadways serving single family or duplex lots to be
dedicated to VDOT. Please note that any streets seeking acceptance into VDOT’s secondary
system will be required to meet all applicable secondary street acceptance requirements
(SSAR). County approval of this rezoning and the associated Generalized Development Plan
(GDP) does not exempt the developer from meeting all provisions of the SSAR including
connectivity requirements (VAC 30-92-60).
We appreciate the opportunity to review and comment on this rezoning request. If you have
any questions or concerns, please feel free to contact us.
Thank you,
Joseph W. Johnson, PE
Area Land Use Engineer / Edinburg Residency
Virginia Department of Transportation
14031 Old Valley Pike / Edinburg, VA 22824
josephw.johnson@vdot.virginia.gov
Planning Office Wayne Lee, Coordinator of Planning and Development
leew@fcpsk12.net
1415 Amherst Street https://www.frederickcountyschoolsva.net/ 540-662-3889 ext. 88249
P.O. Box 3508
Winchester, Virginia 22604-2546
October 7, 2024
Mr. David Madison
Madison II, LLC
558 Bennys Beach Rd.
Front Royal, VA 22630
Re: Madison II, LLC Property rezoning application
Dear Mr. Madison:
Frederick County Public Schools has reviewed the Madison II, LLC Property rezoning application. We
offer the following comments:
1. We note that this proposed development would hold as many as 900 residential units, which
would increase the demand on the schools that would serve it. Those schools include Sherando
High School, Aylor Middle School, and Armel Elementary School. Sherando is currently over
capacity. Aylor is projected to go over capacity next year. Armel is currently 2 students under
capacity but is projected to remain under capacity for several years. These projections do not
include the impact of Madison II.
2. We note the proposed proffer for market rate multifamily residential units and the explanation for
that proffer in the impact analysis statement. FCPS contributes to the development of the
Frederick County Capital Impact Model (CapIM) and in turn supports the outputs of the model as
it relates to the appropriateness of cash proffer amounts to mitigate impacts on our capital
facilities.
3. The influx of new families to our area has brought many challenges. Many Frederick County
schools are currently operating over or near program capacity, and this trend is expected to
continue as more families move in. We plan on expanding nearby Middletown Elementary
School in the near future. It is over capacity and growing. Bass-Hoover Elementary School is
over capacity as well. As the county grows east and south, we expect to see much growth in the
vicinity of the Madison II property.
Please feel free to contact me at leew@fcpsk12.net or 540-662-3888 x88249 if you have any questions.
Sincerely,
K. Wayne Lee, Jr., ALEP
Coordinator of Planning and Development
cc: Dr. George Hummer, Superintendent of Schools
Mr. Shane Goodwin, Assistant Superintendent for Administration
Mr. Logan Sheppard, Director of Transportation
Mr. Calvin Davis, Assistant Director of Transportation
Mr. Wyatt Pearson, Director, Frederick County Planning
Mr. Tyler Klein, Senior Planner, Frederick County Planning
fmo@fcva.us
Fax: 540-678-4739Phone: 540-665-6350
Winchester, VA 22602
1080 Coverstone Drive
Frederick County Fire and Rescue Department
Office of the Fire Marshal
Madison III, LLC
White Post, Virginia 22663
Phone: 540-723-9868
1702 Fairfax Pike
Owner
Printed Date: 11/01/2024
Plan Review
Rezoning
Status: Approved with Conditions
General Information
10/03/2023Received Date:
10/13/2023
10/13/2023
Review Begin Date:
Review End Date:
0.5000Hours:
Property Use:
Occupancy Type:
Activity Number:I1010016
Activity Details
Neighborhood VillageProject Name
Comments:
Future Development shall comply with all applicable codes of the Frederick County Fire Prevention Code.
William Pifer
Lieutenant/Assistant Fire Marshal
Page 1 of 1
26
Rezoning Comments
Frederick Water
Mail to:
Frederick Water
Attn: Engineer
P.O. Box 1877
Winchester, Virginia 22604
(540) 868-1061
Hand deliver to:
Frederick Water
Attn: Engineer
315 Tasker Road
Stephens City, Virginia
Applicant's Name: _____________________________ Telephone: __________________
Mailing Address: _________________________________________
_________________________________________
_________________________________________
Location of property: _________________________________________
_________________________________________
_________________________________________
Current zoning: ___________ Zoning requested: ____________ Acreage: _______
Frederick Water Comments:
__________________________________________________________________________________
PLEASE SEE LETTER TO DAVE MADISON DATED OCTOBER 4, 2024.
_________________________________________________________________________________
Frederick Water Signature & Date: ___10/4/2024__________________________________________
Notice to Frederick Water - Please Return This Form to the Applicant
Applicant: Please fill out the information as accurately as possible in order to assist the agency with their
review. Attach a copy of your application form, location map, proffer statement, impact analysis,
and any other pertinent information.
315 Tasker Road PH (540) 868-1061 Eric R. Lawrence
Stephens City, Virginia 22655 Fax (540) 868-1429 Executive Director
www.FrederickWater.com
Water At Your Service
October 4, 2024
Dave Madison
Madison II LLC
558 Benny’s Beach Road
Front Royal, Virginia 22630
RE: Rezoning Application Comment
Madison 277 Rezoning
Tax Map Numbers: 87-A-15
149.02-acres
Dear Mr. Madison:
Thank you for the opportunity to offer review comments on the Madison 277 rezoning
application package, dated September 5, 2024. Frederick Water offers comments limited to the
anticipated impact/effect upon Frederick Water’s public water and sanitary sewer system and
the demands thereon.
The project parcel is located within the sewer and water service area (SWSA), and therefore by
county policy, Frederick Water’s water and sewer services are available to access. A 12-inch
water main parallels the south side of Route 277, along the subject property’s frontage. A
sanitary sewer force main crossing on an adjacent property is under construction by Frederick
Water.
The application’s Impact Statement is silent on proposed water and sewer demands. The
applicant will need to ensure that adequate water and sanitary sewer conveyance and
treatment system capacity is available to achieve the projected build-out of the project. It is the
applicant’s responsibility to design, acquire easements, and construct the extensions of water
and sewer services necessary to satisfy their proposed demands. The Impact Statement does
acknowledge the applicant’s responsibility to extend services and construct a pump station to
ultimately convey sanitary flows to Frederick Water’s sanitary sewer system.
Page 2
Madison 277 rezoning application
Dave Madison
October 4, 2024
Water and sanitary sewers are to be constructed in accordance with Frederick Water standards
and specifications. Easements will be required to accommodate infrastructure that is dedicated
to Frederick Water. Please be aware that Frederick Water is offering these review comments
without the benefit or knowledge of the proposed water and sewer demands for the site.
Water supplies and sanitary sewer conveyance capacities change daily; with each new
customer connection brings additional demands and generated flows. This letter does not
guarantee system capacities to accommodate the development proposal.
Thank you for the opportunity to offer review comments.
Sincerely,
Eric R. Lawrence
Executive Director
1
COUNTY OF FREDERICK
Steven D. Briglia
Acting County Attorney
540/722-8383
Fax 540/667-0370
E-mail sbriglia@brigliahundley.com
September 25, 2025
VIA E-MAIL
Re: Rezoning Application – Madison Farms 277/Madison Farms II, LLC (Applicant)
Tax Parcel Number: 87-A-15 (the “Property”)
Dear Applicant:
You have submitted to Frederick County for review a proposed proffer statement (the
“Proffer Statement”) for the proposed rezoning of the Property, 149.02± acres in the Opequon
Magisterial District, from the RA (Rural Areas) Zoning District, without proffers to the R4
(Residential Planned Community) Zoning District, with proposed proffers as of August 14, 2025.
I have now reviewed the Proffer Statement, and it is my opinion that the Proffer Statement
would be in a form to meet the minimum requirements of the Frederick County Zoning
Ordinance and the Code of Virginia, and would be legally sufficient as a proffer statement,
subject to the following comments:
• Preliminary Matters:
Typographical error in the first paragraph misspelling “Code”.
The first sentence of the second paragraph is unnecessarily complex. Master
Development Plan is a different defined term than a Generalized Development Plan
and in turn the second paragraph should be revised to only refer to a Generalized
Development Plan. Furthermore, you are seeking to waive the Master Development
Plan requirement in Design Modification #1.
The GDP provided does not contain information typically provided on a Master
Development Plan and is significantly less specific regarding most matters. This
section as written also conflict with section A. 1.
• C. Land Use and Land Use Matrix:
The “Allowed Land Uses” and “Excluded Land Uses” column are structure in a
way that could create confusion if being interpreted at a later date. For example, I
September 25, 2025
Page 2
believe it is the applicant’s intent to exclude B1/B3/TM/M1 uses from Land bay 2, but
they are not listed as excluded in the same way they are in Land Bay 1. All excluded
uses must be clearly identified as to which Land Bay they apply.
The cell designating that 14.9 acres of Land Bay 1 is commercial has a close
parenthesis after “Commercial” which should be deleted.
#2 second sentence should be expanded, “…overall project, and is compliant with
all other applicable proffers.” Or another statement affirming that the uses are bound
by the chart above, same as the sentence following does.
• F. Recreational Facilities:
#2 Amend the final sentence to clarify that the proposed community buildings and
pools count towards the required recreational amenities, but do not replace the County
Code requirement (for a case where more amenities are required by code than those
proffered).
• G. Transportation:
#1 Amend the final sentence to include in accordance with Frederick County
Code. There are certain stipulations that allow for private streets, but a waiver would
be required for a blanket allowance.
#4 amend to read ”…future extension of the roadway by others”
Transportation Monetary contributions and all monetary contributions should be
subject to any escalation clause without any cap.
I have not reviewed the substance of the proffers as to whether the proffers are suitable
and appropriate for this specific development, as my understanding is that review will be done by
staff and the Planning Commission. I also understand that these proffers will not otherwise
override or limit requirements of the required Master Development Plan.
Sincerely,
Steven D. Briglia
Acting County Attorney
cc: Wyatt Pearson, Director of Planning & Development, Frederick County (via e-mail)
Tyler Klein, Senior Planner, Frederick County (via email)