Loading...
HomeMy WebLinkAbout18-06 Comments 2i Woodside Commercial Center / ".. )()T Comments to Rezoning Application Page 1 of Eric Lawrence 7 From: Funkhouser, Rhonda [ Rhonda. Funkhouser@VDOT.Virginia.gov] on behalf of Ingram, Lloyd [Lloyd.Ingram @VDOT. Virginia.gov] Sent: Thursday, February 08, 2007 8:24 AM To: greyWolfelnc @aol.com Cc: elawrenc @co.frederick.va.us, Copp, Jerry; Ingram, Lloyd Subject: Woodside Commercial Center - VDOT Comments to Rezoning Application Mr. Oates, This office has reviewed your application submittal for the Woodside Commercial Center Rezoning dated June 13, 2006 (revised January 26, 2007) and offers the following comments. The revised proffers do address VDOT's concern about the timing of the construction of the right turn lane at Woodside Road, Route 671. Our previous concerns remain a part of this review: • Under the Transportation Proffers offered, VDOT is agreeable with Proffers A, B, C, D and F. Under Item E, which calls for a prorata signalization agreement, the Residency would prefer a significant lump sum contribution to Frederick County towards the Route 672/11 intersection improvements. • As part of our report to the County, we will have to note "The Conclusion" as stated in your TIA: The intersection of Route 11, Hopewell Road and Brucetown Road will maintain unacceptable level of service during the 2010 background and buildout conditions. While the report suggests signalization and separate east bound right turn lanes would improve the level of service to "C" or better, due to current right -of -way restraints, these improvements are not possible. Therefore, it will be the County's decision whether they wish to approve this rezoning and thereby adding additional traffic to this already failing intersection. Thank you for the opportunity to comment on this proposal. Lloyd A. Ingram Transportation Engineer VDOT — Edinburg Residency Land Development 14031 Old Valley Pike Edinburg, VA 22824 (540) 984 -5611 (540) 984 -5607 (fax) 2/8!2007 FILE COPY COUNTY of FREDERICK Department of Planning and Development 540/665 -5651 FAX: 540/665-6395 TO: Finance Department MEMORANDUM FROM: Pam Deeter, Office Assistant II SUBJECT: Return Of Sign Deposit DATE: March 29, 2007 The amount of $50.00 was deposited in line item 93- 010 - 019110 -0008 for the company named below had a deposit for one sign for Rezoning #18 -06 for Woodside Commercial Center. The company has returned the sign and is therefore entitled to the return of the deposit. You may pay this through the regular bill cycle. Please send a check in the amount of $50.00 to: RSA/pd Silverwolfe LLC 1073 Redbud Rd Winchester, VA 22603 107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000 � I r o Q �. 0 LL �� . I QIIIU� ,� e p 2 e � eVIC a e s ia�e n`O� O`s pe i \,�P, o on ie gO ia6 N \�� e �y a Coo o ftbe e e \ � sV a O`S �� e < sS,o �ei Sao e �\, \% �\ie C gae ab`J ies as bN \ \` � as V�et ti A CC �a�C. Co��rJ titiS a o,�ti5 Cteae �` ,, 0. 56 o � 5no1665 aa`e5c� -4aps F' o d� te %% I C Fo. o bF` \ �toe a � a • ,.•O \y •• \\ . 6A.1 14 �` oo s E a \S • • GF 0C aye � I le naea • • •�SF•`eSh be\``( �� ,CVF' aemti oa` as j eS INCH • • • J F,tF `�be s p � �.y oe ss 4 ' T A X R E C E I P T RICK COUNTY LLIAM ORNDOFF, JR BOX 225 STER VA 22604 -0225 F kb hebes` �J SIGN DEPOSITS PLANNING a ` co ° "` So �° `Se , VOI �e i Ticket #:00005580001 a Date : 11/14/2006 Register: BCC /BC Trans. #: 62739 Dept # 1095 Acct# Previous Balance $ 100.00 Principal Being Paid $ 100.00 Penalty $ .00 Interest $ .00 Amount Paid $ 100.00 * Balance Due $ .00 Pd by PLANNING Check 27825.50 # VARIOUS BALANCE DUE INCLUDES PENALTY /INTEREST THRU THE MONTH 11/2006 J NOV 9 2006 TRANSMITTAL LETTER GREYWOLFE INC. 1073 REDBUD ROAD a WINCHESTER, VA 22603 (540) 667 -2001 0 (540) 545 -4001 FAX c — �►® GREYWOLFEINC@AOL.COM '! Frederick County Planning & Development November 9, 2006 107 North Kent Street Winchester, VA 22603 Attn: Candice E. Perkins Subject: Woodside Commercial Center Dear Sir: Attached are revised proffer statements for the rezoning and responses to your comments are below. The County's B -3 zoning district (Industrial Transition) was created to buffer between commercial and industrial uses. I disagree that commercial aspects of the B -3 zoning district should be proffered out since that would leave only M -1 (Industrial) uses. The commercial uses in B -3 such general offices should remain since they create the "transition ". Secondly, this a relatively small site not suited for large scale buildings and truck traffic that is entailed with "industrial- only" parks. The level of service C is not provided. The property value of this development is nowhere near large enough to construct the new intersection of Hopewell Road and Route 11. The proposed cash proffer offered based this development's impact will to have suffice, otherwise all commercial development on this corridor will not happen until a large enough project comes sometime in the future and that can construct the intersection. 3. Additional lanes on Route 11, other than the 12' lane proffered, may be required in the future. However, this will be based on the trips generated and the VDOT regulations in place at that time. Should a turn lane be necessary, VDOT will require it be designed and built at the site plan phase. 4. There are not any proposed uses at this time; therefore, since the traffic is below level of service C, we have computed the traffic based on 75,000 sf of retail per the rezoning application. 5. The consultant is revising the Traffic Impact Analysis to include the projects you listed. 6. The Traffic Impact analysis now shows an aligned intersection at Hopewell & Brucetown Road. This is a much better design that will solve the transportation issues instead of just improving enough to maintain a level of service C. 7. The amount of money needed to build the aligned intersection is more than the market value of this project once it is rezoned. Therefore, we are unable to build it. However, the proffer of $100 per trip insures that we are contributing our fair share to this goal. S. I have removed the bonding portion from proffer #lb -c per your comment. 9. I maintain that the uses allowed in B -3 need to stay in place. The proximity of residences and Route 11 makes it more desirable to see general offices than a manufacturing plant. I think a B -1 or B -2 zoning would fit in better in this area. However, the Comprehensive Plan does indicate commercial west of Route 11 and industrial east. 10. As stated in the comment, "the zoning ordinance requires landscaping ". I do not see the need to proffer something that is already required. However I have proffered the required landscaped buffer as require in the ordinance. 11. Proffer #8 has been revised to include restrictions of not only parking but outdoor storage and driving lanes other than the entrance. I also added that any required fire lanes in the front yard will have to be grass covered. 12. The single monument sign has been limited to a maximum height of 12' and a maximum area of 100 sf. 13. Agency comments are attached. 14.The submission fee is attached. Thank you, Gary R. Oates, LS -B, PE GreyWolfe, Inc 0 COUNTY of FREDERICK Department of Planning and Development 107 North Kent Street, Suite 202 o Winchester, Virginia 22601 -5000 Telephone: 540/665 -5651 FAX: 540 /665 -6395 TO: OcA-qS COMPANY: G w �� wb � FAX #: 5 0 5 ( 4 5 �-) y 0 1 Date: tO) I Number of Pages (including cover sheet) Remarks: From the desk of: Fo-M P. 1 1 edlate T Result Report ( 0ct.19 9:53AM ) * z 9 Fax Header) Fl le Date Time Destination Plo6 TM me Page Result User R"ame Mo. Oct.19, 9:51AM 1 540 545 4001 G3TES 1 "25" P. 4 OK 4807 # . Batch M Memory L Send later @ . For w a rd1ng E ECM S Standard D Detail F . . o R , 6 t n LAN — Fax + Delivery O . RXNotice Reo. A R Notice 0 0 TRANSMITTAL LETTER ;,\, GREYWOLFE,, INC. J�, 1073 REDBUD ROAD • WINCHESTER, VA 22603 Ao (540) 667 -2001 • (540) 545 -4001 FAX GREYWOLFEINC@AOL.COM , Frederick County Planning & Development September 21, 2006 107 North Kent Street Winchester, VA 22603 Attn: Candice E. Perkins Subject: Woodside Commercial Center Dear Sir: Attached are revised proffer statements for the rezoning and responses to your comments are below. 1. The northeast land use plan designates the western side of Route 11 for commercial uses and the eastern side for industrial uses. The County's B -3 zoning district (Industrial Transition) was created to "buffer between these uses. I am using the B -3 district because: a. This site can not make use of the railroad behind it that was the driving force for industrial uses on the eastern side of Route 11 and along the railroad. b. There are two residences within close proximity; therefore, an M -1 zoning would be undesirable for them. c. The property lies between Route 11 and the most intense industrial uses in our County, the Quarry and a concrete plant. Therefore a "transitional area" seems to make sense. d. The size of this parcel would not lend itself well to an industrial park with a lot of truck traffic. 2. The entrance along Route 11 in needed in order to subdivide this lot in the future. Also, since we are providing the inter - parcel connector, the adjoining property will be able to utilize our entrance and not build on for their five / acres. The screening and buffer along Route 11 is accomplished by restricting parking lots between Route 11, installing a split rail fence, and reducing signage to one monument style sign. Furthermore, this will continue the appearance along Route 11 that started with the approved rezoning across Route 11. 3. The Traffic Impact Analysis indicated the level of service for this area will drop below level C whether this plan is approved or not. 0 0 4. All plans will be sent to VDOT for review. Items 5 thru 8 relate to the Traffic study, in our meeting on September 12, you indicated that Mike Glickman, with Patton, Harris, & Rust, had revised the study and you were acceptable with it. Please let me know if that is not the case. 9. The site will have two lots fronting Route 11, two fronting Route 671, and one lot at the corner. I have revised the proffer to state the improvement constructed or bonded when the first building applies for an "occupancy permit'. 10. The proffers eliminating or reducing particular uses has been revised. We are still excluding gasoline stations /truck stops. I have increased the use of "Amusement and recreational services operated indoors" to 10,000 sf because of a potential interest of a gym (national chain). The restriction to 10,000 sf is to keep a "Sportsplex" out. The other uses will be left in place. I am doing this for two reasons: 1. The revised proffer for cash contributions for offsite road improvements is linked to traffic counts. The purpose of reducing the floor areas of certain uses was to lessen the impact from high traffic counts. Now higher traffic counts will be accounted for with cash. 2. The purpose of using B -3 was to allow many of these uses as a "transition" to the industrial uses further east. If we were to exclude all uses except the industrial component, then we are back to M -1 zoning. The positive point of B -3 is we could have a restaurant, offices, or flex -tech along Route 11 and warehousing further away. 11.I do not agree building mounted signs should be eliminated along Route 11. I would agree that we should reduce their size. I have included a restriction of no more than eight square feet per business. That way a building with more than one tenant could place their name or logo on an awning or door. 12. The proffer for money to Clear Brook Fire and Rescue has been eliminated and the money to Frederick County Fire & Rescue increased from $0.05 to $0.10 per square foot. 13. Agency comments. I am still awaiting comments from Public Works, Clear Brook Fire and Rescue, and Bob Mitchell. 14. Fee. A check for $3,883.50 will be paid at submission. Thank you, Gary R. Oates, LS -B, PE Grey Wolfe, Inc NCO COUNT o FREDERICK Department of Planning and Development 540/665 -5651 _. FAX: 540/665 -6395 MEMORANDUM TO: Robert T. Mitchell, Esquire FROM: Susan K. Eddy, AICP, Senior Planner 5<E RE: Rezoning Application Proffer Statement DATE: June 20, 2006 Please find attached to this memorandum the proffer statements for the Woodside Commercial Center rezoning application that has recently been submitted to the Department of Planning & Development. The rezoning application appears to be relatively close to being complete. Therefore, it is appropriate at this time for your office to provide a formal comment on the form and content of the proffer statement. Thank you for your continued assistance. cc: John R. Riley, Jr., County Administrator Attachment ent SKE /bad 107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000 MIGME Department of Planning and Development 540/665.5651 FAX: 540 /665 -6395 August 4, 2006 Mr. Gary Oates GreyWolfe, Inc. 1073 Redbud Road Winchester, VA 22603 -4757 RE: Proposed Rezoning of Woodside Commercial Center Dear Gary: I have had the opportunity to review the draft rezoning application for the Woodside Commercial Center. This application seeks to rezone 8.835 acres from RA (Rural Areas) District to the B3 (Industrial Transition) District. Staffs review comments are listed below for your consideration. 1. Northeast Land Use Plan. The site is within the limits of the Northeast Land Use Plan, and designates the site for industrial use. The plan further states that "Industrial land uses are proposed adjacent to the railroads in the southern and northern portions of the study area". The 133 Zoning District is an industrial transition district and is generally consistent with the Northeast Land Use Plan as it relates to this site on Martinsburg Pike, so long as many of the commercial uses allowed in the 133 district are prohibited from this site. 2. Northeast Land Use Plan. The Northeast Land Use Plan discourages individual lot access on the Martinsburg Pike corridor, encourages inter - parcel connections, and recommends adequate screening from adjoining laird uses and recommends greater setbacks and buffers and screening along Martinsburg Pike. The proffer statement submitted does address screening of the adjoining RA residential properties; but does not address screening or access along Martinsburg Pike. The proffers state that only one entrance will be permitted onto Martinsburg Pike; since this site has adequate road frontage on Woodside Road, which the applicant is proposing to improve, the only access onto this site should be from Woodside Road and access onto Martinsburg Pike should be prohibited. 3. Northeast Land Use Plan. The plan calls for Level of Service Category C or better for proposed industrial and commercial development. This application does not provide that Level of Service. 107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000 Page 2 Mr. Gary Oates RE: Proposed Rezoning of Woodside Commercial Center August 4, 2006 4. Northeast Land Use Plan. The plan calls for improving Martinsburg Pike (Route 11 North) to a four -lane facility. The applicant has proffered to construct a 12' lane along the road frontage for this site, as well as dedications for Route I I and Woodside Road. The applicant will need to work with VDOT to ensure this meets the ultimate requirements for Route 11 North. 5. Impact Assessment Statement — Proposed Uses. The application states the rezoning is for 133 (Industrial Transition) uses and the TIA is based on 75.000 square feet of heavy industry. Heavy Industry is not allowed in the 133 District. It is only allowed in the M2 (Industrial General) District. Furthermore, unless a specific use is proffered, the County will assume the maximum possible development (retail) as per the County's rezoning application, combined with the proffered floor space. The applicant will need to base the TIA and all analysis on what is actually proffered with the development, which includes 75,000 square feet of floor area with various uses (restaurant, etc.). Basing the TIA on heavy industry is not acceptable. 6. Traffic Impact Analysis. As stated previously, the Northeast Land Use Plan calls for Level of Service C or better. Even with the suggested improvements in the TIA, Level of Service C is not provided. Furthermore, the TIA suggested improvements include signalization and an eastbound left turn lane at the intersection of Route d l /Hopewell Road /Brucetown Road. Only a pro -rata share of the signalization is proffered. The turn lanes are not proffered. 7. Traffic Impact Analysis (Background). The background information provided in the TIA for Woodside Commercial Center does not include the recently approved Clearbrook Business Center rezoning, as well as the North Stephenson Rezoning (Omps). Also, the numbers provided for the Rutherford's Farm Rezoning (background — 500,000sf) do not appear to match what is associated with the rezoning. The original M1 rezoning was proffered at over 1.4 million square feet of floor area (9 average daily trips (ADT)) and the subsequent rezoning of a portion of this site to 132 /133 added another 2,368 ADT. Correct errors. 8. Traffic Impact Analysis (Levels of Service). Figure 9 of the submitted TIA shows that the Route l I /Hopewell Road /Brucetown Road will be able to achieve acceptable levels of service with the suggested improvements. These levels of service are better than what was projected with the Clearbrook Business Center rezoning TIA and appear incorrect. 9. Proffer Statement ( #lb -c). Proffer lb states that the additional lane along Route 11 will be built prior to occupancy of any building accessing Route 11. ♦h Page 3 Mr. Gary Oates RE: Proposed Rezoning of Woodside Commercial Center August 4, 2006 Potentially, if all buildings access Woodside Road, the additional Route 11 lane would never be required. This lane should be built prior to occupancy of anything on the site. Proffer I has a similar situation to 1b, and the paving of Route 671 should also be done prior to occupancy of anything on the site. 10. Proffer Statement ( #4 -9). The applicant has proffered to prohibit gasoline service stations and truck stops and proffers a limited floor space of uses like restaurants, warehousing, hardware stores and recreational services. Since the Comprehensive Plan calls for this site to be used for industrial uses, general business offices should be proffered out as well as some of the uses for which you limited the square footage. It. Proffer Statement ( 411). The proffer that pertains to signage states that the applicant will not install any signs along Martinsburg Pike other than one monument sign. Building mounted signs that face Martinsburg Pike should be prohibited as well. 12. Monetary Contributions. The proffers state that the Clearbrook Fire & Rescue Department will receive $0.05 per building square foot. Proffers carmot be made to individual companies; all proffers need to be directed to Frederick County Fire & Rescue. 13. Agency Comments. Please provide appropriate agency comments from the following agencies: Historic Resources Advisory Board, Virginia Department of Transportation, Frederick County Department of Public Works, Frederick County Fire Marshall, Frederick County Department of Parks and Recreation, Frederick County Sanitation Authority, Frederick - Winchester Health Department, Clearbrook Fire and Rescue Company and the Frederick - Winchester Service Authority. The proposed proffers have been forwarded by staff to the Frederick County Attorney. Once attorney comments are received by the Planning Department, they will be forwarded to your office. Attorney comments are required for acceptance of the rezoning application. 14. Fees. The fee for this application includes a $3,000.00 base fee plus $100.00 per acre, and a $50.00 public hearing sign fee. Thus, a total of $3,883.50 is due upon submission of the official rezoning application. This is based on fees as of January 27, 2005. Fees may change. Page 4 Mr. Gary Oates RE: Proposed Rezoning of Woodside Commercial Center August 4, 2006 All of the above comments and reviewing agency comments should be appropriately addressed before staff can accept this rezoning application. Please feel free to contact me with questions regarding this application. Sincerely, G cL t Candice E. Perkins Planner II Attachments CEP /bad 2010 BACKGROUND CONDITIONS Based upon the VDOT (Virginia Department of Transportation) historical average daily traffic data (between years 2002 and 2004) for Route 11 within the vicinity of the site, a growth rate of 3.5 % was calculated and applied to the existing traffic volumes (shown in Figure 2) to obtain the 2010 base conditions. Additionally, PHR +A included specific future developments located within the vicinity of the proposed site. Using the 7 Edition of the Institute of Transportation Engineers' (ITE) Trio Generation RepofT PHR +A has provided Table 1 to summarize the 2010 "other developments" trip generation. Figure 4 shows the 2010 background ADT and AM/PM peak hour traffic volumes at key locations throughout the study area network. Figure 5 shows the respective 2010 background lane geometry and AM/PM peak hour levels of service. All HCS+ levels of service worksheets are included in the Appendix section of this report. Table 1 2010 Background Developments Trin Generation Summary' Code Land Use _ -- Amount - �- AM Peat Hour AM out Total In PM Peat Hour Out Total ADT Sempeles Property' Industrial Park 898,425 SF 459 101 559 154 580 734 5.204 130 820 Retail 73,500 SF 79 51 130 245 266 511 5,559 Total ( 538 151 689 399 845 1,245 10,763 i Rutherford's Farm Industrial Park 90 337 427 3,228 130 Industrial Park 500, sF 292 64 356 Total 292 64 356 90 337 427 3,228 Stephenson Village 40 120 160 137 77 214 2,14 210 Single -Family Detached 215 units 63 56 28 84 220 Apartment 120 units 10 53 72 87 71 35 107 1,697 230 Townhouse/Condo 195 mots 15 4 52 86 2 53 251 Elderly Housing - Detach 133 units 17 30 31 1 lu Elderly Housing - Attach 36 units 2 1 Total 83 276 359 321 172 493 5,351 E Assumed 50% build-out for Year 2010 r� `t0�iy A Traffic Impact Analysis of the Woodside Commercial Center P I ---J l Project Number: a 12, 2 1-0 1 l June 12, 2006 Page 5 1 1 Figure 9 2010 Build -out Lane Geometry and Levels of Service A T impact Analysis of the Woodsid Com mercial Center Prgect Number. a 1 2 , 20 6 H + J 12, e 12 Page 12 T s D Unsignalized Critical Moveme r A D enotes two -way left turn lane t._ f 4 lGK C H91�? CAR T TURICK Department of Planning and Development 540/665 -5651 FAX: 540/665 -6395 October 24, 2006 Mr. Gary Oates GreyWolfe, Inc. 1073 Redbud Road Winchester, VA 22603 -4757 RE: Proposed Rezoning of Woodside Commercial Center Dear Gary: Attached you will find a copy of the review comments from the County Attorney's office concerning the proposed proffer statement for the rezoning of Woodside Commercial Center. Please do not hesitate to contact roe should you have any questions or concerns. Sincerely. Candice E. Perkins Planner II CEP /bad Attachment 107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000 COUNTY of FREDERICK Department of Planning and Development 107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000 Telephone: 5401665 -5651 FAX: 5401665 -6395 � _L J y iLw Date: l 02 0 Number of Pages (including cover sheet) Remarks: From the desk of: P. �medlate TX Result R ( 0c t.2A2006 8: 32 AM t Fa. Header) File Date Time Destination Mode TXtlme Page Result User Name No. ---------------------------------------------------------------------------------------------------- Oct.24. 8:31AM 1 540 545 4001 G3TES) 106" P. 5 OK 4837 # . Batch M Memory L . Send later @ Forwardlne E ECM S Standard D Detail F Fine . Reduction LAN —Fa. + Delivery 0 RX Notice Req. A RX Notice