RE: Revised Site Plan Comments – Coca Cola Business Park, Lot 1 Addition
170 Shady Elm Road
Frederick County, Virginia
Dear Mr. Dunlap:
Upon review of the revised site plan dated May 19, 2025, we recommend approval of the
subject plan. Please be advised that receipt of nutrient credit purchase (6.18 lb/yr) will be
required with the land disturbance application. (11.59 acres disturbed)
**Effective July 1, 2025, all plans submitted for review will need to comply with the DEQ
VRRM 4.1 and the new stormwater handbook. I have included the link below to access the new
stormwater handbook. The plans and all details must be updated to comply with the new
stormwater handbook requirements.**
https://online.encodeplus.com/regs/deq-va/index.aspx
Sincerely,
Joe C. Wilder
Director of Public Works
JCW/kco
cc: Planning and Development
file
From:Spielman, Ryan (VDOT)
To:Dennie Dunlap
Cc:Amy Feltner
Subject:170 Shady Elm Road Bldg. Addition Site Plan
Date:Wednesday, October 15, 2025 7:10:05 AM
Attachments:Outlook-gs2cax0h.png
Dennie,
A VDOT review has been conducted for the170 Shady Elm Rd. Bldg Addition, site plan,
dated September 30, 2025. Based off the review of the drawings, all previous comments
have been addressed, and the plan appears satisfactory; the applicant can proceed to
the VDOT permitting process.
· Our review and comments are general in nature. Should details be
overlooked during plan review or conditions in the field exist such that additional
measures are warranted, such measures shall be completed to the satisfaction
of the department.
· Materials used and methods of construction shall adhere to the current
observed VDOT Road and Bridge Specifications, Road and Bridge Standards,
Manual on Uniform Traffic Control Devices, and Land Use Permit Special
Provisions.
· A preconstruction conference shall be held by the engineer and/or the
developer with the attendance of the contractor, various County agencies, utility
companies, and VDOT prior to initiation of work.
· All drainage is to be carried within the right-of-way in ditch lines or gutters
along the street to a pipe or drainage easement.
· Any construction related changes to the approved plan must come through
the design engineer to VDOT for approval. Please allow a minimum of 5 business
days for VDOT review.
· A Land Use Permit shall be obtained before any work is performed on the
State’s right-of-way. The permit is issued by this office and may require
application fees, the salary & expenses of a State assigned inspector, and surety
bond coverage.
· Please submit an electronic copy of the plans to this office for file and
permitting. (received)
If you have any questions or need further information, please do not hesitate to contact
me.