Loading...
HomeMy WebLinkAbout12-25 Comment LetterCOUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 107 North Kent Street, Suite 202 • Winchester, Virginia 22601 March 4, 2025 Dennie Dunlap (ddunlap@dice-eng.com) Dice Engineering, PLC 101 Shelby Court Winchester, VA 22602 Re: Review Comments for Site Plan #12-25 – 170 Shady Elm Road (Interstate 81 Winchester Property Owner LLC) Building Addition Property Identification Number (PIN): 63-A-58 Dear Mr. Dunlap: Planning Staff has reviewed the above-referenced site plan to determine if administrative approval can be granted. At this time, administrative approval cannot be granted. This site plan cannot be approved until the issues in this letter, as well as all issues of the other review agencies, have been adequately addressed. Please review Staff’s comments listed below and then prepare a revised site plan which adequately addresses each concern. Review Comments: 1) Cover Sheet: The following revisions should be made to the sheet 1: • Reference Number: Add new site plan reference #12-25. Add reference to previously approved SP #55-99. 2) Site Plan: The following revisions should be made to the sheet C-06: • Curbs & Gutters: No curbs or gutters are shown around the parking lot spaces facing 260 Shady Elm Road. Wheel stops are shown in lieu of curbs and gutters. §165-202.01(D)(3) states that “Concrete curbing and gutters shall be installed around the perimeter of all parking lots…All curbing shall be a minimum of six inches in height.” Is this for low-impact development design in accordance with §165-202.01(D)(3)(c)? If Public Works approves this design, planning will approve as well. 3) Agency Approvals: Comment sheets (approvals) are required from the following agencies: Frederick County (FC) Building Inspections Department, FC Public Works, Frederick Water, the FC Fire Marshal, and the Virginia Department of Transportation. Additional comments may be provided on subsequent submissions. Re: SP #12-25 – 170 Shady Elm Road (Interstate 81 Winchester Property Owner LLC) Building Addition Page 2 of 2 After you have revised the site plan, please resubmit one (1) hard copy so that staff may verify the information contained on the plan addresses the above comments. Staff will also need all the approved review agency comments. Once the revised hard copy of the site plan has been reviewed, staff will notify you to submit five (5) copies of the final plan set and a digital (PDF) copy for final approval. Do not hesitate to contact me should you have any questions or concerns regarding this letter. Thank you for your consideration. Sincerely, Kayla Peloquin Planner II cc: Interstate 81 Winchester Property Owner LLC C/O Equus Capital Partner (3843 West Chester Pike, Newtown Square, PA 19073)