Loading...
HomeMy WebLinkAbout21-20 Signed First Pages'k P(6.& i*1.'X6 Y Tnve S4,M e nt LIX-I LEGEND EXISTING FEATURES EXISTING EDGE OF PAVEMENT __ _ __w EX EP�� EXISTING EDGE OF GRAVEL _,_ , _, ,,, EX EG EXISTING CURB AND GUTTER EX CG-6 _. EX. INTERMEDIATE CONTOUR ---- --............ EXISTING INDEX CONTOUR� EXISTING SPOT ELEVATION X 0.0' EXISTING TELEPHONE LINE _T ............... .__ _....:.__ _._ ;,....... ....., w EXISTING SANITARY SEWER EXISTING ELECTRIC SERVICE EXISTING GAS LINE EX. 15 " RCP EXISTING STORM SEWER EXISTING FENCE LINE X _ _ X � � X EXISTING DITCH LINE - EXISTING WATERLINE W/ TEE EXISTING FIRE HYDRANT EX. FH EXISTING WATER VALVE EXISTING REDUCER f EXISTING TREE DRIP LINE PROPOSED FEATURES PROPOSED EDGE OF PAVEMENT PROPOSED EDGE OF GRAVEL PROP EP PROP EG PROP. CURB & GUTTER PROP CG-6 PROP. REVERSE CURB & GUTTER PROP CG-6R PROPOSED CONTOUR 50 PROPOSED SPOT ELEVATION +50" PROPOSED STORM SEWER PROP. 24"ADS o PROPOSED SANITARY SEWER - PROPOSED TELEPHONE _T -7 -- T -T - T -T T PROPOSED ELECTRIC - E - E - E - E - E - E - E PROPOSED GAS LINE - GAS- GAS- GAS- GAS- GAS- GAS- GAS - PROPOSED WATER LINE . -r -• -W -• ®" -" PROPOSED WATER METER � 1 "WM PROPOSED FIRE HYDRANT PROP. FH COMMON LABELS & FEATURES PROPERTY LINE OF PROJECT NEIGHBORING PROPERTY LINES EASEMENT LINE-------®�---- PROPERTY CORNER FOUND O PARKING SPACE TOTALS 92 ADA HANDICAP PARKING STALL SIGNS O SANITARY MANHOLE IDENTIFIER STORM DRAIN STRUCTURE IDENTIFIER LIGHT POLES LOCATION OF TEST PITS EROSION & SEDIMENT CONTROL FEATURES LIMITS OF CLEARING & GRADING - - - - - - - - - LCG INLET PROTECTION 00 OUTLET PROTECTION 00 CHECKDAM ' @ DIVERSION DIKE-�--►-- DD SILT FENCE W/ WIRE SUPPORT x x x SF RIP RAP RR SEDIMENT TRAP CONSTRUCTION ENTRANCE Rev. Jan. 2019 1. Frederick Water's Water and Sewer Standards and Specifications are available at www, frederickwater. com 2. The contractor shall adhere to Frederick Water standards and specifications in effect at the time of construction. 3. The contractor shall coordinate with and arrange for inspection by Frederick Water. 4, The contractor shall connect a new sewer line to an existing manhole by core drilling the manhole. 5. A new water (or forced sewer) main shall be connected to an existing main by a wet tap. Frederick Water shall furnish all needed material and make the tap, a. An Application for Wet Tap shall be submitted and the initial fee paid before the tap is made, 6. Exact locations of water and sewer services on new lines are to be coordinated with Frederick Water's inspector, 7. Frederick Water's maintenance division shall furnish and install all water meters through 2 inch in size. It is the contractor's responsibility to have the meter box assembly installed correctly. Before a permanent meter is installed., a, The meter box, with its frame and cover, must be properly aligned with the coppersetter. b. The frame and cover shall be set to final grade. c. The distance between the top of the cover and the yoke bar shall be between 20 and 23 inches. d, All components of the meter box assembly shall be in proper working order, 8, For services that connect to existing lines: a, Frederick Water shall furnish and install: i, all %'xY ", -/ ", 1" 1 Y2"and 2" water services k all sewer services. b. The owner/developershall., i. coordinate (or have the contractor coordinate) the location of the service lateral with Frederick Water's engineering assistant /i. submit an Application for Service and pay the required fees, 9, All water service lines must have a backflow prevention assembly (double check valve or RPZ, as required). The assembly must meet ASSE standard number 1015 or 1013. 10, All fire lines must have a backflow prevention assembly (detector double check valve or RPZ, as required). The assembly shall meet ASSE standard number 1048 or 1047. Any exterior, privately owned fire line, interior or exterior, shall also have a fire service HP Protectus III meter. This assembly shall be installed immediately before the backflow prevention unit Radio read remotes are required, 11, Frederick Water shall review the mechanical plan(s) for design and material approval of a building's: a, domestic water meter and its backflow prevention device, and/or its b. Fire service line's backflow prevention device, 12, DEQ must also approve sewer pump stations. Frederick Water requires a copy of DEQ's Certificate to Operate and a copy of the station's DEQ approved 0&M manual. These documents must be received before substantial completion is issued and water meters released. WATER & SEWER DEMAND AVERAGE DAILY USE (GALLONS) MAXIMUM DAILY USE (GALLONS) MAXIMUM PEAK FLOWRATE (GPM) 300 600 15 THESE NUMBERS ARE ESTIMATES FOR 15 EMPLOYEES 1. Permits must be issued from VDOT prior to any construction in a public right-of-way. 2. The Manual on Uniform Traffic Control Devices (MUTCD) must be adhered to when working in a public right of way. 3. The contractor will remove ill mud and debris from the public right of way that is left by vehicles entering and leaving the site, 4, Any damage to neighboring properties including county roads and sidewalks, caused by the development of this site will be the responsibility of the developer. All damage must be repaired to original conditions. 5. A construction entrance must be installed in accordance with the "Virginia Erosion and Sediment Control Handbook" Section 3.02, The contractor must maintain this access for the duration of the project. 6. The contractor will be responsible for adequate and positive drainage of this site. 7. The contractor will obtain a Land Disturbance Permit prior to any site work or construction. & All construction will be done following the laws and guidelines set forth by OSHA and VOSH. 9. The contractor will notify engineer of record of any discrepancies between the approved plans and existing site conditions, 10. The developer is responsible for the relocation of any utilities required by this site plan. 11, All Erosion and Sediment Control devices shown on this site plan shall be installed prior to construction. 12. All controlled fill must be compacted to a minimum of 95% density following Method A' of the Standard Proctor ASTM-D698, AASHTO-T99, or VTM-1 as applicable. Any fill placed under buildings, structures, or pavement must be inspected and approved by a professional soils engineer. A geotechnical report supersedes this note if provided. 13, The contractor is responsible for contacting MISS UTILITY prior to any site work, All utilities shown on this plan are approximate locations and not all utilities may be shown, 14, The contractor will contain all litter and debris on -site. The work must be left in an orderly manner at the end of each workday, 15, An approved set of site plans must be on -site during the construction process. 16. The contractor will notify all utility companies prior to excavation within easements, 17. The contractor will seed and straw, for soil stabilization, any disturbed areas that will be left for more than thirty days. DEPARTMENT OF INSPECTION GENERAL NOTES 1. Buildings shall comply with the Virginia Uniform Statewide Building Code & Sections 311, S (storage) of the International Building Code/2015 & the 2015 Fire Code, Other codes that apply are ICC/ANSI A117.1-3-09 Accessible and the Usable Buildings & Facilities & the 2015 Virginia Energy Code. 2. Proposed 159, 000 sq ft single story warehouse/business shall comply with Chapter 5 for height and area (T503). Limitations for type of construction in Table 503 of the 2015 IBC and Fire Protection shall be installed as required in Chapter 9 IBC, Fire Pump shall meet NFPA 20. 3. Proposed unlimited area facilities shall meet Section 507 UnGm%tedAree Bui/dings and maintain an open perimeter of 60 4. Building shall comply with ANSI Handicap A117,1-3-09 for parking, entrance, and egress. All required egress shall be accessible. 5. Landings at doors shall not exceed 1:48 slope and thresholds shall not exceed 0. 5" and walkways shall not exceed 1:20 slope; HC Signage shall comply with USBC 1106,8, 6, Special Inspection requirements of Chapter 17 of IBC shall apply to this structure and must be sealed by a Virginia Registered Design Professional, (Bolls, concrete, steel, etc.); specifically, fill for slab exceeding code shall require an engineered foundation. 7. A design professional licensed of the Commonwealth of Virginia shall seal the structural plans submitted for building permits, 8. Maximum slope across handicap parking stalls shall not exceed 21yo, handicap signage shall comply with USBC 1106.8, 9. All required egress doors shall be accessible to a minimum exterior area for assisted rescue, section 1016 USBC/IBC, Note fire ratings around this door if this section is utilized. Required exits shall not exceed maximum travel distance listed in Table 1016.1, 10. Storage racks exceeding 12' in height requires a permit and shall comply with the International Fire Code, High pile storage areas require fire department access around the perimeter of the building. Access doors shall not be placed further apart than 100 11, No gutter downspouts shall discharge over walkways, 12, A geotechnical evaluation shall be performed and submitted with application as required by USBC/IBC Section 1803, 13. Public Entrances into spaces larger than 3000 sf shall be provided with a vestibule as detailed per ANSIA117,1-09. FIRE MARSHALL GENERAL NOTES 1, An inspection by the Fire ,Marshall's office will determine where curbing must be painted yellow. 2. "No Parking - Fire Lane" signs will be placed on the site by the Fire Marshall's direction, 3. The contractor must align the fire hydrants to the direction as determined by the Fire Marshall. 4. Burning brush piles of natural vegetation requires a permit, Burning construction debris is prohibited. 5. Emergency vehicle access must be provided at all times, Fire hydrants will be always be left unobstructed. MIA sr ICERTIFICATION # EXP. DATE: ' ) IIII 71F. • 1. The Responsible Land Disturber is that party responsible for carrying out the land disturbing activity as set forth in the plans, 2. Note: An on -site pre -construction meeting is required with tho Owner, Site Contractor, Public Works, &Designer prior to commencing any site work, 3. The contractor will possess a Land Disturbance Permit prior to any site work or construction. VDOT GENERAL NOTES Rev. June 2013 Vl. All work on this project shall conform to the current editions and latest revisions to the Virginia Department of Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment Control Regulations, and any other applicable state, federal, or local regulations applicable. in case of a discrepancy or conflict between the Standards or Specifications and Regulations, the most stringent shall govern, V2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety & Health Administration (OSHA), and Virginia Occupational Safety & Health (VOSH) Rules & Regulations. V3, When working on VDOT right-of-way, all traffic control, whether permanent or temporary, shall be in accordance with the current edition of VOOT's Work Area Protection Manual, A transportation management plan needs to be submitted for approval and land use permit issued prior to any execution of work within the VDOT right of way, V4. The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic signal poles, junction boxes, controllers, etc., owned by VDOT or private / public utility companies. It is the sole responsibility of the developer to locate and identify utility facilities or items that may be in conflict with the proposed construction activity. VOOT approval of these plans does not indemnify the developer from this responsibility, V5. Design features relating to field construction, regulations, and control or safety of traffic may be subject to change as deemed necessary by VOOT. Any additional expense incurred as a result of any field revision shall be the responsibility of the developer. V6. If required by the local VDOT Land Development Office, a pre -construction conference shall be arranged and held by the engineer and/or developer with the attendance of the contractor(s), various County agencies, utility companies and VDOT prior to initiation of work. V7. The contractor shall notify the local VDOT Land Development Office when work is to begin or cease for any undetermined length of time. VOOT requires 48 hours advance notice prior to any required or requested inspection. V8. The contractor shall notify the Traffic Operations Center at (540) 332-9500 for any traffic control plan that impacts a VDOT maintained Interstate or Primary roadway to provide notification of the installation and removal of the work zone. V9. The contractor shall be responsible for maintaining a VDOT permitted temporary construction entrance(s) in accordance with Section 3.02 of the Virginia Erosion and Sediment Control Handbook, Furthermore, access to other properties affected by this project shall be maintained through construction, V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the end of construction, VI1. All water and sewer lines within existing or proposed VDOT right-of-way shall have a minimum thirty-six (36) inches cover and when possible shall be installed under roadway drainage facilities at conflict points. V12. Any unusual subsurface conditions (e.g,, unsuitable soils, springs, sinkholes, voids, caves, etc.) encountered during the course of construction shall be immediately brought to the attention of the engineer and VDOT, Work shall cease in that vicinity until an adequate design can be determined by the engineer and approved by MOOT. V13, All fill areas, borrow material and undercut areas shall be inspected and approved by a VD, 0T representative prior to placement and fill Where CBR testing is required, a VDOT representative shall be present to insure the sample obtained is representative of the location, When soil samples are submitted to private laboratories for testing, the samples shall be clearly identified and labeled as belonging to a project to be accepted by VDOT and that testing shall be performed in accordance with a// applicable VDOT standards and procedures. V14. All roadway fill, base, subgrade material, and backfill in utility/storm sewer trenches shall be compacted in six (6) inch lifts to 95% of theoretical maximum density as determined by AASHTO T-99 Method A, within plus or minus 2% of optimum moisture for the full width of any dedicated street right-of-way. At the direction of VDOT, density tests shall be performed by a qualified independent agency in accordance with VDOT Road and Bridge Specifications. Certified copies of all test reports shall be submitted to VDOT daily, unless specified otherwise, VI5. VOOT Standard CD and UD underdrains shall be installed where indicated on these plans and/or as specified by VOOT, V16. A post installation visual/video camera inspection shall be conducted by the Contractor on all pipes identified on the plans as storm sewer pipe and a select number of pipe culverts, For pipe culverts, a minimum of one pipe installation for each size of each material type will be inspected or ten percent of the total amount for each size and material type summarized. All pipe installations on the plans not identified as storm sewer pipe shall be considered as culvert pipe for inspection purposes. Additional testing may be required as directed by the Area Land Use Engineer or their representative. V17. The installation of any entrances and mailboxes within any dedicated street right-of-way shall meet VDOT minimum design standards and is the responsibility of the developer V18. Prior to VDOT acceptance of any streets, all required street signage and/or pavement markings shall be installed by the developer or, at VDOT's discretion, by VDOT on an account receivable basis following the Manual On Uniform Traffic Control Devices, V19. The developer must provide to the VDOT Land Development Office a list of all material sources prior to the start of construction. Copies of all invokes for materials utilized within any dedicated street right-of-way must be provided to the local VDOT Residency Office prior to acceptance of that work. Unit and total prices may be obscured, V20. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader. Density will be determined using the density control strip in accordance with Section 304 of the VOOT Road and Bridge Specifications and VTM-10. A certified compaction technician shall perform these tests. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. In addition to checking stone depths, a VDOT representative shall be notified and given the opportunity to be present during the construction and testing of the density control strip. V21, Asphalt concrete pavement shall be placed in accordance with Section 315 of the VDOT Road and Bridge Specifications. Density shall be determined using the density control strip as specified in Section 315 and VTM-76. A certified compaction technician shall perform these tests. Certified copies of the test reports shall be submitted to VOOT daily, unless specified otherwise, A VOOT representative shall be notified and given the opportunity to be present during the construction and testing of the control strip, V22, In accordance with Section 302, 03, the foundations for pipe culverts thirty-six (36) inches and larger shall be explored below the bottom of the excavation to determine the type and condition of the foundation. The contractor shall report findings of foundation exploration to the engineer and VDOT for approval prior to placing pipe. Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Where soft, yielding, or otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation stabilization shall be determined by the engineer and approved by VOOT, V23. VOOT Standard Guardrail shall be installed where warranted and/or as proposed on these plans in accordance with VDOPs installation criteria. Final approval of guardrail layout to be given by VDOT after grading is mostly complete. V24. Approval of this plan shall expire five (5) years from the date of the approval letter, V25, VDOT Standard CG-12 Curb Ramps shall be installed where indicated on these plans and/or as specified by VDOT V26, The foundations for all box culverts shall be investigated by means of exploratory borings advanced below proposed foundation elevation to determine the type and condition of the foundation. The contractor shall submit copies of borehole logs and report findings of foundation exploration to the engineer and VDOT for approval prior to constructing box. Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Contrary to the Standard, where rock is encountered and cast -in -place box is proposed, the thickness of bedding shall be six (6) inches, Where soft, yielding, or otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation stabilization shall be determined by the engineer and approved by VDOT, ITE CODE I ITE USE AREA 130 1 INDUSTRIAL 10, 000 sf AM PEAK HOUR PM PEAK IN OUT TOTAL 40 27 67 DATA TAKEN FROM THE I, T E, MANUAL IN OUT TOTAL 5 53 58 ADT 387 1. Miss Utility must be contacted prior to planting, Advise engineer of record of any conflicts in planting locations and utility markings. Landscaper must stake and guy all trees, Stake locations must a void utilities. 2. Trees and shrubs shall be healthy and free of insect eggs, larvae, and disease. The plants shall have ample roots and be well branched. The planter shall guarantee all plants for one year. 3. Landscaper shall use shredded mulch in all planting beds and around trees. Tags from each plant will be provided to the owner 4. Plant substitutions will be allowed with the written approval of the Frederick County Planning Department. 5. All plantings shall conform with the Frederick County Zoning Ordinance ,§165-203.01B, VICINITY MAP COD ` :►_, � N J APPLE Ln �0 BLOSSOM C `° MALL U o 0 "0 C p �y / (6 0)SO cu ® o >> ck� , QaJ n, AIRPORT "Q 13 C5 SCALE 1 "- 2000, ® SITE ,(l PROJECT INFORMA TION Owner YINVESTMENT, LLC 209 Beechcroft Road i Winchester, VA 22601 Phone - (540) 550-7974 Property Data Building Setbacks Per Code Proposed Tax Map Number 64-(A)-45P Front: 75` 75.0' A Address Muskoka Court Left Side: 25' 26,3' -r?� Area 1, 0971 acres Right Side: 25' 52. 5' �� m �3 y Zoning M-1 Rear., 25' 62,1' ® �i 7 Legal References #200003062 Ln\� Existing Use Vacant Parking Setbacks Per Code Proposed �. �� ,-� N, va Proposed Use Office -Warehouse Front: 10.00' 24.6' , >- d \% _® Disturbed Area 0.71 acres Left Side: 51 32.0 v> P Right Side: 5' 5. 0' Rear., 5' 37.0'Np� Zoning Data Open Space Minimum 25% = 0.27 acres Q z i o Open Space Proposed 27% = 0.30 acres j cn Q e F,A,R, Maximum 1,0 Use For Parking Unit Tabulation U, v Q , W m O o F.A.R. Proposed 0.21 Office (2,000 sf) 1 per 250 sf 8 z o = o v Warehouse (10) 1,5 per employee 15 z z ~ Proposed Building Data a z w Q q � Type of Construction 28 -Concrete &Metal W U, z zQCS J- Ica Q o Area 10,000 sf Require Proposed Q-_ w Q z Height 24 feet Parking Spaces 23 33 v , "p ® v=i o Max. Height Allowed 60 feet Handicap Spaces 2 3 ® Loading Spaces (1:40K) 0,25 1 Monument Sign Data Allowed Sign Area 50 sf Monument Sign Height 12 ft max. SEE FREDERICK COUNTY ZONING ORDINANCE ,§ 165-201.06 Surveying & Engineering Firm: GreyWolfe, Inc. (540) 667-2001 Zoning Enforcement: Department of Planning (540) 665-5651 Site Inspections: Department of Inspections (5401 665-5650 Erosion and Sediment Control, Department of Public Works (540) 665-5643 Sanitary Sewer and Water: Frederick Water (540) 869-1061 VOOT, (540) 535-1824 Telephone .° Verizon (301) 954-6282 Electric: Rappahannock Electric Cooperative (540) 622-2098 Gas: Washington Gas Co, (540) 869-1111 MISS UTILITY., 1-600-552-7001 Previous Site Plan #34-04 Sheet Index w �Ln o� Uz W z2: z� zU U CLLn z z as o ® !;� V M�� > cc., cn LU13� Q z Cover Sheet & General Notes Sheet I o Existing Conditions Sheet 2 LU Boundary and Dimensions Plan Sheet 3 LU W Grading Plan Sheet 4 Storm water Plan and Details Sheet 5 w o 0 & Sediment Control Plan Sheet 6 o MErosion o Landscaping & Lighting Plan Sheet 7 Life Safety Plan Sheet 8 Zoning Genera/ Notes U �\ J j Maximum 1. This project will not disturb any environmental features as O Environmental Existing Disturbance Proposed defined by the Frederick County Zoning Ordinance, Features Acrea e Allowed Disturbance 2. The owner will be responsible for obtaining or granting �\ V 0 o easements shown on this plan. Floodp/ain 0 acres 0 /0 0 /0 3. Easements will be recorded and copies sent to the parties ~ W Lakes & Ponds 0 acres 0% 0%involved. j Wetlands > ZAC 0 acres 0% 0 /0 Lij Di 4. All utilities that will service this site must be placed W O Sinkholes 0 acres 0% 0% underground. - Q Natural S. W. 0 acres 10% 0% 5. A Dumpster is on site and will not be modified at this time. ,,o Q � V Retention Areas 6. Outdoor lighting shall be provided by shielded wall pack o li hts. See li htin lan. Steep Slopes >50% 0 acres 25% 0% g g g p v ;'0j Woodlands 0 acres 25% 0% U O Q •'• • Frederick County Zoning Administrator Date 4x__2 1 z7cz' Final Site Plan Appro v by Frederick County Planning Department Reviewer Date 1, Frederick County Zoning Administrator approval expires at five (5) years from the date of site plan approval, 2, The Frederick Water approval is valid for three (3) years from date of approval. If construction is not in progress at the end of this period, Authority approval shall be void. 3. The Frederick County Department of Public Works approval is not enough to begin site development, The owner/contractor must obtain a Land Disturbance Permit and agree to periodic inspections. 4. The Frederick County Department of Inspections approval does not constitute a building permit, Building plans must be submitted and approved prior to constructing any structure. Furthermore, the site must meet ail ADA requirements and be approved by Inspections. W z DATE: MAY 1, 2020 SCALE: N/A FILE NO. 0127 SHEET 1 OF 8