HomeMy WebLinkAbout15-20 Signed First PageABBREVIATIONS
Construction Notes:
Virginia
Department of Transportation
ASSY.
ASSEMBLY
Staunton District
B.F.
BASEMENT FLOOR
1. All work and materials shall conform to the current standards of Frederick County, Virginia, the regulations of the Americans with
Rev. January 19, 2013
FREDERICK COUNTY, VIRGINIA
BC
BOTTOM of CURB
Disabilities Act, where applicable, the Virginia Department of Transportation, and all applicable codes.
BML
CG-2/CG-3
BUILDING MOUNTED LIGHT
VDOT CURB
ifi ions of the Commonwealth of Virginia, where applicable.
2. Erosion and sediment control shall conform to the. standards and specifications 9
VDOT General
V1.
Notes
All work on this project shall conform to the current editions of and latest. revisions to the Virginia Department of Transportation (VDOT} Road and
CG-6fCG-7
G P
VDOT CURB &GUTTER
CAST PLACE CONCRETE.
"Miss • �• n 0
3. It shall be the responsibility of the Contractor to notify Utility at 811 at least five (5) working days, but not more than to ( )
Y
• • • • applicable sate federal or local regulations. In
Specifications and Standards the Virginia Erosion and Sediment Control Regulations, and any other app ca t g
Bridge Spec g
CMF
CONCRETE MONUMENT FOUND
.
activity.
days prior to commencement of any load disturbing y
case of a discrepancy or conflict between the Standards or Specifications and Regulations, the most stringent shall govern.
CPP
CORRUGATED POLYETHYLENE PIPE
V2,
uction shall comply with the latest U.S. Department of Labor, Occupational Safety and Health Administration (OSHA), and Virginia Occupational
All. construction p y P
CMP
CORRUGATED METAL PIPE
• • • within seven days after final grade is reached on any portion
4. Permanent or temporary sod stabilization shall be applied to denuded areas Y 9
be final but will remain
Health VOSH Rules and Regulations.
Safety & ( ) g _
CMPA
CO
CORRUGATED METAL PIPE ARCH
CLEAN OUT
- -withinnuded areas that may not at grade
soil stabilization shall be applied seven days to de y 9
of the site. Temporary o PP
be applied to areas that to be left.. dormant for more than one year.
V3.
right-of-way, I traffic control whether permanent or temporary, shall be in accordance with the current edition of VDOT's
When working within VDOT right of way, all t off , p
D{AMETER
.are
dormant for longer than 14 .days. Permanent. stabilizationDIA.
shall
Work Area Protection Manual A transportation management plan needs to be submitted for approval and land use permit issued prior to any execution
DS
DOWNSPOUT
5. All existingutilities have been shown hosed up on the best available information. However, there may be existing utilities which are not
`
of work within the VDOT right of way,
EOP
EOG
EDGE OF PAVEMENT
EDGE OF GRAVEL
• • n of all existing utilities rior to
Contractor to verify the location Putilities,
he .ies responsibility of the Gont y 9including
shown and should be located. Therefore, it will bet p y , , •
be immediately to the Engineer, the owner.
9
V4
•controllers,etc.
traffic signal poles, unction boxes,.
T developer shall be ies ons,ble for relocating, of his expense, any and all , g g P J
he d p R 9
ESMT.
EASEMENT
ns and the actual field conditions shall reported
between these {a n ep Y
construction. An discrepanciesp
Y
owned by VDOT or private /public. utility companies. It is the sole responsibility of the developer to locate and identify utility facilities or items that
�(.
EXISTING
and the appropriate utility company.
may be in conflict with the proposed construction .activity. VDOT approval of these plans does not indemnify the developer from this responsibility.
F.F.
F.F.E.
FIRST FLOOR
FINISHED FLOOR ELEVATION
under round.
6. All proposed utilities shall be installed g
V5.
Design features relating to field construction, regulations, and control or safety of traffic may be subject to change as deemed necessary by VDOT. Any
g 9
FQC
FIRE DEPARTMENT CONNECTION
necessary for construction prior to the commencement of work. An
responsibility of the Contractor to obtain all permits _ ry P
7. It shall be the resp y
additional expense incurred as a result of any field revision shall be the responsibility of the developer.
arranged and held b' the engineer and or developer with
the local VDOT Land Development Office, apse -construction conference shall be aria g y g P
FH
F.L.S.
Ga.GAUGE
FIRE HYDRANT
FIRE .LANE SIGN
tion documents shall be resent on the site at all times.
approved set of construction P
V6.
If required by
the attendance of the contractor (s), various County agencies, utility companies and VDOT prior to initiation of work.
VICINITY MAP
GM
GAS METER
` -Lewis,he field survey has been
hie and bounds information was derived from a field survey performed by Painter LewisP.L.C. Y
8. Topographic boundary
V7.
r n undetermined length of time. VDOT requires
The contractor shall notify the local VDOT Land Development Office when work is to begin or cease for any g q
GV
HCR
GAS VALVE or GATE VALVE
HANDICAP RAMP
r interval of one 1 foot has been established for this project. Contact Painter -Lewis, P.L.C.
based on U.S.C. and G.S. datum and a contour O
an required or requested inspection.
and shall receive 48 hours advance notice :prior to y q q P
i
HB
HOSE BIB
•
- 792 to establish vertical control for project construction.
at 540 662 5 P J
V8.
The shall notify the. Traffic Operations Center at (}540) 332-9500 for any traffic control plan that impacts: a VDOT maintained interstate or
�� i'�
HP
HIGH POINT
been prepared for this project.
9. No geotechnical report has b a p p p J
.contractor
Primary roadway to provide notification of the installation and removal of the work zone.
ti II
` t
INV
IPF
INVERT
IRON PIPE FOUND
V9.
The contractor shall be responsible for maintaining a CVDOT permitted temporary construction entrance(s) in accordance with Section 3.02 of the Virginia
� £� +�------�-�
IPS
IRON PIPE SET
.. applicable.maintained
ate face of curb. edge of pavement, or edge of stone pavement, where opp
10. All radii designations Indic g P 9
nt Contra} Handbook. Furthermore, access to other properties affected by this project shall be through construction,
Erosion and Sediment
a�� �-�-��
LP
LOW POINT
. .
Ian of and the connection to .the existing utilities with the appropnate utility company, where
11. The Contractor shall coordinate the relocation 9
V10.
Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the end of construction.
VDOT right-of-way have minimum thirty-six (36) inches cover and when possible shalt be
�° �
�
}
LT.
MLP
LIGHT
METAL LIGHT POLE
applicable.
V11.
All water and sewer tines within existing or proposed shall a
� �
MP
METAL POST
installed under roadway drainage facilities at conflict points.
MH
MANHOLE
t and plans to the regulatory agency requiring such.springs.sinkholes
12. The Contractor shall provide all AS BUILT documents p g rY 9 Y
V12.
voids caves etc. encountered Burin the course of construction shall be
Any unusual subsurface conditions (e.g., unsuitable sods, > ) g
NDC
NOSE DOWN CURB
_
13. Stakeout Note: If requested by VDOT, the approximate location of proposed entrances from State maintained road will be staked.
the
immediately brought to the attention of the engineer and VDOT: Work shall cease in that vicinity until an adequate design can be determinedbyN.T.S.
Y g
OHE
NOT TO SCALE
OVERHEAD ELECTRIC
engineer and approved by VDOT.
OHT
OVERHEAD TELEPHONE
• gutters
' grade shall be maintained from the centerline of the.. existing road to the flow line, to preclude the forming of false gu
14. A smoothing g
V13.
and approved b a VDOT representative rior to placement and fill. Where CBR
All. fill areas, borrow .material and undercut :areas shall be inspected. a _ pp y p p
PL
PROPERTY LINE
and/or the ondin of any water on the roadway.
/ P 9
testing is required, a VDOT representative shall be present to insure the sample obtained is representative of the location. When soil samples are
z
pp
POWER POLE
complying with other applicable local, State and Federal requirements.
the PP
submitted to private laboratories for testing, the samples shall be clearly identified and labeled as belonging to a project to be accepted by VDOT and
�nuiii iw�z.�o,rR
PR.
PVMT
PROPOSED
PAVEMENT
15. The approval of these plans shall in no way relieve owner of _ .
waters and wetlands.
that testing shall be performed in accordance with all applicable VDOT standards and procedures.
p
,;
RCP
REINFORCED CONCRETE PIPE
federal permits shall be obtained prior to disturbances within and Jurisdictional
All applicable state and p
V14.
All roadway fill, base, subgrode material, and backfill in utility/storm sewer trenches shall be compacted in six (6) inch lifts to 95% of theoretical
R.D.
ROOF DRAIN
maximum density as determined by AASHTO T-99 Method A, within plus or minus 2% of optimum moisture for the full width of any dedicated street
RED.
SAN.
REDUCER
SANITARY
Erosion and Sediment Control'
right-of-way. At the direction of VDOT, density tests shall be performed by a qualified independent agency in accordance with VDOT Road and Bridge
SEW.
SEWER
ed prior to an land disturbing activities. All work shall be done in accordance
All Erasion and Sediment Control measures shall be install p y 9
. , VDOT Bail unless s ecified otherwise.
Specifications, Certified copies of test reports shall be submitted to y, p
STD.
STANDARD
with the current edition of the of Commonwealth of Virginia Erasion and Sediment Control Handbook.
w
V15.
VDOT Standard CD and UD under drainsshall be installed where indicated on these plans and/or as specified by VDOT.
�4.€ ��
�Rrr
T.B.D.
TO BE DEMOLISHED
' Construction.
2: All work shall be confined to the designated Limits of Co
V1'6.
.
A post installation visual/video camera inspection shall be conducted by the Contractor on all pipes identified on the plans as storm sewer pipe and a
{car, ►
T.B.R.
T.B.P.
TO BE REMOVED
TO BE PRESERVED or PROTECTED
select number of culverts. For pipe culverts, a minimum of one pipe installation for each size of each material type will be inspected or ten
TC
TOP OF CURB
• Control measures, All Measures shall
3. The Contractor shall be responsible for the.. installation and. maintenance of oil Erosion and Sediment Cont u
.pipe
installations on the Ions not identified as storm sewer pipe e shall' be
percent of the total amount far each size and material type summarized, .All pipe sta p P P
TEL.
TELEPHONE
• • be
rintendent or his representative. An damaged structures shall
be inspected Bail and after each significant rainfall by the site superintendent P Y
P yconsidered
as culvert pipe for inspection purposes. Additional testing may be required as directed b the Area Land Use Engineer or their representative.
P P P P P 9 Y q Y 9 P
#
TRB
TTYPVRB
TELEPHONE RISER BOX
TELEVISION RISER BOX
r replaced be the end of that work day.
repaired o p Y
V17:
.The installation of any entrances and mailboxes within any dedicated street right-of-way shall meet VDOT minimum design. standards and is the
or TYP.
TYPICAL
tion all permanent erosion and sediment control measures shall be installed. After stabilization, the temporary
4. Upon completion of construction, p
responsibility of the developer.
•4
.,�P��`
UGE
UGE
UNDERGROUND ELECTRIC
UNDERGROUND GAS
• vegetative cover shall be checked regularly and
Authority. All ve etati g Y
Erosion Control devices shall be removed, as approved by the Local Inspection Autho y g
V18:
markings shall be installed b` the developer or, at VDOT s
Prior to VDOT acceptance of any streets,. all required. street ignage and/or pavement m _ g y P
{�
is tz.
UGG
UGCATV
UNDERGROUND CABLE T.V.
hall be repaired, .fertilized replanted. and mulched, as needed.
any damaged areas s p P
discretion, by VDOT on an account receivable basis following the Manual On Uniform Traffic Control Devices.
UGT
UNDERGROUND TELEPHONE TH pF
' entering the public R-O-W. If
e means of cleaning trucks and other construction equipment prior to ente g p
5. The Contractor shall provide adequate 9
as art of the
V19.
i I sources prior to the start of construction. Copies of all invoices
The developer shall provide the VDOT Land Development Office with a list of all mater a p P
P
• • • right-of-way to the local VDOT Land Development Office prior to acceptance of the
within dedicated street right of way must be provided p P P
XFMR
WL
AI
ELECTRIC TRANSFORMER
WATERLINE
antral of potential mud generated
necessary, a trash rack shall be used as part of the Construction Entrance to help n the c p g P
rY
for materials utilized within an Y
SITE LOCATION MAP
WM
�'� ��
WATER METER ' ��'
✓�
• installed as needed. It is the
this site. If it is determined that this is not sufficient, then a wash rack shall be ,
development of t s
work. Unit and total prices may be obscured.
�•�•
POWER POLE
dust at all times.
responsibility of the. Contractor to maintain clean streets and to allay d
V2O•
means of a mechanical spreader. Density will be determined using the density
Aggregate base: and subbase materials shall be placed on subgrade by me _p y 9
GENERAL NOTES:
WPP
WTP
WOOD o ,,
WOOD TELEPHONE POLE JOHN C. LEWIS
control stripin accordance with Section 304 of the VDOT Road and Bridge Specifications and VTM-10. A certified compaction technician shall perform
WV
WATER VALVE
Pavia and Concrete:
9 ' merit sections as detailed on the Ions.
drive areas shall receive the minimum pave P
i unless s ecified otherwise. In addition to checkin stone de ths, a VDOT`
these tests. Certified copies of test reports shall be submitted to VDOT da ly, p g P
OWNER: NGINEER LAN A E ARCHITE T.
25 R
RADIUS IN FEET N 1 21
is roads. main aisles and parking
1. The proposed public a P g n the pavement
• shall be railed as required to provide a smooth transition between p
with the existing sections. s ci g q P
- f the density control strip.
a opportunity to be resent Burin the. construction. and testing o y p
representative shall be notified and given. the opp y p g
P
- - -A-30
TM# 64 A 29 & TM# 64
+ .00
00
PROPOSED SPOT ELEVATION
� w
All: points of connection pavement
P
sections.
V21.
accordance with Section 315 of the VDOT Road and Bride Specifications. Density shall be determined
Asphalt concrete. pavements shall be placed ,n oc 9
Wakeland Manor Land Trust Painter -Lewis, PLC
p0
x(OO.. _ }
EXISTING SPOT ELEVATION
0 ;
HATCHING INDICATES REVERSED PITCH ti
.. - d ractices.
• - certified II perform these tests. Certified copies of
using the density control strip as specified m Section 315 and VTM 76. A certified compaction. technician shall p p
9 Y • . -
-
300 C ran Drive: 817 Cedar' Creek Grade, Suite 12'0
g
� Cs
IN THE GUTTER PAN: PITCH TO BE t "
_ accordance with standard
classification A 3. All work shall be done in acco P
e shall be VDOT c
2. All concrete
• given he opportunity to be re sent
specified otherwise„ A VDOT representative shall be :notified and g_ , # pp y p
test reports shall be submitted to VDOT daily, unless sp p
Stephens City,. VA 22655 Winchester, Virginia 22601
1/2 PER FOOT. TRANSITION THE GUTTER � 0 NA L
Excavation and Grading:
during. the construction and testing: of the control strip..
Contact: Rex Wakeman Contact: John C. Lewis, P.E,,L.L.A.
OVER A 10' LENGTH (TYP),
• • • • • existing
• f the existing utilities. If conflicts exist, then the g
1, Test its shall be excavated to determine. the depths and locations of all o g
P
V22.
. - _ • the
` 6 inches and larger shall be explored below the bottom of
e with Section 302.03- the foundations. for pipe culverts thirty-six (3) g P
In accordance P P -
_
Tel: 54 0-869-3644 Tel. 540-662 5792
•
ion. of the proposed development.
utilities shall be lowered or moved to promote the construct p p P
.. _
condition of the foundation. The contractor shall report findings of foundation exploration: to the engineer and
excavation to determine the type and c P 9
LIST OF DRAWINGS.
• cleared and rubbed materials shall be removed and properly disposed of off -site.
2. All deleterious materials, demolished debris, and c e g
VDOT for approval prior to placing pipe. Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Where soft, yielding, or otherwise
be determined by the engineer and approved.
EXISTING PARCEL DATA:
SHEET 1/15:
COVER SHEET
by
unsuitable foundation is encountered, the foundation design and/or need for foundation stabilization shall
TM#64-A-29: Zoned B2, Business General, 4.86 acres
SHEET 2/15:
PROFFER STATEMENT
on -site, if applicable, in the areas as directed the
3. All topsoil or vegetative cover shall be excavated. to its. full depth and stockpiled o , pp
b VDOT.
y O
• with VDOT's installation criteria: Final
on these in accordance t
TM#64-A-30: Zoned B2, Business General, 2.22 acres
PHASING PLAN
Owner's representative for future finish grading-
V23.
VDOT Standard Guardrail shall. be installed where warranted and/or as proposed plans
is
Existing Use: Vacant
g
SHEET 3/15:
EXISTING CONDITIONS
..
e obtained b the Contractor and approved by a Certified 'Geo-Technical Engineer. All fill
4. All borrow fill material, if necessary, shall b y PP
approval of the guardrail layout. to be given by VDOT after grading mostly complete.
ions three 3 from the date. of the approval letter.
O
Proposed .Parcel 1: 0.653 acres
PHASE 1 E&S PLAN
• „ D-698 Maximum D Density, or as directed by the
shall be laced in lifts of 8 or less and shall be compacted to 95% of ASTM Dry Y
material p
- •
V24.
V25.
shall. expire .ears
Approval ofthese p p Y
VDOT Standard. CG-12 Curb Ramps: shall be installed where indicated on these plans and/or as specified by VDOT.
Proposed Parcel 2: 5.896 acres
P
SHEET 4/15:
EROSION AND SEDIMENT CONTROL NOTES
_
Geo Technical Engineer.
V26.
The foundations for all box culverts hall be investigated by means of exploratory borings advanced below proposed foundation elevation to determine.
Right of Way: 0.531 acres
SOILS MAP
. , tructures without - permission of the: Owner.
5. No blasting shall be permitted within 25 feet. of existing utilities ors P
• • • - • ' o the
i copies of borehole logs and report findings of foundation exploration t
the type and condition of the foundation. The contractor shall. submit op g p 9 pWATER
Proposed Use: Self Storage/outdoor storage
p
QUALITY NARRATIVE
.
constructing box, Foundation designs shall comply with VDOT Road and BridgeStandardPB-1. Contrary to the
engineer and VDOT for approval .prior to 9 P Y
Proposed Buildings: 9 one story building
P
5/15:
PHASE 2 E&S PLAN
• , , _
• topsoil stockpile onSHEET
shall receive a minimum of 4 topsoil obtained off -site or from the p p
ads slopes, and lawn areas P
6: All landscaped Isla p , ,•
. -
-f yielding, or
Standard where rock. is encountered and cast -in -place box s proposed, the thickness of bedding. shall be six (6) inches. Where soft, y g,
- ' h number Of
Building 1 will have 54 units. Building 2 Will have 56 units. e U
g g
EROSION AND SEDIMENT CONTROL. DETAILS
' graded and raked prior to application of permanent vegetative cover.
site. The topsoil shall be g a p PP P
• • 'stabilization shall be determined b the engineer and
otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation Y 9
units in the remaining buildings Is to be determined.
g �SHEET
6/15:
SITE. LAYOUT PLAN
n areas shall be stabilized b the establishment of permanent turf grass installed in accordance with generally accepted
7: All disturbed law Y
'b VDOT.
approvedy
Building Restriction Lines:
Front Yard Primary Street Setback: Required- 50' Provided-250'
SHEET 7 15:
GRADING PLAN
practices.
Front Yard Minor Street Setback: Required- 35' Provided-36'
SHEET 8/15:
WATERLINE PROFILE
I and maintenance Ian.
8. Fill slopes steeper than 3:1 will require a slope stability analysis a P
Rear Yard. Setback: Required- 0'
SHEET 9/15:
FREDERICK WATER GENERAL NOTES AND .DETAILS
Side Yard Setback: Required- 0'
SHEET 10/15
STORM SEWER PROFILES
Maximum Building Height: Allowed- 35' Provided-12'
SHEET 11/15:
STORM SEWER HYDRAULIC CALCULATIONS'
Sign Setback: Required-10' Provided-10'+
SHEET 12/15:
SITE ENTRANCE PROFILE
FAR: 55,500 sf/256,830 sf=0.216
CONSTRUCTION DETAILS
SHEET 13/15:
LANDSCAPE PLAN
Buffers and Screening: B2 against MH1=B type buffer req'd
SHEET 14/15:
LIFE SAFETY PLAN
B2 against RA(Resid.)=B type buffer req'd
SIGNS AND STRIPING PLAN
B2 against RA(vacant)=no buffer required
SHEET 15/15:
STORMWATER MANAGEMENT -QUANTITY
Parking Requirements:
Parking Restriction Lines:
Street Setback: Required-10' Provided- 12'
Yard Setbacks Required-5' Provided- 26'
SITE PLAN APPROVAL
Parking Spaces Required: 3 for the office
NAME z3 ,L
1 per employee
_.DATE,W
1 /40,000- SF loading
/S- z
SITE PLAN NUMBER
Office: 3 spaces required
Employees: 1 employee = 1 spaces required
Parking Spaces Provided: 4 including 1 ADA space
ZONING NOTES:
Loading Spaces Required: 55,500/40,000 = 1 space required
SITE PLAN SP#15-20
TRAFFIC IMPACT: UTILITY AND REGULATORY
CONTACTS:
Loading Spaces Provided: 1
Frederick Count, Road Classification for Route 522, Front Roal Pike: Minor Arterial Road
Y
1. Signs will conform to Section 165.201.06 of the Frederick County Zoning
Building and Impervious Area Coverage:
g P g
CROSSROADS COMMERCE CENTER
WATER AND SEWER SERVICE NATURAL GAS Ordinance and will required a separate permit.
2018 Existing Traffic Data -Route 522
Parcel Greenspace Required: 15% or 38,524 sq. ft.
SELF STORAGE
AADT=16,000 trips Frederick Water
315 Tasker Road
Washington Gas
9 2• The maximum height for the monument sign is 12'. The maximum size
9
Parcel Greenspace Provided: 38.8% or 99;692 sq. ft.
Edition Stephens City, VA 22655
P
350 Hillandale Lane
Winchester VA 22602 for the monument sign is 50 square feet.
Proposed Impervious Areas: Roofin 101,63 sq. ft.SHAWNEE
MAGISTERIAL DISTRICT
Ninth
Data Source. ITE Manual, N
,
Parking Areas= 101,638 sq. ft.
Land Use 151: Mini -Warehouse 540-868-1061
Trips based on Gross Square Feet:
540-868-7923
3. The self storage facility will be in conformance with Frederick County
Total Impervious Area= 157,138 sq. ft.-61.2%
FREDERICK COUNTY, VI RG I N iA
Gross Square Feet=56,050 BUILDING INSPECTIONS'
Frederick County Inspections
ELECTRIC SERVICE Zoning Ordinance 165-204.18.
Department Shenandoah Valley' Electric
Trash Removal: The owner will contract with a licensed, private trash hauler for
• = entering, 50% exiting)
Weekday. 56.05x2.5 140 taps (50% e t g, g) .
107 North Kent
52%
Street
Cooperative
the regular removal of trash.
AM Peak Hour: 56.05xO.28=16 trips (48% entering, exiting)
56.05xO.29=16 trips (53% entering, 47% exiting) Winchester, VA 22601
3463 Valley Pike
PM Peak Hour:
=130 trips 50% criteria 50% exiting) 540-665-5650
Saturday. 56.05x233 p ( g, g)
Winchester, VA 22602
Lighting: All lighting will conform to the requirements of the Frederick County
540-450-0111
Zoning Ordinance Section 165-201.07. Building mounted lights only are
ZONING ADMINISTRATOR
DATE
EROSION AND SEDIMENT
` Frederick County
CONTROL
Department of Public Works TELEPHONE SERVICE
proposed.
FREDERICK
COUNTY, VIRGINIA
107 North Kent
Winchester, VA 22601
Street
Verizon
404 Hillandale Lane RESPONSIBLE LAND DISTURBER
Environmental Features:
SITE PLAN EXPIRES FIVE (5) YEARS FROM DATE OF APPROVAL
540-665-5643
Winchester, VA 22602
Wetlands - No wetlands have been identified on the site.
PUBLIC ROAD IMPROVEMENTS 540-665-3156 NAME:
Flood plains - FIRM Map No. FIRM 510069CO218D shows that the parcel is
within Zone X. This zone is characterized by areas outside the 0.2% annual
PAINTER-LEWIS, P.L.C.
Frederick Water Information Virginia Department of Transportation CERTIFICATION #:
chance floodplain.
2275 Northwestern Pike
_ _
817 Cedar Creek Grade, Suite 120
WATER AND SEWER DEMAND CALCULATIONS Winchester, VA 22603
DATE:
Storm Water Management:
-•--- ____
��
540-535-1818
Water quantity impacts have will be offset by the installation: of stormwater
Winchester, Virginia 22601
Dail Employees:` 1 persons
Y
THE RESPONSIBLE LAND DISTURBER IS THE
management facilities on the site. The stormwater management facilities were
Telephone (540) 662-5792
per person: 30 d
Average Demandp p gp
PARTY RESPONSIBLE FOR CONSTRUCTION &
designed Subdivision Design Plan #19-07 prior to the implementation of water
Facsimile (540) 662-5793
Total Demand: 30 gpd
MAINTENANCE OF ALL THE LAND DISTURBING
quality requirements.
'--
Email: office®painterlewis.com
ACTIVITIES AS SET FORTH IN THESE PLANS:
JOB NO.: 1711030 SHEET,
Previous Approval Numbers: REZ #10-05, MDP #09-06, Subdivision Design
CONSULTING
March 25, 2020
1 1 5
ENGINEERS
/
Plan #19-07
Latest Revision Date: June 12, 2020