HomeMy WebLinkAbout12-20 Signed First PageWATER AND SEWER
WINCHESTER PUBLIC UTILITIES
15 NORTH CAMERON STREET
WINCHESTER, VA 22601
540.667.1815
ELECTRIC SERVICE
SHENANDOAH VALLEY ELECTRIC COOP
3463 VALLEY PIKE
WINCHESTER, VA 22602
540-450-0111
TELEPHONE SERVICE
VERIZON
404 HILLANDALE LANE
WINCHESTER, VA 22602
540.665.3153
CABLE SERVICE
COMCAST COMMUNICATIONS
195 RAINVILLE ROAD
WINCHESTER, VA 22602
NATURAL GAS SERVICE
WASHINGTON GAS
P. 0. BOX 2400
WINCHESTER, VA 22604
540.869.1111
CALL BEFORE YOU DIG
CALL 811 FROM YOU CELL PHONE OR
1-800-552-7001 FROM A LAND LINE.
SECTION 56-265.17 OF THE CODE OF VA REQUIRES THAT
YOU PROVIDE THREE WORKING DAYS NOTICE TO UTILITY
OWNERS BEFORE YOU EXCAVATE, DRILL OR BAST.
TR X COMPANY INC.
FLEET MAINTENANCE FACILITY WINCHESTER PLANT
LOT 63 A 109
FREDERICK COUNTY, VA SHAWNEE MAGISTERIAL DISTRICT
TREX COMPANY, INC.
PROJECT
LOCATION
Winchester, VA •
/i
j 22602
540.686.7373 i i 1.1100
NARSttOLEGGE
LAND SUFZVEYOPS, P,LroC
N
SITE PLAN APPROVAL
NAME DATE
... DATE
SITE PLAN NUMBER
SHEET INDEX
Sheet
Number
Sheet Name
1
TITLE SHEET
2
GENERAL NOTES AND SUMMARIES
3
SURROUNDING PROPERTIES, ROADS AND LAND USES
4
PROPERTY BOUNDARY
5
EXISTING CONDITIONS
6
DEMOLITION PLAN
7
SITE PLAN
8
SITE PLAN DETAILS
9
SITE PLAN DETAILS
10
GRADING PLAN
1.1
ENTRANCE PLAN — ROUTE 11
12
ENTRANCE PLAN — ROUTE 11 ENTRANCE & SIGHT DISTANCE PROFILES
13
ENTRANCE PLAN — ROUTE 11 TRANSPORTATION MANAGEMENT PLAN
14
ENTRANCE PLAN — ROUTE 11 TRANSPORTATION MANAGEMENT PLAN
15
ENTRANCE PLAN — SHAWNEE DRIVE
16
ENTRANCE PLAN — SHAWNEE DRIVE TRANSPORTATION MANAGEMENT PLAN
1.7
ENTRANCE PLAN — SHAWNEE DRIVE TRANSPORTATION MANAGEMENT PLAN
18
VDOT GENERAL NOTES AD DETAILS
19
WATER MAIN PROFILE
20
DRAINAGE DIVIDES AND COMPUTATIONS
21
STORM SEWER PROFILES
22
STORM WATER QUALITY CALCLATIONS
23
STORM WATER QUANTITY CALCULATIONS
24
STORM WATER MANAGEMENT CALCULATIONS & DETAILS
25
STORM WATER MANAGEMET CALCULATIONS
26
STORM STRUCTURE DETAILS
27
STORM STRUCTURE DETAILS
28
EROSION & SEDIMENT CONTROL NARRATIVE
29
EROSION & SEDIMENT CONTROL PLAN PHASE 1
30
EROSION &SEDIMENT CONTROL PLAN PHASE 2
31
EROSION & SEDIMENT CONTROL DETAILS
32
EROSION & SEDIMENT CONTROL DETAILS
33
LIFE SAFETY PLAN
34
OUTDOOR LIGHTING PLAN
35
OUTDOOR LIGHTING DETAILS
36
OUTDOOR LIGHTING DETAILS
EL001
OUTDOOR LIGHTING ELECTIC CIRCUITS
37
LANDSCAPE PLAN
RESPONSIBLE LAND DISTURBER
Print Name:
Address:
City:
State:
Zip:
Phone Number:
I hereby agree to install, maintain, and inspect Erosion Control Measures to protect this site and ensure
compliance.
Signature:
Date:
Responsible Land Disturber Cert. Number:
A PRE -CONSTRUCTION MEETING IS REQUIRED PRIOR TO AN LAND DISTURBING ACTIVITIES
THE ENGINEER WHO PREPARED THIS PLAN MAY SERVE AS THE REPONSIBLE LAND DISTURBER FOR THE REVIEW
PROCESS ONLYANDASSUMES NO RESPONSIBILITY FORACTUAL LAND DISTURBING ACTIVITIES. THE RESPONSIBLE
LAND DISTURBER IS THAT PERSON RESPONSIBLE FOR CARRYING OUTTHE LAND DISTURBING ACTIVITIES SET
FORTH IN THESE PLANS.
Jc'�z 09�
DATE
PLAN VALID FOR FIVE YEARS FROM APPROVAL DATE
SITE PLAN 12-20
N
O
�
•
O
U
O
r+� y
Lr)
a
�m
O
E
W
E
C):�
0
U
as
c
(D
a
L
Q
(0
C
O
J
U_
W
V
Z {� Q
Q Z
W U) C7
LLW H ® fY
W Q >
� Q
T.
Q'_ F—
LIJ
�+ / W
Co
W J�Q®
J LL ®�
U
� v ww
® Z
Z p
n
111
Q
IY
Z = IL
Q �
IL
2
0
V
x
W
H
ALL DOCUMENTS PREPARED BY STOWE ENGINEERING ARE
INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY
ARE NOT INTENDED TO BE SUITABLE FOR REUSE BY THE OWNER
OR OTHERS ON E%TENSIONS OF THE PROJECTOR ANY OTHER
PROJECT,ANY REUSE WITHOUT WRITTEN VERIFICATION OR
ADAPTATION BY STOWE ENGINEERING WILL BE AT THE USERS
SOLE RISK.
000
S. 5
6- TIMOTHY S. STOWE
Lio o, 94
z z 8/20
' A
PROJECT NUMBER:
1193.0
DATE: February 28, 2020
SCALE: AS SHOWN
DRAWN BY:
TSS
CHECKED BY:
TSS
CS101
SHEET 1 OF
37