Loading...
HomeMy WebLinkAbout12-20 Signed First PageWATER AND SEWER WINCHESTER PUBLIC UTILITIES 15 NORTH CAMERON STREET WINCHESTER, VA 22601 540.667.1815 ELECTRIC SERVICE SHENANDOAH VALLEY ELECTRIC COOP 3463 VALLEY PIKE WINCHESTER, VA 22602 540-450-0111 TELEPHONE SERVICE VERIZON 404 HILLANDALE LANE WINCHESTER, VA 22602 540.665.3153 CABLE SERVICE COMCAST COMMUNICATIONS 195 RAINVILLE ROAD WINCHESTER, VA 22602 NATURAL GAS SERVICE WASHINGTON GAS P. 0. BOX 2400 WINCHESTER, VA 22604 540.869.1111 CALL BEFORE YOU DIG CALL 811 FROM YOU CELL PHONE OR 1-800-552-7001 FROM A LAND LINE. SECTION 56-265.17 OF THE CODE OF VA REQUIRES THAT YOU PROVIDE THREE WORKING DAYS NOTICE TO UTILITY OWNERS BEFORE YOU EXCAVATE, DRILL OR BAST. TR X COMPANY INC. FLEET MAINTENANCE FACILITY WINCHESTER PLANT LOT 63 A 109 FREDERICK COUNTY, VA SHAWNEE MAGISTERIAL DISTRICT TREX COMPANY, INC. PROJECT LOCATION Winchester, VA • /i j 22602 540.686.7373 i i 1.1100 NARSttOLEGGE LAND SUFZVEYOPS, P,LroC N SITE PLAN APPROVAL NAME DATE ... DATE SITE PLAN NUMBER SHEET INDEX Sheet Number Sheet Name 1 TITLE SHEET 2 GENERAL NOTES AND SUMMARIES 3 SURROUNDING PROPERTIES, ROADS AND LAND USES 4 PROPERTY BOUNDARY 5 EXISTING CONDITIONS 6 DEMOLITION PLAN 7 SITE PLAN 8 SITE PLAN DETAILS 9 SITE PLAN DETAILS 10 GRADING PLAN 1.1 ENTRANCE PLAN — ROUTE 11 12 ENTRANCE PLAN — ROUTE 11 ENTRANCE & SIGHT DISTANCE PROFILES 13 ENTRANCE PLAN — ROUTE 11 TRANSPORTATION MANAGEMENT PLAN 14 ENTRANCE PLAN — ROUTE 11 TRANSPORTATION MANAGEMENT PLAN 15 ENTRANCE PLAN — SHAWNEE DRIVE 16 ENTRANCE PLAN — SHAWNEE DRIVE TRANSPORTATION MANAGEMENT PLAN 1.7 ENTRANCE PLAN — SHAWNEE DRIVE TRANSPORTATION MANAGEMENT PLAN 18 VDOT GENERAL NOTES AD DETAILS 19 WATER MAIN PROFILE 20 DRAINAGE DIVIDES AND COMPUTATIONS 21 STORM SEWER PROFILES 22 STORM WATER QUALITY CALCLATIONS 23 STORM WATER QUANTITY CALCULATIONS 24 STORM WATER MANAGEMENT CALCULATIONS & DETAILS 25 STORM WATER MANAGEMET CALCULATIONS 26 STORM STRUCTURE DETAILS 27 STORM STRUCTURE DETAILS 28 EROSION & SEDIMENT CONTROL NARRATIVE 29 EROSION & SEDIMENT CONTROL PLAN PHASE 1 30 EROSION &SEDIMENT CONTROL PLAN PHASE 2 31 EROSION & SEDIMENT CONTROL DETAILS 32 EROSION & SEDIMENT CONTROL DETAILS 33 LIFE SAFETY PLAN 34 OUTDOOR LIGHTING PLAN 35 OUTDOOR LIGHTING DETAILS 36 OUTDOOR LIGHTING DETAILS EL001 OUTDOOR LIGHTING ELECTIC CIRCUITS 37 LANDSCAPE PLAN RESPONSIBLE LAND DISTURBER Print Name: Address: City: State: Zip: Phone Number: I hereby agree to install, maintain, and inspect Erosion Control Measures to protect this site and ensure compliance. Signature: Date: Responsible Land Disturber Cert. Number: A PRE -CONSTRUCTION MEETING IS REQUIRED PRIOR TO AN LAND DISTURBING ACTIVITIES THE ENGINEER WHO PREPARED THIS PLAN MAY SERVE AS THE REPONSIBLE LAND DISTURBER FOR THE REVIEW PROCESS ONLYANDASSUMES NO RESPONSIBILITY FORACTUAL LAND DISTURBING ACTIVITIES. THE RESPONSIBLE LAND DISTURBER IS THAT PERSON RESPONSIBLE FOR CARRYING OUTTHE LAND DISTURBING ACTIVITIES SET FORTH IN THESE PLANS. Jc'�z 09� DATE PLAN VALID FOR FIVE YEARS FROM APPROVAL DATE SITE PLAN 12-20 N O � • O U O r+� y Lr) a �m O E W E C):� 0 U as c (D a L Q (0 C O J U_ W V Z {� Q Q Z W U) C7 LLW H ® fY W Q > � Q T. Q'_ F— LIJ �+ / W Co W J�Q® J LL ®� U � v ww ® Z Z p n 111 Q IY Z = IL Q � IL 2 0 V x W H ALL DOCUMENTS PREPARED BY STOWE ENGINEERING ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED TO BE SUITABLE FOR REUSE BY THE OWNER OR OTHERS ON E%TENSIONS OF THE PROJECTOR ANY OTHER PROJECT,ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY STOWE ENGINEERING WILL BE AT THE USERS SOLE RISK. 000 S. 5 6- TIMOTHY S. STOWE Lio o, 94 z z 8/20 ' A PROJECT NUMBER: 1193.0 DATE: February 28, 2020 SCALE: AS SHOWN DRAWN BY: TSS CHECKED BY: TSS CS101 SHEET 1 OF 37