FREDERICK WATER
CONSTRUCTION NOTES
1.
The
Frederick Water
Water and
Sewer Standards
and Specifications are available
at www.frederickwater.com.
2.
The
contractor shall
adhere to
Frederick Water
standards and specifications in
effect at the time of construction.
3.
The
contractor
shall
coordinate
with
and arrange
for
inspection by Frederick Water.
4.
The
contractor
shall
connect a
new
sewer line to
an
existing manhole by core drilling the manhole.
5. A new water (or forced sewer) main shall be connected to an existing main by a wet tap.
Frederick Water shall furnish all needed material and make the tap.
a. An Application for Wet Tap shall be submitted and the initial fee paid before the tap is made.
6. Exact locations of water and sewer services on new lines are to be coordinated with Frederick Water's inspector.
7. Frederick Water's maintenance division shall furnish and install all water meters though 2 inch in size. It is the
contractor's responsibility to have the meter box assembly installed correctly.
Before a permanent meter is installed:
a. The meter box, with its frame and cover, must be properly aligned with the yoke bar.
b. The frame and cover shall be set to final grade.
c. The distance between the top of the cover and the yoke bar shall be between 20 and 23 inches.
d. All components of the meter box assembly shall be in proper working order.
8. For services that connect to existing lines:
a. Frederick Water shall furnish and install:
,t it f> tf 91 ff
1. all 5/� x�4 , Y`4 t 1 , 1Y2 and 2 water services.
2. all sewer services.
b. The owner/developer shall:
1. coordinate (or have the contractor coordinate) the location of the service lateral with Frederick Water's
engineering assistant.
2. submit an Application for Service and pay the required fees.
9. All water service lines must have a backflow prevention assembly (double check valve or RPZ, as required).
The assembly must meet ASSE standard number 1015 or 1013.
10. All fire lines must have backflow prevention assembly (detector double check valve of RPZ, as required).
The assembly shall meet ASSE standard number 1048 or 1047. Any privately owned fire line, interior or
exterior, shall also have a fire service HP Protectus III meter. This assembly shall be installed immediately before
the backflow prevention unit. Radio read remotes are required.
11. Frederick Water shall review the mechanical plan(s) for design and material approval of a building's:
a. domestic water meter and its backflow prevention device, and/or its
b. Fire service line's water meter and backflow prevention device.
12. DEQ must also approve sewer pump stations. Frederick Water requires a copy of DEQ's Certificate to Operate
and a copy of the station's DEQ approved 0&M manual. These documents must be received before substantial
completion is issued and water meters released.
Frederick Water Additional Notes
1. COORDINATE A MEETING WITH THE FREDERICK WATER INSPECTOR AT LEAST (7) WORKING DAYS PRIOR TO GROUND
DISTURBING ACTIVITIES
2. EXERCISE EXTREME CAUTION WHILE TRAVELING AND WORKING OVER THE EXISTING WATER MAIN, SANITARY SEWER
MAIN AND SERVICES
3. TEST PIT THE EXISTING WATER MAIN, SANITARY SEWER MAIN AND SERVICES, TO CONFIRM THAT BOTH
COMPLY WITH MINIMUM COVER AND SEPARATION REQUIREMENTS. REPORT TEST PIT RESULTS TO OWNER'S ENGINEER
FOR REVIEW
4. ADJUST ALL WATER AND SANITARY SEWER FACILITIES TO FINISH GRADE
5. REMOVE ALL TREES, SHRUBS AND DEBRIS FROM EXISTING AND PROPOSED FREDERICK
EASEMENTS
6. PERFORM ALL WORK PER FREDERICK WATERS INSPECTORS REQUIREMENTS
Construction Notes:
1. All work and materials shall conform to the current standards of Frederick County, Virginia, the regulations of the Americans with Disabilities Act, where
applicable, the Virginia Department of Transportation, and all applicable codes.
2. Erosion and sediment control shall conform to the standards and specifications of the Commonwealth of Virginia, where applicable.
3. It shall be the responsibility of the Contractor to notify "Miss Utility" at 811 at least five (5) working days, but not more than ten (10) days prior to
commencement of any land disturbing activity.
4. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site.
Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 14
days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year.
5. All existing utilities have been shown based upon the best available information. However, there may be existing utilities which are not shown and should be
located. Therefore, it will be the responsibility of the Contractor to verify the location of oil existing utilities prior to construction. Any discrepancies between
these plans and the actual field conditions shall be reported immediately to the Engineer, the owner, and the appropriate utility company.
6. All proposed utilities shall be installed underground.
7. It shall be the responsibility of the Contractor to obtain all permits necessary for construction prior to the commencement of work. An approved set of
construction documents shall be present on the site at all times.
8. Topographic and boundary information was derived from a field survey performed by Painter -Lewis, P.L.C. The field survey has been based on U.S.C. and
G.S. datum and a contour interval of one (1) foot has been established for this project. Contact Painter -Lewis, P.L.C. at 540-662-5792 to establish vertical
control for project construction.
9. No geotechnical report has been prepared for this project.
10. All radii designations indicate face of curb, edge of pavement, or edge of stone pavement, where applicable.
11. The Contractor shall coordinate the relocation of and the connection to the existing utilities with the appropriate utility company, where applicable.
12. The Contractor shall provide all AS BUILT documents and plans to the regulatory agency requiring such.
(13. Stakeout Note: If requested by VDOT, the approximate location of proposed entrances from State -maintained road will be staked. Not applicable)
14. A smoothing grade shall be maintained from the existing pavement to the new storage area, to preclude the forming of false gutters and/or the ponding of
any water.
15. The approval of these plans shall in no way relieve the owner of complying with other applicable local, State and Federal requirements. All applicable state
and federal permits shall be obtained prior to disturbances within and jurisdictional waters and wetlands.
Erosion and Sediment Control:
1. All Erosion and Sediment Control measures shall be installed prior to any land disturbing activities. All work shall be done in accordance with the current
edition of the of Commonwealth of Virginia Erosion and Sediment Control Handbook.
2. All work shall be confined to the designated Limits of Construction.
3. The Contractor shall be responsible for the installation and maintenance of all Erosion and Sediment Control measures. All Measures shall be inspected daily
and after each significant rainfall by the site superintendent or his representative. Any damaged structures shall be repaired or replaced be the end of that
work day.
4. Upon completion of construction, all permanent erosion and sediment control measures shall be installed. After stabilization, the temporary Erosion Control
devices shall be removed, as approved by the Local Inspection Authority. All vegetative cover shall be checked regularly and any damaged areas shall be
repaired, fertilized, replanted, and mulched, as needed.
5. The Contractor shall provide adequate means of cleaning trucks and other construction equipment prior to entering the public R-O-W. If necessary, a trash
rack shall be used as part of the Construction Entrance to help in the control of potential mud generated as part of the development of this site. If it is
determined that this is not sufficient, then a wash rack shall be installed, as needed. It is the responsibility of the Contractor to maintain clean streets and to
allay dust at all times.
Paving and Concrete:
1. The proposed public roads, main drive aisles, and parking areas shall receive the minimum pavement sections, as detailed on the plans. All points of
connection with the existing pavement sections shall be graded as required to provide a smooth transition between the pavement sections.
2. All concrete shall be VDOT classification A-3. All work shall be done in accordance with standard practices.
Excavation and Grading:
1. Test pits shall be excavated to determine the depths and locations of all of the existing utilities. If conflicts exist, then the existing utilities shall be lowered
or moved to promote the construction of the proposed development.
2. All deleterious materials, demolished debris, and cleared and grubbed materials shall be removed and properly disposed of off -site.
3. All topsoil or vegetative cover shall be excavated to its full depth and stockpiled on -site, if applicable, in the areas as directed by the Owner's representative
for future finish grading.
4. All borrow fill material, if necessary, shall be obtained by the Contractor and approved by a Certified Geo-Technical Engineer. Ail fill material shall be placed
in lifts of 8" or less and shall be compacted to 95% of ASTM D-698 Maximum Dry Density, or as directed by the Geo-Technical Engineer.
5. No blasting shall be permitted within 25 feet of existing utilities or structures without permission of the Owner.
6. All landscaped islands, slopes, and lawn areas shall receive a minimum of 4" topsoil obtained off -site or from the topsoil stockpile on site. The topsoil shall
be graded and raked, prior to application of permanent vegetative cover.
7. All disturbed lawn areas shall be stabilized by the establishment of permanent turf grass installed in accordance with generally accepted practices.
8. If required by Frederick County, fill slopes steeper than 3:1 will require a slope stability analysis and maintenance plan.
Frederick Water Information TRAFFIC IMPACT:
WATER AND SEWER DEMAND CALCULATIONS No increase in traffic is anticipated.
No additional demand is anticipated.
rIGN NOTES:
UTILITY AND REGULATORY CONTACTS: Sgns will conform to Section 165.201.06 of the Frederick
ounty Zoning Ordinance.
WATER AND SEWER SERVICE
Frederick Water
315 Tasker Road
Stephens City, VA 22655
540-868-1061
BUILDING INSPECTIONS
Frederick County Inspections Department
107 North Kent Street
Winchester, VA 22601
540-665-5650
EROSION AND SEDIMENT CONTROL
Frederick County Department of Public Works
107 North Kent Street
Winchester, VA 22601
540-665-5643
PUBLIC ROAD IMPROVEMENTS
Virginia Department of Transportation
2275 Northwestern Pike
Winchester, VA 22603
540-535-1818
NATURAL GAS
Washington Gas
350 Hilfandale Lane
Winchester, VA 22602
540-868-7923
ELECTRIC SERVICE
Shenandoah Valley Electri
Cooperative
3463 Valley Pike
Winchester, VA 22602
540-450-0111
TELEPHONE SERVICE
Verizon
404 Hillandole Lane
Winchester, VA 22602
540-665-3156
2. The maximum height for the monument sign is 25'. The
maximum size for the monument sign is 150 square feet.
3. No additional signs are proposed with this site plan.
RESPONSIBLE LAND DISTURBER
CERTIFICATION #:
DATE:
THE RESPONSIBLE LAND DISTURBER IS THE
PARTY RESPONSIBLE FOR CONSTRUCTION &
MAINTENANCE OF ALL THE LAND DISTURBING
ACTIVITIES AS SET FORTH IN THESE PLANS.
Oir�-
Pike
GENERAL NOTES:
OWNER:
TM# 86-A-102E
3Millers, LC
208 Centre Drive
Stephens City, VA 22655
Contact: Mr. Billy Miller
Tel: 540-664-7806
EXISTING PARCEL DATA:
Parcel ID:
Existing Zoning:
Existing Use:
Existing Building:
F.A.R.:
Building Restriction Lines:
Front Yard Major Street Setback:
Front Yard Minor Street Setback:
Rear Yard Setback:
Side Yard Setback:
Maximum Building Height:
Sign Setback:
ABBREVIATIONS
ASSY. ASSEMBLY
B.F. BASEMENT FLOOR
BC BOTTOM OF CURB
BML BUILDING MOUNTED LIGHT
CG-2/CG-3 VDOT CURB
CG-6/CG-7 VDOT CURB & GUTTER
CIP CAST IN PLACE CONCRETE
CL CLASS
CMF CONCRETE MONUMENT FOUND
CPP CORRUGATED POLYETHYLENE PIPE
CMP CORRUGATED METAL PIPE
CMPA CORRUGATED METAL PIPE ARCH
CO CLEAN OUT
DIA. DIAMETER
DS DOWNSPOUT
EOP EDGE OF PAVEMENT
EOG EDGE OF GRAVEL
ESMT. EASEMENT
EX. EXISTING
F.F. FIRST FLOOR
F.F.E. FINISHED FLOOR ELEVATION
FDC FIRE DEPARTMENT CONNECTION
FH FIRE HYDRANT
Go.
GAUGE NE SIGN
GM GAS METER
GV GAS VALVE or GATE VALVE
HCR HANDICAP RAMP
HB HP HOSE
POINT
T
INV INVERT
IPF IRON PIPE FOUND
IPS IRON PIPE SET
LP LOW POINT
LT. LIGHT
MLP METAL LIGHT POLE
MP METAL POST
MH MANHOLE
NDC NOSE DOWN CURB
N.T.S. NOT TO SCALE
OHE OVERHEAD ELECTRIC
OHT OVERHEAD TELEPHONE
PL PROPERTY LINE
PP POWER POLE
PR. PROPOSED
PVMT PAVEMENT
RCP REINFORCED CONCRETE PIPE
R.D. ROOF DRAIN
RED. REDUCER
SAN. SANITARY
SEW. SEWER
STD, STANDARD
T.B.D. TO BE DEMOLISHED
T.B.R. TO BE REMOVED
T.B.P. TO BE PRESERVED or PROTECTED
TC TOP OF CURB
TEL. TELEPHONE
TRB TELEPHONE RISER BOX
TVRB TELEVISION RISER BOX
TYP or TYP. TYPICAL
UGE UNDERGROUND ELECTRIC
UGG UNDERGROUND GAS
UG CATV UNDERGROUND CABLE T.V.
UGT UNDERGROUND TELEPHONE TH OF
XFMR ELECTRIC TRANSFORMER
WL WATERLINE
SITE WM WATER METER i ram,
WPP WOOD POWER POLE
WTP WOOD TELEPHONE POLE ® JOHN C. LEWIS
ENGINEER/LANDSCAPE ARCHITECT:
Painter -Lewis, PLC
817 Cedar Creek Grade, Suite 120
Winchester, Virginia 22601
Contact: John C. Lewis, P.E.,L.L.A.
Tel: 540-662-5792
TM#86-A-102E
B2-Business General District
Area of Lot: 2.7235 acres
Hardware Store
1-story, 22,800 sf
0.192 of 1.0 allowed
Required-
50'
Provided-80'
Required-
35'
Provided -NA'
Required-
0'
Required- 0'
Allowed-
35'
Provided-18'
Required-10'
Provided-10'+
Parking Requirements:
Parking Restriction Lines:
Street Setback: Required-10'
Yard Setback: Required-5'
Parking Spaces Required: 1 /200 Gross SF
No changes to the parking spaces on the site are proposed under this site
plan. The number of parking existing parking spaces were approved by
Frederick County in 2005.
Parking Spaces Provided: 57 including 3 ADA spaces
Loading Required: 1 space per 10,000 sf + 1 space for
each additional 30,000 sf- 1 space provided
WV
25'R
*00.00
x(00.00)
WATER VALVE
RADIUS IN FEET U . No. 1 21.
PROPOSED SPOT ELEVATION •0
EXISTING SPOT ELEVATION .p
HATCHING INDICATES REVERSED PITCH Off, 1�
IN THE GUTTER PAN: PITCH TO BE �S ONAL
1/2" PER FOOT. TRANSITION THE GUTTER
OVER A 10' LENGTH (TYP).
LIST OF DRAWINGS:
SHEET 1/9:
COVER SHEET
SHEET 2/9:
SITE OVERVIEW
EXISTING FIRE HYDRANT LOCATIONS
SHEET 3/9:
EXISTING CONDITIONS
DEMOLITION PLAN
PHASE 1 E&S PLAN
E&S DETAILS
SHEET 4/9:
EROSION AND SEDIMENT CONTROL
NOTES
PHASE 2 E&S PLAN
SHEET 5/9:
SITE PLAN
SHEET 6/9:
CONSTRUCTION DETAILS
LIGHTING PLAN
SHEET 7/9:
LANDSCAPE PLAN
SHEET 8/9:
STORMWATER MANAGEMENT PLAN
WATER QUALITY
NEW DITCH ANALYSIS
SHEET 9/9:
STORMWATER MANAGEMENT PLAN
WATER QUANTITY
Building and Impervious Area Coverage:
Parcel Greenspace Required: 15% or 17,795 sq. ft.
Parcel Greenspace Provided: 20.82% or 24,696 sq. ft.
Proposed Impervious Areas: Roof= 22,800 sq. ft.
Impervious Areas= 71,140 sq. ft.
Total impervious Area= 93,940 sq. ft.-79.18%
Trash Removal: The owner will contract with a licensed, private trash hauler
for the regular removal of trash.
Lighting: All lighting will conform to the requirements of the Frederick County
Zoning Ordinance Section 165-201.07.
Environmental Features:
Wetlands - No wetlands have been identified on the site.
Flood plains - FIRM Map No. 51069CO150D shows that the parcel is within
Zone X. This zone is characterized by areas outside the 0.2% annual chance
floodplain.
Storm Water Management:
Water quantity control has been provided by the installation of stormwater
management facilities on the site. Water quality will be addressed by the
purchase of nutrient credits.
3Millers, LC is responsible for the maintenance of the proposed stormwater
management pond including mowing and periodic removal of debris.
Previous Site Plan: #07-05
SITE PLAN SP#11-20
MILLER'S HARDWARE
OUTDOOR STORAGE AREA EXPANSION
OPEQUON MAGISTERIAL DISTRICT
FREDERICK COUNTY, VIRGII�IA
' SITE PLAN APPROVAL
IL41CME ,._BATE 3 0. ;r
IM
ZONING ADMINISTRATOR DATE //
FREDERICK COUNTY, VIRGINIAiTEPtANNUMBER
SITE PLAN EXPIRES FIVE (5) YEARS FROM DATE OF APPROVAL
-LEWIS, P.L.C.PAINTER
817 Cedar Creek Grade, Suite 120
Winchester, Virginia 22601
Telephone (540) 662-5792
_ Facsimile (540) 662-5793
Email: off ice0pointerlewis.com
CONSULTING JOB NO.: 1905001 SHEET:
ENGINEERS Latest Revision Date: May 1, 2020 /