Loading...
HomeMy WebLinkAbout09-20 Signed First PageIt MC ?1,ti, o9-ao m0.a�son v���o..9� OWNER / DEVELOPER: TM# 64-A-18 Madison II, LLC 558 Bennys Beach Road Front Royal, VA 22630 Contact: Mr. David Madison Tel: 540-974-0584 TAX MAP#64H-1-1-109 Zoning: Area: Existing Use: Proposed Use: Historical Structures and Sites: None ENGINEER/LANDSCAPE ARCHITECT: Painter -Lewis, PLC 817 Cedar Creek Grade, Suite 120 Winchester, Virginia 22601 Contact: John C. Lewis, P.E.,L.L.A. Tel: 540-662-5792 RP -Residential Performance District and B2-Business General District 51.26 acres total (5 acres of B2, 46.26 acres of RP, 4.75 acres dedicated to public R-O-W) Vacant Commercial (B2), Residential Apartments (480 Units) and Townhouses (108 Units) (RP), Public Roads Environmental Features: Wetlands - 2.05 acres of wetlands have been identified on the site. Flood plains - FIRM Map No. 51069CO209D shows that a portion of the parcel is within Zone X. This zone is characterized by areas of 1 % annual chance flood with average depths of less that 1 foot. Steep SLOPES - Approximately 0.02 acres of steep slopes (>50%) have been identified on the site. Project Phasing: Phasing for the construction of this project will be in accordance with Items #4, 6a, and 6b of the approved Proffer Statement for Madison Village, Parcel TM#64-A-18. The approved Proffer Statement can be found on Sheet 69. Buffers and Screening: Zoning District Buffers: RP against RP: no buffer required RP against (vacant) RA: RP against (residential)RA: B2 against B2 B2 against RP: no buffer required Category B buffer (30' inactive/20'active w/ full screen) No Buffer or Screen required Category B buffer . (25' inactive/25'active w/ full screen) Residential Separation Buffers: Townhouses against Multifamily: Category B: Full Screen in 30' 1 nactive/20' Active Townhouses against Multifamily (on -site): no buffer required Road Efficiency Buffer: The existing woodland shall be preserved and maintained as the Road Efficiency Buffer along Rt. 522. Storm Water Management: Storm water quantity and quality controls will be provided throughout the development in multiple, underground & surface facilities. RP ZONING: Area: 46.26 acres Existing Use: Vacant Proposed Use: Residential Residential Density: Maximum=640/46.26=13.8 units per acre Minimum=420/46.26= 9.1 units per acre Apartment Units Proposed: 480 Townhome Units Proposed: 108 Open Space Requirements: Required: 30%, 13.88 acres Proposed: 30%, 13.88 acres (26% or 3.61 acres is covered by environmental features.) Recreational Units: Required: 1 rec, unit per 30 housing units Required: 588/30= 19.6 rec. units Recreational Units will include a community building and swimming pool in both Phase 1 and Phase 3, plus hiking trails generally throughout the development. See Sheet 2 for unit details. Parking Requirements: Minimum Parking Requirement: 2 spaces per unit Apartment Parking Spaces Required: 480 x 2=960 Apartment Parking Spaces Provided: 993 spaces including 40 ADA spaces Townhouse Parking Spaces Required: 108 x 2=216 Townhouse Parking Spaces Provided: 267: 1 surface space and 1 garage space (min.) at each lot + 51 off -lot spaces Public R-O-W Spaces Provided: 37 Parking Restriction Lines: Street Setback: Required-10' Yard Setback: Required-5' Sign Setback: Required-10' Townhouse Lot Dimensions: Minimum Lot Size: 1,500 sf Minimum Lot Width: 22' end unit, 18' interior unit Building Restriction Lines: From Public or Private Road right of way: 25' with garage 15' without garage From off-street parking: 15, Side Yard Setback: 10, Rear Yard Setback: 20' Setbacks for Unroofed Decks, stoops, landings: Front from off-street parking: 10, Front from private/public road: 15, Side Yard: 5' Rear Yard: 5' Minimum Parking Required: 2 spaces per unit Maximum Main Building Height: 40' Maximum Accessory Building Height: 20' Multi -family Dimensions: Maximum impervious area: 60% Building Restriction Lines: From public roadway: 35, From offstreet parking or driveways: 20' Side(peri meter): 50, Rear(peri meter): 50, Rear for baiconies/decks: 20' Building spacing side to side: 20' Building spacing side to back: 35' Building spacing back to back: 50, Building Height: 60' Principal Structure: 60' (or up to 80' with increased setbacks) Accessory Structure: 20' B2 ZONING: Area: 5.00 acres Existing Use: Vacant Proposed Use: Commercial Building Restriction Lines: Front Yard Major Street Setback: Required- 50' Front Yard Minor Street Setback: Required- 35' Rear Yard Setback: Required- 0' Side Yard Setback: Required- 0' Maximum Building Height: Allowed- 35' (60' for office use and hotels) Sign Setback: Required- 10' Parking Requirements: Parking Restriction Lines: Street Setback: Required-10' Yard Setback: Required-5' Open Space Required: 15% " A separate Site Plan submittal will be required for the B2 Area Virginia Department of Transportation®LINTY LOCATION General Notes: Staunton District v 1. All work and materials shall conform to the current standards of Frederick County, Virginia, the regulations of Rev. June 19, 2013 the Americans with Disabilities Act, where applicable, and all applicable codes. VDOT General notes FREDERICK COUNTY V11. All work on this project shall conform to the current editions of and latest revisions to the Virginia Department of Transportation (VDOT) Road and 2. Erosion and sediment control shall conform to the standards and specifications of the Commonwealth of Bridge Specifications and Standards, the Virginia Erosion and Sediment Control Regulations, and any other applicable state, federal or local regulations. In case of a discrepancy or conflict between the Standards or Specifications and Regulations, the most stringent shall govern. Virginia, where applicable. Vz All construction shall comply with the latest U.S. Department of Labor, Occupational Safety and Health Administration (OSHA), and Virginia 3. It shall be the responsibility of the Contractor to notify "Miss Utility" at 811 at least two (2) working days, but not Occupational Safety and Health (VOSH) Rules and Regulations. more than ten (10) days prior to commencement of any land disturbing activity. V3. When working within VDOT right-of-way, all traffic control, whether permanent or temporary, shall be in accordance with the current edition of VDOT's Work Area Protection Manual. A transportation management plan needs to be submitted for approval and land use permit issued prior to 4. No disturbed areas shall be denuded more than thirty (30) days. The contractor shall stabilize all denuded any execution ofwork within the VDOT right of way. areas within seven (7) days after the end of construction. V4 The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic signal poles, junction boxes, controllers, etc., owned by VDOT or private/public utility companies. It is the sole responsibility of the developer to locate and identify utility facilities or items that 5. All existing utilities have been shown based upon the best available information. However, there may be may be in conflict with the proposed construction activity. VDOT approval of these plans does not indemnify the developerfrom this responsibility. existing utilities which are not shown and should be located. Therefore, it will be the responsibility of the V5. Design features relating to field construction, regulations, and control or safety of traffic may be subject to change as deemed necessary by VDOT. Contractor to verify the location of all existing utilities prior to construction. Any discrepancies between these Any additional expense incurred as a result of any field revision shall be the responsibility ofthe developer, plans and the actual field conditions shall be reported immediately to the Engineer, the owner, and the Y6. If required by the local VDOT land Development Office, apre-construction conference shall be arranged and held by the engineer and/or appropriate utility company. developer with the attendance ofthe contractor (s), various County agencies, utility companies and VDOT prior to initiation ofwork. LOCATION MAP. 1 " = 2000` 6. All proposed utilities shall be Installed underground. V7. The contractor shall notify the local VDOT Land Development Office when work is to begin or cease for any undermined length of time. VDOT inspection. requires and shall receive 48 hours advance notice prior to any required or requested 7. It shall be the responsibility of the Contractor to obtain all permits necessary for construction prior to the V8. The contractor shall notify the Traffic Operations Center at (540) 332-9500 for any traffic control plan that impacts a VDOT maintained Interstate of commencement of work. An approved set of construction documents shall be present on the site at all times. Primary roadway to provide notification ofthe installation and removal ofthe work zone. V9. The contractor shall be responsible for maintaining a VDOT permitted temporary construction entrance(s) in accordance with Section 3.02 of the 8. Topographic information was derived from a topographic survey performed by Painter -Lewis, P.L.C. A field Virginia Erosion and Sediment Control Handbook. Furthermore, access to other properties affected by this project shall be maintained through survey determined the topographic information which has been based on U.S.C. and G.S. datum and a contour construction. interval of one (1) foot has been established for this project. Contact Painter -Lewis, P.L.C. at 540-662-5792 to V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the end of construction. establish vertical control for project construction. V11. All water and sewer lines within existing or proposed VDOT right -of --way shall have a minimum thirty -sic (36) inches cover and when possible shall 9. No soils report was prepared for this project. be installed under roadway drainage facilities at conflict points. y viz Any unusual subsurface conditions (e.g., unsuitable soils, springs, sinkholes, voids, caves, etc.) encountered during the course of construction 10. All radii designations indicate face of curb, edge of pavement, or edge of stone pavement, where applicable. shall be immediately brought to the attention ofthe engineer and VDOT. Work shall cease in that vicinity until an adequate design can be determined by the engineer and approved by VDOT. J 11. The Contractor shall coordinate the relocation of and the connection to the existing utilities with the VII& All fill areas, borrow material and undercut areas shall be inspected and approved by a VDOT representative prior to placement and fill. Where CBR testing is required, a VDOT representative shall be present to insure the sample obtained is representative of the location. Men soli appropriate utility company, Where applicable. samples are submitted to private laboratories for testing, the samples shall be dearly identified and labeled as belonging to a project to be accepted by VDOT and that testing shall be performed in accordance with all applicable VDOT standards and procedures. 12, The Contractor shall provide all AS BUILT documents and plans to the regulatory agency requiring such. V14. All roadway fill, base, subgrade material, and badkfiii in utiiityfstorm sewer trenches shall be compacted in accordance with the lift thicknesses, i <� density and moisture requirements as specified in the current VOOT Road and Bridge Specifications. Certified copies of test reports shall be < z ,`P Construction Notes: submitted to VDOT daily, unless specified otherwise. Erosion and Sediment Control: VI& VDOT Standard CD and LID underdrains shall be installed where indicated on these plans andfor as specified by VDOT. 1. All Erosion and Sediment Control measures shall be installed prior to any land disturbing activities. All work V16. A post installation visual/video camera inspection shall be conducted by the Contractor on all pipes identified on the plans as storm sewer pipe 0 shall be done in accordance with the current edition of the of Commonwealth of Virginia Erosion and Sediment and a select number of pipe culverts, For pipe culverts, a minimum of one pipe installation for each size of each material type will be inspected or ten percent of the total amount for each size and material type summarized. All pipe installations on the plans not identified as storm sewer pipe Control Handbook. shall be considered as culvert pipe for inspection purposes. Additional testing may be required as directed by the Area Land Use Engineer or their vj representative. J 2. All work shall be confined to the designated Limits of Construction. V17. The installation of any entrances and mailboxes within any dedicated street right -of --way shad meet VDOT minimum design standards and is the 3. The Contractor shall be responsible for the installation and maintenance of all Erosion and Sediment Control responsibility ofthe developer. measures. All Measures shall be inspected daily and after each significant rainfall by the site superintendent or Vitt. Prior to VDOT acceptance of any streets, all required street signage and/or pavement markings shall be installed by the developer in accordance his representative. Any damaged structures shall be repaired or replaced be the end of that work day. with the Manual On Uniform Traffic control Devices. via The developer shall provide the VDOT Land Development Office with a list of all material sources prior to the start of construction. Copies of all 4.Upon completion of construction, all permanent erosion and sediment control measures shall be installed. invoices for materials utilized within any dedicated street right-of-way must be provided to the local VDOT Land Development Office prior to After stabilization, the temporary Erosion Control devices shall be removed, as approved by the Local Inspection acceptance of the work. Unit and total prices may be obscured. Authority. All vegetative cover shall be checked regularly and any damaged areas shall be repaired, fertilized, V211 Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader. Density will be determined using the PROPERTY DEVELOPMENT TABULATION replanted, and mulched, as needed. density control strip in accordance with Section 304 ofthe VOOT Road and Bridge Specifications and VTM-10. A certified compaction technician shall perform these tests. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. In addition to checking PROPERTY DESCRIPTION AREA (acres) stone depths, a VDOT representative shall be notified and given the opportunity to be present during the construction and testing of the density 5. The Contractor shall provide adequate means of cleaning trucks and other construction equipment rior to p q 9P control strip. be Existing Total Parcel Area 51.26 acres entering the public R-O-W. If necessary, a trash rack shall be used as part of the Construction Entrance to help V21. Asphalt concrete pavements shall be placed in accordance with Sedion 315 of the VDOT Road and Bridge Specifications. Density shall determined using the density control strip as specified in Section 315 and VTM-76. A certified compaction technician shall perform these tests. in the control of potential mud generated as part of the development of this site. If it is determined that this is not Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. A VDOT representative shall be notified and given the RP Zoned Area 46.26 acres sufficient, then a wash rack shall be installed, as needed. It is the responsibility of the Contractor to maintain opportunity to be present during the construction and testing of the density control strip. 62 Zoned Area 05.00 acres clean streets and to allay dust at all times. V2z in accordance with Section 302.03, the foundations for pipe culverts thirty-six (36) inches and larger shall be explored below the bottom of the excavation to determinethe type and condition ofthe foundation. The contractor shall report findings of foundation exploration to the engineer and Total Route 522 R-O-W Dedication 00.19 acres Paving and Concrete: VDOT for approval prior to placing pipe. Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Where soft, yielding, or 04.56 1. The proposed main drive aisles and parking areas shall receive the minimum pavement sections, as detailed otherwise unsuitable foundation is encountered, the foundation design andlor need for foundation stabilization shall be determined by the engineer Proposed Public R-O-W Dedication (on -site) acres on the plans. All points of connection with the existing pavement sections shall be graded as required to provide and approved by VDOT. Open Space Proposed (within RP) 19.12 acres (41 %) a smooth transition between the pavement sections.. Y23. VDOT Standard Guardrail shall be installed where wararked and/or as proposed on these plans in accordance with VDOT's installation criteria. Final approval ofthe guardrail layout to be given by VDOT after grading is mostly complete. h t da d +ices y 2. All concrete shall be VDOT classification A-3. Ali work shall be done in accordance wit s an r prat V24. Approval of these plans shall expire three (3) years from the date of the approval letter. Phase 1 Open Space/Units 4.85 acres/96 opts/31 towns Excavation and Grading: V25. VDOT Standard CG-12 Curb Ramps shall be installed where indicated on these plans andfor as specified by VDOT. Phase 2 Open Space/Units 4.62 acres/168 opts/52 towns 1. Test pits shall be excavated to determine the depths and locations of all of the existing utilities. If conflicts Y2& The foundations for all box cuhrerts shall be investigated by means of exploratory borings advanced below proposed foundation elevation to 9.65 acres/216 opts/25 towns exist, then the existing utilities shall be lowered or moved to promote the construction of the proposed determine the type and condition of the foundation. The contractor shall submit copies of borehole logs and report findings of foundation Phase 3 Open Space/Units development. exploration to the engineer and VDOT for approval prior to constructing box. Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Contrary to the Standard, where rock is encountered and cast -in -place box is proposed, the thickness of bedding shall be six (6) RP Zoned, Townhouse Density 108units/15.26acres=7.1 units per acre inches, sots, yielding, otherwise unsuitable foundation is encountered, the foundation design andior need for foundation stabilization 2 All deleterious materials demolished debris and cleared and rubbed materials shall be removed and properly g P P Y i shall be determinedbytheengineerand approvedbyVDOT determined RP Zoned Multifamily Density 480units/31.00acres=15.5 units per acre disposed of off -site. 3. All topsoil or vegetative cover shall be excavated to its full depth and stockpiled on -site, if applicable, in the ABBREVIATIONS UTILITY AND REGULATORY CONTACTS: ASSEMBLY ASSYareas as directed by the Owner's representative for future finish grading. B.F..FBASEMENT FLOOR WATER AND SEWER SERVICE BML BUILDING MOUNTED LIGHT 4. All borrow fill material, if necessary, shall be obtained by the Contractor and approved by a Certified ter Frederick Water CG-2, CG-3 VDOT CURB CG-7, CG-6 VDOT CURB & GUTTER Goo -Technical Engineer. All fill material shall be placed in lifts of 8" or less and shall be compacted to 95% of P. 0. BOX CIP CAST IN PLACE CONCRETE ASTM D-698 Maximum Dr Density, or as directed b the Geo-Technical Engineer. Y Y Y 9 Stephens City, VA 22655 CL CLASS 540-868-1061 CMF CONCRETE MONUMENT FOUND 5, No blasting shall be permitted within 25 feet of existing utilities or structures without permission of the Owner. CPP CORRUGATED POLYETHYLENE PIPE CMP CORRUGATED METAL PIPE BUILDING INSPECTIONS CMPA CORRUGATED METAL PIPE ARCH 6. All landscaped islands, slopes, and lawn areas shall receive a minimum of 4" topsoil obtained off -site or from Frederick County Inspections Department CO CLEAN OUT the topsoil stockpile on site. The topsoil shall be graded and raked, prior to application of permanent vegetative 107 North Kent Street DIA. DIAMETER cover. Winchester, VA 22601 DS DOWNSPOUT EOP EDGE OF PAVEMENT 7, All disturbed lawn areas shall be stabilized by the establishment of permanent turf grass installed in 540-665-5650 EOG EDGE OF GRAVEL EXS ME accordance with generally accepted practices. EROSION AND SEDIMENT CONTROL EX. T Frederick County Department of Public Works F.F. FIRST FLOOR 107 North Kent Street F.F.E. FINISHED FLOOR ELEVATION FIRECONNECTION Winchester, VA 22601 FHG HYDRANMENT 540-665-5643 F.L.S. FIRE LANE SIGN FREDERICK WATER PROJECT INFORMATION FSL FIRE SERVICE LINE PUBLIC ROAD IMPROVEMENTS Ga. GAUGE GM GAS METER WATER AND SANITARY SEWER USAGE rans Virginia Department of Transportation 9 P P GV GAS VALVE or GATE VALVE 2275 Northwestern Pike HCR HANDICAP RAMP WATER DEMAND 64,310 d gp Winchester, VA 22603 BIB HB HP HIGH POINTSANITARY SEWER DISCHARGE 64,310 gpd 540-535-1818 INV INVERT WINCHESTER REGIONAL AIRPORT NOTES IPF IRON PIPE FOUND IPS IRON PIPE SET 1. In accordance with the Code of Virginia, Section 15.2-224, and the Federal Aviation Administration LP LOW POINT CALCULATION OF DEMAND/ DISCHARGE Title 14 of the Code of Federal Regulations CFR Part 77, any construction equipment i.e. cranes, LT. LIGHT • WATER DEMAND derricks, etc, that exceeds the height of the proposed structure(s) in the site plan will require filing MPP METAL LIGHTPOLE •• RESIDENTIAL: 235 gpd PER CONNECTION Form 7460-1. The form can be filed online at https:/,/oeaaa.faa.gov/oeaaa external/portal, and all MH MANHOLE •• COMMERCIAL: 75 gpd PER 1,000 SF conditions of FAA's determination must be met. NDC NOSE DOWN CURB •• INDUSTRIAL: 25 GAL PER PERSON PER DAY 2. During the construction phase of the buildings, any cranes that are determined to require an N.P.S. NO PARKING SIGN N.T.S. NOT TO SCALE 10 PERSONS PER ACRE aviation obstruction flag and/or obstruction light visible during operations or lowered at night unless lit OHE OVERHEAD ELECTRIC should be coordinated with David Foley, Operations Supervisor Winchester Regional Airport Authority, no OHT OVERHEAD TELEPHONE • SEWER DISCHARGE less that forty-eight hours prior to start at 540-662-5786. PIV POST INDICATOR VALVE •• SEWER DISCHARGE EQUALS WATER DEMAND 3. Permanent and temporary outdoor lighting should be shielded or full cutoff_ type in order to PL PROPERTY LINE PP POWER POLE minimize light ollution to slots approaching the Winchester Airport. 9 P P PP 9 P PR. PROPOSED 4. Controlled burning should be prohibited due to the close proximity to the runway and since the PVMT PAVEMENT OCT 10 property is within the flight pattern of the Winchester Airport. Unsuitable materials should be hauled RCP REINFORCED CONCRETE PIPE away from the construction site appropriately. R.D. ROOF DRAIN CAN SANITARY WATER AND SEWER DEMAND CALCULATIONS Apartments: 480 units Based on usage history study, appartment demand is approximately 76 gpd per unit: 36,480 gpd Townhouses: 108 units Residential demand per unit=235 gpr: 25,380 gpd 5 acres gross B2 land Q�TH OF Ll� The et commercial area is approximately G' 3 acres which will support approximately 32,670 @ 75 sf of commercial space gpd per 1000 sf: 2,450 gpd U JOHN C. IS 9 Total Demand: 64,310 gpd L':N. 1� PLANS ARE APPROVED AS NOTED; THE APPLICANT WILL BE REQUIRED TO PERFORM A SANITARY �ww CAPACITY ANALYSIS TO DETERMINE THE IMPACT ON THE SYSTEM FROM THIS PROJECT. THE �4 ti APPLICANT WILL BE RESPONSIBLE FOR UPGRADES AS NEEDED TO THE SYSTEM IN ORDER TO IONAL ACCOMMODATE THE PROPOSED FLOWS FROM THIS PROJECT. RESPONSIBLE LAND DISTURBER NAME: CERTIFICATION #: DATE: THE RESPONSIBLE LAND DISTURBER IS THE PARTY RESPONSIBLE FOR CONSTRUCTION & MAINTENANCE OF ALL THE LAND DISTURBING ACTIVITIES AS SET FORTH IN THESE PLANS. SEW. SEWER STD. STANDARD T.B.D. TO BE DEMOLISHED T.B.R. TO BE REMOVED T.B.P. TO BE PRESERVED or PROTECTED TB or T.B. THRUST BLOCK TC TOP OF CURB TEL. TELEPHONE TRB TELEPHONE RISER BOX TVRB TELEVISION RISER BOX TYP or TYP. TYPICAL UGE UNDERGROUND ELECTRIC UGG UNDERGROUND GAS UG CATV UNDERGROUND CABLE T.V. UGT UNDERGROUND TELEPHONE XFMR ELECTRIC TRANSFORMER WL WATERLINE WM WATER METER WPP WOOD POWER POLE WTP WOOD TELEPHONE POLE WV WATER VALVE 25'R RADIUS IN FEET (ALL CURB RADII 5' UNLESS OTHERWISE NOTED) 00.00 PROPOSED SPOT ELEVATION +00.00 EXISTING SPOT ELEVATION HATCHING INDICATES REVERSED PITCH IN THE GUTTER PAN: PITCH TO BE 1 /2" PER FOOT. TRANSITION THE GUTTER OVER A 10' LENGTH (TYP). REV LIST OF DRAWINGS: 3116120 COVER SHEET 1 /1 p / )A DWACIKI!" DI AM RHONDA DRIVE STA 10+00-STA 15+80.75 RENA BELL DRIVE STA 10+00-STA 13+38.49 STA 13+38.49-STA 25+90.8 STRUCTURES: 11.12.13,14,15,15A,16,17,21,22,BIOTETENTION FILTER SHEET 20: STORM SEWER PROFILES STRUCTURES: 8 9141819 20 23 24 30 31 32 33 36 37 38 48 SHEET 21: STORM SEWER PROFILES STRUCTURES: 25,25A,25B.26,27,28,34,35,36„$7,39,40 42,46,47,DETENTION STRUCTURE 2A SHEET 22: STORM SEWER PROFILES STRUCTURES: 54 55 56 57 58 59 60 61 62 79 80,81,82,83,92,93.DETENTION STRUCTURE 2C SHEET 23: STORM SEWER PROFILES STRUCTURES: 2A1 45 65 66 67 68 69 70 71 72 73 74 75 76 77111 112127128 SHEET 24: STORM SEWER PROFILES STRUCTURES: 105106108109125126128'i29,131,142,143,DETENTION STRUCTURE 3C SHEET 25: STORM SEWER PROFILES STRUCTURES: 107108118119120121 122 129,130,139.140.DETENTION STRUCTURE 3E STRUCTURES: 110111 112113114131 13213313413513713$140141 DETENTION STRUCTURE 3D SHEET 36: SANITARY SEWER PROFILE LINE 7: MH7-MH'17-MH16 LINE 8: PS1-MH26 SHEET 37: SANITARY SEWER PROFILE LINE 9: 05-MH3041­136 QW137T ill• CAAIITARY (ZL'WFR DPt)Pll F I IMP to- UI-Ili-kill'i7-U1410 "A" A IS SHEET 55: 3/16f20 LANDSCAPE PLAN TYPICAL ORNAMENTAL PI.ANTING FOR TOWNHOUSES AND APARTMENTS SITE PLAN APPROVAL NAME. DATE --21_1.I9 eozc SITE PLAN NUMBER 0 % _z 0 APPROVED BY THE ZONING AND SUBDIVISION ADMINISTRATOR DATE MADISON VILLAGE SUBDIVISION DESIGN PLAN AND RESIDENTIAL SITE PLAN RESIDENTIAL & COMMERCIAL DEVELOPMENT SHAWNEE MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA TM # 64-A-18 SITE PLAN #09-20 PREVIOUS APPROVALS: REZ #03-11, MDP #03-13, SP #45-14 lip PAINTER=LEWIS, P.L.C. 817 Cedar Creek Grade, Suite 120 Winchester, Virginia 22601 Telephone (540) 662-5792 Facsimile (540) 662-5793 Email: office®pointerlewis.com CONSULTING JOB NO.: 1201007 SHEET: November 25, 2014 ENGINEERS Latest Revision Date: March 16, 2020