HomeMy WebLinkAbout08-21 Comments
107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000
October 17, 2025
Mr. Kevin J. Knechtel, PE
Potesta & Associates, Inc.
15 South Braddock Street
Winchester, Virginia 22601
RE: Revised Site Plan Comments – Warrior Self Storage
Frederick County, Virginia
Dear Mr. Knechtel:
Upon review of the revised site plan dated October 14, 2025, we recommend approval of
the subject plan. Please be advised that receipt of nutrient credit purchase (6.34 lbs) will be
required with the land disturbance application. (5.06 acres disturbed)
**Effective July 1, 2025, all plans submitted for review will need to comply with the DEQ
VRRM 4.1 and the new stormwater handbook. I have included the link below to access the new
stormwater handbook. The plans and all details must be updated to comply with the new
stormwater handbook requirements.**
https://online.encodeplus.com/regs/deq-va/index.aspx
Sincerely,
Joe C. Wilder
Director of Public Works
JCW/kco
cc: Planning and Development
file
1trustland@comcast.net
From:Josh Messmer <jsmessmer@potesta.com>Sent:Wednesday, June 11, 2025 3:50 PMTo:trustland@comcast.netCc:Joe Knechtel; Melissa HighSubject:FW: Warrior Self Storage Site Plan ApprovalGood afternoon Jeremy, VDOT has approved Warrior Self Storage! See below approval letter. Thanks, Joshua Messmer Potesta & Associates, Inc. 15 S. Braddock Street
Winchester, Virginia 22601 Phone: (540) 450-0180
Fax: (540) 450-0182 From: Spielman, Joseph (VDOT) <Joseph.Spielman@vdot.virginia.gov> Sent: Wednesday, June 11, 2025 3:37 PM To: Joe Knechtel <KJKnechtel@potesta.com> Cc: Josh Messmer <jsmessmer@potesta.com> Subject: Warrior Self Storage Site Plan Approval Joe, A VDOT review has been conducted for the revision of the Warrior Self Storage Site plan dated, May 15,
2025. Based off the review of the revised drawings, t he site plan is approved by our office. · Our review and comments are general in nature . Should details be overlooked during plan
review or conditions in the field exist such that add itional measures are warranted, such
measures shall be completed to the satisfaction of the department.
· Materials used and methods of construction s hall adhere to the current observed VDOT Road and Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control Devices, and Land Use Permit Special Provisions.
· A preconstruction conference shall be held by the engineer and/or the developer with the
attendance of the contractor, various County agencies, utility companies, and VDOT prior to
initiation of work.
· All drainage is to be carried within the ri ght-of-way in ditch lines or gutters along the street to a pipe or drainage easement.
· Any construction related changes to the approved plan must come through the design engineer to VDOT for approval. Please allow a minimum of 5 business days for VDOT review.
2· A Land Use Permit shall be obtained before an y work is performed on the State’s right-of-
way. The permit is issued by this office and may req uire application fees, the salary & expenses
of a State assigned inspector, and surety bond coverage. · Please submit an electronic copy of the plans to this office for file and permitting. (Already Received) If you have any questions or need further information , please do not hesitate to contact me. Ryan Joseph Ryan Spielman Land Development Engineer / Edinburg Residency Virginia Department of Transportation 540-535-1829 joseph.spielman@vdot.virginia.gov
fmo@fcva.us
Fax: 540-678-4739Phone: 540-665-6350
Winchester, VA 22602
1080 Coverstone Drive
Frederick County Fire and Rescue Department
Office of the Fire Marshal
Engineering Firm :
Greenway Engineering
Warrior Self Storage
Stephens City, Virginia 22655
Warrior Self Storage
Warrior Dr/Tasker Rd
Business Name
Printed Date: 08/04/2021
Plan Review
Site
Status: Approved
General Information
06/09/2021Received Date:
06/11/2021
06/11/2021
Review Begin Date:
Review End Date:
1.0000Hours:
Property Use:
Occupancy Type:
RevisionReview Cause:
Activity Number:I061024
Activity Details
Self Storage FacilityProject Name
Comments:
Revised page 6 of 22 approved.
Adam Hounshell
Lieutenant/Assistant Fire Marshal
Page 1 of 1