HomeMy WebLinkAbout10-24 BOS Staff Report REZONING #10-24
Winchester East at Opequon Crossing (Riggleman-Gross)
Staff Report for the Board of Supervisors
Prepared: August 4, 2025
Staff Contact: M. Tyler Klein, AICP, Senior Planner
Executive Summary:
Meeting Schedule
Planning Commission: 12/18/2024
Planning Commission: 01/15/2025
Action: Work Session
Action: Recommended Denial
Board of Supervisors: 02/12/2025
Board of Supervisors: 02/26/2025
Board of Supervisors: 03/12/2025
Board of Supervisors: 08/13/2025
Action: Postponed by Applicant
Action: Postponed by Applicant
Action: Postponed by Applicant
Action: Pending
Property Information
Property Identification Number (PIN) 65-A-194B & 65-A-195
Address 2737 & 2747 Senseny Road, Winchester
Magisterial District Red Bud
Acreage +/- 91.7-acres*
Zoning & Present Land Use Zoning: RA (Rural Areas) District
Land Use: Residential/Agricultural
Proposed Zoning RP (Residential Performance) District
Adjoining Property Zoning & Present Land Use
North: RP (Residential Performance) District Land Use: Residential/Open Space
South: Rural Areas (RA) District Land Use: Residential
East: Clarke County Land Use: Clarke County
West: RP (Residential Performance) District Land Use: Residential (single-family
detached)
Proposed Use
This is a request to rezone two (2) parcels totaling +/-91.7-acres from the RA (Rural Areas)
Zoning District to the RP (Residential Performance) Zoning District with proffers to develop
up to 319 single-family residential housing units. *A recent physical survey of the property
conducted by the applicant indicates that the two properties contain approximately 100.53
acres.
Positives Concerns
The proposed rezoning implements Plan
policy specific to “residential” land uses on
The Plan envisions residential land uses
outside and east of Route 37 to be rural area
Page 2 of 11
portions of the property west of future Route
37, and where the Plan envisions new
residential growth within the limits of the UDA
and SWSA which encompass the subject
parcels.
A significant portion of the site around the
Opequon Creek is preserved for open space
and recreation (trail) with public access
proffered enabling connections to other public
access trails in the vicinity. This open space
reservation serves to provide a natural buffer
to rural areas in Clarke County to the east and
implements Plan policy specific to natural
resource conservation and preservation.
Inter-parcel access to adjoining
neighborhoods (Canyon Road/Senseny Glen)
is proffered as well as required by County
Ordinance and the timing of the connection
(80% of total occupancy) ensures adequate
circulation is in place prior to this inter-parcel
connection to minimize traffic impacts.
The proffer statement fully implements
Capital Impact Model (CapIM) monetary
contributions for residential housing types,
addressing capital impacts to county services
for schools, fire and rescue services, and
parks and recreation.
To address impacts on adjoining residences,
the proffer statement restricts the hours of
operation for construction activities, including
deliveries, on the property from 7AM to 7PM
Monday through Friday and 9AM to sunset on
Saturdays.
residential in character. This serves to provide
a transition area to the Opequon Creek and to
the well-established rural character of adjacent
Clarke County. The applicant’s proposal
shows residential in that area that is denser in
nature than what the Plan envisions.
The proposed two-lane section of the future
major collector roadway (Proffer 7) is only to
be provided to the first intersection serving the
residential land bays within the development
and not to the limits of development adjoining
the Opequon Crossing community as would be
typically expected. This leaves a significant
gap to create/complete a road connection
between Senseny Road and Hallowed
Crossing Lane (and ultimately Route 7) as
identified in the Eastern Frederick County
Transportation Study.
Staff notes that since the Planning Commission action in January 2025 the applicant has
submitted a master development plan (MDP) application to the County to utilize transfer of
development right (TDR) credits to develop 289 residential units. Portions of the subject
properties are identified in the County’s Comprehensive Plan as eligible receiving properties
for TDR. Should the property develop utilizing TDR, there would be no proffered conditions
included.
Page 3 of 11
Review Agency Comments:
Review Agency
Comment Date Comment Summary Status
Frederick County (FC)
County Attorney
July 30, 2025 Legal
form.
Frederick Water October 11,
2024
“The application's Impact Statement
is silent on proposed water and
sewer demands. The applicant will
need to ensure that adequate water
distribution and sanitary sewer
conveyance and treatment system
capacity is available to achieve the
projected build-out of the project. It
is the applicant's responsibility to
design, acquire easements, and
construct the extensions of water
and sewer services necessary to
satisfy their proposed demands. The
Proffer Statement does acknowledge
the applicant's responsibility to
extend services and construct a
pump station to ultimately convey
sanitary flows to Frederick Water's
sanitary sewer system.”
See attached letter.
Virginia Department of
Transportation
(VDOT)
November 26,
2024
See attached letter. Comments
addressed.
FC Public Works September 30,
2024
“A comprehensive review shall be
performed if a site plan is submitted
in the future.”
FC Fire Marshal October 1, 2024 “All fire department access roads,
fire lane markings, water supply
needs, and other applicable
development shall meet the criteria of
the current addition of the Frederick
County Fire Prevention Code in
future developments.”
Frederick Park &
Recreation
October 1, 2024 “Referenced recreation areas are not
shown on GDP. A shared use path
(10’) along Senseny Road frontage
and a recreation trail providing creek
access along Opequon Creek are
recommended.”
Comments
partially
addressed.
Page 4 of 11
Historic Resources
Advisory Board
(HRAB)
October 18,
2024
See attached letter. Comment
addressed.
Frederick County
Public Schools
September 3,
2024
See attached letter.
Frederick-Winchester
Health Department
September 26,
2024
“This office has no objections to the
proposed rezoning.”
Clarke County –
Department of
Planning
October 8, 2024 See attached letter. Comments
partially
addressed.
Planning & Zoning Staff Analysis:
Comprehensive Plan Conformance:
The Comprehensive Plan (adopted November 2021) and the Senseny/Eastern Frederick Urban
Area Plan (SEFUAP) provide guidance on the future development of the subject property. The
Plan identifies the subject properties as “residential” and “rural areas.” The subject properties are
also within the limits of the Sewer and Water Service Area (SWSA) and the Urban Development
Area (UDA), enabling a request for a residential rezoning. The Area Plan states:
“Outside of the urban centers described above, the residential land uses in the
Senseny/Eastern Frederick study area are defined in three main categories:
• R4 – these are generally reflective of our existing residential densities at
approximately 4 units per acre.
• R6 – these are slightly higher residential densities at approximately 6 units
per acre (this is generally attached house development).
• Higher density residential – these are generally multifamily and a mix of
other housing types with densities of approximately 12-16 units per acre
(this density is necessary to accommodate the anticipated growth of the
County within the urban areas and is essential to support the urban center
concept identified in the Comprehensive Plan and this study).
The residential land uses outside and east of Route 37 are envisioned to be rural area
residential in character. Route 37, to the north and east of Route 50, may generally be
considered as the boundary between the urban areas and rural areas within this study area.
This provides a transition area to the Opequon Creek and to the well-established rural
character of adjacent Clarke County.”
The rezoning proposes “single family residential (attached and/or detached)” in areas identified
for future “residential” land uses. However, the generalized development plan (GDP, dated
02/24/25) also identifies “single-family residential” in areas planned to remain “rural” (i.e. those
areas east of future Route 37 and the planned transition area to the Opequon Creek and Clarke
County). In this respect, the proposed rezoning is not fully consistent with the adopted Plan policy
as it pertains to future land use compatibility east of future Route 37. However, it may otherwise
Page 5 of 11
be appropriate to develop the site as “residential” given the surrounding/existing residential
neighborhoods to the north, west and south and if impacts are sufficiently mitigated.
The Area Plan also identifies “Natural Resources” around Opequon Creek. The Plan states:
“Within the Senseny/Eastern Frederick Urban Areas Plan, effort should focus on the
creation of greenways, stream valley parks and stream buffers around waterways, while
taking into account environmentally sensitive areas. Pedestrian facilities should be
constructed that connect these features to other public facilities. Many such examples have
been identified on the accompanying map. Environmental corridors should be incorporated
with all development activities to ensure safe movement and protection of species and
future development within the study area should take into account the natural resources
located on and around their property.”
The proposal includes the use of the Opequon Creek watershed for recreational purposes, including
a 6-foot (FT) wide natural surface trail (Proffer 2.2 and GDP) with public access.
Transportation & Site Access:
The Plan identifies transportation improvements in the vicinity of the subject properties, including
the future Route 37 bypass (“major arterial roadway”) which bisects the subject properties
(north/south). Senseny Road (Route 657) is identified as an “improved major collector,” and future
multi-use trails planned along Senseny Road and Future Route 37.
The proffer statement and the GDP include right-of-way (ROW) reservation for future Route 37
(104’) and additional widths as required, and construction of two (2) lanes from Senseny Road to
the first intersection serving the development. Additionally, the rezoning proposal addresses the
future widening of Senseny Road to an “improved major collector” and the Plan identified 10’
multi-use trails. Inter-parcel connectivity to the west is provided via Canyon Road through the
Senseny Glen subdivision.
Page 6 of 11
The proposal generally implements Plan policy specific to future right-of-way dedication for
Route 37 and improved Senseny Road.
It is anticipated that development of up to 319 single-family residences will create additional
vehicle traffic impacting on the existing network (Senseny Road, Greenwood Road, Channing
Drive). The Traffic Impact Analysis (TIA, revised March 4, 2025), which studied up to a maximum
of 380 units (40 SFD & 340 SFA/TH), notes:
“All study intersections operate at an acceptable level of service and queues with and
without the addition of the proposed development. Based on the capacity and queueing
analysis results, the proposed development will not have a substantial impact on the
surrounding transportation and roadway network. Therefore, no improvements are
recommended to mitigate the traffic generated by the proposed development.”
The TIA study intersections included Senseny Road and Twinbrook Circle/Senseny Glen Drive
(existing), Woodrow Road/Canyon Road and Channing Drive (existing), and Senseny Road and
proposed site entrance (future).
The rezoning promotes a more near-term solution that is contained in the Board of Supervisors
endorsed Eastern Frederick County Transportation Study (EFCTS, January 2025. A graphical
representation of the project identified on the subject properties (#4), projected costs, and project
analysis taken from the study is included below for context.
Page 7 of 11
The proffer statement includes partial construction (660+/- linear feet) of a two-lane portion of
the EFCTS identified collector roadway, from Senseny Road, north to the first intersection/point-
of-access to the residential land bay. However, this proposal while implementing a segment of
the identified major collector roadway on the subject properties between Senseny Road and
Route 7 (via Hallowed Crossing Way/Opequon Crossing) would still leave a significant gap in
the transportation network between the completed section and the current terminus of Hallowed
Crossing Way, and completion of the ultimate link between the two roadways. This segment
would need to be completed by others, potentially Frederick County, and may require state
and/or federal transportation dollars that are yet to be secured. Unless fully County funded, the
timeframe to secure funding, design and construct the remaining segment is estimated to be a
minimum of 6-8 years. This timeframe is highly variable and dependent upon successful grant
applications that have not yet been developed or approved for submission by the Board of
Supervisors. Outside of the EFCTS, this potential project has not been scoped, designed, or
proposed for funding.
Capital Impacts & Levels-of-Service (LOS):
When evaluating capital costs of new residential development, the County projects per unit costs
through the Capital Impact Model (CapIM). The model has been designed to project fiscal impacts
that may result from land use change decisions. The Board of Supervisors updated the County’s
adopted Capital Impact Model on October 9, 2024. Cash proffer categories (per the Code of
Virginia) are limited to public safety facilities, school facilities, and parks and recreation facilities.
On the following page is the projected capital impact by unit type from the County’s adopted
Capital Impact Model (CapIM) for single-family detached and attached units.
Page 8 of 11
Single-Family Detached (SFD)
Single-Family Attached (SFA)
The applicant has proffered $17,322 per single-family detached (SFD) unit and $15,596 per single-
family attached (SFA) unit. As proffered (7/23/25), the rezoning fully implements CapIM
monetary contributions for proposed residential housing types.
The proposed 319-unit residential development is projected to generate up to 120 students (60
elementary school children; 26 middle school schoolers and 35 high schoolers). The current public
schools’ level of service (LOS, August 2025) for facilities that would serve the proposed
development are as follows:
Page 9 of 11
Public Schools Level of Service (LOS)*
School
Current
Enrollment
(2023)
Program
Capacity
(2020)
% (CapIM) % (with proposed development
generated students)**
Greenwood
Mill
Elementary
School
590 696 84.63% 93.3%
Admiral
Richard E
Byrd
Middle
School
817 900 90.44% 93.6%
Millbrook
High
School
1,563 1,341 116.33% 119.1%
*CapIM Output – July 2025
**Planning and Development staff generated
Note: The LOS analysis above reflects a point-in-time (2025). It does not include pipeline projects
(unbuilt residential units) generating new students in the vicinity of the above schools, future
redistricting of school service areas, or capital project planning, such as the 4th high school, that
may alleviate strain on school capacity.
Proffer Statement, Generalized Development Plan (GDP), & Impact Analysis:
Proffer Statement
(Revised 7/13/2025)
Staff Comment
Proffer 1 – Land Use No comment.
Proffer 2 – Parks and Recreation
No comment.
Proffer 3 – Proffer Payments
No comment.
Proffer 4 – Creation of Homeowners’
Association
No comment.
Proffer 5 – Water and Sewer No comment.
Proffer 6 – Historic Resources No comment.
Proffer 7 - Transportation The proposed two-lane section of the future
major collector roadway (Proffer 7) is only to
be provided to the first intersection serving the
residential land bays within the development
Page 10 of 11
and not to the limits of development adjoining
the Opequon Crossing community. This leaves
a significant gap to create/complete a road
connection between Senseny Road and
Hallowed Crossing Lane (and ultimately
Route 7) as identified in the Eastern Frederick
County Transportation Study.
Proffer 8 – Exclusion of Public Property from
Proffers
No comment.
Proffer 9 – Severability No comment.
Proffer 10 – Binding Effect No comment.
Proffer 11 – Escalator Cause No comment.
The generalized development plan (GDP) revised July 23, 2025, is included below and reflects
proffered improvements, open space and residential land bays.
Page 11 of 11
Planning Commission Summary from 12/18/24 Work Session
The Planning Commission held a work session at 6p.m. on Wednesday December 18, 2024, to
discuss the proposed rezoning application with staff and the applicant and their representatives
(Commissioners Kerns & Tripplet absent). Issues discussed for the applicant to address prior to
the public hearing: the need to complete the planned road connection between Senseny Road and
Hallowed Crossing Way (and ultimately Route 7) of which only a portion is proffered to be
completed, monetary contributions (including the proposed “credit” for future ROW) to offset
anticipated capital impacts, particularly to public schools, and revisions to transportation proffers
regarding site access and circulation (including inter-parcel connection to Canyon Road/Senseny
Glen).
Planning Commission Summary from 01/15/25 Regular Meeting
The Planning Commission held a public hearing on January 16, 2025 at their regular meeting. The
topics discussed by the Planning Commission included: the timing of transportation improvements
and completion of the proposed “parkway” between Senseny Road and Route 7, the availability
of public utilities and impact of new residential development of water resources, impacts to county
facilities, particularly schools, and the escalator clause included in the proffer statement. The
applicant noted the importance of the ROW dedication for future Route 37 and partial completion
of the “parkway” on the subject properties as the “first step” to making a connection between
Senseny Road and Route 7 and alleviating traffic in this area of the County. Thirteen (13) members
of the public spoke in opposition to the proposed rezoning, including the HOA President of
Senseny Glen. The public comments cited concerns with water resources, safety along roadways,
traffic, and County infrastructure not keeping pace with development, particularly public schools.
The Planning Commission voted 8-2-1 to recommend denial of the proposed rezoning
(Commissioners Aikens & Dehaven – no; Commissioner Bottorf – abstain; Commissioners
Kozel & Triplett - absent).
Staff would note the revised proffer statement (7/23/25) and GDP (7/23/25) are slightly
different from the proffer statement presented to the Planning Commission in January 2025.
The July 2025 proposal includes more residential units, and a lesser commitment to partial
construction of the major collector roadway (future Route 37).
Following this public hearing, staff are seeking a decision from the Board of Supervisors on
this Rezoning application.