HomeMy WebLinkAbout10-24 PC Staff Report REZONING #10-24
Winchester East at Opequon Crossing (Riggleman-Gross)
Staff Report for the Planning Commission
Prepared: January 8, 2025
Staff Contact: M. Tyler Klein, AICP, Senior Planner
Executive Summary:
Meeting Schedule
Planning Commission: 12/18/2024
Planning Commission: 01/15/2025
Action: Work Session
Action: Pending
Board of Supervisors: 02/12/2025 Action: Pending
Property Information
Property Identification Number (PIN) 65-A-194B & 65-A-195
Address 2737 & 2747 Senseny Road, Winchester
Magisterial District Red Bud
Acreage +/- 91.7-acres
Zoning & Present Land Use Zoning: RA (Rural Areas) District
Land Use: Residential/Agricultural
Proposed Zoning RP (Residential Performance) District
Adjoining Property Zoning & Present Land Use
North: RP (Residential Performance) District Land Use: Residential/Open Space
South: Rural Areas (RA) District Land Use: Residential
East: Clarke County Land Use: Clarke County
West: RP (Residential Performance) District Land Use: Residential (single-family
detached)
Proposed Use
This is a request to rezone two (2) parcels totaling +/-91.7-acres from the RA (Rural Areas)
Zoning District to the RP (Residential Performance) Zoning District with proffers to develop
up to 303 single-family residential units.
Positives Concerns
The proposed rezoning “generally”
implements Plan policy specific to residential
land uses on portions of the property west of
future Route 37.
A significant portion of the site around the
Opequon Creek is designated for open space
Proffer 7 requires several clarifications
regarding approval of engineering for design
of public roadways, access to the proposed
major collector roadway, points-of-access to
the development from adjoining properties and
roadways, construction access, and 10’ wide
shared use trail location. Clarity is needed to
31
Page 2 of 12
and recreation (trail) with public access
proffered if there are other public trails
connected to it. This serves to provide a natural
buffer to rural areas in Clarke County to the
east and implements Plan policy specific to
natural resource conservation and
preservation.
The rezoning promotes a portion of a more
near-term solution to circulation and the future
transportation network between Senseny Road
and Route 7 that is supported; recommended in
the draft Eastern Frederick County
Transportation Study (EFCTS).
The proffer statement fully implements
Capital Impact Model (CapIM) monetary
contributions for residential housing types.
To address impacts on adjoining residences,
the proffer statement restricts the hours of
operation for construction activities, including
deliveries, on the property from 7AM to 9PM
Monday through Friday and 9AM to sunset on
Saturdays.
ensure orderly and timely development of
transportation improvements and achieving
desired circulation and access.
The proposed two-lane section of the future
major collector roadway is only to be provided
to the intersection serving the residential land
bays within the development and not to the
limits of development adjoining the Opequon
Crossing community. This leaves a significant
gap to create/complete a road connection
between Senseny Road and Hallowed
Crossing Lane (and ultimately Route 7) as
identified in the Eastern Frederick County
Transportation Study.
Proffer 11.1 specifies interest on monetary
contributions would not take effect until 20-
months after the rezoning is approved and caps
the annual interest at 6% per year
uncompounded. Generally speaking, inflation
compounds and in turn this may not otherwise
offset anticipated inflation.
A revised proffer statement, dated January 6, 2025, has been included for consideration.
32
Page 3 of 12
Review Agency Comments:
Review Agency
Comment Date Comment Summary Status
Frederick County (FC)
County Attorney
October 25,
2024
See attached letter.
Legal
form.
Frederick Water October 11,
2024
“The application's Impact Statement
is silent on proposed water and
sewer demands. The applicant will
need to ensure that adequate water
distribution and sanitary sewer
conveyance and treatment system
capacity is available to achieve the
projected build-out of the project. It
is the applicant's responsibility to
design, acquire easements, and
construct the extensions of water
and sewer services necessary to
satisfy their proposed demands. The
Proffer Statement does acknowledge
the applicant's responsibility to
extend services and construct a
pump station to ultimately convey
sanitary flows to Frederick Water's
sanitary sewer system.”
See attached letter.
Virginia Department of
Transportation
(VDOT)
November 26,
2024
See attached letter. Comments
addressed.
FC Public Works September 30,
2024
“A comprehensive review shall be
performed if a site plan is submitted
in the future.”
FC Fire Marshal October 1, 2024 “All fire department access roads,
fire lane markings, water supply
needs, and other applicable
development shall meet the criteria of
the current addition of the Frederick
County Fire Prevention Code in
future developments.”
Frederick Park &
Recreation
October 1, 2024 “Referenced recreation areas are not
shown on GDP. A shared use path
(10’) along Senseny Road frontage
and a recreation trail providing creek
access along Opequon Creek are
recommended.”
Comments
partially
addressed.
33
Page 4 of 12
Historic Resources
Advisory Board
(HRAB)
October 18,
2024
See attached letter. Comment
addressed.
Frederick County
Public Schools
September 3,
2024
See attached letter.
Frederick-Winchester
Health Department
September 26,
2024
“This office has no objections to the
proposed rezoning.”
Clarke County –
Department of
Planning
October 8, 2024 See attached letter. Comments
partially
addressed.
34
Page 5 of 12
Planning & Zoning Staff Analysis:
Comprehensive Plan Conformance:
The Comprehensive Plan (adopted November 2021) and the Senseny/Eastern Frederick Urban
Area Plan (SEFUAP) provide guidance on the future development of the subject property. The
Plan identifies the subject properties as “residential” and “rural areas.” The subject properties are
also within the limits of the Sewer and Water Service Area (SWSA) and the Urban Development
Area (UDA). The Area Plan states:
“Outside of the urban centers described above, the residential land uses in the
Senseny/Eastern Frederick study area are defined in three main categories:
• R4 – these are generally reflective of our existing residential densities at
approximately 4 units per acre.
• R6 – these are slightly higher residential densities at approximately 6 units
per acre (this is generally attached house development).
• Higher density residential – these are generally multifamily and a mix of
other housing types with densities of approximately 12-16 units per acre
(this density is necessary to accommodate the anticipated growth of the
County within the urban areas and is essential to support the urban center
concept identified in the Comprehensive Plan and this study).
The residential land uses outside and east of Route 37 are envisioned to be rural area
residential in character. Route 37, to the north and east of Route 50, may generally be
considered as the boundary between the urban areas and rural areas within this study area.
This provides a transition area to the Opequon Creek and to the well-established rural
character of adjacent Clarke County.”
The rezoning proposes “single family residential (attached and/or detached)” in areas identified
for future “residential” land uses. However, the generalized development plan (GDP, dated
11/19/24) also identifies “single-family residential” in areas planned to remain “rural” (i.e. those
areas east of future Route 37 and the planned transition area to the Opequon Creek and Clarke
County. In this respect, the proposed rezoning is not fully consistent with the adopted Plan policy
as it pertains to future land use compatibility east of future Route 37. However, it may otherwise
be appropriate to develop the site as “residential” given the surrounding/existing residential
neighborhoods to the north, west and south.
The Area Plan also identifies “Natural Resources” around Opequon Creek. The Plan states:
“Within the Senseny/Eastern Frederick Urban Areas Plan, effort should focus on the
creation of greenways, stream valley parks and stream buffers around waterways, while
taking into account environmentally sensitive areas. Pedestrian facilities should be
constructed that connect these features to other public facilities. Many such examples have
been identified on the accompanying map. Environmental corridors should be incorporated
with all development activities to ensure safe movement and protection of species and
future development within the study area should take into account the natural resources
located on and around their property.”
35
Page 6 of 12
The proposal includes the use of the Opequon Creek watershed for recreational purposes, including
a 6-foot (FT) wide natural surface trail (Proffer 2.2 and GDP).
Transportation & Site Access:
The Plan identifies transportation improvements in the vicinity of the subject properties, including
the future Route 37 bypass (“major arterial roadway”) which bisects the subject properties
(north/south). Senseny Road (Route 657) is identified as an “improved major collector,” and future
multi-use trails planned Senseny Road and Future Route 37.
The proffer statement and the GDP include right-of-way (ROW) reservation for future Route 37
(104’) and additional widths as required, and construction of two (2) lanes as access to the
residential land bays from Senseny Road. Additionally, the rezoning proposal addresses the future
widening of Senseny Road to an “improved major collector” and the Plan identified 10’ multi-use
trails are absent from the proposal. The applicant should further study if connections can be made
to existing off-street trails in Senseny Glen and Twin Lakes subdivisions.
The proposal generally implements Plan policy specific to future right-of-way dedication for
Route 37 and improved Senseny Road.
It is anticipated that development of up to 303 single-family residences will create additional
vehicle traffic impacting on the existing network (Senseny Road, Greenwood Road, Channing
Drive). However, the Traffic Impact Analysis (TIA, September 19, 2024) notes:
“All study intersections operate at an acceptable level of service and queues with and
without the addition of the proposed development. Based on the capacity and queueing
analysis results, the proposed development will not have a substantial impact on the
surrounding transportation and roadway network. Therefore, no improvements are
recommended to mitigate the traffic generated by the proposed development.”
36
Page 7 of 12
The TIA study intersections included Senseny Road and Twinbrook Circle/Senseny Glen Drive
(existing), Woodrow Road/Canyon Road and Channing Drive (existing), and Senseny Road and
proposed site entrance (future).
The rezoning promotes a more near-term solution that is recommended in the draft Eastern
Frederick County Transportation Study (EFCTS), which the Board of Supervisors has not yet
endorsed (anticipated January 2025) but has been reviewed and endorsed by the Transportation
Committee (TC) and the Planning Commission. A graphical representation of the project
identified on the subject properties (#4), projected costs, and project analysis taken from the study
is included below for context.
The development of access points on the parkway, envisioned by the EFCTS, should be minimized
to the maximum extent reasonably possible to preserve future north south flows. However, this
proposal while implementing a segment of the identified major collector roadway on the subject
properties between Senseny Road and Route 7 (via Hallowed Crossing Way/Opequon Crossing)
would still leave a significant gap in the transportation network between the northern limits of this
37
Page 8 of 12
development and the current terminus of Hallowed Crossing Way, and completion of the ultimate
link between the two roadways. This segment would need to be completed by others, potentially
Frederick County, and may require state and/or federal transportation dollars that are yet to be
secured. The timeframe to secure funding, design and construct the remaining segment is estimated
to be 6-8 years or more depending upon funding source and success of funding applications.
Capital Impacts & Levels-of-Service (LOS):
When evaluating capital costs of new residential development, the County projects per unit costs
through the Capital Impact Model (CapIM). The model has been designed to project fiscal impacts
that may result from land use change decisions. The Board of Supervisors updated the County’s
adopted Capital Impact Model on October 9, 2024. Cash proffer categories (per the Code of
Virginia) are limited to public safety facilities, school facilities, and parks and recreation facilities.
Below is the projected capital impact by unit type from the County’s adopted Capital Impact Model
(CapIM) for single-family detached and attached units.
Single-Family Detached (SFD)
Single-Family Attached (SFA
38
Page 9 of 12
The applicant has proffered $17,322 per single-family detached (SFD) unit and $15,596 per single-
family attached (SFA) unit. As proffered (1/6/25), the rezoning fully implements CapIM monetary
contributions for proposed residential housing types.
The proposed 303-unit residential development is projected to generate 113 students (49
elementary school aged children; 26 middle schoolers and 38 high schoolers). The current public
schools’ level of service (LOS, 2024) for facilities that would serve the proposed development are
as follows:
Public Schools Level of Service (LOS)*
School
Current
Enrollment
(2023)
Program
Capacity
(2020)
% (CapIM) % (with proposed development
generated students)**
Greenwood
Mill
Elementary
School
590 696 84.63% 91.8%
Admiral
Richard E
Byrd
Middle
School
817 900 90.44% 93.6%
Millbrook
High
School
1,563 1,341 116.33% 119.4%
*CapIM Output – October 2024
**Planning and Development staff generated
Proffer Statement, Generalized Development Plan (GDP), & Impact Analysis:
Proffer Statement
(Revised 1/6/2025)
Staff Comment
Proffer 1 – Land Use No comment.
Proffer 2 – Parks and Recreation
No comment.
Proffer 3 – Proffer Payments
No comment.
Proffer 4 – Creation of Homeowners’
Association
No comment.
Proffer 5 – Water and Sewer No comment.
Proffer 6 – Historic Resources No comment.
39
Page 10 of 12
Proffer 7 - Transportation Proffer 7.1 and Proffer 7.6 should further
specify final engineering of public roadways is
also subject to Virginia Department of
Transportation (VDOT) approval.
Proffer 7.2 should further specify access to
Senseny Road (Route 637) is limited to one (1)
entrance. The proffer could be further
enhanced by limiting access to the
development to three (3) total entrances, as
noted in the VDOT comment letter, one (1)
from Senseny Road, one (1) from Canyon
Road, and one (1) from Hallowed Crossing
Way (future connection).
Proffer 7.3 should be revised to specify when
access to Canyon Road will be provided, for
example occupancy of 50% of the residential
units. The proffer should be further clarified to
prohibit access to Canyon Road for
construction vehicles and materials.
Proffer 7.4 should further clarify that access to
the “major collector road” should be limited to
one (1) point of access for each residential land
bay as shown on the GDP.
Proffer 7.5 and the generalized development
plan (GDP) should further extend the to-be
constructed “two-lane section of a major
collector roadway” beyond the proposed
intersection and to the limits of the future
bridge. A trigger should be included requiring
the two-lane section of the major collector road
to be completed prior to occupying the first
residential unit. Staff is concerned that absent
this trigger and implementation of the two-lane
section, all new trips generated by the
development would only have access from
Canyon Road/Senseny Glen subdivision until
the access road is complete.
Proffer 7.8 should be revised to specify that
the 10’ wide shared used path should continue
to extend along the proposed two-lane section
of the future connector road, and the GDP
40
Page 11 of 12
should be updated to reflect this trail section
as well. Trail connectivity from the proposed
development to existing residential
communities to the west may also be
appropriate.
Proffer 8 – Exclusion of Public Property from
Proffers
No comment.
Proffer 9 – Severability No comment.
Proffer 10 – Binding Effect No comment.
Proffer 11 – Escalator Cause Interest on monetary contributions would not
take effect until 20-months after the rezoning
is approved and caps the annual interest at 6%
per year uncompounded. Generally speaking,
inflation compounds and in turn this may not
otherwise offset anticipated inflation.
41
Page 12 of 12
The generalized development plan (GDP) dated November 19, 2024, is included below. Please
note, the GDP was not updated following the Planning Commission work session. The GDP
depicts the future right-of-way for Senseny Road, future Route 37, the half-section (two-lane)
major collector roadway, shared 10’ shared use path, preserved open space, 6’ natural surface trail
along Opequon Creek, and the proposed residential land bays.
Planning Commission Summary from 12/18/24 Work Session
The Planning Commission held a work session at 6p.m. on Wednesday December 18, 2024, to
discuss the proposed rezoning application with staff and the applicant and their representatives
(Commissioners Kerns & Tripplet absent). Issues discussed for the applicant to address prior to
the public hearing: the need to complete the planned road connection between Senseny Road and
Hallowed Crossing Way (and ultimately Route 7) of which only a portion is proffered to be
completed, monetary contributions (including the proposed “credit” for future ROW) to offset
anticipated capital impacts, particularly to public schools, and revisions to transportation proffers
regarding site access and circulation (including inter-parcel connection to Canyon Road/Senseny
Glen).
Following a public hearing, staff are seeking a recommendation from the Planning
Commission to forward to the Board of Supervisors on this rezoning application.
42