HomeMy WebLinkAbout26-21 Comment ResponsejDICE ENGINEERING, PLC February 18, 2022 Mr. Tyler Klein, AICP Dept. of Planning & Development 107 N. Kent St., Suite 202 Winchester, VA 22601 RE: Stonewall 4 Site Plan (#26-21) Planning Review Comments Dear Mr. Klein: The following represents Dice Engineering, PLC responses to your comments provided via letter, dated September 29, 2021, concerning the Stonewall 4 site plan review. This plan now incorporates Arch/MEP design info that was not available for the previous submission. Review comments are shown in bold italics. I am responding on a point -by -point basis to correlate with your comments. 1. Site Plan Reference. Add the site plan number, SP# 26-21, to the plan set. The site plan number is provided on all sheets. 2. Proffers. Staff notes inclusion of the letter from the Department of Interior dated February 13, 2020, satisfies the requirements for HABS contained in proffer 4.1. Proffer 4.2 will need to be addressed, and documentation provide to the Department of Planning and Development, prior to any permit approval for demolition. Comment noted; an additional note pertaining to the architectural historian study is now included (see sheet C-03). 3. Photometric Plan. A site lighting plan containing the applicable standards contained in the Zoning Ordinance §165-201.07, Outdoor Lighting Standards is required for review. Building -mounted and pole -mounted lighting fixtures type, location, mounting height and minimum/maximum/average illumination levels should be provided. Specify a note on the plan conformance with the above Zoning Ordinance section number requirements. The site lighting plan with photometric information is now included (see sheets C-16 & C-17) with the associated lighting details (see sheet C-39). 4. Site Plan — Phase I & II. The following comment should be addressed on Sheets C- 08 and C-12, as appropriate: o Curb & Gutter: Concrete curbing and gutters shall be installed around the perimeter of all parking lots (§165-202.01(D)(3)). The Zoning Administrator may allow for the elimination of curb and gutter for parcels located inside of the Sewer and Water Service Area when necessary to implement low -impact 101 Shelby Ct. 540.974.5157 (phone) Email: office@dice-eng.com Winchester, VA 22602 540.723.4868 (fax) Dept. of Planning and Development RE: Stonewall 4 Site Plan (SP #26-21) February 18, 2022 Page 2 development design. This shall only be permitted where practices such as bioretention, infiltration trenches, and rain gardens are used and only where it can be demonstrated that soil conditions are favorable, or if an adequate underdrain is included in the design and only when approved by the Director of Public Works (§165-202.01(D)(3)(c)). If it is the intent of the designer to implement LID for portions of the employee parking areas, add a note to this effect. The stormwater management design has been revised in these areas, and while there are still grass channels running parallel to the parking areas, these are no longer designed specifically as LID areas for water quality purposes. However, it is still preferable to have the parking areas sheet flow into these proposed grass swales and for runoff to be collected by a series of storm inlets located in the swales in lieu of a typical curb and gutter with curb inlets arrangement. Therefore, a sawtooth curb with gutter is proposed in these areas to promote the conveyance to the grass swales via sheet flow (see plan sheets C-08 & C-12, and detail sheet C-45). 5. A_gency Approvals. Comment sheets (approvals) are required from the following agencies: Building Inspections, Public Works, Geographic Information Systems (G1S), the Fire Marshall, Frederick Water, and the Virginia Department of Transportation (VDOT). Comment noted; approvals from GIS and Building Inspections are attached, and the remaining approvals will be provided once all have been received. Please find attached one hard copy of the site plan for your review. If you have any questions, please don't hesitate to contact me. Thank you for your time and consideration regarding this matter. Sincerely, Dice Engineering, PLC Dennie D. Dunlap III, P.E. Principal