Loading...
HomeMy WebLinkAbout09-25 CommentsNo further road names or addresses required. 2/5/2025 2/7/2025 No 2/7/2025 107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000 February 28, 2025 Mr. Trenton Caudill, PE Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE: Site Plan Comments – Graystone Industrial Center – Building 1 Parking Expansion Frederick County, Virginia Dear Mr. Caudill: Upon review of the site plan dated February 3, 2025, we recommend approval of the subject plan. (.84 acres disturbed) **Effective July 1, 2025, all plans submitted for review will need to comply with the DEQ VRRM 4.1 and the new stormwater handbook. I have included the link below to access the new stormwater handbook. The plans and all details must be updated to comply with the new stormwater handbook requirements.** https://online.encodeplus.com/regs/deq-va/index.aspx Sincerely, Joe C. Wilder Director of Public Works JCW/kco cc: Planning and Development file 1 Trenton Caudill From:Spielman, Joseph (VDOT) <Joseph.Spielman@vdot.virginia.gov> Sent:Thursday, February 20, 2025 7:54 AM To:Trenton Caudill Cc:Johnson, Joseph (VDOT) Subject:Graystone Industrial Center - Building 1 Expansion - Approval Trenton, A VDOT review has been conducted for the revision of the Graystone Industrial Center - Building 1 Expansion, dated February 3, 2025. Based off the review of the drawings, the site plan is approved by our office. · Our review and comments are general in nature. Should details be overlooked during plan review or conditions in the field exist such that additional measures are warranted, such measures shall be completed to the satisfaction of the department. · Materials used and methods of construction shall adhere to the current observed VDOT Road and Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control Devices, and Land Use Permit Special Provisions. · A preconstruction conference shall be held by the engineer and/or the developer with the attendance of the contractor, various County agencies, utility companies, and VDOT prior to initiation of work. · All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe or drainage easement. · Any construction related changes to the approved plan must come through the design engineer to VDOT for approval. Please allow a minimum of 5 business days for VDOT review. · A Land Use Permit shall be obtained before any work is performed on the State’s right-of- way. The permit is issued by this office and may require application fees, the salary & expenses of a State assigned inspector, and surety bond coverage. · Please submit an electronic copy of the plans to this office for file and permitting. If you have any questions or need further information, please do not hesitate to contact me. Ryan Joseph Ryan Spielman Land Development Engineer / Edinburg Residency Virginia Department of Transportation 540-535-1829 2 joseph.spielman@vdot.virginia.gov