Loading...
HomeMy WebLinkAbout09-24 Impact Analysis Statement MIDDLETOWN, LLC REZONING IMPACT ANALYSIS STATEMENT Tax Parcel 84-A-78 Back Creek Magisterial District Frederick County, Virginia July 29, 2022 Revised August 6, 2024 Current Owner: Wendell Hester Trust Brian J. Hester, Trustee & Jason G. Hester, Trustee Applicant: Middletown, LLC Contact Person: Christopher Mohn, AICP Greenway Engineering, Inc. 151 Windy Hill Lane Winchester, VA 22602 540-662-4185 Greenway Engineering July 29, 2022 Middletown, LLC Rezoning Revised August 6, 2024 File #0127E Impact Statement/CMM 2 MIDDLETOWN, LLC REZONING IMPACT ANALYSIS STATEMENT EXECUTIVE SUMMARY This report has been prepared for the purpose of assessing the impact to Fredrick County of the proffered rezoning of 101.25± acres from RA, Rural Areas District to TM, Technology Manufacturing Park District, as proposed by Middletown, LLC (Applicant). The subject property is identified as Tax Parcel 84-A-78 and located on the east side of Valley Pike (U.S. Route 11 South) roughly 3,000 feet north of the Town of Middletown Corporate Limits. The subject property is currently owned by the Wendell Hester Trust, Brian J. Hester Trustee and Jason G. Hester Trustee. The Applicant proposes to rezone the subject property to allow development of a mix of technology-related industrial and public uses as permitted by the TM District. Specifically, as shown on the proffered General Development Plan (GDP), the Applicant seeks to establish an Industrial Use land bay totaling approximately 70.85± acres, within which data center or other technology-related industrial uses would be permitted to develop. The maximum development intensity will be limited by weekday trip generation, with industrial uses allowed to generate up to 3,239 weekday trips, consistent with the traffic impact analysis prepared for this application. Limiting development intensity by weekday trip generation is appropriate for the TM District as it will provide flexibility to accommodate the building and floor area scenarios possible with the district’s permitted uses. The Applicant further proposes a Public Use land bay comprised of approximately 10± acres that will be reserved for future dedication to Frederick County for development of public or quasi-public uses. Ultimate use of this acreage will be at the discretion of Frederick County. That said, the site’s proximity to Interstate 81 and adjacency to Middletown Elementary School make it well suited for parks and recreation uses, such as, but not limited to, an indoor aquatic center, ice rink, or other passive or active facilities to meet community needs. The Applicant has proffered to mitigate the impacts attributable to the proposed rezoning through a combination of design features and monetary contributions. To minimize impacts to adjoining uses, extensive buffers will be provided along Valley Pike, Mustang Lane, and the site boundary with Middletown Elementary School. Additionally, vehicular access to the Industrial Use land bay will be prohibited on Mustang Lane, with access for such traffic instead limited to two entrances on Valley Pike served by dedicated right and left turn lanes. The combination of these features will ensure the physical integration of the proposed industrial uses into the surrounding community with minimal disruption to established residential and institutional uses. Greenway Engineering July 29, 2022 Middletown, LLC Rezoning Revised August 6, 2024 File #0127E Impact Statement/CMM 3 The traffic analysis prepared by Wells + Associates (Wells) for this application indicates that intersections impacted by the projected industrial trips will function at acceptable level of service conditions, assuming signalization of the Interstate 81 northbound ramp/Reliance Road and the Valley Pike/Reliance Road intersections. The latter signalization is proffered to be completed by the developer of the Village at Middletown project when requested by VDOT. The Wells analysis indicates that signalization of the Interstate 81 northbound ramp/Reliance Road intersection will be needed regardless of this rezoning application, as this improvement will be required to address the impacts of regional traffic growth and construction of previously approved developments. Indeed, trips generated by the rezoning application are projected to constitute up to a maximum of only 15% to 20% of the traffic at this intersection. While not solely responsible for the need for this regional transportation improvement, the Applicant has proffered a proportional monetary contribution of $200,000 for use by Frederick County and VDOT in funding the signalization project. Alternatively, this contribution could be combined with other funding sources by Frederick County and VDOT to complete other needed improvements in and around the interchange area. In either case, the Applicant’s proffered contribution will ensure that any potential impacts attributable to the rezoning application to the surrounding road network are effectively mitigated. Basic Site and Application Information Location: East side of Valley Pike (U.S. Route 11), approximately 3,000 feet north of Town of Middletown Magisterial District: Back Creek District Property ID Numbers: 84-A-78 Current Zoning: RA, Rural Areas District Current Use: Undeveloped Proposed Zoning: TM, Technology Manufacturing Park District with proffers Proposed Use: Industrial and Public, with potential Data Center Use Total Rezoning Area: 101.25±-acres Rezoning Area Breakdown: 70.85± acres – Industrial Use Development Area 10± acres – Public Use Development Area 18.7± acres – SWM/BMP and Proffered Buffer Areas 1.7± acres – Mustang Lane Ingress-Egress Easement Greenway Engineering July 29, 2022 Middletown, LLC Rezoning Revised August 6, 2024 File #0127E Impact Statement/CMM 4 COMPREHENSIVE POLICY PLAN Sewer and Water Service Area The Sewer and Water Service Area (SWSA) is generally consistent with the UDA, but also extends outside of the UDA to accommodate areas of the County in which commercial, industrial, and institutional land uses are desired, but residential development is not. The subject property is currently located wholly within the SWSA as established by the Middletown/Lord Fairfax Sewer and Water Service Area Plan and is therefore properly situated for development served by public water and sewer. Comprehensive Plan Conformity The subject property is a component of the Middletown/Lord Fairfax Sewer and Water Service Area Plan, which is a small area plan within the Frederick County Comprehensive Plan (Comprehensive Plan). The Area Plan designates the subject property for future Mixed- use Industrial/Office land use. Neither the Area Plan nor Comprehensive Plan describe the intended characteristics of this land use designation, meaning there are no policy guidelines for how industrial and/or office uses are expected to be configured or allocated on properties designated Mixed-use Industrial/Office. However, in practice this land use designation is meant to provide areas for development of Economic Development Authority (EDA) targeted industries, data centers, offices, and low-impact industrial uses, which aligns with the intent of the TM District. The proffered General Development Plan (GDP) designates an approximately 70.85±-acre land bay for development of industrial land uses, identified as the Industrial Use development area. Additionally, the Applicant has proffered to reserve approximately 10± acres of the subject property for future development of public uses, identified as the Public Use development area. While Frederick County will have discretion regarding the ultimate use of the acreage, the site is well situated as a potential location for a regional parks and recreation facility that includes an indoor aquatic center and/or ice rink. Regardless of the type of public facility ultimately developed, by combining the proffered reservation of land for public use with the wide array of uses permitted in the TM District, this rezoning provides a framework for ensuring the subject property develops with a diverse mix of land uses as envisioned by the Comprehensive Plan. SUITABILITY OF THE SITE Access The subject property has approximately 2,275± feet of frontage on the east side of Valley Pike (U.S. Route 11) and is bifurcated by Mustang Lane, a private access easement roadway that provides access to Middletown Elementary School. To avoid impacts to the adjoining school use, the Applicant has proffered to prohibit access to the Industrial Use land bay from Mustang Lane. As such, only public uses will be accessed via Mustang Lane. Access to the Industrial Use land bay will be provided by two commercial entrances on Valley Pike served Greenway Engineering July 29, 2022 Middletown, LLC Rezoning Revised August 6, 2024 File #0127E Impact Statement/CMM 5 by a dedicated right turn lane and the existing center left turn lane. The traffic analysis prepared by Wells + Associated for this application indicates that this access arrangement will adequately serve the planned industrial uses, and further that VDOT entrance spacing requirements can be satisfied . Flood Plains The 101.25±-acre subject property does not contain areas of floodplain as demonstrated on FEMA NFIP Map #51069C0320E Effective Date January 29, 2021. Wetlands A Wetland Delineation Report was prepared for the subject property by Greenway Engineering, Inc., dated April 7, 2021. The delineation identified one Pond (Pond A) and three stream channels (Stream A, Stream B, and Stream C) within the site area. Stream A is approximately 1-2 feet wide located in the northeast corner of the site. Stream A flows from the west and feeds into Pond A and then outfalls from Pond A and flows east offsite to a culvert under I-81. Stream B is located roughly in the eastern center of the project boundary and is approximately 1-3 feet wide. Stream B flows from the north to the southeast south before flowing offsite to the east into a culvert under I-81. Stream C is approximately 1-2 feet wide and flows into stream B. Stream C was mostly dry during field investigation. Sporadic erosional channels were observed on the southwest portion of the property most likely the result of receiving stormwater runoff from the adjacent school and Mustang Lane. These features were not deemed streams based on field observations. Pond A is approximately 0.23 acres in total size in the northeastern portion of the site. One data point was collected during the wetland delineation behind the dam of the pond to demonstrate that no wetlands were in that area. The U.S. Army Corps of Engineers confirmed these findings upon issuance of Jurisdictional Determination NAO-2021-01189, dated July 27, 2021. Any impacts to delineated wetland areas can be mitigated during site development. Greenway Engineering July 29, 2022 Middletown, LLC Rezoning Revised August 6, 2024 File #0127E Impact Statement/CMM 6 Soil Types The subject property contains soil types as demonstrated by the Soil Survey of Frederick County, Virginia and the Frederick County GIS Database. The following soil types are present on site:  1C - Berks Channery silt loam 8 to 15 percent slopes: these soils are described as having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture coarse texture. These soils have a moderate rate of water transmission.  3B - Blairton silt loam 2 to 7 percent slopes: these soils are described as having a drained area of slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission.  3B - Blairton silt loam 2 to 7 percent slopes: these soils are described as having an undrained area of very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high-water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission.  5B - Carbo silt loam 2 to 7 percent slopes: these soils are described as having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high-water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission.  6C – Carbo-Oaklet, very rocky silt loams 2 to 15 percent slopes: these soils are described as having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high-water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission.  8B - Chilhowie silty clay loam 2 to 7 percent slopes: these soils are described as having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high-water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. Greenway Engineering July 29, 2022 Middletown, LLC Rezoning Revised August 6, 2024 File #0127E Impact Statement/CMM 7  8C - Chilhowie silty clay loam 7 to 15 percent slopes: these soils are described as having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high-water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission.  32B - Oaklet silt loam 2 to 7 percent slopes: these soils are described as having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission.  32C - Oaklet silt loam 7 to 15 percent slopes: these soils are described as having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission.  41D – Weikert-Berks channery silt loam 15 to 25 percent slopes: these soils are described as having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high-water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. Other Environmental Features The property does not contain areas of steep slope, lakes or natural stormwater retention areas as defined by the Frederick County Zoning Ordinance. The subject property is also located in the geographic portion of the County that is underlain by karst geology. This environmental feature will not constrain development of future TM District uses and will be managed during final engineering design in accordance with all applicable ordinances and regulations. SURROUNDING PROPERTIES Adjoining property zoning and present use: North: RA, Rural Areas District Use: Agricultural/Residential South: RA, Rural Areas District Use: Institutional East: RA, Rural Areas District Use: Agricultural/Residential West: RA, Rural Areas District Use: Agricultural/Residential Greenway Engineering July 29, 2022 Middletown, LLC Rezoning Revised August 6, 2024 File #0127E Impact Statement/CMM 8 TRANSPORTATION Wells + Associates (Wells) prepared a traffic impact study (TIS) for the development of industrial uses on the subject property. Pursuant to initial VDOT review of the TIS, Wells prepared an Operational and Safety Analysis Report (OSAR) for the interchange at Interstate 81 and Reliance Road as well as a Signal Justification Reports (SJR) for both the northbound (NB) and southbound (SB) interchange ramps and the Reliance Road/Valley Pike (U.S. Route 11) intersection. The OSAR and SJR have been approved by VDOT. The existing conditions analysis indicates that all study intersections currently operate at an acceptable level-of-service (LOS) “C” or better during the weekday AM and PM peak hours. With the addition of regional traffic growth and the construction of pipeline developments (e.g., background traffic growth), the I-81 NB Ramp/Reliance Road and the Valley Pike (U.S. Route 11)/Reliance Road intersections are projected to operate beyond capacity and require signalization to maintain acceptable levels-of-service. The Industrial Use land bay is planned to be developed in phases based on market demand. This land bay is proposed to develop with TM District uses, which vary in terms of possible building/floor area composition, trip generation rates, and trip characteristics. That said, for the purposes of the TIS, OSAR, and SJR, the land bay was assumed to develop with 848,000 square feet of general industrial uses that are estimated to generate 580 AM peak hour trips (510 in and 70 out), 188 PM peak hour trips (26 in and 162 out), and 3,239 average weekday (24-hour) trips when fully occupied. The Applicant has proffered to limit the intensity of development in the Industrial Use development area based on this weekday trip generation scenario to accommodate the varied building/floor area possibilities associated with TM District uses while ensuring traffic impacts are effectively mitigated. With the addition of the site’s industrial traffic, acceptable levels-of-service at I-81 NB and SB Ramps at the Reliance Road interchange and the Valley Pike (U.S. Route 11)/Reliance Road intersections would continue to be maintained assuming the installation of traffic signals. Installation of the traffic signal at the I-81 NB Ramp intersection should be prioritized. All proposed traffic signals would satisfy warrants for signalization and have been previously recommended in other area traffic studies, and therefore represent existing improvement needs. All other study intersections are anticipated to operate at an acceptable level of service. Acceptable levels of service would be maintained at the site driveways whether one or two entrances are provided. The proposed access would meet VDOT spacing standards but would warrant exclusive right and left turn lanes, with the existing center-left turn lane being sufficient for such access. The Applicant has proffered to make a monetary contribution in the amount of $200,000 for use by Frederick County and VDOT to address projected signalization requirements at study area intersections and related improvements. The signal at the Valley Pike/Reliance Road intersection is proffered to be installed by the developer of the Village at Middletown project when requested by VDOT. Trips directly attributable to the proposed rezoning and possible Greenway Engineering July 29, 2022 Middletown, LLC Rezoning Revised August 6, 2024 File #0127E Impact Statement/CMM 9 TM District uses are projected to comprise no more than 15% to 20% of total traffic at the interchange intersections. Based on recent design experience, Wells estimates the cost of signalization to be approximately $350,000 per ramp intersection, or roughly $700,000 in total. As such, the Applicant’s contribution reflects and exceeds the project’s maximum proportional share of overall impacts and can be targeted to ensure acceptable level of service conditions at the I-81 NB Ramp/Reliance Road intersection or leveraged by Frederick County and VDOT to complete other improvements in and around the interchange area. Coupled with access-related improvements, the monetary contribution toward regional road improvements will ensure that all traffic-related impacts of the proposed rezoning are effectively mitigated. PUBLIC WATER AND SEWER The subject property is located within the Sewer and Water Service Area (SWSA) and is therefore entitled to be served by public water and sewer pursuant to applicable County policy. Existing development within the Middletown/Lord Fairfax SWSA obtains public water from the City of Winchester and public sewer from the Town of Middletown. However, with a 2014 update to the Area Plan, the Board of Supervisors identified Frederick Water as the required service provider for any new development within the Middletown/Lord Fairfax SWSA, even though the nearest Frederick Water infrastructure is located roughly 5 miles north of the SWSA boundary. The Applicant engaged with Frederick Water, the Town of Middletown, and Frederick County to determine the agreements and system requirements necessary to serve the subject property in conformance with this policy, to no avail. Recent guidance received from Frederick County indicated the Board of Supervisors may modify this policy with an affirmative action on the rezoning application, thereby allowing the site to be served by entities other than Frederick Water. Assuming ultimate approval of this rezoning application, the Applicant will proceed with serving the site with public water and sewer through the City of Winchester and the Town of Middletown, respectively. Water Supply The City of Winchester previously provided a “will serve” letter to the Applicant indicating sufficient capacity to serve the proposed industrial development on the site. A 24-inch water main owned by the City of Winchester extends along the length of the site frontage within the Valley Pike right-of-way. A meter extends off this main into the subject property, from which an 8-inch water line extends within the Mustang Lane private access easement to Middletown Elementary School. Sewage Conveyance and Treatment The subject property contains existing sewer infrastructure that includes a privately maintained sanitary sewer pump station and 8-inch gravity sewer main. Such infrastructure currently conveys effluent flows from Middletown Elementary School to the Town of Middletown system via inter-connected 4-inch and 6-inch force mains extending along Valley Pike. In addition to flows originating from the elementary school, the 6-inch segment of the Valley Pike force main also conveys effluent from Lord Fairfax Community College (LFCC). Upon reaching the Town of Middletown’s system, the flows convey via gravity mains to the Town’s wastewater treatment plant. Greenway Engineering July 29, 2022 Middletown, LLC Rezoning Revised August 6, 2024 File #0127E Impact Statement/CMM 10 Development of the Industrial Use land bay is anticipated to require peak flow capacity of 35 gpm. Per the design plans, the existing pump station is operating (per the design plans) at 93 gpm. The existing school utilizes in their peak month a flow of 18 gpm (3,420 GPD over an 8-hour period). Flow calculations show the existing pump station and subsequent force main has appropriate capacity to handle the anticipated flows from the proposed industrial uses. Given these capacities, the Applicant has proposed using these existing systems to connect to the Town of Middletown’s system. SITE DRAINAGE The topographic relief on the subject property generally follows a northeast to southwest pattern which directs drainage from the subject property towards the front of the property towards Valley Pike (Route 11). A complete stormwater management plan will be designed at the time of final engineering design. All associated stormwater quantity and quality measures will be designed in conformance with all applicable state and local regulations; therefore, site drainage and stormwater management impacting adjoining properties and the community will be mitigated. Based on preliminary analysis, the Applicant has identified the location of regional SWM/BMP facilities on the GDP that will be designed and constructed to serve both the Industrial Use and Public Use development areas. HISTORICAL SITES AND STRUCTURES The Frederick County Rural Landmarks Survey identifies the presence of the Jeff Henson House (DHR ID 034-1030) on the subject property but does not indicate any potential significance. Three other surveyed resources exist in proximity to the site, identified as the Abel Tract (DHR 032-0237), Sunnyside (DHR 034-1028), and Valley View Farm (DHR 034-1029). The Abel Tract is associated with the Cedar Creek Battlefield and is subject to an easement held by the Board of Historic Resources. The National Park Service Study of Civil War Sites in the Shenandoah Valley identifies the subject property as being located within the Battle of Cedar Creek study area boundary (DHR ID 034-0303); however, the subject property is located well outside of the defined core battlefield area and is also defined as having lost integrity due to existing development patterns. That said, due to the Civil War history in the Middletown area and proximity of the resources noted above, the Applicant commissioned Dovetail Associates to complete a Cultural Resources Survey to validate these conditions. The findings of Dovetail’s report confirm that the site did not play a significant role in the Battle of Cedar Creek or other Civil War action, and further that no other potentially significant resources are located on the subject property. Therefore, the proposed rezoning of the subject property will not generate negative impacts associated with historic resources. Pursuant to comments received from the Historic Resources Advisory Board (HRAB), the Applicant has proffered a monetary contribution of $3,000 for installation of interpretive signage on or adjacent to the Public Use development area. This contribution reflects the Greenway Engineering July 29, 2022 Middletown, LLC Rezoning Revised August 6, 2024 File #0127E Impact Statement/CMM 11 current cost of procuring such signage through Civil War Trails, whose existing network includes sites in Frederick County and the City of Winchester. !! !! !! !! !! !! !!!!!! !!!!!! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!! !! !! !! !! !! !! !! !! !! !! !! !! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !!!!!!!!!! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! £¤11 §¨¦81VALLEY PIKEMAIN STSKIRMISHERLNWO O L E N M I L L S D R COVILLESTLARRICKLNC O U G I L L R D RILEY M IL L L NMINERALSTGARLANDSNAPPDRMUSTA N G L N N BUCKTON RDKLIN E S M I L L L N RIENZI KNOLLLN KLINES MILL RD RID INGS M I L L RD 84 A 78 Map Data Source: Frederick County, VA. GIS Department, 2021 Data. 2019 Aerial Image.AERIAL OVERVIEW EXHIBITMIDDLETOWN LLC.FREDERICK COUNTY, VIRGINIADATE: 07-26-2022PROJECT ID: 0127EDESIGNED BY: DJCSCALE:1 inch = 625 feet625 0 625 Feet Legend Subject Parcel ! ! ! ! !! ! ! ! ! ! !! ! Middletown Town Limits Parcel Boundary µMIDDLETOWN LLC.AERIAL OVERVIEW EXHIBITCIVIL ENGINEERING | LAND PLANNING | GIS | LAND SURVEYING | ENVIRONMENTAL | ANALYTICAL LABORATORY | QUALITY CONTROL TESTING & INSPECTIONS WINCHESTER, VA | ASHBURN, VA | MARTINSBURG, WV £¤11 §¨¦81VALLEY PIKEMAIN STSKIRMISHERLNC O U G I L L R D LARRICKLNRILEY M I L L L NGARLANDSNAPPDRMUSTA N G L N KLIN E S M I L L L N NBUCKTONRDRIENZI KNOLLLN RID INGS M I L L RD 84 A 78 Map Data Source: Frederick County, VA. GIS Department, 2021 Data. 2019 Aerial Image.ZONING AND LOCATION EXHIBITMIDDLETOWN LLC.FREDERICK COUNTY, VIRGINIADATE: 07-26-2022PROJECT ID: 0127EDESIGNED BY: DJCSCALE:1 inch = 625 feet625 0 625 Feet Legend Subject Parcel Middletown Town Limits Parcel Boundary µMIDDLETOWN LLC.ZONING AND LOCATION EXHIBITCIVIL ENGINEERING | LAND PLANNING | GIS | LAND SURVEYING | ENVIRONMENTAL | ANALYTICAL LABORATORY | QUALITY CONTROL TESTING & INSPECTIONS WINCHESTER, VA | ASHBURN, VA | MARTINSBURG, WV§¨¦66 §¨¦81£¤11 LOCATION MAP SITE STEPHENS CITY MIDDLETOWN NOTE: THE ENTIRETY OF THE AREA SHOWN IS ZONED RA (RURAL AREAS DISTRICT) !! !! !! !! !! !! !! !! !!!!!!!! !! !!!! ! ! ! ! ! ! ! !!!!!!!!!!!! ! ! ! ! ! ! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !!!!!!!!!!!! !! !! !!!! !! !! !! !! !! !! !!!! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !!730740750720750740720730740750756752750720730740710 720720710 700700730740 73 0 740 740750730740750740 740710730720730 730760 £¤11 §¨¦81VALLEY PIKERIDINGS MILL RDGARLANDSNAPPDRMUSTA N G L N KLIN E S M I L L L N L A R R IC K LNRIENZI KNOLLLN WestRun M a rshBroo k 84 A 78 Map Data Source: Frederick County, VA. GIS Department, 2021 Data. 2019 Aerial Image.NATURAL FEATURES EXHIBITMIDDLETOWN LLC.FREDERICK COUNTY, VIRGINIADATE: 07-26-2022PROJECT ID: 0127EDESIGNED BY: DJCSCALE:1 inch = 500 feet500 0 500 Feet Legend Subject Parcel Parcel Boundary Stream Wetland (NWI) Delineated Streams Lake or Pond 100 Year Floodplain 10' Contours µMIDDLETOWN LLC.NATURAL FEATURES EXHIBITCIVIL ENGINEERING | LAND PLANNING | GIS | LAND SURVEYING | ENVIRONMENTAL | ANALYTICAL LABORATORY | QUALITY CONTROL TESTING & INSPECTIONS WINCHESTER, VA | ASHBURN, VA | MARTINSBURG, WVNOTE: CONTOURS ARE SHOWN AT A 10' INTERVAL UNLESS OTHERWISE NOTED. [e [e[e[e[e [e[e[e[e [e [e [e[e [e [e[e[e [e [e[e[e [e[e [e [e [e[e [e [e[e[e[e [e[e [e[e [e [e[e [e[e[e [e[e[e[e[e[e[e[e[e[e[e[e[e [e [e [e [e[e [e[e[e [e [e[e[e [e[e[e[e[e [e [e[e[e[e [e[e[e [e[e [e [e[e [e [e [e [e[e [e [e[e[e [e [e [e [e [e [e [e [e [e[e[e[e [e [e[e [e[e[e[e[e [e[e [e[e [e[e[e [e [e [e[e[e [e [e [e[e[e[e[e [e[e [e[e[e [e[e[e[e[e [e [e [e [e[e[e [e [e [e [e[e [e[e[e[e[e[e [e [e[e [e[e[e[e[e[e[e[e[e[e[e[e[e[e [e [e[e [e[e [e[e [e [e [e[e [e [e [e [e[e [e[e[e[e [e [e [e [e [e[e [e[e[e [e[e [e [e[e[e [e [e [e [e [e [e [e[e[e [e[e[e[e[e[e[e[e [e [e [e[e [e [e[e[e[e [e [e [e[e [e[e [e [e [e [e [e[e[e [e [e [e [e [e[e[e[e[e[e[e[e[e[e[e[e[e [e [e[e[e[e[e[e[e [e[e[e[e[e[e [e[e[e[e[e [e[e [e[e [e[e[e[e [e [e[e[e [e[e[e[e [e [e [e[e[e[e [e[e [e [e[e [e[e[e[e [e[e [e[e [e[e[e [e [e [e !! !! !! !! !! !! !!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!! !! !! !! !! !! !! !! !! !! !! !! !! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !!!!!!!!!! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! £¤11 §¨¦81VALLEY PIKEMAIN STSKIRMISHERLNWO O L E N M I L L S D R COVILLESTLARRICKLNC O U G I L L R D RILEY M IL L L NMINERALSTGARLANDSNAPPDRMUSTA N G L N N BUCKTON RDKLIN E S M I L L L N RIENZI KNOLLLN KLINES MILL RD RID INGS M I L L RD 84 A 78 34-1023Downes,Al House 34-1028Sunny Side 34-1029ValleyView Farm 34-131KendrickHouse Map Data Source: Frederick County, VA. GIS Department, 2021 Data. 2019 Aerial Image.HISTORIC FEATURES EXHIBITMIDDLETOWN LLC.FREDERICK COUNTY, VIRGINIADATE: 07-26-2022PROJECT ID: 0127EDESIGNED BY: DJCSCALE:1 inch = 625 feet625 0 625 Feet Legend Subject Parcel !! !! !! ! ! ! ! !!!!Middletown Town Limits Parcel Boundary [e Landmark Civil War Battlefields Cedar Creek µMIDDLETOWN LLC.HISTORIC FEATURES EXHIBITCIVIL ENGINEERING | LAND PLANNING | GIS | LAND SURVEYING | ENVIRONMENTAL | ANALYTICAL LABORATORY | QUALITY CONTROL TESTING & INSPECTIONS WINCHESTER, VA | ASHBURN, VA | MARTINSBURG, WV