TRANSMITTAL
Date: December 08, 2004 Project Name: Wakeland Manor, Phase Two
To: Frederick Co. -Dept. of Planning & Development BC Project #: 03032.62
Via: Hand
Attn: CAAaj,ce Mi s Purpose: Your Information
Copies Description
1 Subdivision Plan Revision
1 Memo to FCSA Detailing Changes Made Per Sheet
L
`v
Remarks: This revision changes the sanitary sewer service to lots 138 -143 (Phase 5) and offsite parcel "B" from a gravi
system to a low pressure system.
Copy To: From: Dennis G. Casbeer
Received By:
Date:
The BC Consultants, Inc
43 West Jubal Early Drive, Winchester, VA 22601
(540)665-0475 (540) 665-1874 (Fax)
www.bccon.com
BC Consultants
Planners • Engineers • Surveyors • Landscape Architects
Date: December 2, 2004
To: Mr. John Whitacre, Frederick County Sanitation Authority (FCSA)
From: Dennis Casbeer
RE: Wakeland Manor Phase 2
BC Project #: 03032.62
As we discussed with you earlier, enclosed are revisions to the referenced project. This
revision deletes the sanitary sewer that was extended from existing manhole "E" to
serve lots 138 to 143 in Phase 5 and the offsite Wakeman property, Parcel 'B'.
A detailed, sheet by sheet analysis of the plan revisions is as follows:
Sheet 4
The sanitary sewer serving Phase 5 and Parcel "B" has been deleted.
Sheet 4A
This sheet was included solely for the sanitary sewer extension. Therefore, this sheet
has been removed from the plan.
Sheets 12A
This sheet was included solely for the sanitary sewer extension. Therefore, this sheet
has been removed from the plan.
Sheet 24
The clearing, grading and erosion and sediment control devices associated with the
sanitary sewer extension construction have been deleted.
Sheet 24A
This sheet was included solely for the sanitary sewer extension. Therefore, this sheet
has been removed from the plan.
Sheet 25C
The clearing, grading and erosion and sediment control devices associated with the
sanitary sewer extension construction have been deleted.
Sheet 25C2
This sheet was included solely for the sanitary sewer extension. Therefore, this sheet
has been removed from the plan.
(V:\Project\_2003\03031\Engr\Documents\Sec2\WM2 San Grinder Rev.doc)