Loading...
HomeMy WebLinkAbout12-04 Wakeland Manor Phase 6 - Backfile (2)r " BC Consultants Planners • Engineers • Surveyors • Landscape Architects Date: January 6, 2005 To: Mr. Barry Sweitzer - VDOT Ms. Candice Perkins - Frederick County DPD From: Dennis Casbeer RE: Wakeland Manor Phase 6 BC Project #: 03032.32 This revision is to change the curb return radius on the east side of the Owens Lane entrance onto Macedonia Church Road. The curb return radius is reduced from 35' to 13'. The curb and gutter has also been eliminated in front of lot 10 on the Macedonia Church Road frontage. (The curb and gutter remains as originally proposed in front of lot 11 because additional right-of-way will be dedicated at that corner.) This revision is necessary because of the cost of relocating the existing utility pole and the developer's inability to obtain the additional right-of-way needed to construct the previously proposed curb return. This issue has been discussed with VDOT and they have preliminary accepted the reduced radius. If you have any questions or need additional information, please call me. Thanks. (V:\Project\_2003\03031\Engr\Documents\Sec6\WM6 Entrance Rev.doc) The BC Consultants, Inc. 43 West Jubal Early Drive Winchester, Virginia 22601 (540) 665-0475 Fax (540) 665-1874 BC Consultants Planners • Engineers • Surveyors • Landscape Architects Date: January 6, 2005 To: Mr. Barry Sweitzer - VDOT Ms. Candice Perkins - Frederick County DPD From: Dennis Casbeer RE: Wakeland Manor Phase 6 BC Project #: 03032.32 This revision is to change the curb return radius on the east side of the Owens Lane entrance onto Macedonia Church Road. The curb return radius is reduced from 35' to 13'. The curb and gutter has also been eliminated in front of lot 10 on the Macedonia Church Road frontage. (The curb and gutter remains as originally proposed in front of lot 11 because additional right-of-way will be dedicated at that corner.) This revision is necessary because of the cost of relocating the existing utility pole and the developer's inability to obtain the additional right-of-way needed to construct the previously proposed curb return. This issue has been discussed with VDOT and they have preliminary accepted the reduced radius. If you have any questions or need additional information, please call me. Thanks. (V:\Project\_2003\03031\Engr\Documents\Sec6\WM6 Entrance Rev.doc) The BC Consultants, Inc. 43 West Jubal Early Drive Winchester, Virginia 22601 (540) 665-0475 Fax (540) 665-1874 BC Consultants Planners • Engineers • Surveyors • Landscape Architects Date: January 6, 2005 To: Mr. Barry Sweitzer - VDOT Ms. Candice Perkins - Frederick County DPD From: Dennis Casbeer RE: Wakeland Manor Phase 6 BC Project #: 03032.32 This revision is to change the curb return radius on the east side of the Owens Lane entrance onto Macedonia Church Road. The curb return radius is reduced from 35' to 13'. The curb and gutter has also been eliminated in front of lot 10 on the Macedonia Church Road frontage. (The curb and gutter remains as originally proposed in front of lot 11 because additional right-of-way will be dedicated at that corner.) This revision is necessary because of the cost of relocating the existing utility pole and the developer's inability to obtain the additional right-of-way needed to construct the previously proposed curb return. This issue has been discussed with VDOT and they have preliminary accepted the reduced radius. If you have any questions or need additional information, please call me. Thanks. (V:\Project\_2003\03031\Engr\Documents\Sec6\WM6 Entrance Rev.doc) The BC Consultants, Inc. 43 West Jubal Early Drive Winchester, Virginia 22601 (540) 665-0475 Fax (540) 665-1874