Loading...
HomeMy WebLinkAbout(Revised January 2001) Westview Business Center - Backfilea - 12ECOP COUNTY of FREDERIC Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 August 14, 2007 Frederick County Inspections Department Attn: John Trenary Frederick County Building Official 107 N. Kent Street Winchester, VA 22601 RE: Stop Work Order for Zoning Violations Dear John: This letter is to inform you that building permits have not been issued for work being done on the Donovan Trucking site located in Westview Business Center. This property is in violation of the Frederick County Zoning Ordinance, in regards to the approved site plan, and structures built without building permits. There are possible violations of the building code on this property. I am requesting a Stop Work Order be issued for this on any permits on this property. Please contact me at (540) 665-5651 regarding any questions that you may have. Sincerely, Mark R. Cheran Zoning Administrator MRC/bad 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 February 16, 2001 Greenway Engineering Ann: Mark D. Smith, P.E. 151 Windy Hill Lane Winchester, VA 22602 RE: Approval of Revised Master Development Plan for Westview Business Center Dear Mark: Frederick County administratively approved the referenced master development plan on February 15, 2001. This master development plan was revised to delineate new commercial entrance locations on Millwood Pike (Route 50), Victory Road (Route 728), and Independence Drive (Route 1092); to provide current land use information within the business center; and to delineate disturbance areas and access points within the undeveloped acreage. Please find attached four copies of the approved Final Revised Westview Business Center Master Development Plan for distribution to all appropriate parties. Please do not hesitate to contact me if you have any questions regarding the information in this letter. Sincerely, L) C� k . J?4 � Evan A. Wyatt, AICP Planning Director EAW Attachment U:\Fvan\Common\P1an Reviews\RevisedWestviewBusinessCenterMDPAppmvalletmr.wpd 107 North Kent Street • Winchester, Virginia 22601-5000 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 FAX: 540/ 678-0682 January 10, 2001 Mr. Mark D. Smith Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE: Westview Business Center, Master Development Plan Dear Mr. Mark Smith: I had the opportunity to review the above -referenced master development plan submitted to our department. The following comments should be addressed and included in a revision of this master development plan. 1. Please show signed certificate of surveyor, engineer, or architect on each page of the site plan. 2. Please show surveyed boundaries of all lots and parcels. 3. Please delineate the areas of disturbed woodlands on site. This will require the use. of different symbology. 4. Please add the Department of Historic Resources' (DHR) Rural Landmark Survey Number 34-329 to the Ford House located on Parcel 64-A-159. 5. Please show the building outline of Valley Cycle located on Parcel 64-A-159P. 6. Please state the location of Myersons Drive located to the right of Parcel 64-A-159P. 7. Please correct the zoning for Parcel 64-A-159C to Rural Areas (RA). 8. The Northwest quadrant of the site indicates three new entrance locations, but no internal road system. Please identify any proposed road system in this area. i 9. Please provide minimum right of way for all internal roads. 107 North Kent Street • Winchester, Virginia 22601-5000 a-, Page 2 Mr. Mark Smith Westview Business Center January 10, 2001 10. If applicable, please show the use of inter -parcel connectors. 11. Identify the location of storm water management facilities. 12. Under the project information section, please update the owners of the following parcels with the correct owners I have listed here. 64-A-159L GRW Technologies, Inc. 64-A-159N Braddock Street Properties, LLC. After you have revised the master development plan, please resubmit one copy so that I may verify the information contained on the plan. - If you have any questions or if any of the numbered items are unclear, do not hesitate to contact me. Sincerely, Howard R. Long, III Planner I I' • . U:\Howie\Common\Master Plans\Westview Business Centre\Westview Business Centre - Review.wpd 151 Windy Hill Lane Winchester, Virginia 22602 Founded in 1971 February 12, 2001 Frederick County Department of Planning and Development 107 North Kent Street Winchester, VA 22601-5000 ATT: Howard R. Long, I11, Planner I RE: Westview Revised Master Plan Dear Mr. Long: We have prepared this letter to respond to your comments dated January 10, 2001 on the above -referenced revised master plan. 1. The seal on the plans has been signed. 2. The surveyed boundaries of the Westview Business Center are shown on the plans. Bearings and distances on interior lot lines are not required in Section 165-130. Please let me know if I have misinterpreted the Ordinance. 3. The areas of disturbed woodlands have been more clearly identified. 4. The DHR survey number was added to the Ford House. 5. The building outline of Valley Cycle has been added. 6. Myersons Drive has been labeled. 7. The zoning of Parcel 64-A-159C has been changed to RA. 8. No road system is proposed for Lot 159E at this time. As I understand it, the owner is trying to sell the parcel as a whole. 9. Since no other internal roads are proposed at this time on Lot 159E, the right-of-ways were not labeled. 10. No inter -parcel connectors are proposed for Lot 159E at this time. 11. All stormwater management facilities were located. 12. Owners for lots 159L and 159N were revised. Please contact me if you require further information. Sincerely, Greenway Engineering >Ja;so�nJ. �PE. s, CC: George Glaize File #2079/JTT/dls Engineers Surveyors Telephone 540-662-4185 FAX 540-722-9528 GREENWAY ENGINEERING 151 Windy Hill Lane Winchester, Virginia 22602 Founded in 1971 T R A N S M I T T A L Project Name File No. Date Westview Business Center 973.1 February 12, 2001 To: Frederick Co Planning Attn: Howard Long Copied: George Glaize From: Jason Thomas/ds GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 Remarks: r Urgent F For Your Review r As You Requested C Please Conmient Message: Howard, Attached is 1 copy of the revised site plan along with the revision letter for the above project. Call with any concerns. RECEIVED FEB 12 2001 DEPT, OF PLANNING/DEVELOPMENT Engineers Surveyors Telephone 540-662-4185 FAX 540-722-9528 greenway@visuallink.com 1 14t\ GREENWAY ENGINEERING %47 151 Windy Hill Lane Winchester, Virginia 22602 Founded in 1971 T R A N S M I T T A L Project Name: Westview Business Centre File No.: 973.1 Date: February 13. 2001 To: Frederick Co Planning Attn: Howie Long Copied: From: Jason Thomas/ds GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 Remarks: 17 Urgent r7 For Your Review 17 As You Requested Ir,'Please Comment Message: Howie, Attached are 7 copies of the site plan for the above project for final approval. Call with any concerns. 'vIENT Engineers Surveyors Telephone 540-662-4185 FAX 540-722-9528 greenway@vi su al l ink. com k_ CHARUES D. NOTTINGHAM COM1VAISSIONER Mr. Jason J. Thomas, P.E. C/O Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 Dear Jason: DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY 1,1031 OLD VALLEY PIKE EDINBURG, VA 22324 November 6, 2000 .TERRY :^?o RESIDENT _i-1 TELE i5aC1 �.�Y Ref: Westview Business Centre Revised Master Development Plan Route 50, Millwood Pike @ Route 728, Victory Lane @ Route 1092, Independence Dr. Frederick County A VDOT review has been completed on the referenced project plan dated 04/25/00. Our approval is provided on the attached Request for Master Development Plan Comments form for Frederick County. Please provide this VDOT office with three (3) copies of the final approved plan when available for our use and distribution. Thanks for the opportunity to review the plan and for the excellent response to VDOT concerns. BJS/rf Enclosure xc: Mr. Dave Heironimus Mr. Kris Tierney Sjvicer6ly, Barry J. Sweitzer Trans. Roadway Engineer For: Steven A. Melnikoff Transportation Engineer wE KEEP `.iIRGINIA MOWING ft Frederick County, Virginia Master Development Plan Application Packages Request for Master Development Plan Comments Virginia Department of Transportation Mail to: Hand deliver to: Virginia Department of Transportation Virginia Department of Transportation Attn: Resident Engineer 1 0 Commerce Street 140 1 Old Valley Pike Winchester, VA Edinburg, Virginia 22824 (540) 722-3460 (540) 984-5600 Please fill out the information as accurately as possible in order to assist the Virginia Department of Transportation with their review. Please attach three (3) copies of the NIDP with the sweet. Applicant's Name: &IZ5r.iC_e Address: //.S. C.t'rCA.C-J sT Phone Number: Sya- 66 - Sri dame of development and/or description of the request: /LS lSld.,I - XAn4V75a,, enF e'2?A4C A,..TAc. AJ4d:5 i ocation of property: Goi[.��it Qi= /�i�[e�o� /n/.rc� �ga(jTr so�T //VL7E�E".yO ��vGri ,O.G/Ci try, �/- (-1/GT0(,Y 1-4Aa ► V';r`irla Department of Transportation's Comments No objection to the preliminary master plan. Before making any final comments, this office will require a complete set of site plans, drainage calculations and traffic flow data from the I.T.E. Trip Generation Manual, Sixth Edition for review. VD0i reserves the rigNt to commen on ail rig -o -way neeeds, , e— right-of-way, the developer will need to apply to this office fo i;;uance of appropriate permits to cover said work. See attached letter from vnn•r to Page 20 /06/00 MASTER DEVELOPMENT PLAN (REVISED JANUARY 2001) WESTVIEW BUSINESS CENTER