HomeMy WebLinkAbout01-11 Snowden Bridge-Brookfield 331.63 Acres 850 Units Stonewall - BackfileMASTER DEVELOPMENT PLAN TRACKING SHEET (Note: The application does not need to be complete to be accepted, but will not be scheduled for the PC or BOS until all items have been received.) Submission Package Comment sheets from the following agencies along with any marked copies of the plan: VDOT County Engineer Fire Marshall City of Winchester Sanitation Authority"GIS i% Inspections Dept. C — ' Parks & Recreation Health Dept. if Winchester Regional Airport `J One copy of the master development plan application. Appropriate number of plans, colored maps, etc., to cover PC & BOS meetings ✓Submission Fee Application received Fee Paid ($ Y 60 A[if Preliminary MDP heard by Planning Commission ACTION: Al j4 Preliminary MDP heard by Board of Supervisors ACTION: IV A- Letter to applicant regarding Board action (if required) AIA Final MDP submitted with review agency, PC & BOS comments addressed Administratively approved; letter sent to applicant, copy to file and cc's Sys ID # OPEN FILE: L A File opened 4/1 Reference Manual updated/number assigned (o D-base updated N /} List of adjoiners given to staff member for verification A.) A Location maps requested from Mapping Application Action Summary updated CLOSE FILE: Approval (or denial) letter mailed to applicant, copy for file, cc's Public Works and Real Estate File stamped "approved", "denied" or "withdrawn" Z, Reference Manual updated D-base updated Application Action Summary updated O� 0 No N A " c) "o O O N N N > .--i A U >o N Y~ A U y [� O rs.a.�3kn RECEIVED FROM " ADDRESS Sso7 /s ' !)-1 -1 ❑ FOR FOR AMT.OF ACCOUNT I CASH I AMT. PAID I "°'� CHECK BALANCE DUE I MONEY ORDER 4' .sj;9-3100 A,-& DOLLARS $ q4-A 3� BY_ COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 September 16, 2011 Mr. Evan Wyatt Greemvay Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE: MASTER DEVELOPMENT PLAN 401-11 FOR SNOWDEN BRIDGE Final Master Development Plan Approval Property Identification Numbers (PINs): 44-A-293, 44-A-292A, 44-A-31B Dear Evan: Frederick County administratively approved the above -referenced final Master Development Plan (MDP) on September 9, 2011. This MDP is approved for the potential development of 331.63 acres (61 acres of this total will require a future MDP to revision) of land in the R4 (Residential Planned Community) District within the Stonewall Magisterial District. This MDP provides for the development of up to 850 dwelling units (single family, townhouse and multifamily). This is a new MDP and takes the place of all previously approved MDP's for the land holdings of Brookfield - Stephenson Village, LLC. The properties covered under this MDP are located within Land Bay III of the project. All requirements of the Frederick County Zoning and Subdivision Ordinance have been addressed in the plan. Please note that approval of a site plan is required prior to the subdivision or development of this parcel. I am providing you with six (6) copies of the approved final master development plan. Please ensure that these plans are distributed accordingly. Feel free to contact me if you have any questions. Sincerely, Candice E. Perkins, AICP Senior Planner CEP/bad cc: Brookfield Stephenson Village LLC, 8500 Executive Park Ave, Suite 300, Fairfax VA 22031 Charles DeHaven Jr., Stonewall District Supervisor Gary Oates and Stan Crockett, Stonewall District Planning Commissioners Jane Anderson, Real Estate Commissioner of Revenue Public Works 107 North Dent Street, Suite 202 a Winchester, Virginia 22601-5000 MASTER DEVELOPMENT PLAN APPLICATION FORM - Department of Planning & Development Use Only — Application # a l " / / Date Application Received:9/6zz / ! —X4"f PC Meeting Date / / .. , ,1 BOS Meeting Date � Fee Amount Paid $ �i Initials: Receipt # 6Q� s�Q 1. Project Title: Snowden Bridge MDP - Brookfield Stephenson Village LLC 2. Applicant: Name: Greenway Engineering Telephone: 540-662-4185 Address: 151 Windy Hill Lane Winchester, VA 22602 3. Property Owner (if different than above): Name: Brookfield Stephenson Village LLC Telephone: 703-270-1470 Address: 8500 Executive Park Ave, Suite 300 Fairfax, VA 22031 4. Design Company: Name: Greenway Engineering Telephone: 540-662-4185 Address: 151 Windy Hill Lane Winchester, VA 22602 5. Please list names of all owners, principals, and/or majority stockholders: Robert C. Hubbell and Richard J. Dengler 6. Magisterial District: Stonewall District 10 %. Property Location: South side of Old Charles Town Road (Rt 761) and Jordan Springs Road (Rt 664) and on the East side of Milburn Road (Rt 662) in the Stonewall Magisterial District. (Give State Route # and name, distance and direction from intersection) 8. Is this an original or amended Master Development Plan? Original �! Amended �Previous MDP# 9. Property Information: a) Property Identification Number (PIN): b) Total Acreage: c) Current Zoning: d) Present Use: e) Proposed Uses: 44-A-31 B, 44-A-292A, 44-A-293 331.63 Acres R41Residential Planned Community Residential & Unimproved Residential 10. If residential uses are proposed, provide the following: a) Density: 2.56 units per acre b) Number of Units: 850 c) Housing Types: SFD, TH, MF 11. Adjoining Property use and zoning: - USE North MDP - Sheet 2 East South West MDP - Sheet 2 MDP - Sheet 2 MDP - Sheet 2 ZONING MDP - Sheet 2 MDP - Sheet 2 MDP - Sheet 2 MDP - Sheet 2 I have read the material included in this package and understand what is required by the Frederick County Department of Planning and Development. I also understand that the master development plan shall include all contiguous land under single or common ownership. All required material will be complete prior to the submission of my master development plan application. I (we) hereby certify that this application and its accompanying materials are true and accurate to the best of my (our) knowledge. Applicant(s): Date: 13 Date: Owners : / Date: L5-111 Date: 0 3 3 Special Limited Power of Attorney County of Frederick, Virginia Frederick Planning Web Site: www.co.frederick.va.us Department of Planning & Development, County of Frederick, Virginia, 107 North Kent Street, Suite 202 Winchester, Virginia 22601 Facsimile 540-665-6395 Phone 540-665-5651 Know All Men By These Presents: That I (We) (Name) Brookfield Stephenson Village LLC, (Phone) (703) 270-1470 Richard J. Dengler, Vice -President (Managing Member) (Address) 8500 Executive Park Avenue, Suite 300 Fairfax, VA 22031 the owner(s) of all those tracts or parcels of land ("Property") conveyed to me (us), by deed recorded in the Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by Instrument No. on Page and is described as Instrument No. on Page and is described as Instrument No. on Page and is described as Parcel: 44 Lot: 31B Block: A Section: Subdivision: Parcel: 44 Lot: 292A Block: A Section: Subdivision: Parcel: 44 Lot: 293 Block: A Section: Subdivision: do hereby make, constitute and appoint: (Name) Greenway Engineering, Inc. (Phone) (540) 662-4185 (Address) 151 Windy Hill Lane, Winchester, VA 22602 To act as my true and lawful attorney -in -fact for and in my (our) name, place and stead with full power and authority I (we) would have if acting personally to file planning application for my (our) above described Property, including: ❑ Rezoning (Including proffers) ❑ Conditional Use Permit ® Master Development Plan (Preliminary and Final) ❑ Subdivision ❑ Site Plan ❑ Variance or Appeal ❑ Comprehensive Policy Plan Amendment My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered conditions except as follows: This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or modified. In witness thereof, I (we) have hereto my (our) handandseal this 5 day of. 1A f.1A 20V I I Signature(s) .�g State of Virginia, City/County of _�LI�A To -wit: a Notary Public in and for the jurisdiction aforesaid, certify that the pc fined to foregoing instrument and who I (are) known to me, personally appeared before ac owledg the sa e before me in the jurisdiction aforesaid this S day of (nt 206 I My Conunission Expires: otary Public Registration #:.—I 3q 1 a Revised 3/ l 7/0 N9W NO.7391285 i kMIRES 9-3d15 i O P Analysis of Stephenson Village (aka Snowden Bridge) Proffers To Understand Potential Impact of Enabling Multiple MDPs to Reflect Various Ownership Interests Rezoning #06-03 October 26, 2010 This analysis has been conducted by the Planning Department staff in an effort to better understand the potential areas of conflict within the approved proffer statement and the design modification document that might exist if the Snowden Bridge project were divided into various Master Development Plans (MDPs) reflective of developer ownership interests. Of most concern are the proffered conditions whose implementation is tied to a: stated date, request of County Officials, or Vehicles Trips Per Day (VPD) threshold. These implementation triggers are global to the larger Snowden Bridge development and may not solely be the responsibility of the developer of an individual MDP. Generally, if a proffered condition is not being satisfied, the County could withhold further subdivision and zoning approvals until compliance is achieved. In the event that a proffered condition is not implemented and is not clearly linked to a particular MDP, it would be advantageous to have a clear line of responsibility so that the unaffected party is not held responsible for proffer compliance. These potential conflict areas are the impetus of this analysis. Below are the proffered conditions and design modifications document sections that warrant clarification and assignment of responsibility prior to enabling the overall Snowden Bridge development to be divided into various Master Development Plans (MDPs) reflective of developer ownership interests. Often a potential resolution of the proffer conflict may be achieved with the advanced payment of a proffered cash contribution; Other proffer conflicts may warrant additional discussions to identify appropriate resolutions. Page 2 Analysis of Stephenson Village (aka Snowden Bridge) Proffers October 26, 2010 Proffered Condition Sections and Topics of Potential Concern "2. PHASING PLAN TO MINIMIZE SUDDEN IMPACTS ON COUNTY SERVICES A. Additional Proffer Payment To ensure that unanticipated increases in Frederick County Public School population do not burden the county with extra costs, Frederick County may assess the Applicant to effectively double school related proffers for each student that exceeds a cumulative yearly total increase of 60 students per year.... This additional proffer payment will be provided to Frederick County by the Applicant within 30 days of receipt of the September 30 report produced by the Frederick County Public Schools." ISSUE: As written, this results in cash payments on a potential annual basis. Since the student count is linked to an annual calendar date, not a zoning or subdivision approval, which developer (presuming there are multiple MDPs each owned by different parties) will be responsible for the payment of these proffered funds? Assignment of responsibility should be clarified. 115. MATCHING FUNDS FOR TRANSPORTATION ENHANCEMENTS AND/OR HERITAGE TOURISM In consideration of the approval of rezoning application #06-03 the Applicant shall contribute $75,000 in matching funds to Frederick County to be utilized for transportation enhancement and/or for the promotion of heritage tourism. The money will be made available to Frederick County within 30 days of receipt of a written request for said funds by the Frederick County Board of Supervisors or their authorized agent." ISSUE: Who will make this proffered cash payment when there are various developers with various MDPs? Assignment of responsibility should be clarified. Page 3 Analysis of Stephenson Village (aka Snowden Bridge) Proffers October 26, 2010 116. MONETARY CONTRIBUTIONS TO CLEARBROOK VOLUNTEER FIRE AND RESCUE, INC. To further mitigate the impact on fire and rescue services, the Applicant will pay to Clearbrook Volunteer Fire and Rescue Inc., the sum of $200,000.00 for its general fund. This is over and above the monetary contributions to Frederick County Fire and Rescue identified in Section 4 of this proffer statement. The money will be payable as follows: $50,000.00 to be paid not later than nine months after zoning approval (payment received). $50,000.00 to be paid within thirty (30) days of the issuance of the 500th building permit in Stephenson Village but not later than December 31, 2008. $50,000.00 to be paid within thirty (30) days of the issuance of the 1,000th building permit in Stephenson Village but not later than December 31, 2013. $50,000.00 to be paid within thirty (30) days of the issuance of the 1,500th building permit in Stephenson Village but not later than December 31, 2018." ISSUE: Who will make this proffered cash payment when there are various developers with various MDPs? Assignment of responsibility should be clarified. "7. MULTI MODAL TRANSPORTATION IMPROVEMENTS D. The applicant will execute a signalization agreement with the Virginia of Transportation for the intersection of US Route 11 and Old Charles Town Road. Additionally, the Applicant will construct full size entrance improvements with both a right turn lane and left turn lane on Old Charles Town Road, and a right turn lane on US Route 11 at said intersection. These improvements will be installed in accordance with the Virginia of transportation design guidance when warranted by VDOT." ISSUE: These proffered improvements were designed to occur later in the development process once the project is underway, VPD had increased, and VDOT determined that warrants had been met to implement the improvement. Who will implement these improvements when there are various developers with various MDPs, all of which are contributing to the warrants for improvement? Assignment of responsibility should be clarified. Page 4 Analysis of Stephenson Village (aka Snowden Bridge) Proffers October 26, 2010 "E. The Applicant will execute a signalization agreement with the Virginia Department of Transportation for the intersection of Old Charles Town Road and the Major Collector Road serving as the entrance to the Stephenson Village Community. The Applicant will provide for the signalization at the intersection of Old Charles Town Road and the Major Collector Road based on the terms of this agreement when warranted by the Virginia Department of Transportation." ISSUE: These proffered improvements were designed to occur later in the development process once the project is underway, VPD had increased, and VDOT determined that warrants had been met to implement the improvement. Assignment of responsibility for implementation of proffer should be clarified. "F. The Applicant will design and construct a four -lane boulevard Major Collector Road for the Stephenson Village Community in substantial conformance with the proffered Generalized Development Plan. The Major Collector Road will be constructed in two phases. The first phase will be a two-lane half section that is constructed from Old Charles Town Road to the limits of the development as depicted on the approved Master Development Plan. The phase of the Major Collector Road will be constructed and bonded in segments in accordance with the approved Subdivision Design Plan for Stephenson Village. The second phase of the Major Collector Road will provide for the ultimate four -lane section with appropriate right and left turn lanes based on the following program: (1) The design of the transportation improvements identified in Section 7(F)2- 7(F)5 of this proffer statement will begin with 8-% of the actual traffic count volume is realized as identified in each Section. The completion of the improvements specified in each Section will occur within 18 months of initial design. (2) Once actual traffic counts of 7,996 vehicle trips per day have been document on the Major Collector Road, the Applicant will bond and commence construction of the additional lanes to the existing Major Collector Road to its ultimate four -lane section from Old Charles Town Road to the limits of the Major Collector Road within the development. (3) Once the actual traffic count reaches 10,570 vehicle trips per day on the Major Collector Road, the Applicant will bond and commence construction of Page 5 Analysis of Stephenson Village (aka Snowden Bridge) Proffers October 26, 2010 a three -lane section of Old Charles Town Road, from the Entrance to Stephenson Village to US Route 11 using the existing bridge. (4) Once the actual traffic count reaches 10,570 vehicle trips per day on the Major Collector Road, the Applicant will bond and commence construction of a two lane half section of the Major Collector Road from the limits of the four -lane section to US Route 11 at the Rutherford Farm Industrial Park intersection to include right and left turn lanes on the east side of US Route 11 as determined by VDOT.... (5) Once the actual traffic count at the southwestern entrance to Stephenson Village near the Rutherford Farm Industrial Park intersection reaches 7,996 vehicle trips per day on the Major Collector Road, the Applicant will bond and commence construction of the remaining additional lanes to the existing Major Collector Road from the limits of the four -lane section to provide for the ultimate four -lane section ending at the east side of US Route 11. ISSUE: Who will make these improvements when there are various developers with their own individual MDPs? How is the proffer implemented if a portion of the road has already been constructed (2-lane) through a portion of development that has been completed, and now additional development (possibly by a different developer) is planned that would trigger improvements (to 4-lane)? Each MDP will be responsible for showing the proffered improvements, but implementation of the road improvement will be triggered by the proffer. Is it appropriate for one developer to be responsible for constructing the road across another developer's MDP? Assignment of responsibility should be clarified. "G. The Applicant will provide $50,000 that shall be utilized as matching funds by VDOT and/or the County of Fredrick for future improvements to the Interstate 81/US Route 11 interchange at Exit 317. This dollar amount is intended to assist VDOT and the County of Frederick with this regional improvement. The $50,000 will be made available to VDOT or to the County of Frederick, within 30 days of written request for said funds by the appropriate party. ISSUE: Who will make this proffered cash payment when there are various developers with various MDPs? Assignment of responsibility should be clarified. Page 6 Analysis of Stephenson Village (aka Snowden Bridge) Proffers October 26, 2010 "13. COMMERCIAL CENTER The Applicant has identified an area as shown on the General Development Plan (Exhibit A) for a commercial center that will be developed at a time to be determined by the Applicant. Within the commercial center development, the following shall be provided: F. The Applicant has identified an area as shown on the General Development Plan (Exhibit A) for a commercial center. The development of 60,000 square feet of commercial space will begin within the commercial center no later than the issuance of the 1,200th non -age restricted residential building permit with the completion of this commercial space within 18 months. The Applicant will be allowed to extend the commencement of commercial construction for an additional two year period if any one of the following circumstances has occurred: An elementary school has not been constructed on the Property; or a building permit is obtained for the development of a new grocery store within a three mile radius of commercial center within Stephenson Village." ISSUE: While this Commercial Center is located on land not yet included in an approved MDP, the question remains: who is responsible for constructing the commercial center when there are various developers with various MDPs? If the residential developer(s) has no interest in a commercial center, how would the proffer be satisfied? Assignment of responsibility should be clarified. Page 7 Analysis of Stephenson Village (aka Snowden Bridge) Proffers October 26, 2010 Community Design Modification Document Section and Topic of Potential Concern "MODIFICATION #9 §165-13313 Master development plan, contiguous land §165-141A(8) Master development plan, contents §165-141B(2);(4);(8) Master development plan, R4 contents Alternative Design Standard The provision of a detailed Master Development Plan for Stephenson Village that is designed to reflect the acreage within the community that is planned for development by specific phase and provides an aggregate tabulation of all required development percentages to ensure that the requirements of the R4 District and the proffered Generalized Development Plan are met throughout the development of the Stephenson Village community. ISSUE: Maintaining an accurate aggregate tabulation of all required development percentages to ensure that the required R4 District and the proffered GDP are met will be difficult when there are multiple MDPs. This Modification was designed to enable the detailed MDP to be grown as the project progressed, as opposed to the crafting of a single MDP at time of rezoning consideration, and utilize the aggregate tabulation to track proffer and ordinance compliance. Tracking compliance will be difficult if various MDPs are progressing concurrently. POTENTIAL RESOLUTION TO ENABLE SEPARATE MDPs: Utilize a single aggregate tabulation sheet covering all development within the entire Snowden Bridge project that reflects the accumulated planned development of all MDPs, and require that the tabulation sheet be updated by the developer with every MDP submission, confirming tabulation compliance prior to approving MDPs (and subsequent revisions). Page 1 of 1 Evan Wyatt From: Yeatman, Kimberly M. [Kim.Yeatman@VDOT.Virginia.gov] Sent: Monday, April 11, 2011 1:14 PM To: Evan Wyatt Cc: Smith, Matthew, P.E.; Funkhouser, Rhonda Subject: FW: Snowden MDP The revisions to the above referenced sheet addresses all of our comments on the revision to the MDP plan. Three full sets can be submitted for signature along with a CD with separate PDF's for each sheet. From: Evan Wyatt [mailto:ewyatt@greenwayeng.com] Sent: Friday, April 08, 2011 3:42 PM To: Yeatman, Kimberly M. Subject: FW: Snowden MDP Hi Kim, Please find attached a PDF of Sheet 7/13 that reflects the information in your comment response. Please advise me if this is acceptable to address your comments and I will forward you a complete copy of the revised MDP for your file. Thanks again for your assistance regarding this matter. Have a good weekend, Evan From: Kurt D. Pennington Sent: Friday, April 08, 2011 3:23 PM To: Evan Wyatt Subject: Snowden MDP Kurt Pennington GREENWAY ENGINEERING 151 Windy Hill Lane Winchester, VA 22602 Phone: 540-662-4185 Fax: 540-722-9528 Visit us on the web at www.greenwayeng.com to learn about exciting new services offered by Greenway Engineering: Laboratory Services, Water Sewer, Maintenance / Monitoring, ESA Phase I, Wetlands and more. Please consider the environment before printing this CONFIDENTIALITY NOTICE: This email may contain confidential and privileged material for the sole use of the intended recipient(s). Any review, use, distribution or disclosure by others is strictly prohibited. If you have received this communication in error, please notify the sender immediately by email and delete the message and any file attachments from your computer. Thank you. 4/ 11/2011 Snowden Bridge Master Development Plan Page 1 of 1 Evan Wyatt From: Yeatman, Kimberly M. [Kim.Yeatman@VDOT.Virginia.gov] Sent: Tuesday, April 05, 2011 9:00 AM To: Evan Wyatt Cc: Smith, Matthew, P.E.; Funkhouser, Rhonda Subject: Snowden Bridge Master Development Plan We have reviewed the revised Snowden Bridge Master Development Plan for Brookfield Stephenson Village, LLC dated March 3, 2011. The only remaining item that needs to be addressed, is that all of the streets that are showing two different road classifications should specify the area of each street that will be constructed with each classification of road. For example, the comment response letter indicated that Parkland Drive will be a Class III from Snowden Bridge Boulevard to Temperance Drive, and it will be a Class II street from Temperance to the cul-de-sac. However, this information was not put on the MDP. In order to ensure that the streets are constructed wide enough to accommodate all of the traffic that will be using them, the street classifications need to be determined in the overall review of the plan. The street sections cannot be determined by just looking at the traffic generated by an individual section on the construction plan. The ADT should be calculated using the maximum traffic that could be generated by each street, and this will ensure the streets are wide enough to accommodate the ultimate traffic. If you have any questions, please give me a call. Kim Yeatman Virginia Department of Transportation Land Development - Permit Specialist Clarke, Frederick, Shenandoah & Warren Counties 540-535-1828 4/_5/2011 r from 504 535 390H Request for Master Development Plan Comments Frederick County Fire Marshal Mail to: Hand deliver to: Frederick County Fire Marshal 1" Floor Attn: Fire Marshal 107 N. Kent Street 107 N. Kent Street Winchester, VA Winchester, VA 22601 (540) 665-6350 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the MDP with the sheet. Applicant's Name: Address Phone Number Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 540-662-4185 Name of development and/or description of the request: Snowden Bridge -Revised Master Development Plan Location of property: The property is located on the south side of Old Charles Town Road (Rt. 761) and Jordan Springs Road (Rt. 664) and east of Milburn Road (Rt. 662) in the Stonewall Magisterial District. Fire Marshal's Comments: Frederick County Fire Marshal use only Date reviewed Review Number 1 3 4 5 (please circle one) Date reviewed y (� Date approved y Revision required Signature and Date F�K from 504 535 3900 Control number MDP11-0001 Project Name Snowden Bridge Master Development Address 151 Windy Hill Lane Type Application MDP Current Zoning R1 Automatic Sprinkler System No Other recommendation Emergency Vehicle Access Adequate Siamese Location Emergency Vehicle Access Comments Access Comments Additional Comments Plans ApDroverd its Subrrdtted Plan Approval Recommended Yes 0q-0a-11 6a-a7 Frederick Countlr Fire and Rescue Lenart€ en Office of the Fire Marshal Eclat, Review and Gomments Date received Date reviewed Date Revised 3/21/2011 4/4/2011 Applicant Greenway Engineering City State Zip Applicant Phone Winchester VA 22602 540-662-4185 Tax ID Number Fire District Rescue District 13 13 Recommendations Automatic Fire Alarm System No Hydrant Location Adequate Roadway/Aisleway Width Election District Stonewall Residential Sprinkler System Yes Fire Lane Required Yes Special Hazards No Reviewed By Signature S. Mark Showers Title ,� �L?�_.�'! �. L�I./,!•�'Gi� Request for Master Development Plan Comments Frederick County Inspections Department L Mail to: Hand deliver to: Frederick County Inspections Department 4 Floor - Attn: Building Official 107 N. Kent Street 107 N. Kent Street Winchester, VA Winchester, VA 22601 (540) 665-5650 Please fill out the information as accurately as possible in order to assist the Inspections Department with their review. Please attach one (1) copies of the MDP with the sheet. Applicant's Name: Greenway Engineering Inc. Address 151 Windy Hill Lane Winchester, VA 22602 Phone Number 540-662-4185 Name of development and/or description of the request: Snowden Bridge -Revised Master Development Plan Location of property: The property is located on the south side of Old Charles Town Road (Rt 761) and Jordan Springs Road (Rt. 664) and east of Milburn Road (Rt. 662) in the Stonewall Maizisterial District. Frederick County Inspections Department's Comments: �L :\ C (l:�\•_y '�\� :S\` \cA\ Frederick County Inspections use only Date reviewed Review Number 12 3 4 5 (please circle one) Date reviewed Date approv,�d 3 151 y Revision required Signature and Date //. ,-� n GREENWAY ENGINEERING Request for Master Development Plan Comments Frederick County Department of Public Works Mail to: Hand deliver to: Frederick County 4th Floor Department of Public Works 107 N. Kent Street 107 N. Kent Street Winchester, VA Winchester, VA 22601 (540) 665-5643 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach three (3) copies of the MDP with the sheet. Applicant's Name: Greenway Engineering Inc. Address 151 Windy Hill Lane Winchester, VA 22602 Phone Number 540-662-4185 Name of development and/or description of the request: Snowden Bridge -Revised Master Development Plan Location of property: The property is located on the south side of Old Charles Town Road (Rt. 761) and Jordan Springs Road (Rt. 664) and east of Milburn Road (Rt. 662) in the Stonewall Magisterial District. TlPnartmPnt of Pnhl;r- WnrVc Pnmmnnt- Department of Public Works use only Date reviewed Review Number 12 3 4 5 (please circle one) Date reviewed Date appr Revision required Signature and Date .f117111 FREDr,tICK COUNTY SANITATION AUTHORITY SITE PLAN REVIEW COMMENTS PO Box 1877, Winchester, VA 22604 540.868.1061 Voice 315 Tasker Road, Stephens City, VA 22655 540.868.1429 Fax Project .5/YOWaQv6V 0/,- M,0� 1EV1��Y Applicant U RzsILIwoX REVIEW STATUS attention F Vi4/y W Y11 77' review number Ry , / correct & resubmit approved DRAWINGS send me by 1. print of sheets approved as noted number of items to be corrected You may submit just cover sheet and the revised sheets. 2. two CDs: each disc shall contain the following plan sheets_ a) One CD (containing all of the above noted sheets) shall be in PDF format. Each sheet shall be in its own file and be in landscape orientation. Each file shall be titled with the project name and appropriate sheet number. b) One CD (containing all of the above noted sheets) shall be in DWG format. Each sheet shall be in its own file and each sheet shall be titled with the project name and with the appropriate sheet number. Each sheet shall (1) be in landscape orientation, (2) be without border, (3) be in state plane coordinate system NAD 83, and (4) be compatible with AutoCAD 2006. c) Each of the two CDs shall be labeled with its format and project name, and placed in its own paper CD envelope. EASEMENTS Y / N I need a copy of the recoNdff e water and / or sewer easement(s). Y / N I need a copy of the re oe water and / or sewer easement(s). The easement document shall contain a plat and both shall be signed by the Authority. I need a copy of the recorded deed(s) of easement before service will be wtbQ ized. OTRER JNIH33NIJN3 Y / N This project also requires DEQ - Valley Region approval. 4411 Early RoIdox 3 00, H rrisonburg, VA 22801 (540-5 -7814) �`� G : �W Y / N This project also req— ngton Office approval. 131 Walker St., V 44 0 (540-463-7136) 3 A 3 8 Y / N This project has a sewer pump station that FCSA will own. e-puu"pastatuii-stte-- shall be granted to the Authority in fee simple absolute. Also, I require (1) a copy of DEQ's Certificate to Construct, (2) a copy of DEQ's Certificate to Operate, and (3) two copies of the station's O & M manual. These documents must be received before water meters will be released. Date: Jo . Whitacre - Senior Engineer 1 NOV ' 10 FaA from : 5406622936 83-22-11 61:54 Pg: 2 Request for Master Development Plan Comments Winchester Regional .Airport Mail to: Hand deliver to: Winchester Regional Airport 491 Airport Road Attn: Executive Director (Route 645, off of Route 522 South) 491 Airport Road (540) 662-2422 Winchester, Virginia 22602 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copies of the MDP with the sheet. Applicant's Name: Greenway Engineering Address 151 Windy Hill Lane Winchester, VA 22602 Phone Number 540-662-4185 Name of development and/or description of the request: Snowden Bridge -Revised Master Development Plan Location of property: The property_is located on the south side of Old Charles Town Road (Rt. 761) and Jordan Springs Road (Rt. 664) and east of Milburn Road (Rt. 662) in the Stonewall Maizisterial District. Winchester Regional Airport Comments: RECEIVED MARMAR 7 901 Fa% from : 5406622936 US-zz-11 01 ; bd rg . ]L ;SEW WINCHESTER REGIONAL AIRPORT 491 AIRPORT ROAD MP°F`WCOU WINCHESTER, VIRGINIA 22602 yoprC� (540) 662.2422 March 22, 2011 Evan Wyatt, Planner Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 Re: Master Development Plan Comments Snowden Bridge— Brookfield Stephenson Village, LLC Stonewall Magisterial District Dear Mr. Wyatt: The referenced Master Development Plan has been reviewed and it appears that the proposed plan will not have an impact on operations at the Winchester Regional Airport as the proposed development lies within the airport's airspace it does fall outside of the airport's Part 77 surface. The Airport does request the opportunity to comment on future construction site plans of commercial buildings or communication towers to ensure compatibility with Airport surfaces/operations. Thank you for your cooperation and consideration in the continuing safe operations of the Winchester Regional Airport. Sincerely, Serena R. Manuel Executive Director MNil 7 2, 2011 GREENWAY ENGINEERING Evan Wyatt From: Wayne Lee [Leew@frederick.k12.va.us] Sent: Monday, April 04, 2011 10:19 AM To: Evan Wyatt Cc: Al Orndorff Subject: RE: Snowden Bridge Revised MDP Evan, FCPS has no concerns regarding this MDP revision. The 119 fewer single-family detached units, 55 more single-family attached units, and the 16 fewer multifamily units are estimated to generate 47 fewer students than the currently approved MDP. Thank you for the opportunity to comment. Wayne Kenneth Wayne Lee, Jr. Coordinator of Planning and Development Frederick County Public Schools 1415 Amherst Street P. 0. Box 3508 Winchester, VA 22604-2546 leew@frederick.kl2.va.us (office) 540-662-3889 x88249 (fax) 540-662-4237 (cell) 540-533-3745 >>> "Evan Wyatt" <ewyatt@greenwayeng.com> 4/4/2011 9:44 AM >>> Hi Wayne, Based on the proffered GDP, the residential units are only allowed the be developed within LBIII and LBIV. When buildout occurs within these land bays, the project is entitled to have a maximum of 2,465 dwelling units. Therefore, everything in your first paragraph is accurate except for the last sentence, as LBIII can not yield 2,465 units - it will take both land bays to accomplish that density. As requested, the information below identifies the housing type/unit change between the approved MDP and the proposed MDP that you are reviewing: Approved MDP SFD 669 TH 135 MF 126 Proposed MDP SFD 550 TH 190 MF 110 Net Change SFD -119 units TH +55 MF -16 The revised MDP results in a net change of -80 units from the approved MDP. I hope this information is what you are looking for; however, please contact me if you have any further questions. Thanks, Evan -----Original Message ----- From: Wayne Lee [mailto:Leew@frederick.kl2.va.us] 1 Sent: Friday, April 01, 2011 4:00 PM To: Evan Wyatt Subject: Re: Snowden Bridge Revised MDP Evan, I have a couple of questions, to help understand the land bay breakdown table on sheet 10. If I am reading this correctly, the housing types in land bays III and IV will end up totaling 100% when the development is built? And, there will be 2,465 housing units or fewer in land bay III? Do you have a table showing the changes by housing type in the numbers of units from the current MDP to the proposed MDP (such as is in your email of July 8, 2010 - that's in the chain of correspondence you brought when we met the other day)? Thanks. Wayne >>> "Evan Wyatt" <ewyatt@greenwayeng.com> 3/29/2011 10:19 AM >>> Hi Wayne, I am following up to see when you might have the review comments ready for the revised.MDP. Please let me know if you would like us to pick them up when they are available. Thanks, Evan GREENWAY ENGINEERING 151 Windy Hill Lane Winchester, VA 22602 Phone: 540-662-4185 Fax: 540-722-9528 Visit us on the web at www.greenwayeng.com <http://www.greenwayeng.com/> to learn about exciting new services offered by Greenway Engineering: Laboratory Services, Water Sewer, Maintenance / Monitoring, ESA Phase I, Wetlands and more. P Please consider the environment before printing this CONFIDENTIALITY NOTICE: This email may contain confidential and privileged material for the sole use of the intended recipient(s). Any review, use, distribution or disclosure by others is strictly prohibited. If you have received this communication in error, please notify the sender immediately by email and delete the message and any file attachments from your computer. Thank you. --- Scanned by M+ Guardian Messaging Firewall --- --- Scanned by M+ Guardian Messaging Firewall --- 2 Request for Master Development Plan Comments Frederick County Department of Parks and Recreation Mail to: Hand deliver to: Frederick County 107 N. Kent Street Department of Parks and Recreation 2nd Floor 107 N. Kent Street Winchester, VA Winchester, VA 22601 (540) 665-5678 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copies of the MDP with the sheet. Applicant's Name: Greenway Engineering, Inc. Address 151 Windy Hill Lane Winchester, VA 22602 Phone Number 540-662-4185 Name of development and/or description of the request: Snowden Bridge -Revised Master Development Plan Location of property: The property is located on the south side of Old Charles Town Road (Rt. 761) and Jordan Springs Road (Rt. 664) and east of Milburn Road (Rt. 662) in the Stonewall Magisterial District. Department of Parks and Recreation use only //�� Date reviewed // Review umbeU 2 3 4 5 (please circle one) Date reviewed Ida e appro ed - Revision required Signature and Date A/ Request for Master Development Plan Comments Department of GIS (Geographic Information S uElVED' Mail to: Hand deliver to: Department of GIS, Attn: GIS Manager Department of GIS 107 North Kent Street 107 North Kent Str 7etWinchester, VA 22601 Winchester, VA 22REE�lVV4 V (540) 665-5614 (540) 665-5614G1NEE fPJG The GIS Department will review the proposed street names for this project to ensure their acceptability into the Frederick County Street Name System. Proposed street names will also be routed through the Communication Center Supervisor for review. This step will prevent duplicate street names from being entered. Please attach one copy of the plan indicating proposed names. Applicant's Name Address Phone Number Greenway Enineering 151 Windy Hill Lane Winchester, VA 22602 540-662-4185 Name of development and/or description of the request: Snowden Bridge - Revised Master Development Plan Location of property: The property is located on the south side of Old Charles Town Road (Rt 761) and Jordan Springs Road (Rt 664) and east of Milburn Road (Rt 662) in the Stonewall Magisterial District. GIS OFFICE USE ONLY: Date reviewed Incomplete Date reviewed Signature and Date Date approved Incomplete Date approved Revision required Date revision received Request for Master Development Plan Comments Department of GIS (Geographic Information Systems) Mail to: Hand deliver to: Department of GIS, Attn: GIS Manager Department of GIS 107 North Kent Street 107 North Kent Street Winchester, VA 22601 Winchester, VA 22601 (540) 665-5614 (540) 665-5614 The GIS Department will review the proposed street names for this project to ensure their acceptability into the Frederick County Street Name System. Proposed street names will also be routed through the Communication Center Supervisor for review. This step will prevent duplicate street names from being entered. Please attach one copy of the plan indicating proposed names. Applicant's Name: Greenway En ineering Address 151 Windy Hill Lane Winchester, VA 22602 Phone Number 540-662-4185 Name of development and/or description of the request: Snowden Bridge - Revised Master Development Plan Location of property: The property is located on the south side of Old Charles Town Road (Rt 761) and Jordan Springs Road (Rt 664) and east of Milburn Road (Rt 662) in the Stonewall Magisterial District. GIS Dept. Comments: GIS OFFICE USE ONLY: Date reviewed o2( Incomplete Date reviewed Signature and Date Date revision received Incomplete Date approved GREENWAY a�05 NGINEERING Date approved Revision required N INFORMATION TECHNOLOGIES COUNTY OF FREDERICK, VIRGINIA W E STREET NAME COMMENTS SUBDIVISION COMMENTS S DATE: March 21, 2011 SUBDIVISION: Snowden Bridge STAFF MEMBER: Annie Williams, GIS Technician APPLICANT: Greenway Engineering 151 Windy Hill Ln Winchester, VA 22602 COMMENTS: The Frederick County Department of GIS has reviewed the requested road names for use by the subdivision and has made the following determinations: 1. The following road names have been APPROVED and ADDED into the Frederick County Road Naming and Structure numbering system: Argyle Ct Arrow Crown Ct Baily Way Balkan Ct Ballarat Dr Barrel Way Basketweave Dr Blackford Dr Brasstown Loop Centennial Dr Churn Dash Ct Coronation PI Crofton Dr Dervish Ct Domino Ct Dresden Ct Dutchman Ct Ellison Way Farmhouse Ct Fiesta Dr Flyfoot Dr Friendship Way Garret Ct Gretchen Ct Handspike PI Jitterbug Ct Kearsarge Ct Lattice Dr Leavenworth Ct Lindy Ct Mosaic Ct Norland Knoll Way Northumberland Dr Notions Ct Parkland Dr Parkland Dr Patchwork Dr Patriot Ct Pelham Ter Pintangle Ct Pinwheel Ct Poinsettia Ct Prairie PI Redcort Dr Rosebud Ct Rotunda Ct Sawtooth Dr Setting Sun Ct Shoo Fly Ter Snowden Bridge Blvd Spangler Ct Splendour Garden Way Starburst St Temperance Dr Temple Ct Valise Way Woolwich Dr 2. The following road names are DENIED use because of conflict, either by spelling or by phonetics, with road names already in the Frederick County Road Naming and Structure Numbering System: Dorsett St (conflicts with Dorset Ct in Albin Village) Haralson Loop (conflicts with Harrelson PI in Apple Pie Meadows) 3. Structure numbering will be assigned during the permitting and construction phase of development. 4. Road names are not approved and accepted into the Frederick County Road Naming and Structure Numbering System without plats or plans delineating location, access from current road system, location, entire length Frederick County Information Technologies, 107 North Kent Street, Winchester, VA 22601, (540)665-5614 GREENWAY ENGINEERING, mc. 151 Windy Hill Lane Winchester, Virginia 22602 Founded in 1971 August 30, 2011 Frederick County Planning Department Attn: Candice Perkins 107 North Kent Street Winchester, VA 22601 RE: Snowden Bridge Master Development Plan Brookfield Stephenson Village LLC Comment Response Letter Dear Candice: The purpose of this letter is to provide you with a summary of the information that has been incorporated onto the final plan set to address the comments from your April 4, 2011 review letter. Please note the following: Comment 1: Tables #2, #4, #5, #6, #7 and the amenity/value table from the previously approved Master Development Plan (MDP) need to be incorporated as information in this plan set. Comment 1 Response: Sheet 5 of 13 has been incorporated into the final plan set to provide for the various tables requested in this comment. Additionally, residential area tabulations have been modified on Tables #2, #5, and #7 on this sheet to reflect design revisions associated with the single family units. Comment 2: This MDP has been revised numerous times; a completed revision block needs to be included. Comment 2 Response: The Snowden Bridge Master Development Plan - Brookfield Stephenson Village LLC, represents the first MDP for Brookfield Homes that accounts solely for the land owned by this company. The final plan set does not include the revision sheet from the previously approved MDP; however, it does include revisions that have been incorporated resulting from the review agency comments associated with this process. The revision blocks on this final plan set will be utilized in the future as modifications or additions are made to the Brookfield Stephenson Village LLC property. Comment 3: Provide all adjoining property information on Sheet 2. Engineers Surveyors Planners Environmental Scientists Telephone 540-662-4185 FAX 540-722-9528 2760 B/EA W www.greenwayeng.com Comment 3 Response: Sheet 2 of 13 has been revised to include all applicable property owner information, as well as the Instrument Number references for the Brookfield Stephenson Village LLC property areas that have been dedicated and/or platted. Comment 4: Provide the acreage of each parcel owned by Brookfield on Sheet 2. Comment 4 Response: Sheet 2 of 13 has been revised to provide for the acreages associated with tax map parcels 44-A-31B, 44-A-292A, and 44-A-293 owned by Brookfield Stephenson Village LLC. Additionally, Instrument Number references have been provided for the Snowden Bridge Boulevard dedication and Snowden Bridge Section One with applicable acreages being shown on the Cover Sheet for these areas. Comment 5: An updated table that shows the recreational unit requirements and the provided amenities needs to be provided. Comment 5 Response: Sheet 5 of 13 has been revised to provide for the recreational unit requirements for the overall project, as well as for the portion of the Brookfield Stephenson Village LLC property that is currently planned for development. Additionally, it should be noted that the only recreational unit credits that have been provided account for the swimming pool and bathhouse facility as these are currently bonded with Frederick County. A recreation center site plan is being reviewed which provides for additional recreational amenities; however, credits for those facilities will be accounted for during the next update to the MDP for the Brookfield Stephenson Village LLC property. Comment 6: Provide a narrative advising that the remainder of the unplanned area associated with tax map parcel 44-A-292A will come in under a future MDP revision. Comment 6 Response: Sheet 6 of 13 has been revised to provide a narrative stating that the remaining acreage of the overall ownership area shall be processed under a future MDP revision. Comment 7: The townhouse perimeter setback needs to be shown on all applicable plan sheets. Comment 7 Response: Sheet 6 of 13, 8 of 13, and 9 of 13 have been revised to incorporate the locations of the townhouse perimeter setback areas, which includes a narrative describing the requirements for the perimeter setback areas. 2760B/EAW 2 Comment 8: Specify the housing types that will be utilized in the active adult community area. Comment 8 Response: Sheet 6 of 13 and 11 of 13 have been revised to specify the development of single family and multi -family housing types within the active adult community area. Comment 9: Provide the location of the gating for the active adult community area to demonstrate that vehicles accessing this area will not back up onto Parkland Drive. Comment 9 Response: Sheet 6 of 13 and 11 of 13 have been revised to demonstrate the locations of the gating for the active adult community on Splendour Garden Way and Ellison Way. Additionally, a narrative has been provided on both sheets stating that the gated access to this community area will be determined during the Site Plan process, which will allow for more detailed design to demonstrate that vehicles will not back up onto Parkland Drive. Comment 10: The application fee needs to include a $3,000.00 base fee, as well as an acreage fee to account for areas that were not subject to the previous MDP and areas where the housing types have been modified. Comment 10 Response: The application fee has been determined to be $8,800.00. This includes the $3,000.00 base fee and the $5,800.00 acreage area (58 acres) identified in the April 11, 2011 PDF from Candice Perkins. Application Information/Review Agency Comments: Review agency comment approvals have been obtained from the Fire Marshal, Building Inspections, Public Works, GIS, Parks and Recreation, FCSA, Public Schools and VDOT. Additionally, the MDP Application and executed Special Limited Power of Attorney document have been obtained from the property owner. Please review the information associated with the revised plan set and advise me if it is appropriate to submit final Plan sets for County approval of this MDP. Sincerely, i - ' Evanj4--- Y att AICP Greenway Engineering Cc: Rick Dengler, Brookfield Stephenson Village LLC 2760B/EAW 3 Page I of 1 Evan Wyatt From: Kurt D. Pennington Sent: Wednesday, August 31, 2011 10:41 AM To: Evan Wyatt Subject: FW: Snowden Bridge MDP Fee From: Kurt D. Pennington Sent: Monday, April 11, 2011 11:06 AM To: Evan Wyatt Subject: FW: Snowden Bridge MDP Fee Evan, Based on Candice's email, below, here are the affected areas; • Sec 2&3 32 Ac • Sec 4 14 Ac • Sec 7 4 Ac • AA (Parkland) 6 Ac Total modified areas = 58 Acres Required Fee $3000 + $5800 = $8800 Kurt From: Candice Perkins[maiIto: cperkins@co.frederick.va.us] Sent: Monday, April 11, 2011 10:43 AM To: Kurt D. Pennington Cc: Evan Wyatt Subject: Snowden Bridge MDP Fee Hi Kurt, Per our conversation last week the MDP fee for Snowden Bridge will be the base fee ($3,000) plus $100/acre for the areas that are added or modified with this plan. I have attached two pdf's that highlight the areas being modified with this plan. Let me know if you have any questions. Candice Perkins, AICP Senior Planner Frederick County Department of Planning & Development 107 North Kent Street Winchester, Virginia 22601 (540) 665-5651 (540) 665-6395 (fax) cperkins@co.frederick.va.us www.co.frederick.va.us No virus found in this message. Checked by AVG - www.avg.com Version: 10.0.1209 / Virus Database: 1500/3546 - Release Date: 04/02/11 Internal Virus Database is out of date. 8/31 /2011 ;TING SNOWDEN / BRIDGE BOULEVARD DEDICATED R/W T. \ x Ix /�i CENTHi/ ` T.M. 44-A-31 � lu pro PTS PT8�� tiO /�S cb� 11.0 +4W3E WITS SHALL ►IN mNMUM 34Y WE AND 50' � � � 25' ROAD C ,EAR SETBACKS ALONG EFFICIENCY )E PER�ER SOLMARIES' U BUFFER T.M. 44—A-29 ® eta DENOTES BROKFIELD STEPHENSOECT LREAE, ITC PROJ AREA- DENSITY USE LOTS LOTS R/W OS TOTALS Single Family 550 141.1 53.7 40.4 20 2 00.070 Townhouse 190 10.7 1.0 2.5 8.5 0.0 13. 0.41 Multifamily 110 11.4 - Day Care - 1.2 MLz . ,., , - 57.2 - 48.9 270.5 3.14 850 WITHIN ENVIROMENTAL FEATURES nvF.W SPACE IS T.M. 44—A-31A EXISTING SNOWDEN BRIDGE BOULEVARD DEDICATED R/W W F'R\ Obi T.M. 44-A-292A ROAD FFERY `�1\ A TEA D T 1 jot a AREA _ 1'= ACTIVE �'T /w1 N\ CD�11T`! 'Nor 41 11 T C 44A 3 n 1 11 1 T.M. 44-A-31A 1 1 1 1 1 \\ O Cb Ct \ 9 \ 1 SFD / f / T.M. 44-A-29. SFD \ SFD SF[ SFD SFD 0 COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 April 4, 2011 Mr. Evan Wyatt Ureenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE: Preliminary Master Development Plan for Snowden Bridge MDP Property Identification Numbers (PINS): 44-A-293, 44-A-292A, 44-A-31B First Review Dear Evan: Thank you for providing me with the opportunity to _review the preliminary master development plan for the proposed development referred to as Snowden Bridge. Please adequately address each of the comments listed below prior to formal submission of the preliminary master development plan referenced above: Preliminary Review Comments: 1. Development Aggregate Tabulation sheet. The previously approved MDP contained a development aggregate tabulation sheet that contained a number of tables that. have not been included with this MDP revision. Specifically the following tables should be included with this MDP: Tables #2, 4, 5, 6, 7 and the amenity/value table from sheet 6 of the w1DP approved in 2008. 2. Revisions. This MDP has been revised Numerous times; a completed .revision, block needs to be included. 3. Adjoining Properties. On sheet 2 provide all adjoining property information. 4. Parcel Size. On sheet 2 show the acreage of each parcel owned by Brookfield. Recreational Amenities and Values. An updated table that shows the recreational unit requirements and the provided ametiities needs to be provided. 6. Remainder of Parcel .292A. 'Provide a notation on sheet 5 that the remainder of parcel 44-A-292.A will conie. in under a future MDP revision (if there are designs for this area it should be included with this MDP submission . 7. Townhouse Perimeter Setback. The townh'ouse petuneter setbacR needs to Poe shown/expanded as indicated on sheets 5, 7 and 8 8. Active Adult Community Housing Types. Spec-i-c_i tho liousing types that wi;.l be utilized in the active adult cominuniiy area. 9. Active Adult Community. The active adult c.omnio ity is proffered to be gated, provide the location of the gates and ensure that vehicles waiting to access the active adult area will not back up once Parkland Drive. 107 North Kent Street, Suite 202 - Winchester, Virginia.22601-5000 Mr. Evan Wyatt, Greenway Engineering RE: Snowden Bridge MDP April 4, 2011 Page 2 10. Fees and Public Meeting. The fee for this application includes a $3,000.00 base fee plus $100.00 per acre for the first 150 acres and $50 per acre for the remainder. This is based on fees as of April 28, 2008. Fees may change. The -fees for this MDP need to account for areas that were not subject to the previous MDP (parcel T3B, Patchwork Drive area on parcel 292A and areas where the housing types have been modified). In order to continue the review of this Master Development Plan, you will need to submit a complete MDP application, a signed and notarized Special Limited Power of Attorney Form, all review agency comments and review fee, to this department. Review comments are required from the following agencies: Frederick County Fire Marshal, Frederick County Department of Building Inspections, Frederick County Department of Public Works, Frederick County Department of G.I.S., Frederick County Parks & Recreation, Frederick County Sanitation Authority, Frederick County Public Schools and the Virginia Department of Transportation. Please do not hesitate to contact me with questions regarding this letter. Sincerely, c� e� Candice E. Perkins, AICP Senior Planner CEP/dlw Attachment Request for Master Development Plan Comments Frederick County Department of Planning and Development Mail to: Hand deliver to: Frederick County 4 Ih Floor Department of Planning and Development 107 N. Kent Street 107 N. Kent Street Winchester, VA Winchester, VA 22601 (540) 665-5651 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the MDP with the sheet. Applicant's Name: Greenway Engineering Inc. Address 151 Windy Hill Lane Winchester, VA 22602 Phone Number 540-662-4185 Name of development and/or description of the request: Snowden Bridge -Revised Master Development Plan Location of property: The property is located on the south side of Old Charles Town Road (Rt. 761) and Jordan Springs Road (Rt. 664) and east of Milburn Road (Rt. 662) in the Stonewall Magisterial District. Department of Planning and Development's Comments: Department of Planning and Development use only Date reviewed Review Number 12 3 4 5 (please circle one) Date reviewed Date approved Revision required Signature and Date SNOWDEN BRIDGE SECTION 4 RECREATION PARKING ANALYSIS BASED ON PRINCE WILLIAM COUNTY, VA. PARKING REQUIREMENTS ACTIVITY QUANT. OR AREA PK. SPACES REQ. PRIMARY PEAK USAGE SECONDARY USAGE BASKETBALL COURT 1 COURT 4 SP. (4 SP. PER CT.) SUMMER NON SUMMER WK WEEKDAY (6:30- 9:00 PM) EVENING (6:30- 9:00 PM) WEEKEND WEEKEND (9:00 AM-4:00 PM) (9:00 AM-4:00 PM) TENNIS COURT 1 COURT 4 SP. (4 SP. PER CT.) SUMMER NON SUMMER WK WEEKDAY (6:30- 9:00 PM) DAY (9:00-11:30 AM / 1:00-2:30 PM) WEEKEND (9:00 AM-4:00 PM) WEEKEND (9:00 AM-4:00 PM) TOT LOT 6000 SQ.FT. 1 SP. (3 SP. PER AC.) SUMMER NON SUMMER �a PSS` WEEKDAY (9:00 AM-3:00 PM) WEEKDAY (9:00 AM- 3:00 PM) j �p WEEKEND (9:00 AM-4:00 PM) WEEKEND (9:00 AM-4:00 PM) DOG PARK 12,000 SQ.FT. 1 SP. (3 SP. PER AC.) ALL YEAR NA WK EVENING (6:30-8:30 PM) WEEKEND (9:00 AM-8:30 PM) POOL BATHHOUSE 2800 RAW SQ.FT. 11 SP. (I SP./250 SQ.FT.) SUMMER SUMMER WEEKDAY WEEKEND / HOLIDAY (11:00 AM- 3:00 PM) (11:00 AM-4:30 PM POOL�SE 6515 SQ.FT. 43 SP. (1 SP./150 SQ.FT.) SUMMER SUMMER WEEKDAY ���L ��� WEEKEND / HOLIDAY (11:00 AM- 3:00 PM) (11:00 AM-4:30 PM CARE 200 STUDENT APPROX. 24 SP. (1 SP./ 5 CHILDREN FOR NON SUMMER SUMMER WEEKDAYS r FIRST 40, THEN I SP./ 10 WEEKDAYS (6:30-8:30 AM / 5:00-6:30 PM) l U0 CHILDREN) (6:30-8:30 AM / 5:00-6:30PM) TOTAL PARKING REQUIRED 188 PK SPACES TOTAL PARKING PROVIDED I 110 PK SPACES a Pounded in 1971 GREENWAY ENGINEERING 151 Windy Hill Lane Winchester, Virginia 22602 1 . J SEP 1 2011 i. T R A N S M I T T A L Project Name: Snowden Bridge Revised Master Development Plan — Brookfield Stephenson Village, LLC Property File No: 2760B Date September 1, 2011 To: FC Planning From: Evan Wyatt Attn: Candice Perkins GREENWAY ENGINEERING Phone: 540-662-4185 Copied Fax: 540-722-9528 Delivery: ❑ Fed Ex ❑ U.S. Mail ® Courier ❑ Pick Up ❑ Other ❑ Urgent ® For Your Review ❑ As You Requested ® Please Comment Message: Hi Candice, Thanks again for meeting with me today to review the final MDP and application information. Please find attached 8 sets of the final MDP for County approval, as well as the application fee, application form, executed special limited power of attorney form, and all applicable approved review agency comments. Please review this information and contact me if you have any questions or advise me when the approved plan sets are available and we will make arrangements to pick them up. Thank you, Evan Hand Delivery and Pick Ups Only: Received By: Date: Time: Please Print Name: GREENWAY ENGINEERING 151 Windy Hill Lane Founded in 1971 Winchester, Virginia 22602 T R A N S M I T T A L Project Name: Snowden Bridge MDP — Brookfield Property File No: 2760B Date April 11, 2011 To: FC Planning From: Evan Wyatt Attn: Candice Perkins GREENWAY ENGINEERING Phone: 540-662-4185 Copied Fax: 540-722-9528 Delivery: ❑ Fed Ex ❑ U.S. Mail ® Courier ❑ Pick Up ❑ Other ❑ Urgent ® For Your Review ® As You Requested ® Please Comment Message: Hi Candice, Please find attached one copy of the MDP that has been revised to reflect your comments dated April 4, 2011. I have highlighted the revisions to assist in your review. Please review this information and advise me if this addresses your comments at your earliest possible convenience. Thank you, Evan Hand Delivery and Pick Ups Only: Received By: Date: y (i \ Time V F� ((, Please Print Name: - I : APR 1 1 2011 Page 1 of 1 Evan Wyatt From: Kurt D. Pennington Sent: Monday, April 11, 2011 11:06 AM To: Evan Wyatt Subject: FW: Snowden Bridge MDP Fee Evan, Based on Candice's email, below, here are the affected areas; • Sec 2&3 32 Ac • Sec 4 14 Ac • Sec 7 4 Ac • AA (Parkland) 6 Ac Total modified areas = 58 Acres Required Fee $3000 + $5800 = $8800 Kurt From: Candice Perkins [ ma i Ito: cperki ns@co. frederick.va. us] Sent: Monday, April 11, 2011 10:43 AM To: Kurt D. Pennington Cc: Evan Wyatt Subject: Snowden Bridge MDP Fee Hi Kurt, Per our conversation last week the MDP fee for Snowden Bridge will be the base fee ($3,000) plus $100/acre for the areas that are added or modified with this plan. I have attached two pdf's that highlight the areas being modified with this plan. Let me know if you have any questions. Candice Perkins, AICP Senior Planner Frederick County Department of Planning & Development 107 North Kent Street Winchester, Virginia 22601 (540) 665-5651 (540) 665-6395 (fax) cperkins@co.frederick.va.us www.co.frederick.va.us No virus found in this message. Checked by AVG - www.avg.com Version: 10.0.1209 / Virus Database: 1500/3546 - Release Date: 04/02/11 Internal Virus Database is out of date. 4/11/2011 COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/665-6395 April 4, 2011 Mr. Evan Wyatt Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE: Preliminary Master Development Plan for Snowden Bridge MDP Property Identification Numbers (PINs): 44-A-293, 44-A-292A, 44-A-31B First Review Dear Evan: Thank you for providing me with the opportunity to review the preliminary master development plan for the proposed development referred to as Snowden Bridge. Please adequately address each of the comments listed below prior to formal submission of the preliminary master development plan referenced above: Preliminary Review Comments: 1. Development Aggregate Tabulation sheet. The previously approved MDP contained a development aggregate tabulation sheet that contained a number of tables that have not been included with this MDP revision.. Specifically the. following tables should be included with this MDP:. Tables #2, 4, 5, 6, 7 and the amenity/value table from sheet 6 of the MDP approved in 2008.. 2. Revisions. This MDP has been revised numerous times; a completed revision block needs to be included. 3. Adjoining Properties. On sheet 2 provide all adjoining property information. 4. Parcel Size. On sheet 2 show the acreage of each parcel owned by Brookfield. 5. Recreational Amenities and Values. An. updated table that shows the recreational unit requirements and the provided amenities needs to be provided. 6. Remainder of Parcel 292A. Provide a notation on sheet .5 that the remainder of parcel 44-A-292A will come in under a future MDP revision (if there are designs for this area it should be included with. this MDP submission). 7. Townhouse Perimeter Setback. The townhouse -perimeter setback needs to be shown/expanded as indicated on sheets 5, 7 and 8. 8. Active Adult Community Hoeing Types. Specify the housing types that will be utilized in the active adult community area. 9. Active Adult Community. The active adult community is proffered to be gated, provide the location of the gates and .ensure that vehicles waiting to access the active adult area will not back up onto ParklandDrive. 107 North Kent Street, Suite 202 • Winchester., Virginia.22601-5000 Mr. Evan Wyatt, Greenway Engineering RE: Snowden Bridge MDP April 4, 2011 Page 2 10. Fees and Public Meeting. The fee for this application includes a $3,000.00 base fee plus $100.00 per acre for the first 150 acres and $50 per acre for the remainder. This is based on fees as of April 28, 2008. Fees may change. The fees for this MDP need to account for areas that were not subject to the previous MDP (parcel '173B, Patchwork Drive area on parcel 292A and areas where the housing types have been modified). In order to continue the review of this Master Development Plan, you will need to submit a complete MDP application, a signed and notarized Special Limited Power of Attorney Form, all review agency comments and review fee, to this department. Review comments are required from the following agencies: Frederick County Fire Marshal, Frederick County Department of Building Inspections, Frederick County Department of Public Works, Frederick County Department of G.I.S., Frederick County Parks & Recreation, Frederick County Sanitation Authority, Frederick County Public Schools and the Virginia Department of Transportation. Please do not hesitate to contact me with questions regarding this letter. Sincerely, i L` Candice E. Perkins, AICP Senior Planner CEP/dlw Attachment /:N 147 Founded in 1971 GREENWAY ENGINEERING 151 Windy Hill Lane Winchester, Virginia 22602 MAR 7 5 2011 r T R A N S M I T T A L Project Name: Snowden Bridge Master Development Plan — Brookfield Stephenson Village, LLC Property File No: 2760B Date March 16, 2011 To: FC Planning Attn: Candice Perkins Copied Delivery: ❑ Fed Ex ❑ Other ❑ U.S. Mail From: Evan Wyatt GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 ® Courier ❑ Pick Up ❑ Urgent ® For Your Review ❑ As You Requested ® Please Comment Message: Hi Candice, Please find attached the revised Snowden Bridge Master Development Plan that reflects the property owned solely by Brookfield Stephenson Village, LLC for your review and comment. Please review this information and advise me if you need anything else at this time, or contact our office when your comments are available and we will make arrangements to pick them up. Thank you, Evan Hand Delivery and Pick Ups Only: Received By: Date: Time: Please Print Name: GREENWAY ENGINEERING, iNc. 151 Windy Hill Lane Winchester, Virginia 22602 Founded in 1971 MEMORANDUM TO: VDOT, Lloyd Ingram FCSA, John Whitacre Frederick County Planning, Candice Perkins Frederick County Public Works, Joe Wilder Frederick County Inspections, John Trenary Frederick County Fire Marshal, John Bauer Frederick County Parks and Recreation, Matt Hott Frederick County Public Schools, Wayne Lee Winchester Regional Airport, Renny Manuel FROM: Evan Wyatt, Greenway Engineering cqu) RE: Snowden Bridge Master Development Plan DATE: November 23, 2010 Greenway Engineering has been working with the Planning Department to create a Master Development Plan (MDP) for Snowden Bridge, which accounts for the Brookfield Stephenson Village, LLC property. This MDP has been reformatted to reflect the typical plan set that Greenway Engineering prepares for this type of project, which is being resubmitted for your review and comment. The information in this MDP is consistent with the information from your previous review except for the following: ➢ The extension of Parkland Drive through the Active Adult section to provide access to the eastern -most residential lots. ➢ The provision of ingress -egress easements for Flyfoot Drive and Northumberland Drive to allow for public street access to the portions of Land Bay I11, which are not owned by Brookfield Stephenson Village, LLC. Please find attached a new MDP plan set and comment sheet, as well as a copy of your previous comments. I would appreciate it if you would provide Greenway Engineering with an updated comment for this project at your earliest possible convenience. Please contact me if you have any questions or if you need any additional information. Engineers Surveyors Planners Environmental Scientists Telephone 540-662-4185 FAX 540-722-9528 www.greenwayeng.com n_ "yL GREENWAY ENGINEERING 151 Windy Hill Lane Founded in 1971 Winchester, Virginia 22602 TRANSMITTAL Project Name: Snowden Bridge -Master Development Plan Revision File No: 2760B Date: Tue, Nov 23, 2010 To: FC-Planning From: Kurt Pennington/dlm Attn: --Candice Perkins GREENWAY ENGINEERING Copied' p Phone: 540-662-4185 Fax: 540-722-9528 Delivery: ❑ Fed Ex ❑ U.S. Mail 0 Courier ❑ Pick Up ❑ Other ❑ Urgent 0 For Your Review ❑ As You Requested ❑] Please Comment Message Candice, Attached is the following for your review and approval: -2 copies of the revised Master Development Plan -Cover letter Thank you for your assistance. Contact us with any questions or need for additional information. NOV 232010 Hand Delivery ­and Pick Ups Only: Received by: Date: Please Print Name: Document Approval Form PLEASE REVIEW TIE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS- YOUR APPROVAL PLEASE NMAL AND PROVIDE THE DATE AND TIME OF YOUR APPROVAL. LF 2RUDOCUMENT DOES NOT MEET YOM?APPROVAL PLEASE PR0ME COMK E2MAS TO WHAT YOU WOULD LTO HAVE COAMET ED. INMALS DATE &c IMAE . Candice l J 1 Received by Clerical Staff (Date & Time): U:1PamlCo=onDoc=cnt Approval Form.wpd Please note: The Subdivision/MDP plans associated with this file are located in the file room.