HomeMy WebLinkAbout14-07 Amended Snowden Bridge Stonewall - BackfileMASTER DEVELOPMENT PLAN TRACKING SHEET
(Note: The application does not need to be complete to be accepted but will not be scheduled for
the PC or BOS until all items have been received.)
Submission Package
Comment -sheets from the following agencies along with any marked copies of the plan:
OT County Engineer
\kkrf City of Winchester
Fire Marshal \�
Sanitation Authority GIS (Mapping)
Inspections Dept. Parks & Recreation
Health Department Winchester Regional Airport
One copy of the master development plan application.
L--- Appropriate number of blueprint plans, colored maps, etc. to cover the PC and BOS meetings.
c-*-� Submission Fee
Date
Il d
IV A
Ott A
NOTES:
TRACKING
Application received
bo
Fee Paid (amount: $-2d0o )
Preliminary MDP heard by Planning Commission - Action taken:
Preliminary MDP heard by Board of Supervisors - Action taken:
Letter to applicant regarding Board action and revisions (if required).
Final MDP submitted with review agency, PC and BOS comments addressed.
Final MDP signed by County Administrator and Planning Director (send two
copies to applicant).
Administratively approved; letter sent to applicant.
DATE:
File opened.
0.? Reference Manual updated/number assigned.
L�I� D-base updated.
N F1 List of adjoiners given to staff member for verification.
One black & white location map requested from Mapping & Graphics.
N it Four sets of labels requested from Data Processing.
t 4 7 ile given to Renee' to update Application Action Summary.
CLOSE OUT FILE:
O Approval (or denial) letter mailed to applicant (*Note: Be sure Joe Wilder in Public works
and Jane Anderson in Real Estate receive a copy of the administrative approval letter.
Jane wants a copy of the final action letter even if the application was denied or
withdrawn.)
I File stamped "approved"/"denied" or "withdrawn."
±� Reference Manual updated.
A�0 D-base updated.
r6 05 Q File given to Renee' for final update to Application Action Summary.
File in file drawer.
U %CwoINCommon%Tnekmg sh=ts%TPACKING.h4DP
Rw 01/21/03
4-.
0
N
cc
cc
N
'T
ol
+� O
o
t� p
N
cr
U a w)
a)�U, Vl
jj
N U
wa�3�
DATE U NU %
RECEIVED FROM �-
ADDRESS / J
OFOR RENTc'`
❑FOR
AMT. OF
CASH
ACCOUNT
AMT. PAID`
T
CHECK
i
I y3 ��
BALANCE
MONEY
DUE
ORDER
No. 8159
vy"
DOLLARS
GREENWAY ENGINEERING
151 Windy Hill Lane JUL 16
Founded in 1971 Winchester, Virginia 22602
TRANSMITTAL
Project Name: Snowden Bridge -Land Bay IIIA Part A -Revised MDP
File No: 2760B
Date: Wed, Jul 16, 2008
To: FC Planning
Attn: Amber Powers
Copied
Delivery: I- Fed Ex
Other_
From: Kurt Pennington/dlm
GREENWAY ENGINEERING
Phone: 540-662-4185
Fax: 540-722-9528
Fj U.S. Mail [j Courier rJ Pick Up
r-j Urgent r71 For Your Review [j As You Requested F] Please Comment
Message
Amber,
Per our client's request, attached is the following for approval and signature:
-5 copies of the revised Master Development Plan for Land Bay II1A Part A
-Copy of Planning comment letter dated January 23, 2008
Thank you for your assistance. Call with any questions.
Hand Delivery and Pick Ups Only:
Received by:
Date: Time:
Please Print Name:
COUNTY of FREDERICK
Department of Planning and Development
540/ 665-5651
FAX: 540/ 665-6395
January 23, 2008
Greenway Engineering
Attention: Kurt Pennington
151 Windy Hill Lane
Winchester, VA 22602
RE: Revised Master Development Plan Administrative Approval
Snowden Bridge Land Bay IIIA Part A
Property Identification Numbers (PINS): 44-A-31A, 292, and 293
Dear Kurt:
This letter is to confirm that the revised Master Development Plan for Snowden Bridge Land Bay
IIIA Part A is approvable. This is a revision to the approved Master Development Plan dated April
16, 2007 which provides for the phased development of approximately 230 acres of land within the
Stonewall Magisterial District.
Please submit five copies of the Final Master Development Plan for signature. Feel free to contact
me with any questions regarding this approval.
Sincerely, -
Amber Powers
Planning Technician
ALP/bad
cc: Brookfield Washington, LLC, 8500 Executive Park Ave., Ste. 300, Fairfax, VA 22031
JAN 2 5 2008 I;
107 North Kent Street, Suite 202 Winchester, Virginia 2260f-5000
L%t!ICK
COLWY
Department of Planning and Development
540/665-5651
FAX: 540/ 665-6395
August 1, 2008
Greenway Engineering
Attention: Kurt Pennington
151 Windy Hill Lane
Winchester, VA 22602
RE: Revised Master Development Plan Approval (MDP #14-07)
Snowden Bridge Land Bay IIIA Part A
Property Identification Numbers (PINS): 44-A-31A, 292, and 293
Dear Kurt:
This letter is to confirm that the revised Master Development Plan for Snowden Bridge Land Bay IIIA Part A
has been approved. This is a revision to the Master Development Plan (MDP #05-07) which was approved on
April 16, 2007 and outlined the phased development of approximately 230 acres of land within the Stonewall
Magisterial District.
Key aspects of approved MDP # 14-07:
• None of the changes affect the proposed new major collector, Snowden
Bridge Boulevard.
• No changes to the approved number of units allotted for each housing type.
• Very minor changes in the location of the housing sub -types included in the
new MDP that do not alter the distance or relationship between single family
detached housing types and multi -family or attached single family housing
types such as townhouses and active adult housing.
• Changes include minor alterations in the layout of internal streets within
sections 4, 7 and 11, and the removal of public trail connecting sections 7
and 1 I of the development.
Enclosed are three copies of the signed final Master Development Plan. Feel free to contact me with any
questions you may have regarding this approval.
Sincerely,
Amber Powers
Planner I
ALP/bad
cc: Brookfield Washington, LLC, 8500 Executive Park Ave., Ste. 300, Fairfax, VA 22031
Charles S. DeHaven, Jr., Stonewall District Supervisor
Gary Oates and Richard Ruckman, Stonewall District Planning Commissioners
Jane Anderson, Real Estate
Commissioner of Revenue
107 North Kent Street, Suite 202 - Winchester, Virginia 22601-5000
I
July 18, 2008
Greenway Engineering
Attention: Kurt Pennington
151 Windy Hill Lane
Winchester, VA 22602
COUNTY of FREDERICK
Department of Planning and Development
540/ 665-5651
FAX: 540/ 665-6395
RE: Master Development Plan Numbers: 05-07, 14-07; and 04-08
Snowden Bridge Land Bay IIIA Part A
Property Identification Numbers (PINS): 44-A-31A, 292, and 293
Dear Kurt:
This letter is to confirm that the currently approved Master Development Plan (MDP) for Snowden
Bridge land bay IIIA is #05-07. The process for approving MDP application # 14-07, which made
changes to the layout of several minor streets, was not completed and consequently set aside once our
office received the most recent MDP application #04-08.
Both MDP # 14-07 and #04-08 are technically approvable, although 904-08 still needs a final blessing
by the Board of Supervisors before it can be signed. Currently, the County is awaiting some action
regarding the most recent MDP submission which was tabled from the Board of Supervisors meeting
held on July 91h.
In order to approve the older of the two plans, it would be necessary to formally withdraw the #04-08
version. We are requesting a letter to this effect which would allow us to close out the file and return
to using the older, # 14-07 version.
Please contact me if you have any questions.
Sincerely,
Amber Powers
Planner I
ALP/bad
cc: Brookfield Washington, LLC, 8500 Executive Park Ave., Ste. 300, Fairfax, VA 22031
107 North Kent Street, Suite 202 - Winchester, Virginia 22601-5000
Snowden Bridge - VDOT Com---mts to Revised Master Development PIP, Page 1 of 1
Mark Cheran
From: Funkhouser, Rhonda [Rhonda.Funkhouser@VDOT.Virginia.gov] on behalf of Ingram, Lloyd
[Lloyd.Ingram@VDOT.Virginia.gov]
Sent: Monday, April 07, 2008 3:01 PM
To: kpennington@greenwayeng.com
Cc: Ingram, Lloyd; cperkins@co.frederick.va.us; mcheran@co.frederick.va.us
Subject: Snowden Bridge - VDOT Comments to Revised Master Development Plan
The revised master development plan for this property appears to have significant measurable
impact on Routes 761 and 11, the VDOT facilities which would provide access to the property.
The revised master development plan dated February 22, 2008 appears acceptable to VDOT.
Before making any final comments, this office will require a complete set of site plans,
drainage calculations and traffic flow data from the I.T.E. Trip Generation Manual, Seventh
Edition for review. VDOT reserves the right to comment on all right-of-way needs, including
right-of-way dedications, traffic signalization, and off -site roadway improvements and
drainage. Prior to construction on the State's right-of-way the developer will need to apply to
this office for issuance of appropriate permits to cover said work.
Please provide a paper copy, as well as an electronic copy, of the revised MDP once the
County has approved.
Thank you for allowing us the opportunity to comment.
«SC N_20080407145316_001. pdf>>
Lloyd A. Ingram, Transportation Engineer
Virginia Department of Transportation
Edinburg Residency — Land Development
14031 Old Valley Pike
Edinburg, Virginia 22824
Phone #(540) 984-5611
Fax #(540) 984-5607
5/7/2008
COUNTY of >F'REDERICK
Department of Public Works
540/665-5643
FAX: 540/ 678-0682
April 3, 2008
Mr. Kurt Pennington
Greenway Engineering Group, Inc.
180-9 Prosperity Drive
Winchester, Virginia 22602
RE: Revised Master Development Plan Comments — Snowden Bridge
Frederick County, Virginia
Dear Mr. Pennington:
Upon review of the revised plan dated February 22, 2008, all of our previous comments
have been addressed. Therefore, we recommend approval of the subject site plan.
Sincerely,
{ � 1
�Joe C. Wilder
Deputy Director
JCW/mlr
cc: Planning and Development
file
SNOWDENBRIDGEMDP
107 North Kent Street 4 Winchester, Virginia 22601-5000
g m
C®U
&Cn?11CK
Department of Planning and Development
540/ 665-5651
FAX: 540/ 665-6395
January 23, 2008
Greenway Engineering
Attention: Kurt Pennington
151 Windy Hill Lane
Winchester, VA 22602
RE: Revised Master Development Plan Administrative Approval
Snowden Bridge Land Bay IIIA Part A
Property Identification Numbers (PINS): 44-A-31A, 292, and 293
Dear Kurt:
This letter is to confirm that the revised Master Development Plan for Snowden Bridge Land Bay
IIIA Part A is approvable. This is a revision to the approved Master Development Plan dated April
16, 2007 which provides for the phased development of approximately 230 acres of land within the
Stonewall Magisterial District.
Please submit five copies of the Final Master Development Plan for signature. Feel free to contact
me with any questions regarding this approval.
Sincerely,
Amber Powers
Planning Technician
ALP/bad
cc: Brookfield Washington, LLC, 8500 Executive Park Ave., Ste. 300, Fairfax, VA 22031
107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000
DEC z 0
0 GREENWAY ENGINEERING
151 Windy Hill Lane
Founded in 1971 Winchester, Virginia 22602
TRANSMITTAL
Project Name: Snowden Bridge -Master Development Plan LB IIIA, Part A
File No: 2760B
Date: Thu, Dec 20, 2007
To: FC Planning
Attn: Candice Perkins
Copied
Delivery: F Fed Ex
F-j Other_
CJ U.S. Mail
From: Kurt Pennington/dlm
GREENWAY ENGINEERING
Phone: 540-662-4185
Fax: 540-722-9528
F j Courier rJ Pick Up
1-1 Urgent R] For Your Review I✓j As You Requested r-J Please Comment
Message
Candice,
Per your request, attached is the following:
-Copy of approval letter from FC Fire Marshal.
Thank you for your assistance. Call with any questions.
Hand Delivery and Pick Ups Only:
Received by: Date: Time:
Please Print Name:
GREENWAY ENGINEERING
151 Windy Hill Lane
Founded 1n 1971 Winchester, Virginia 22602
TRANSMITTAL
Project Name: Snowden Bridge -Master Development Plan - Land Bay IIIA, Part A
File No: 2760B
Date: Mon, Dec 10. 2007
To: FC Planning
Attn: Lauren E. Krempa
Copied
Delivery: F Fed Ex F-1 U.S. Mail
F-j Other
From: Kurt Pennington/reb
GREENWAY ENGINEERING
Phone: 540-662-4185
Fax: 540-722-9528
FR--/] Courier F] Pick Up
r-j Urgent P-1 For Your Review P-1 As You Requested F] Please Comment
Message
Lauren,
Per your request, attached are the following for your review:
-- Two copies of the revised Master Development Plan - LBIIIA, Part A per Planning comments
dated November 15, 2007
-- Comment Response Letter
As always, thank you for your assistance. Call with any questions.
Hand Delivery and Pick Ups Only:
Received by: Date: Time:
DEC 1 0
Please Print Name:
GREENWAY ENGINEERING, INC.
151 Windy Hill Lane
Winchester, Virginia 22602 DEC 1 0
Founded in 1971
December 10, 2007
County of Frederick
Department of Planning and Development
107 North Kent Street, Suite 202
Winchester, VA 22601
Attn: Lauren E. Krempa, Planner I
Re: Snowden Bridge Land Bay I11A — Part A
Comment Response Letter
Dear Ms. Krempa:
We are in receipt of your comments dated November 15, 2007, and offer the following responses
Comments from Department of Planning and Development:
Comment 1: On sheet 6, the provided chart should match Exhibit E of the Rezoing Proffer.
Response: The chart has been revised accordingly.
Comment 2: On sheet 12, regarding the layout of Farmhouse Court, the submitted subdivision design
plan for this section shows a private access drive off the end of Farmhouse for the benefit of two lots.
Obtain a comment from VDOT which verifies that an entrance will be given for the private drive and
show the private drive on the revised MDP.
Response: Farmhouse Court has been revised to be a standard cul-de-sac. The private access drive
servicing two lots at the end of the cul-de-sac is unnamed and will not be shown. Only named streets
have been shown previously. The entrance will be in accordance with VDOT guidelines and
approved subdivision plans within the development.
Comment 3: On sheet 12, the connection of the private trail system to the Active Adult Community
Center should be shown as provided on the previously approved MDP.
Response: The private trail system located within the Active Adult Community has been revised to
eliminate connections to the Hiatt Run trail system to the south and the private trail system to the
north that were indicated on the previous Master Development Plan. The Active Adult Community
within Snowden Bridge in being designed as a gated, exclusive community; therefore, trail
connections that would allow access into this land bay by others is not desirable. Brookfield Homes
has experienced this issue in the Braemar project in Prince William County, which continues to be a
source of complaint from the residents of that Active Adult Community. Greenway engineering met
with Jim Doran, Director of Parks and Recreation on August 23, 2007 to discuss this issue and was
advised that it would be appropriate to eliminate the private trail system connections from the Active
Engineers Surveyors Planners Environmental Scientists
Telephone 540-662-4185 FAX 540-722-9528
File #276013/kp/reb www.greenwayeng.com
Adult Community. The location of the private trail systems was not a component of the adopted
proffer statement from this project; therefore, this should be considered as a revision to the previously
approved Master Development Plan.
Thank you for your assistance with this project. Contact us with any question or need for
additional information.
Sincerely,
Greenway Engineering, Inc.
Kurt Pennington
File #2760B/KP/reb
Control number
MDP07-0014
Project Name
Snowden Bridge-LBIIIA, Part A
Address
151 Windy Hill Ln.
Type Application
Master Development
Current Zoning
R
Automatic Sprinkler System
No
Other recommendation
Emergency Vehicle Access
Adequate
Siamese Location
Not Identified
Emergency Vehicle Access Comments
Access Comments
Additional Comments
Plans approved as submitted.
Date received Date reviewed Date Revised
12/11/2007 12/14/2007
Applicant
Greenway Engineering
City State Zip Applicant Phone
Winchester VA 22602 540-662-4185
Tax ID Number Fire District Rescue District
44-A-31 A, etc. 13 13
Recommendations
Automatic Fire Alarm System
Yes
Requirements
Hydrant Location
Not Identified
Roadway/Aisleway Width
Not Identified
Election District
Stonewall
Residential Sprinkler System
Yes
Fire Lane Required
Yes
Special Hazards
No
Plan Approval Recommended Reviewed By Signature
Yes J. Neal
Title
IJI
[ByP.e,06
DEC J 4. hY R
COPY
COUNT' of FREDERICK
Department of Planning and Development
540/ 665-5651
FAX: 540/ 665-6395
November 15, 2007
Greenway Engineering
Attention: Kurt Pennington
151 Windy Hill Lane
Winchester, VA 22602
RE: Revised Master Development Plan Review Comments
Snowden Bridge Land Bay IIIA Part A
Property Identification Numbers (PINS): 44-A-31A, 292, and 293
Dear Kurt:
Please adequately address each of the comments listed below prior to formal submission of the
revised master development plan referenced above.
Preliminary Review Comments:
1. On Sheet 6, the provided chart should match Exhibit E of the Rezoning Proffers.
2. On sheet 12, regarding the layout of Farmhouse Court, the submitted subdivision design
plan for this section shows a private access drive off the end of Farmhouse for the benefit
of two lots. Obtain a comment from VDOT which verifies that an entrance will be given
for the private drive and show the private drive on the revised MDP.
3. On sheet 12, the connection of the private trail system to the Active Adult Community
Center should be shown as provided on the previously approved MDP.
Please address the above comments and resubmit. Approval from the following agencies will be
required prior to granting an administrative approval of this revised plan: Virginia Department of
Transportation and Frederick County Fire Marshal. Please do not hesitate to contact me with
questions regarding this letter.
/Sincerely,
Ct
Lauren E.
Planner I
�'em a '
p
LEK/bad
Attachment
cc: Brookfield Washington, LLC, 8500 Executive Park Ave., Ste. 300, Fairfax, VA 22031
107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000
OCT 3 1 Z ,,
APPLICATION
MASTER DEVELOPMENT PLAN
Department of Planning and Development :Use Only.
Date application received / 1*7 Application #
Complete. Date of acceptance
Incomplete. Date of return
1. Project Title: Snowden Bridge -Master Development Plan
LB IIIA — Part A
2. Owner's Name Stephenson Associates, LC
Brookfield Stephenson Village, LLC
3.
4.
(Please list name of all owners or parties in interest)
Applicant: Greenway Engineering
Address: 151 Windy Hill Lane
Winchester, VA 22602
Phone Number: 540-662-4185
Design
Greenway Engineering
Company:
Address:
Same
Phone Number:
Same
Contact Name:
Kurt Pennington
5. Location of Property The property is located on the south side of Old
Charles Town Road (Rt. 761) and Jordan Springs Road
(Rt. 664) and east of Milburn Road (Rt. 662)
6. Total
Acreage:
285.5 acres
7. Property Information
a) Property Identification Number
(PIN):
b) Current Zoning:
c) Present Use:
d) Proposed Uses:
e) Adjoining Property Information:
North
South
East
West
44-A-292, 44-A-293, 44-A-31,
44-A-31 A
R4-Residential-Planned Community
Residential -Undeveloped
Residential -Planned Community
Property Identification Property Uses
Numbers
On File
f) Magisterial District:
Stonewall
8. Is this an original or amended Master Development Plan?
Original ❑ Amended
I have read the material included in this package and understand what is required by the
Frederick County Department of Planning and Development. I also understand that the
master development plan shall include all contiguous land under single or common
ownership. All required material will be completed prior to the submission of my master
development plan applicati/
Signature:
Date: /O L,3a Lo
Request for Master Development Plan Comments
Frederick County Department of Planning and Development
Mail to: Hand deliver to:
Frederick County 4` Floor
Department of Planning and Development 107 N. Kent Street
107 N. Kent Street Winchester, VA
Winchester, VA 22601 (540) 665-5651
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the MDP with the sheet.
Applicant's Name: Greenway Engineering
Address 151 Windy Hill Lane
Winchester, VA 22602
Phone Number 540-662-4185
Name of development and/or description of the request: Stephenson Village Master
Development Plan -LB IIIA-Part A
Location of property: The property is located on the south side of Old Charles Town Road (Rt.
761) and Jordan Springs Road (Rt. 664) and east of Milburn Road (Rt. 662) in the Stonewall
Magisterial District.
Department of Planning and Development's Comments:
Department of Planning and Development use only
Date reviewed Review Number 12 3 45 (please circle one)
Date reviewed Date approved Revision required
Signature and Date
•
A= -- GREENWAY ENGINEERING
151 Windy Hill Lane
Founded in 1971 Winchester, Virginia 22602
TRANSMITTAL
Project Name: Snowden Bridge -Master Development Plan
File No: 2760B
Date: October 31, 2007
To: FC Planning
Attn:
Copied
From: Judy Chow/dlm
Eric Lawrence GREENWAY ENGINEERING
Delivery: F Fed Ex
Other_
Phone: 540-662-4185
Fax: 540-722-9528
U.S. Mail F Courier r-1 Pick Up
Urgent P-1 For Your Review r-1 As You Requested n Please Comment
Message
Eric,
Attached is the following for administrative approval:
-12 copies of the revised Master Development Plan
-Master Development Plan Application
-Planning comment sheet
We will deliver the $2,000.00 application fee check later today.
As always, thank you for your assistance. Call with any questions or need for additional
information.
Hand Delivery and Pick Ups Only:
Received by: Date:
Please Print Name:
0 GREENWAY ENGINEERING
151 Windy Hill Lane
Founded 1n 1971 Winchester, Virginia 22602
TRANSMITTAL
Project Name: Snowden Bridge -Master Development Plan
File No: 2760B
Date: Wed, Oct 31, 2007
To: FC Planning
Attn: Eric Lawrence
Copied
From: Judy Chow/dlm
GREENWAY ENGINEERING
Phone: 540-662-4185
Fax: 540-722-9528
Delivery: 1- Fed Ex r-J U.S. Mail Courier Pick Up
Other
r-J Urgent r-71 For Your Review r-1 As You Requested P-1 Please Comment
Message
Eric,
Per our trasmittal submitted earlier today, attached is the Application Review fee check for
$2,000.00 for the Revised Master Development Plan.
Again, thank you for your assistance. Let us know if you should need any additional information.
Hand Delivery and Pick Ups Only:
Received by: Date:
Please Print Name:
OCT 3 1 200
Document Approval Form
0 CT 3 1 2007
PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS YOUR
APPROVAL PLEASE INITIAL AND PROVIDE THE DATE AND TIME OF YOUR
APPROVAL.
IF THIS DOCUMENT DOES NOT MEET YOUR APPROVAL PLEASE PROVIDE
COMMENTS AS TO WHAT YOU WOULD LIKE TO HA VE COMPLETED.
INITIALS DATE & TIME
Candice
Angie
Mark
Dana
Eric
Mike
(John
Lauren
COMMENTS:
Received by Clerical Staff (Date & Time): %
U:\Pam\Common\Document Approval Form.wpd
Please note: The Subdivision/MDP plans associated m 114-07 AMEND E OWDEN BRIDGE