Loading...
HomeMy WebLinkAbout04-98 Tasker Road Land Bays 1-9 Opequon Magisterial District - Backfile (2)PONDS DISTURBED WOODLANDS V 64 242 6,3 A 12 lot 31 g%' 24 06 ti U-2 bIGpC r)aumwCa ot, IoTiI o.n on all 14 on A S s TED I- IN6 ACUTY 11-O.S. eiN "**47 Founded in 191-1 GREENWAY ENGINEERING 151 Windy Hill Lane Winchester, Virginia 22602 T R A N S M I T T A L Project Name: Autumn Glen File No: 2085 Date January 29, 2004 To: FC Planning Attn: Eric Lawrence Copied From: Kurt Pennington/dlm GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 ❑ Urgent ❑ For Your Review ❑ As You Requested ❑ Please Comment Message: Eric, Per your request, attached are 5 copies of sheets 1A-5 for the MDP to be added to sheet 1 previously submitted to your office for approval and signature. Sorry for any inconvenience. Thank you for your assistnace. Call with any concerns. - - - JAN 2 9 2004 Greenway Engineering Telephone 540-662-4185 FAX 540-722-9528 www.greenwayeng.com TASKER ROAD LAND BAYS 1-9 MDP #004-98 Opequon Magisterial District ,,,,y,, Ow,r) AMUMN GLEN LAND BAYS Part of Tasker Road 4 Sept. '00) MDP #004-98