Loading...
HomeMy WebLinkAbout22-02 Sovereign Village Section II, A, B, and C Red Bud - Backfilet 0 Subdivision Checklist Comment sheets from the following agencies, along with any marked copies of the plan: VDOT City of Winchester GIS (Road Name / Review) �/ Sanitation Authority Health Department FC PS Inspections Department L Parks & Recreation Fire Marshal County Engineer 2. One copy of the subdivision application Application received. Fee paid (amount: $ Information entered in d-BASE and Reference Manual �a 7.02 6k__ File given to Renee' to add to Application Action Summary Plat(s) signed by Subdivision Administrator 1 ' 30- 05 Approval letter toAiv appplicant/agent Copy of final subsion plat(s) [with signatures] made and given to Mapping and Graphics Manager for structure numbering assignment 3' `7- Q Updated d-BASE and Reference Manual J • 2.03 0,�ile given to Renee'- to update Application Action Summary Final plat(s) submitted with review agency signatures along with: - - --Recorded deed of dedication-- ---------- -- --- 00 1/ Bond estimate (if required) $r--- O:\Operations ManuaRsubdivision.trk Revised: 6/24/02 i F CASH 1 0,02915 i�. I I • Date RECEIPT Received From (,c) a Address ,zt " 'JIL w W •c Jv qC, %ollarss'$ f,3 giFor Alt-, ACCOUNT HOW PAID AMT. OF ACCOUNT CASH AMT. PAIn CHE BALANCE MONEY ORDER [I By" DU E CREDIT CARD Q - ' ~ / | | / � / COMMONWEALTH OF VIRGINI& (D _ | � ) | ! ^ | . ���"=' r . . | ' INGTRUM[N O6OOV4484 BOOK/ pAGE/ RECORDED. 03/AlO AT 1l/4{ | � t".-POITOR: MAMNING& -: L r5r'/ CO ' ---' ---' ---'---' EX: NMZ� 1�� | / � | � �� 0F �� � �/�X8 / | / CASH � ��.0O / . ' DB�I�l� : ---- '— '_ --- | � ^^ SDVEREl�m YI �� .. ^^""�^ ^^ ,m�z^ - / | CONSIDE8AT0N/ .VO A/VAL- .OV �P- | , / PlM. / | 3� �� ^ �� 1@ �� 1� ^ ' ' / 1O6 TECHNOL�� TRUG7 FU 5.OV �5 YOF / ' TENDERED ^ | | . | A��T�D� CHANGE AMT : ^ O@ ' . .. .. � | / CLERK OF P. { � - . | | . / ! / � ! | � | | | ' � cn / . � ! | � { 8 ! / | DOmnmm ^ � . { | 060004484 cm W CSl THIS DEED OF DEDICATION, made and dated this 95 day of 2006, by and between MANNING & ROSS DEVELOPERS, LLC, a Virginia Limite Liability Company, party of the first part, hereinafter called the DECLARANT (Grantor for indexing purposes), and FREDERICK COUNTY, VIRGINIA, party of the second part (Grantee for indexing purposes), and THE FREDERICK COUNTY SANITATION AUTHORITY, party of the third part (Grantee for indexing purposes). WHEREAS, the DECLARANT is the owner in fee simple of the real estate shown on the attached plat drawn by Mark D. Smith, dated January 11, 2006 known as Sovereign Village, Section 2C, attached hereto and by this reference made a part hereof, which property is further described on the Final Master Development Plan of Sovereign Village as filed in the Office of the County of Frederick Department of Planning and Development. This is a portion of the same real estate conveyed to the DECLARANT by Deed dated October 1, 1999, of record in the Office of the Clerk of the Circuit Court of Frederick County in Deed Book 948 at Page 1760; Manning & Ross, LLC amended its name to Manning & Ross Developers, LLC by certificate duly issued from the State Corporation Commission dated January 11, 2001. WHEREAS, said real estate, as shown on the aforesaid attached plat, has been subdivided into lots for the construction of single family homes thereon, and the attached plat shows accurately the metes and bounds of the subdivided land, together with the dimensions of each lot thereof and also shows certain surrounding lands in said Subdivision to be used as common open space, storm water detention easement, landscaping easements, access and driveway easements, sanitary sewer easements, drainage easements, and utility easements over and across said lots, all of which shall constitute a portion of that development known as Sovereign Village, and which common open space/driveway/ and access easement areas shall be owned and maintained by the Sovereign Village Homeowners Association upon the terms and conditions set forth hereinafter: and, WHEREAS, the DECLARANT now desires to subdivide the same into lots to be known as Section 2C, Sovereign Village. The subdivision of said real estate, as it now appears on the aforesaid attached plat, is with the free consent and in accordance with the desires of the undersigned DECLARANT, and the DECLARANT hereto further desires to subdivide the CD W M aforesaid real estate in accordance with the provisions of "The Virginia Land Subdivision Act" as are applicable and in force and effect as of the date of execution of this Deed of Dedication. NOW, THEREFORE, THIS DEED OF DEDICATION WITNESSETH: That for and in consideration of the premises and the benefits which will accrue by reason of this Dedication, the DECLARANT does hereby subdivide all of that certain tract or parcel of land designated as Sovereign Village Subdivision, Section 2C, lying and being situate in Red Bud Magisterial District, Frederick County, Virginia, and being more particularly described by the aforesaid plat of Mark D. Smith, dated January 11, 2006, attached hereto and by this reference made a part hereof, and by this reference incorporated herein as if set out in full, and which plat is drawn in conformity with the final master development plan for Sovereign Village Subdivision, on file in the Office of the Frederick County Department of Planning and Development. This is a portion of the same real estate conveyed to Manning & Ross, LLC, said Deed being of record in the aforesaid Clerk's Office as heretofore recited. For and in consideration as aforesaid, the Declarant does further dedicate all of the streets in Sovereign Village, Section 2C, to Frederick County, Virginia (hereinafter sometimes referred to as "the County") for public use, which streets dedicated hereby are more particularly described by herein above referenced final subdivision plat of Sovereign Village, Section 2C. All of the lots shown on the plat attached hereto shall be subject to the following restrictions and covenants and Articles which are covenants running with the land, and shall be binding upon all parties having any right, title and interest in and to the aforesaid lots or any part thereof, their heirs, successors and assigns, and shall inure to the benefit of each owner thereof. ARTICLE I Section 1. "Association" shall mean and refer to .Sovereign Village Homeowners Association, Inc., a nonstock Virginia Corporation, it successors and assigns. Section 2. "Common Areas" shall mean and refer to that certain real property hereinabove described as common open space, driveway and access areas, and such additions thereto as may hereafter be brought within the jurisdiction of the Corporation. Section 3. A "Lot" shall mean and refer to any of the lots designated upon the plat of Sovereign Village Subdivision, with the exception of the common areas space and parking areas. 2 Section 4. "Member" shall mean and refer to every person or entity who holds membership in the Association. Section 5. "Owner" shall mean and refer to the record owner, whether one or more persons or entities, of a fee simple title to any Lot which is a part of the Sovereign Village Subdivision, as shown on the attached plat, including contract sellers, but excluding those having such interest merely as security for the performance of an obligation. Section 6. "Declarant" shall mean and refer to Manning & Ross Developers, LLC, its successors and assigns. ARTICLE II Every person or entity who is a record owner of a fee or undivided fee interest in any Lot which is subject by covenants of record to assessments by the Association, including contract sellers, shall be a member of the Association. The foregoing is not intended to include persons or entities who hold an interest merely as security for the performance of an obligation. Only one membership shall be accorded per Lot. Membership shall be appurtenant to and may not be separated from ownership of any Lot which is subject to assessment by the Association. Ownership of such Lot shall be the sole qualification for membership. ARTICLE III ►i1��1�Z�' '7��a1�.� Each Member of the Association shall have one vote for each lot owned in which said Member shall hold the interest required for membership in Article H. When more than one person I holds such interest in any Lot, all such persons shall be Members., The vote for such Lot shall be exercised as they among themselves determine, but in no event shall more than one vote be cast with respect to any Lot. The affairs of the Association shall be managed by a Board of not less than three (3), but no more than five (5) directors, who must be members of the Association. The initial Board of Directors shall be appointed by the DECLARANT and serve until the first annual meeting following conveyance of fifty percent (50%) of the Lots in Sovereign Village Subdivision without the assignment of Declarants Rights reserved herein; thereafter, the Board of Directors shall be elected by the Membership as determined in the Bylaws of the Association. 3 I TREASURER In the event that the Board of Directors deem it necessary, the Treasurer of the Association shall be bonded, with the expense of such a fidelity bond for said officer to be borne by the Association. ARTICLE IV PROPERTY RIGHTS IN COMMON PROPERTIES Section 1. Member's Easement of Enjoyment: Every Member shall have a right and easement of enjoyment in and to the "Common Areas", specifically including but not limited to the rights of ingress and egress across the aforesaid "Common Areas" and such easement shall be appurtenant to and shall pass with the title to every assessed Lot, subject to the following provisions: (a) The rights of the Association, in accordance with its Articles and Bylaws, to borrow money for the purpose of improving the aforesaid "Common Areas" and in aid thereof to mortgage said property and the rights of such mortgagee in said "Common Areas" shall be subordinate to the rights of the Homeowners hereunder. (b) The rights of the Association to suspend the voting rights and the right to the use of the "Common Areas" by a Member for any period during which any assessment against his Lot remains unpaid; and for a period not to exceed thirty (30) days for any infraction of its published rules and regulations. (c) The rights of the Association to dedicate or transfer all or part of the "Common Areas" to any public agency, authority, or utility for such purposes and subject to such conditions as may be agreed to by the Members. No such dedication or transfer shall be effective unless an instrument signed by Members entitled to cast two -third (2/3) of the votes has been recorded agreeing to such dedication or transfer, and unless written notice of the proposed action is sent to every Member not less than twenty- five (25) days nor more than fifty (50) days in advance. 4 CD O G3 Section 2. Delegation of Use: Any Member may delegate, in accordance with the Bylaws, his right of enjoyment to the "Common Areas" to the members of his family, his tenants, or contract purchasers who reside on the .property. Section 3. Title to the "Common Areas": The DECLARANT hereby covenants for its heirs and assigns, that Manning & Ross Developers, LLC, will convey fee simple title to the common open space (referred to herein above as the "Common Areas") to the Association, prior to the conveyance of the lots constituting fifty percent (50%) of all approved buildable lots in the subdivision. ARTICLE V COVENANTS FOR MAINTENANCE ASSESSMENTS FOR THE ASSOCIATION Section 1. Assessments: The DECLARANT, for each Lot owned, hereby covenants, and each Owner of any Lot by acceptance of a Deed therefore, whether or not it shall be so expressed in any such Deed or other conveyance, is deemed to covenant and agree to pay to the Association (1) annual assessments or charges, and (2) special assessments for capital improvements, such assessments to be fixed, established, and collected from time to time as hereinafter provided. The annual assessments and special assessments, together, with interest thereon at the rate of twelve percent (12.00%) per annum and costs of collection thereof, as hereinafter provided, shall be a charge on the land and shall be a continuing lien upon the property against which each such assessment is made. Each such assessment, together with such interest, costs and reasonable attorney's fee, shall also be the personal obligation of the person who was the Owner of such property at the time when the assessment fee was due. The personal obligation shall not pass to his successors in title unless expressly assumed by them, but shall continue as a lien upon said lot as set forth herein above. Section 2. Purpose of Assessments: The assessments levied by the Association shall be used exclusively for the following purposes, to -wit: Improvements and maintenance of the "Common Areas", specifically including, but not limited to, payment of real estate taxes, repairs, snow removal, storm drainage repair, maintenance of street lights and payment of all utility charges therefore, and services and facilities devoted to the aforesaid purposes and related to the use of and enjoyment of the "Common Areas"; for the maintenance of shrubbery and lawns, 5 0 a -r__ co including the mowing of all lawns in the "Common Areas"; and further for the purpose of promoting the recreation, health, safety and welfare of the resident in the "Common Areas" of Sovereign Village Subdivision, including payment of all liability insurance premiums for said "Common Areas" and facilities within. Section 3. Basis and Maximum of Annual Assessments: Commencing January 1, 2006, the maximum annual assessment shall be $100.00 per year per Lot; (a) Thereafter, the maximum annual assessment per Lot may be increased above that set forth herein above by a vote of the Members for the next succeeding year and at the end of each year's period, for each succeeding period of one year, provided that any such change shall have the assent of two-thirds (2/3) of the votes of Members who are voting in person or by proxy, at a meeting duly called for this purpose, written notice of which shall be sent to all Members not less than thirty (30) days nor more than sixty (60) days in advance of the meeting, setting forth the purpose of the meeting. The limitations hereof shall to apply to any change in the maximum and basis of the assessments undertaken as an incident to a merger or consolidation in which the Association is authorized to participate under its Articles of Incorporation. (b) After consideration of current maintenance costs and future needs of the Association, the Board of Directors may fix the annual assessments at an amount not in excess of the maximum. Section 4. Special Assessments for Capital Improvements: In addition to the annual assessments authorized above, the Association may levy in any assessment year a special assessment applicable to that year only, for the purpose of defraying, in whole or in part, the cost of any construction or reconstruction, unexpected repair or replacement of a described capital improvement upon the "Common Areas", including the necessary fixtures and personal property related thereto, provided that any such assessment shall have the assent of two-thirds (2/3) of the votes of Members who are voting in person or by proxy at a meeting duly called for this purpose, C: Q O written notice of which shall be sent to all Members not less than thirty (30) days nor more than sixty (60) days in advance of the meeting, setting forth the purpose of the meeting. Section 5. Uniform Rate of Assessment: Both annual and special assessments must be fixed at a uniform rate for all Lots, and may be collected on a monthly basis. Section 6. Quorum for any Action Authority Under Sections 3 and 4: At the first meeting called, as provided in Sections 3 and 4 hereof, the presence at the meeting of Members or of proxies entitled to cast Fifty -One percent (51 %) of all votes shall constitute a quorum. If the required quorum is not forthcoming at any meeting, another meeting may be called, subject to the notice requirement set forth in Sections 3 and 4 and the required quorum at any such subsequent meeting shall be one-half (1/2) of the required quorum at the preceding meeting. No such subsequent meeting shall be held more than sixty (60) days following the preceding meeting. Section 7. Date of Commencement of Annual Assessments: DUE DATE: The annual assessments provided for herein shall commence as to any Lot on the first day of the month following the conveyance of that particular lot to a grantee other than one wholly owned by DECLARANT. The first annual assessment shall be adjusted according to the number of months remaining in the calendar year after acquisition of title by any purchaser for DECLARANT. The Board of Directors shall fix the amount of the annual assessment against each Lot at least thirty (30) days in advance of each annual assessment period. Written notice of the annual assessment shall be sent to every Owner subject thereto. The due dates shall be established by the Board of Directors. The Association shall, upon demand at any time, furnish a certificate in writing signed by an officer of the Association, setting forth whether the assessments on a specified Lot have been paid. A reasonable charge may be made by the Board for the issuance of these certificates. Such certificates shall be conclusive evidence of payment of any assessment therein stated to have been paid. Section 8. Effect ofNon-Payment of Assessments: Remedies ofthe Association: Any assessments which are not paid when due shall be delinquent. If the assessments which is not paid within thirty (30) days after the due date, the assessment shall bear interest from the date of delinquency at the rate of twelve percent (12%) per annum, and the Association may bring an action at law against the Owner personally obligated to pay the same, or foreclose the lien against the property, and interest, costs and reasonable attorney's fees on any such action shall be added 7 0 .r:- N) to the amount of such assessment. No Owner may waive or otherwise escape liability for the assessments provided for herein by non-use of the "Common Areas" or abandonment of his Lot. Section 9. Subordination of the Lien to Mortgages: The lien of the assessments provided for herein shall be subordinated to the lien of any mortgage or mortgages now or hereafter encumbering any Lot. Sale or transfer of any Lot shall not affect the assessment lien. However, the sale or transfer of any Lot which is subject to any mortgage, pursuant to a decree of foreclosure thereof, shall extinguish the lien of such assessments as to payments thereof which become due prior to such sale or transfer. No sale or transfers shall relieve such Lot from liability for any assessments thereafter becoming due from the lien thereof. Section 10. Exempt Property: The following property subject to the Declaration shall be exempt from the assessments created herein; (a) the "Common Areas"; (b) all properties dedicated to and accepted by a local public authority; and (c) all properties owned by a charitable or nonprofit organization exempt from taxation by the laws of the State of Virginia: and (d) any and all lots, whether improved or unimproved, owned by DECLARANT. However, no residence occupied as a dwelling shall be exempt from these assessments, regardless of ownership. Section 11. Failure to Maintain "Common Areas": In the event that t h e Association, or its successors, shall fail to maintain the "Common Areas" in reasonable order and condition, the County of Frederick may take such action as authorized by the Frederick County Zoning Ordinance. The County of Frederick Zoning Ordinance is by this reference made a part hereof as if set out in full. ARTICLE VI USE, RESTRICTIONS AND COVENANTS This Subdivision shall be subject to the following restrictions which are constituted covenants real to run with the land: 1. All Lots shall be used for single family residential purposes only. No detached garage or carport shall be permitted on any lot. 2. No profession or home occupation shall be conducted in or on any part of a Lot; provided, however, that DECLARANT reserves the right to use one or more of said Lots for business purposes in connection with the development, sales and operation of said subdivision. 8 3. No building or structure of any kind whatsoever shall be erected, altered, placed, or permitted to remain on any lot, other than a permanent single family dwelling. No such dwelling shall exceed two stories above foundation line in height. No other building or improvements shall be erected, altered, or placed or permitted to remain on any lot other than a carport or garage, patio walls, in ground swimming pool, wooden fences, as hereinafter described, and other outbuildings for use and enjoyment of the lot for residential purposes. Any gazebo, garden shed, other outbuildings, mailbox, newspaper box or receptacle of any type, shall not be placed on a lot unless approved by the Architectural Committee hereinafter referred to. Any garage or carport as herein before provided shall be homogeneous in design to the dwelling. No mobile homes are permitted on any of said lots. No recreational type camper or trailer shall be parked on any of said lots until such time as a home is build on such lot and thereafter, such recreation camper, trailer or recreational vehicle must be stored within a garage area so that the same may not be seen from any roadway. 4. All homes shall have 1,900 square feet of living space except ranch homes, which shall have 1,500 square feet of living space. No split foyer, or modular or prefabricated homes shall be allowed. Living space shall be computed using outside foundation measurements and shall be exclusive of carports, garages and basements. Roof pitch shall be at least 5/12. 5. No dwelling, garage or other building shall be erected or placed on any lot which has an exterior construction other than brick, wood, stone, dryvit, or combination thereof, unless otherwise approved by the Architectural Committee. In no event will the exterior surface of any home have less than 200 square feet of stone or brick. No masonite board or log home shall be used on the exterior of any home. Any exterior solar design or antennae, satellite dish, towers, transmitters for radio, television, microwave, or the like, must be screened and approved by the Architectural Committee. In this respect, the Architectural Committee may engage such professional services for review of plans and each lot owner submitting said plans shall pay the reasonable charges made for review by the professional services. 6. After a residence is built on any of said lots, the lot owner shall provide in connection therewith off-street parking space of at last 12' x 50' which will be paved with concrete. 6 CD O 7. No signs or advertising of any nature shall be erected or maintained -` on any Lot except for sale signs for said Lot not to exceed four (4) -� square feet in area, or signs used by a builder to advertise the property during construction and sale. No "For Rent" signs shall be allowed on any Lot whatsoever. 8. No boats, mobile homes, motor homes, campers, buses, trailers of any type, tractors, truck or other motor vehicles (other than automobiles, motorcycles, pickup trucks and 3/4 ton (or less) vans) shall be permitted on any Lot except during the course of construction. No motor vehicle or material portion thereof which does not have a current license and current Virginia inspection sticker shall be permitted on any Lot. 9. No animals of any kind (including livestock, poultry or birds) shall be permitted on any Lot, except that dogs, cats and other usual household pets may be kept, provided they are not kept, bred or maintained for commercial or charitable purposes or in unusual numbers; and further provided that no dogs shall be permitted to run at large or without restraint in said Subdivision. No dog may be tied and left unattended outdoors. 10. No fence or hedge shall be constructed or erected on any Lot in said Subdivision, without prior approval by the Association. This restriction shall not apply however, to any hedge or fence constructed or erected by the DECLARANT. 11. No noxious or offensive activities shall be carried on upon any Lot, nor shall anything be done thereon which may be or may become an annoyance or nuisance to the neighborhood. 12. In the event that a dwelling is destroyed, or has materially deteriorated, the owner of the unit shall immediately repair the damage or deterioration. No structure other than a dwelling house of at least the same dimensions and architecture as the unit destroyed shall be constructed in the place of the original home. 13. Each Owner shall keep all Lots owned by him and all improvements therein or thereon in good order and repair and free of debris, including, but not limited to, the seeding, watering, and mowing of all lawns, the pruning and cutting of all trees and shrubbery (in the event that such duties are not undertaken and performed by the Association, as set forth herein above), and the painting (or other appropriate external care) of all buildings and other improvements, all in a manner and with such frequency as is 10 CO C::) Cn consistent with good property management. In the event an Owner of any Lot in Sovereign Village Subdivision shall fail to maintain the premises and the improvements situated thereon as provided herein, the Association, after notice to the Owner as provided in the Bylaws and approval by two-thirds (2/3) vote of the Board of Directors, shall have the right to enter upon said Lot to correct drainage and to repair, maintain and restore the Lot and the exterior of the building erected thereon. All cost related to such correction, repair, or restoration shall become a special assessment upon such Lot. 14. No Lot shall be used or maintained as a dumping ground for rubbish. Trash, garbage or other waste shall be in sanitary containers. All incinerators or other equipment for the storage or disposal of such material shall be kept in a clean and sanitary condition in the rear. No refuse or any container for same shall be placed or stored in front of any home, except on the date of garbage pickup. 15. No trees shall be planted nor other digging undertaken without first securing the approval of the local power company and without first being advised as to the location of all underground electrical, television cable and telephone wires. 16. No exterior clothes line, or hanging device, shall be permitted on any Lot. 17. The color of the paint on the exterior of every building on each Lot shall remain the same as the original color. 18. No building, structure, addition nor exterior alteration (including basketball backboards, rims or nets) or improvements of any character shall be constructed upon any Lot or dwelling located thereon, except as exterior painting is permitted by the prior paragraph, unless the plan of construction, including quality of workmanship, design, colors and materials, shall have been approved in writing by the Sovereign Village Homeowners Association as being in harmony with the whole subdivision, especially the adjoining homes. 19. If in the construction of any dwelling by DECLARANT there occurs an encroachment, then such encroachment shall be deemed a perpetual easement for the benefit of the dominant Lot. 11 C) C) r7 M 20. The DECLARANT reserves the right for itself, its successors and assigns, or an Architectural Committee being itself or appointed by it, its successors or assigns, to reject any and all plans for houses or other structures proposed to be constructed on any lot. The DECLARANT retains the majority vote on the Architectural Committee. The DECLARANT shall constitute the Architectural Committee and shall have the power to appoint its successors in interest, and such Architectural Committee shall have no liability whatsoever, either direct or indirect, on the approval or disapproval of matters as set forth herein above, but such power in the Architectural Committee shall be solely discretionary. The size of the Architectural Committee shall be determined by the DECLARANT or its duly nominated successors in interest. If the said Architectural Committee, or its duly authorized representative, shall fail to approve or disapprove any proposed plans, specifications, or locations within thirty days after the same have been submitted to the DECLARANT for approval, such plans, specifications, and locations shall be deemed to have received the approval of said Committee, or its duly authorized agent. Any or all of the rights, powers, duties and obligations which, in this instrument, are assumed by, reserved, or given to the DECLARANT, its successors or assigns, for the said Architectural Committee, may be assigned or transferred to any one or more corporations or associations which will agree to assume said rights, powers, duties, and obligations and carry out and perform the same. Any such assignment or transfer shall be made by appropriate instrument in writing in which the assignee or transferee shall join for the purpose of evidencing its acceptance of such rights, power, duties, and obligations, which instrument shall be recorded; and such assignee or transferee shall thereupon have the same rights and powers and be subject to the same obligations and duties as are herein given to and assumed by the DECLARANT, its successors or assigns, or the said Architectural Committee. In the event of such assignment or transfer, the DECLARANT, its successors or assigns, or said Architectural Committee, shall thereupon be released from all of the rights, powers, duties, and obligation in this instrument reserved or given to and assumed by the DECLARANT, its successors or assigns, or the said Architectural Committee. The right of assignment hereby reserved to the DECLARANT, its successors or assigns, and the said Architectural Committee, is so reserved to the end that the rights, powers, duties and obligations 12 reserved and given to them may be assigned to an association or corporation formed by the owners of lots in said subdivision for the purpose of accepting said assignment; and such assignment may be made at such time as the DECLARANT, its successors or assigns, and the said Architectural Committee shall jointly determine. In the event that the DECLARANT fails to appoint an Architectural Committee, or if such Architectural Committee has formed but is later disbanded, then approval for plans may be obtained by the lot owner submitting plans drawn and signed by a licensed architect in the State of Virginia, and in addition, if the plans are for an allowed outbuilding, then such architect shall further certify that the design is homogeneous with the existing structure on said lot. 21. The DECLARANT herein reserves and shall have the right alone to waive any one or more of the restrictive covenants and conditions contained herein as to any Lot transferred by it except that it cannot change the use of any Lot from residential to commercial. This waiver shall not affect the binding effect of the covenants and conditions upon any other Lot. The DECLARANT further reserves the right along to impose additional restrictive covenants and restrictions as to any Lot or Lots owned by it at the time of the imposition and such imposition shall not affect the binding effect of these provisions upon any other Lots. 22. The invalidation of any one of the covenants or restrictions contained herein by judgment or Court order shall in nowise affect any of the other provisions which shall remain in full force and effect. The failure of the Lot Owners or the DECLARANT herein to enforce any covenants or restrictions shall not be deemed to be a waiver of the right to do so thereafter as to a default occurring prior or subsequent thereto. ARTICLE VII EASEMENTS Section 1. Sewer and Water Easement: The property dedicated hereby is subject to that certain easement(s) or right(s) of way designated Sanitary Sewer Easement and Utility Easement on the aforesaid attached plat. The DECLARANT does hereby grant and convey unto the Frederick County Sanitation Authority, a perpetual right of way or easement over the aforesaid rights of way for the installation and maintenance of water and sewer lines and any related facility designated on the aforesaid plat as Sanitary Sewer Easement and Utility Easement. 13 CD a Section 2. Access and Driveway Easements: The property dedicated hereby is subject to those certain easements designated Private Access and Driveway Easements which are shown on the aforesaid attached plat, which Easements shall be for the private use of the Lot owners of Sovereign Village, their successors, assigns and invitees. All lot owners shall be entitled to free passage over any sidewalks that are constructed and which run parallel with the streets in Sovereign Village, Section 2C, and over any sidewalks so constructed with regard to additional properties added as a part of Sovereign Village. All sidewalks shall be kept free of obstruction and provided further that all owners shall remove snow from the sidewalk that transverses their lot. Section 3. Surface Drainage Easement: The property dedicated hereby is subject to that certain easement or right of way designated Storm Water Detention Easement on the aforesaid Final Master Development Plan of the County of Frederick for the purpose of surface water drainage easement. No structures of any kind which substantially impede or obstruct the flow or ponding of surface drainage water may be placed within said surface water drainage easement designated on the aforesaid plat. Said Storm Water Detention Easement may not be altered or modified without the prior consent of the County of Frederick, and the DECLARANT does hereby grant and convey unto the County of Frederick a perpetual right of way or easement over the aforesaid designated Storm Water Detention Easement for the purpose of so providing surface drainage. DECLARANT does further agree that the County of Frederick shall be under no obligation to maintain said Storm Water Detention Easement, provided, however, that in the event the Association fails to maintain said easement, then, and in that event, the County of Frederick shall have the right to maintain the same and charge the Association pursuant to the provision of Article V, Section 11, herein above. DECLARANT, for a period of five (5) years from the date of conveyance of the first lot in Sovereign Village Subdivision, Section 2C, reserves a blanket easement and right on, over and under the ground within said Subdivision to maintain and correct drainage of surface water in order to maintain reasonable standards of health, safety and appearance. Such right expressly includes the right to cut any trees, bushes or shrubbery, make any grading of the soil or to take any other similar action reasonably necessary, following which the DECLARANT shall restore the affected property to its reasonable predisturbance condition as near as practical. The DECLARANT shall 14 0 c� give reasonable notice of intent to take such action to all affected owners, unless in the opinion of the DECLARANT an emergency exists which precludes such notice. Reservation by DECLARANT of such blanket easement and rights contained herein shall not, in any way, obligate DECLARANT to undertake any maintenance, repair or corrective action whatsoever and shall not impose any liability or responsibility upon DECLARANT therefore. Section 4. Reservations: The DECLARANT reserves unto itself, its successors or assigns, the right to erect, maintain, operate and replace underground telephone and electrical conduits, related equipment, and other facilities, sewer, gas, water, and television lines and related equipment, and other utility equipment where such utility lines and equipment are now located and within the Utility Easements and Sanitary Sewer Easements, as designated on the attached plat, and over the "Common Areas" as needed. Section 5. Sipage Easements: The DECLARANT reserves unto itself, its successors or assigns, the certain signage easement located within the open space running parallel to Senseny Road. The purpose of said signage easement is to erect identification signage for Sovereign Village Subdivision and additional lands added thereto as provided herein and which signage while being originally erected by DECLARANT, shall be maintained by the Sovereign Village Homeowners Association. ARTICLE VIII GENERAL PROVISIONS Section 1. Enforcement: The Association, its successors or assigns, or any Owner, shall have the right to enforce, by any proceeding at law or in equity, all restrictions, conditions, covenants, reservations, liens and charges, now, or hereafter, imposed by the provisions of this Declaration. Failure by the Association, its successors or assigns, or by any Owner to enforce any covenant or restriction herein contained shall in no event by deemed a waiver of the right to do so thereafter. All costs which the Association, its successors or assigns, or any Owner shall incur in the enforcement of the restrictions, conditions, covenants, reservations, liens, and charges, nor or hereafter imposed, shall be borne by the party against which action is taken and which costs shall include reasonable attorney's fees, costs, and damages. 15 Q Cn Section 2. Severability: Invalidation of any one of these covenants or restrictions by judgment or court order shall in no way affect any other provision which shall remain in full force and effect. Section 3. Amendment: The covenants and restrictions of this Declaration shall run with the land and bind the land, and shall inure to the benefit of and be enforceable by the Association, or the Owner of any Lot subject to this Declaration, their respective legal representatives, heirs, successors and assigns, for a term of thirty (30) years from the date this Declaration is recorded, after which time, said covenants shall be automatically extended for successive periods of ten (10) years. The covenants and restrictions of this Declaration may be amended during the first thirty (30) year period by an instrument signed by not less than ninety percent (90%) of the Lot Owners, and thereafter, by an instrument signed by not less than seventy- five percent (75%) of the Lot Owners. Any amendment must be properly recorded. Section 4. Dissolution: Upon dissolution of the Association, other than incident to a merger or consolidation, the assets of the Association shall be dedicated to an appropriate public agency to be used for purposes similar to those for which the Association was created or for general welfare of the residents of Sovereign Village Subdivision. In the event that such dedication is refused acceptance, such assets shall be deemed vested in the Members of the Association as tenants in common. Section 5. Dedication of Street: The DECLARANT does hereby dedicate unto the County of Frederick, Virginia as public streets those certain roadways designated as Canyon Road, Wales Court and Rossman Boulevard on the aforesaid recorded plat of Sovereign Village Subdivision, Section 2C. The Dedication and Subdivision of the land as shown on the attached plat is with the free consent and in accordance with the desire of the undersigned DECLARANT of the land being subdivided, and is in conformity with the provisions of "The Virginia Land Subdivision Act" as are applicable, together with the applicable ordinances and regulations of the governing body of the County of Frederick, Virginia. The County of Frederick, Virginia and the Frederick County Sanitation Authority, by the signature of its agents on the attached plat, do accept the dedications to public domain of the land and easements, respectively, herein described as such. 16 Ui The designated "Common Area" are not dedicated hereby for use by the general public but are dedicated to the common use and enjoyment of the homeowners in Sovereign Village Subdivision as provided herein above. ARTICLE IX ADDITIONAL SECTIONS Section 1. Additional sections ("Phases") of Sovereign Village will be added in the future and those sections, as they are added, will become part of Sovereign Village Subdivision, subject to the same provisions as set forth herein and governed by the same property owners association, provided, however, that DECLARANT may amend the land use restrictions, setback requirements, building sizes and any other provisions so long as the same scheme established in Sovereign Village, that being a single family residential lot is maintained. Section 2. The additions authorized under this Article shall be made by filing of record a Supplementary Declaration of Covenants and Restrictions with respect to the additional property which shall extend the scheme of the covenants and the restrictions of the Declaration (amended as herein permitted) to such property. Section 3. Such Supplementary Declaration may contain such complementary additions and modifications of the covenants and restrictions contained in this Declaration as may be necessary to reflect the different character, if any of the added properties, and as are not inconsistent with the scheme of this Declaration. Except as hereinafter permitted, such Supplementary Declaration shall not revoke, modify or add to the covenants established by this Declaration within the existing property. Section 4. The DECLARANT shall not be and is not bound to make or proceed with the addition of any of the proposed additional sections of Sovereign Village Subdivision. 17 C CQ . c.n iV inconsistent with the scheme of this Declaration. Except as hereinafter permitted, such Supplementary Declaration shall not revoke, modify or add to the covenants established by this Declaration within the existing property. Section 4. The DECLARANT shall not be and is not bound to make or proceed with the addition of any of the proposed additional sections of Sovereign Village Subdivision. WITNESS the following signatures and seals: DECLARANT: MANNING ROSS DEVELOP , LLC By: gory Nf B soft, Manager STATE OF VIRGINIA, CITY OF WINCHESTER, TO WIT: I, /'4' 4 - E G,%/ a notary Public in and for the State and jurisdiction aforesaid do hereby certify that Gregory M. Bancroft, Manager of Manning & Ross Developers, LLC, wh se names are signed to the foregoing Deed of Dedication dated the day of ZZ 2006, have personally appeared before me and acknowledged the same in my State a6d jurisdiction aforesaid. Given under my hand this day of 2006. My commission expires:/-/-D 7 `�q64;liiiilfggggg Notary Pub i • PUBLIC -31 ''"+rreriteaceeaE`` 11940\AADEED of Dedication Sovereign Village Sect 2C.wpd 18 To:15406656395 From: Travel Promotions 04/1912006 12:51 PM P. 1 of 1 Tos All corporate Employees From: Your corporate Travel Department TgAIC111:A16 First 50 Callers vAr.) kT roN 5 Days / 4 Nights in Magical �Y Includes Theme Park Tickets to either DISNEY • UNIVERSAL or SEAWORLD CALL TODAYI and receive Z Round Trip Airline T PLUS... 2 nights accommodations at your choice of Jamaica Cancun, /Il exlco or LasVegas CALL NOW TOLL FREE P.P. Pawn based an dbl. 0 e- 800-471-4531 Please refer to CLAIM # MV 13& i when you call Mon. - Fri. 9:00 a.m. - 8:00 p.m. EST. If lines are busy please keep trying Orlando Resorts ans within minutes of Disney'& Main Gates. If you have received this fax in error and would like to be removed from our list please call Toll Free 877.629.4797 'VICINITY MA? 0 209 APPROVALS. AREA TABULATION: TOTAL LOT AREAS = 7.0435 AC <Z�7 0�-e,4 — W. "0 / V., G+6 ROAD R/W AREA = 1.7001 AC rederick Co. Sanitation Authority Date TOTAL OPEN SPACE = 0.0000 AC SUBDIVIDED AREA = 8.7436 AC OWNER'S CERTIFICATE.• THE SUBDIVISION OF THE LAND SHOWN HEREON IS WITH THE FREE CONSENT AND IN ACCORDANCE WITH THE DESIRE OF THE UNDERSIGNED OWNERS, PROPRIETORS, AND TRUSTEES, IF ANY. FOR : MANNING & ROSS DEVELOPERS, LLC 7BY.' Az 1 ZS? o(, DATE' SURVEYOR'S CERTIFICATE. - ORIGINAL AREA = 70.1045 AC REMAINING AREA = 61.3609 AC a "OPEN SPACE PROVIDED FOR IN SEC. 2 A & 2—B Acknowledged before me aUU(i this A &doy of �brua fe&9: My Commission Expires: 10-3)-a0U 9 r Of Notary I HEREBY CERTIFY THAT THE LAND CONTAINED IN THIS SUBDIVISION IS A PORTION OF THE LAND ACQUIRED BY MANNING & ROSS DEVELOPERS, LLC, B DATED OCTOBER 1, 1999 AND RECORDED AMONG THE LAD RECOR OF FR ER CK COUNTY, VIRGINIA, IN DEED BOOK 948 AT PAGE 1760. MARK D. SMITH, LS PARENT TAX PARCEL IDENTIFICATION TAX ID No.: 65—((A))-39 70.1045 AC. ZONE. RP USE. VACANT FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE H of SECTION 2—C ;OA RED BUD DISTRICT - FREDERICK COUNTY, VIRGINI ARK D. ITH P SCALE: 1" = N A DATE: JANUARY ii, 2006 No.002009 GREENWAY ENGINEERING le G 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 882-4185 FAX: (540) 722-9528 Founded In 1971 www.greenwayong.com 2185 SHT 1 of 12 INSERT MAP co NOT TO SCALE o cn 71W 65-((A))-J9 MANNING & ROSS DEVELOPERS, L.L.C. INSr f 010016381 FUTURE DEVELOPMENT FINAL SUBDIVISION PLAT I ..fir. SO VEREI GN VI L LA GE - TH ITH SECTION 2-C RED BUD DISTRICT — FREDERICK COUNTY VIRGINIA(4A K D. SCALE: 1" = N/A DATE: JANUARY 11, 2006o.002009 GREENWAY ENGINEERING151 WINDY HILL LANE 4Engineers WINCHESTER, VA. 22602 'Mo Surveyors TELEPHONE: (540) 662-4185 FAX; (540) 722-9528 ounded in 1971 www.zraenwayann.com cur 9 „s i CD 01 cn PROFFER: A MONETARY CONTRIBUTION OF $3, 658.73 PER LOT SHALL BE PAID TO THE TREASURER OF FREDERICK COUNTY PRIOR TO THE ISSUANCE OF THE INITIAL BUILDING PERMITS FOR EACH LOT. LEGEND: BRL = BUILDING RESTRICTION LINE = POINT O IRON REBAR SET IRF = IRON REBAR FOUND NOTES: 1. ALL LOTS ARE SUBJECT TO A 20' SLOPE & DRAINAGE EASEMENT ALONG ALL STREET RIGHT-OF-WAY LINES AND A 10' UTILITY & DRAINAGE EASEMENT ALONG ALL PROPERTY LINES. 2. PRIOR TO THE ACCEPTANCE OF THE ROADS CONTAINED IN SOVEREIGN VILLAGE INTO THE STATE SYSTEM, A PERMANENT CONNECTION TO THE EXISTING STATE ROAD SYSTEM MUST BE CONSTRUCTED CONSISTENT WITH THE APPROVED MASTER DEVELOPMENT PLAN. 3. SETBACKS UNLESS OTHERWISE NOTED ARE FRONT = 35' SIDE = 10' RF4R = 25' 4. ALL LOTS ARE SINGLE FAMILY DETACHED - URBAN MINIMUM LOT WIDTH AT SETBACK = 70' MINIMUM LOT WIDTH AT R/W = 40' MINIMUM LOT SIZE = 12, 000 SQ FT FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE T SECTION 2- C RED BUD DISTRICT — FREDERICK COUNTY VIRGINIA MARK D. MITH SCALE: 1" = N/A I DATE: JANUARY 11, 2006 No.002009 GREENWAYYENGINEERING HILL LANE Engineers WINCHESTER, VA. 22602 _ •1J Surveyors TELEPHONE: (540) 882-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayong.com 2185 SHT 3 of 12 CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE Cl 525.00' 75.81 ' 75.74 ' N 00'00 37 W 08' 16 23" C2 43.00' 64.83' 58.86 N 47'19 12" W 8623'15" C7 550.00 183.00 182.15 N 05'23 06 0 W 19703 48 C8 300. 00' 182.21 f 79. 42 N 02'28 58 E 34'47 55 C9 550.00 152.54 152.05 N 03'47 55 W 15'53 27" C 10 550.00 30.45' 30.45' N 13' 19 49" W 03' 10 21 C11 300.00' 91.38 91.03, N 86'5856 E 17'27'09" C 12 300.00 156.97 155.19 S 86'45 16 E 29'58 45 C22 275.00 68.00' 6Z83 S 78 50 56 E 14'10 05 C23 43.00 74.05 65.24 N 44'43 47" E 98'40 28" C24 575.00 87.85' 87.77' N 00'13'49" W 08'45'15" TM 65-((A))-39 O cl) MANNING & ROSS DEVELOPERS, L.L.C. ZONE: RP, USE: VACANT (INST.J 010016381) ti PLAI o MER108 3 pG qj9 AR� Og /O SHEET 12 M SEE SSMAci �fzo (9.1) Ro . - 50 .. C ARM E 10, EASEMENT I� LOT 135 134 I° N 14676 SO. FT L_ 10' BRL i J N 18' 14T07� E i -- 150.00_— �D I — 10� BRL IJ Li ---"120 . % LOT 136 SOSE EIIGN 2L BGE 3 I I N 12000 SO. FT (INST. 030021202) 133 L — _10' BRL J A/ 18' 14707"r E 150.00' r-1r 17.0' --moo LOT 137 JI N 12000 SO. FT I L— — — 10' BRL J 132 S 18' 14TO7� W �--- 15--- 50 0 50— Mind GRAPHI SCALE (� SEE SHEET 5 (13.S (IN FEET) IRFON 138 FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2 — C RED BUD DISTRICT — FREDERICK COUNTY VIRGINIA SCALE: 1" = 50' 1 DATE: JANUARY 11, 2006 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayang.com 25' L0 00 W i2 �I cn FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2 — C RED BUD DISTRICT — FREDERICK COUNTY VIRGINIA SCALE: 1" = 50' 1 DATE: JANUARY 11, 2006 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayang.com 25' L0 00 W i2 �I cn CURVE RADIUS RC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C 13 500.00 194.37 P466.05# 193.14 S 82'54'040 E 22' 16 22" C 14 800.00' 459.49' S 7720 54" E 33'2242" C20 775.00 451.49 445.13 S 7720 54 E 3.22 42 C21 525.00 204.08 202.80 S 82'54 04 E 22' 16 22 C42 775.00 10.35 10.35 N 86 20 43" E 00'45 56 C43 525.00 64.50 64.46' N 8928560 E 0702 22 74.79' 74.73' S 8255'01 " E 08'09'45 W525.00 525.00 64.79 64.75' S 75' 18 01 " E 0704 15 131 p IRF 132 ry�Oryry � ff\ MERIDIAN OF PLAT DB 843 PG 417 137 SEE SHEET 4 41 vo RO,p\ F ,� IN LOT 138 12527 SQ, FT/ 130 iV io,35' o � LOT 139 ,' �N' IRF O N / /' _ ry 12455 SO. fT m 115.1 j oo -moo.. k � SOVREIGN VILLAGE I "- SEC. 2B o 10_� (INST.# 030021202) Off--' S 03-00'06 ! W , 129 1468' I10' BRL y i m LOT 140 m 12178 SO. FT I 10' BRL ! 128 O S 030116'20" E , 149.08' � � o 05.0) cNi N 141 SEE SHEET 6 I O IRF FINAL SUBDIVISION PLAT SOVEREIGN VI L LA GE SECTION 2 - C RED BUD DISTRICT - FREDERICK COUNTY VIRGINIA SCALE: 1" = 50' 1 DATE: JANUARY 11, 2006 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: 540) 882-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com 1+ U 50 0 50 GRAPHIC SCALE (IN FEET) ,TH / V V - ��— MARK D. SMITH No.002009 k4b vrro� Oji- 2185 0 CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C 14 800.00 466.05' 459.49' S 7720 54" E 33 2242" C20 775.00 451.49' 445.13' S 7720 54 E 33'22 42 C39 775.00 112.59' 112.49' S 75.50 55" E 0819'26 C40 775.00 90.82 90.77 S 8322 04 E 06'42 52 C41 775.00 1 88.56 88.51 S 8959 55" E 06'32 49 128 3 SOVREIGN OLLIAGE SEC. 2B 2 (INST.# 030021509) 0— (INST.# 030021202) 3 127 N IRF tAW 23.5 126 0 Ann — MERIDIAN OF PLAT DB 843 PG 417 140 SEE SHEET 5 I N 03' 16'20" W 149.08' , — Ij' BRL , m N --- LOT 141 12012 SO. FT . 10' BRL i p �-�Vj16 29" Hi h / I j� 149 96' — 10' BRL LOT 142 12026 SO. FT11 110R� J15.7) „ LOT 14J 0 15983 SQ. FT VO 18... IRFO 7e �s8 SEE SHEET 7 144 ?S, 50 0 50 / GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2—C RED BUD DISTRICT — FREDERICK COUNTY VIRGINIA SCALE: 1" = 50' 1 DATE: JANUARY 11, 2006 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 862-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayong.com 03 W W MARK D. SS ITH No.002009 r� 1�111,0(I'a4�" SUI 85 0 to a CURVE RADIUS ARC LENGTH CHORD . LENGTH CHORD BEARING DELTA ANGLE C 14 800 000' 466.05 459.49' S 7720'54' E 33'22 42' C20 775.00' 451.49' 445.13' S 7720 54' E 33'22 42' C37 775.00 55.06' 55.05 S 62'41 40 E 04'04 14 C38 775.00 94.10 94.04 S 68' 12 30 E 06'57 24 Rfii 00 lfi R101 P X Mpe 843 14.3 ;' I IRO \ SEE SHEET' 6 N STM. 024INAGE EASEMENT. I� H 126 �N 18' 18'487 E 158.77' I I (41.5) 10' BRL (109.9 2.5 I g4 I i� j m LOT 144 m 13391 SO. FTZt SOVREIGN VILLAGE IRF•23�SEC. 28 (INST.,f 030021202) S 25•►. 1=2` W J 3 y �k/ [— — .— —.1575j, . BRL , Q5 •� �►� LOT 145 12585 SO. FT IRF = 1 N ., Q) 339.93�0 '' b ���► 110 rS 60'39 jj E IRF 5� W * — . (11.7� �o 29.80 50 0 50 GRAPHIC SCALE (IN FEET) S ?g2027 �' TM —209 N/F FU—SHEPS FARM) PARTNERSHIP ZONE • RP, USE.• VACANT (DB 789, PG 1022) FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2-C RED BUD DISTRICT - FREDERICK COUNTY. VIRGINIA SCALE: i" = 50' 1 DATE: JANUARY 11, 2006 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com �O-•.15880' SIN 368 46' ' --'?,_0 D �._._._ ARK D. SMITH No.002009 _ ;Iuwo CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C14 800.001 466.05 459.49 S 772054" E 33'2242 C 19 825.00' 480.61 ' 473.85' N 7720'54" W 337242" CM 825.00' 75.66' 75.64 N 7706 05" W 05'15'18" C34 825.00 75.66 75.64 N 71'50 47 W 05'15 18 C35 1 825.00 75.66 75.64 N 66'35 30 W 05' 15 18 C36 1 825.00 47.59 47.58 N 62' 18 42 W 03' 18 18" I O 150 I SEE SHEET 9 U►T N 10'16'16" E O Do 843 P� 417 _ 157.55' I 2 I BRL .m LOT 149 m o I I 12668 SO. FT I o o _ 10' BRL 150. 4 p I 10' BRL N W I ►� 1 W LOT 148 25' 12385 SQ. FT m� N. cp N Q •10' BRL N I O - 46 l 01.19 (21.9 BRL J(19.0 ) / 147 (61) 3 12840T SQ. F o S 60 39 33" El 29.80' N?s• �Rl j ��►��� �02b9� J i c-W�o IRF O WZ 5926. O apC s ?9:?0 °' 'OO' ^" LOT 146 44 ly O 13047 SQ. FT 06, sAly. sEw./ J WATER ESMT. Lj rJO 0 50 TM 55—((A))-209 S FU—SHEP FARM PAMERSHIP ?,g?°?j• SIN GRAPHIC SCALE ZONE.• RP, USE.- VANT 6s?8j, R' FND (IN FEET) (DB 789, PG 1022 O FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE T SECTION 2 - C RED BUD DISTRICT — FREDERICK COUNTY VIRGINIA MARK D. MITH SCALE: 1" = 50' 1 DATE: JANUARY 11, 2006 No.002009 GREENWAY ENGINEERING 151 WINDY HILL LANE 'c0 � � I I Engineers WINCHESTER, VA. 22602 -,1! Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded tin 1971 www.greenwayang.com 2185 SHT R of 12 CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C 13 500.00' 194.37' 193.14' S 8254'04" E 22' 16 22 C14 800.00 466.05' 459.49 S 77720'54" E 33'2242" C 18 475.00 184.65 183.49 N 82'54 04 W 22' 16 22 C 19 825.00' 480. 61 473 85' N 77-20 54 W 33'22 42 C29 475.00 24.73 24.73 S 8727 14 W 02'58 58 C30 825.00' 54.70' 54.69 S 87'51 43" W 03'47 56" C31 825.00 , 75.66' 75.64' N 87'36'40" W 05,15 18" C32 825 000 75.66 75. 64 N 82*2123 W 05' 15 18 151 SEE SHEET 10 N_ 3'1_W 161.80' 10' BRL m LOT 1�52 jig 12532 50. FT H L_ _ f0' BRL J N_M14'L _m W _ 150.06 I 10' BRL LOT 151 I 12308 SO. 17 I 3g N. J L 0 ' BRL I N 05• J �00 59 E 149.67r 10 RL — LOT 150 1264J SO. FT m I 10' BRL 1575T W SEE SHEET 8 149 MERIDIAN OF PLAT DB 843 PG 417 I r s TAW 65—((A))-39 MANNING & ROSS DEVELOPERS, L.L.C. ZONE: RP, USE.- VACANT (INST 1010016381) h R 50 0 50 GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2-C RED BUD DISTRICT — FREDERICK COUNTY VIRGINIA SCALE: 1" = 50' 1 DATE: JANUARY 11, 2006 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayong.com V MARK D. SMITH Nno{.002009 ��Vtl�rb�04 svRo�' of 12 Mll CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C 13 500.00 194.37 193.14 S 82054 04 E 22' 16 22 C 18 475.00 184.65 183.49 N 82'54 04 W 22' 16'22 C27 475.0O' 68.13' 68.07' N 75 52'25' W 08' 13'04' C28 475.00 91.79 91.65' N 85 31 07' W 11'04 20 W W MERIDIAN OF PLAT Di 843 PG 417 0� h 156 �� SEE SHEET 11 o 0 =� `= � 00 LOT 155 N, I I,� 12143 SO. FT 4i/('O) 4, s' I j e 1p, h 0 LOT 154 o� N 12342 SQ. FT m TM 65-((A))-39 I p MANNING & ROSS r< DEVELOPERS, L.L.C. p ZONE • RP, USE.• VACANT o _ 10' gRL (INST.J 010016381) N 0-o 00 E� o 163.,39.00 C� W I 10' BRL N ��I m LOT 15J ml M W 12429 SQ. FT N • N o S 0 03 7" E n 161.80' ISEE SHEET 9 152 50 0 50 GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT 50 VEREI GN VI L LEI GE SECTION 2- C RED BUD DISTRICT - FREDERICK COUNTY VIRGINIA- SCALE: 1" = 50' 1 DATE: JANUARY 11, 2006 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 ounded In 1971 www.greenwayeng.com ,TH0.; MWK D. ' IITH No. 002009 C4 of 12 r CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C2 43. 000 64.83' 58.86.. N 47' 19 12 W 8623 15 C3 328.00 35.62 35.60 N 87'24 09 W 06' 13'20 C4 272.00' 1.21 ' 1.21 ' S 84'25'07 E 00' 15' 16" C5 43.00' 76.45' 66.77 N 44'31 '16 E 101'51 'S8" C6 325.00 149.15' 147.84' N 06'44 06 E 26' 17 39 C7 550.00 883.00 182.15' N 05'23 06 W 19'03 48 C8 3O0.00 182.21 179.42 N 02'28 58 E 34'47 55 C9 550. 00 152.54' 152.05' N 03'4755 W 15'53 27 CIO 550.00 30.45' 30.45 N 13' 19'49 W 03' 10'21 C 11 300.00' 91.38' 91.03 N 865856m E 1727'09 C 12 300.00 156.97 155.19 S 86'45 16 E 29'58 45 C 15 275.00' 134.27' 132.94' N 05'53'42 E 27'58 28 C 16 43.00 62.39' S7.06 N 49 39 35 W 83'08'06 C 17 325.00' 110.40' 109.87' N 81'2946 W 19'2745 C25 325.00' 37.53' 37.51 N 87'55 09 W 06'36 59 C26 325.00 72.87 72.72 N 78-11 '17 W 12'50 46 0 05'42'31 " E oC4 56.00' SEE SHEET 12 W C6 0--lo .00 �s o T °ES cs (168) 50 R/W (5.7) C15 0 C� C10 3` 15' WATERLINE •�' ESM7. •�.•.� - 35 BRL-� a- i. vl 25,V C c I � LLJ �• I h O a h O, U � O 50 0 50 obi O O GRAPHIC SCALE (IN FEET) 0 I o; N 15143 T O. FT NI 20' DRAINAGE EASEMENT J :N 12.27 31 " E 10' BRL i -150.78'. _ �' - 10BRL cF I LOT 157 m b 12454 SO. FT �I 3.52' N BRI 814 07 E- 8' _, 150. 00, -- 10' BRL I 2 u LOT 156 m I 3 12048 SQ. FTL J 10' BRL I ............. S 18' 1.19' SEE SHEET 10 155 FINAL SUBDIVISION PLAT SOVEREIGN VI L LEI GE IsEcrioN 2-c RED BUD DISTRICT - FREDERICK COUNTY,. VIRGINIA SCALE: 1" = 60" 1 DATE: JANUARY 11, 2006 GREENWAY ENGINEERING 151 wwy HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TEL FPHO 64 )540722 89528185 AX: rn LAT PL or MER' 1 3 pG W DB n W MARK D. SMITH No.002009 Founded in 1971 com 1 v � � W � I I 58 SEE SHEET 11 / (19 CANYON ROAD 501 �w DISTANCE LINE BEARING SAN. SEWER EASEMENT .1 69 IRF Q L 75 0 75 / / ; , 114 GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE REIGN VILLAGE SEC. 2-E (INST. ;f030021202) REIGN VILLAGE SEC. 2 A (INST. jf030004670) SECTION 2- C RED BUD DISTRICT — FREDERICK COUNTY, VIRGINIA SCALE: 1" = 75' 1 DATE: JANUARY 11, 2006 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 "--4�Surveyors TELEPHONE: (540) 882-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com MARK D. SMITH No.002009 O (O Q> j_-- a C�1 VIRGINIA: FREDE.RICK COUNTY. SCT. Phis instrument of writing was producod to me on and with certifc.- to of ac no ledgeruent thereto annexed was admitted to record. T imposed by Sec. 58.1-802 of $- ej ��L_,.. ��, and 58.1-801 have been paid, if assessable 4'6"� Aav , Clerk COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/665-6395 September 19, 2006 Manning & Ross Developers, LLC PO Box 27 Winchester, VA, 22604 RE: Sovereign Village Subdivision Dear Sir or Madam: I have had the opportunity to conduct a site inspection for Sovereign Village in Frederick County on September 8, 2006. It is Frederick County's policy that bonds will not be released until all improvements have been completed. As you proceed with this project, please address the following comments prior to seeking a release of bond. • The SDP calls for a reduced road efficiency buffer, consisting of a six foot high berm with a single row of evergreen trees, along Senseny Road. The evergreens must be a minimum of four feet in height at the time of planting. • The SDP also calls for a full road efficiency buffer, consisting of a six foot high berm with a double row of evergreen trees, along Channing Drive at Farmington Boulevard. The evergreens must be a minimum of four feet in height at the time of planting. • The SDP requires street trees, ten trees on each side, along Rossmann Boulevard in Section One • The fallen tree is still located at the intersection of Canyon Drive and Channing Drive. If you have any questions, please feel free to contact me at (540) 665-5651. Sincerely, i Lauren E. Krempa Zoning Inspector LEK/bad 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 t^7 l e- • 5 DL'eja I c--r V ►'b 66 PAWP 14" L,gdt4A6`d r—*,rha.5 LAWSON AND SILEK, P.L.C. 160 ExETER DRIVE, SvrrE 103 POST OmcE Box 2740 WiNcEmsTER, VA 22604 TELEPHONE: (540) 665-0050 FAcsumm: (540) 7224051 June 28, 2006 Kris C. Tierney, Assistant County Administrator County Administration Building 107 North Kent Street Winchester, VA 22601 Dear Kris: JON 2 g 2006 THOMAS MOORE LAWSON • TLAWSONna,LSPLC.COM Re: Manning and Ross Builders Our File No. 860.001 I am in receipt of Ben Butler's letter dated June 20, 2006, which was sent by mail and unfortunately not received by this office until a day ago. Attached is another letter from me, which had been drafted before Ben's letter and circulated for review, comment and approval by my clients and others, which was to be a response to Eric Lawrence's letter of June 14, 2006. Unfortunately, it appears that due to the parties' failure to communicate in person, by telephone or by fax that we now have a series of correspondence which are crossing in the mail and that I believe are creating more confusion and less remedy to the problem at hand. Ben Butler's letter of June 20'h touts it encloses a copy of the Easement Agreement, which had been drafted and agreed to between QR Development, L.L.C., Lynnehaven, L.C., and Manning & Ross Developers, LLC. As you know from my conversations and communications some time prior to June 206, you already had a copy of this Agreement in your file. You have a copy of that Agreement because I forwarded it to you via e-mail on June 16, 2006. My understandingwas that the County intended to review that draft Agreement and decide whether it was in an acceptable form to the County and/or if the County wanted to be a party to the Agreement. Manning & Ross was willing to sign the Agreement back when it was drafted and it continues with that intention. As I understand it, the only issue remaining is whether the County also wants to be a party and, therefore, the Agreement needs to be amended. I leave that in your hands. Ben Butler's letter further states that there is a Deed of Dedication, which needs to be executed by Manning & Ross to allow a formal dedication of that portion of Channing Drive, which has been completed adjacent to the Arcadia development. In point of fact, that Deed of Dedication has been executed by Manning & Ross. I have previously advised Mr. Butler of Manning & Ross' willingness to dedicate the road for some time and my only comment to the draft Deed of Dedication FRONT ROVAL" aria: Posr Omm FAa "2, Fawr ROrA4 VotGnmw 22630.1VLQ8ONt: (540) G3S-9415, FAC V4MJM (54M 635-9421, F Mwrt.: m=UQDxrNXcor44XCrAMM FAoweXAa : 105M MAM 8Ta6Cr. SO[R 200, FADWAX. Vatcapu 22030,7iasuomm (703) 3S2-2615, Fes: (703) 352-4195, F.mAmz 7"bLAsO.LwwKm(§WMREFMJ 7' Mr. Kris Tierney June 28, 2006 Page 2 was my belief that for a Dedication to be complete, it needs to be accepted by the public body and the form document needed to be amended to reflect the acceptance of the dedication by Frederick County and also the approval of the form of the document by the County Attorney. I understand that within the last two days, the Deed of Dedication has been amended to incorporate those two revisions and accordingly, Manning & Ross has executed the Deed of Dedication. Finally, I do believe that everyone is in agreement that with the dedication of the portion of Charming Drive adjacent to the Arcadia development that the QR development Section 3 and the Manning & Ross development Section 4 need to be approved for building permits by Frederick County. I believe this is consistent with the proffers and rezoning that was approved back when Sovereign Village was accepted by the County. I also agree that there will need to be an amended Master Plan prepared by Manning & Ross to address the sections of its property yet to be developed and that the Master Plan will need to specifically spell out the incompletion of Channing Drive, those areas that border Manning & Ross, coordination of the completion of Channing Drive and the portions of the property that border Lynnehaven and/or QR Development, and also provide for the size, shape, and completion date of a community/recreation center. As I point out in the attached letter, there will also need to be some work on the ordinance to address this community/recreation center in advance of the filing of that Master Plan. All in all, and as we have said on numerous occasions, this is a process that will require steps, and I believe we are well on our way to completing those steps. Also, we firmly believe, however, that any finger -pointing is counterproductive and may well lead to the undoing of the cooperation that is being developed. Accordingly, I am strongly suggesting to all those in receipt of this letter that we keep this in mind. Thank you for your continued assistance and cooperation. Should you have any questions, please do not hesitate to give me a call. TML:atd cc: Manning and Ross Builders Benjamin M. Butler, Esquire Eric R. Lawrence, Planning Director Mark Cheran, Zoning and Subdivision Administrator Richard Shickle, Chairman of the Frederick County Board of Supervisors LAWSON AND SILEK, P.L.C. 160 EXETER DWF, SME 103 Posy OFFICE Box 2740 WiNcHmEx, VA 22604 TELEPHONE: (540) 6654050 FAcsuaLE: (540) 727,4051 June 22, 2006 Kris C. Tierney, Assistant County Administrator County Administration Building 107 North Kent Street Winchester, VA 22601 Dear Kris: THOMAS MOORE LAWSON • TLAWSON(a)LSPLC.COM Re: Manning and Ross Builders Our File No. 860.001 I am in receipt of a letter dated June 14th sent from Eric Lawrence on behalf of the Planning and Development Department of Frederick County, which was a follow up to our meeting of May 31" and my letter of June 2, 2006. To keep everyone in the loop, I am copying all of those copied on the June 14th letter. Also, I have had the opportunity to share the June 146' letter with my clients. While we are pleased to continue the dialogue concerning the issue surrounding the Sovereign Village development, the proffers associated with Channing Drive, the community center and various requests for Master Plan amendments, I am confused by Eric Lawrence's letter. I understand the County's desire to give specific delineations of the process by which proffered components of Sovereign Village are delivered, but I believe it is clear that the proffers provide for the delivery of those component pieces. Further, while I do not disagree that an amended Master Plan process may be the mechanism for tying up all remaining loose ends to include a specific timetable for the construction of Channing Drive and a community center, I do not think it is appropriate to hold up existing property where proffered improvements have been delivered and, in specific cases, where Channing Drive has been fully constructed. My letter of June 2nd described a process which acknowledged the completion of segments of Channing Drive, which should allow for a connection between Senseny and Valley Mill Roads consistent with the rezoning and proffers to allow for the issuance of building permits. Those permits would be before the property owned by QR Development/Denver Quinnelly, and also by Manning & Ross. To that end, in addition to my letter, I forwarded to you an Easement Agreement, which had been drafted to be executed by all parties in interest to assure a clear path toward the completion of Channing Drive in areas where it is not yet constructed. Fwoxr Ra,,aLAm==: Pour Oenct R= "2, From ROYAL. Vu"" 2W9.1VLXM0*m: (540) 635-9413. FAC9amsi (SM) 635-9421. UMmu srtntaQ[xNxcommcl.coM FAarAxA enw: 10805 MAIN STRZr.T. SV1rE 20% FAmswwx. VutooaA 22030.7tuteorm: CN3) 352-2615. Fwcsam.s.: (M) 352-4190. FbLAU-1110NIAsO.Lww'savQDVZRELO+.wr Mr. Kris Tierney June 22, 2006 Page 2 With regard to the Master Plan amendment, this is to confirm that Manning & Ross has previously submitted an amended Master Plan, which provided as one of its components the bonding and construction of the remainder of Channing Drive. As you know, that Master Plan never made it out of Planning because of an ordinance interpretation that required the construction of a multi- million dollar community center. In our last meeting, all agreed, including representatives of Frederick County, that assuming it was even possible to deliver a multi -million dollar community center, that it would not be in the interest of the community and it would not be something that could be maintained by the Homeowners' Association. Accordingly, at our meeting of May 31 ", it was agreed that Manning & Ross would prepare a revised Master Plan to provide for the construction of Channing Drive, provided some agreement or ordinance revision could be reached to allow for a reasonable community center in a size suitable for the Sovereign Village community. I had thought in our meeting of May 3 1 " we had all agreed that the preparation of that Master Plan and the amendment of any relevant ordinance would take an extended period of time and that it would not be proper to hold from development the existing lots, which are ready to go forward due to the recent construction of Channing Drive. From my read of Mr. Lawrence's letter, however, it now appears we did not have an agreement and the County is suggesting that everything within the Sovereign Village development will be held up until such time as the Master Plan and text to that have been submitted, reviewed and approved. Please review your notes of the meeting, as well as the enclosed and referenced correspondence and let me know how Frederick County intends to proceed. I continue to submit that the lots that lay adjacent to the newly completed sections of Channing Drive should be permitted and allowed for development. My clients have authorized me to state in writing that as a second step to this process they will re -submit their amended Master Plan and they will provide for the completion of the remainder of Channing Drive. I had thought we had the commitment of the County to work to create an ordinance that allows, and calls for, the construction of a reasonable community center. Thank you for your continued assistance and cooperation. If, after you have reviewed the enclosed, you would like to meet to discuss these issues further, please give me a call. TML:atd cc: Manning & Ross Builders Benjamin M. Butler, Esquire Eric R. Lawrence, Planning Director Mark Cheran, Zoning and Subdivision Administrator COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/665-6395 une 14, 2006 , 77,-,., Ty Lawson, Esquire Lawson and Silek, P.L.C. 160 Exeter Drive, Suite 103 Winchester, Virginia 22603 Benjamin M. Butler, Esquire Kuykendall Johnston McKee & Butler P.L.C. 112 S. Cameron Street Winchester, Virginia 22601 RE: Channing Drive: Lynnhaven and Sovereign Village developments Dear Ty and Ben: Thank you for meeting with Kris Tierney, Mark Cheran, and me on May 31, 2006, to discuss the progression of the Charming Drive developments (Lynnhaven and Sovereign Village). I believe we had a fruitful meeting, and now better understand the various issues from each of our vantage points. The most significant issues appear to relate to the completion of the Channing Drive road improvements and the recreation center. Staff is also prepared to work with each of your development teams to facilitate revisions to your respective master development plans when each is sought. At the conclusion of our meeting, county staff indicated our intent to meet with various County officials to apprise them on the development. In preparation for this meeting, your development teams offered to provide county staff with: (1) a letter summarizing our May 31, 2006 meeting, and offering a commitment to bond the unimproved portions conjunction with approval of a. revised MDP; (2) a preliminary Master Development P1 n revision for Sovereign Village which .would: intr�tdt e multiplex: housing type; .and (3) a three -party agreement to address the provision of right-of-way by each party and the construction responsibilities for the remaining portion of the Channing Drive road improvement. As of June 13, 2006, I have not received all of these materials. The County is in receipt of a letter from Mr. Lawson, dated June 2, 2006, which address the commitment to bond outstanding improvements associated with Channing Drive, an element the County understood would be addressed in response to our May 31, 2006 meeting. Additionally, I would note that the recreation center is a proffered community amenity and. is not directly associated with a revised MDP as . suggested in this June 2, 2066 letter. While we. believe the recreation center could be enhanced as part 107 North Kent Street, Suite 202 • Wmchester, Virginia 22601-5000 e Ty Lawson, Esquire Benjamin Butler, Esquire Re: Channing Drive June 14, 2006 Page 2 of an open space reduction effort, it's important not to overlook that the recreation center was proffered with the rezoning. Mr. Lawson's letter seeks an amendment to an open space ordinance to correct a `flaw' in the ordinance text. As discussed on May 31, 2006, it is expected that Manning and Ross provide county staff with their revised master development plan. Staff continues to offer to work with the development team, review the revised MDP, and determine the quantity of additional recreation units that would be required, and how such additional recreation units might be incorporated into the proffered reereation centers As of June 12, 2006, the revised MDP has not been provided to County staff. Until the MDP review and subsequent discussion occurs, it is inappropriate to consider an ordinance text amendment as suggested in Mr. Lawson's letter. As discussed, the three -party agreement suggested by the development teams would delineate the process by which the Channing Drive road improvements would be completed. And more importantly, the agreement would acknowledge a working relationship between the developers and their willingness to execute the necessary documents when the road dedication was necessary. As of June 13, 2006, I have not received the three -party agreement. We look forward to receiving the three items as discussed on May 31, 2006. Once in receipt of these materials, we will proceed with the appropriate MDP review and apprise the County officials with the development's efforts to address the road and proffered recreation center construction commitments. We look forward to working with your development teams on this project. Sin rely, E c R. Lawrence Planning Director cc: QR Development - Lynnhaven Manning and Ross Developers — Sovereign Village Kris Tierney, Assistant County Administrator Mark Cheran, Zoning and Subdivision Administrator ERL/bad LAWSON AND SILEK, P.L.C. 160 Z== DW,% Sons 103 i Posr OFFmcz Bm 2740 WWC= TR, VA nO4 Fes: (540) 722-4051 June 2, 2006 Kris C. Tierney, Assistant County Administrator County Administration Building 107 North Kent Street Winchester, VA 22601 Re: Manning and Ross Builders Our File No. 860.001 Dear Kris: This is a follow up to our meeting of May 31, 2006 involving you, Eric Lawrence and Mark Cheran on behalf of Frederick County, David Madison, Greg Bancroft and me on behalf of Manning and Ross, and Ben Butler on behalf of QR, LLC/Denver Quinnelly. During the meeting we discussed the proffers for the Sovereign Village subdivision and what appears to be the last two outstanding issues: the completion of Channing Drive and agreement on the Community Center. As we discussed in the last meeting, it maybe best to consider each of these remaining items separately because the project is complex with multiple property owners and proffers which do not prescribe a specific timetable on the completion of the projects. During the meeting, we confirmed another section of Channing Drive has been completed and is ready to be dedicated. This is the portion that runs from the Arcadia development to the south, into the Sovereign Village development and in the direction of Senseny Road. With the completion of this section of road, there is now a public street connection between Senseny and Valley Mill. We all recognize that road network completion is significant and it provides the connection that was a desire of the developer and the County when the original proffers and rezoning were accepted. During our meeting we also discussed what remains for the completion appears to be the last two segments of Charming, mainly the piece that runs through the Bean property and immediately y unaeveiopea Tana ana the segment or roaa that runs turougn the middle of the commercial properties owned by Maturing and Ross and Lynnhaven (John Scully). We talked about those segments of roads and the fact that there remains a significant amount of residential and commercial development value that lies on either side of those segments of Charming Drive and all agreed that under the existing proffers, those two segments of Channing Drive will in fact be completed. As always, the question has been timing for the completion, but we believe with Fsnnr Dssue.Asosstss lose OsslR Duet 6bf.FiUefe D1o�w, Vs�eo�12i70.1» (SN) tlS•f�iS.FAaDmis (SN► 1. DatAu.t BHZYlaeCW6dCGaOM FwUMMA0�1s bUX4ftwMT.8sets 26f, Fwuu:.Vumw2141..?tr::aoeat(71�93tdfL7.FK7aQss C1O�31u1f�.LauDtlfeoauW r , Mr. Kris Tierney June 2, 2006 Page 2 the connection that now exists between Senseny and Valley Mill, the pressure to immediately deliver Charming is off. QR and Manning and Ross are asking that the Deed of Dedication of the segment of Charming that has been built be accepted by the County and with that the lots that adjoin be allowed to be developed and built upon. There appears to be quite a bit of history relating to the Community Center. As I understand it, Manning and Ross had proposed a multiplex project on their property and had agreed to construct Charming Drive as part of the orderly development of this new multiplex development. The multiplex proposed would not exceed the total density allowed for the Manning and Ross section of Sovereign Village. It was created to address a perceived demand for a different type of unit. In response to a draft Master Plan that had been submitted to the County in furtherance of this multiplex project, the County amended the ordinance dealing with open space and rec unit requirements. Unfortunately, the text that was submitted had a flaw in it in that triggered a recalculation of the open space requirements for the existing plans (including lots that had been sold to third parties), placing an excessive and disproportionate rec unit requirement on this new multiplex project. At the meeting, Manning and Ross agreed it would be interested in reviving that multiplex master plan and included specifics about the construction of the Community Center, as well as the remainder of Charming Drive. There must be work done, however, on the rec unit requirement to make this possible. I believe work can and should be done, but it will take a considerable amount of time and, in the interim, the dedication for the portion of Channing that has been completed waits. Accordingly, the landowners would recommend that we work with the County to revise the ordinance or come up with some other accommodation with regard to the rec unit calculations, but in the interim that the Deed of Dedication be accepted and the lots that front on the nearly completed Charming Drive be allowed to be developed and built upon. As always, I thank you for your assistance and cooperation. If you have any questions or comments, please do not hesitate to give me a call. Very TML:cmh cc: Manning and Ross Builders Benjamin M. Butler, Esquire PC,REVIE`' DATE: 11/03/99 BOS REVIEW DATE: 12/08/99 REZONING APPLICATION #15-99 MANNING DRIVE To rezone 354.3 acres from RA (Rural Areas) District to RP (Residential Performance) District, and 22.0 acres from RA (Rural Areas) District to B2 (Business General) District LOCATION: This property is located on the north side of Senseny Road (Route 657), on both sides of Bean's Pond Lane, and adjacent to the Bedford Village, Apple Ridge, Senseny Glen, and Carlisle Heights subdivisions. MAGISTERIAL DISTRICT: Stonewall PROPERTY ID NUMBERS: 55-A-206, 209, 211, 213 & 65-A-30, 31, 39, 40 PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas) District Land Use: Agricultural and Vacant ADJOINING PROPERTY ZONING & PRESENT USE: North: Zoned RP (Residential Performance) District Zoned RA (Rural Areas) District South: Zoned RP (Residential Performance) District .41 RA (Rural Areas) District East: Zoned RP (Residential Performance) District RA (Rural Areas) District West: Zoned RP (Residential Performance) District RA (Rural Areas) District Use: Vacant (Fieldstone Heights) Residential and Vacant Use: Residential (Burning Knolls, Apple Ridge, Senseny Glen) Residential Use: Residential (Bedford Village, Apple Ridge) Residential and Vacant Use: Residential (Carlisle Heights) Residential and Vacant Charming Drive REZ #15-99 Page 2 November 30, 1999 PROPOSED USE: Residential and Commercial REVIEW EVALUATIONS: Virginia Dept. of Transportation: Please refer to E-mail correspondence from VDOT to Greenway Engineering dated September 1, 1999, and letter from VDOT to Mrs. Gina A. Forrester dated September 2, 1999, Fire Marshal: Plan approval recommended. County En ig neer: The submission of the revised traffic study adequately addresses the previous review comments. Sanitation Authority: No comment. Greenwood Volunteer Fire and Rescue Company: Please refer to minutes from Greenwood Volunteer Fire and Rescue Company Special Board Meeting dated May 18, 1999. Parks and Recreation: If the Capital Facilities Fiscal Impact Model used for this development reflects current information from the Planning Department, it would appear the proposed proffer will meet the Parks and Recreational needs created by this development. Also, the Parks and Recreation Department would recommend that the trail system be designed to accommodate bicycles and connect with adjacent developments being considered. Frederick County Public Schools: Please refer to three letters from Frederick County Public Schools to Greenway Engineering dated June 7, 1999. County Attorney: Proffer statement appears to be in proper form. Planning & Zoning: Project Scope The applicants have proposed to rezone eight parcels totaling 376.3 acres to establish 354.3 acres of residential land use and 22 acres of commercial land use. This proposal calls for the development of 846 residential lots (excluding townhouse and apartment units); 220,000 square feet of commercial use, a community recreation center that will be available to all area residents through membership, and a pedestrian trail system which connects all land areas east of Charming Drive. -2- Channing Drive REZ #15-99 Page 3 November 30, 1999 Site History The original Frederick County Zoning Map (U.S. G. S. Stephenson Quadrangle) depicts the zoning for the eight parcels as A-2 (Agricultural General) District. This zoning classification was modi$ed to RA (Rural Areas) District on February 14, 1990 during the comprehensive amendment to the county's Zoning Ordinance. Location The eight properties, totaling 376.3 acres, are located in the county's Urban Development Area (UDA) and the Sewer and Water Service Area (SWSA). This acreage is currently accessible from Senseny Road (Route 657), Beans Pond Lane which intersects Senseny Road (Route 657) near Parkwood Circle (Route 1235) and Sunset Drive (Route 812), and Eddy's Lane (Route 820) which intersects Valley Mill Road (Route 659) near Berryville Pike (Route 7). Surrounding properties are primarily residential in nature or are planned for future residential development. Site Suitability The 376.3 acres does not contain areas of floodplain; however, areas of steep slope, woodlands, wetlands, and prime agricultural soils exist on the property. The Frederick County Rural Landmarks Survey identifies eight properties within the proximity of this acreage which contain historic structures; however, none of these structures are identified as potentially significant historic resources. The Frederick County Rural Landmarks Survey does not identify potential historic districts within the proximity of this site. Issues Identified by Planning Commission The Planning Commission held a public hearing to consider the rezoning of the eight parcels identified in this staff report on March 3, 1999. The applicant asked the Planning Commission to table action on this request to allow for adequate time to address the concerns that were raised during the meeting. The following information is intended to identify the concerns and issues raised by the Planning Commission and how the applicant has proposed to mitigate these issues through the development of additional information and through the submission of a revised proffer statement: 1) The Planning Commission felt that a detailed traffic impact analysis statement needed to be prepared which provided Level of Service (LOS) information for the existing road system and LOS information for the road system based on the impacts of the proposed rezoning. -3- Channing Drive REZ #15-99 Page 4 November 30, 1999 The applicant has incorporated a detailed traffic impact analysis statement which was prepared by Callow Transportation Consulting (CTC) ofMarshall, Virginia. The CTC traffic analysis provides 1999 average daily traffic count (ADT) information volumes for A.M. and P.M. peak hour traffic at all intersections within proximity of this acreage; traffic volume increase at all intersections through 2005 utilizing a 3.5% annual growth rate which accounts for the acreage proposed for rezoning, as well as seven developments within this area that have been approved but are not at build -out; trip generation information for the proposed residential and commercial land use, trip distribution percentages for traffic movements from this acreage onto the existing road systems; and LOS information for existing road systems and intersections, as well as LOS information for build -out conditions of this acreage. 2) The Planning Commission felt that the detailed traffic impact analysis statement needed to be reviewed by VDOT and that new comments needed to be provided to the county based on the results of their review. The CTC traffic impact analysis statement was submitted to VDOT and reviewed by their traffic engineering division in Staunton. The results of this review are provided in two correspondences from the VDOT Edinburg Residency. Please refer to E-mail correspondence from VDOT to Greenway Engineering dated September 1, 1999, and letter from VDOT to Mrs. Gina A. Forrester dated September 2, 1999. 3) The Planning Commission felt that the method for providing access from Senseny Road (Route 657) to Berryville Pike (Route 7) needed to be determined, and that the issue of widening the existing single -lane bridge adjacent to the McHale property needed to be addressed The CTC traffic impact analysis provides information for the segment of Valley Mill Road (Route 659) between Greenwood Road (Route 656) and Berryville Pike; however, it does not state if this information is based on the current road alignment or for an alternative alignment. Previous discussions between the applicant and staffindicate that the current road alignment is proposed to be utilized, as the ability to provide an alternative alignment is not feasible since the applicant does not own the property. The applicant's proffer statement provides a monetary contribution of up to $84,600 that can be utilized by VDOT for improvements to the existing single -lane bridge adjacent to the McHale property. A monetary contribution of $100 is available on a per -lot basis as building permits are issued by the County. These funds are available as matching funds through VDOT's Revenue Sharing Program should the County submit a request for this type of project. -4- Channing Drive REZ #15-99 Page 5 , November 30, 1999 4) The Planning Commission felt that phasing for the residential and commercial land uses would need to be associated with LOS impacts to the existing road system within the proximity of this acreage. The applicant's proffer statement provides a phasing schedule for the residential land use which calls for the issuance of 79 building permits annually. This phasing program would Emit the build -out of the residential land use to a minimum of 11 years. Furthermore, the applicant's proffer statement limits the issuance of building permits to a total of 475 until the off -site portion of Channing Drive is developed to Valley Mill Road. The CTC traffic impact analysis does not associate the LOS of the existing road system to the applicant's residential phasing plan; however, it does state that appropriate turn lanes will need to be provided at the Senseny Road/Greenwood Road intersection to adequately accommodate the build -out of the residential component. The applicant has proffered a monetary contribution of $30,000 to be used towards the installation of two of the four turn lanes identified by the CTC traffic impact analysis. The applicant has not proffered a phasing plan for the development of the 22-acre commercial land use; however, the proffer statement limits the development of this acreage to 220,000 square feet of floor area. The CTC traffic impact analysis identifies the need for Senseny Road to be improved to a four -lane condition between Channing Drive and the Senseny Road/Greenwood Road intersection to adequately accommodate the commercial component of the proposed rezoning. 5) The Planning Commission felt that the applicant needed to revisit the proffer associated with the provision of a new elementary school site to ensure that the County was not put in the position of funding the difference between the cost of land and the per -unit impact that was demonstrated by the Capital Facilities Fiscal Impact Model. The Frederick County Public Schools civil engineer determined that the proposed 15-acre site contained development constraints which would make it difficult to construct a new elementary school facility. The applicant's proffer statement was revised to eliminate the dedicated 15-acre elementary school site and to provide a per -unit monetary contribution that is consistent with the results of the Capital Facilities Fiscal Impact Model. 6) The Planning Commission felt that the applicant needed to address solid waste issues which may involve the provision of land to accommodate a new solid waste citizen's convenience center. The applicant's proffer statement was revised to provide a monetary contribution to the -5- Channing Drive REZ #15-99 Page 6 November 30, 1999 County to expand the existing solid waste citizen's convenience center located on the east side of Greenwood Road (Route 656). This proposal satisfies the County Engineer and the Greenwood Volunteer Fire and Rescue Company. Please refer to the minutes from the Greenwood Volunteer Fire and Rescue Company Special Board Meeting dated May 18, 1999. Issues Identified by Review Agencies 1) Frederick County Public Schools (FCPS): FCPS has stated that the cumulative impact ofthe proposed rezoning and existing residential subdivisions within close proximity of this acreage will require the County to construct new school facilities to ensure that existing facilities do not exceed design capacities. FCPS believes that it is very important to consider the impacts of the proposed rezoning on current and future school needs. The applicant has based the impacts to community facilities and services on the results of the Frederick County Capital Facilities Impact Model as applied to this rezoning request. The applicant has provided a building permit phasing schedule as a part of the proffer statement which calls for the development of 79 new residential units on an annual basis. The following table provides information for the impact that the building permit phasing schedule would create for the public school system on average: Proposed Building Permit Phasing Schedule Year Total Building Permits Issued Elementary School Impact @ . 39 Pupils/Dwelling Middle School Impact @ .14 Pupils/Dwelling High School Impact @ .17 Pupils/Dwelhng 1999 79 31 12 14 2000 158 62 23 27 2001 237 93 34 41 2002 j 316 124 45 54 -6- Channing Drive REZ #15-99 Page 7 November 30, 1999 Year Total Building Permits Issued Elementary School Impact @ . 39 Pupils/Dwelling Middle School Impact @. 14 Pupils/Dwelling High School Impact @ .17 Pupils/Dwelling 2003 395 155 56 68 2004 474 185 67 81 2005 553 216 78 95 2006 632 247 89 108 2007 711 278 100 121 2008 790 309 111 135 2009 846 330 119 144 The attendance zones established by the Frederick County School Board depict Senseny Road Elementary, James Wood Middle School, and James Wood High School as the current facilities in which student enrollment would occur. The 1999-2000 School Capacity and Enrollment data demonstrate that Senseny Road Elementary has a practical capacity of 570 students with a current enrollment of 537 students, or 98% capacity. James Wood Middle School has a practical capacity of 1,000 students with a current enrollment of 960 students, or 96% capacity. James Wood High School has a practical capacity of 1,670 students with a current enrollment of 1,572 students, or 94% capacity. Therefore, the information in this table suggests that the practical capacity for student enrollment at all three school levels will be exceeded prior to the build -out of these properties. The Frederick County School Board has identified the need for a new elementary school and a new high school in this area to address the impacts from this proposal coupled with the existing developments that have not achieved build -out at this time. 2) Virginia Department of Transportation (VDOT): The completion of the improvements on Greenwood Road (Route 656) between Senseny Road (Route 657) and Valley Mill Road (Route 659) are assumed to be in place as a component of the CTC traffic impact analysis. This road improvement project is proposed to be advertised for construction in March 2000 and is anticipated to be complete by March 2002. The Greenwood Road improvement project calls for the provision of traffic signalization at the Senseny Road/Greenwood Road intersection. -7- Channing Drive REZ #15-99 Page 8 November 30, 1999 VDOT has identified the need to construct Senseny Road between Channing Drive and the Senseny Road/Greenwood Road intersection to a four -lane condition with appropriate turn lanes prior to the build -out of the proffered land uses in this rezoning proposal. Furthermore, VDOT has identified the need for traffic signalization at the intersection of Greenwood Road and Valley Mill Road prior to the build -out of the residential component of this acreage. The applicant's proffer statement provides a monetary contribution of $75,000 for traffic signalization at the Senseny Road/Greenwood Road intersection which may be transferred to the Greenwood Road/Valley Mill Road intersection if warranted by VDOT. 3) Frederick County Parks and Recreation (FCPR): FOR has recommended that the proposed trail system be developed to accommodate bicycle travel and that this trail system connect to adjacent developments. The applicant's proffer statement provides an exhibit which depicts a trail system which connects to the Senseny Glen and Fieldstone Heights subdivisions; however, this trail system will not accommodate bicycle travel if it is constructed with wood chips or mulch as proposed by the applicant. Proffer Statement The applicants have prepared a revised proffer statement that has been signed by all owners, notarized, and reviewed by the County Attorney. The revised proffer statement is divided into four articles which reflect conditions that are applicable to the entire acreage, as well as conditions that are specific to the 91.4-acre Lynnhaven parcel, the 152.2-acre Giles parcel, and the 132.7-acre Futral/Sheppard parcel. This is a very detailed and complex proffer statement; therefore, the following information attempts to provide the essence of the proffered conditions based on category: 1) Residential Component * 846 total permits on 354.3 acres creating an overall gross density of 2.4 units per acre. * Issuance of 79 building permits on an annual basis. * Limitation of 475 building permits until Channing Drive is extended to connect with Valley Mill Road. * Prohibit the development of townhouse and apartment buildings on the entire acreage. 2) Commercial Component Maximum of 240,000 square feet of development creating a Floor -to -Area Ratio of 0.25. -8- Channing Drive REZ #15-99 Page 9 November 30, 1999 Prohibit specific commercial land uses that are allowed by -right in the B2 District. Provide architectural requirements for three walls on all buildings. 3) Transportation Component * Installation of traffic signalization at the intersection of Senseny Road and Channing Drive. * Turn lanes on Senseny Road at the intersection of Channing Drive. * Boulevard design with deciduous tree landscaping along main entrance road within the residential portion of this acreage owned by Giles. * A $75,000 monetary contribution for traffic signalization at the intersection of Senseny Road/Greenwood Road that is transferrable to the intersection of Greenwood Road/Valley Mill Road. * A monetary contribution of $100 per residential lot payable at the time of building permit issuance to be earmarked for improvements to the one -lane bridge on Valley Mill Road near Berryville Pike. * A $30,000 monetary contribution towards the installation of turn lanes at the Senseny Road/Greenwood Road intersection. 4) Recreational Amenities Component Development of a membership -based community recreational center with a minimum floor area of 3,000 square feet which will contain a pool and outdoor multi -purpose courts. Provision of a trail system to be constructed of wood chips or mulch which will. link the majority of this acreage and connect to Senseny Glen and Fieldstone Heights subdivisions. 5) Solid Waste Component A monetary contribution of $3,600 per year for a maximum of 10 years to allow for the expansion of the existing solid waste citizen's convenience center at the Greenwood Volunteer Fire and Rescue Company on Greenwood Road. 6) o Community Facilities and Services Component A monetary contribution to mitigate the negative fiscal impacts associated with Frederick County Public Schools, Frederick County Parks and Recreation, and Frederick County Fire and Rescue Services that is consistent with the results of the Capital Facilities Fiscal Impact Model. The following table provides a summary of the monetary contributions that have been proffered by the applicants to mitigate the negative fiscal impacts to community facilities and services: -9- Channing Drive REZ #15-99 Page 10 November 30, 1999 Proffered Monetary Contributions for Community Facilities and Services @ 846 Residential Lots and 240,000 square feet of Commercial Use Community Facility or Service Total Monetary Contribution Frederick County Public Schools $ 2,628,183.77 Frederick County Parks & Recreation $ 476,794.72 Frederick County Fire & Rescue Service $ 45,324.26 STAFF CONCLUSIONS FOR THE 11/03/99 PLANNING COMMISSION MEETING: The proposal to rezone 354.3 acres to the RP (Residential Performance) District and 22 acres to B2 (Business General) District is consistent with the land use patterns for urban and suburban residential development and commercial development identified in the Comprehensive Policy Plan. The general road network layout for the proposed development is consistent with the needs identified in the Comprehensive Policy Plan's Eastern Road Plan Map. The overall gross density for residential development is less than the densities identified in the Comprehensive Policy Plan and the Zoning Ordinance, and is consistent with the development patterns within surrounding developments. The proffered commercial square footage is 25% of the allowable coverage identified within the Zoning Ordinance. The Frederick County Planning Commission tabled this rezoning request during the March 3, 1999 meeting and directed the applicants to identify how they proposed to mitigate the issues and concerns raised during the meeting. The applicants have provided additional information and have developed a revised proffer statement in an attempt to address these issues and concerns. The revised proffer statement mitigates the majority of the identified issues and concerns; however, some issues and concerns remain unresolved. These involve the ability to provide access between Senseny Road and Berryville Pike (other than by improvements to the existing road system); the establishment of a residential and commercial development phasing plan that is related to Level of Service impacts to the existing road system (other than limiting residential building permits to 475 lots until Channing Drive is extended to Valley Mill Road); the ability to construct Senseny Road to a four -lane condition between Channing Drive and the Senseny Road/Greenwood Road intersection; and the provision of a surface material that would allow for bicycle travel on the proposed trail system. -10- Channing Drive REZ #15-99 Page 11 November 30, 1999 The language within the Land Use Chapter of the Comprehensive Policy Plan states that new development should only be approved within the Urban Development Area (UDA) when roads and other infrastructure with sufficient capacity have been provided. Several improvements to the existing transportation system were identified through the Callow Transportation Consultants (CTC) traffic impact analysis. Some of these improvements are proposed to be accomplished by the applicants, while some would require improvements funded through the County's Secondary Road Improvement Plan allocations. Of these, the most significant issue involves the four -lane improvements to Senseny Road between Channing Drive and the Senseny Road/Greenwood Road intersection. Currently, this segment of Senseny Road is the 23' priority identified on the County's Secondary Road Improvement Plan. The top five priorities are currently identified as receiving allocations from VDOT over the next six years. Additionally, the Frederick County Public Schools comment identifies that the development of this acreage, coupled with approved residential development within the area, will necessitate the development of new school facilities. The County's Capital Improvements Plan (CIP) identifies land acquisition for a new elementary school site and the construction of a third high school within the proximity of this acreage to be funded through allocations made between the 1999-2000 and the 2001-2002 fiscal years; however, allocations for these capital facilities have not begun. The applicants should advise the Planning Commission how the four -lane improvements to Senseny Road can be accomplished outside of the normal Secondary Road Improvement Plan allocation process. The CTC traffic study identifies this road improvement need when the retail component is realized, as this land use will attract 11,990 average daily vehicle trips at build -out. One method to mitigate this impact is to delay construction of the commercial acreage until this segment of Senseny Road is improved to a four -lane condition. Similarly, other improvements to the road network system that are outside of the applicant's ability to complete, such as off -site turn lanes and bridge improvements, could be tied into the residential building permit phasing schedule to ensure that adequate Levels of Service are maintained on the road network system. The Planning Commission should determine if the items proffered by the applicant reasonably mitigate the impacts to the County's infrastructure, services and to adjoining properties when forwarding a recommendation to the Board of Supervisors for final disposition of this matter. PLANNING COMMISSION SUMMARY & ACTION FOR THE 11/03/99 MEETING: There were 28 citizens who came before the Commission to speak about the proposed rezoning. Of those 28, 13 persons spoke in favor of the rezoning and 15 spoke in opposition to the rezoning or believed a decision should be postponed to a later date. The issues raised by those in opposition included the following: the timing of the proposed development was wrong, due to the inability of infrastructure in this part of the County to take care of existing needs, in addition to those of the proposed development; the amount of surrounding area that was already rezoned for residential development; the existing and anticipated traffic congestion on Senseny and Greenwood Roads; the Channing Drive REZ #15-99 Page 12 November 30, 1999 potential for busing school children to schools outside of the immediate neighborhood; the need for an additional school site in this area to serve additional residential growth; the overcrowded condition of existing schools; the opposition by Apple Ridge subdivision residents to extending Morning Glory Drive and Wayfaring Drive as "through streets" because it would disrupt their quality of life; the availability of sufficient water supply and capacity for sewage treatment; and finally, the concern that taxes would have to be raised to pay for the additional development. Those persons who spoke in favor of the development made the following points: the proposal is the culmination of 25 years worth of planning that is supported by the builders and the developers, and is the kind of "planned community" that citizens are now demanding; the developers and builders associated with this project are not "outsiders," but live and work in Frederick County and are just as concerned about the quality of life here; the applicants/developers of this project are proffering the money for this development to pay its own way and are also offering to participate in solving infrastructure problems; the proposed development will occur in the Urban Development Area, where facilities are available and agricultural land is poor; the school situation is much better than it used to be in terms of overcrowding; the interconnection of roads through adjacent subdivisions is for emergency services purposes; the proposed 800 homes will not be impacting this area all at once, but will take a minimum of ten years to develop; and finally, residential development trends within the County indicate that approximately 600 building permits continue to be issued each year. Members of the Planning Commission believed the commercial area was an integral part ofthis plan's success and that it needed to be built early. They believed the commercial development would reduce traffic on Senseny Road. The Commission discussed the traffic impact study with the applicant and the logistics of the second traffic impact study, which was to be submitted when the commercial area was developed. The Planning Commission was pleased with the proposal and noted that it is the kind of exemplary plan they have been working towards for years. Members spoke about the frustration of receiving rezoning requests on five and ten acre tracts because of the difficulty in planning comprehensively. They also spoke about the rapid growth that is occurring in the rural area, outside of the UDA, which creates uncontrolled, unmanageable growth, with no ability for the County to realize proffers or to influence infrastructure. They believed the proposal was in agreement with sound Comprehensive Planning practices and the road network was consistent with the Eastern Road Plan. They believed that the applicant's revised proffer statement and additional information reasonably mitigated the impacts to infrastructure, services, and adjoining properties and addressed the concerns raised by members of the public and the Commission. The Commission unanimously recommended approval ofthe rezoning of 354.3 acres from RA (Rural Areas) to RP (Residential Performance) and of 22.0 acres from RA (Rural Areas) to B2 (Business General) with the revised proffers submitted by the applicant. (Note: Mr. Stone, Mr. Wilson, and Mr. Ours were absent for this vote.) _12_ Page 1 of 2 t Greenway Engineering, From: Ziemer, Vega <VZIEMER@VDOT.STATE.VA.US> To: <greenway@visuallink.com> Cc: Diamond, Jim <Diamond_JB@VDOT.STATE.VA.US>; Harris, Clarence (C.B.) <CHan1s@VD0T.STATE.VA.US>; Heironimus, David (Dave) <Heironimus_D@VDOT.STATE.VA.US>; <ewyatt@co.frederick.va.us>; <ktiemey@co.frederick.va.us>; Melnikoff, Steve <SMELNIKOFF@VDOT.STATE.VA.US>; Funkhouser, Rhonda <Funkhouser R@VDOT.STATE.VA.US> Sent: Wednesday, September 01, 1999 9:08 AM Subject: Traffic Analysis, Channing Drive Rezoning, Route 657, Frederick County Commonwealth of Virginia -- Department of Transportation Edinburg Residency 14031 Old Valley Pike Edinburg, VA 22824 ' (540) 984-5600 - Fax (540) 984-5607 September 1, 1999 Mr. Mark Smith, P.E., L.S. Greenway Engineering, Inc. 151 Windy Hill Lane Ref: Traffic Analysis Winchester, VA 22602 Channing Drive Rezoning Route 657, Frederick County Dear Mr. Smith: VDOT has completed the review of a traffic impact analysis prepared by Callow Transportation Consulting (CTC) for the referenced development rezonings. Based on this review, we have the following comments and concerns: 1. This analysis is based on the assumption that Route 656 will be constructed according to plan and additional lanes constructed at the intersection of Routes 656 and 659. 2. The CTC study has determined that the Route 657 link east of the Route 657/656 intersection will need to become a four -lane section to the first project entrance with the retail component (Channing Drive). The four-laning of Route 657 will need to be completed prior to the build -out of the developments outlined in the Channing Drive rezoning. 3. A traffic signal will be needed on Route 659 at the intersection of Route 656 prior to build -out of the residential areas. VDOT will ask the -13- 9/3/99 Page 2 of 2 developer to enter into a signal agreement at all locations in this CTC study, along with those locations stipulated in the rezoning documents. Based on our review of the CTC study, VDOT concurs that the traffic growth associated with this rezoning will be acceptable and manageable with the proposed improvements. Should you have any questions, please do not hesitate to call. Sincerely, Steven A. Melnikoff Steven A. Melnikoff Transportation Engineer SAM/vcz Cy: Mr. J. B. Diamond Mr. C. B. Harris Mr. D. A. Heironimus Mr. Evan Wyatt Mr. Kris Tierney -14- 9/3/99 t COMMONWEALTH ®f VIRGI IA DEPARTMENT OF TRANSPORTATION DAVID R. GEHR EDINBURG RESIDENCY JERRYA. COPP COMMISSIONER 14031 OLD VALLEY 8 PIKE RESIDENT ENGINEER TELE (540) 984-5600 EDINBURG, VA 22824-0278 FAX (540) 984-W07 September 2, 1999 Mrs. Gina A. Forrester c/o Friends of Frederick P. 0. Box 3771 Winchester, VA 22601 Dear Mrs. Forrester: Ref: Channing Drive Rezoning Traffic Impact Analysis Route 657 — Frederick County VDOT has just completed a review of the final traffic impact analysis prepared by Callow Transportation Consulting (CTC). Based on our review, VDOT concurs that the traffic growth associated with this rezoning will be acceptable and manageable with the proposed improvement. Please find attached herewith for your review and information a copy of the CTC document. Should you have any questions, please feel free to call. SAM/vcz Cy: Mr. D. A. Heironimus Mr. Evan Wyatt Sincerely, Steven A. Melnikoff Transportation Engineer 7 19914 DEFT, OF FLai ii it iGiV JELGF�r1E�l� _15_ WE KEEP VIRGINIA MOVING 01414/1994 18:02 154072: 8 GREEN�JAY ENGIh' 7ING PAGE 02 Greenwood Volunteer .Fire & Rescue Company, Inc. P. O. Box 3023 Winchester, Virginia 22604 Special Board Meeting May 18, 1999 Meeting was opened by President, Charlie Dunn at 9 : *0 I+. m. Marla Smith of Greenway Engineering had a site plan and land swap for the dumpster site with the -County of Frederick after reviewing the plan $'ddie Keeler made a motion to move the dum�star site according to the site plan, extend leaoie:-to County of Frederick until 2004 at $300.00 dollars per month, seconded by Walt Cunningham, motion carried 10 yes, 1 no, and 1 abst, president did not cast a vote. MeetiAg adjourned Mime Clime, Secretary c/o to Mark Smith, Greenway Engineering -17- Frederick County Public Schools 1415 Amherst Street Post Office Box 3508 Winchester, Virginia 22604-2546 Telephone: (540) 662-3888 — FAX (540) 722-2788 Administrative Assistant to the Superintendent June 7, 1999 Mr. Ralph Beeman Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 REF: Rezoning Comments, Sheppard/Futral Parcel Dear Mr. Beeman: I am in receipt of your request for rezoning comments concerning a parcel of land to be rezoned from RA (Rural Area) to RP (Residential Performance). It is my understanding the proposed rezoning from RA to RP will allow the construction of approximately 293 single family homes. You have also indicated the land to be rezoned is approximately 132.70 acres in size and is at the following location: At the end of Eddy's Lane (Route 820) and adjacent to the Apple Ridge Subdivision. The prior approval of a number of subdivisions in this portion of Frederick County has resulted in the schools serving this area having student enrollment near or exceeding their design capacity. The cumulative impact of this project, along with the potential for the development of approved residential lots in this area, will necessitate the construction of additional school facilities requiring a significant expenditure of financial resources to accommodate growth in student enrollment. In addition to the initial capital expenditure needed for the construction of new school facilities, the process of providing educational services to the students generated by this rezoning will result in an increase to the annual operating cost of the school division. It is very important that the impact of the proposed rezoning on current and future school needs be considered during the approval process. Sincerely, Thomas Sullivan Administrative Assistant to the Superintendent p.c.: Dr. William C. Dean, Superintendent of Schools, Frederick County Public Schools Mr. Robert Cleaver, Assistant Superintendent for Administration, Frederick County Public Schools -19- Frederick County Public Schouls 1415 Amherst Street Post Office Box 3508 Winchester, Virginia 22604-2546 Telephone: (540) 662-3888 — FAX (540) 722-2788 Administrative Assistant to the Superintendent June 7 1999 Mr. Ralph Beeman, Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 REF: Rezoning Comments, Lynnehaven, L.C. Dear Mr. Beeman: I am in receipt of your request for rezoning comments concerning a proposal to rezone a parcel of land containing approximately 91.4 acres in the following manner: (1) 81.4 acres from RA (Rural Area) to RP and B2 (Residential Performance and Business General); and, (2) 10.0 acres from RA (Rural Area) to B2 (Business General). It is my understanding the proposed rezoning from RA to RP and B2 will allow the construction of approximately 203 single family units and commercial development of a maximum of 100,000 square feet in the areas designated RA and B2, respectively. You have also indicated the land to be rezoned is 91.4 acres in size and is at the following location: On the west side of Beans Pond Lane, 150' from the intersection with Senseny Road, and adjacent to the Carlisle Heights subdivision. The prior approval of a number of subdivisions in this portion of Frederick County has resulted in the schools serving this area having student enrollment near or exceeding their design capacity. The cumulative in;pact of this protect, al:,;,b =1,th the potc..0 for :e development of approved residential lots in this area, will necessitate the construction of additional school facilities requiring the expenditure of significant capital resources to accommodate growth in student enrollment. In addition to the initial expenditures needed for the construction of new school facilities, the process of providing educational services to the students generated by this rezoning will result in an increase to the annual operating cost of the school division. It is very important that the impact of the proposed rezoning on current and future school needs be considered during the approval process. Sincerely, Tomas Sullivan Administrative Assistant to the Superintendent p.c.: Dr. William C. Dean, Superintendent of Schools, Frederick County Public Schools Mr. Robert Cleaver, Assistant Superintendent for Administration, Frederick County Public Schools _21_ F,-derick County Public Schc.._.1s 1415 Amherst Street Post Office Box 3508 Winchester, Virginia 22604-2546 Telephone: (540) 662-3888 — FAX (540) 722-2788 Administrative Assistant to the Superintendent June 7 1999 Mr. Ralph Beeman, Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 REF: Rezoning Comments, Giles Farm Dear Mr. Beeman: I am in receipt of your request for rezoning comments concerning a proposal to rezone a parcel of land containing approximately 152.2 acres in the following manner: (1) 140.2 acres from RA (Rural Area) to RP (Residential Performance); and, (2) 12 acres from RA (Rural Area) to B2 (Business General). It is my understanding the proposed rezoning from RA to RP and B2 will allow the construction of approximately 350 single family units and commercial development of more than 120,000 square feet in the areas designated RA and B2, respectively. You have also indicated the land to be rezoned is approximately 152.2 acres in size and is at the following location: North side of Senseny Road, 650' east of Beans Pond Lane, across from the Burning Knolls subdivision and adjacent to the Bedford Village and Apple Ridge Subdivisions. The prior approval of a number of subdivisions in this portion of Frederick County has resulted in the schools serving this area having student enrollment near or exceeding their design capacity. The cumulative impact of this project, along with the potential for the development of approved residential lots in this area, will necessitate the c�rstr'a �i:; : of additio-ual school f:ici'lities requiring a significant expenditure of financial resources to accommodate growth in student enrollment. In addition to the initial capital expenditure needed for the construction of new school -facilities, the process of providing educational services to the students generated by this rezoning will result in an increase to the annual operating cost of the school division. It is very important that the impact of the proposed rezoning on current and future school needs be considered during the approval process. Sincerely, Thomas Sullivan Administrative Assistant to the Superintendent p.c.: Dr. William C. Dean, Superintendent of Schools, Frederick County Public Schools Mr. Robert Cleaver, Assistant Superintendent for Administration, Frederick County Public Schools -23- CIIANNI" 'G DRIVE REZONING REZONING APPLICATION FORM FREDERICK COUNTY, VIRGINIA The following information shall be provided by the applicant. All parcel identification numbers, deed book and page numbers may be obtained from the Office of the Commissioner of Revenue, Real Estate Division,107 North Kent Street, Winchester. 1. Applicant: Name: Greenway Engineering Address: 151 Windy Hill Lane Winchester, VA 22602 2. Property Owners (if different than above) Name: Robert A. Giles, et als 2309 Senseny Road Winchester, VA 22602 Name: Lynnehaven L. C. 112 N. Cameron Street Winchester, VA 22601 Name: Fu-Shep Farm Partnership 309 S. Stewart Street Winchester, VA 22601 3. Contact person if other than above Name: Mark D. Smith, P.E., L.S., Telephone: (540) 662-4185 SFY 1. i� �cqq DEPT. OF PLAiv'4"'4G/GEVELOP1VIENr. Telephone: (540) 667-4460 Telephone: (540) 662-0323 Telephone: (540) 667-1359 Telephone: (540) 662-4185 4. Checklist: Check the following items that have been included with this application. Location map X Agency Comments X Plat X Fees X Deed to property X Impact Analysis Statement X Verification of taxes paid X Proffer Statement X -25- 5. The Code of Virginia allows us to request full disclosure of ownership in relation to rezoning applications. Please list below all owners or parties in interest of the land to be rezoned: Wanda G. High, Janita Giles, Robert A. Giles, Richard F. Giles John Scully, Steve Bridgeforth Dr. George Sheppard, Dr. Allen Fdtral 6. A) Current Use of the Property: Agricultural, undeveloped 354.3 acres - Residential B) Proposed Use of the Property: 22.0 acres Commercial 7. Adjoining Property: Please see attached PARCEL ID NUMBER USE ZONING 8. Location: The property is located at (give exact location based on nearest road and distance from nearest intersection, using road names and route numbers): North side of Senseny Road, on both sides of Bean's Pond Lane, and adjacent to the Bedford Village, Apple Ridge, and Carlisle Heights subdivisions. -26- Information to be Submitted for Capital Facilities Impact Model In order for the Planning Staff to use its capital facilities impact model, it is necessary for the applicant to provide information concerning the specifics of the proposed use. Otherwise, the planning staff will use the maximum possible density or intensity scenario for the proposed Zoning District as described on Page 9 of the application package. 9. Parcel Identification/Location: 55-((A))-206, 209, 211, 213, & 65-((A))-30, 31, 39, 40 Districts Magisterial: Senseny Road High School: James Wood Fire Service: Greenwood Vol. Fire Co. Middle School: James Wood Rescue Service: Greenwood Vol. Fire Co. Elementary School: Senseny Road, Redbud 10. Zoning Change: List the acreage included in each new zoning category being requested. Acres Current Zoning Zoning Requested 354.3 RA RP 22.0 RA B2 376.3 Total acreage to be rezoned 11. The following information should be provided according to the type of rezoning proposed : Number of Units Proposed Single Family homes: 946 Townhome: Multi -Family: Non -Residential Lots: Mobile Home: Hotel Rooms: Square Footage of Proposed Uses Office: Service Station: Retail: 220,000 Manufacturing: Restaurant: Warehouse: Other: -27- 12. Signature: I (we), the undersigned, do hereby respectfully make application and petition the Frederick County Board of Supervisors to amend the zoning ordinance and to change the zoning map of Frederick County, Virginia. I (we) authorize Frederick County officials to enter the property for site inspection purposes. I (we) understand that the sign issued when this application is submitted must be placed at the front property line at least seven days prior to the Planning Commission public hearing and the Board of Supervisors' public hearing and maintained so as to be visible from the road right-of-way until the hearing. I (we) hereby certify that this application and its accompanying materials are true and accurate to the best of my (our) knowledge. Applicant: Owner(s): Date: Date: ' -1<I q Date: �- Date: Date: S T� Date: Date: C'9 _28_ Green way Engineering July 13,1999 Channing Drive Rezoning Application Giles Farm - Adjoining Property Owners Parcel First Name Last Name Addl Address City State Zip Code Zone Use 55-A-180,181 Eastern Frederick Development Co. P.O. Box 2097 Winchester VA 22601 RP 6 55-A-206 Lynnehaven, L.C. 112 N. Cameron Street Winchester VA 22601 RA 5 55-A-208 Martin Bean et ux 561 Beans Pond Road Winchester VA 22602 RA 2 55-A-209 Fu-Shep Farm Partnership 405 Briarmont Drive Winchester VA 22601 RA 6 65-A-30 Lynnehaven, L.C. 112 N. Cameron Street Winchester VA 22601 RA 2 65-A-34 Louella Parsons 2239 Senseny Road Winchester VA 22602 RA 2 65-A-36 Margaret Giles 2251 Senseny Road Winchester VA 22602 RA 2 65-A-37 Richard Giles et ux 2265 Senseny Road Winchester VA 22602 RA 2 65-A-38 Wanda High et als 2283 Senseny Road Winchester VA 22602 RA 2 65-A-40 Fu-Shep Farm Partnership 405 Briarmont Drive Winchester VA 22601 RA 6 65B-4-A-1 Robert Emmons et ux 2366 Senseny Road Winchester VA 22602 RP 2 65B-4-A-2 Charles Mellot et ux 2360 Senseny Road wnchester VA 22602 RP 2 65B-4-A-3 David Adams 1408 28th street Niceville FL 32578 RP 2 65B-4-A-4,5 Benton Heironimus 98 Dixie Belle Drive Winchester VA 22602 RP 2 65B-4-A-6 Teresa Bowers 2324 Senseny Road Winchester VA 22602 RP 2 65B-4-A-7, 9 Robert See et ux 2310 Senseny Road Winchester VA 22602 RP 2 65B-4-A-8 Robert See, Jr 2310 Senseny Road Winchester VA 22602 RP 2 65B-4-A-10,11 Robert Gilmer et ux 2286 Senseny Road Winchester VA 22602 RP '' 2 6513-5-1 Irene Jenkins 2374 Senseny Road Winchester VA 22602 RP 2 6513-5-2 John Keeler 2384 Senseny Road Winchester VA 22602 RP 2 65B-5-3 Melvin Kump et ux 2303 Senseny Road Winchester VA 22602 RP 2 65B-5-4 Charles Nickleson 108 Boad Avenue Winchester VA 22602 RP 2 6513-5-5, 6 Edward Snyder et ux 125 Boad Street Winchester VA 22602 RP 2 6513-5-7 Zane Kerns et ux 401 Three Oaks Road Winchester VA 22603 RP 2 6513-5-8 Elizabeth Mason et al 2444 Senseny Road Winchester VA 22602 RP 2 65B-5-9, 10 Shirley Lambert P.O. Box 362 Berryville VA 22611 RP 2 65E-1-31 Kenneth Williams et ux 428 Maple Avenue Waukesha WI 53188 RA 2 Green way Engineering July 13, 1999 Channing Drive Rezoning Application - Lynnehaven, L.C. - Adjoining Property Owners Parcel First Name Last Name Add? Address City State Zip Code Zone Use 55-((A))-181 Eastern Frederick P.O. Box 2097 Winchester VA 22604 6 RP 55-((A))-184A Greenwood Road P.O. Box 2097 Winchester VA 22604 5 RP 55-((A))-184C Eugene Grove et ux 340 W. Parkins Mill Rd Winchester VA 22602 5 RA 55-((A))-201 Orrick Cemetery Co., Inc 501 S. Braddock Winchester VA 22601 5 RA r,5-((A))-208 Martin Bean et ux 561 Beans Pond Lane Winchester VA 22602 2 RA ,jl-((I))-4-186 Gordon Greer et ux 308 Woodrow Rd Winchester VA 22602 2 RP 55I-((1))-4-187 Rex Pugh et ux 307 Woodrow Rd Winchester VA 22602 2 RP 55I-((1))-4-188 C. C. Longerbeam Inc. P.O. Box 3276 Winchester VA 22604 2 RP 55I-((1))-4-189 C. C. Longerbeam Inc. P.O. Box 3276 Winchester VA 22604 2 RP 55I-((1))-4-190 C. C. Longerbeam Inc. P.O. Box 3276 Winchester VA 22604 2 RP 55I-((1))-4-191 C. C. Longerbeam Inc. P.O. Box 3276 Winchester VA 22604 2 RP 551-((1))-4-192 C. C. Longerbeam Inc. P.O. Box 3276 Winchester VA 22604 2 RP 551-((1))-4-193 C. C. Longerbeam Inc. P.O. Box 3276 Winchester VA 22604 2 RP 5I-((1))-4-194 C. C. Longerbeam Inc. P.O. Box 3276 Winchester VA 22604 2 RP 55I-((1))-4-195 C. C. Longerbeam Inc. P.O. Box 3276 Winchester VA 22604 2 RP 55I-((1))-4-196 C. C. Longerbeam Inc. P.O. Box 3276 Winchester VA 22604 2 RP 55I-((1))-4-197 C. C. Longerbeam Inc. P.O. Box 3276 Winchester VA 22604 2 RP -1-((1))-4-198 C. C. Longerbeam Inc. P.O. Box 3276 Winchester VA 22604 2 RP 551-((1))-4-199 C. C. Longerbeam Inc. P.O. Box 3276 Winchester VA 22604 2 RP 55I-((1))-4-200 C. C. Longerbeam Inc. P.O. Box 3276 Winchester VA 22604 2 RP 55I-((1))-4-201 C. C. Longerbeam Inc. P.O. Box 3276 Winchester VA 22604 2 RP 551-((1))-4-202 C. C. Longerbeam Inc. P.O. Box 3276 Winchester VA 22604 2 RP 551-((1))-4-203 C. C. Longerbeam Inc. P.O. Box 3276 Winchester VA 22604 2 RP 65-((A))-23 Russell Moreland et ux 2105 Senseny Rd Winchester VA 22602 2 RA 65-((A))-24 Sharley Morris 2123 Senseny Rd Winchester VA 22602 2 RA 65-((A))-25 Gary Baker et ux 2135 Senseny Rd Winchester VA 22602 2 RA Greenway Engineering July 13, 1999 Channing Drive Rezoning Application Lynnehaven, L.C. - Adjoining Property Owners Parcel First Name Last Name Add? Address City State Zip Code Zone Use 65-((A))-25A Skip Baker P.O. Box 174 Stephenson . VA 22656 2 RA 65-((A))-25B Robert Byers et ux 2159 Senseny Rd Winchester VA 22602 2 RA 65-((A))-27 Douglas Clark et ux 2044 Senseny Rd Winchester VA 22602 2 RA 65-((A))-28 Douglas Clark et ux 2044 Senseny Rd Winchester VA 22602 2 RA 65-((A))-30 Lynnehaven L. C. 112 N. Cameron St Winchester VA 22601 2 RA -((A))-39 Wanda High et als 2283 Senseny Rd Winchester VA 22602 6 RA w Greenway Engineering July 13, 1999 Channing Drive Rezoning Application - Sheppard/Futral - Adjoining Property Owners Parcel First Name Last Name Addl Address City State Zip Code Zone Use 55-((A))-181 Eastern Frederick P.O. Box 2097 Winchester VA 22604 RP 6 55-((A))-210 Linden Adams et us 310 Eddys Lane Winchester VA 22602 RA 5 55-((A))-212 John Haggerty et al 5 Partridge Lane Lincoln MA 01773 RA 6 65-((A))-39 Wanda High et als 2283 Senseny Rd Winchester VA 22602 RA 6 65-((A))-41 Jasbo Inc. & Fred Glaize III P.O. Box 888 Winchester VA 22604 RP 5 65-((A))-195 Forest Riggleman et ux 2737 Senseny Road Winchester VA 22602 RA 5 65D-((I))-(3)-22 Lewis Strother, Sr. 101 Edgewood Drive Winchester VA 22602 RP 2 65E-((1))-13 David Critchley et ux 105 Wayfaring Drive Winchester VA 22602 RA 2 65E-((1))-14 Franklin Sholes et ux 102 Wayfaring Drive Winchester VA 22602 RA 2 65E-((I))-16 Charles Dawson et ux 129 Morning Glory Drive Winchester VA 22602 RA 2 65E-((1))-17 Dennis Conner et ux 131 Morning Glory Drive Winchester VA 22602 RA 2 65E-((1))-18 Scott Straub et ux 133 Morning Glory Drive Winchester VA 22602 RA 2 65E-((1))-19 Troy Bingman et ux 135 Morning Glory Drive Winchester VA 22602 RA 2 65E-((1))-20 John Ham, Jr. et ux 137 Morning Glory Drive Winchester VA 22602 RA 2 65E-((1))-21 Steven Jones 139 Morning Glory Drive Winchester VA 22602 RA 2 65E-((1))-22 Michael Brown et ux 141 Morning Glory Drive Winchester VA 22602 RA 2 65E-((1))-23 Edward Fawns et ux 143 Morning Glory Drive Winchester VA 22602 RA 2 65E-((1))-24 Marilyn Harold 145 Morning Glory Drive Winchester VA 22602 RA 2 65E-((1))-25 Anne Sendecke 147 Morning Glory Drive Winchester VA 22602 RA 2 65E-((1))-26 Timothy Schock et ux 149 Morning Glory Drive Winchester VA 22602 RA 2 65E-((1))-27 David Hyman et ux 151 Morning Glory Drive Winchester VA 22602 RA 2 65E-((1))-28, 29 William Machardy et ux 155 Morning Glory Drive Winchester Va 22602 RA 2 65E-((1))-30 Paul Nelson et ux 157 Morning Glory Drive Winchester VA 22602 RA 2 65E-((1))-31 Kenneth Williams et ux 428 Maple Avenue Waukesha WI 53188 RA 2 65E-((1))-32 Ronald Ladesic et ux 158 Morning Glory Drive Winchester VA 22602 RA 2 65E-((1))-33 Melco Inc. 609A Cedar Creek Grade Winchester VA 22601 RA 2 Greenway Engineering July 13, 1999 Channing Drive Rezoning Application w Sheppard/Futral - Adjoining Property Owners Parcel First Name Last Name Add'l Address City State Zip Code Zone Use 65E-((I))-34 John Swigart et ux 105 Primrose Place Winchester VA 22602 RA 2 65E-((I))-35 Leonard Williamson et ux 107 Primrose Place Winchester VA 22602 RA 2 65E-((1))-36 Bonnie Martin 109 Primrose Place Winchester VA 22602 RA 2 65E-((1))-37 Bruce Everett et ux 111 Primrose Place Winchester VA 22602 RA 2 65E-((1))-38 Michael Wade et ux 113 Primrose Place Winchester VA 22602 RA 2 65E-((2))-10 Howard Dunn et ux 115 Bedford Drive Winchester VA 22602 RP 2 65E-((2))-1 l Mary Coston 113 Bedford Drive Winchester VA 22602 RP 2 65E-((2))-12 Betty Mullen I I I Bedford Drive Winchester VA 22602 RP 2 65E-((2))-13 Dennis Grubbs 109 Bedford Drive Winchester VA 22602 RP 2 65E-((2))-14 Leslie Hubbard 107 Bedford Drive Winchester VA 22602 RP 2 65E-((2))-15 Paul Miller 3203 Patterson Avenue Richmond VA 23221 RP 2 65E-((2))-16 Michael Swedberg et ux 103 Bedford Drive Winchester VA 22602 RP 2 Green way Engineering July 2, 1999 ,manning Drive Rezoning CHANNING DRIVE REZONING PROPERTY ID NUMBERS 55-((A))-206, 209, 211, 213 & 65-((A))-30, 31, 39, 40 Pursuant to Section 15.2 - 2296 Et Seq., of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia shall approve rezoning application #1 for the rezoning of approximately 354.3 acres from the Rural Areas (RA) zoning district to the Residential Performance (RP) zoning district, and the rezoning of 22.0 acres from the Rural Areas (RA) zoning district to the Business General (B2) zoning district, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the applicant and such be approved by the Frederick County Board of Supervisors in accordance with said code and zoning ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and of no effect whatsoever. These proffers shall be binding upon the applicant and their legal successors, heirs, or assigns. ARTICLE I: PHASED CONSTRUCTION PLAN This article shall apply to the following parcels: Lynnehaven, L.C.: 55-((A))-206, and 65-((A))-30, 31 Giles Farm: 65-((A))-39 Sheppard/Futral: 55-((A))-209, 211, 213 and 65-((A))-40 The total number of residential building permits that may be issued for any parcel within the subject property in combination with all other above -referenced parcels shall not exceed the following phasing schedule: -35- Green way Engineering July 2, 1999 anning Drive Rezoning Year 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 Permits Issued to Date 79 158 237 316 395 474 553 632 711 790 846 ARTICLE II: LYNNEHAVEN, L. C. This article shall apply only to those properties currently owned by Lynnehaven, L.C., property identification numbers 55-((A))-206, and 65-((A))-30,31. The subject properties are more particularly described as all of the land owned by Lynnehaven, L.C. as recorded in Deed Book 843 at Pages 415, 418, and 424 and reported to collectively contain 91.4 acres. The conditions proffered are as follows: A) AREA ZONED RP - 81.4 ACRES 1. MAXIMUM DENSITY The total number of lots shall be limited so as not to exceed a 2.5 unit per acre density for the entire subject area. 2. PROHIBITED UNIT TYPES Townhouses, weak -link townhouses, and garden apartments, as defined in the Frederick County Zoning Ordinance, shall not be permitted. 3. PEDESTRIAN WALKWAYS Pedestrian walkways shall be provided in the master development plan in addition to required sidewalks. Nature trails shall be constructed by the applicant in open space areas, in dedicated easements, and in tandem with the regional stormwater management network. Said trails shall also link to similar trail systems in adjacent housing developments, and shall be six feet wide with a wood chip or mulched surface. See Exhibit A attached. 2 -36- Green way Engineering July 2, 1999 anning Drive Rezoning 4. SOLID WASTE The owners of the subject property shall pay $100.00/mo. to Frederick County for the use of the solid waste facility located on the Greenwood Volunteer Fire Company property and serving the Greenwood/Senseny Road area. Said payment shall be made from the time Frederick County encumbers and signs a new lease for the expansion of said facility, or acquires another facility serving this general area, and shall continue for a period of ten years, or the term of said lease, whichever is less. B) AREA ZONED B2 -10.0 ACRES 1. PROHIBITED USES The following uses shall not be permitted on the subject property: Description SIC Automotive dealers 55 Hotels and motels 701 Organization hotels and lodging 704 Golf driving ranges & miniature golf courses 7999 Self-service storage facilities --- Commercial batting cages operated outdoors --- u F.A.14ikyj t019111 In the B2 area established by this rezoning, the maximum cumulative floor area of all buildings in said B2 area shall not exceed 100,000 square feet. 3. BUILDING FACADES Commercial structures within the proposed B2 area shall be faced with brick, drivet, or architectural block on three (3) sides. C) ENTIRE PARCEL 1. CHANNING DRIVE Channing Drive is a new major collector which will be constructed along the eastern boundary of the subject property. Channing Drive shall consist of an 80' dedicated right-of-way with two 12' lanes, along with any associated turn lanes required by the Virginia Department of Transportation. This thoroughfare will be built in sections as warranted by adjacent development. The following criteria establish when the property owner is required to extend Channing Drive: 3 -37- Greenway Engineering July 2,1999 anning Drive Rezoning a) Each subdivision plan for residential housing adjacent to a portion of Channing Drive that has not yet been constructed shall include the construction of the adjacent portion of said drive in the subdivision plan. b) The construction of the first section of Channing Drive, from Senseny Road to the proposed B2 area, shall be included in the first site plan submitted for the B2 area if said road section has not yet been constructed. c) All of Channing Drive from Valley Mill Road to Senseny Road shall be constructed, open for traffic and dedicated to Frederick County before the 475th residential building permit is issued for any of the parcels listed in Article I of this proffer. 2. TRAFFIC SIGNALS a) The installation of a traffic signal at the intersection of Senseny Road and Channing Drive shall be included in the first site plan submitted for the B2 area, if a traffic signal has not yet been installed at said intersection should residential traffic meet signalization warrants. The developer agrees to enter into a signal agreement with VDOT prior to final site plan approval. b) The owners shall make a $25,000 cash contribution towards the installation of a traffic signal at the intersection of Greenwood Road (Route 656) and Senseny Road (Route 657). This contribution shall be made to the Virginia Department of Transportation upon their request and upon approval by said department for the installation of this traffic signal. In the event a traffic signal is installed at said intersection before this contribution is made, the Virginia Department of Transportation may request the transfer of said contribution towards signalization at the intersection of Greenwood Road (Route 656) and Valley Mill Road (Route 659). The developer agrees to enter into a signal agreement with VDOT prior to final subdivision and/or site plan approval. 3. BRIDGE IMPROVEMENTS There is currently a one -lane bridge on Valley Mill Road where it crosses Abrams Creek. The owners of the subject property shall pay towards feasibility studies, engineering, or construction of improvements to this crossing. These monies, paid to Frederick County, VA, are to be set aside for said improvements, and may be considered by the county for matching funds. Said payments shall be $100.00 per residential lot, at the time the initial building permit is issued for said lot. The owner of the subject property shall be required to pay said monies until the Virginia Department of Transportation awards a contract for a two lane expansion and construction of these improvements on said bridge. 4. TURN LANES AND RIGHT OF WAY DEDICATION a) Right and left turn lanes shall be constructed on Senseny Road at the intersection with Channing Drive. Said lanes shall be constructed by the applicant at the time Channing Drive is connected to Senseny Road. b) Right and left turn lanes shall be constructed on Charming Drive at the intersection with the main entrance road into the Lynnehaven subdivision. 4 -38- Green way Engineering July 2, 1999 canning Drive Rezoning c) The installation of a total of two turn lanes at the intersection of Senseny Road and Greenwood Road shall be included in the first site plan submitted for the B2 area, if two turn lanes have not yet been installed at said intersection. The necessity of said turn lanes, and their configuration will be subject to later review by the Virginia Department of Transportation. The owners of the subject property shall install said turn lanes or pay to the Virginia Department of Transportation up to $15,000 per turn lane towards the installation of said turn lanes. d) This paragraph shall apply to parcels 55-((A))-206, and 65-((A))-39: The first site plan submitted for either of these parcels which will result in more than 120,000 sf of commercial area for both parcels collectively shall result in an updated traffic study to determine if additional offsite improvements are required. Said traffic study shall require approval by the Virginia Department of Transportation. 5. DRAINAGE AND WETLANDS DEVELOPMENT Sediment forebays shall be constructed upstream of Twin Lakes in order to decrease the siltation of said lake and settle out man-made impurities. These sediment forebays shall be constructed in such a way as to encourage their development into a wetland with locally indigenous vegetation and wildlife. 6. MONETARY CONTRIBUTION a) Residential: In the event rezoning application # is approved for rezoning, the owners of the subject property will pay to the Treasurer of Frederick County, Virginia, $3,278.31 per residential lot prior to the initial building permit being issued for said lot. This per lot monetary proffer provides for: $2,694.11 for Frederick County Public Schools $539.07 for Frederick County Parks and Recreation $45.13 for Frederick County Fire and Rescue These payments are intended to offset the additional cost to Frederick County due to an increased demand on public services. b) Commercial: In the event rezoning application # is approved for rezoning, the owners of the subject property will pay to the Treasurer of Frederick County, Virginia, $3,245.60 prior to the initial building permit being issued within the B2 zoned area. This monetary contribution is intended to offset the additional capital costs to Frederick County for fire and rescue services. 5 -39- Greenway Engineering July 2,1999 anning Drive Rezoning ARTICLE III. ROBERT A. GILES, et als This article shall apply only to that property currently owned by Robert A. Giles, et als, property identification number 65-((A))-39. The subject property is more particularly described as all of the land owned jointly by Wanda G. High, Janita Giles, Robert A. Giles, and Richard F. Giles as recorded in Will Book 79, page 317, and in Deed Book 889 at Page 741 and further described by a survey by Curtis L. McAllister dated February 13, 1990 and reported to contain 152.20 acres. The conditions proffered are as follows: A) AREA ZONED RP -140.2 ACRES 1. MAXIMUM DENSITY The total number of lots shall be limited so as not to exceed a 2.5 unit per acre density for the entire subject area. 2. PROHIBITED UNIT TYPES Townhouses, weak -link townhouses, and garden apartments, as defined in the Frederick County Zoning Ordinance, shall not be permitted. 3. RECREATION CENTER A community recreation center shall be included in the master development of the subject site. This recreation center shall have a floor area of at least 3,000 square feet and shall include a pool and an outdoor multi -purpose playing court; the facade shall be constructed of brick, wood product, masonry, or drivet. Said facility shall be open for membership by residents of all subdivisions resulting from this Channing Drive Rezoning and shall also be open for membership to all other area residents. 4. PEDESTRIAN WALKWAYS Pedestrian walkways shall be provided in the master development plan in addition to required sidewalks. Nature trails shall be constructed by the applicant in open space areas, in dedicated easements, and in tandem with the regional stormwater management network. Said trails shall also link to similar trail systems in adjacent housing developments, and shall be six feet wide with a wood chip or mulched surface. See Exhibit A attached. 5. SOLID WASTE The owners of the subject property shall pay $100.00/mo. to Frederick County for the use of the solid waste facility located on the Greenwood Volunteer Fire Company property and serving the Greenwood/Senseny Road area. Said payment shall be made from the time Frederick County encumbers and signs a new lease for the expansion of said facility, or acquires another facility serving this general area, and shall continue_ for a period of ten years, or the term of said lease, whichever is less. -40- Green way Engineering July 2, 1999 canning Drive Rezoning B) AREA ZONED B2 -12.0 ACRES 1. PROHIBITED USES The following uses shall not be permitted on the subject property: Description SIC Automotive dealers 55 Hotels and motels 701 Organization hotels and lodging 704 Golf driving ranges & miniature golf courses 7999 Self-service storage facilities --- Commercial batting cages operated outdoors --- 2. MAXIMUM BUILDOUT In the B2 area established by this rezoning, the maximum cumulative floor area of all buildings in said B2 area shall not exceed 120,000 square feet. 3. BUILDING FACADES Commercial structures within the proposed B2 area shall be faced with brick, drivet, or architectural block on three (3) sides. C) ENTIRE PARCEL 1. CHANNING DRIVE Channing Drive is a new major collector which will be constructed along the western boundary of the subject property. Channing Drive shall consist of an 80' dedicated right-of-way with two 12' lanes, along with any associated turn lanes required by the Virginia Department of Transportation. This thoroughfare will be built in sections as warranted by adjacent development. The following criteria establish when the property owner is required to extend Channing Drive: a) Each subdivision plan for residential housing adjacent to a portion of Channing Drive that has not yet been constructed shall include the construction of the adjacent portion of said drive in the subdivision plan. b) The construction of the first section of Channing Drive, from Senseny Road to the proposed B2 area, shall be included in the first site plan submitted for the B2 area if said road section has not yet been constructed. 7 -41- Greenway Engineering July 2, 1999 anning Drive Rezoning c) All of Channing Drive from Valley Mill Road to Senseny Road shall be constructed, open for traffic and dedicated to Frederick County before the 475th residential building permit is issued for any of the parcels listed in Article I of this proffer. 2. STREETSCAPE The main entrance road into the residential subdivision established on the Giles Farm property shall have four travel lanes, and shall have a median strip at least 10 feet wide. Said roadway shall be streetscaped with deciduous trees (at least one tree per 80 lineal feet), ground cover and shrubbery as allowed by the Virginia Department of Transportation. 3. TRAFFIC SIGNALS a) The installation of a traffic signal at the intersection of Senseny Road and Channing Drive shall be included in the first site plan submitted for the B2 area, if a traffic signal has not yet been installed at said intersection should residential traffic meet signalization warrants. The developer agrees to enter into a signal agreement with VDOT prior to final site plan approval. b) The owners shall make a $25,000 cash contribution towards the installation of a traffic signal at the intersection of Greenwood Road (Route 656) and Senseny Road (Route 657). This contribution shall be made to the Virginia Department of Transportation upon their request and upon approval by said department for the installation of this traffic signal. In the event a traffic signal is installed at said intersection before this contribution is made, the Virginia Department of Transportation may request the transfer of said contribution towards signalization at the intersection of Greenwood Road (Route 656) and Valley Mill Road (Route 659). The developer agrees to enter into a signal agreement with VDOT prior to final subdivision and/or site plan approval. 4. BRIDGE IMPROVEMENTS There is currently a one -lane bridge on Valley Mill Road where it crosses Abrams Creek. The owners of the subject property shall pay towards feasibility studies, engineering, or construction of improvements to this crossing. These monies, paid to Frederick County, VA, are to be set aside for said improvements, and may be considered by the county for matching funds. Said payments shall be $100.00 per residential lot, at the time the initial building permit is issued for said lot. The owner of the subject property shall be required to pay said monies until the Virginia Department of Transportation awards a contract for a two lane expansion and construction of these improvements on said bridge. 5. TURN LANES AND RIGHT OF WAY DEDICATION a) Right and left turn lanes shall be constructed on Senseny Road at the intersection with Channing Drive. Said lanes shall be constructed by the applicant at the time Channing Drive is connected to Senseny Road. b) Right and left turn lanes shall be constructed on Senseny Road at the intersection with the main entrance road into the Giles Farm subdivision. -42- Greenway Engineering July 2,1999 anning Drive Rezoning c) Right-of-way shall be dedicated to the Commonwealth of Virginia along the entire frontage of Senseny Road. Said right-of-way shall extend 40' from the existing road centerline. d) The installation of a total of two turn lanes at the intersection of Senseny Road and Greenwood Road shall be included in the first site plan submitted for the B2 area, if two turn lanes have not yet been installed at said intersection. The necessity of said turn lanes, and their configuration will be subject to later review by the Virginia Department of Transportation. The owners of the subject property shall install said turn lanes or pay to the Virginia Department of Transportation up to $15,000 per turn lane towards the installation of said turn lanes. e) This paragraph shall apply to parcels 55-((A))-206, and 65-((A))-39: The first site plan submitted for either of these parcels which will result in more than 120,000 sf of commercial area for both parcels collectively shall result in an updated traffic study to determine if additional offsite improvements are required. Said traffic study shall require approval by the Virginia Department of Transportation. 6. DRAINAGE AND WETLANDS DEVELOPMENT Sediment forebays shall be constructed upstream of Twin Lakes in order to decrease the siltation of said lake and to settle out man-made impurities. These sediment forebays shall be constructed in such a way as to encourage their development into a wetland with locally indigenous vegetation and wildlife. 7. MONETARY CONTRIBUTION TO OFFSET IMPACT OF DEVELOPMENT a) Residential: In the event rezoning application # is approved for rezoning, the owners of the subject property will pay to the Treasurer of Frederick County, Virginia, $3,558.73 per residential lot prior to the initial building permit being issued for said lot This per lot monetary contribution provides for: $2,958.80 for Frederick County Public Schools $554.80 for Frederick County Parks and Recreation $45.13 for Frederick County Fire and Rescue These payments are intended to offset the additional cost to Frederick County due to an increased demand on public services. b) Commercial: In the event rezoning application # is approved for rezoning, the owners of the subject property will pay to the Treasurer of Frederick County, Virginia, $3,898.68 prior to the initial building permit being issued within the B2 zoned area. This monetary contribution is intended to offset the additional capital costs to Frederick County for fire and rescue services. 9 -43- Green way Engineering July 2, 1999 canning Drive Rezoning ARTICLE IV: DRS. GEORGE SHEPPARD & ALLEN FUTRAL This article shall apply only to those properties currently owned by Drs. George Sheppard & Allen Futral, property identification numbers 55-((A))-209, 211, 213, and 65-((A))-40. The subject property is more particularly described as all of the land owned by Fu-Shep Farm Partnership as recorded in Deed Book 789 at Page 1022 and further described by a survey by Curtis L. McAllister dated February 13, 1990. The conditions proffered are as follows: 1. MAXIMUM DENSITY The total number of parcels shall be limited so as not to exceed a 2.2 unit per acre density for the entire collective area for parcels 55-((A))-209, 211, and 213, and a 2.5 unit per acre density for parcel 65-((A))-40. 2. PROHIBITED UNIT TYPES Townhouses, weak -link townhouses, and garden apartments, as defined in the Frederick County Zoning Ordinance, shall not be permitted. 3. PEDESTRIAN WALKWAYS Pedestrian walkways shall be provided in the master development plan in addition to required sidewalks. Nature trails shall be constructed by the applicant in open space areas, in dedicated easements, and in tandem with the regional stormwater management network. Said trails shall also link to similar trail systems in adjacent housing developments, and shall be six feet wide with a wood chip or mulched surface. See Exhibit A attached. 4. SOLID WASTE The owners of the subject property shall pay $100.00/mo. to Frederick County for the use of the solid waste facility located on the Greenwood Volunteer Fire Company property and serving the Greenwood/Senseny Road area. Said payment shall be made from the time Frederick County encumbers and signs a new lease for the expansion of said facility, or acquires another facility serving this general area, and shall continue for a period of ten years, or the term of said lease, whichever is less. 5. CHANNING DRIVE All of Channing Drive from Valley Mill Road to Senseny Road shall be constructed, open for traffic and dedicated to Frederick County before the 475th residential building permit is issued for any of the parcels listed in Article I of this proffer. 10 -44- Greenway Engineering July 2, 1999 fanning Drive Rezoning 6. TRAFFIC SIGNAL The owners shall make a $25,000 cash contribution towards the installation of a traffic signal at the intersection of Greenwood Road (Route 656) and Senseny Road (Route 657). This contribution shall be made to the Virginia Department of Transportation upon their request and upon approval by said department for the installation of this traffic signal. In the event a traffic signal is installed at said intersection before this contribution is made, the Virginia Department of Transportation may request the transfer of said contribution towards signalization at the intersection of Greenwood Road (Route 656) and Valley Mill Road (Route 659). The developer agrees to enter into a signal agreement with VDOT prior to final subdivision and/or site plan approval. 7. BRIDGE IMPROVEMENTS There is currently a one -lane bridge on Valley Mill Road where it crosses Abrams Creek. The owners of the subject property shall pay towards feasibility studies, engineering, or construction of improvements to this crossing. These monies, paid to Frederick County, VA, are to be set aside for said improvements, and may be considered by the county for matching funds. Said payments shall be $100.00 per residential lot, at the time the initial building permit is issued for said lot. The owner of the subject property shall be required to pay said monies until the Virginia Department of Transportation awards a contract for a two lane expansion and construction of these improvements on said bridge. 8. DRAINAGE AND WETLANDS DEVELOPMENT Sediment forebays shall be constructed upstream of Twin Lakes in order to decrease the siltation of said lake and to settle out man-made impurities. These sediment forebays shall be constructed in such a way as to encourage their development into a wetland with locally indigenous vegetation and wildlife. 9. MONETARY CONTRIBUTION TO OFFSET IMPACT OF DEVELOPMENT In the event rezoning application # is approved, and the property is subsequently developed within an RP zone, the undersigned will pay to the Treasurer of Frederick County, Virginia $4,205.14 per residential lot prior to the initial building permit being issued for said lot. This per lot monetary contribution provides for: $3,568.94 for Frederick County Public Schools $591.07 for Frederick County Parks and Recreation $45.13 for Frederick County Fire and Rescue This payment is intended to offset the additional cost to Frederick County due to an increased demand on public services. 11 -45- Green way Engineering July 2, 1999 canning Drive Rezoning ARTICLE V: SIGNATURES The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the applicant and owner. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: v Robert A. Giles, Executor, Giles Farm Commonwealth of Virginia, U CA/County f r z� k �. To Wit: The foregoing instrument was acknowledged before me this day � of 4, o4^,Y2:��, 1999 by � z D2p--"� ��'Ta-Lnv Notary Public t C My Commission Expires ( 1 C'114 ohn Scully, tynInehavet9IX Commonwealth of Virginia, O City ount of y- o�'y t' To Wit: The foregoing instrument was acknowledged before me this day of �-,A,1999 by Notary Public My Commission Expires % i 12 -46- Green way Engineering July 2, 1999 canning Drive Rezoning am "A Dr. George Sheppard' W Marie Sheppard Commonwealth of Virginia, City/�Coun�of �".Jl_ Q 0 n 1 C' To Wit: The foregoing instrument was acknowledged before me this �1 day of Q.U.011,0, 1999 by D Notary Public My Commission Expires 1 ` 1c,'�-r- QCOC , �ol Dr. Allen Futral f �etty Futral Commonwealth of Virginia, U City/ ounty f'-r 9 k 0 L To Wit: The foregoing instrument was acknowledged before me this day ofOj-�al , . , 1999 by r l / Notary Public My Commission Expires `1 � I -� �C`� J\� k ` , 13 -47- Wol 6%1 IMPAC'T,STATEMENT PROPERTY ID NUMBERS 55-((A))-209, 211,213 and 65-((A))-40 REZONING APPLICATION January 7,1999 Greenaway Engineering 151 Windy Hill Lane Wnchesmr, VA 22602 -51- Greenway Engweering January 7, I999 Aeppar¢dl al IpWaet Stater wqt INTRODUCTION The subject property, tax map nos. 55-((A))-209, 211, 213, and 65-((A))-40, is a contiguous group of parcels located between Valley Mill Road (Route 659) and Senseny Road (Route 657). Eddy's Lane (Route 820) terminates on the subject site, and the Apple Ridge subdivision borders the property. The total acreage for these parcels is 132.70 acres. The current zoning is Rural Areas (RA), and the proposed zoning is Residential Performance (RP). This report has been prepared for the purpose of assessing the impact on Frederick County by this rezoning. SITE SIJMBII.ITY The subject property is located within the "Urban Development Area" as defined within the Frederick County Comprehensive Poligy Plan. This designation reflects the intention of Frederick County to allow for more intensive development on the subject site. The purpose of this area designation is to direct the expansion and improvement of public utilities and infrastructure to areas that will be intensively developed. Flood Plains The subject site is located on FEMANFIP map # 510063-0120-B. The site is located within a "ZONE C" area. No portion of the subject site is in a 100 yr. flood plain. The site does include intermittent streams, as well as a natural impoundment known as Twin Lakes. Wetlands Twin Lakes is listed in the National Wetlands Inventory Map as a wetland. Mature Woodlands Approximately 35%of the subject site is wooded. This estimate is based on aerial mapping, and has not been conclusively verified on the ground. Soil Types Information for soil types on this site has been obtained from the Soil Survey of Frederick Counter Virginia, by the USDS Soil Conservation Service. Prime Agricultural Soils Only 10% of the subject property contains soils that are suited to cultivated crops or hay. Approximately 35% of the site could be used for pasture. _52_ Greenway Engineering January 7, 1999 Sheppardl/ lal Inspact Statement Steep Slopes Approximately 401/6 of the subject property includes slopes greater than 15%. These areas are located along the intermittent streams, and along established drainways. The site will be graded to insure its usability for residential housing, while leaving intact the areas of steep slopes nearest the established drainways, and meeting all zoning requirements. Construction Concerns There are several aspects of the soils and the geology of the subject site that will need to be addressed in order to establish a residential community on this property. The depth to shale bedrock ranges from 15 to 30 inches. This will present some grading difficulties, requiring more fill to be placed than cut. Some of the shale can be reused as fill, since it is generally friable. There is a seasonal high water table on roughly 5 acres of the subject site. Between October and April, the water table in these areas is within six inches of the surface. This feature will present only a minor obstacle, which can be surmounted with proper grading and sound geotechnical design. Steep slope is also listed as a limitation to development, but by ordinance only 25% can be developed. In conclusion, proper design and construction techniques will be used so that the soil and geology of the subject property will not interfere with the proposed development. All of the properties adjoining the subject site are either undeveloped or are single-family homes, and are zoned either Rural Areas (RA) or Residential Performance (RP). The homes on the adjoining lots in the Apple Ridge subdivision are within 50' of the subject property. All other homes on adjoining parcels are greater than 100' of the adjoining boundary. BASIS FOR DETERMEqLNG EMPACT The subject property is currently zoned "RA". It is expected that the 132.70 acre site could be developed under an RA zone to include 26 dwelling units. W -53- Greenway Engineering January 7, 1999 Shear& rat InWad &atenwnt The density of parcels 55-((A))-209, 211, & 213, having a total area of 128.76 acres, have been limited by proffer to 2.2 dwelling units per acre. The density of parcel 65-((A))-40, with 3.94 acres has been limited by proffer to 2.5 dwelling units per acre This works out to a maximum potential of 293 units. TRAFFIC ANALYSIS Traffic Data The existing traffic data was supplied by VDOT Office Services Specialist, Vega Ziemer (Edinburg office): EXISTING TRAFFIC COUNTS Date of ADT Road Stud(vehicles/day) Route 655 1993 2,522 between Winchester and 656 Route 656 1995 2,376 between Rte 659S & Rte 7W Route 656 1995 4,237 between Rte 657 & Rte 659S Route 656 1995 3,041 between Rte 655 & Rte 657 Route 657 1993 8,027 between Winchester and 656 Route 657 1995 4,779 between Routes 656 and 736 Route 657 1995 1,231 between Rte 736 and Clarke Co. Route 659 1995 4,524 between 658 and 656N. Route 659 1993 401 between Rte 656N & Rte 7 Route 7 1996 17,000 between Winchester and Clarke Co. U. S. Route 50 1996 18,000 between Rte 522 & Rte 723W VDOT has classified Route 657 (Senseny Road), Route 659 (Valley Mill Road), Route 656 (Greenwood Road), and Route 655 (Sulphur Springs Road) as major collectors. -54- Greenway Engineering January 7, 1999 S'hWardi. -ral Impad Statement Trip Generation The following table is based on trip data taken from the ITE Trip Generation Manual, a Edition: TRIP GENERATION DATA Zone Use Density PEAK HOUR TRIPS AMI PM ADT Entering Exiting Entering Exiting vehicles/day) Existing RA Single Family Detached 26 5 15 17 10 249 RP Single Family Detached 293 56 169 191 108 2,804 Increase: 2,555 The development of the rezoned site at the maximum density could therefore generate a traffic increase of approximately 2,550 trips per day. Traffic Impact Traffic impacts were determined using the following estimated traffic split: Lra fficTh 5% will travel through Carlisle Heights and the other minor collector road to Rte 656. 40% of the increased traffic will travel Rte 657 into the City of Winchester. 20% will travel Rte 657 to Rte 656, then south to Route 50. 5% will travel Rte 657 east into Clarke County. 5% will travel Rte 659 east to Route 7. 12% will travel Rte 659 west to Rte 656, and then north on Rte 656. 13% will travel Rte 659 west to Route 7, and & I-81. The following table shows the increase in traffic on the local road network as compared to current traffic counts and expected traffic volumes on these roads in 2010. 4 _55_ Greenway Engweerwg JanuaPy 7, d 999 Sheppar&- ..Pad Impact Statement TRAFFIC FACT ON L®CAI, ROADS Road Traffic Impact from Site Traffic - 1999* Traffic - 2010* (vehicles/day) (vehicles/day) (vehicles/day) Route 655 (Sulpher Spr. Rd) 511 3,100 4,530 between Winchester & Rte 656 Route 656 (Greenwood Rd) 307 2,726 3,980 between Rte 659S & Rte 7W Route 656 (Greenwood Rd) 128 4,862 7,098 between Rte 657 & Rte 659E Route 656 (Greenwood Rd) 511 3,490 5,095 between Rte 655 & Rte 657 Route 657 (Senseny Rd) 1,022 9,870 14,400 Winchester & Rte 656 Route 657 (Senseny Rd) 1,533 5,484 8,006 from site west to Rte 656 Route 657 (Senseny Rd) 128 1,413 2,062 from site east to Clarke County Route 659 (Valley Mill Road) 332 5,190 7,580 between Rte 658 & 656 Route 659 (Valley Mill Road) 639 460 720 from site west to Rte 656 Route 659 (Valley Mill Road) 128 460 720 from site east to Rte 7 Route 7 434 18,850 27,520 between Winchester & Clarke Co. U.S. Route 50 511 19,960 29,140 between Rte 522 & Rte 723W * Projected traffic counts (both year 1999 and year 2010) were calculated using a 3.5% growth rate. Traffic Summary The traffic increases are fairly substantial on Senseny Road. Although there is a fairly significant increase on Valley Mill Road, from the site west to Greenwood Road, the existing and projected traffic counts are quite low. The owner has limited the density of dwelling units on the subject property, resulting in a maximum buildout of 293 units. The unproffered potential of this property is 530 dwelling units, which would create 81% more traffic from the subject site than the proffered density. Additionally, The proffered construction phasing plan will reduce the rate of traffic increases on the local road network. Therefore, while the traffic increases are substantial, the proffers that the owner has made will lessen the impact of this new development on the local road network. 5 -56- Greenway Engineering January 7, 1999 Sheppar&- ..raI IWact Statement WATER SUPPLY The impact of this proposed development on water supply systems is based on design volumes supplied by the FCSA, and on maximum dwelling units in the proffered zoning. The total design consumption can be determined by the following formula: Consumption per dwelling unit = 275 gpd Number of units = 293 Total Residential Consumption = 293 units x 275 gpd = 80,575 gpd Therefore, the total water consumption for the subject property at maximum buildout is approximately 80,600 gpd. There is currently an 8" water main located along Senseny Road, as well as an available connection to an 8" line near the Apple Ridge subdivision. According to Mr. John Whitacre of the FCSA, a water main will have to be looped through the site. SEWAGE CONVEYANCE AND TREATI%HNT Based on our water consumption, the proposed proffered zoning will add 80,600 gpd to the sewage conveyance system at maximum buildout. Mr. John Whitacre of the Frederick County Sanitation Authority was consulted regarding sewer design criteria for a sewer system serving the subject site and the neighboring Giles Farm and Lynnehaven properties. The ultimate severing of the three project area will be by a regional pump station that is proposed adjacent to Twin Lakes. By this regional concept, gravity sewer lines will follow the roads and ravines to the proposed pump station. As agreed with the Frederick County Sanitation Authority, construction of the proposed pump station, will be the sole responsibility of the parties involved in the three project development. Once in operation and accepted by the Frederick County Sanitation Authority, the ownership and maintenance of the pump station will become the responsibility of said agency. With the completion of the proposed pump station, several other projects will have the ability to connect by gravity into this system, allowing some smaller pump stations, such as the Apple Ridge station, to come off-line. _57_ Greenway Engineering January 7, 1999 Sheppar&- .crud Impact SY&evwnf DRAINAGE There are four intermittent streams on the subject property — three feeding into and one exiting Twin Lakes. Stormwater runoff from the entire site flows into this lake via established swales, drainways, and these intermittent streams. The flow exiting Twin Lakes empties into the Opequon Creek. Twin Lakes will become the backbone of a new, regional stormwater management system. A series of smaller, dry detention basins, along with sediment forebays will be developed upstream of Twin Lakes to reduce peak flows and control water quality. The stormwater management network will be developed in tandem with the nature trail system. The trail crossings of small tributaries will act as embankments for the sediment forebays. In time, wetlands should develop in these areas which will serve dual purposes of sediment removal and adding a natural wetland that can be observed through the trail system. The majority of the three -project area (Giles Farm, Sheppard/Futral, & Lynnehaven properties) naturally drains to the Twin Lakes facility. However, there is a small area adjacent to Senseny Road and the Apple Ridge Subdivision, and also an area near the Carlisle Heights subdivision, that will require a separate peak reduction as it releases through the storm sewer networks of the these subdivisions. With this regional approach, stormwater management for the three -project area will be adequately satisfied. SOLID WASTE DISPOSAL The following calculations were made to estimate the maximum impact of solid waste generated on the subject site, using design criteria from the Civil Engineering Manual, 4 h Edition. The design factors are standard for residential units. generation rate in ids = (population size)X(waste in lbm/capita-day)X(loadin facto actor day compacted density in lbm/cu yd population size = (2.75 persons/household) X (293 dwelling units) = 806 persons waste = 5 lbm/capita-day loading factor =1.25 density =1000 lbm/cu yd Total residential volume = 5 cu yds day Annually, the generated solid waste volume will be: Total residential volume = 5 cu yds X 365 days = 1,825 cu yds day yr yr Therefore, the total solid waste generated by the subject site is estimated to be 1,825 cubic yards annually. VA _58_ Greemvay Engineering January 7, 1999 5neppar& -Arai lmTad Statement HISTORIC SITES AND STRUCTURES The Carter-Lee-Damron house is located on the subject property at the end of Route 820. The historic home identified as Tick Bill is located on adjoining parcel 65-((A))-195, approximately 550' from the adjoining boundary. Adams Farm is to the north of the subject property, and is around 400' from the adjoining boundary. The Haggerty house is approximately 600' west of the subject site. There are also some structures on adjoining parcel 65-((A))-39, that are listed in the Rural Landmarks Survey Report simply as "Outbuildings, Rte 657." None of these structures are "potentially significant" as defined by said report. There are no homes nearby that are potentially eligible for the state and national register of historic places. There are also no potential historic districts nearby. COMMUNITY FACILITIES The impact on the utilities and infrastructure near the site will be estimated by the Frederick County Capital Facilities Impact Model. No additional impacts are forseen by the development of the subject property at the proffered density. M _59_ N, iRr' .372 rut -M- t91� goo• zoo o ♦oo• soo' �G SCALE IN FEET GEORGE W. GILES BROWN 70-W N29120'Or"f 14 N30'/6'/eS . • 2 4?Z44 Naas � is o?,stir, I • b w 0 N PAUL' GI1.33 to b Dd. FUT:tAL & Dd. SHEPPAAU) Z h 121.11 AC.iESCA CA 3 h R-iss iJ AC -,o t DEED eoorc-ror DEEP h PAGE-131 .� 96 AC. A 19 P. b 6 r lot W pH°us\p-171 XARTRIP pIJ s AC.- LP0. ,55.1 rj'Ir'3 ? W 3 � r , 17 rs W /s/o.so, 11 PATTON A h d ESKRIDGE b rN . x .szss 9 10 srr'Jelrs"w HAGGERTY LAND OF PA UL G /L CS /2 /. // A CRES LOCATED ABOUT 3 MlL£S EAST OF WINCH£STER. IN SHAWNEE DISTRICT, FREDERICK COUNTY, VIRGINIA . i RICHARD U. GOODE CERTIFIED SURVEYOR BERRYVILLE, VIRG/NIA Boundary Survey Appendix 2 h- v 9�t eri. 372 i,::i 627 1 �5 GNEtt 400L Zoo' o 400' goof dP SCALE IN FEET GEORGE W. GILES 5' d �NIr '3 N28'33'Z5"E ZZ9I.73, 4 561�S300 N6�00� �S it w ZZ88.37 75.'A MRSi . OE HAVEN ��6 S PAUL o I G►LES PORT is OF L..:.1; CF G3C '.;: ,I. G11.7s 3.943 LiS A 41:1 ' CF :lAT F.t : M.:. TO .hE LA:.0 cF PAUL Gil.•.S rho ubuvc tract of laws, local.-t.t on thn ;:orth siuv of ito:ni l.o. 657 about 3 miles Oanl. of situate in Shawnee .•:agist'rrial District, Frederick ::ounty, 7irtini4, is uounuea. aL follows: Beginning at (1) the point, of intersection ofthe :forth line of toad No. 657 with the :lest line of the Lana of Fars. Leriaven; thence with the North line of ao:,n No. 657 for the folio.ing 2 eours-:s f1 64 deg. W min. GU sec. :l 41.75 feet to (i) a C.rncr-mo hij;hway h,artm r; th .rnce 1: 63 d.r,;. G.'. min. OC sec. Yl 25.32 f•:e t to (3) a point on the North side of Road ::o. h57; thence with 2 ns, division lima throurh the land of Geor,;a 1. t;ales it 28 det;. 33 min: 25 see.3 2291.73 feet to (4) thence S ul d F. 26 nin. 35 sec. 3 75.CC feet to (5) a.point 75.0 f+:t ::ortheast of a sat stone 4t a f^_nea corner, said store: hint; the F'rthcast carnnr o: ti:e uc&.vui l:.nd;.thance with Paul 'Giles and than with :•:rs. DeHaven S 211 dec. 33 min. 25 sec. 1.1 2288.37 feet to the ;.oirit of b•r. in::int , co:x;dninr 3.943 Acres more . or less. AJ4J k . •ticlurd U. Gm;o, Certified Surveyor, Jar.u•ry 11, 1971. Vza(NIA Fd3D3.31CC COUXl, 3Cr. r..' trurav of wmmj was producc3 to no on th d Y. 1917 at� 1 and weir co:li.i . of .ackan 1:3g.nent thorato anneta.l was ..d, t ,l to r.cro:•1. Ta:...r,,.:�j a/ Sic..itl•.r';.1 of L , and 5L.":•1 L•4va been p.:id, if aso.sable. �1- 1I,U�i Clark. Boundary Survey Appendix 2 2 -64- EX ri+ 372 !et - 624 too, SO, 0 too, zoo, - SCALE FEET IN NAGNfr/CS '02, :.. ... 4 RAU4, G14rS rR • i PUtTi. t QT LAFU OF PATTOfd3SntILGSEA .. 1.633 AILZ Z �gd2O.0e6S N2i! 36M7 . e 4 W ESKRIDGE LQ PATTON d The above tract of land, located about 3,000 feet North of the Senseney Bond, about 31 miles Bast of Winchester, and situate in Shawnee b:agisterial Listrict, Frederick County, Virginia, is bounded as follows: '. Beginning at (1) an iron -mg by a set stone' at a fence corner, scorner between Paul Giles -and iia(Zerty; thence with 2 new division lines through the land of Patton & Eskridfe S 23 deg. 00 min. 00 sec. W 101.53 feet to (2) an iron peg; thence 11 72 deg. 41 min. 35 sec. W 482.06 feet to (3) an iron peg in the Fast line of the land of Paul Giles; thence with the land of Paul Giles for the 1bllowing 2 courses X 2b deg. 17 rain. 25 sec. E 198.94 feet to (4) a point in the center of a spring a snort distance North of a stream; thence S b0 deg. 59 min. 38 sec. 3 470.85 feet to the point of beginnin;,, eo rL aining 1.633 Acres more or less. 'edaj ( >�� rticharn U Goons, Certified Surveyor, January 11, 1971. V.R."McA FdsJ .itCC Cot1.irY, SCr. T frumen Hriling was prodj# to me on the d .y of _ 1911 at / . M and with earl..i, . of ac c.re dq.ne�t therat,3 anae cal .vas admitted to'rscord. raz wt „.;:1 j/ �:�. ,iJ-a1.1 of $ a 'Q�_, and S. 54 have been paid, if a.se.sabte. Boundary Survey Appendix 2 _(A_ DEC-14-98 "ON 12:26 FREDER ICK COUNTY 1 549S�ac�a2 �_:32 OUTPUT MODULE Net Credit for -_-- Fiscal Taxes to Capital Impact Capital Net C99fa lmra Fire Department $780 $5,635 $0 Rescue Department $1,457 Elementary Schools $3 7 8,269 Middle Schools $119.070 $130,576 $1,013,579 High Schools $W,82$ Parks and Recreation $i Z5,625 .7.7U S1,5.7.864 TOTAL $1,322,017 $0 $143,972 $1,178,444 FIRE AND RESCUE ADDENDUM New Capital Costs Not $12,817.97 Covered by County Contributions NGTES: Model Run Dale 12 I1198 EAW P.I.N. 55-A 209; 211; & 213 Rezoning: Assumes 2@4 SFO an 128.78 acres of RP. Due to changing conditions assaclated vv;th development in the County, the results of this Output Module may not be valid beyond a period of 90 days from the model run date. Capital Facilities MW Appendix 3 1 DSC-14-98 MON 1 ':05 FREDERICK COUNTY 1 5406780682 P.Oi OUTPUT MODULE Net Credit: for Fiscal Taxes to Capital Impact Capital Net �sQuota Immd Fire Department $27 $196 $0 Rescue Department $51 Elementary Schools $13,319 h'iddle Schools $4,193 $4,596 $36,889 High Schools $22,776 Parks and Recreation $8.18 Jim S5-911 TOTAL $46XO $0 $5,0e9 $41,480 FIRE AND RESCUE ADDENDUM New Capital Costs Not $449.48 Covered by County Contributions NOTES: Model Run Date 12/11/95 EAW P-I.N, 65 A-40 Rezoning: Assumes 10 SFD on 3.94 acres of RP. Due to changing conditions associated with development in the County, the results of this Output Module may not be valid beyond a period of 90 days from the model run date. Capital Facilities Mode _ Appendix 2 IMPACT STATEMENT GILES FARM PROPERTY ID NUMBER 65-((A)) 39 REZONING APPLICATION January 7,1999 Greenway Engineering 151 Windy Hill Lane Winchester, .VA 22602 -69- Greenway Engineering January 7,1999 .Iles Farm Impact Statement INTRODUCTION The subject property, tax map no. 65-((A))-39, is located on the north side of Senseny Road, and is 650' east of Beans Pond Lane. Said property is across from the Burning Knolls and C.M. Lockhart subdivisions, and is adjacent to the Bedford Village and Apple Ridge subdivisions. This site consists of a 152.2 acre parcel and is currently located within a Rural Areas (RA) zoning district. The owners propose to rezone 140.2 acres of this parcel to Residential Performance (RP). The remaining 12.0 acres are proposed to be rezoned to the Business General (B2) zoning district. This report has been prepared for the purpose of assessing the impact on Frederick County by this rezoning. This impact statement will refer to the proposed residential area as "Parcel A". The area proposed for commercial purposes will be designated "Parcel B". SITE SUITABILITY The subject property is located within the "Urban Development Area" as defined within the. Frederick County Comprehensive Policy Plan. This designation reflects the intention of Frederick County to allow for more intensive development on the subject site. The purpose of this area designation is to direct the expansion and improvement of public utilities and infrastructure to areas that will be intensively developed. Flood Plains The subject site is located on FEMA NFIP map 9 510063-0120-B. The site is located within a "ZONE C" area. No portion of the subject site is in a 100 yr. flood plain. The site does include an intermittent stream, as well as a pond. Wetlands The National Wetlands Inventory Map lists two wetland areas on the subject property. These wetlands, cumulatively less than an acre, join the pond on the southwest comer of the property Mature Woodlands Approximately 30% of the 152.2 acre tract is wooded. This estimate is based on aerial mapping, and has not been conclusively verified on the ground. Soil Types Information for soil types on this site has been obtained from the Soil Survey of Frederick COunM Mir inia, by the USDS Soil Conservation Service. The subject site is located on map sheet no. 37, and contains eight different soil types. These are Berks, Blairton, Clearbrook, and Weikert-Berks soils at various slopes. 1 -71- Greenway Engineering January 7, 1999 .'es ,Farm Impact Statement ` Prime Agricultural Soils The Weikert-Berks soil type, which covers approximately 50% of the subject property, is listed as "not suited" or "poorly suited" to cultivated crops, hay or pasture. The remainder of the site is composed of soils that are listed as "moderately well suited" to "fairly well suited" to these agricultural purposes. Steep Slopes The terrain over approximately one third of the site includes slopes greater than 15%. These areas are located along the intermittent stream, and along established drainways. The site will be graded to insure its usability for residential housing, while leaving intact the areas of steep slopes nearest the established drainways, and meeting all zoning requirements.. Construction Concerns There are several aspects of the soils and the geology of the subject site that will need to be addressed in order to establish a residential community on this property. The depth to shale bedrock ranges from 12 to 40 inches. This will present some grading difficulties, requiring more fill to be placed than cut. Some of the shale can be reused as fill, since it is generally friable. The Clearbrook and Blairton soils have seasonal high water tables. Between October and April, the water table in these soils is within two feet of the surface. These soils cover about 10-15% of the subject site. This feature will present only a minor obstacle, which can be surmounted with proper grading and sound geotechnical design. The Weikert-Berks soil type is listed as being a severe erosion hazard. This soil type covers approximately one half of the subject site. All construction on this site, however, will conform to the standards within the Virginia Erosion and Sediment Control Handbook. This will include the placement of silt screens and sediment traps. It will also require reseeding of all disturbed areas after grading has been completed. In conclusion, proper design and construction techniques will be used so that the soil and geology of the subject property will not interfere with the proposed development. SURROUNDING PROPERTIES All of the properties adjoining the subject site are either undeveloped or are single-family homes. Homes on these adjoining lots are generally within 100'-200' of the boundary with the subject site. Rezoning the subject site to "RP" will harmonize well with the surrounding properties, all of which are zoned either "RA" or "RP". The proposed rezoning of a portion of the subject site to B-2 will have the desirable result of allowing for retail stores, grocery stores, service stations, offices, or similar uses within close proximity to residential units. 2 -72- Greenway Engineering January 7,1999 es Farm ImpactStatemestt BASIS FOR DETERMINING EWFACT RA The existing "RA" zoning for the 152.2 acre site will allow for a maximum residential density of 30 single family detached units. The density of Parcel A has been limited by proffer to 2.5 dwelling units per acre. This works out to a maximum potential of 350 units. IM The cumulative total floor area of all primary -use buildings within the proposed B2 zone has been limited by proffer to 120,000 square feet. All impacts created by the proposed B2 zone have been calculated using this proffered maximum area. TRAFFIC ANALYSIS Traffic Data The existing traffic data was supplied by VDOT Office Services Specialist, Vega Ziemer (Edinburg office): 3 -73- Greenway Engineering January 7,1999 les Farm Impact Statement EXISTING TRAFFIC COUNTS Date of ADT Road Stud vehicles/da Route 655 1993 2,522 between Winchester and 656 Route 656 1995 2,376 between Rte 659S & Rte 7W Route 656 1995 4,237 between Rte 657 & Rte 659S Route 656 1995 3,041 between Rte 655 & Rte 657. Route 657 1993 8,027 between Winchester and 656 Route 657 1995 4,779 between Routes 656 and 736 Route 657 1995 1,231 between Rte 736 and Clarke Co. Route 659 1995 4,524 between 658 and 656N. Route 659 1993 401 between Rte 656N & Rte 7 Route 7 1996 17,000 between Winchester and Clarke Co. U. S. Route 50 1996 18,000 between Rte 522 & Rte 723W VDOT has classified Route 657 (Senseny Road), Route 659 (Valley Mill Road), Route 656 (Greenwood Road), and Route 655 (Sulpher Springs Road) as major collectors. Trip Generation The following table is based on trip data taken from the TTE Trip Generation Manual, 66 Edition: TRIP GENERATION DATA Zone Use Density PEAK HOUR TRIPS ADT (vehicles/day) AM PM Entering Entering Exiting Existing RA Single Family Detached 30 6 17 20 11 287 RP Single Family Detached 350 67 202 228 129 3,350 B2 Retail 120,000 75 48 215 233 5,150 Total Increase: 8,213 d -74- Greenway Engineering January 7,1999 ies Farm Impact Statement The development of the rezoned site at the maximum density could therefore generate a traffic increase of approximately 8,200 trips per day. Traffic Impact - Traffic impacts were determined using the following estimated traffic split: Lra ffic lit 5% will travel through Carlisle Heights and the other minor collector road to Rte 656. 40% of the increased traffic will travel Rte 657 into the City of Winchester. 20% will travel Rte 657 to Rte 656, then south to Route 50. 5% will travel Rte 657 east into Clarke County. 5% will travel Rte 659 east to Route 7. 12% will travel Rte 659 west to Rte 656, and then north on Rte 656. 13% will travel Rte 659 west to Route 7, and & I-81. The following table shows the increase in traffic on the local road network as compared to current traffic counts and expected traffic volumes on these roads in 2010. s _75_ Greenway Engineering January 7, 1999 es Farm Impact Statement TRAFFIC EMPACT ON LOCAL ROADS Road Traffic Impact from Site Traffic -1999* Traffic - 2010* vehicles/day) (vehicles/day) (vehicles/day) Route 655 (Sulpher Springs Rd) 1,643 3,100 4,530 between Winchester & Rte 656 Route 656 (Greenwood Rd) 986 2,726 3,980 between Rte 659S & Rte 7W Route 656 (Greenwood Rd) 411 4,862 7,098 between Rte 657 & Rte 659S Route 656 (Greenwood Rd) 1,643 3,490 5,095 between Rte 655 & Rte 657 Route 657 (Senseny Rd) 3,285 9,870 14,400 Winchester & Rte 656 Route 657 (Senseny Rd) 4,928 5,484 8,006 from site west to Rte 656 Route 657 (Senseny Rd) 411 1,413 2,062 from site east to Clarke County Route 659 (Valley Mill Road) 1,068 5,190 7,580 between Rte 658 & 656 Route 659 (Valley Mill Road) 2,053 460 720 from site west to Rte 656 Route 659 (Valley Mill Road) 411 460 720 from site east to Rte 7 Route 7 1,396 18,850 27,520 between Winchester & Clarke Co. U.S. Route 50 1,643 19,960 29,140 between Rte 522 & Rte 723W * Projected traffic counts (both year 1999 and year 2010) were calculated using a 3.5% growth rate. The increases are substantial on Senseny, Greenwood, and Valley Mill, and Sulpher Springs Roads. It is worthy to note, however, that the current traffic count is fairly sparse on Valley Mill Road between Greenwood Road and Route 7. Transportation Improvements The owners of the subject property have made several proffers that will improve traffic flow in the subject area: Channing Drive, a new major collector that will travel along the western border of the subject property, will be built by the owner of the subject property and the adjacent property owner. A Traffic Signal will be installed at the intersection of Channing Drive and Senseny Road. 6 -76- Greenway Engineering January 7, I999 1 es Farm Impact Statement $25,000 will be contributed by the owner toward a traffic signal at the intersection of Greenwood Road and Senseny Road. - Right And Left Turn Lanes will be constructed on Senseny Road and on Channing Drive. The Main Entrance into the Giles Farm subdivision will be a four -lane boulevard. In addition to these proffers, which have a direct impact on improving traffic flow, the owners of the subject property have proffered a 2.5 unit per acre density for the residential area and a 120,000 sf maximum buildout for the commercial area. These proffered reductions substantially reduce the the maximum amount of traffic that could be generated by the subject site. Another bonus for traffic flow is the proffered construction phasing plan. In this proffer, the owners have agreed to limit the number of building permits that will be issued in any one year, which will reduce the rate of traffic increases on the affected roads. Traffic Summary While the increases in traffic are substantial, the concessions that the owners have made to aid traffic flow have been generous, and these concessions are more than is normally proffered, and more than the Virginia Department of Transportation expected. WATER SUPPLY The impact of this proposed development on water supply systems is based on design volumes supplied by the FCSA. The total design consumption can be determined by the following formula: Consumption per Dwelling Unit = 275 gpd Number of Units = 350 Total Residential Consumption = 350 units x 275 gpd WN Design Consumption = 250ud 1000 sf Proffered Maximum Buildout = 120,000 sf Total Commercial Consumption = 120,000 sf x 250gpd 1000 sf 7 -77- Greenway Engineering January 7,1999 es Farm Impact Statement Total Commercial Consumption = 30,000 gpd - Entire Parcel Total Consumption = 96,250 gpd + 30.000 and = 126,250 gpd Therefore, the total water consumption for the subject property at maximum buildout is 126,250 gpd. There is currently an 8" water main located along Senseny Road, as well as an available connection to an 8" line near the Apple Ridge subdivision. According to Mr. John Whitacre of the FCSA, a water main will have to be looped through the site. SEWAGE CONVEYANCE AND TREATMENT Based on our water consumption, the proposed proffered zoning will add 126,250 gpd to the sewage conveyance system at maximum buildout. Mr. John Whitacre of the Frederick County Sanitation Authority was consulted regarding the sewer design criteria and capacities for the existing sewer system serving this subject site and the neighboring Lynnehaven and Sheppard/Futral properties. The Giles Farm and Lynnehaven properties will be served in two phases. The first phase will be utilization of the existing pump station on Beans Pond Lane. Areas that will naturally flow to this pump station can be developed as long as capacity exists in the pump station. The ultimate phase two sewering of the three project area will be by a regional pump station that is proposed adjacent to Twin Lakes. By this regional concept, gravity sewer lines will drain along the roads and ravines to the proposed pump station. As agreed with the Frederick County Sanitation Authority, construction of the proposed pump station will be the sole responsibility of the parties involved in the three project development. Once in operation and accepted by the Frederick County Sanitation Authority, the ownership and maintenance of the pump station will become the responsibility of said agency. With the completion of the proposed pump station, several other projects will have the ability to connect by gravity into this system, allowing some smaller pump stations, such as the Apple Ridge station, to come off-line. DRAINAGE An unnamed intermittent stream flows along the Northwestern and the Northern portions of the subject property and feeds into Twin Lakes. The overflow from this lake drains into the Opequon Creek. Approximately 87 acres of the subject site flows directly into this stream via established swales and drainways. Stormwater on the remaining portion of the site (approximately 65 acres) flows into one of three drainways that continue into the neighboring Apple Ridge and Bedford Village subdivisions, and empties into another tributary of the Opequon. 8 -78- Greenway Engineering January 7,1999 es Farm Impaet Statement Regional stormwater management will be provided by a stormwater management network This network will include the existing wet pond known a& Twin Lakes. By utilizing this wet pond as the backbone of the stormwater management system, we will then move upstream and develop a series of smaller, dry detention basins, along with sediment forebays to control water quality. The stormwater management network will be developed in tandem with our natural walking trail system. The trail crossings of small tributaries will act as embankments for the sediment forebays. In time, wetlands should develop in these areas which will serve dual purposes of sediment removal and adding a natural wetland that can be observed through the trail system. The majority of the three -project area (Giles Farm, Sheppard/Futral, & Lynnehaven properties) naturally drains to the Twin Lakes facility. However, there is a small area adjacent to Senseny Road and Apple Ridge Subdivision that will require a separate peak reduction as it releases through the storm sewer network of the Apple Ridge Subdivision. With this regional approach, stormwater management for the three -project area will be adequately satisfied. SOLID WASTE DISPOSAL The following calculations were made to estimate the maximum impact of solid waste generated on the subject site: The impact created by the residential units on Parcel A has been estimated using design criteria in the Civil Engineering Manual, 40' Edition. The design factors are standard for residential units. generation rate in cu yds = (population size)Xlwaste in lbm/capita-day)X(loading factor day compacted density in lbm/cu yd population size = (2.75 persons/household) X (350 dwelling units) = 962 persons waste = 51bm/capita-day loading factor = 1.25 density = 10001bm/cu yd Total residential volume = 6.0 cu yds day Annually, the generated solid waste volume will be: Total residential volume = 6.0 cu yds X 365 days = 2,200 cu yds day yr yr Therefore the maximum waste generated by Parcel A will be 2,200 cu yds per year. M The solid waste impact for Parcel B has been estimated using the following Fairfax County design requirements. E _79_ Greenway Engineering January 7,1999 -,s Farm Impact Statement Waste generation rate = 11.440 lbs - - 1000 sf/yr total solid waste = 120,000 sf x 11,440 lbs 1000 sf/yr = 1,372,800 lbs/yr compaction = 4001bs/cy total volume=1,372,800 lbs/yr 400 lbs/cy = 3,430 cy/yr Entire Parcel Total waste = 2,200 gpd + 3.430 gp = 5,630 gpd Therefore, the total solid waste generated by the subject site is estimated to be 5,630 cubic yards annually. HISTORIC SITES AND STRUCTURES The Rural Landmarks Survey Report for Frederick County, Virginia reveals the presence of some historic structures on the subject property. These structures are listed in said survey simply as "Outbuildings, Rte 657." The Braithwaite house is located at the end of Beans Pond Lane on adjoining parcel 55-((A))- 208, and is within 100' of the adjoining boundary. Also, the Carter-Lee- Damron house is on adjoining parcel 55-((A))-209, but is approximately 2,200' from the adjoining boundary. None of these buildings are "potentially significant" as defined by said report. There are no homes nearby that are potentially eligible for the state and national register of historic places. There are also no potential historic districts nearby. COMMUNITY FACILITIES The impact on the utilities and infrastructure near the site will be estimated by the Frederick County Capital Facilities Impact Model 10 -80- Greenway Engineering January 7, 1999 -,s Fann Impact Statement OTHER IMPACTS No additional impacts are forseen by the development of the subject property at the proffered density. 11 -81- Given under my hand this 22 day of November, I943. IJy commission exrires -:'arch 20, I9.14. VI IV II•ME RITTER -- 0 ary ub 1c r x' I �4y iI i The followinr is a survey of a portion of the Wary L. Braithwaite lards, situate and lying* in Shawnee Varisterial District, Frederick County,l State of VirCi.nia, about four miles south east of the Cit, of hinchester bounded on the north by a line of the Tonry Brown Estate lands, on the east by a line of the Carter estate lands, on the south by a line of George V. Giles former rurchase of a portion j of the nary E. Braithwaite lands, on the wrest b; lines of the said Braithwaite's other ixa lands and is more rarticularly described by a survey viz.- BeCirming at a post corner to the Giles fearer purchase; running through the Braithwaites lands by the two folloring courses and distances I1 GS I/2 E 24.24 rods to a post corner; thence N 58 E IUO.24 rods to a walnut tree a i corner to the said Braithwraite's other lands in the Brown rstate line;nthence with the `. last mentioned line S. 67 E 82.0 rods to a set stone a corner to the Brown estate lands and also a corner to the Carter estate lands; thence with a line of the latter S 25 I/2.-TxI22x92xao T I30.03 rods to triprle oaks a corner to the Giles former rurchase in Holmes Carper's line; thence with a line of the Giles former purchase I+ 59 I/2 W I20 rods to the point i of beginning containinf 74 acres - 2 Roods - I2 Sq. Fo. Surveyed II-2-43 By IALKLR UCC. BOND I 'IIRGIIiIA FREED'.:RICK COMM, (SCT. This instrument of rritinr was -reduced to me on the 9th day of Dec. I044 at I:00 P. L. and with certificate of acknowledCment thereto I annexed was admitted to retard. Boundary Survey Appendix 2 -85- t . C r� �a � � r i j 1 The following is a survey of a portion of the George C. Braithwaite farm land fronting on the north side of the Senseney Road about 4 miles* east of Winchester Frederick Count Virg inia ginia and is more particularly described as i follows: Beginning at a white oak on the north side of the said road running with the 1 1 north property line of the Senseney road S 68'20' E 2625 ft. to a double white oak a i corner to the Holmes Carper land ins aid highway boundary line; thence with a line of said Carper N 27'55' E 1535 ft. to a triple white oak a corner to Braithwaite's other land in the said Carper!s line; thence by two division lines through the other i lands of Braithwaite N 60'W 1957 ft. to a stake corner to the other land of the said iBraithwaite near the east side of the private road leading from Braithwaite'.s mansion house to the Senseney road; thence 5 47 W 2000 ft. to the point of beginning containing 88.8 acres. 1 j Survey made August 20, 1940: i WALKER 11cC,BOND. � VIROT111A FREDERICK COUNTY SCT: I This Instrument of writing was produced to me on the 4th day of Nov. 1940 at 2:154and with certificate of acknowledgment thereto annexed was . admitted to record. i ,CLERK. Boundary Survey Appep jV 2 OUTPUT MODULE Net Credit fi Fiscal Taxes to Capital Impact Capital Net Costs Cred Costs Impa Fire Department $1,095 $7,551 $0 Rescue Department $2,369 Elementary Schools $467,496 Middle Schools $147,160 $375,539 $1,038,540 High Schools $799,422 Parks and Recreation $217,058 $Z2,323 $194,735 TOTAL $1,634,600 $2,791,290 $405,412 $0 FIRE AND RESCUE ADDENDUM New Capital Costs Not $19,73928 Covered by County Contributions NOTES: Model Run Date 12/30/98 EAW P.I.N. 65-A 39 Rezoning: Assumes 351 SFD & 120,000 sq.ft. retail on 1422 acres of RP $10 acres of B2. Due to changing conditions associated with development in the County, the results of this Output Module may not be valid beyond a period of 90 days from the model run date. Capital Facilities Model Appendix 3 -87- IMPACT ,STATEMENT L SEA YEN, L.C. PROPERTY ID NUMBERS 55-((A))-206 & 65-((A)) 30, 31 REZONING APPLICATION January 7,1999 Greenway Engineering 151 Windy bill Lane Winchester, VA 22602 -89- Greenway Engineering January 7,1999 ..,ynnehaven Impact Statement Prime Agricultural Soils - - The soils over approximately one-third of the subject property range from being "fairly well suited" to "well suited" to cultivated crops, hay and pasture. The remaining two-thirds of the site is classified as "poorly suited" or "not suited" for these agricultural purposes. Steep Slopes Approximately 30 acres of the subject property includes slopes greater than 15%. These areas are located along the intermittent streams. The site will be graded to insure its usability for residential housing, while leaving intact the areas of steep slopes nearest the established drainways, and meeting all zoning requirements. . Construction Concerns There are several aspects of the soils and the geology of the subject site that will need to be addressed in order to establish a residential community on this property. The depth to shale bedrock ranges from 12 to 40 inches. This will present some grading difficulties, requiring more fill to be placed than cut. Some of the shale can be reused as fill, since it is generally friable. There is a seasonal high water table on roughly 2 acres of the subject site. Between October and April, the water table in these areas is within six inches of the surface. This area of seasonal high water is relatively small, however, compared to the overall site, and proper grading and sound geotechnical design will make this area suitable for construction. In conclusion, proper design and construction techniques will be used so that the soil and geology of the subject property will not interfere with the proposed development. SURROUNDING PROPERTIES All of the properties adjoining the subject site are either undeveloped or are single-family homes, and are zoned either Rural Areas (RA) or Residential Performance (RP). The adjoining lots in the Carlisle Heights subdivision have homes that are within 50' of the subject property. Additionally, the homes on 55-((A))-208, and on 65-((A))-30 are within 50-100' feet of the adjoining boundary with the subject property. All other homes on adjoining properties are greater than 150' of the adjoining boundary. Rezoning the subject site to "RP" will harmonize well with the surrounding properties, which are all either zoned "RA", or "RP". The proposed rezoning of a portion of the subject site to B-2 will have the desirable result of allowing for retail stores, grocery stores, service stations, offices, or similar uses within close proximity to residential units. 2 -92- Greenway Engineering January 7, 1999 anehaven Impact Statement INTRODUCTION The subject property, tax map nos. 55-((A))-206 and 65-((A))-30, 31 is a contiguous group of parcels located on the west side of Beans Pond Lane, 150' from the intersection with Senseny Road. Said property is adjacent to the Carlisle Heights subdivision. This 91.4 acre site is currently located within a Rural Areas (RA) zoning district. The owners propose to rezone 81.4 acres of this parcel to Residential Performance (RP), and the remaining 10.0 acres to Business General (B2). This report has been prepared for the purpose of assessing the impact on Frederick County by this rezoning. This impact statement will refer to the proposed residential area as "Parcel A". The area proposed for commercial purposes will be designated "Parcel B". SITE SUITABILITY The subject property is located within the "Urban Development Area" as defined within the Frederick County Comprehensive Policy Plan. This designation reflects the intention of Frederick County to allow for more intensive development on the subject site. The purpose of this area designation is to direct the expansion and improvement of public utilities and infrastructure to areas that will be intensively developed. Flood Plains The subject site is located on FEMA NFIP map nos. 510063-0115-B and 510063-0120-B. The site is located within a "ZONE C" area. No portion of the subject site is in a 100 yr. flood plain. The site does include four drainage ways with intermittent flow, and also a pond. Wetlands The National Wetlands Inventory Map lists the small pond on the western edge of the subject property as a wetland. This pond covers approximately 1 acre. Mature Woodlands Approximately 70% of the 91.4 acre tract is wooded. This estimate is based on aerial mapping, and has not been conclusively verified on the ground. Soil Types Information for soil types on this site has been obtained from the Soil Survey of Frederick County Virginia, by the USDS Soil Conservation Service. The subject site is located on map sheet nos. 36, and 37 -91- Greemvay Engineering January 7,1999 .anehaven Impact Statement EXISTING TRAFFIC COUNTS Date of ADT Road Study vehicles/day) Route 655 1993 2,522 between Winchester and 656 Route 656 1995 2,376 between Rte 659S & Rte 7W Route 656 1995 4,237 between Rte 657 & Rte 659S Route 656 1995 3,041 between Rte 655 & Rte 657 Route 657 1993 8,027 between Winchester and 656 Route 657 1995 4,779 between Routes 656 and 736 Route 657 1995 1,231 between Rte 736 and Clarke Co. Route 659 1995 4,524 between 658 and 656N. Route 659 1993 401 between Rte 656N & Rte 7 Route 7 1996 17,000 between Winchester and Clarke Co. U. S. Route 50 1996 18,000 between Rte 522 & Rte 723W VDOT has classified Route 657 (Senseny Road), Route 659 (Valley Mill Road), Route 656 (Greenwood Road), and Route 655 (Sulpher Springs Road) as major collectors. Trip Generation The following table is based on trip data taken from the ITE Trip Generation Manual, a Edition: n u -94- Greenway Engineering January 7,1999 e,,mreharen Impact Statement BASIS FOR IDFTFRIVIINING EM PACT — RA The subject property is currently zoned "RA'. It is expected that Parcel A, with 81.4 acres, could be developed under an RA zone to include 16 dwelling units. RP The density of Parcel A has been limited by proffer to 2.5 dwelling units per acre. This works out to a maximum potential of 203 units. B-2 The cumulative total floor area of all primary -use buildings within the proposed B2 zone has been limited by proffer to 100,000 square feet. All impacts created by the proposed B2 zone have been calculated using this proffered maximum area. TRAFFIC ANALYSIS Traffic Data The existing traffic data was supplied by VDOT Office Services Specialist, Vega Ziemer (Edinburg office): 3 -93- Greenway Engineering January 7,1999 inehaven Impact Statement TRA1F 1 TC EMIPACT ON LOCAL ROADS Road Traffic Impact from Site Traffic - 1999* Traffic - 2010* (vehicles/day) (vehicles/day) (vehicles/day) Route 655 (Sulpher Spr. Rd) 1,212 3,100 4,530 between Winchester & Rte 656 Route 656 (Greenwood Rd) 727 2,726 3,980 between Rte 659S & Rte 7W Route 656 (Greenwood Rd) 303 4,862 7,098 between Rte 657 & Rte 659S Route 656 (Greenwood Rd) 1,212 3,490 5,095 between Rte 655 & Rte 657 Route 657 (Senseny Rd) 2,425 9,870 14,400 Winchester & Rte 656 Route 657 (Senseny Rd) 3,637 5,484 8,006 from site west to Rte 656 Route 657 (Senseny Rd) 303 1,413 2,062 from site east to Clarke County Route 659 (Valley Mill Road) 788 5,190 7,580 between Rte 658 & 656 Route 659 (Valley Mill Road) 1,516 460 720 from site west to Rte 656 Route 659 (Valley Mill Road) 303 460 720 from site east to Rte 7 Route 7 1,031 18,850 27,520 between Winchester & Clarke Co. U.S. Route 50 1,212 19,960 29,140 between Rte 522 & Rte 723 W * Projected traffic counts (both year 1999 and year 2010) were calculated using a 3.5% growth rate. Transportation Improvements Channing Drive, a new major collector that will travel along the eastern border of the subject property, will be built by the owner of the subject property and the adjacent property owner. This road will improve traffic flow in the region, making it easier to travel between Senseny Road and Valley NO Road. The owners of the subject property have proffered a 2.5 unit per acre density for the residential area and a 100,000 sf maximum buildout for the commercial area. These proffered reductions substantially reduce the the maximum amount of traffic that could be generated by the subject site. Another bonus for traffic flow is the proffered construction phasing plan. In this proffer, the owners have agreed to limit the number of building permits that will be issued in any one year, which will reduce the rate of traffic increases on the affected roads. n -96- Greenway Engineering January 7,1999 , inehaven Impact Statement TRIP GENERATION DATA Zone Use Density PEAK HOUR TRIPS AM PM ADT Entering Exiting Enterin Exiting (vehicles/day) Existing RA Single Family Detached 18 3 10 12 7 172 RP Single Family Detached 203 39 117 133 75 1,943 B2 Retail 100,000 63 40 180 194 4,292 Total Increase: 6,062 The development of the rezoned site at the maximum density could therefore generate a traffic increase of approximately 6,060 trips per day. Traffic Impact Traffic impacts were determined using the following estimated traffic split: Traffic Tht 5% will travel through Carlisle Heights and the other minor collector road to Rte 656. 40% of the increased traffic will travel Rte 657 into the City of Winchester. 20% will travel Rte 657 to Rte 656, then south to Route 50. 5% will travel Rte 657 east into Clarke County. 5% will travel Rte 659 east to Route 7. 12% will travel Rte 659 west to Rte 656, and then north on Rte 656. 13% will travel Rte 659 west to Route 7, and & I-81. The following table shows the increase in traffic on the local road network as compared to current traffic counts and expected traffic volumes on these roads in 2010. 61 -95- GreemsW Engineering January 7, 1999 inehaven Impact Statement Traffic Summary Although the increases are substantial on Senseny, Greenwood, Valley Mill, and Sulpher Springs Roads, the proffers that the owner has made will lessen the impact of this new development on the local road network WATER SUPPLY The impact of this proposed development on water supply systems is based on design volumes supplied by the FCSA, and on maximum dwelling units in the proffered zoning. The total design consumption can be determined by the following calculations: Consumption per dwelling unit = 275 gpd Number of units = 203 Total Residential Consumption = 203 units x 275 gpd = 55,825 gpd Design consumption = 250and 1000 sf Maximum possible buildout=100,000 sf Total Commercial Consumption = 25,000 gpd Entire Parcel Total Consumption = 55,825 gpd + 25,000 gvd = 80,825 gpd Therefore, the total water consumption for the subject property at maximum buildout is approximately 80,825 gpd. There is currently an 8" water main located along Senseny Road. According to Mr. John Whitacre of the FCSA, a water main will have to be looped through the site. it -97- Greenway Engineering January 7,1999 .1nehaven Impact Statement SEWAGE CONVEYANCE AND TREATMENT -- Based on our water consumption, the proposed rezoning will add 80,825 gpd to the sewage conveyance system at maximum buildout. Mr. John Whitacre of the Frederick County Sanitation Authority was consulted regarding the sewer design criteria and capacities for the existing sewer system serving this subject site and the neighboring Giles Farm property. The Giles Farm and Lynnehaven properties will be served in two phases. The first phase will be utilization of the existing pump station on Beans Pond Lane. Areas that will naturally flow to this pump station can be developed as long as capacity exists in the pump station. The ultimate phase two sewering of the three project area (Giles Farm, Sheppard/Futral, and Lynnehaven properties) will.be by a regional pump station that is proposed adjacent to Twin Lakes. By this regional concept, gravity sewer lines will follow the roads and ravines to the proposed pump station. As agreed with the Frederick County Sanitation Authority, construction of the proposed pump station will be the sole responsibility of the parties involved in the three project development. Once in operation and accepted by the Frederick County Sanitation Authority, the ownership and maintenance of the pump station will become the responsibility of said agency. With the completion of the proposed pump station, several other projects will have the ability to connect by gravity into this system, allowing some smaller pump stations, such as the Apple Ridge station, to come off-line. DRAINAGE The are four drainage ways with intermittent flow on the subject property, and there is also a pond. The runoff from approximately 86 acres of the subject site flows through these drainage ways and into nearby Twin Lakes. The overflow from this lake drains into the Opequon Creek Stormwater on the remaining 5 acres, at the northwest comer of the property, drains through the Carlisle Heights subdivision, and empties into a tributary of Abrams Creek. Regional stormwater management will be provided by a stormwater management network This network will include the existing wet pond known as Twin Lakes. By utilizing this wet pond as the backbone of the stormwater management system, we will then move upstream and develop a series of smaller, dry detention basins, along with sediment forebays to control water quality. The stormwater management network, will be developed in tandem with our natural walking trail system. The trail crossings of small tributaries will act as embankments for the sediment forebays. In time, wetlands should develop in these areas which will serve dual purposes of sediment removal and adding a natural wetland that can be observed through the trail system. The majority of the three -project area (Giles Farm, Sheppard/Futral, & Lynnehaven properties) naturally drains to the Twin Lakes facility. However, there is a small area adjacent to Senseny Road and Apple Ridge Subdivision, and also an area near the Carlisle Heights subdivision, that will require a separate peak reduction as it releases through the storm sewer network of subdivisions. With this regional approach, stormwater management for the three -project area will be adequately satisfied. 8 -98- Greenway Engineering January 7, I999 k.,.,nehaven Impact Statement SOLID WASTE DISPOSAL The following calculations were made to estimate the maximum impact of solid waste generated on the subject site. M The impact created by the residential units on Parcel A has been estimated using design criteria in the Civil Engineering Manual, 4 h Edition. The design factors are standard for residential units. generation rate in cu yds = (population size)X(waste - lbm/capita-day)X(loadin fact actor day compacted density - lbm/cu yd population size = (2.75 persons/household) X (203 dwelling units) = 558 persons waste = 5 lbm/capita-day loading factor = 1.25 density = 1000 Ibm/cu yd Total residential volume = 3.5 cu yds day Annually, the generated solid waste volume will be: Total residential volume = 3.5 cu yds X 365 days = 1,270 cu yds day Yr yr Therefore the maximum waste generated by Parcel A will be 1,270 cu yds per year. fm The impact created by all businesses on Parcel B, within the proposed B-2 zone, has been estimated using using Fairfax County design requirements. Waste generation rate = 11,440 lbs 1000 sf/yr total solid waste = 100,000 sf x 11,440 lbs 1000 sf/yr = 1,144,000 lbs/yr compaction = 4001bs/cy 0� _99_ Greenway Engineering .Tanuary 7,1999-nehaven Impact Statement total volume = 1,144,000 lbs/vr 4001bs/cy = 2,860 cy/yr Entire Parcel Total waste = 1,270 gpd + 2,860 and = 4,130 gpd Therefore, the total solid waste generated by the subject site is estimated to be 4,130 cubic yards annually. HISTORIC SITES AND STRUCTURES The Rural Landmarks Survey Report for Frederick County, Virginia reveals the presence of two historic structures near the subject property. The Braithwaite house is located at the end of Beans Pond Lane on adjoining parcel 55-((A))-208, and is within 100' of the adjoining boundary. There are also some structures on adjoining parcel 65-((A))-39, that are listed in the Rural Landmarks Survey Report simply as "Outbuildings, Rte 657." Neither these buildings nor the Braithwaite house are "potentially significant" as defined by said report. There are no homes nearby that are potentially eligible for the state and national register of historic places. There are also no potential historic districts nearby. COi FACILITIES The impact on the utilities and infrastructure near the site will be estimated by the Frederick County Capital Facilities Impact Model. OTHER EMPACTS No additional impacts are forseen by the development of the subject property at the proffered density. 10 -100- BK843PG0423 I 0.902 ACRES D8 339 • P 049 o a S41/Ty 10 a LEiitiE RE * _ y' y NOTES:. ` ' M1�• 1. No Tide Report famished. 2. The property shown hereon 1v NiF � delineated qn Fraderlol: County KFANS +ai Tax Map 86 ® as Paroei 30. by 3. 7tt• property t; subject to yp / easements of record. 0 / INIS 1.61'I0"W smserrr nono NLE wtotn twrt srnrt: Hours 657 vowwaft snWonamemm" aer. �— g1 / BOUNOAHY SURVEY AND COIIP08tTE PLAT OR 0.904 ACRES sTarmwa IN THE PutMta of i= A 'cLLECFi = d FA/UiCES FiLiOT: SFIAINNEE MAGISTERIAL DISTRICT PREDEAICK COUNTY, VIRt31NU1 MAY 18,1990 St:,ALE:t'. b0r 16ut w, etilfo9w aaaatatea. loc. Boundary .Survey Appendix 2 -101- EX 8 4 3 PG 0 4 17 aJA (TERN F♦ 0oran1CK nim p - 6AK TfllO * -- 83.13'28'E S g78�i 4 • ..80. i 1 a .tT'b Meu ^�1 Ilia . Iran find Sol Q itlr N Iron nod round �} II,r � tint, rffxl round ortovE +se-,7a Tv 13A GEWER GnEI 71EA�C �� T'MTIVEgslrlp ?y sLW ���onntcK I CEMbTEAY Co WC 19 \\.�i7a senEmu*NT ' 190I VMIM1E •' \ \ ' OVEIYtL4 rowan I9�E ro3T I.188.2T49'W POST i s SENBENY `T� no (nTE 857) Ins `( Y'I 90.2198 ACRES � $A 1, ins stT 3? 05 Mw aLk* T e � 8Ei BTCrIN i ' WF GILES 181.351 A/W IT CC. WA L41Jr 711EE 14 ra 1w GILES 190.529 � 1 I ELLIOIT AND SMIIII � 2 1 DONALd KERNS E -N459S 1S, WHITE OAK THEN 1.51'20'11N Q $9.881 '� M LAS 0. LEGGE' CE TSIClltt Na ffw-g— ; COMPOSITE BOUNDARY SURVEY OF THE LAND OF ELLIOTT DELIVERY SERVICE, INC. DEED BOOK 487-PAGE 431 SHAWNEE MAGISTERIAL DISTRICT FREDERICK'COUNTY, VIRGINIA r TV" Cu"ou" SCALE: 1N.SW SURVEYED: AMiL 25,1991 � rA��+d+1'J - a uatad „da .unw�d w..wil a nnwd Taa b■ofla e7 SIe 5654.9 O 5654 IN,�,•�bb.-PM-It OMSN • sitbegl W. cliff oT associates. Inc. j��Tl/q M w6"es . w. nenows s3t09"l�f,d 4d z G jLt; s acns . Swt.ryrf ' IN iwN wv 1b. w1.1 WuY4w�pill wIN.W M •� .,IIW I/NI INII,11 111 /1111/ f111 Boundary Survey Appendix 2 2104- BK843PG0430 WF I ELLIOTT I 841006'42"E - 13 ..58' I ;6 .Z 0 ti q > LOT 4 0 f� w O " 0.276 ACRES 1y W Z `� t D13 384 - P 461 :r •o 0 y o a o. •16'a8" LOT 3 I NSg WF I I ERNS ' HIP KERNS I NOTES: �%�,l►L71rfi j 1. No Title Report furnished. 2. The property, shown hereon Is DOUGUS C. LE01 delineated on Frederick County QUOLASJC. EG Tax Mopes 0 as Parcel 31. 1� 3. The property Is subject to easemente of record. BOUNDARY SURVEY AND PLAT / OF 0.276 ACRES / STAMM IN THE NAME OF / LESTER A. ELLIOTT and CARLIN L- SMIT11 YINCirUFREDEitlptCWM WT St1AWNEE MAGISTERIAL DISTRICT ��r w�6%�5vms, produ=d 10 me an an FREDERICK COUNTY. VIRGINIA and wkh cf, w• .e�uib."+«tonem u..c.w flM�f ed MAY IS. 1990 SCALE:1' • 40' ws myNted to so Taxiwpostd yr SK 354ki d i'} M.d sa.H l.m tnwn pld . N aasasfW � r Nilbett w, tlif[asd1G# utooiates, ine. fa. f K fw�r ffw !r 1Yi� fr-� P . Y P— Boundary Survey Appendix 2 -105n- OUTPUT MODULE Capital Casts Net Credit fo. Fiscal Takes to Impact Capital Net cmi Costs Impa Fire Department $670 $4,536 $0 Rescue Department $1,519 Elementary Schools $271,707 Middle Schools $85,529 $272,259 $549,599 High Schools $464,621 Parks and Recreation $126,153 $16.184 $109,970 TOTAL $950,200 $2,431,521 $292,979 $0 FIRE AND RESCUE ADDENDUM New Capital Costs Not $12,452.40 Covered by County Contributions NOTES: Model Run Date 12/30/98 EAW P.I.N. 55-A 206 Rezoning: Assumes 204 SFD & 100,000 sq.ft retail on- $t.=acres of RP & 10 acres of B2. Due to changing conditions associated with development in the County, the results of this Output Module may not be valid beyond a period of 90 days from the model run date. Capital Facilities el Appendix 3 01/29/1994 11:13 15407229528 GREENWA`1 ENGINEERING PAGE 02 CALLOW TRANSPORTATION CONSULTING 7633 Riverside Farm Road Marsl . Virginia 20115 (703) 4913812 Fax (703) 4813726 October 5,1999 %rdmmml1,11141M lro;*bf k smith, Gemaway Emghteering By: -jd m F. Callow Sum Cfaan122 Drive Rtzoming Road Requirements Sa ambry of Reconm lat one VDOT is currently planning to install a traffic signal at Senseny Road and Route 657. Also, VDOT is going to reconstruct the intersection of Route 656 and Route 657 along with associated approach roadway sections. One additional lane will be added to each of the four (4) approaches to the new intersection. These road and traffic signal improvements will support the proposed development in the Channing Drive rezoning through the build -out of the residential phase. These traffic improvements will also support the other known but not built residential developments that will use the same road system as the proposed Channing Drive development. As the retail development on the Channing Drive development approaches completion, Route 657 from Route 656 to Channing Drive will need to be improved to a four -lone section. -109- CALLOW TRANSPORTATION CONSULTING 7633 Riverside Farm Road Marshall, Virginia 20115 (703) 4813812 Fax (703) 4813726 August 6,1999 Memorandum To: Mark Smith, Greenway Engineering By: John F. Callow Subject: Charming Drive Rezoning OVERVIEW Report Summary Per your request Callow Transportation Consulting (CTC) has revised the traffic implications of the build -out of the Channing Drive rezoning located in the east part of Frederick County, Virginia. The property is located north of Senseny Road (Route 657) and west of the Frederick County/Clark County boundary line. The Channing Drive rezoning is proposed as a residential/retail development with 846 single family detached homes and a proposed retail center with 120,000 square feet. This report addresses the proposed land uses with any coinciding transportation improvements. This report was prepared following discussions with VDOT and you. VDOT supplied the traffic counts used in this study and Frederick County gave CTC the approved but not yet built homes within the study area. EXISTING CONDITIONS The VDOT supplied traffic counts were summarized at all key intersections and road links including the intersections of Routes 657 and Route 656, Route 659 and Route 656 as well as the road links Route 659 south of Route 7 and Route 655 east of Route 50. Figure 1 shows existing (1999) ADT (Average Daily Trips) and A.M. and P.M peak hour traffic volumes at the key intersections and links that VDOT wished to be analyzed This represents the road network that the Channing Drive property proposed development will impact. Figure 2 illustrates all respective existing lane geometry and A.M. and P.M peak hour levels of service. A detailed description of level of service is found in the Appendix section of this report. METHODOLOGY The traffic impacts for the Channing Drive rezoning were established through a sequence of activities as the narratives that follow document: • Calculation of trip generation for the Channing Drive rezoning, • Assessment of background traffic including other planned projects in the area of impact, • Distribution and assignment of Channing Drive generated trips onto the completed road network, • Analysis of capacity and level of service for future build -out conditions for the residential portion and the residential plus the retail parts of the planned development. 2005 BACKGROUND TRAFFIC The existing traffic volumes were increased to account for area growth through Year 2005. CTC grew the existing traffic volumes utilizing the growth rate of 3.5 percent per year. In addition, CTC calculated the trips associated with seven developments not yet completed in the study area. These developments, representing 700 homes, include: 1. Fieldstone Heights 2. Carlisle Heights 3. Briarwood 4. Coventry Courts 5. Saratoga Meadows 6. Abrams Point 7. Oakdale Crossing II. The proposed improvements by VDOT at the intersections of Route 659/656 were incorporated into the future network analyses. TRIP GENERATION The number of trips produced by and attracted to this Channing Drive rezoning site were established using ITE Trip Generation Manual, 6th Edition rates. Table 1 shows the trip generation results for the Channing Drive rezoning. It was assumed that at full build -out that 15 percent of the retail trips would come from the Channing Drive property. Table 1 Channing Drive Trip Generation Summary AM Peak Hour PM Peak Hour Code Land Use Amount In Out Total In Out Total ADT 210 Single Family Detach 846 units 150 451 601 471 265 736 8,460 820 Retail 120,000 SF 109 69 178 340 368 708 7,665 Total Trips 259 520 779 811 633 1,444 16,125 4�Q �N` CTC s 702(284) ,e 659 1 r Route 659 ait(su)) d 0 GG m H %M 5«" 2) (.,Q 7 a� Route 657 r (mops mm* (70n a �04 Aso ♦� z23(iai) Route 655 (244)107 my . AM(PM) no scale Figure 1 Giles - Existing Conditions 8/6/99 *denotes critic2d movement -113- N �oGf CTC e) y 3 O a � A(A) c(c) to 659 B(B)4 goa B(g) A(A)* A(A)* Route 659 v v e v "'► (A)* Route 657 A(A)* C U °G `r0 Route 655 &B) A�i(PM) no scale Figure 2 Giles - Existing Lame Geometry and Level of Service j 8/6/99 i *denotes critical movement -114- TRIP DISTRIBUTION AND TRIP ASSIGNMENT The distribution of trips was based upon local travel patterns for the road network surrounding the Channing Drive rezoning site. Figure 3 represents the trip distribution percentages into and out of the Channing Drive rezoning development. These distribution percentages were also used for the other development assignments. 2005 TRAFFIC IMPACTS -RESIDENTIAL BUILD -OUT The Channing Drive rezoning assigned residential trips were added to the 2005 background traffic. Figure 4 shows 2005 residential build -out A.M. and P.M peak hour traffic volumes at the key intersections and links within the road network surrounding the Channing Drive rezoning. Figure 5 shows the respective 2005 build -out lane geometry and A.M. and P.M peak hour levels of service. Additional turn lanes would need to be constructed with the implementation of the full residential component, as shown on Figure 5, in order to maintain acceptable levels of service. A detailed description of level of service is found in the Appendix section of this report. CONCLUSION The traffic impacts associated with the Channing Drive rezoning development are acceptable and manageable. All intersections maintain acceptable overall levels of service `C' or better for 2005 build -out conditions. The intersections of the Route 657/Route 656 and Route 656/oute 659 would need to be signalized. 2005 TRAFFIC IMPACTS -FULL BUILD -OUT The Channing Drive rezoning full build -out assigned trips were then added to the 2005 background traffic volumes. Figure 6 shows build -out A.M. and P.M peak hour traffic volumes at the key intersections and links within the road network surrounding Channing Drive rezoning. Figure 7 shows the respective lane geometry and A.M. and P.M peak hour levels of service. The Route 657 link east of the Route 657/656 intersection will need to become a 4-lane section to the first project entrance with the retail component. A detailed description of level of service is found in the Appendix section of this report. e e 4%N e> CTC go�� 659 �e e 0 S Route 657 e � 1 e 4 ;ro e e Route 655 no scale Figure 3 Giles - Trip Distribution Percentages 8/6/99 -116- N - Ao 4f�,) CTC ,1�<yy01 26a3) 'Mr 33(79) 109(164) M% r ,^ b 3 a a..s r 40�398(280) ��118(96) Route 657 15s2� r�ur 16i(464) y 64(") e*r 4 Aso 389(231) Route 655 (424)165 - AM(PM) no scale Figure 4 Giles - 2005 Residential Build -taut Conditions - 8/6/99 'denotes exitieat movement -117- N e > CTC Signalized Intersection 659 r' LOS B(B) &� B<B) J. B(B) AL Route 559 B(B) ! 1 C(C) VSignalized Intersection LOS = B(B) C(C) _ B(B) Route 657 (B)B j 4 r C(C) ) so C(C) 4— Route 655 MEN► AM(PM) no scale Figure 5 Giles - 2005 Residential Build -(hut Lane Geometry and Level of Service 8/6/99 *denotes critical movement -118- �N - A0 /L e> CTC Z6(23) 43(94) ii4(179) W3 "f a a ..a L124(u7) 4�416(374) Route 657 iso�sso) a.► ) Bey �Qr G Aso Route 655 as7(z� (4SM79mmM* AM(PM) no scale Figure 6 Giles - 2005 Full Build -Out Conditions 8/6/99 *denotes critical movement -119- Signalized Intersection 659 LOS B(B) 1zO° BM) *IF C(C) 14 Signalized Intersection LOS = B(C) C(C) B(c) I w Route 657 (B)B � oir C(C) C(C) f� Mom* Route 655 B(C) N k &C AM(PM) no scale Figure 7 Giles - 2005 Full build -taut Lane Geometry and Level of Service _. 8/6/99 denotes aiticni movement -120- -121 - INTERSECTION CAPACITY ANALYSIS and LEVEL OF SERVICE The most current analysis methodologies used for evaluating the capacity of intersections were developed by the Transportation Research Board (TRB) in conjunction with the Federal Highway Administration (FHWA) and other members of the transportation profession. This methodology is represented in TRB Special Report Number 209, The Highway Capacity Manual (HCM). Computerized methods for conducting these analyses were developed by FHWA; and are the methods used in this report. The following brief explanations of the methodologies are adapted from the HCM. UNSIGNALIZED INTERSECTIONS - TWSC At an unsignalized two-way stop -controlled (TWSC) intersection, the major street has continuous right of way while the side street is controlled by a stop sign or yield sign. In operation, vehicles exiting the side street and crossing or turning into the main street flow must wait for "acceptable gaps" in the main street flow. The same is true of left -turning traffic from the main street that must cross the opposing flow. The analysis takes into account the probability of a gap in the main street traffic. The probability and number of acceptable gaps is lower in higher volume flows. The acceptability of a gap is modified by physical factors (sight distance, turning radius, etc.) and by characteristics of the traffic flow (percentage trucks, buses, etc.). In the analysis in these reports, all default values suggested by the HCM were used unless additional information was available. These defaults include the . estimated percentage of trucks (single unit and tractor *railer), buses and motorcycles. The level of service for TWSC intersections is determined only for individual movements - not for the intersection as a whole. The total delay is defined as the total elapsed time from when a vehicle stops at the end of the queue until the vehicle departs from the stop line; this time includes the time required for the vehicle to travel from the last -in -queue position to the first -in -queue position. Level of Service Criteria for TWSC Intersections Average Total Delay Level of Service sec/veh A <_5 B >5 and <_10 C >10 and:! 20 D >20 and <5' 0 E >30 and <_45 F >45 -122- SIGNALIZED INTERSECTIONS The operation (and therefore the capacity) of a signalized intersection is complicated by the fact that the signal is allocating time between conflicting traffic movements - movements that must use the same physical space. The analysis, therefore, must not only look at the physical geometry of the intersection, but the signal timing aspects as well. In the analysis of signalized intersections, two terms are important: volume to capacity ratio (v/c) and; average stopped delay (seconds per vehicle). The theoretical capacity is based on the physical geometry, the available green time (often expressed as G/C), and the traffic mix (e.g. trucks use more capacity than cars). The average stopped delay may be calculated from the v/c ratio, cycle length, quality of progression on the arterial and available green time on each approach. In this report all the default values recommended by the HCM are used unless other specific information is available (percentage of trucks, pedestrians, etc.). Existing signal timings are observed and used whenever possible. When future signals are being evaluated, an "optional" signal timing is calculated based on projected volumes. The level of service is based on the calculated average delay per vehicle for each approach and for the intersection as a whole. Based on extensive research studies, the maximum delay acceptable by the average driver is sixty seconds per vehicle at a signalized intersection. This is defined as the upper limit on the possible range of delay/level of service criteria. The following criteria describe the full range of level of service: Level of Service Criteria for Signalized Intersections Stopped Delay Level of Service per Vehicle (sec) A <_5.0 B >5.0and<_15.0 C >15.0 and 15.0 D >25.0 and <_40.0 E >40.0 and <_60.0 F >60.0 -123- LEVEL OF SERVICE DESCRIPTIONS FOR SIGNALIZED INTERSECTIONS Level of Service Description A Level of Service A describes operations with very low delay, up to 5 sec per vehicle. This level of service occurs when progression is extremely favorable, and most vehicles arrive during the green phase. Most vehicles do not stop at all. Short cycle lengths may also contribute to low delay. B Level of Service B describes operations with delay greater than 5 and up to 15 sec per vehicle. This level generally occurs with good progression, short cycle lengths, or both. More vehicles stop than for LOS A, causing higher levels of average delay. C Level Of Service C describes operations with delay greater than 15 and up to 25 sec per vehicle. These higher delays may result from fair progression, longer cycle lengths, or both. individual cycle failures may begin to appear in this level. The number of vehicles stopping is significant at this level, though many still pass though the intersection without stopping. D Level of Service B describes operations with delay greater than 25 and up to 40 sec per vehicle. At level D, the influence of congestion becomes more noticeable. Longer delays may result from some combination of unfavorable progression, longer cycle lengths, or high v/c ratios. Many vehicles stop, and the proportion of vehicles not stopping declines. Individual cycle failures are noticeable. E Level of Service E describes operations with delay greater than 40 and up to 60 sec per vehicle. This level is considered by many agencies to be the limit of acceptable delay. These high delay values generally indicate poor progression, long cycle lengths, and high v/c ratios. Individual cycle failures are frequent occurrences. F Level of Service F describes operations with delay in excess of 60 sec per vehicle. This level, considered to be unacceptable to most drivers, often occurs with over saturation, that is, when arrival flow rates exceed the capacity of the intersection. It may also occur at high v/c ratios below 1.0 with many individual cycle failures. Poor progression and cycle lengths may also be major contributing causes to such delay levels. -124- HCS: Unsignalized Intersections Release 2.1g E656-7A.HC0 Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Streets: (N-S) Route 656 (E-W) Route 657 Major Street Direction.... EW Length of Time Analyzed... 60 (min) Analyst................... CTC Date of Analysis.......... 8/5/99 other information ......... Existing Conditions AM PEAK Two-way Stop -controlled Intersection Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- No. Lanes Stop/Yield Volumes PHF Grade MC' s (%) SU/RV'S (o) CV's (%) PCE'S ------------ 1 1 < 0 N 82 75 52' .95 .95 .95 0 1.10 --------------- 1 1 < 0 N 7 180 56 .95 .95 .95 0 1.10 ---------------- 0 > 1 1 53 30 10 .95 .95 .95 0 1.10 1.10 1.10 ---------------- Adjustment Factors 0 > 1. 1 26 54 119 .95 .95 .95 0 1.10 1.10 1.10 --------------- Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 -125- HCS: Unsignalized Intersections Release 2.1g E656-7A.HC0 Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 106 218 Potential Capacity: (pcph) 1224 1074 Movement Capacity: (pcph) 1224 1074 Prob. of Queue -Free State: 0.99 0.87 -------------------------------------------------------- Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 134 248 Potential Capacity: (pcph) 1480 1306 Movement Capacity: (pcph) 1480 1306 Prob. of Queue -Free State: 0.99 0.93 -------------------------------------------------------- Step 3: TH from Minor Street - NB SB -------------------------------------------------------- Conflicting Flows: (vph) 448 446 Potential Capacity: (pcph) 635 636 Capacity Adjustment Factor due to Impeding Movements 0.92 0.92 Movement Capacity: (pcph) 586 587 Prob. of Queue -Free State: 0.94 0.89 --------------------------------------------------------- Step 4: LT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 509 440 Potential Capacity: (pcph) 537 589 Major LT, Minor TH Impedance Factor: 0.82 0.87 Adjusted Impedance Factor: 0.86 0.90 Capacity Adjustment Factor due to Impeding Movements 0.75 0.89 Movement Capacity: -------------------------------------------------------- (pcph) 404 524 Intersection Performance Summary Avg. 950 Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) -------- NB L ------ 62 ------ 404 ------ > 455 ------- 10.1 ------- 0.9 ----- C --------- NB T 35 586 > 9.3 NB R 12 1224 3.0 0.0 A SB L 30 524 > 565 7.6 0.6 B SB T 63 587 > 5.4 SB R 138 1074 3.8 0.5 A EB L 95 1306 - 3.0 0.1 A 1.2 WB L 8 1480 2.4 0.0 A 0.1 Intersection Delay1260 2.9 sec/veh HCS: Unsignalized Intersections Release 2.1g E656-7P.HC0 Page 1 ----------------------------------------------------------------------- Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets: (N-S) Route 656 (E-W) Route 657 Major Street Direction.... EW Length of Time Analyzed... 60 (min) Analyst.... ............. CTC Date of Analysis.......... 8/5/99 Other Information ......... Existing Conditions PM PEAK Two-way Stop -controlled Intersection ----------------------------------------------------------------------- ----------------------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Stop/Yield Volumes PHF Grade MCI ( a) SU/RV'S M CV's ( o) PCE's ------------ 1 1 < 0 N 158 220 76 .95 .95 .95 0 1.10 --------------- 1 1 < 0 N, 14 132 54' .95 .95 .95' 0 1.10 ---------------- 0 > 1 1 65 69 16 .95 .95 .95 0 1.10 1.10 1.10 ---------------- Adjustment Factors 0 > 1 1 47 55 182 .95 .95 .95 0 1.10 1.10 1.10 --------------- Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 -127- HCS: Unsignalized Intersections Release 2.1g E656-7P.HC0 Page 2 Worksheet for TWSC Intersection Step 1: RT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 272 168 Potential Capacity: (pcph) 1008 1138 Movement Capacity: (pcph) 1008 1138 Prob. of Queue -Free State: 0.98 0.81 -------------------------------------------------------- Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 312 196 Potential Capacity: (pcph) 1217 1383 Movement Capacity: (pcph) 1217 1383 Prob. of Queue -Free State: 0.99 0.87 -------------------------------------------------------- Step 3: TH from Minor Street -------------------------------------------------------- NB SB Conflicting Flows: (vph) 649 660 Potential Capacity: (pcph) 498 491 Capacity Adjustment Factor due to Impeding Movements 0.86 0.86 Movement Capacity: (pcph) 426 420 Prob. of Queue -Free State: 0.81 0..85 -------------------------------------------------------- Step 4: LT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 746 666 Potential Capacity: (pcph) 392 436 Major LT, Minor TH Impedance Factor: 0.73 0.69 Adjusted impedance Factor: 0.79 0.76 Capacity Adjustment Factor due to Impeding Movements 0.64 0.75 Movement Capacity: (pcph) -------------------------------------------------------- 252 327 Intersection Performance Summary Avg. 950 Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) -------- NB L ------ 75 ------ 252 ------ > 319 ------- 21.8 ------- 2.9 ----- D --------- NB T 80 426 > 19.9 NB R 19 1008 3.6 0.0 A SB L 54 327 > 372 14.2 1.5 C SB T 64 420 > 7.6 SB R 211 1138 3.9 0.8 A EB L 183 1383 3.0 0.5 A 1.0 WB L 17 1217 3.0 0.0 A 0.2 Intersection Delay-12�- 5.2 sec/veh HCS: Unsignalized Intersections Release 2.1g ESTH656P.HC0 Page 1 Center For Microcomputers In Transportation University of Florida - 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 -------------------- Streets: (N-S) Route 656 SOUTH (E-W) Route 659 Major Street Direction.... EW Length of Time Analyzed... 60 (min) Analyst ................... CTC Date of Analysis.......... 8/5/99 Other Information ......... Existing Conditions AM PEAK Two-way Stop -controlled Intersection Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Stop/Yield Volumes PHF Grade MC's ( o) SU/RV' s ( %) CV' s ( 0 PCEIs ------------ 0 1 < 0 N 51 99 .95 .95 0 --------------- 0 > 1 0 N 94 51 .95 .95 0 1.10 ---------------- 0 > 0 < 0 99 106 .9 .95 0 1.10 1.10 ---------------- Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 -129- HCS: Unsignalized Intersections Release 2.1g ESTH656P.HC0 Page 2 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 106 Potential Capacity: (pcph) 1224 Movement Capacity: (pcph) 1224 Prob. of Queue -Free State: 0.90 -------------------------------------------------------- Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 158 Potential Capacity: (pcph) 1441 Movement Capacity: (pcph) 1441 Prob. of Queue -Free State: 0.92 TH Saturation Flow Rate: (pcphpl) 1700 RT Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -Free State: 0.92 -------------------------------------------------------- Step 4: LT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 259 Potential Capacity: (pcph) 750 Major LT, Minor TH Impedance Factor: 0.92 Adjusted Impedance Factor: 0.92 Capacity Adjustment Factor due to Impeding Movements 0.92 Movement Capacity: (pcph) -------------------------------------------------------- 691 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) ------- ----- (sec/veh) --------- -------- ------ ------ ------------- N)3 L 121 691 > 885 5.6 1.3 B 5.6 NB R 123 1224 > WB L 109 1441 2.7 0.2 A 1.8 Intersection Delay = 2.8 sec/veh -130- HCS: Unsignalized Intersections Release 2.1g ESTH656-.HCO Page 1 Center For Microcomputers In Transportation University of Florida - 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets: (N-S) Route 656 SOUTH (E-W) Route 659 Major Street Direction.... EW Length of Time Analyzed... 60 (min) Analyst ................... CTC Date of Analysis.......... 8/5/99 Other Information ......... Existing Conditions PM PEAK Two-way Stop -controlled Intersection ----------------------------------------------------------------------- ----------------------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Stop/Yield Volumes PHF Grade MC's (%) SU/RV ' s ( o ) CV's (o) PCE's ------------ 0 1 < 0 N 51 99 .95 .95 0 --------------- 0 > 1 0 N 106 42 .95 .95 0 1.10 ---------------- 0 > 0 < 0 78 94, .9 .95 0 1.10 1.10 ----------------- Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf ) ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 -131- HCS: Unsignalized Intersections Release 2.1g ESTH656-.HCO Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 106 Potential Capacity: (pcph) 1224 Movement Capacity: (pcph) 1224 Prob. of Queue -Free State: 0.91 -------------------------------------------------------- Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 158 Potential Capacity: (pcph) 1441 Movement Capacity: (pcph) 1441 Prob. of Queue -Free State: 0.91 TH Saturation Flow Rate: (pcphpl) 1700 RT Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -Free State: 0.91 -------------------------------------------------------- Step 4: LT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 262 Potential Capacity: (pcph) 747 Maj or LT, Minor TH Imvedance Factor: 0.91 Adjusted Impedance Factor: 0.91 Capacity Adjustment Factor due to Impeding Movements 0.91 Movement Capacity: (pcph) -------------------------------------------------------- 682 Intersection Performance Summary Avg. 95°s Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) ----- (sec/veh) --------- -------- ------ NB L 96 ------ 682 ------ > ------- ------- + 892 5.2 1.0 B 5.2 NB R 109 1224 > WB L 123 1441 2.7 0.2 A 2.0 Intersection Delay = 2.5 sec/veh -132- HCS: Unsignalized Intersections Release 2.1g E656-9A.HC0 Page 1 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Center For Microcomputers In Transportation University of Florida - 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ------------- Streets: (N-S) Route 656 North (E-W) Route 659 Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ................... CTC Date of Analysis.......... 8/5/99 Other Information ......... Existing Conditions AM PEAK Two-way Stop -controlled Intersection ----------------------------------------------------------------------- ----------------------------------------------------------------------- Northbound Southbound Eastbound Westbound L T R L T R L T R L T R __J No. Lanes Stop/Yield Volumes PHF Grade MCI (0 SU/RVIs (o) CVIs (%) PCEIs 0 1 < 0 N 96 52 .95 .95 0 --------------- 0 > 1 0 N 3 71 .95 .95 0 1.10 Adjustment Factors 0 > 0 < 0 74 2 .95 .95 0 1.10 1.10 --------------- Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 -133- HCS: Unsignalized Intersections Release 2.1g E656-9A.HC0 Page 2 ----------------------------------------------------------------------- Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 128 Potential Capacity: (pcph) 1193 Movement Capacity: (pcph) 1193 Prob. of Queue -Free State: 1.00 -------------------------------------------------------- Step 2: LT from Major Street SB NB -------------------------------------------------------- Conflicting Flows: (vph) 156 Potential Capacity: (pcph) 1445 Movement Capacity: (pcph) 1445 Prob. of Queue -Free State: 1.00 TH Saturation Flow Rate: (pcphpl) 1700 RT Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -Free State: 1.00 -------------------------------------------------------- Step 4: LT from Minor Street WB EB -------------------------------------------------------- Conflictirg Flows: (vph) 206 Potential Capacity: (pcph) 805 Major LT, Minor TH Impedance Factor: 1.00 Adjusted Impedance Factor: 1.00 Capacity Adjustment Factor due to Impeding Movements 1.00 Movement Capacity: (pcph) -------------------------------------------------------- 803 Intersection Performance Summary Avg. 950 Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) ------- (veh) ------- (sec/veh) -------------- -------- ------ WB L 86 ------ 803 ------ > 809 5.0 0.3 A 5.0 WB R 2 1193 > SB L 3 1445 2.5 0.0 A 0.1 Intersection Delay = 1.3 sec/veh -134- HCS: Unsignalized Intersections Release 2.1g E656-9P.HC0 Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ------------------------ Streets: (N-S) Route 656 North (E-W) Route 659 Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ................... CTC Date of Analysis.......... 8/5/99 Other Information ......... Existing Conditions PM PEAK Two-way Stop -controlled Intersection Northbound Southbound Eastbound Westbound L T R L T R L T R L T R No. Lanes Stop/Yield Volumes PHF Grade MC's (t) SU/RV'S M CV's ( o) PCE's ------------ 0 1 < 0 N 71 74 .95 .95 0 --------------- 0 > 1 0 N 2 96 .95 .95 0 1.10 ---------------- Adjustment Factors 0 > 0 < 0 52 3 .95 .95 0 1.10 1.10 --------------- Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf ) ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 -135- HCS: Unsignalized Intersections Release 2.1g E656-9P.HC0 Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 114 Potential Capacity: (pcph) 1212 Movement Capacity: (pcph) 1212 Prob. of Queue -Free State: 1.00 -------------------------------------------------------- Step 2: LT from Major Street SB NB -------------------------------------------------------- Conflicting Flows: (vph) 153 Potential Capacity: (pcph) 1449 Movement Capacity: (pcph) 1449 Prob. of Queue -Free State: 1.00 TH Saturation Flow Rate: (pcphpl) 1700 RT Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -Free State: 1.00 -------------------------------------------------------- Step 4: LT from Minor Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 217 Potential Capacity: (pcph) 793 Major LT, Minor TH impedance Factor: 1.00 Adjusted Impedance Factor: 1.00 Capacity Adjustment Factor due to Impeding Movements 1.00 Movement Capacity: -------------------------------------------------------- (pcph) 792 Intersection Performance Summary Avg. 95a Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) -------- ------ WB L 61 ------ 792 ------ > ------- ------- -------------- 805 4.9 0.2 A 4.9 WB R 3 1212 > SB L 2 1449 2.5 0.0 A 0.1 Intersection Delay = 0.9 sec/veh -136- 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... Route 659 south of Route 7 ANALYST .............. CTC TIME OF ANALYSIS..... AM PEAK DATE OF ANALYSIS..... 04-29-1999 OTHER INFORMATION.... Existing Conditions A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS ........................ 2 PERCENTAGE OF BUSES. ...................... 0 PERCENTAGE OF RECREATIONAL VEHICLES......... 0 DESIGN SPEED (MPH) .......................... 50 PEAK HOUR FACTOR ............................ .95 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... 41 / 59 LANE WIDTH(FT)............................. 10 USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... 6 PERCENT NO PASSING ZONES .................... 100 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV --- ----- ----- ----- ----- A 2 1.8 2.2 1 ----- ----- .9 .98 B 2.2 2 2.5 1 .9 .98 C 2.2 2 2.5 1 .9 .98 D 2 1.6 1.6 1 .9 .98 E 2 1.6 1.6 1 .9 .98 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 147 ACTUAL FLOW RATE: 155 SERVICE LOS FLOW RATE V/C ------------ ----- A 99 .04 B 394 .16 C 788 .32 D 1408 .57 E 2471 1 -137- LOS FOR GIVEN CONDITIONS: B -138- 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... Route 659 south of Route 7 ANALYST..............n CTC TIME OF ANALYSIS.....M PEAK DATE OF ANALYSIS..... 04-29-1999 OTHER INFORMATION.... Existing Conditions A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS ........................ 2 PERCENTAGE OF BUSES :........................ 0 PERCENTAGE OF RECREATIONAL VEHICLES......... 0 DESIGN SPEED (MPH) .......................... 50 PEAK HOUR FACTOR ............................ .95 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... 41 / 59 LANE WIDTH (FT)....... .................... 10 USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... 6 PERCENT NO PASSING ZONES .................... 100 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV --- ----- ----- ----- A 2 1.8 2.2 ----- .84 ----- ----- .95 .98 B 2.2 2 2.5 .84 .95 .98 C 2.2 2 2.5 .84 .95 .98 D 2 1.6 1.6 .84 .95 .98 E 2 1.6 1.6 .87 .95 .98 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 171 ACTUAL FLOW RATE: 180 SERVICE LOS FLOW RATE V/C ------------ ----- A 87 .04 B 348 .16 C 695 .32 D 1243 .57 E 2259 1 -139- LOS FOR GIVEN CONDITIONS: B -140- 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... Route 655 west of Route 656 ANALYST .............. CTC TIME OF ANALYSIS..... AM PEAK DATE OF ANALYSIS..... 04-29-1999 OTHER INFORMATION.... EXISTING CONDITIONS A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS ........................ 2 PERCENTAGE OF BUSES ......................... 0 PERCENTAGE OF RECREATIONAL VEHICLES......... 0 DESIGN SPEED (MPH) .......................... 50 PEAK HOUR FACTOR ............................ .95 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... 32 / 68 LANE WIDTH(FT)............................. 12 USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... 6 PERCENT NO PASSING ZONES .................... 100 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV --- ----- ----- ----- ----- A 2 1.8 2.2 1 ----- .9 .98 B 2.2 2 2.5 1 .9 .98 C 2.2 2 2.5 1 .9 .98 D 2 1.6 1.6 1 .9 .98 ' E 2 1.6 1.6 1 .9 .98 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 326 ACTUAL FLOW RATE: 343 SERVICE LOS FLOW RATE V/C ------------ ----- A 99 .04 B 394 .16 C 788 .32 D 1408 .57 E 2471 1 LOS FOR GIVEN CONDITIONS : - fAj - LOS FOR GIVEN CONDITIONS: C -142- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08-05-1999 Center For Microcomputers In Transportation ---------------------- Streets: (E-W) Route 657 - (N-S) Route 656 Analyst: CTC File Name: RB656-7A.HC9 Area Type: Other 8-5-99 AM PEAK Comment: 2005 Residential Build -out No. Lanes Volumes PHF or PK15 Lane W (ft) Grade Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr Type RTOR Vols Lost Time Prop. Share Prop. Prot. ------------ Phase Combi n Eastbound L T R ---- ---- ----I 1 1 1 158 163 64I 0.95 0.95 0.95'. 12.0 12.0 12.0' 0 2 2 2 N N 0 0 (Y/N) N 3 3 3 13 3.00 3.00 3.00 ation 1 2 Westbound L T R ---- ---- ---- 118 398 33i 0.95 0.95 0.95' 12.0 12.0 12.0'. 0 2 2 2 N N 0 0 (Y/N) N 3 3 3 6 3.00 3.00 3.00 ---------------- Signal Operatic 3 4 --------------------- Northbound I Southbound L T R L T R 0 > 1 1 65 44 21 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (Y/N) N 3 3 4 3.00 3.00 3.00 ---------------- )ns 5 0 > 1 1 48 88 215 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (Y/N) N 3 3 43 3.00 3.00 3.00 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 74.OA Green 38.OP Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 120 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts - Cap Flow Ratio Ratio Delay LOS Delay LOS --- ----- EB L ---- 357 ------- 571 ----- 0.465 ----- ----- 0.625 8.4 --- B ----- 7.0 B T 1164 1863 0.148 0.625 6.0 B R 990 1583 0.054 0.625 5.6 B WB L 707 1131 0.175 0.625 6.1 B 6.8 B T 1164 1863 0.360 0.625 7.1 B R 990 1583 0.029 0.625 5.6 B NB LT 444 1365 0.257 0.325 19.3 C 19.1 C R 515 1583 0.035 0.325 17.9 C SB LT 521 1602 0.277 0.325 19.5 C 19.8 C R 515 1583 0.352 0.325 20.1 C Intersection Delay = 11.0 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.426 ---------------------------------14a----------------------------------- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08-05-1999 Center For Microcomputers In Transportation ----------------------------------------------------------------------- ----------------------------------------------------------------------- Streets: (E-W) Route 657 (N-S) Route 656 Analyst: CTC File Name: RB656-7P.HC9 Area Type: Other 8-5-99 pM PEAK Comment: 2005 Residential Build -out ----------------------------------------------------------------------- ----------------------------------------------------------------------- Eastbound ( WestboundI Northbound ( Southboundd L LR Ld L No. Lanes volumes PHF or PK15 Lane W (ft) Grade % Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr Type RTOR Vols Lost Time Prop. Share Prop. Prot. ------------ Phase Combi ---- ---- ---- 285 464 93' 0.95 0.95 0.95 12.0 12.0 12.0 0 2 2 2 N N 0 0 (Y/N) N 3 3 3 19 3.00 3.00 3.00 --------------- nation 1 2 1 1 1 96 280 32 0.95 0.95 0.95', 12.0 12.0 12.0' 0 2 2 2 N N 0 0 (Y/N) N 3 3 3 6 3.00 3.00 3.00 ---------------- Signal Operatic 3 4 80 110 46 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (Y/N) N 3 3 9 3.00 3.00 3.00 ---------------- )ns 5 0 > 1 1 110 82 304 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (Y/N) N 3 3 61 3.00 3.00 3.00 --------------- 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 74.OA Green 38.OP Yellow/AR 4.0 Yellow/AR 4.0 Cycle Length: 120 secs Phase combination order: #1 #5 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS --- ----- EB L ---- 505 ------- 808 ----- 0.594 ----- ----- 0.625 10.1 --- B ----- 8.2 B T 1164 1863 0.419 0.625 7.5 B R 990 1583 0.079 0.625 5.7 B WB L 270 432 0.374 0.625 7.5 B 6.7 B T 1164 1863 0.253 0.625 6.5 B R 990 1583 0.028 0.625 5.5 B NB LT 392 1208 0.510 0.325 22.1 C 21.4 C R 515 1583 0.076 0.325 18.1 C SB LT 325 1001 0.621 0.325 24.7 C 23.0 C R 515 1583 0.497 0.325 21.7 C Intersection Delay = 12.9 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec CF'Atical v/c(x) = 0.603 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08-05-1999 Center For Microcomputers In Transportation -------------------- Streets: (E-W) Route 659 (N-S) Route 656 Analyst: CTC File Name: RB656-9A.HC9 Area Type: Other 8-5-99 AM PEAK Comment: 2005 Residential Build -Out No. Lanes Volumes PHF or PK15 Lane W (ft) Grade °s Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr Type RTOR Vols Lost Time Prop. Share Prop. Prot. Phase Combi n Eastbound L T R 1 1 < 0 26 38 109 0.95 0.95 0.95 12.0 12.0 0 2 2 2I, N N 0 0 (YIN) N 3 3 12 3.00 3.00 3.00 ---------------- ation 1 2 Westbound L T R 1 1 < 0 73 76 101 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (YIN) N 3 3 22 3.00 3.00 3.00 ---------------- Signal Operatic 3 4 EB Left Thru Right Peds WB Left Thru Right Peds NB Right SB Right Green 10.OA 50.OA Yellow/AR 0.0 5.0 Cycle Length: 120 secs Phase combinat: --------------------------------------- Intersection Perfort Lane Group: Adj Sat v/c Mvmts Cap Flow Ratio I EB L TR WB L TR NB L TR SB L TR Lost Time/Cycl 554 1770 859 1662 510 1177 745 1720 488 1220 713 1782 289 1770 793 1830 Intersection e, L = 12.0 -------------------------- Northbound I Southbound L T R L T R 1 1 < 0 161 172 70 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (YIN) N 3 3 0 3.00 3.00 3.00 ---------------- )ns 5 1 1 < 0 31 106 14 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (YIN) N 3 3 0 3.00 3.00 3.00 --------------- 6 7 8 NB Left Thru Right Peds SB Left Thru Right Peds EB Right WB Right Green 4.OA 47.OA Yellow/AR 0.0 4.0 _on order: #1 #2 #5 #6 •------------------------=------- lance Summary g/C Approach:. ratio Delay LOS Delay LOS 0.049 0.517 9.3 B 9.8 B 0.165 0.517 9.9 B 0.151 0.433 13.3 B 13.6 B 0.219 0.433 13.8 B 0.346 0.400 16.4 C 16.4 C 0.358 0.400 16.4 C. 0.114 0.433 14.1 B 13.5 B 0.160 0.433 13.4 B Delay = 14.2 sec/veh Intersection LOS = B sec Critical v/c(x) = 0.291 ----------------------------------------------------------------------- -145- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08-05-1999 Center For Microcomputers In Transportation --------------------- Streets: (E-W) Route 659 (N-S) Route 656 Analyst: CTC File Name: RB656-9P.HC9 Area Type: Other 8-5-99 PM PEAK Comment: 2005 Residential Build -Out No. Lanes Volumes PHF or PK15 Lane W (ft) Grade Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr Type RTOR Vols Lost Time Prop. Share Prop. Prot.) ------------ Phase Combi n Eastbound L T R 1 1 < 0 23 79 164 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (Y/N) N 3 3 12 3.00 3.00 3.00 ation 1 2 Westbound L T R 1 1 < 0 77 48 63I 0.95 0.95 0.95'. 12.0 12.0 0 2 2 2 N N 0 0 (Y/N) N 3 3 22 3.00 3.00 3.00 ---------------- Signal Operatic 3 4 EB Left Thru Right Peds WB Left Thru Right Peds NB Right SB Right Green 10.OA 50.OA Yellow/AR 0.0 5.0 Cycle Length: 120 secs Phase combinat- --------------------------------------- Intersection Perforr Lane Group: Adj Sat v/c Mvmts Cap Flow Ratio I EB L TR WB L TR NB L TR SB L TR 671 1770 867 1679 380 878 752 1735 275 687 698 1746 358 1770 790 1823 Intersection Lost Time/Cycle, L = 9.0 ----------------------------------------------------------------------- ----------------------- Northbound I Southbound L T R L T R ---- 1 ---- 1 < ---- 0 120 116 84 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (Y/N) N 3 3 0 3.00 3.00 3.00 ---------------- )ns 5 1 1 < 0 49 228 38 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (Y/N) N 3 3 0 3.00 3.00 3.00 --------------- 6 7 8 NB Left Thru Right Peds SB Left Thru Right Peds EB Right WB Right Green 4.OA 47.OA Yellow/AR 0.0 4.0 .on order: #1 #2 #5 #6 •-------------------------------- lance Summary g/C Approach: ratio Delay LOS Delay LOS 0.036 0.517 9.2 B 10.5 B 0.280 0.517 10.6 B 0.213 0.433 13.8 B 13.4 B 0.125 0.433 13.2 B 0.459 0.400 18.0 C 16.7 C 0.301 0.400 15.9 C 0.145 0.433 15.1 C 14.9 B 0.354 0.433 14.8 B Delay-14.1 sec/veh Intersection sec Critical v/c(x) = 0.364 LOS = B -146- 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... Route 655 west of Route 656 ANALYST .............. CTC TIME OF ANALYSIS..... PM PEAK DATE OF ANALYSIS..... 04-29-1999 OTHER INFORMATION.... EXISTING CONDITIONS A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS ........................ 2 PERCENTAGE OF BUSES ......................... 0 PERCENTAGE OF RECREATIONAL VEHICLES......... 0 DESIGN SPEED (MPH) .......................... 50 PEAK HOUR FACTOR ............................ .95 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... 65 / 35 LANE WIDTH(FT)............................. 12 USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... 6 PERCENT NO PASSING ZONES .................... 100 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV --- ----- ----- ----- ----- A 2 1.8 2.2 1 ----- ----- .9 .98 B 2.2 2 2.5 1 .9 .98 C 2.2 2 2.5 1 .9 .98 D 2 1.6 1.6 1 .9 .98 E 2 1.6 1.6 1 .9 .98 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 375 ACTUAL FLOW RATE: 395 SERVICE LOS FLOW RATE V/C ------------ ----- A 99 .04 B 394 .16 _. C 788 .32 D 1408 .57 E 2471 1 -147- HCS: Unsignalized Intersections Release 2.1g RB656-9A.HC0 Page 1 Center For Microcomputers In Transportation University of Florida - 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ----------------------------------------------------------------------- Streets: (N-S) Route 656 (E-W) Route 659 Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ................... CTC Date of Analysis.......... 8/5/99 Other information ......... 2005 Residential Build -Out AM PEAK Two-way Stop -controlled Intersection Northbound Southbound Eastbound westbound L T R L T R L T R L T R No. Lanes Stop/Yield Volumes PHF Grade MC's M SU/RVIs (o) CV's (°s) PCEIs 1 1 < 0 N 161 172 70 .9 .95 .95 0 1.10 ---------------- 1 1 < 0 N 31 106 14 .95 .95 .95 0 1.10 ---------------- 1 1 < 0 26 38 109 .9 .95 .95 0 1.10 1.10 1.10 ---------------- Adjustment Factors 1 1 < 0 73 76 101 .95 .95 .95 0 1.10 1.10 1.10 --------------- vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 -148- t HCS: Unsignalized Intersections Release 2.1g RB656-9A.HC0 Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 218 120 Potential Capacity: (pcph) 1074 1204 Movement Capacity: (pcph) 1074 1204 Prob. of Queue -Free State: 0.89 0.89 -------------------------------------------------------- Step 2: LT from Major Street SB NB -------------------------------------------------------- Conflicting Flows: (vph) 255 127 Potential Capacity: (pcph) 1296 1491 Movement Capacity: (pcph) 1296 1491 Prob. of Queue -Free State: 0.97 0.87 -------------------------------------------------------- Step 3: TH from Minor Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 557 586 Potential Capacity: (pcph) 557 537 Capacity Adjustment Factor due to Impeding Movements 0.84 0.84 Movement Capacity: (pcph) 470 453 Prob. of Queue -Free State: 0.81 0.90 -------------------------------------------------------- Step 4: LT from Minor Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 627 642 Potential Capacity: (pcph) 459 450 Major LT, Minor TH Impedance Factor: 0.76 0.69 Adjusted Impedance Factor: 0.82 0.76 Capacity Adjustment Factor due to Impeding Movements 0.73 0.67 Movement Capacity: -------------------------------------------------------- (pcph) 335 303 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) -------- EB L ------ 32 ------ 303 ------ ------- 13.3 ------- 0.3 ----- C --------- EB T 44 453 > 6.5 EB R 127 1204 > 844 5.3 0.9 B WB L 85 335 14.4 1.1 C WB T 88 470 > 9.4 WB R 117 1074 > 692 7.4 1.4 B NB L 197 1491 2.8 0.5 A 1.1 SB L 36 1296 2.9 0.0 A 0.6 Intersection DelaI149= 4.1 sec/veh HCS: Unsignalized Intersections Release 2.1g RB656-9P.HC0 Page 1 Center For Microcomputers In Transportation University of Florida - 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets: (N-S) Route 656 (E-W) Route 659 Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ................... CTC Date of Analysis.......... 8/5/99 Other Information ......... 2005 Residential Build -Out PM PEAK Two-way Stop -controlled Intersection Northbound Southbound Eastbound Westbound L T R L T R L T R L T R No. Lanes Stop/Yield Volumes PHF Grade MCIs (°s) SU/RV'S (a) CV's (o) PCE'S ------------ 1 1 < 0 N 120 116 84 .9 .95 .95 0 1.10 --------------- 1 1 < 0 N 49 228 38 .95 .95 .95 0 1.10 ---------------- 1 1 < 0 23 79 164 .9 .95 .95 0 1.10 1.10 1.10 ---------------- Adjustment Factors 1 1 < 0 77 48 63 .95 .95 .95 0 1.10 1.10 1.10 --------------- Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 -150- HCS: Unsignalized Intersections Release 2.1g RB656-9P.HC0 Page 2 ------------------ Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 166 260 Potential Capacity: (pcph) 1141 1022 Movement Capacity: (pcph) 1141 1022 Prob. of Queue -Free State: 0.94 0.81 -------------------------------------------------------- Step 2: LT from Major Street SB NB -------------------------------------------------------- Conflicting Flows: (vph) 210 280 Potential Capacity: (pcph) 1361 1261 Movement Capacity: (pcph) 1361 1261 Prob. of Queue -Free State: 0.96 0.88 -------------------------------------------------------- Step 3: TH from Minor Street -------------------------------------------------------- WB EB Conflicting Flows: (vph) 631 655 Potential Capacity: (pcph) 509 494 Capacity Adjustment Factor due to Impeding Movements 0.85 0.85 Movement Capacity: (pcph) 431 419 Prob. of Queue -Free State: 0.87 0.78 -------------------------------------------------------- Step 4: LT from Minor Street WB EB -------------------------------------------------------- Conflicting Flows: (vph.) 739 670 Potential Capacity: (pcph) 395 433 Major LT, Minor TH Impedance Factor: 0.66 0.74 Adjusted Impedance Factor: 0.74 0.80 Capacity Adjustment Factor due to Impeding Movements 0.60 0.75 Movement Capacity: -------------------------------------------------------- (pcph) 238 323 Intersection Performance Summary Avg. 9 5 0 Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph) (sec/veh) (veh) (sec/veh) EB L 29 323 12.2 0.2 C EB T 91 419 > 9.0 EB R 190 1022 > 697 8.6 2.2 B WB L 89 238 24.1 1.9 D WB T 56 431 > 13.8 WB R 73 1141 > 665 6.7 0.8 B NB L 146 1261 3.2 0.4 A 1.2 SB L 57 1361 2.8 0.0 A 0.4 Intersection Delay151= 5.1 sec/veh 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... Route 659 south of Route 7 ANALYST .............. CTC TIME OF ANALYSIS..... AM Peak DATE OF ANALYSIS..... 7-3-1999 OTHER INFORMATION.... 2005 Residential Build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS ........................ 2 PERCENTAGE OF BUSES ......................... 0 PERCENTAGE OF RECREATIONAL VEHICLES......... 0 DESIGN SPEED (MPH) .......................... 50 PEAK HOUR FACTOR............ .............. .95 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... 46 / 54 LANE WIDTH(FT)............................. 10 USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... 6 PERCENT NO PASSING ZONES .................... 100 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV --- ----- ----- ----- ----- A 2 1.8 2.2 .84 ----- ----- .98 .98 B 2.2 2 2.5 .84 .98 .98 C 2.2 2 2.5 .84 .98 .98 D 2 1.6 1.6 .84 .98 .98 + E 2 1.6 1.6 .87 .98 .98 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 300 ACTUAL FLOW RATE: 316 SERVICE LOS FLOW RATE V/C --- --------- A 90 .04 B 359 .16 C 717 .32 D 1283 .57 - E 2331 1 LOS FOR GIVEN CONDITIONS : _ 1 5 2 _ 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... Route 659 south of Route 7 ANALYST .............. CTC TIME OF ANALYSIS..... PM PEAK DATE OF ANALYSIS..... 7-3-1999 OTHER INFORMATION.... 2005 Residential Build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS ........................ 2 PERCENTAGE OF BUSES ......................... 0 PERCENTAGE OF RECREATIONAL VEHICLES......... 0 DESIGN SPEED (MPH) .......................... 50 PEAK HOUR FACTOR ............................ .95 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... 49 / 51 LANE WIDTH(FT)............................. 10 USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... 6 PERCENT NO PASSING ZONES .................... 100 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV --- ----- ----- ----- ----- A 2 1.8 2.2 1 ----- ----- .9 .98 B 2.2 2 2.5 1 .9 .98. C 2.2 2 2.5 1 .9 .98 D 2 1.6 1.6 1 .9 .98 E 2 1.6 1.6 1 .9 .98 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 363 ACTUAL FLOW RATE: 382 SERVICE LOS FLOW RATE V/C ------------ ----- A 99 .04 B 394 .16 _ C 788 .32 D 1408 .57 E 2471 1 -153- LOS FOR GIVEN CONDITIONS: B -154- 1985 HCM:TWO-LANE HIGHWAYS FACILITY LOCATION.... Route 655 west of Route 656 ANALYST .............. CTC TIME OF ANALYSIS..... AM Peak DATE OF ANALYSIS..... 07-05-99 OTHER INFORMATION.... 2005 Residential Build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS ........................ 2 PERCENTAGE OF BUSES ......................... 0 PERCENTAGE OF RECREATIONAL VEHICLES......... 0 DESIGN SPEED (MPH) .......................... 50 PEAK HOUR FACTOR ............................ .95 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... 68 / 32 LANE WIDTH(FT)............................. 12 USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... 6 PERCENT NO PASSING ZONES .................... 100 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV --- ----- ----- ----- A 2 1.8 2.2 ----- ----- 1 ----- .9 .98 B 2.2 2 2.5 1 .9 .98 C 2.2 2 2.5 1 .9 .98 D 2 1.6 1.6 1 .9 .98 E 2 1.6 1.6 1 .9 .98 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 326 ACTUAL FLOW RATE: 343 SERVICE LOS FLOW RATE V/C ------------ ----- A 99 .04 B 394 .16 C 788 .32 - D 1408 .57 E 2471 1 -155- LOS FOR GIVEN CONDITIONS: B -156- 1985 HCM:TWO-LANE HIGHWAYS FACILITY LOCATION.... Route 655 west of Route 656 ANALYST .............. CTC TIME OF ANALYSIS..... PM PEAK DATE OF ANALYSIS..... 04-29-1999 OTHER INFORMATION.... 2005 Residential Build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS ........................ 2 PERCENTAGE OF BUSES ......................... 0 PERCENTAGE OF RECREATIONAL VEHICLES......... 0 DESIGN SPEED (MPH) .......................... 50 PEAK HOUR FACTOR ............................ .95 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... 65 / 35 LANE WIDTH(FT)............................. 12 USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... 6 PERCENT NO PASSING ZONES .................... 100 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV --- ----- ----- ----- A 2 1.8 2.2 ----- 1 ----- ----- .9 .98 B 2.2 2 2.5 1 .9 .98 C 2.2 2 2.5 1 .9 .98 D 2 1.6 1.6 1 .9 .98 E 2 1.6 1.6 1 .9 .98 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 655 ACTUAL FLOW RATE: 689 SERVICE LOS FLOW RATE V/C ------------ ----- A 99 .04 B 394 .16 C 788 .32 D 1408 .57 E 2471 1 -157- LOS FOR GIVEN CONDITIONS: C -158- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08-05-1999 Center For Microcomputers In Transportation --------------------- Streets: (E-W) Route 657 (N-S) Route 656 Analyst: CTC File Name: FB656-7A.HC9 Area Type: Other 8-5-99 AM PEAK Comment: 2005 Residential + Retail Build -Out ------------- -------------------------------------------------------- Eastbound I Westbound I Northbound I Southbound L T R L T R L T R L T R No. Lanes Volumes PHF or PK15 Lane W (ft) Grade 's Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr Type RTOR Vols Lost Time Prop. Share Prop. Prot., - Phase Combi n 1 1 1 158 190 64 0.95 0.95 0.95 12.0 12.0 12.0 0 2 2 2 N N 0 0 (YIN) N 3 3 3 13 3.00 3.00 3.00 ation 1 2 1 1 1 36 416 124 0.95 0.95 0.95 12.0 12.0 12.0 0 2 2 2 N N 0 0 (YIN) N 3 3 3 25 3.00 3.00 3.00 ---------------- Signal Operatic 3 4 0 > 1 1 65 44 25 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (YIN) N 3 3 5 3.00 3.00 3.00 ---------------- ms 5 0 > 1 1 58 88 215 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (YIN) N 3 3 43 3.00 3.00 3.00 6 7 8 EB Left * * NB Left Thru * * Thru Right * * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 10.OA 53.OA Green 4.OA 44.OA Yellow/AR 0.0 5.0 Yellow/AR 0.0 4.0 Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- + Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ----------- ----- ----- ----- --- ----- --- EB L 240 1770 0.692 0.542 16.5 C 11.9 B T 1009 1863 0.198 0.542 9.1 B R 857 1583 0.062 0.542 8.4 B WB L 474 1035 0.080 0.458 11.8 B 14.5 B T 854 1863 0.513 0.458 15.3 C R 726 1583 0.145 0.458 12.2 B NB LT 482 1285 0.237 0.375 16.7 C 16.5 C R 594 1583 0.035 0.375 15.3 C SB LT 697 1706 0.22-1 0.408 14.9 B 15.2 C R 646 1583 0.280 0.408 15.4 C Intersection Delay = 14.1 sec/veh Intersection LOS = B Lost Time/Cycle, L = 9.0 sec Cjtical v/c(x) = 0.441 1 1 1 36 416 124 0.95 0.95 0.95 12.0 12.0 12.0 0 2 2 2 N N 0 0 (YIN) N 3 3 3 25 3.00 3.00 3.00 ---------------- Signal Operatic 3 4 0 > 1 1 65 44 25 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (YIN) N 3 3 5 3.00 3.00 3.00 ---------------- ms 5 0 > 1 1 58 88 215 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (YIN) N 3 3 43 3.00 3.00 3.00 6 7 8 EB Left * * NB Left Thru * * Thru Right * * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 10.OA 53.OA Green 4.OA 44.OA Yellow/AR 0.0 5.0 Yellow/AR 0.0 4.0 Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- + Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ----------- ----- ----- ----- --- ----- --- EB L 240 1770 0.692 0.542 16.5 C 11.9 B T 1009 1863 0.198 0.542 9.1 B R 857 1583 0.062 0.542 8.4 B WB L 474 1035 0.080 0.458 11.8 B 14.5 B T 854 1863 0.513 0.458 15.3 C R 726 1583 0.145 0.458 12.2 B NB LT 482 1285 0.237 0.375 16.7 C 16.5 C R 594 1583 0.035 0.375 15.3 C SB LT 697 1706 0.22-1 0.408 14.9 B 15.2 C R 646 1583 0.280 0.408 15.4 C Intersection Delay = 14.1 sec/veh Intersection LOS = B Lost Time/Cycle, L = 9.0 sec Cjtical v/c(x) = 0.441 0 > 1 1 65 44 25 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (YIN) N 3 3 5 3.00 3.00 3.00 ---------------- ms 5 0 > 1 1 58 88 215 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (YIN) N 3 3 43 3.00 3.00 3.00 6 7 8 EB Left * * NB Left Thru * * Thru Right * * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 10.OA 53.OA Green 4.OA 44.OA Yellow/AR 0.0 5.0 Yellow/AR 0.0 4.0 Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- + Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ----------- ----- ----- ----- --- ----- --- EB L 240 1770 0.692 0.542 16.5 C 11.9 B T 1009 1863 0.198 0.542 9.1 B R 857 1583 0.062 0.542 8.4 B WB L 474 1035 0.080 0.458 11.8 B 14.5 B T 854 1863 0.513 0.458 15.3 C R 726 1583 0.145 0.458 12.2 B NB LT 482 1285 0.237 0.375 16.7 C 16.5 C R 594 1583 0.035 0.375 15.3 C SB LT 697 1706 0.22-1 0.408 14.9 B 15.2 C R 646 1583 0.280 0.408 15.4 C Intersection Delay = 14.1 sec/veh Intersection LOS = B Lost Time/Cycle, L = 9.0 sec Cjtical v/c(x) = 0.441 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08-05-1999 Center For Microcomputers In Transportation ----------------------------------------------------------------------- ----------------------------------------------------------------------- Streets: (E-W) Route 657 (N-S) Route 656 Analyst: CTC File Name: FB656-7P.HC9 Area Type: Other 8-5-99 PM PEAK Comment: 2005 Residential + Retail Build -Out ----------------------------------------------------------------------- ----------------------------------------------------------------------- IEastbound I WestboundI Northbound I Southboundd L LR Ld L No. Lanes Volumes PHF or PK15 Lane W ( f t ) Grade 0-4 Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr Type RTOR Vols Lost Time Prop. Share Prop. Prot. ------------ Phase Combi n 1 1 1 285 550 93 0.95 0.95 0.95 12.0 12.0 12.0 0 2 2 21 N N 0 0 (Y/N) N 3 3 3 19 3.00 3.00 3.00 ation 1 2 1 1 1 47 374 127 0.95 0.95 0.95 12.0 12.0 12.0 0 2 2 2 N N 0 0 (Y/N) N 3 3 3 25 3.00 3.00 3.00 ---------------- Signal Operatic 3 4 0 > 1 1 7 80 110 601 0.95 0.95 0.951 12.0 12.0' 0 2 2 2 N N 0 0 (Y/N) N 3 3 12 3.00 3.00 3.00 )ns 5 0 > 1 1 139 82 304 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (Y/N) N 3 3 61 3.00 3.00 3.00 6 7 8 EB Left * * NB Left Thru * * Thru Right * * Right Peds Peds WE Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WE Right Green 19.OA 49.OA Green 4.OA 40.OA Yellow/AR 0.0 4.0 Yellow/AR 0.0 4.0 Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ----------- ----- ----- ----- --- ----- EB L 395 1770 0.759 0.575 16.3 C 12.1 B T 1071 1863 0.541 0.575 10.6 B R 910 1583 0.086 0.575 7.4 B WE L 97 232 0.507 0.417 20.2 C 16.9 C T 776 1863 0.508 0.417 17.2 C R 660 1583 0.164 0.417 14.2 B NB LT 397 1162 0.504 0.342 21.2 C 20.4 C R 541 1583 0.092 0.342 17.3 C SB LT 588 1568 0.395 0.375 18.0 C 18.2 C R 594 1583 0.431 0.375 18.4 C Intersection Delay = 15.5 sec/veh Intersection LOS = C Lost Time/Cycle, L = 9.0 sec Cyr ical v/c(x) = 0.548 1 1 1 47 374 127 0.95 0.95 0.95 12.0 12.0 12.0 0 2 2 2 N N 0 0 (Y/N) N 3 3 3 25 3.00 3.00 3.00 ---------------- Signal Operatic 3 4 0 > 1 1 7 80 110 601 0.95 0.95 0.951 12.0 12.0' 0 2 2 2 N N 0 0 (Y/N) N 3 3 12 3.00 3.00 3.00 )ns 5 0 > 1 1 139 82 304 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (Y/N) N 3 3 61 3.00 3.00 3.00 6 7 8 EB Left * * NB Left Thru * * Thru Right * * Right Peds Peds WE Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WE Right Green 19.OA 49.OA Green 4.OA 40.OA Yellow/AR 0.0 4.0 Yellow/AR 0.0 4.0 Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ----------- ----- ----- ----- --- ----- EB L 395 1770 0.759 0.575 16.3 C 12.1 B T 1071 1863 0.541 0.575 10.6 B R 910 1583 0.086 0.575 7.4 B WE L 97 232 0.507 0.417 20.2 C 16.9 C T 776 1863 0.508 0.417 17.2 C R 660 1583 0.164 0.417 14.2 B NB LT 397 1162 0.504 0.342 21.2 C 20.4 C R 541 1583 0.092 0.342 17.3 C SB LT 588 1568 0.395 0.375 18.0 C 18.2 C R 594 1583 0.431 0.375 18.4 C Intersection Delay = 15.5 sec/veh Intersection LOS = C Lost Time/Cycle, L = 9.0 sec Cyr ical v/c(x) = 0.548 0 > 1 1 7 80 110 601 0.95 0.95 0.951 12.0 12.0' 0 2 2 2 N N 0 0 (Y/N) N 3 3 12 3.00 3.00 3.00 )ns 5 0 > 1 1 139 82 304 0.95 0.95 0.95 12.0 12.0 0 2 2 2 N N 0 0 (Y/N) N 3 3 61 3.00 3.00 3.00 6 7 8 EB Left * * NB Left Thru * * Thru Right * * Right Peds Peds WE Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WE Right Green 19.OA 49.OA Green 4.OA 40.OA Yellow/AR 0.0 4.0 Yellow/AR 0.0 4.0 Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ----------- ----- ----- ----- --- ----- EB L 395 1770 0.759 0.575 16.3 C 12.1 B T 1071 1863 0.541 0.575 10.6 B R 910 1583 0.086 0.575 7.4 B WE L 97 232 0.507 0.417 20.2 C 16.9 C T 776 1863 0.508 0.417 17.2 C R 660 1583 0.164 0.417 14.2 B NB LT 397 1162 0.504 0.342 21.2 C 20.4 C R 541 1583 0.092 0.342 17.3 C SB LT 588 1568 0.395 0.375 18.0 C 18.2 C R 594 1583 0.431 0.375 18.4 C Intersection Delay = 15.5 sec/veh Intersection LOS = C Lost Time/Cycle, L = 9.0 sec Cyr ical v/c(x) = 0.548 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 08-05-1999 Center For Microcomputers In Transportation -------------------- Streets: (E-W) Route 659 (N-S) Route 656 Analyst: CTC File Name: FB656-9P.HC9 Area Type: Other 8-5-99 PM PEAK Comment: 2005 Residential + Retail Build -Out Eastbound L T R Westbound L T R -------------------------- Northbound I Southbound L T R L T R No. Lanes 1 1 < 0 1 1 < 0 1 1 < 0 1 1 < 0 Volumes 23 94 179 77 64 110 135 131 84 64 271 38 PHF or PK15 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Grade 0 0 0 0 . Heavy Veh 2 2 2 2 2 2 2 2 2 2 2 2 Parking N N N N N N N N Bus Stops 0 0 0 0 Con. Peds 0 0 0 0 Ped Button (YIN) N (YIN) N (YIN) N (YIN) N Arr Type 3 3 3 3 3 3 3 3 RTOR Vols 12 22 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Prop. Share Prop. Prot. ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * * NB Left Thru * * Thru Right * * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 10.OA 50.OA Green 4.OA 47.OA Yellow/AR 0.0 5.0 Yellow/AR 0.0 4.0 Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS --- ----- EB L ----------- 558 1770 ----- 0.043 ----- ----- 0.517 9.3 --- ----- B 10.8 B TR 870 1684 0.315 0.517 10.9 B WB L 343 791 0.236 0.433 13.9 B 13.8 B TR 737 1700 0.217 0.433 13.8 B NB L 227 567 0.626 0.400 22.3 C 18.5 C TR 702 1754 0.322 0.400 16.1 C SB L 331 1770 0.202 0.433 16.0 C 15.5 C TR 792 1828 0.410 0.433 15.3 C Intersection Delay = 14.9 sec/veh Intersection LOS = B Lost Time/Cycle, L = 9.0 sec Critical v/c(x) = 0.456 161 HCS: Unsignalized Intersections Release 2.1g FB656-9A.HC0 Page 1 Center For Microcomputers In Transportation University of Florida - 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets: (N-S) Route 656 (E-W) Route 659 Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ................... CTC Date of Analysis.......... 8/5/99 Other Information......... 2005 Residential + Retail Build -Out A M PEAK Two-way Stop -controlled Intersection ----------------------------------------------------------------------- ----------------------------------------------------------------------- Northbound Southbound Eastbound Westbound L T R L T R L T R L T R No. Lanes Stop/yield Volumes PHF Grade Mc'S (o) SU/RV'S (%) CV's ( a) PCE'S ------------ 1 1 < 0 N' 164 175 70' .9 .95 .95 0 1.10 --------------- 1 1 < 0 N 35 119 14 .95 .95 .95 0 1.10 ---------------- 1 1 < 0 26 43 114 .95 .95 .95 0 1.10 1.10 1.10 ---------------- Adjustment Factors 1 1 < 0 73 76 110 .95 .95 .95 0 1.10 1.10 1.10 --------------- Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 -162- HCS: Unsignalized Intersections Release 2.1g FB656-9A.HC0 Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 221 132 Potential Capacity: (pcph) 1070 1187 Movement Capacity: (pcph) 1070 1187 Prob. of Queue -Free State: 0.88 0.89 -------------------------------------------------------- Step 2: LT from Major Street SB NB ------------- 7------------------------------------------- Conflicting Flows: (vph) 258 140 Potential Capacity: (pcph) 1292 1470 Movement Capacity: (pcph) 1292 1470 Prob. of Queue -Free State: 0.97 0.86 -------------------------------------------------------- Step 3: TH from Minor Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 580 610 Potential Capacity: (pcph) 541 522 Capacity Adjustment Factor due to Impeding Movements 0.84 0.84 Movement Capacity: (pcph) 453 437 Prob. of Queue -Free State: 0.81 0.89 -------------------------------------------------------- Step 4: LT from Minor -------------------------------------------------------- Street WB EB Conflicting Flows: (vph) 655 670 Potential Capacity: (pcph) 442 433 Major LT, Minor TH Impedance Factor: 0.74 0.67 Adjusted Impedance Factor: 0.80 0.75 Capacity Adjustment Factor due to Impeding Movements 0.71 0.66 Movement Capacity: -------------------------------------------------------- (pcph) 314 285 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) -------- ------ ------ EB L 30 ------ 285 ------- 14.1 ------- 0.3 ----- C --------- EB T 50 437 > 6.9 EB R 132 1187 > 807 5.8 1.0 B WB L 85 314 15.7 1.2 C WB T 88 453 > 9.9 WB R 128 1070 > 688 7.6 1.6 B NB L 200 1470 2.8 0.5 A 1.1 SB L 41 1292 2.9 0.0 A 0.6 Intersection Delay163= 4.3 sec/veh HCS: Unsignalized Intersections Release 2.1g FB656-9P.HC0 Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 --------------------- Streets: (N-S) Route 656 (E-W) Route 659 Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ................... CTC Date of Analysis.......... 8/5/99- Other Information......... P005 Residential + Retail Build -Out P M PEAK Two-way Stop -controlled Intersection Northbound Southbound Eastbound Westbound L T R L T R L T R L T R No. Lanes Stop/Yield volumes PHF Grade MCIS (%) SU/RVIs (o) CVIs (.) PCEIs ------------ 1 1 < 0 N 135 131 84 .9 .95 .95 0 1.10 --------------- 1 1 < 0 N 64 271 38 .95 .95 .95 0 1.10 ---------------- 1 1 < 0 23 94 179 .95 .95 .95' 0 1.10 1.10 1.10 ---------------- Adjustment Factors 1 1 < 0 77 64 110 .95 .95 .95 0 1.10 1.10 1.10 --------------- vehicle Critical Follow-u-P Maneuver Gap (tg) Time (tf ) ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 -164- HCS: Unsignalized Intersections Release 2.1g FB656-9P.HC0 Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 182 305 Potential Capacity: (pcph) 1120 970 Movement Capacity: (pcph) 1120 970 Prob. of Queue -Free State: 0.89 0.79 -------------------------------------------------------- Step 2: LT from Major Street SB NB -------------------------------------------------------- Conflicting Flows: (vph) 226 325 Potential Capacity: (pcph) 1338 1200 Movement Capacity: (pcph) 1338 1200 Prob. of Queue -Free State: 0.94 0.86 -------------------------------------------------------- Step 3: TH from Minor -------------------------------------------------------- Street WB EB Conflicting Flows: (vph) 724 748 Potential Capacity: (pcph) 455 442 Capacity Adjustment Factor due to Impeding Movements 0.81 .0.81 Movement Capacity: (pcph) 371 360 Prob. of Queue -Free State: 0.80 0.70 -------------------------------------------------------- Step 4: LT from Minor -------------------------------------------------------- Street WB EB Conflicting Flows: (vph) 848 796 Potential Capacity: (pcph) 342 366 Major LT, Minor TH Impedance Factor: 0.57 0.65 Adjusted Impedance Factor: 0.66 0.73 Capacity Adjustment Factor due to Impeding Movements 0.52 0.65 Movement Capacity: -------------------------------------------------------- (pcph) 178 237 Intersection Performance Summary Avg. 95 0 Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph) (sec/veh) (veh) (sec/veh) -------- EB L ------ 26 ------ 237 ------ ------- 17.1 ------- 0.3 ----- C --------- EB T 109 360 > 12.5 EB R 207 970 > 612 12.1 3.4 C WB L 89 178 40.0 2.9 E WB T 74 371 > 17.9 WB R 128 1120 > 644 8.1 1.5 B NB L 165 1200 3.5 0.5 A 1.3 SB L 74 1338 2.8 0.0 A 0.5 Intersection Dela165= 7.0 sec/veh 1985 HCM:TWO-LANE HIGHWAYS FACILITY LOCATION.... Route 655 west of Route 656 ANALYST........... CTC TIME OF ANALYSIS.... WM PEAK DATE OF ANALYSIS ...... 04-29-1999 OTHER INFORMATION.... 2005 Residential + Retail Build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS ........................ 2 PERCENTAGE OF BUSES ......................... 0 PERCENTAGE OF RECREATIONAL VEHICLES......:.. 0 DESIGN SPEED (MPH) .......................... 50 PEAK HOUR FACTOR ............................ .95 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... 63 / 37 LANE WIDTH(FT)............................. 12 USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... 6 PERCENT NO PASSING ZONES .................... 100 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV --- ----- ----- ----- A 2 1.8 2.2 ----- 1 ----- ----- .9 .98 B 2.2 2 2.5 1 .9 .98 C 2.2 2 2.5 1 .9 .98 D 2 1.6 1.6 1 .9 .98 E 2 1.6 1.6 1 .9 .98 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 576 ACTUAL FLOW RATE: 606 SERVICE LOS FLOW RATE V/C ------------ ----- A 99 .04 B 394 .16 C 788 .32 - D 1408 .57 E 2471 1 -166- LOS FOR GIVEN CONDITIONS: C -167- 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... Route 655 west of Route 656 ANALYST .............. CTC TIME OF ANALYSIS..... PM PEAK DATE OF ANALYSIS..... 04-29-1999 OTHER. INFORMATION.... 2005 Residential + Retail Build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS ........................ 2 PERCENTAGE OF BUSES ......................... 0 PERCENTAGE OF RECREATIONAL VEHICLES......... 0 DESIGN SPEED (MPH) .......................... 50 PEAK HOUR FACTOR ............................ .95 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... 63 / 37 LANE WIDTH(FT)............................. 12 USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... 6 PERCENT NO PASSING ZONES .................... 100 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV --- ----- ----- ----- A 2 1.8 2.2 ----- .84 ----- ----- .95 .98 B 2.2 2 2.5 .84 .95 .98 C 2.2 2 2.5 .84 .95 .98 D 2 1.6 1.6 .84 .95 .98 E 2 1.6 1.6 .87 .95 .98 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 745 ACTUAL FLOW RATE: 784 SERVICE LOS FLOW RATE V/C ------------ ----- A 88 .04 B 349 .16 C 698 .32 - D 1249 .57 E 2269 1 -168- LOS FOR GIVEN CONDITIONS: D -169- 1985 HCM:TWO-LANE HIGHWAYS FACILITY LOCATION.... Route 659 south of Route 7 ANALYST .............. CTC TIME OF ANALYSIS..... AM PEAK DATE OF ANALYSIS..... 04-29-1999 OTHER INFORMATION.... 2005 Residential + Retail Build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS ........................ 2 PERCENTAGE OF BUSES ......................... 0 PERCENTAGE OF RECREATIONAL VEHICLES......... 0 DESIGN SPEED (MPH) .......................... 50 PEAK HOUR FACTOR ............................ .95 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... 48 / 52 LANE WIDTH(FT)............................. 10 USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... 6 PERCENT NO PASSING ZONES .................... 100 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV --- ----- ----- ----- A 2. 1.8 2.2 ----- .84 ----- ----- .95 .98 B 2.2 2 2.5 .84 .95 .98 C 2.2 2 2.5 .84 .95 .98 D 2 1.6 1.6 .84 .95 .98 E 2 1.6 1.6 .87 .95 .98 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 315 ACTUAL FLOW RATE: 332 SERVICE LOS FLOW RATE V/C ------------ ----- A 88 .04 B 349 .16 C 698 .32 - D 1249 .57 E 2269 1 -170- LOS FOR GIVEN CONDITIONS: B -171- 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... Route 659 south of Route 7 ANALYST .............. CTC TIME OF ANALYSIS..... AM PEAK DATE OF ANALYSIS..... 04-29-1999 OTHER INFORMATION.... 2005 Residential + Retail Build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS ...................'..... 2 PERCENTAGE OF BUSES ......................... 0 PERCENTAGE OF RECREATIONAL VEHICLES......... 0 DESIGN SPEED (MPH) .......................... 50 PEAK HOUR FACTOR ............................ .95 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... 48 / 52 LANE WIDTH (FT) ............................. 10 USABLE SHOULDER WIDTH (AVG. WIDTH INFT.) — .6 PERCENT NO PASSING ZONES .................... 100 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV --- ----- ----- ----- ----- A 2 1.8 2.2 1 ----- ----- .9 .98 B 2.2 2 2.5 1 .9 .98 C 2.2 2 2.5 1 .9 .98 D 2 1.6 1.6 1 .9 .98 E 2 1.6 1.6 1 .9 .98 C) LEVEL OF SERVICE RESULTS ---- --------------------------------------------------------- INPUT VOLUME(vph): 423 ACTUAL FLOW RATE: 445 SERVICE LOS FLOW RATE V/C ------------ ----- A 99 .04 B 394 .16 C 788 .32 - D 1408 .57 E 2471 1 -172- 030021202 0 1 2, 000' r i209 art ♦ ♦- i cc m Sol --•---iV ��rEr� -- -I� .. ., �,, ... o. ..--.. •• �I ��, •. •-,•ate , __ INSERT MAP NOT TO SCALE TM 65-((A))-39 MANNING & ROSS DEVELOPERS, L.L.C. INST./ 010016381 FUTURE DEVELOPMENT 126 127 128 125 129 130 134 133 132 131 124 > N 2-6 o SECT_10�..- COURT 123 GODWIN 122 116 11 118 11 120 121 0 115 114 OUTLOT PARCEL "D" �P 112 80 109 108 107 106 h 1 10 4+ 2 81 105 79 82 83 WICKHAM TERRACE 4 W 78 SOVEREIGN VILLAGE J SECTION 2-A tz Q. INST.,/ 0J0004670 102 104 77 84 ZONED: RP, USE: RES, 103 i W 85 100 101 h o 86 99 89 88 87 lospcE 98 0 wtCll� 97 o 96 95 OUTLOT PARCEL C" 90 94 or 93 ca O 91 92 20 1 21 1 22 1 23 26 16 17 SOVEREIGN VILLAGE 27 18 f9 ECTION ONE - PHASE TWO 24 25 15 /NST1 020007579 ZONED RP, I USE.''RES. 28 14ONET l 1 FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE tiAl SECTION 2 - B RED BUD DISTRICT — FREDERICK COUNTY, VIRGINIA SCALE: N/A I DATE: JULY 23, 2003 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22.602 1 Surveyors TELEPHONE: (540) 662-4185 -4�FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com 0 c.J 0 w v v v %WV MARK D. SMITH v No.002009 5 SHEET 2 OF 11 W . O PROFFER: A MONETARY CONTRIBUTION OF $3, 658. 73 PER LOT SHALL BE PAID TO THE TREASURER OF FREDERICK COUNTY PRIOR TO THE ISSUANCE OF THE INITIAL BUILDING PERMITS FOR EACH LOT. LEGEND: BRL = BUILDING RESTRICTION LINE = POINT p = IRON REBAR SET IRF = IRON REBAR FOUND NOTES: 1. ALL LOTS ARE SUBJECT TO A 20' SLOPE & DRAINAGE EASEMENT ALONG ALL STREET RIGHT-OF-WAY LINES AND A 10' UTILITY & DRAINAGE EASEMENT ALONG ALL PROPERTY LINES. 2. PRIOR TO THE ACCEPTANCE OF THE ROADS CONTAINED IN SOVEREIGN VILLAGE INTO THE STATE SYSTEM, A PERMANENT CONNECTION TO THE EXISTING STATE ROAD SYSTEM MUST BE CONSTRUCTED CONSISTENT WITH THE APPROVED MASTER DEVELOPMENT PLAN. J. SETBACKS UNLESS OTHERWISE NOTED ARE.• FRONT = 35' SIDE = 10' REAR = 25' 4. ALL LOTS ARE SINGLE FAMILY DETACHED - URBAN MINIMUM LOT WIDTH AT SETBACK = 70' MINIMUM LOT WIDTH AT R/W = 40' MINIMUM LOT SIZE = 12, 000 SO FT FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE Z,TH 0 SECTION 2-B RED BUD DISTRICT — FREDERICK COUNTY, VIRGINIA MARK D. SMITH No.002009 -71231 SCALE: N/A I DATE: JULY 23, 2003 GREENWAY ENGINEERING 151 WINDY HILL LANE WINCHESTER, VA. 22602 l�04 Engineers 1*114�FAX: ,SuRV Surveyors TELEPHONE: (540) 662-4185 (540) 722-9528 Founded in 1971 E-MAIL: www.greenwayeng.com k-2-185 SHEET 3 OF 11 CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE Cl 525.00' 382.01 ' 373.64' N 24'59 30 " E 41 '41 '24 " C2 550.00' 400.20' 391.43' N 2459 30" E 41'4 J 24" C3 550.00' 250.09' 247.94' N 32'4838" E 26'03'10" C4 550.00' 150. 11 ' 149.64' N 11'57 55" E 15'38'15'" C5 200.00' 32.00' 31.97' S 65'37'54 " E 09' 10'06" C6 850.00' 489.4 1' 482.68' S 77'32 33 " E 32'59 24 " C 17 875.00' 503.81 ' 496.88' N 7732 33 " W 32'59 24 " C 18 175.00' 28.00' 27.97' S 65'3754 " E 09' 10'06" C19 43.00' 62.80' 57.37' N 675634" E 83'4058" C20 575.00' 198.06' 197.08' S 35'58'09" W 19'44 O8" C21 575.00' 75.22' 75. 17' N 42'05 21 " E 07'2944" C22 575.00' 75.22' 75.17' N 34'3537" E 07'2944" C23 575.00' 47.61' 47.60' N 28'2824" E 04'44'40" C24 1 875.00' 1 61.48" 1 61.47' 1 S 63'03'38" E 1 04'01'32" SECTION 2-A 113 (INST.# 030004670) ti� 112 EX. 10' GAS PIPELINE tO O IRF EASEMENT ,'c (INST./ 030006383) CJ O 10 BRl 7 ,\OHO p o ^ Im �� 5soof Q= �, o � N 1LOT 114 T v l �_ �\ 2s• a 3 98 O ml 't o O�� S 51;39 31;, - 8' E \N --- �-�� I� LOT 115 m� �? i Q I N 12389 SO. FTW� \� - tAj 10' BRL S 59'09'16" E `D _ _ 139. 14 ' 10' BRL C23 117 N -' � 116 e LOT � ' Z I I Z 12775 SO. FTto I e W N CIA 35' BRL`.. o O W I- - �`. ' •' •' to SANITARY SEWER '• EASEMENT :•. i �°' i i iPl 65'0424" � / (15� ;iiiC24iiiiCc) ' C17 I ;n N C6 C J- nnrMIN COURT (0.7) V y S y0'12'57� _ C5 --' 71.20' 50' 9# 50 N U CO w O CIl IRrIN - - GRAPHIC SCALE (IN FEET) �- SEE SHEET 10 \ FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE H SECTION 2 - B RED BUD DISTRICT - FREDERICK COUNTY, VIRGINIA MARK D. SMITH v SCALE: 1 " = 50' JULY 23, 2003 No. 002009 toJ7%4�. GREENWAY ENGINEERING ,723, 0, 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 9` "U S�,V j " Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in. 1971 www.greenwayeng.com 2185 SHEET 4 OF 11 0 w CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C6 850.00' 489.4 1' 482.68' S 77'32 33 " E 32'59 24 " C 17 875.00' 503.8 1' 496.88' N 77'32 33 " W 32'59 24 " C25 875.00' 76.81 ' 76.78' S 6735' 17" E 05'01 '46" C26 875.00' 76.81 ' 76.78' S 72'37 04 " E 05'0 146 " C27 875.00' 1 76.8 1' 76.78' S 77'38'50" E 05-01-46" MERIDI43 p� 41A7 SEE SHEET 4 �6 S / 115 � ' I 116 / 49. &7--0 24 ;55:3, .. E 198,31 1¢865� Ed LOT 117 `b N 12389 SO. FT 10, I_ _ 15_0.0o' 10BRL I � I a z Ih LOT 118 m l W N J I o 1 N 12869 SQ. FT n I h W d' •c�I Iii v VI I 10' BRL �0 _ _S 14'S2'03" W O 159.33' 10' BRL J ' i I LOT 119 ml I 'Q I 14094 SO. FT a' _ 10 _-J I W _ _. . ' BRL' 17" W i 0.--- 177.01 ► �, (8.2 )' I 120 SEE SHEET 6 50 0 50 GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2 - B RED BUD DISTRICT - FREDERICK COUNTY, VIRGINIA SCALE: 1" = 50' 1 DATE: JULY 23, 2003 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com TH - '-, ,4 MARK D. SMITH 9 No.002009 �g7123,o3 of CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C6 850.00' 489.4 1' 482.68' S 77'32 33 E 32'59 24 " C7 450.00' 1 13.43' 1 13.13' S 86'48 59" E 14 2633" C14 55.00' 271.10' 68.92' S 06'25'11 " W 2822447" C15 25.00' 24.29' 23.34' S 60'12'18" E 55'3946" C 16 425.00' 44.51 ' 44.49' N 885747" E 06'00 04 " C 17 875.00' 503.81 ' 496.88' N 77'32'33" W 32'59 24 " C28 875.00' 76.81 ' 76.78' S 82'40'37" E 05'01 '46" C29 875.00' 76.8 1' 76.78' S 87'42 23" E 05'01 '46" C30 875.00' 58.28' 58.27' N 8752' 14 " E 03'48 59 " C31 55.00' 23.84' 23.65' S 44'4726" E 24'50'01 MER01ANOF 47 1 DB83P4G SEE SHEET 5 I 119 (8.2) _N 09'50'17" E _- 10' BRL r cam, L I/ 25' A-100 LOT 120 m . 14926 SO. FT y � ( _ _ 10' BRL_ _ / CO L_ / S 04'48'30" W A 177.39' _ _ — / 3 F— cl)10 ' BRL , LOT 121I ONO I N � m 15338 SO. FT a•j v� cV / 6RLCzJ W 00 E� Z 185-93 ~O L,j — ' t D' BRL j� N LOT 122 C�--�Q: 17533 SQ. FT \ O • 20' DRAINAGE rn \�'Ql EASEMENT /z c 20' DRAINAGE EASEMENT �� C, (0.9) 50 0 50ss- 123 GRAPHIC SCALE (21.2) Q (IN FEET) SEE SHEET 7 FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2-B RED BUD DISTRICT - FREDERICK COUNTY, VIRGINIA SCALE: 1" = 50' 1 DATE: JULY 23, 2003 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com O W CD -_j W MARK D. YMITH v No.002009 �4 7, 23 . G �. 4, SURD _ CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C7 450.00' 113.43' 113.13' S 86'48'59" E 14'26 ;33" C 14 55.00' 271.10' 68.92' S 06'25' 11 " W 282'24'47" C32 55.00' 56.9 1' 54.4 1' S 8651 '09 " E 59' 17 25 " C33 55.00' 46 63' 45 25' N 39'12'46" E 48'3446" C34 1 55.00' 4 o co w O co 6.63' STN 45.25' N 09'22'00" E 48'34'46" 10' GAS PIPELINE 15' X 20' WATERLINE LOT 125 l �' EASEMENT EASEMENT r 18967 SO. FT h , / 8' m / WIN C��R 1(20) L _ 10' BRL S 75'04'37" E 126.55'_ SAN. SEWER EASEMENT-'Til) �15) 10' BRL (16.6) w O LOT 124 l ti (2C3'Z2 I J 181 SO. FT / / c� o '` 9.8' 122 ^ fn°�. 35 BRL \ �s6-',9N�^� SEE SHEET 6 If LOT 123 v 15190 SO. FT mom' l ti 20' DRAINAGE- \ ` EASEMENT � C N ��J 6Z2) ;oos�-� - ryo f 2' / =730 O' OUTLET PARCEL 0" IRF ,>S oo , SEE SHEET 11 0 I IRF TM 65-((A))-40 50 0 50 N/F FU-SHEP FARM PARTNERSHIP ZONE., RP, US£.• . VACANT / DS 789, PG 1022 , GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE LT SECTION 2-B° RED BUD DISTRICT - FREDERICK COUNTY, VIRGINIA MARK D. SMITH 9 SCALE: 1 " = 50' 1 DATE: DECEMBER 12, 2002 No. 002009 GREENWAIY YEINGINEERING -7-Z3,03151 LANE Engineers WINCHESTER, VA. 22602 q SURV° Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 197'1 www.greenwayeng.com 2185 SHEET 7 OF 11 J� CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C6 850. 00' 489. 41 ' 482. 68' S 77'32 33 " E 32'59 24 " C7 450.00' 1 13.43' 113.13' S 86'48 59 " E 14'26 33 " C11 825.00' 475.02' 468.49' S 773233" E 32'59 24" C12 475.00' 57.15' 57.12' N 8924'33" E 06'5337" C 13 25.00' 20.79' 20.19' S 69'02 05 " W 47'38 34 " C14 55.00' 271.10' 68.92' S 06*25'11 " W 282'2447" C35 55.00' 46.63' 45.25' N 575645" W 48'34'46" C36 55.00' 50.45' 48.70' S 71'29'20" W 52'33 04" C37 475.00' 16.73' 16.73' N 88'09'10" W 02'01 05" C38 1 475.00' 1 40. 42' 1 40. 41 ' S 88'24 'O 1 " W 1 04 *52 32 " C39 1 825.00' 1 39.74' 1 39.73' S 87'2032" W 1 02'4535" 0 I 129 lo II SEE SHEET 9 0 I N 0116'40�_ 153.46' � ^0 (- 10' BRL I ^ 2 I m LOT 128 m l 12530 SO. FT w N _10'9RL - N 00'50'_7" 1E_ I149.41' - - 1 10' BRL \ ��< LOT 127 \ \ 12023 SO. FT w �I �� , ml 110' eRc N 0 N 07'45 52 .-EJ / 121.59' G�, l' " 10' BRL �10) LOT 126 12858 SO. FT 10' GAS PIPELINE-J EASEMENT 15' X 20' WATERLINE EASEMENT 125 \ / / SEE SHEET 7 \N \/ / I �Z � 00� � aWW saw Wow Co vti a a S 72' 13'34 " W - 34.98' '3.5 ) CIL 20' DRAINAGE -- EASEMENT 50 0 50 MERIDIAN OF PLAT OB 843 PG 417 j GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2 - B RED BUD DISTRICT - FREDERICK COUNTY, VIRGINIA SCALE: 1" = 50' 1 DATE: JULY 23, 2003 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com TH MARK D. SMITH 9 No.002009 rq� Z3� Qp sURov 185 SHEET 8 OF 11 CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C6 850.00' 489.4 1' 482.68' N 77'32'33 " W 32'59 24 " C11 825.00' 475.02' 468.49' N 773233" W 32'5924" C40 825.00' 87.00' 86.96' N 88' 15 25 " W 06'02 31 " C41 825.00' 87.00' 86.96' N 82' 12 54 " W 06'02 31 " C42 825.00' 87. DO' 86.96' N 76' 10'23 " W 06'02 31 " O MERIDIAN OF PLAT DB 843 PG 417 O 132 0 SEE SHEET 10 � N 's s , F \ 1g9460, 0 LOT 131 / 12069 SO. FT m 'BRL J 4822E—J W V `i 1p RL 0,ge W 3 W LOT 130 12152 SO. FT h' c BR co N 04'45` [ �152 I 25' 10BRL �m LOT 129 m ion 12107 SO. FT I (15.6' 5' TYP. _ 10' BRL S 01'16'40" E 153.46' 0 10' GAS PIPELINE EASEMENT N 8 128 SEE SHEET 8 0 0 50 0 50 GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2-B RED BUD DISTRICT - FREDERICK COUNTY, VIRGINIA SCALE: 1 " = 50' 1 DATE: JULY 23, 2003 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com ,TH MARK D. SMITH v No.002009 le 23, a�o4 Q SURv CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE Cl 525.00' 382.01 ' 373.64' N 24'59'30" E 41 '41 '24 " C2 550.00' 400.20' 391.43' N 245930" E 41'41 24" C3 550.00' 250.09' 247.94' N 32'48'38" E 26'03'10" C4 550.00' 150.11 ' 149.64 N 11'57 55" E 15*38,15" C5 200.00' 32.00' 31.97' S 653754 " E 09' 10'06 " C6 850.00' 489.4 1' 482.68' S 77'32 33" E 32'59 24 " C8 575.00' 93.53' 93.43' S 08'4825" W 09'19'13" C9 43. 00' 62.80' 5 Z 37' S 2822 28 " £ 83'40'58 " C 10 225.00' 36.00' 35.97' S 65'37 54 " E 09' 10'06" Cll 825.00' 475.02' 468.49' N 77'32'33" W 32*5924" C43 825.00' 88.4 1' 88.37' N 70'04 55 " W 06'08 24 " C44 825.00' 85.88' 85.84' N 64'01'47" W 05*57*51" C45 225.00' 4.64' 4.64' N 61'38 20" W 01' 10 57" C46 225.00' 31.36' 31.33' N 66'1323" W 07'59'09" IRF OTHER LAND OF M&R DEVELOPERS L.L.C. ZONED: RP USE.- VACANT RO_SSAudA1A1 ani n EVARD lsl 1-5 SHEET 9 O O CA) kA o� O N m O �FPGF 00 P�7 Mpg 41 10' GAS PIPELINE EASEMENT OTHER LAND OF M&R DEVELOPERS L.L.C. ZONED: RP USE. VACANT 9, LINE BEARING DISTANCE L 1 N 70' 12'S7" W 1 6.95' 50 0 50 GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2-B RED BUD DISTRICT - FREDERICK COUNTY, VIRGINIA SCALE: 1" = 50' DATE: JULY 23, 2003 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com MARK D. SMITH 9 No.002009 SURD w V J JP 113 ti� \\S� �OJV \ 112 0 � 110 ` • lRF 109 lZ rn - � o rn� O •� 108Uj v V Cj cl- Q Svc' roc: 107 W w t-2 IR r� N 106 Nto �� Z Z IRF S 28 32'30" W IRF 703.49' EX. 20' DRAINAGE EMENT (INST. 01001736 i 114 IRF S E SHEET 4 1 115 L3 117 _ �h tv o0i 41 w w 118 v=i v� W ` � /� EASEMENT LINE TABLE Im 119 120 OUTLOT � � W PARCEL T �'' Clot 135810 SO. FT. �w 121 m F 122 L4 S2. STORM DRAINAGE S 8832'30" W 353. 51 ' LINE BEARING DISTANCE L2 N 3279'00" E 63.01 L3 N 24*55 36" E 49.67 L4 N 32 4734 E 98.72 4-- S 61 '27'30" E 75.00' TM 55—((A))-209 TM 65—((A))-40 I I N/F FU—SHEP N/F FU—SHEP FARM PARTNERSHIP FARM PARTNERSHIP ZONED. RP, USE. VACANT ZONED: RP, USE. VACANT (DB 789, PG 1022) (DB 789, PG 1022) 100 0 100. GRAPHIC SCALE FINAL SUBDIVISION PLAT SOVEREIGN VILLAUr. SECTION 2-B RED BUD DISTRICT — FREDERICK COUNTY. �IRGINIA SCALE: 1" = 100' DATE: JULY 23, 2003 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com o r� o 123 � IRF LJj 11RF1� W MARK D. SMITH No.002009 ,031 LINE BEARING DISTANCE L 1 �,. THIS DEED OF DEDICATION, made and dated this �1 day of , 2002, by and between MANNING & ROSS DEVELOPERS, LLC, a Virginia Limited Liability Company, party of the first part, hereinafter called the DECLARANT (Grantor for indexing purposes), and FREDERICK COUNTY, VIR JNIA, party of the second part (Grantee for indexing purposes), and THE FREDERICK COUNTY SANITATION AUTHORITY, party of the third part (Grantee for indexing purposes). WHEREAS, the DECLARANT is the owner in fee simple of the real estate shown on the attached plat drawn by Mark D. Smith, dated July 23, 2003 known as Sovereign Village, Section 2-13, of record in the Clerk's Office of the Circuit Court of Frederick County as Instrument No. 03-0021202, which property is further described on the Final ]Master Development Plan of Sovereign Village as filed in the Office of the County of Frederick Department of Planning and Development. This is a portion of the same real estate conveyed to the DECLARANT by Deed dated October 1, 1999, of record in the Office of the Clerk of the Circuit Court of Frederick County in Deed Book 948 at Page 1760; Manning & Ross, LLC amended its name to Manning & Ross Developers, LLC by certificate duly issued from the State Corporation Commission dated January 11, 2001. WHEREAS, said real estate, as shown on the aforesaid attached plat, has been subdivided into lots for ine construction of single tamely homes thereon, and the attached plat shows accurately the metes and bounds of the subdivided land, together with the dimensions of each lot thereof and also shows certain surrounding lands in said Subdivision to be utsed as common open space, storm water detention easement, landscaping easements, access and driveway easements, sanitary sewer easements, drainage easements, and utility easements over and across said lots, all of which shall constitute a portion of that development known as Sovereign Village, and which common open space/driveway/ and access easement areas shall be owned and maintained by the Sovereign Village Homeowners Association upon the terms and conditions set forth hereinafter: and, WHEREAS, the DECLARANT now desires to subdivide the same into lots to be known as Sovereign Village. The subdivision of said real estate, as it now appears on the aforesaid attached plat, is with the free consent and in accordance with the desires of the undersigned DECLARANT, and the DECLARANT hereto further desires to subdivide the C:.__) aforesaid real estate in accordance with the provisions of "The Virginia Land Subdivision Act" as are applicable and in force and effect as of the date of execution of this Deed of Dedication. NOW, THEREFORE, THIS DEED OF DEDICATION WITNESSETH: That for and in consideration of the premises and the benefits which will accrue by reason of this Dedication, the DECLARANT does hereby subdivide all of that certain tract or parcel of land designated as Sovereign Village Subdivision, Section 2-B, lying and being situate in Red Bud Magisterial District, Frederick County, Virginia, and being more particularly described by the aforesaid plat of Mark D. Smith, dated July 23, 2003, of record in the aforesaid Clerk's Office as Instrument No. 03-0021202, and by this reference incorporated herein as if set out in full, and which plat is drawn in conformity with the final master development plan for Sovereign Village Subdivision, on file in the Office of the Frederick County Department of Planning and Development. This is a portion of the same real estate conveyed to Manning & Ross, LLC, said Deed being of record in the aforesaid Clerk's Office as heretofore recited. For and in consideration as aforesaid, the Declarant does further dedicate all of the streets in Sovereign Village, Section 2-13, to Frederick County, Virginia (hereinafter sometimes referred to as "the County") for public use, which streets dedicated hereby are more particularly described by herein above referenced final subdivision plat of Sovereign Village, Section 2-B. All of the lots shown on the plat attached hereto shall be subject to the following restrictions and covenants and Articles which are covenants running with the land, and shall be binding upon all parties having any right, title and interest in and to the aforesaid ]'.ots or any part thereof, their heirs, successors and assigns, and shall inure to the benefit of each owner thereof. ARTICLE I Section 1. "Association" shall mean and refer to Sovereign Village Homeowners Association, Inc., a nonstock Virginia Corporation, it successors and assigns. Section 2. "Common Areas" shall mean and refer to that certain real property hereinabove described as common open space, driveway and access areas, and such additions thereto as may hereafter be brought within the jurisdiction of the Corporation. CD r...� Section 3. A LOT" shall mean and refer to any of the lots designated upon the plat of Sovereign Village Subdivision, with the exception of the common areas space and parking areas. Section 4. "Member" shall man and refer to every person or entity who holds membership in the Association. Section 5. "Owner" shall mean and refer to the record owner, whether one or more persons or entities, of a fee simple title to any Lot which is a part of the Sovereign Village Subdivision, as shown on the attached plat, including contract sellers, but excluding, those having such interest merely as security for the performance of an obligation. Section 6. "Declarant" shall mean and refer to Manning & Ross Develop rs, LLC, its successors and assigns. ARTICLE 11 Every person or entity who is a record owner of a fee or undivided fee interest in any Lot which is subject by covenants of record to assessments by the Association, including contract sellers, shall be a member of the Association. The foregoing is not intended to include persons or entities who hold an interest merely as security for the performance; of an obligation. Only one membership shall be accorded per Lot. Membership shall be appurtenant to and may not be separated from ownership of any Lot which is subject to assessment by the Association. Ownership of such Lot shall be the sole qualification for membership. ARTICLE III VOTING RIGHTS Each Member of the Association shall have one vote for each lot owned in which said Member shall hold the interest required for membership in Article II. When more than one person holds such interest in any Lot, all such persons shall be Members. The vote for such Lot shall be exercised as they among themselves determine, but in no event shall more than one vote be cast with respect to any Lot. BOARD OF DIRECTORS The affairs of the Association shall be managed by a Board of not less than three (3), but no more than five (5) directors, who must be members of the Association. The initial 3 C-) r\) !`4J Board of Directors shall be appointed by the DECLARANT and serve until the first annual meeting following conveyance of all of the Lots in Sovereign Village Subdivision without the assignment of Declarants Rights reserved herein; thereafter, the Board of Directors shall be elected by the Membership as determined in the Bylaws of the Association. TREASURER In the event that the Board of Directors deem it necessary, the Treasurer of the Association shall be bonded, with the expense of such a fidelity bond for said officer- to be borne by the Association. ARTICLE IV PROPERTY RIGHTS IN COMMON PROPERTIES Section 1. Member's Easement of Enjoyment: Every Member shall have a right and easement of enjoyment in and to the "Common Areas", specifically including but not limited to the rights of ingress and egress across the aforesaid "Common Areas" and such easement shall be appurtenant to and shall pass with the title to every assessed Lot, subject to the following provisions: (a) The rights of the Association, in accordance with its Articles and Bylaws, to borrow money for the purpose of improving the aforesaid "Common Areas" and in aid thereof to mortgage said property and. the rights of such mortgagee in said "Common Areas" shall be subordinate to the rights of the Homeowners hereunder. (b) The rights of the Association to suspend the voting rights and the right to the use of the "Common Areas" by a Member for any period during which any assessment against his Lot remains unpaid; and for a period not to exceed thirty (30) days for any infraction of its published rules and regulations. (c) The rights of the Association to dedicate or transfer all or part of the "Common Areas" to any public agency, authority, or utility for such purposes and subject to such conditions as may be agreed to by the Members. No such dedication or transfer shall be effective unless an instrument signed by Members entitled to cast two -third (2/3) of the votes has been recorded agreeing to such dedication or transfer, and unless written notice of the proposed action is sent to every Member not less than twenty-five (25) days nor more than fifty (50) days in advance. 4 C.7 Ni Section 2. Delegation of Use: Any Member may delegate, in accordance with the Bylaws, his right of enjoyment to the "Common Areas" to the members of his famiily, his tenants, or contract purchasers who reside on the property. Section 3. Title to the "Common Areas": The DECLARANT hereby covenants for its heirs and assigns, that Maiming & Ross Developers, LLC, will convey fee simple title to the common open space (referred to herein above as the "Common Areas") to the Association, prior to the conveyance of the first of the Lots in said Subdivision to a grantee other than one which is wholly owned by the DECLARANT. ARTICLE V COVENANTS FOR MAINTENANCE ASSESSMENTS FOR THE ASSOCIATION Section 1. Assessments: The DECLARANT, for each Lot owned, hereby covenants, and each Owner of any Lot by acceptance of a Deed therefore, whether or not it shall be so expressed in any such Deed or other conveyance, is deemed to covenant and agree to pay to the Association (1) annual assessments or charges, and (2) special assessments for capital improvements, such assessments to be fixed, established, and collected fror?i time to time as hereinafter provided. The annual assessments and special assessments, together, with interest thereon at the rate of twelve percent (12.00%) per annum and costs of collection thereof, as hereinafter provided, shall be a charge on the land and shall be a continuing lien upon the property against which each such assessment is made. Each such assessment, together with such interest, costs and reasonable attorney's fee, shall also be the personal obligation of the person who was the Owner of such property at the time when the assessment fee was due. The personal obligation shall not pass to his successors in title unless expressly assumed by them, but shall continue as a lien upon said lot as set forth herein above. Section 2. Purpose of Assessments: The assessments levied by t h e Association shall be used exclusively for the following purposes, to -wit: Improvements and maintenance of the "Common Areas", specifically including, but not limited to, payrnent of real estate taxes, repairs, snow removal, storm drainage repair, maintenance of street lights and payment of all utility charges therefore, and services and facilities devoted to the aforesaid purposes and related to the use of and enjoyment of the "Common Areas", for the 5 C) F"O, maintenance of shrubbery and lawns, including the mowing of all lawns in the "Common Areas"; and further for the purpose of promoting the recreation, health, safety and welfare of the resident in the "Common Areas" of Sovereign Village Subdivision, including payment of all liability insurance premiums for said "Common Areas" and facilities within. Section 3. Basis and Maximum of Annual Assessments: Commencing January 1, 2003, the maximum annual assessment shall be $50.00 per year per Lot; (a) Thereafter, the maximum annual assessment per Lot may be increased above that set forth herein above by a vote of the Members for the next succeeding year and at the end of each year's period, for each succeeding period of one year, provided that any such change shall have the assent of two-thirds (2/3) of the votes of Members who are voting in person or by proxy, at a meeting duly called for this purpose, written notice of which shall be sent to all Members not less than thirty (30) days nor more than sixty (60) days in advance of the meeting, setting forth the purpose of the meeting. The limitations hereof shall to apply to any change in the maximum and basis of the assessments Luidertaken as an incident to a merger or consolidation in which the Association is authorized to participate under its Articles of Incorporation. (b) After consideration of current maintenance costs and future needs of the Association, the Board of Directors may fix the annual assessments at an amount not in excess of the maximum. Section 4. Special Assessments for Capital Improvements. In addition to the annual assessments authorized above, the Association may levy in any assessment year a special assessment applicable to that year only, for the purpose of defraying, in whole or in part, the cost of any construction or reconstruction, unexpected repair or replacement of a described capital improvement upon the "Common Areas", including the necessary fixtures and personal property related thereto, provided that zmy such assessment shall have the assent of two-thirds (2/3) of the votes of Members who are voting in person or by proxy at a meeting duly called for this purpose, written notice of which shall be sent to all Members not less than thirty (30) days nor more than sixty (60) days in advance of the meeting, setting forth the purpose of the meeting. Section 5. Uniform Rate of Assessment: Both annual and special assessments must be fixed at a uniform rate for all Lots, and may be collected on a monthly basis. Section 6. Quorum for any Action Authority Under Sections 3 and 4: At the first meeting called, as provided in Sections 3 and 4 hereof, the presence at the meeting of Members or of proxies entitled to cast Fifty -One percent (51 %) of all votes shall constitute a quorum. If the required quorum is not forthcoming at any meeting, another meeting may be called, subject to the notice requirement set forth in Sections 3 and 4 and the required quorum at any such subsequent meeting shall be one-half (1/2) of the required quorum at the preceding meeting. No such subsequent meeting shall be held more than sixty (60) days following the preceding meeting. Section 7. Date of Commencement of Annual Assessments: DUE DATE: The annual assessments provided for herein shall commence as to any Lot on the first clay of the month following the conveyance of that particular lot to a grantee other than onewholly owned by DECLARANT. The first annual assessment shall be adjusted according to the number of months remaining in the calendar year after acquisition of title by any purchaser for DECLARANT. The Board of Directors shall fix the amount of the annual assessment against each Lot at least thirty (30) days in advance of each annual assessment period. Written notice of the annual assessment shall be sent to every Owner subject thereto. The due dates shall be established by the Board of Directors. The Association shall, upon demand at any time, furnish a certificate in writing signed by an officer of the Association, setting forth whether the assessments on a specified Lot have been paid. A reasonable charge may be made by the Board for the issuance of these certificates. Such certificates shall be conclusive evidence of payment of any assessment therein stated to have been paid. Section 8. Effect of Non -Payment of Assessments: Remedies of the Association: Any assessments which are not paid when due shall be delinquent. If the assessments which is not paid within thirty (30) days after the due date, the assessment shall bear interest from the date of delinquency at the rate of twelve percent (12%) per annum, and the Association may bring an action at law against the Owner personally obligated to pay the same, or foreclose the lien against the property, and interest, costs and reasonable attorney's fees on any such action shall be added to the amount of such assessment. No Owner may 7 ate; a 1 0-) waive or otherwise escape liability for the assessments provided for herein by non-use of the "Common Areas" or abandonment of his Lot. Section 9. Subordination of the Lien to Mortgaaes: The lien of the assessments provided for herein shall be subordinated to the lien of any mortgage or mortgages now or hereafter encumbering any Lot. Sale or transfer of any Lot shall not affect the assessment lien. However, the sale or transfer of any Lot which is subject to any mortgage, pursuant to a decree of foreclosure thereof, shall extinguish the lien of such assessments as to payments thereof which become due prior to such sale or transfer. No sale or transfers shall relieve such Lot from liability for any assessments thereafter becoming due from the lien thereof. Section 10. Exempt Property The following property subject to the Declaration shall be exempt from the assessments created herein; (a) the "Common Areas"; (b) all properties dedicated to and accepted by a local public authority; and (c) all properties owned by a charitable or nonprofit organization exempt from taxation by the laws of the State of Virginia: and (d) any and all lots, whether improved or unimproved, owned by DECLARANT. However, no residence occupied as a dwelling shall be exempt from these assessments, regardless of ownership. Section 11. Failure to Maintain "Common Areas": In the event that t h e Association, or its successors, shall fail to maintain the "Common Areas" in reasonable order and condition, the County of Frederick may take such action as authorized by the Frederick County Zoning Ordinance. The County of Frederick Zoning Ordinance is by this reference made a part hereof as if set out in full. ARTICLE VI USE, RESTRICTIONS AND COVENANTS This Subdivision shall be subject to the following restrictions which are constituted covenants real to run with the land: 1. All Lots shall be used for single family residential purposes only. No detached garage or carport shall be permitted on any lot. 2. No profession or home occupation shall be conducted in or on any part of a Lot; provided, however, that DECLARANT reserves the right to use one or more of said Lots for business purposes in connection with the development, sales and operation of said 1.1 6 subdivision. 3. No building or structure of any kind whatsoever shall be erected, altered, placed, or permitted to remain on any lot, other than a permanent single family dwelling. No such dwelling shall exceed two stories above foundation line in height. No other building or improvements shall be erected, altered, or placed or permitted to remain on any lot other than a carport or garage, patio walls, in ground swimming pool, wooden fences, as hereinafter described, and other outbuildings for use and enjoyment of the lot for residential purposes. Any gazebo, garden shed, other outbuildings, mailbox, newspaper box or receptacle of any type, shall not be placed on a lot unless approved by the Architectural Committee hereinafter referred to. Any garage or carport as herein before provided shall be homogeneous in design to the dwelling. No mobile homes are permitted on any of said lots. No recreational type camper or trailer shall be parked on any of said lots until such time as a home is build on such lot and thereafter, such recreation camper, trailer or recreational vehicle must be stored within a garage area so that the same may not be seen from any roadway. 4. All homes shall have 1,900 square feet of living space except ranch homes, which shall have 1,500 square feet of living space. No split foyer, or modular or prefabricated homes shall be allowed. Living space shall be computed using outside foundation measurements and shall be exclusive of carports, garages and basements. Roof pitch shall be at least 5/12. 5. No dwelling, garage or other building shall be erected or placed on any lot which has an exterior construction other than brick, wood, stone, dryvit, or combination thereof, unless otherwise approved by the Architectural Committee. In no event will the exterior surface of any home have less than 200 square feet of stone or brick. No masonite board or log home shall be used on the exterior of any home. Any exterior solar design or antennae, satellite dish, towers, transmitters for radio, television, microwave, or the like, must be screened and approved by the Architectural Committee. In this respect, the Architectural Committee may engage such professional services for review of plans and each lot owner submitting said plans shall pay the reasonable charges made for review by the professional services. 6. After a residence is built on any of said lots, the lot owner shall provide in connection therewith off-street parking space of at last 12' x 50' which will be paved with concrete. 7. No signs or advertising of any nature shall be erected or maintained on any Lot except for sale signs for said Lot not to exceed four (4) square feet in area, or signs used by a builder to advertise the property during construction and sale. No "For Rent" signs shall be allowed on any Lot whatsoever. �3 c� No boats, mobile homes, motor homes, campers, buses, trailers of any type, tractors, truck or other motor vehicles (other than automobiles, motorcycles, pickup trucks and 3/4 ton (or less) vans) shall be permitted on any Lot except during the course of construction. No motor vehicle or material portion thereof which does not have a current license and current Virginia inspection sticker shall be permitted on any Lot. 9. No animals of any kind (including livestock, poultry or birds) shall be permitted on any Lot, except that dogs, cats and other usual household pets may be kept, provided they are not kept, bred or maintained for commercial or charitable purposes or in unusual numbers; and further provided that no dogs shall be permitted to run at large or without restraint in said Subdivision. No dog may be tied and left unattended outdoors. 10. No fence or hedge shall be constructed or erected on any Lot in said Subdivision, without prior approval by the Association. 'This restriction shall not apply however, to any hedge or fence constructed or erected by the DECLARANT. 11. No noxious or offensive activities shall be carried on upon any Lot, nor shall anything be done thereon which may be or may become an annoyance or nuisance to the neighborhood. 12. In the event that a dwelling is destroyed, or has materially deteriorated, the owner of the unit shall immediately repair the damage or deterioration. No structure other than a dwelling house of at least the same dimensions and. architecture as the unit destroyed shall be constructed in the place of the original home. 13. Each Owner shall keep all Lots owned by him and all improvements therein or thereon in good order and repair and free of debris, including, but not limited to, the seeding, watering, and mowing of all lawns, the pruning and cutting of all trees and shrubbery (in the event that such duties are not undertaken and performed by the Association, as set forth herein above), and the painting (or other appropriate external care) of all buildings and other improve- ments, all in a manner and with such frequency as is consistent with good property management. In the event an Owner of any Lot in Sovereign Village Subdivision shall fail to maintain the premises and the improvements situated thereon as provided herein, the Association, after notice to the Owner as provided in the Bylaws and approval by two-thirds (2/3) vote of the Board of Directors, shall have the right to enter upon said Lot to correct 1® r� to k rD drainage and to repair„ maintain and restore the Lot and the exterior of the building erected thereon. All cost related to such correction, repair, or restoration shall become a special assessment upon such Lot. 14. No Lot shall be used or maintained as a dumping ground for rubbish. Trash, garbage or other waste shall be in sanitary containers. All incinerators or other equipment for the storage or disposal of such material shall be kept in a clean and sanitary condition in the rear. No refuse or any container for same shall be placed or stored in front of any home, except on the date of garbage pickup. 15. No trees shall be planted nor other digging undertaken without first securing the approval of the local power company and without first being advised as to the location of all underground electrical, television cable and telephone wires. 16. No exterior clothes line, or hanging device, shall be permitted on any Lot. 17. The color of the paint on the exterior of every building on each Lot shall remain the same as the original color. 18. No building, structure, addition nor exterior alteration (including basketball backboards, rims or nets) or improvements of any character shall be constructed upon any Lot or dwelling located thereon, except as exterior painting is permitted by the prior paragraph, unless the plan of construction, including quality of workmanship, design, colors and materials, shall have been approved in writing by the Sovereign Village Homeowners Association as being in harmony with the whole subdivision, especially the adjoining homes. 19. If in the construction of any dwelling by DECLARANT there occurs an encroachment, then such encroachment shall be deemed a perpetual easement for the benefit of the dominant Lot. 20. The DECLARANT reserves the right for itself, its successors and assigns, or an Architectural Committee being itself or appointed by it, its successors or assigns, to reject any and all plans for houses or other structures proposed to be constructed on any lot. The DECLARANT retains the majority vote on tlae Architectural Committee. The DECLARANT shall constitute the Architectural Committee and shall. have the power to appoint its successors in interest, and such Architectural Committee shall have no liability whatsoever, either direct or indirect, on the X approval or disapproval of matters as set forth herein above, but such power in the Architectural Committee shall be solely discretionary. The size of the Architectural Committee shall be determined by the DECLARANT or its duly nominated successors in interest. If the said Architectural Committee, or its duly authorized representative, shall fail to approve or disapprove any proposed plans, specifications, or locations within thirty days after the same have been submitted to the DECLAR kNT for approval, such plans, specifications, and locations shall be deemed to have received the approval of said Committee, or its duly authorized agent. Any or all of the rights, powers, duties and obligations which, in this instrument, are assumed by, reserved, or given to the DECLARANT, its successors or assigns, for the said Architectural Committee, may be assigned or transferred to any one or more corporations or associations which will agree to assume said rights, powers, duties, and obligations and carry out and perform the same. Any such assignment or transfer shall be made by appropriate instrument in writing in which the assignee or transferee shall join for the purpose of evidencing its acceptance of such rights, power, duties, and obligations, which instrument shall be recorded; and such assignee or transferee shall thereupon have the same rights and powers and be subject to the same obligations and duties as are herein given to and assumed by the DECLARANT, its successors or assigns, or the said Architectural Committee. In the event of such assignment or transfer, the DECLARANT, its successors or assigns, or said Architectural Committee, shall thereupon be released from all of the rights, powers, duties, and obligation in this instrument reserved or given to and assumed by the DECLARANT, its successors or assigns, or the said Architectural Committee. The right of assignment hereby reserved to the DECLARANT, its successors or assigns, and the said Architectural Committee, is so reserved to the end that the rights, powers, duties and obligations reserved and given to them may be assigned to an association or corporation formed by the owners of lots in said subdivision for the purpose of accepting said assignment; and such assignment may be made at such time as the DECLARANT, its successors or assigns, and the said Architectural Committee shall jointly determine. In the event that the DECLARANT fails to appoint an Architectural Committee, or if such Architectural Committee has formed but is later disbanded, then approval for plans may be obtained by the lot owner submitting plans drawn and signed by a licensed architect in the State of Virginia, and in addition, if the plans are for an allowed outbuilding, then such architect shall further certify that the design is homogeneous with the existing structure on said lot. 21. The DECLARANT herein reserves and shall have the right alone to 12 CD rNI) waive any one or more of the restrictive covenants and conditions contained herein as to any Lot transferred by it except that it cannot change the use of any Lot from residential to commercial. This waiver shall not affect the binding effect of the covenants and conditions upon any other Lot. The DECLARANT fiirther reserves the right along to impose additional restrictive covenants and restrictions as to any Lot or Lots owned by it at the time of the imposition and such imposition shall not affect the binding effect of these provisions upon any other Lots. 22. The invalidation of any one of the covenants or restrictions contained herein by judgment or Court order shall in nowise affect any of the other provisions which shall remain in full force and effect. The failure of the Lot Owners or the DECLARANT herein to enforce any covenants or restrictions shall not be deemed to be a waiver of the right to do so thereafter as to a default occurring prior or subsequent thereto. ARTICLE VII EASEMENTS Section 1. Sewer and Water Easement: The property dedicated hereby .s subject to that certain easement(s) or right(s) of way designated Sanitary Sewer Easement and Utility Easement on the aforesaid attached plat. The DECLARANT does hereby grant and convey unto the Frederick County Sanitation Authority, a perpetual right of way or easement over the aforesaid rights of way for the installation and maintenance of water and sewer lines and any related facility designated on the aforesaid plat as Sanitary Sewer Easement and Utility Easement. Section 2. Access and Driveway Easements: The property dedicated hereby is subject to those certain easements designated Private Access and Driveway Easements which are shown on the aforesaid attached plat, which Easements shall be for the private use of the Lot owners of Sovereign Village, their successors, assigns and invitees. All lot owners shall be entitled to free passage over any sidewalks that are constructed and which run parallel with the streets in Sovereign Village, 2-13, and over any sidewalks so constructed with regard to additional properties added as a part of Sovereign Village. All sidewalks shall be kept free of obstruction and provided further that all owners shall remove snow from the sidewalk that transverses their lot. 13 r <� t �?� Section 3. Surface Drainage Easement: The property dedicated hereby is subject to that certain easement or right of way designated Storm Water Detention Easement on the aforesaid Final Master Development Plan of the County of Frederick for the purpose of surface water drainage easement. No structures of any kind which substantially impede or obstruct the flow or ponding of surface drainage water may be placed within said surface water drainage easement designated on the aforesaid plat. Said Storm Water Detention Easement may not be altered or. modified without the prior consent of the County of Frederick, and the DECLARANT does hereby grant and convey unto the County of Frederick a perpetual right of way or easement over the aforesaid designated Storm Water Detention Easement for the purpose of so providing surface drainage. DECLARANT does further agree that the County of Frederick shall be under no obligation to maintain said Storm Water Detention Easement, provided, however, that in the event the Association fails to maintain said easement, then, and in that event, the County of Frederick shall have the right to maintain the same and charge the Association pursuant to the provision of Article V. Section 11, herein above. DECLARANT, for a period of five (5) years from the date of conveyance of the first lot in Sovereign Village Subdivision, reserves a blanket easement and right on, over and under the ground within said Subdivision to maintain and correct drainage of surface water in order to maintain reasonable standards of health, safety and appearance. Such right expressly includes the right to cut any trees, bushes or shrubbery, make any grading of the soil or to take any other similar action reasonably necessary, following which the DECLARANT shall restore the affected property to its reasonable predisturbance condition as near as practical. The DECLARANT shall give reasonable notice of intent to take such action to all affected owners, unless in the opinion of the DECLARANT an emergency exists which precludes such notice. Reservation by DECLARANT of such blanket easement and rights contained herein shall not, in any way, obligate DECLARANT to undertake any maintenance, repair or corrective action whatsoever and shall not impose any liability or responsibility upon DECLARANT therefore. 14 CD N) Section 4. Reservations: The DECLARANT reserves unto itself, its successors or assigns, the right to erect, maintain, operate and replace underground telephone and electrical conduits, related equipment, and other facilities, sewer, gas, water, and television lines and related equipment, and other utility equipment where such utility lines and equipment are now located. and within the Utility Easements and Sanitary Sewer Easements, as designated on the attached plat, and over the "Common Areas" as needed. Section 5. Signage Easements: The DECLARANT reserves unto itself, its successors or assigns, the certain signage easement located within the open space running parallel to Senseny Road. The purpose of said signage easement is to erect identification signage for Sovereign Village Subdivision and additional lands added thereto as provided herein and which signage while being originally erected by DECLARANT, shall be maintained by the Sovereign Village Homeowners Association. ARTICLE VIII GENERAL PROVISIONS Section 1. Enforcement: The Association, its successors or assigns, or any Owner, shall have the right to enforce, by any proceeding at law or in equity, all restrictions, conditions, covenants, reservations, liens and charges, now, or hereafter, imposed by the provisions of this Declaration. Failure by the Association, its successors or assigns, or by any Owner to enforce any covenant or restriction herein contained shall in no event by deemed a waiver of the right to do so thereafter. All costs which the Association, its successors or assigns, or any Owner shall incur in the enforcement of the restrictions, conditions, covenants, reservations, liens, and charges, nor or hereafter imposed, shall be borne by the party against which action is taken and which costs shall include reasonable attorney's fees, costs, and damages. Section 2. Severability: Invalidation of any one of these covenants or restrictions by judgment or court order shall in no way affect any other provision which shall remain in full force and effect. F Section 3. Amendment: The covenants and restrictions of this Declaration. shall run with the land and bind the land, and shall inure to the benefit of and be enforceable by the Association, or the Owner of any Lot subject to this Declaration, their respective legal 15 C) N) representatives, heirs, successors and assigns, for a term of thirty (30) years from the date this Declaration is recorded, after which time, said covenants shall be automatically extended for successive periods of ten (10) years. The covenants and restrictions of this Declaration may be amended during the first thirty (30) year period by an instrument signed by not less than ninety percent (90%) of the Lot Owners, and thereafter, by an instrument signed by not less than seventy-five percent (75%) of the Lot Owners. Any amendment must be properly recorded. Section 4. Dissolution: Upon dissolution of the Association, other than incident to a merger or consolidation, the assets of the Association shall be dedicated to an appropriate public agency to be used for purposes similar to those for which the Association was created or for general welfare of the residents of Sovereign Village Subdivision. In the event that such dedication is refused acceptance, such assets shall be deemed vested in the Members of the Association as tenants in common. Section 5. Dedication of Street: The DECLARANT does hereby dedicate unto the County of Frederick, Virginia as public streets those certain roadways designated as Rossman Boulevard and Godwin Court on the aforesaid recorded plat of Sovereign Village Subdivision, Section 2-B. The Dedication and Subdivision of the land as shown on the attached plat is• with the free consent and in accordance with the desire of the undersigned DECLARANT of the land being subdivided, and is in conformity with the provisions of "The Virginia Land Subdivision Act" as are applicable, together with the applicable ordinances and regulations of the governing body of the County of Frederick, Virginia. The County of Frederick, Virginia and the Frederick County Sanitation Authority, by the signature of its agents on the attached plat, do accept the dedications to public domain of the land and easements, respectively, herein described as such. The designated "Common Area" are not dedicated hereby for use by the general public but are dedicated to the common use and enjoyment of the homeowners in Sovereign Village Subdivision as provided herein above. 16 ", ) ARTICLE IX ADDITIONAL SECTIONS v Section 1. Additional sections ("Phases") of Sovereign Village will be added in the fixture and those sections, as they are added, will become part of Sovereign Village Subdivision, subject to the same provisions as set forth herein and governed by the same property owners association, provided, however, that DECLARANT may amend the land use restrictions, setback requirements, building sizes and any other provisions so long as the same scheme established in Sovereign Village, that being a single family residential lot is maintained. Section 2. The additions authorized under this Article shall be made by filing of record a Supplementary Declaration of Covenants and Restrictions with respect to the additional property which shall extend the scheme of the covenants and the restrictions of the Declaration (amended as herein permitted) to such property. Section 3. Such Supplementary Declaration may contain such complementary additions and modifications of the covenants and restrictions contained in this Declaration as may be necessary to reflect the different character, if any of the added properties, and as are not inconsistent with the scheme of this Declaration. Except as hereinafter permitted, such Supplementary Declaration shall not revoke, modify or add to the covenants established by this Declaration within the existing property. Section 4. The DECLARANT shall not be and is not bound to make or proceed with the addition of any of the proposed additional sections of Sovereign Village Subdivision. WITNESS the following signatures and seals: DECLARANT: Manning c ss Develope , LLC r David R. Madison'Manager -7/ Gre$or Ban o t, Manager 17 f STATE OF VIRIGINIA cry CITY/COUNTY OF WINCHESTER TO WIT: I, Lois Mdai5cl4 a notary Public in and for the State and jurisdiction aforesaid do hereby certify that David R. Madison, and Gregory M. Bancroft, Managers of Manning & Ross Developers, LLC, whose names are signed to the foregoing Deed of Dedication dated the Jq') day of �5c:4 j 2003, have personally appeared before nne and acknowledged the same in my State and jurisdiction aforesaid. Given under my hand this ! �1 � day of � , .> ° �►� y " , 2003 . My commission expires: t C. Notary Public 11831:DEED of Dedication Sovereign Village Section 2-13 Aiw- 3 18 INSERT MAP NOT TO SCALE TM 65—((A))-39 MANNING & ROSS DEVELOPERS, L.L.C. INSr.j 010016381 FUTURE DEVELOPMENT FINAL SUBDIVISION PLAT I SOVEREIGN VILLAGE SECTION 2-C RED BUD DISTRICT - FREDERICK COUNTY, VIRGINIA SCALE: 1 " = N/A I DATE: OCT. 23, 2003 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com 4 �2 Q 4 4i h Rt '2 n yQ co 2 I p,LTH OF U MARK D. SMITH v No.002009 185 SHT 2 of 1 PROFFER: A MONETARY CONTRIBUTION OF PER LOT SHALL BE PAID TO THE TREASURER OF FREDERICK COUNTY PRIOR TO THE ISSUANCE OF THE INITIAL BUILDING PERMITS FOR EACH LOT. LEGEND: BRL = BUILDING RESTRICTION LINE POINT p = IRON REBAR SET IRF = IRON REBAR FOUND NOTES: 1. ALL LOTS ARE SUBJECT TO A 20' SLOPE & DRAINAGE EASEMENT ALONG ALL STREET RIGHT—OF—WAY LINES AND A 10' UTILITY & DRAINAGE EASEMENT ALONG ALL PROPERTY LINES. 2. PRIOR TO THE ACCEPTANCE OF THE ROADS CONTAINED IN SOVEREIGN VILLAGE INTO THE STATE SYSTEM, A PERMANENT CONNECTION TO THE EXISTING STATE ROAD SYSTEM MUST BE CONSTRUCTED CONSISTENT WITH THE APPROVED MASTER DEVELOPMENT PLAN. J. SETBACKS UNLESS OTHERWISE NOTED ARE. - FRONT = 35' SIDE = 10' REAR = 25' 4. ALL LOTS ARE SINGLE FAMILY DETACHED — URBAN MINIMUM LOT WIDTH AT SETBACK = 70' MINIMUM LOT WIDTH AT R/W = 40' MINIMUM LOT SIZE = 12, 000 SO FT FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2-C RED BUD DISTRICT - FREDERICK COUNTY, VIRGINIA SCALE: 1 " = N/A I DATE: OCT. 23, 2003 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com ,TH O.F �o �f U MARK D. SMITH v No.002009 2185 SHT 3 of 12 CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE Cl 525.00' 79.08' 79.01 ' N 00° 10'07" W 08'37 50" C2 43.00' 64.54' 58.65' N 47°29'00" W 855957" C7 550.00' 183.00' 182.15' N 05'23'06" W 19'03'48" C8 300.00' 182.2 1' 179.42' N 02'2858" E 34'4755" C9 1 550.00, 152,54' 152.05' N 03°47 55" W 15°53 27" C 10 550.00' 30.45' 30.45' N 13° 1949 " W 03° 10 21 " C 1 1 300.00' 91.38' 91.03' N 86'5856" E 17'27'09 " C 12 300.00' 156.97' 155. 19' S 86'45' 16 " E 29°5845 " C22 275.00' 68.00' 67.83' S 78'5056" E 14'10'05" C23 43.00' 74.05' 65.24' N 44'43'47" E 98°40 28" C24 575.00' i 87.85' 87.77' N 00'13'49" W 08-451151, TM 65-((A))-39 MANNING & ROSS DEVELOPERS, L.L.C. ZONE. RP, USE. VACANT (INST.# 010016381) OF 411 Vry O RIOSAN PG 41 A(� Mpg 43 iQpt1�E 2 IRFj �Gl B G� SEE SHEET ,z'O• N w cr cn v, o , o mA G9 LINE ENS 35 UAL I I / / / S 10' GApip " Na I / / / N EASE EA I N I m LOT 135 m�. , , , ,,, 134 °p 14676 SO. FT , 25' 10' BRL J I i op N 18°14'07" E_ i n j O — 160.00'_ — 10' BRL C ---(N o m LOT 136 m I W ' C �� O SOVEREIGN VILLAGE I o� SECTION 2-8 I I 12000 SO. FT I a 4i (INST: 030021202) I' BRL I � f// Q / , ,� �k 133 L_.--10' . —.J Q�i/aO O�I %► N 18° 14 07" E cn / / J V) i 150.00'00 I Z 10' BRL 1 r17.0' V LOT 137 m� o� 12000 50. Fr :q • 10' BRL 132 S 18° 14'07" W ii 50 0 O 150.00' o SEE SHEET 5 (1,3. g)r-'?�o GRAPHIC SCALE /RFO�' 138 I o (IN FEET) FINAL SUB01VISION PLAT SOVEREIGN VILLAGE SECTION 2-C RED BUD DISTRICT — FREDERICK COUNTY, VIRGINIA SCALE: 1 " = 50' 1 DATE: OCT. 23, 2003 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com p,LTH oF INS'' U MARK D. SMITH v No.002009 185 SHT 4 of 1 CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C13 500.00' 194.37' 193.14' S 8254'04" E 22'1622" C 14 800.00' 466.05' 459.49' S 77'20'54 " E 33'2242" C20 775.00' 451.49' 445.13' S 77'20'54" E 33'2242" C21 525.00' 204.08' 202.80' S 82'54'04" E 22'1622" C42 775.00' 10.35' 10.35' N 86'20'43" E 00'45 56" C43 525.00' 64.50' 64.46' N 89'2856" E 07'02 22" C44 525.00' 74.79' 74.73' S 82'55'01 " E 08'0945" C45 525.00' 64.79' 64.75' S 75'18'01" E 07'04'15" p IRF 132 IV MERIDIAN OF PLAT �'� ry • `� 137 DB 843 PG 417 SEE SHEET 4 1,A4 N 78' O IRF (13.9) h• , �h LOT 138 12527 SO. FT IQ/ �.10, h h 9R57` ii 130 �o o .10R LOT 139 h 12455 SO. FT (15.1) Q IRF SOVREIGN VILLAGE 0� o SEC. 28 0 10, BRL —� Q ' (INST.# 030021202) 0 cl " — N,. 3 0' 0'06 10' BRL � i m LOT 140 m s o°, N 12178 S0. FT I 10' BRL rill128 rnS OX 16'20 " E 149.08' d (15.0) CNi v 141 SEE SHEET 5 I O IRFo 50 0 50 GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE O �LTH oF�r�� U f9 MARK D. SMITH No.002009 SECTION 2 - C RED BUD DISTRICT FREDERICK COUNTY, VIRGINIA SCALE: 1 " = 50' 1 DATE: OCT. 23, 2003 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com ��Smqe 2185 SHT 5 of 12 CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C14 800.00' 466.05' 459.49' S 77'20'54" E 3322'42" C20 775.00' 451.49' 445. 13' S 77'20 54" E 33'2242" C39 775.00' 112.59' 112.49' S 75'50'55" E 08'1926" C40 775.00' 90.82' 90.77' S 83'22'04" E 06'42 52" C41 1 775.00' 1 88.56' 1 88.51' S 89'5955" E 06'3249" MERIDIAN OF PLAT DB 843 PG 477 IRF 140 0. �o SEE SHEET 5 I 128 0 N 03' 16'20 " W 149.08' " Q _ — 10" BRL Q- N m LOT 141 m N 12012 SO. FT SOVREIGN VILLAGE " SEC. 28 z 10, SR( wf1l (INST. 030021202) 0"�----.� N 16 29" E �49. 96 127 10, gRL LOT 142 % 12026 SO. FT IRF p� 23.5) 112 J 3 610 70 126 LOT 143 15983 SO. FT O,Q � • , C� I �S, j9 J � . ��•" 6 FAS��FNTcF IRF 0 SEE SHEET 7 144 50 0 50 (13 1 GRAPHIC SCALE 0 (IN FEET) FINAL SUB01VISION PLAT SOVEREIGN VILLAGE oLTH °F�j�� SECTION 2—C r9 RED BUD DISTRICT FREDERICK COUNTY, VIRGINIA MARK D. SMITH SCALE: 1" = 50' 1 DATE: OCT. 23, 2003 No.002009 GREENWAY ENGINEERING 151 WINDY HILL LANE 4' Engineers WINCHESTER, VA. 22602 �Nd SURN� :07 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com 2185 SHT 6 of 12_ CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C14 800.00' 466.05' 459.49' S 77'20'54" E 33'2242" C20 775.00' 451.49' 445. 13' S 77'20 54" E 33'2242" C37 775.00' 55.06' 55.05' S 62*41'40" E 04'04'14" C38 775.00' 94. 10' 94.04' S 68' 12 30" E 06'57 24 " 126 SOVREIGN VILLAGE SEC. 28 (INST # 030021202) IRF O i` ff- n Or P�,T MERE g43 PG 41, DB 14.3 0 \ SEE SHEET 6 I�\ \ STM. DRAINAGE \ � EASEMENT I N 18' 18'48 " E 158.77' .........,.^,.,.,..... _.. 10 .. 10' BRL.. (109�t 25' LOT 144 mj `O N 13391 SO. FT WI;;00� I IRF L --5.23 125 �cb IRF ` I L .3,gg gs, 0_" IRF N 25,16 12 E _1 z� Q 70' cc LOT 145 JI(i61 12585 SQ. FT m Ile � TEMP. TURN AROUND EASEMENT 10, BR[ (11. 7' O �_ rn S 29 20 2�` TM 55-((A))-209 N/F FU-SHEP FARM PARTNERSHIP 50 0 50 ZONE.(DB R 9, USE.- 1022) VACANT GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2 - C RED BUD DISTRICT - FREDERICK COUNTY, VIRGINIA SCALE: 1" = 50' 1 DATE: OCT. 23, 2003 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 :.,7 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com rS 60°39' '3,; E /j 9. 80 STN - 'o —158 8p " FND `36.06' �l—O of�PLTH of C) MARK D. SMITH v 1• �• •�• 7 of 1 CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C14 800.00' 466.05' 459.49' S 77'20'54" E 33'2242" C 19 825.00' 480.6 1' 473.85' N 77'20 54 " W 33'22 42 " C33 825.00' 75.66' 75.64' N 77'06'05" W 05'15,18" C34 825.00' 75.66' 75.64' N 71'50'47" W 05'15'18" C35 1 825.00' 1 75.66' 1 75.64' N 66'35 30" W 1 05'15'18" C36 1 825.00' 1 47.59' 1 47.58' N 62'1842" W I OX18'18" MERIDIAN OF LAr DB 843 I Iv i 25, S 60'39'33" El 29.80' IRF 0-1—,�26 cO oC� 4 Q 50 0 50 GRAPHIC SCALE (IN FEET) 0 150 I SEE SHEET 9 N 10'16'16" E 0 10' BRL 2 LOT 149 �( Q w I m 12668 So. FT �' o oL10' BRL N o, 150.24 ---�.0 10BRL m LOT 148 ^� 12385 S0. FT m� 10' N20 ..4651"E:: lo, e (21.9) RL ?� EASE'a1ENT E (19.0 ) LOT 147 �3 W 12840 SO. FT m� o W � 70, o BRL � TEMP. TURN AROUND EASEMENT LOT 146 13047 SO. FT B,Q �S8 O C TM 55-((A))-209 FU-SHEP FARM PATNERSHIP ZONE.- RP, USE.- VACANT (DB 789, PG 1022) FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2 - C RED BUD DISTRICT - FREDERICK COUNTY, VIRGINIA SCALE: 1" = 50' 1 DATE: OCT. 23, 2003 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com S �9�U?�•• STN FND 0 o� ,LTH OF r 13 MARK D. SMITH 9' No.002009 l � svRv�� f 1 CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C 13 500.00' 194.37' 193. 14 ' S 8254'04 " E 22' 16 22 " C14 800.00' 466.05' 459.49' S 77'2054" E 33'2242" C18 475.00' 184.65' 183.49' N 8254'04" W 22'1622" C19 825.00' 480.61' 473.85' N 77'20'54" W 33'22'42" C29 475.00 24.73' 24.73' S 87'27'14" W 02'5858" C30 825.00' 54.70' 54.69' S 87'51 '43" W 03'4 756" C31 825.00' 75.66' 75.64' N 87'36'40" W 05'15'18" C32 825.00' 75.66' 75.64' N 82*2123" W 05'15'18" _n UI 3' 25' v MERIDIAN OF PLAT D8 843 PG 417 0 153 0 ISEE SHEET 10 N 01'03'l7" W � 161.80' 10' BRL W o m LOT 152 JA 12532 SO. Fr w o �. Qj L 10' BRL_ J N 00'14'19" Wrt ' 0 F10' —150.06_ BRL TM 65- ((A)) -39 ^� �~ m 2 LOT 151 MANNING & ROSS DEVELOPERS, L.L.C. ZONE.- RP, USE. VACANT Q� � � 12308 So. Fr m I (INST.# 010016381) W 10' BRL N O5'00'59 " 149. 67' _ —---Q-, 10 RL LOT 150 ^� 12643 SO. FT m I o N, co . _ 'o' 8' S 10:L �js�— Iti O 0 / �,,, SEE SHEET 8 Q 149 �Q ° 50 0 50 GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2 - C RED BUD DISTRICT - FREDERICK COUNTY, VIRG/NIA SCALE: 1 " = 50' 1 DATE: OCT. 23, 2003 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com LTH OF Ic N, Uo MARK D. SMITH No.002009 185 SHT CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C 13 500. DO' 194. 37' 193. 14 ' S 82'54 '04 " E 22' 16 22 " C 18 475.00' 184.65' 183.49' N 82'54'04 " W 22' 16 22" C27 475.00' 68. 13' 68.07' N 75'52 25" W 08' 13'04 " C28 475.00' 91.79' 91.65' N 85.31 '07" W 11.04 20" W W 01 4 M I) 156 SEE SHEET 11 =•1 ¢ , LOT 155 1214J SO. FT mI N 1p , B�'L /vlg•` I 1¢ �52.,38 E 10 • BRL LOT 154 12342 SO. FT QO I N 10' BRL N 10'01 '03'' E 163-�91 10, BRL LOT 15J m 12429 SO. FT N. 10' BRL --- I 61.80' SEE SHEET 9 152 FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2 - C RED BUD DISTRICT FREDERICK COUNTY, VIRGIN/A MERIDIAN OF PLAT DB 843 PG 417 0 Qj O N TM 65-((A))-39 MANNING & ROSS DEVELOPERS, L.L.C. ZONE. RP, USE. VACANT (INST.# 010016381) —0 0i iQ) N O V. 0 50 0 50 GRAPHIC SCALE (IN FEET) SCALE: 1"SCALE: 501DATE: OCT. 23, 2003OCT. 23, 2003 GREENWAY ENGINEERING /�'d 71"N 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com ,I,TH OF MARK D. SMITH v No.002009 2185 SHT 10 CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C2 43.00' 64.54' 58.65' N 47'29'00" W 85'5957" C3 325.00' 35.12' 35.10, N 8723'14" W 06'1129" C4 275.00' 1.98' 1.98' S 84'29 53" E 00.2448" C5 43.00' 76.69' 66.92' N 44'12'10" E 102'11'05" C6 1 325.00' 151.86' 150.48' N 06'2947" E 26'46'18" C7 550.00' 183.00' 182.15' N 05'23'06" W 19'03'48" C8 300.00' 182.21' 179.42' N 02'2858" E 34*4755" C9 550.00' 152.54' 152.05' N 03'4755" W 15'5327" C 10 550.00' 30.45' 30.45' N 13' 19'49 " W 03' 10 21 " Ci l 300.00' 91.38, 91.03, N 86'5856" E 17'27'09" C12 300.00' 156.97' 155.19' S 86'45'16" E 29'58'45" C15 275.00' 134.27' 132.94' N 05'53'42" E 27'5828" C16 43.00' 62.39' 57.06' N 49'39'35" W 83'08'06" C17 325.00' 110.40' 109.87' N 81'2946" W 19'2745" C25 325.00 37.53' 3751, N 87'55'09 " W 06'36 59 " C26 325.00' 72.87' 72.72' N 78'11'17" W j 12'50'46" j05-42'31 „ �C4 50.00, \ w 61 SEE SHEET 12 C6 _,_, COURT - 50' �.rc 7� ,10 Cg 1 (I n 01 25 v (311 I W Q h W LQ (nn I W o I O 4 ) vN o. 50 0 50 0 o�GRAPHIC SCALE (IN FEET) 0 15' 35 BBRL-7 m LOT 158 m� 15143 SO. FT , 1 20' DRAINAGE EASEMENT - • . N 12"27 31 ' E 10' BRL �150.78' _ �- 10' BRL Im LOT 157 m ,o 12454 SO. FT N I 3.52'-- __ 10' BRL N 18' 14 07 E I W -150.0o' 10' gRL' --_ �RlZ I� I. 843 0 417 MERIO�AN 0pG 8 I L �O 2 Ov1 CiUW t� �z ~�ozZ ), ti O W LOT 100 W ' " 12048 so. Fr I o W J L 70, BRL S J 18 1 0 ". w 19' SEE SHEET 10 155 00 0 FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2 - C RED BUD DISTRICT - FREDERICK COUNTY, VIRGINIA SCALE: 1" = 50' 1 DATE: OCT. 23, 2003 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com 1-sc,e p,1,,TH OF INS, U MARK D. SMITH 9 No.002009 lq� SURv��4 185 SHT 11 of 1 L 20' STORM L ,)R51 IN AGE EASEMENT L9 LIO . :. ...• — .. ... .... ........ ........... .. ........... STORMWATER MANAGEMENT TM 65 — ((A)) — J9 EASEMENT MANNING & ROSS DEVELOPERS, L.L.C. ZONE.- RP, USE: VACANT (INST/ 010016381) ... _L BEARING DISTANCE —LINE L 1 N 12'4846" E 22. 90' L2 N 43*34'00 " E 133.39' LJ N 29*17'13" E 123.59' L4 N 08*54'16 " E 237.36' L5 N 09*50'49" W 34.68' L 6 N 18*4648" W 63.47' L 7 N 53*20'38 " W 176.92' N 0.3*05'47" E 70.23' _L8 L 9 S 86'54'13" E 73. 58' 10 S 86*54'I3" E 129. 0 1' _L L 11 N 08*03'22 " E 105.39, L 12 N 49*30'34 " E 64.78' 13 N 46'18'36" E 59.39' 158 SEE SHEET 11 CANM Ra4D- w JF* Aol ----------- SAN. EASEMENT C5 - �l ro IRF 75 0 75 6) 0 UrTAV-ML. DL./-iLC (IN FEET) FINAL SUBDIVISION PLAT .')LJVrrTr -C /(.7/V VJLL�4Ur SEC. (­ Z (INST. fOJ0021202) REIGN VILLAGE SEC. 2—A (INST. /030004670) SOVEREIGN VILLAGE SECTION 2-C RED BUD DISTRICT - FREDERICK COUNTY, VIRGINIA SCALE: 1 75' 1 DATE: OCT. 23, 2003 GREENWAY ENGINEERING 714\ 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com ),TH OF U MARK D. SMITH No. 002009 �d svxv�.,,� 218 1 �� 13 5 15 3 INSERT MAP o NOT TO SCALE o cn l 15 7M 65-((A))-39 MANNING & ROW DEVELOPERS, L.L.C. 1 INST./ 010016381 RffURE DEVELOPMENT 5g n �' b 149 148 14 14 152 151 150 55 154153 158 157 156 N RoM 14 143 144 145 cNr'I0 141 r' a 135 _ 127 rfe ' 126 f2a� R O �► f4;f f Its w 1J4 1,13 IM "• �!4 �, S CL -�� sOt�7z 1c;fLt��EN ��'�12.E � 1z � SECTION 2-8 .,.• v a ' 12 IN5T.1 03002120a _ „ti . . ZONED. RP, ilSE' as. 121 { ` 114 OUTLOT PARCEL. `Te" i 11,3 112` 111 _ 108 107 106 /w8f1�' 109 ' 9 110 I° 461 / 79 y4►IC�`FSNJ 7E77fE4CE' ff fr 'ti / 4 SOF REIGN VILLACT t `♦ SE0770N 2-A a tz 9L ! r� 77 IN5T/ OJ0004670 101 102 103 104 84 ZONED:RP, USE: RES. ' 66 Lid ♦ too w 99 l� 49 68 87 A B C 1-1 98 97 96 90 Rs OUTLOT PARCEL V id 93 91 92 16 17 f8 19 I '` , 26 SOVF.I"iVILLAGE M� � � 27 5f.C77ON ONE — PHASE 714 24 f5 �� iNST.j 020007579 25 _ 2'ONM RP, USE RES. 26 MONET FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE T-- SEC TION 2- C RED BUD DISTRICT - FREDERICK COUNTY VIRGINIA M RK D. TH SCALE: i" = N/A DATE: JANUARY 11, 2006 No.002009 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 082-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayang.com 2185 SHT 2 of 12 r- i THIS DEED OF DEDICATION, made and dated this 6— day of 2003, by and between MANNING & ROSS DEVELOPERS, LLC, a Virginia Limited Liability Company, party of the first part, hereinafter called the DECLARANT (Grantor for indexing purposes), and FREDERICK COUNTY, VIRGINIA, party of the second part (Grantee for indexing purposes), and THE FREDERICK COUNTY SANITATION AUTHORITY, party of the third part (Grantee for indexing purposes). WHEREAS, the DECLARANT is the owner in fee simple of the real estate shown on the attached plat drawn by Mark D. Smith, L.S., dated November 15, 2002, known as Sovereign Village, Section 2-A, which property is further described on the Final Master Development Plan of Sovereign Village as filed in the Office of the County of Frederick Department of Planning and Development. This is a portion of the same real estate conveyed to the DECLARANT by Deed dated October 1, 1999, of record in the Office of the Clerk of the Circuit Court of Frederick County in Deed Book 948 at Page 1760; Manning & Ross, LLC amended its name to Manning & Ross Developers, LLC by certificate duly issued from the State Corporation Commission dated January 11, 2001. WHEREAS, said real estate, as shown on the aforesaid attached plat, has been subdivided into lots for the construction of single family homes thereon, and the attached plat shows accurately the metes and bounds of the subdivided land, together with the dimensions of each lot thereof and also shows certain surrounding lands in said Subdivision to be used as common open space, storm water detention easement, landscaping easements, access and driveway easements, sanitary sewer easements, drainage easements, and utility easements over and across said lots, all of which shall constitute a portion of that development known as Sovereign Village, and which common open space/driveway/ and access easement areas shall be owned and maintained by the Sovereign Village Homeowners Association upon the terms and conditions set forth hereinafter: and, WHEREAS, the DECLARANT now desires to subdivide the same into lots to be known as Sovereign Village. The subdivision of said real estate, as it now appears on the aforesaid attached plat, is with the free consent and in accordance with the desires of the undersigned DECLARANT, and the DECLARANT hereto further desires to subdivide the aforesaid real estate in accordance with the provisions of "The Virginia Land Subdivision Act" as are applicable and in force and effect as of the date of execution of this Deed of Dedication. Co c� NOW, THEREFORE, THIS DEED OF DEDICATION WITNESSETH—rD That for and in consideration of the premises and the benefits which will accrue by reason of this Dedication, the DECLARANT does hereby subdivide all of that certain tract or parcel of land designated as Sovereign Village Subdivision, Section 2-A, lying and being situate in Red Bud Magisterial District, Frederick County, Virginia, and being more particularly described by the aforesaid plat of Mark D. Smith, L.S., dated November 15, 2002, attached hereto and made a part hereof and by this reference incorporated herein as if set out in full, and which plat is drawn in conformity with the final master development plan for Sovereign Village Subdivision, on file in the Office of the Frederick County Department of Planning and Development. This is a portion of the same real estate conveyed to Manning & Ross, LLC, said Deed being of record in the aforesaid Clerk's Office as heretofore recited. For and in consideration as aforesaid, the Declarant does further dedicate all of the streets in Sovereign Village, Section 2-A to Frederick County, Virginia (hereinafter sometimes referred to as "the County") for public use, which streets dedicated hereby are more particularly described by herein above referenced final subdivision plat of Sovereign Village, Section 2-A. All of the lots shown on the plat attached hereto shall be subject to the following restrictions and covenants and Articles which are covenants running with the land, and shall be binding upon all parties having any right, title and interest in and to the aforesaid lots or any part thereof, their heirs, successors and assigns, and shall inure to the benefit of each owner thereof. ARTICLE I Section 1. "Association" shall mean and refer to Sovereign Village Homeowners Association, Inc., a nonstock Virginia Corporation, it successors and assigns. Section 2. "Common Areas" shall mean and refer to that certain real property hereinabove described as common open space, driveway and access areas, and such additions thereto as may hereafter be brought within the jurisdiction of the Corporation. Section 3. A LOT" shall mean and refer to any of the lots designated upon the plat of Sovereign Village Subdivision, with the exception of the common areas space and parking areas. 2 13 CD W -C- Section 4. "Member" shall mean and refer to every person or entity who holds membership in the Association. Section 5. "Owner" shall mean and refer to the record owner, whether one or more persons or entities, of a fee simple title to any Lot which is a part of the Sovereign Village Subdivision, as shown on the attached plat, including contract sellers, but excluding those having such interest merely as security for the performance of an obligation. Section 6. "Declarant' shall mean and refer to Manning & Ross Developers, LLC, its successors and assigns. ARTICLE II Every person or entity who is a record owner of a fee or undivided fee interest in any Lot which is subject by covenants of record to assessments by the Association, including contract sellers, shall be a member of the Association. The foregoing is not intended to include persons or entities who hold an interest merely as security for the performance of an obligation. Only one membership shall be accorded per Lot. Membership shall be appurtenant to and may not be separated from ownership of any Lot which is subject to assessment by the Association. Ownership of such Lot shall be the sole qualification for membership. ARTICLE III VOTING RIGHTS Each Member of the Association shall have one vote for each lot owned in which said Member shall hold the interest required for membership in Article II. When more than one person holds such interest in any Lot, all such persons shall be Members. The vote for such Lot shall be exercised as they among themselves determine, but in no event shall more than one vote be cast with respect to any Lot. The affairs of the Association shall be managed by a Board of not less than three (3), but no more than five (5) directors, who must be members of the Association. The initial Board of Directors shall be appointed by the DECLARANT and serve until the first annual meeting following conveyance of all of the Lots in Sovereign Village Subdivision without the M I a C..,3 3= N assignment of Declarants Rights reserved herein; thereafter, the Board of Directors shall be elected by the Membership as determined in the Bylaws of the Association. TREASURER In the event that the Board of Directors deem it necessary, the Treasurer of the Association shall be bonded, with the expense of such a fidelity bond for said officer to be borne by the Association. ARTICLE IV PROPERTY RIGHTS IN COMMON PROPERTIES Section 1. Member's Easement of Enjoyment: Every Member shall have a right and easement of enjoyment in and to the "Common Areas", specifically including but not limited to the rights of ingress and egress across the aforesaid "Common Areas" and such easement shall be appurtenant to and shall pass with the title to every assessed Lot, subject to the following provisions: (a) The rights of the Association, in accordance with its Articles and Bylaws, to borrow money for the purpose of improving the aforesaid "Common Areas" and in aid thereof to mortgage said property and the rights of such mortgagee in said "Common Areas" shall be subordinate to the rights of the Homeowners hereunder. (b) The rights of the Association to suspend the voting rights and the right to the use of the "Common Areas" by a Member for any period during which any assessment against his Lot remains unpaid; and for a period not to exceed thirty (30) days for any infraction of its published rules and regulations. (c) The rights of the Association to dedicate or transfer all or part of the "Common Areas" to any public agency, authority, or utility for such purposes and subject to such conditions as may be agreed to by the Members. No such dedication or transfer shall be effective unless an instrument signed by Members entitled to cast two -third (2/3) of the votes has been recorded agreeing to such dedication or transfer, and unless written notice of the proposed action is sent to every Member not less than twenty-five (25) days nor more than fifty (50) days in advance. 4 C) CA.) C.RJ Section 2. Delegation of Use: Any Member may delegate, in accordance with the Bylaws, his right of enjoyment to the "Common Areas" to the members of his family, his tenants, or contract purchasers who reside on the property. Section 3. Title to the "Common Areas": The DECLARANT hereby covenants for its heirs and assigns, that Manning & Ross Developers, LLC, will convey fee simple title to the common open space (referred to herein above as the "Common Areas") to the Association, prior to the conveyance of the first of the Lots in said Subdivision to a grantee other than one which is wholly owned by the DECLARANT. ARTICLE V COVENANTS FOR MAINTENANCE ASSESSMENTS FOR THE ASSOCIATION Section 1. Assessments: The DECLARANT, for each Lot owned, hereby covenants, and each Owner of any Lot by acceptance of a Deed therefore, whether or not it shall be so expressed in any such Deed or other conveyance, is deemed to covenant and agree to pay to the Association (1) annual assessments or charges, and (2) special assessments for capital improvements, such assessments to be fixed, established, and collected from time to time as hereinafter provided. The annual assessments and special assessments, together, with interest thereon at the rate of twelve percent (12.00%) per annum and costs of collection thereof, as hereinafter provided, shall be a charge on the land and shall be a continuing lien upon the property against which each such assessment is made. Each such assessment, together with such interest, costs and reasonable attorney's fee, shall also be the personal obligation of the person who was the Owner of such property at the time when the assessment fee was due. The personal obligation shall not pass to his successors in title unless expressly assumed by them, but shall continue as a lien upon said lot as set forth herein above. Section 2. Purpose of Assessments: The assessments levied by t h e Association shall be used exclusively for the following purposes, to -wit: Improvements and maintenance of the "Common Areas", specifically including, but not limited to, payment of real estate taxes, repairs, snow removal, storm drainage repair, maintenance of street lights and payment of all utility charges therefore, and services and facilities devoted to the aforesaid purposes and related to the use of and enjoyment of the "Common Areas"; for the 5 G3 4:1_ maintenance of shrubbery and lawns, including the mowing of all lawns in the "Common Areas"; and further for the purpose of promoting the recreation, health, safety and welfare of the resident in the "Common Areas" of Sovereign Village Subdivision, including payment of all liability insurance premiums for said "Common Areas" and facilities within. Section 3. Basis and Maximum of Annual Assessments: Commencing January 1, 2003, the maximum annual assessment shall be $50.00 per year per Lot; (a) Thereafter, the maximum annual assessment per Lot may be increased above that set forth herein above by a vote of the Members for the next succeeding year and at the end of each year's period, for each succeeding period of one year, provided that any such change shall have the assent of two-thirds (2/3) of the votes of Members who are voting in person or by proxy, at a meeting duly called for this purpose, written notice of which shall be sent to all Members not less than thirty (30) days nor more than sixty (60) days in advance of the meeting, setting forth the purpose of the meeting. The limitations hereof shall to apply to any change in the maximum and basis of the assessments undertaken as an incident to a merger or consolidation in which the Association is authorized to participate under its Articles of Incorporation. (b) After consideration of current maintenance costs and future needs of the Association, the Board of Directors may fix the annual assessments at an amount not in excess of the maximum. Section 4. Special Assessments for Capital Improvements: In addition to the annual assessments authorized above, the Association may levy in any assessment year a special assessment applicable to that year only, for the purpose of defraying, in whole or in part, the cost of any construction or reconstruction, unexpected repair or replacement of a described capital improvement upon the "Common Areas", including the necessary fixtures and personal property related thereto, provided that any such assessment shall have the assent of two-thirds (2/3) of the votes of Members who are voting in person or by proxy at a meeting duly called for this purpose, written notice of which shall be sent to all Members not less than thirty (30) days nor more than sixty (60) days in advance of the meeting, setting forth the purpose of the meeting. Section 5. Uniform Rate of Assessment: Both annual and special assessments must be fixed at a uniform rate for all Lots, and may be collected on a monthly basis. Section 6. Quorum for any Action Authority Under Sections 3 and 4: At the first meeting called, as provided in Sections 3 and 4 hereof, the presence at the meeting of Members or of proxies entitled to cast Fifty -One percent (51%) of all votes shall constitute a quorum. If the required quorum is not forthcoming at any meeting, another meeting may be called, subject to the notice requirement set forth in Sections 3 and 4 and the required quorum at any such subsequent meeting shall be one-half (1/2) of the required quorum at the preceding meeting. No such subsequent meeting shall be held more than sixty (60) days following the preceding meeting. Section 7. Date of Commencement of Annual Assessments: DUE DATE: The annual assessments provided for herein shall commence as to any Lot on the first day of the month following the conveyance of that particular lot to a grantee other than one wholly owned by DECLARANT. The first annual assessment shall be adjusted according to the number of months remaining in the calendar year after acquisition of title by any purchaser for DECLARANT. The Board of Directors shall fix the amount of the annual assessment against each Lot at least thirty (30) days in advance of each annual assessment period. Written notice of the annual assessment shall be sent to every Owner subject thereto. The due dates shall be established by the Board of Directors. The Association shall, upon demand at any time, furnish a certificate in writing signed by an officer of the Association, setting forth whether the assessments on a specified Lot have been paid. A reasonable charge may be made by the Board for the issuance of these certificates. Such certificates shall be conclusive evidence of payment of any assessment therein stated to have been paid. Section 8. Effect of Non -Payment of Assessments: Remedies of the Association: Any assessments which are not paid when due shall be delinquent. If the assessments which is not paid within thirty (30) days after the due date, the assessment shall bear interest from the date of delinquency at the rate of twelve percent (12%) per annum, and the Association may bring an action at law against the Owner personally obligated to pay the same, or foreclose the lien against the property, and interest, costs and reasonable attorney's fees on any such action shall be added to the amount of such assessment. No Owner may N CZ) w waive or otherwise escape liability for the assessments provided for herein by non-use of the "Common Areas" or abandonment of his Lot. Section 9. Subordination of the Lien to Mortgages: The lien of the assessments provided for herein shall be subordinated to the lien of any mortgage or mortgages now or hereafter encumbering any Lot. Sale or transfer of any Lot shall not affect the assessment lien. However, the sale or transfer of any Lot which is subject to any mortgage, pursuant to a decree of foreclosure thereof, shall extinguish the lien of such assessments as to payments thereof which become due prior to such sale or transfer. No sale or transfers shall relieve such Lot from liability for any assessments thereafter becoming due from the lien thereof. Section 10. Exempt Property: The following property subject to the Declaration shall be exempt from the assessments created herein; (a) the "Common Areas"; (b) all properties dedicated to and accepted by a local public authority; and (c) all properties owned by a charitable or nonprofit organization exempt from taxation by the laws of the State of Virginia: and (d) any and all lots, whether improved or unimproved, owned by DECLARANT. However, no residence occupied as a dwelling shall be exempt from these assessments, regardless of ownership. Section 11. Failure to Maintain "Common Areas": In the event that t h e Association, or its successors, shall fail to maintain the "Common Areas" in reasonable order and condition, the County of Frederick may take such action as authorized by the Frederick County Zoning Ordinance. The County of Frederick Zoning Ordinance is by this reference made a part hereof as if set out in full. ARTICLE VI USE, RESTRICTIONS AND COVENANTS This Subdivision shall be subject to the following restrictions which are constituted covenants real to run with the land: 1. All Lots shall be used for single family residential purposes only. No detached garage or carport shall be permitted on any lot. 2. No profession or home occupation shall be conducted in or on any part of a Lot; provided, however, that DECLARANT reserves the right to use one or more of said Lots for business purposes in connection with the development, sales and operation of said 0 co w v subdivision. 3. No building or structure of any kind whatsoever shall be erected, altered, placed, or permitted to remain on any lot, other than a permanent single family dwelling. No such dwelling shall exceed two stories above foundation line in height. No other building or improvements shall be erected, altered, or placed or permitted to remain on any lot other than a carport or garage, patio walls, in ground swimming pool, wooden fences, as hereinafter described, and other outbuildings for use and enjoyment of the lot for residential purposes. Any gazebo, garden shed, other outbuildings, mailbox, newspaper box or receptacle of any type, shall not be placed on a lot unless approved by the Architectural Committee hereinafter referred to. Any garage or carport as herein before provided shall be homogeneous in design to the dwelling. No mobile homes are permitted on any of said lots. No recreational type camper or trailer shall be parked on any of said lots until such time as a home is build on such lot and thereafter, such recreation camper, trailer or recreational vehicle must be stored within a garage area so that the same may not be seen from any roadway. 4. All homes shall have 1,900 square feet of living space except ranch homes, which shall have 1,500 square feet of living space. No split foyer, or modular or prefabricated homes shall be allowed. Living space shall be computed using outside foundation measurements and shall be exclusive of carports, garages and basements. Roof pitch shall be at least 5/12. 5. No dwelling, garage or other building shall be erected or placed on any lot which has an exterior construction other than brick, wood, stone, dryvit, or combination thereof, unless otherwise approved by the Architectural Committee. In no event will the exterior surface of any home have less than 200 square feet of stone or brick. No masonite board or log home shall be used on the exterior of any home. Any exterior solar design or antennae, satellite dish, towers, transmitters for radio, television, microwave, or the like, must be screened and approved by the Architectural Committee. In this respect, the Architectural Committee may engage such professional services for review of plans and each lot owner submitting said plans shall pay the reasonable charges made for review by the professional services. 6. After a residence is built on any of said lots, the lot owner shall provide in connection therewith off-street parking space of at last 12' x 50' which will be paved with concrete. 7. No signs or advertising of any nature shall be erected or maintained on any Lot except for sale signs for said Lot not to exceed four (4) square feet in area, or signs used by a builder to advertise the property during construction and sale. No "For Rent" signs shall be allowed on any Lot whatsoever. v C) C� 8. No boats, mobile homes, motor homes, campers, buses, trailers c-0 of any type, tractors, truck or other motor vehicles (other than automobiles, motorcycles, pickup trucks and 3/4 ton (or less) vans) shall be permitted on any Lot except during the course of construction. No motor vehicle or material portion thereof which does not have a current license and current Virginia inspection sticker shall be permitted on any Lot. 9. No animals of any kind (including livestock, poultry or birds) shall be permitted on any Lot, except that dogs, cats and other usual household pets may be kept, provided they are not kept, bred or maintained for commercial or charitable purposes or in unusual numbers; and further provided that no dogs shall be permitted to run at large or without restraint in said Subdivision. No dog may be tied and left unattended outdoors. 10. No fence or hedge shall be constructed or erected on any Lot in said Subdivision, without prior approval by the Association. This restriction shall not apply however, to any hedge or fence constructed or erected by the DECLARANT. 11. No noxious or offensive activities shall be carried on upon any Lot, nor shall anything be done thereon which may be or may become an annoyance or nuisance to the neighborhood. 12. In the event that a dwelling is destroyed, or has materially deteriorated, the owner of the unit shall immediately repair the damage or deterioration. No structure other than a dwelling house of at least the same dimensions and architecture as the unit destroyed shall be constructed in the place of the original home. 13. Each Owner shall keep all Lots owned by him and all improvements therein or thereon in good order and repair and free of debris, including, but not limited to, the seeding, watering, and mowing of all lawns, the pruning and cutting of all trees and shrubbery (in the event that such duties are not undertaken and performed by the Association, as set forth herein above), and the painting (or other appropriate external care) of all buildings and other improve- ments, all in a manner and with such frequency as is consistent with good property management. In the event an Owner of any Lot in Sovereign Village Subdivision shall fail to maintain the premises and the improvements situated thereon as provided herein, the Association, after notice to the Owner as provided in the Bylaws and approval by two-thirds (2/3) vote of the Board of Directors, shall have the right to enter upon said Lot to correct 10 drainage and to repair, maintain and restore the Lot and the exterior of the building erected thereon. All cost related to such correction, repair, or restoration shall become a special assessment upon such Lot. 14. No Lot shall be used or maintained as a dumping ground for rubbish. Trash, garbage or other waste shall be in sanitary containers. All incinerators or other equipment for the storage or disposal of such material shall be kept in a clean and sanitary condition in the rear. No refuse or any container for same shall be placed or stored in front of any home, except on the date of garbage pickup. 15. No trees shall be planted nor other digging undertaken without first securing the approval of the local power company and without first being advised as to the location of all underground electrical, television cable and telephone wires. 16. No exterior clothes line, or hanging device, shall be permitted on any Lot. 17. The color of the paint on the exterior of every building on each Lot shall remain the same as the original color. 18. No building, structure, addition nor exterior alteration (including basketball backboards, rims or nets) or improvements of any character shall be constructed upon any Lot or dwelling located thereon, except as exterior painting is permitted by the prior paragraph, unless the plan of construction, including quality of workmanship, design, colors and materials, shall have been approved in writing by the Sovereign Village Homeowners Association as being in harmony with the whole subdivision, especially the adjoining homes. 19. If in the construction of any dwelling by DECLARANT there occurs an encroachment, then such encroachment shall be deemed a perpetual easement for the benefit of the dominant Lot. 20. The DECLARANT reserves the right for itself, its successors and assigns, or an Architectural Committee being itself or appointed by it, its successors or assigns, to reject any and all plans for houses or other structures proposed to be constructed on any lot. The DECLARANT retains the majority vote on the Architectural Committee. The DECLARANT shall constitute the Architectural Committee and shall have the power to appoint its successors in interest, and such Architectural Committee shall have no liability whatsoever, either direct or indirect, on the 0 CA.) Cn CD approval or disapproval of matters as set forth herein above, but such power in the Architectural Committee shall be solely discretionary. The size of the Architectural Committee shall be determined by the DECLARANT or its duly nominated successors in interest. If the said Architectural Committee, or its duly authorized representative, shall fail to approve or disapprove any proposed plans, specifications, or locations within thirty days after the same have been submitted to the DECLARANT for approval, such plans, specifications, and locations shall be deemed to have received the approval of said Committee, or its duly authorized agent. Any or all of the rights, powers, duties and obligations which, in this instrument, are assumed by, reserved, or given to the DECLARANT, its successors or assigns, for the said Architectural Committee, may be assigned or transferred to any one or more corporations or associations which will agree to assume said rights, powers, duties, and obligations and carry out and perform the same. Any such assignment or transfer shall be made by appropriate instrument in writing in which the assignee or transferee shall join for the purpose of evidencing its acceptance of such rights, power, duties, and obligations, which instrument shall be recorded; and such assignee or transferee shall thereupon have the same rights and powers and be subject to the same obligations and duties as are herein given to and assumed by the DECLARANT, its successors or assigns, or the said Architectural Committee. In the event of such assignment or transfer, the DECLARANT, its successors or assigns, or said Architectural Committee, shall thereupon be released from all of the rights, powers, duties, and obligation in this instrument reserved or given to and assumed by the DECLARANT, its successors or assigns, or the said Architectural Committee. The right of assignment hereby reserved to the DECLARANT, its successors or assigns, and the said Architectural Committee, is so reserved to the end that the rights, powers, duties and obligations reserved and given to them may be assigned to an association or corporation formed by the owners of lots in said subdivision for the purpose of accepting said assignment; and such assignment may be made at such time as the DECLARANT, its successors or assigns, and the said Architectural Committee shall jointly determine. In the event that the DECLARANT fails to appoint an Architectural Committee, or if such Architectural Committee has formed but is later disbanded, then approval for plans may be obtained by the lot owner submitting plans drawn and signed by a licensed architect in the State of Virginia, and in addition, if the plans are for an allowed outbuilding, then such architect shall further certify that the design is homogeneous with the existing structure on said lot. 21. The DECLARANT herein reserves and shall have the right alone to 12 CD w waive any one or more of the restrictive covenants and conditions Ci contained herein as to any Lot transferred by it except that it cannot change the use of any Lot from residential to commercial. This waiver shall not affect the binding effect of the covenants and conditions upon any other Lot. The DECLARANT further reserves the right along to impose additional restrictive covenants and restrictions as to any Lot or Lots owned by it at the time of the imposition and such imposition shall not affect the binding effect of these provisions upon any other Lots. 22. The invalidation of any one of the covenants or restrictions contained herein by judgment or Court order shall in nowise affect any of the other provisions which shall remain in full force and effect. The failure of the Lot Owners or the DECLARANT herein to enforce any covenants or restrictions shall not be deemed to be a waiver of the right to do so thereafter as to a default occurring prior or subsequent thereto. ARTICLE VII EASEMENTS Section 1. Sewer and Water Easement: The property dedicated hereby is subject to that certain easement(s) or right(s) of way designated Sanitary Sewer Easement and Utility Easement on the aforesaid attached plat. The DECLARANT does hereby grant and convey unto the Frederick County Sanitation Authority, a perpetual right of way or easement over the aforesaid rights of way for the installation and maintenance of water and sewer lines and any related facility designated on the aforesaid plat as Sanitary Sewer Easement and Utility Easement. Section 2. Access and Driveway Easements: The property dedicated hereby is subject to those certain easements designated Private Access and Driveway Easements which are shown on the aforesaid attached plat, which Easements shall be for the private use of the Lot owners of Sovereign Village, their successors, assigns and invitees. All lot owners shall be entitled to free passage over any sidewalks that are constructed and which run parallel with the streets in Sovereign Village, Phase 2-A, and over any sidewalks so constructed with regard to additional properties added as a part of Sovereign Village. All sidewalks shall be kept free of obstruction and provided further that all owners shall remove snow from the sidewalk that transverses their lot. 13 A V CA) C-n N Section 3. Surface Drainage Easement: The property dedicated hereby is subject to that certain easement or right of way designated Storm Water Detention Easement on the aforesaid Final Master Development Plan of the County of Frederick for the purpose of surface water drainage easement. No structures of any kind which substantially impede or obstruct the flow or ponding of surface drainage water may be placed within said surface water drainage easement designated on the aforesaid plat. Said Storm Water Detention Easement may not be altered or modified without the prior consent of the County of Frederick, and the DECLARANT does hereby grant and convey unto the County of Frederick a perpetual right of way or easement over the aforesaid designated Storm Water Detention Easement for the purpose of so providing surface drainage. DECLARANT does further agree that the County of Frederick shall be under no obligation to maintain said Storm Water Detention Easement, provided, however, that in the event the Association fails to maintain said easement, then, and in that event, the County of Frederick shall have the right to maintain the same and charge the Association pursuant to the provision of Article V, Section 11, herein above. DECLARANT, for a period of five (5) years from the date of conveyance of the first lot in Sovereign Village Subdivision, reserves a blanket easement and right on, over and under the ground within said Subdivision to maintain and correct drainage of surface water in order to maintain reasonable standards of health, safety and appearance. Such right expressly includes the right to cut any trees, bushes or shrubbery, make any grading of the soil or to take any other similar action reasonably necessary, following which the DECLARANT shall restore the affected property to its reasonable predisturbance condition as near as practical. The DECLARANT shall give reasonable notice of intent to take such action to all affected owners, unless in the opinion of the DECLARANT an emergency exists which precludes such notice. Reservation by DECLARANT of such blanket easement and rights contained herein shall not, in any way, obligate DECLARANT to undertake any maintenance, repair or corrective action whatsoever and shall not impose any liability or responsibility upon DECLARANT therefore. 14 0 W cn w Section 4. Reservations: The DECLARANT reserves unto itself, its successors or assigns, the right to erect, maintain, operate and replace underground telephone and electrical conduits, related equipment, and other facilities, sewer, gas, water, and television lines and related equipment, and other utility equipment where such utility lines and equipment are now located and within the Utility Easements and Sanitary Sewer Easements, as designated on the attached plat, and over the "Common Areas" as needed. Section 5. Signage Easements: The DECLARANT reserves unto itself, its successors or assigns, the certain signage easement located within the open space running parallel to Senseny Road. The purpose of said signage easement is to erect identification signage for Sovereign Village Subdivision and additional lands added thereto as provided herein and which signage while being originally erected by DECLARANT, shall be maintained by the Sovereign Village Homeowners Association. ARTICLE VIII GENERAL PROVISIONS Section 1. Enforcement: The Association, its successors or assigns, or any Owner, shall have the right to enforce, by any proceeding at law or in equity, all restrictions, conditions, covenants, reservations, liens and charges, now, or hereafter, imposed by the provisions of this Declaration. Failure by the Association, its successors or assigns, or by any Owner to enforce any covenant or restriction herein contained shall in no event by deemed a waiver of the right to do so thereafter. All costs which the Association, its successors or assigns, or any Owner shall incur in the enforcement of the restrictions, conditions, covenants, reservations, liens, and charges, nor or hereafter imposed, shall be borne by the party against which action is taken and which costs shall include reasonable attorney's fees, costs, and damages. Section 2. Severability: Invalidation of any one of these covenants or restrictions by judgment or court order shall in no way affect any other provision which shall remain in full force and effect. Section 3. Amendment: The covenants and restrictions of this Declaration shall run with the land and bind the land, and shall inure to the benefit of and be enforceable by the Association, or the Owner of any Lot subject to this Declaration, their respective legal 15 Co w cn .r-- representatives, heirs, successors and assigns, for a term of thirty (30) years from the date this Declaration is recorded, after which time, said covenants shall be automatically extended for successive periods of ten (10) years. The covenants and restrictions of this Declaration may be amended during the first thirty (30) year period by an instrument signed by not less than ninety percent (90%) of the Lot Owners, and thereafter, by an instrument signed by not less than seventy-five percent (75%) of the Lot Owners. Any amendment must be properly recorded. Section 4. Dissolution: Upon dissolution of the Association, other than incident to a merger or consolidation, the assets of the Association shall be dedicated to an appropriate public agency to be used for purposes similar to those for which the Association was created or for general welfare of the residents of Sovereign Village Subdivision. In the event that such dedication is refused acceptance, such assets shall be deemed vested in the Members of the Association as tenants in common. Section 5. Dedication of Street: The DECLARANT does hereby dedicate unto the County of Frederick, Virginia as public streets those certain roadways designated as Wickham Terrace, Dover Drive and Rossman Boulevard on the attached plat of Sovereign Village Subdivision. The Dedication and Subdivision of the land as shown on the attached plat is with the free consent and in accordance with the desire of the undersigned DECLARANT of the land being subdivided, and is in conformity with the provisions of "The Virginia Land Subdivision Act" as are applicable, together with the applicable ordinances and regulations of the governing body of the County of Frederick, Virginia. The County of Frederick, Virginia and the Frederick County Sanitation Authority, by the signature of its agents on the attached plat, do accept the dedications to public domain of the land and easements, respectively, herein described as such. The designated "Common Area" are not dedicated hereby for use by the general public but are dedicated to the common use and enjoyment of the homeowners in Sovereign Village Subdivision as provided herein above. 16 I W c-n c.Jl ARTICLE IX ADDITIONAL SECTIONS Section 1. '"Additional sections ("Phases") of Sovereign Village will be added in the future and those sections, as they are added, will become part of Sovereign Village Subdivision, subject to the same provisions as set forth herein and governed by the same property owners association, provided, however, that DECLARANT may amend the land use restrictions, setback requirements, building sizes and any other provisions so long as the same scheme established in Sovereign Village, that being a single family residential lot is maintained. Section 2. The additions authorized under this Article shall be made by filing of record a Supplementary Declaration of Covenants and Restrictions with respect to the additional property which shall extend the scheme of the covenants and the restrictions of the Declaration (amended as herein permitted) to such property. Section 3. Such Supplementary Declaration may contain such complementary additions and modifications of the covenants and restrictions contained in this Declaration as may be necessary to reflect the different character, if any of the added properties, and as are not inconsistent with the scheme of this Declaration. Except as hereinafter permitted, such Supplementary Declaration shall not revoke, modify or add to the covenants established by this Declaration within the existing property. Section 4. The DECLARANT shall not be and is not bound to make or proceed with the addition of any of the proposed additional sections of Sovereign Village Subdivision. WITNESS the following signatures and seals: DECLARANT: 17 Co W c.n STATE OF VIRIGINIA 011 CITY/C-Q 1— -r OF/J),Xeb PTO WIT: I, Q • tary Public in and for the State and jurisdiction aforesaid do hereb certi that vid R. Madison, and Gregory M. Bancroft, Managers of Manning & Ross Developers, LLC, whose names are signed to the foregoing Deed of Dedication dated the a �' day of 2003, have personally appeared before me and acknowledged the same in my State d jurisdiction aforesaid. Given under my hand this day of , 2003. My commission expires: 41 -e -s4 '1200 S �� 11268/A:DEED of Dedication Sovereign Village Section 2-A I� 18 184C VICINI %Y MAP SCALE. • 1' 1000' a�ej SITE o � �a 0 0 a o� 0 v Se se O�� Ro ss APPROVALS: AREA TABULATION: ' TOTAL LOT AREAS = 1 1.4332 AC ROAD R/W AREA = 3.6998 AC .' -,' rederick Co. Sanitation Authority Date TOTAL OPEN SPACE = 4.5256 AC SUBDIVIDED AREA = 19.6586 AC 0 22 7 Frederick Co. Subdivi ion Administroto Date ORIGINAL AREA = 122.5659 AC J4(%...wo REMAINING AREA = 102.9073 AC Va. Dept. of Tra portation Date OWNER'S CERTIFICATE: THE SUBDIVISION OF THE LAND SHOWN HEREON IS WITH THE FREE CONSENT AND IN ACCORDANCE WITH THE DESIRE Acknowledged before me OF THE UNDERSIGNED OWNERS, PROPRIETORS, AND TRUSTEES, IF ANY. this c� y day of �ik �+�ti 20 FOR : MANNING & ROSS DEVELOPERS, LLC M Commission Expires: y p /l) L:�� 6Q. �na-k ' I Z 26)02- BY Notary DATE SURVEYOR'S CERTIFICATE: I HEREBY CERTIFY THAT THE LAND CONTAINED IN THIS SUBDIVISION IS A PORTION OF THE LANDS ACQUIRED BY MANNING & ROSS DEVELOPERS, LLC, BY DEEDS DATED OCTOBER 1, 1999 AND NOVEMBER 28, 2001 AND RECORDED AMOHE LAND RECORDS OF FREDERICK COUNTY, VIRGINIA, IN DEE AT PAG . 1760 AND AO&OK9 INSTRUMENT NO. 010016381. MARK D. SMITH, LS PARENT TAX PARCEL IDENTIFICATION TAX ID No.: 65—((A))-39 101.1539 AC. ZONE: RP USE: VACANT TAX ID No.: 65—((A))-39A 21.4120 AC. ZONE: RP USE: VACANT FINAL SUBDIVISION PLAT SOVEREIGN VIL LA GE TH SECTION 2 -A RED BUD DISTRICT — FREDERICK COUNTY, VIRGINIA U MARK D. ITH No.002009 SCALE: N/A DATE: NOVEMBER 15, 2002 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 `rU SURD Y Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 2185 SHEET 1 OF 18 Founded in 1971 www.greenwayeng.com INSET MAP NOT TO SCALE TM 65-((A))-39 MANNING AND ROSS DEVELOPERS, L.L.C. INSTJ 010016381 FUTURE DEVELOPMENT 16 j 20 1 21 1 22 1 23 26 17 SOVEREIGN VILLAGE 27 IB 19 SEC ONE - PHASE TWO 24 15 INST.J 020007579 25 r ZONED: RP, USE. RES. 28 MONET TERRACE 14 13 12 11 10 9 8 29 31 30 rl 33 32 y 39 1 2 3 4 .5 6 7 37 38 34 3 36 WAYFARING OR( �� 70 ��--- Vl' 0�ry 76 75 747;7J72 7f t 4� F24f 40 FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2-4 RED BUD DISTRICT - FREDERICK COUNTY, VIRGINIA SCALE: N/A I DATE: NOVEMBER 15, 2002 GREENWAY ENGINEERING 151 WINDY HELL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com V MARK D. SMITH No.002009 ; SU5 2185 SHEET 2 OF 18 A MONETARY CONTRIBUTION OF $J, 558. 73 PER LOT SHALL BE PAID TO THE TREASURER OF FREDERICK COUNTY PRIOR TO THE ISSUANCE OF THE INITIAL BUILDING PERMITS FOR EACH LOT. LEGEND: BRL = BUILDING RESTRICTION LINE = POINT 0 = IRON REBAR SET NOTES: 1. ALL LOTS ARE SUBJECT TO A 20' SLOPE & DRAINAGE EASEMENT ALONG ALL STREET RIGHT—OF—WAY LINES AND A 10' UTILITY & DRAINAGE EASEMENT ALONG ALL PROPERTY LINES. 2. PRIOR TO THE ACCEPTANCE OF THE ROADS CONTAINED IN SOVEREIGN VILLAGE INTO THE STATE SYSTEM, A PERMANENT CONNECTION TO THE EXISTING STATE ROAD SYSTEM MUST BE CONSTRUCTED CONSISTENT WITH THE APPROVED MASTER DEVELOPMENT PLAN. 3. SETBACKS UNLESS OTHERWISE NOTED ARE FRONT = 35' SIDE = 10' REAR = 25' 4. ALL LOTS ARE SINGLE FAMILY DETACHED — URBAN MINIMUM LOT WIDTH AT SETBACK = 70' MINIMUM LOT WIDTH AT R/W = 40' MINIMUM LOT SIZE = 12, 000 SO FT 5. LOTS 88, 89, 90, AND 91 WITH FRONTAGE ON ROSSMANN BOULEVARD WILL NOT BE ALLOWED DIRECT VEHICULAR ACCESS TO ROSSMANN BOULEVARD FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE T SECTION 2-A° RED BUD DISTRICT — FREDERICK COUNTY VIRGINIA M RK D. SMITH SCALE: N/A I DATE: NOVEMBER 15, 2002 No.002009 GREENWAYYENGINEERING 141M LANE Engineers WINCHESTER, VA. 22602 `,1J Surveyors TELEPHONE: (540) 662-4186 FAX: (540) 722-9528 Founded in 1971 E-MAIL: www.greenwayeng.com 2185 SHEET 3 OF 18 F CURVF RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C2 925.00' 468.89' 463.89' N 60' 16'45" E 29'02'38" C3 525.00' 265.40' 262.59' N 60' 19'09" E 2857'53" C4 900.00' 706.27' 688.29' • N 52'19'12" E 44'5745" C5 1 550.00' 171.94' 171.24' N 65 50'45" E 17'5442" C28 575.00' 116.36' 116.16' S 69'00'15" W 11'35'40" C29 875.00' 443.55' 438.82' S 601645" W 29'02'38" 05 875.00' 112.18' 112.10' N 62'47'08" E 0720'43" 06 875. 00' 8Z 04' 87.00' N 69' 18'29" E 05'4 1'58" 07 875.00' 40.37' 40.37' N 73'2846" E 02'38'37" C38 575.00' 39.58' 39.57' N 72'4947" E 03'5637" • OBR/D/,gA, SEE SHEET 5 c �r 80 \� 81 S 19008'32" E ` - - _, O� SEE 150.00' _ _`. 84 SHEET 6 �•?I • 70' 20' DRAINAGE I EASEMENT i LOT 79 m 04'" W 12411 SQ.: FT N : �� S 70.2483.38' I I I 10' 9Rc85 S 17'5052" 'E' — _—_ 154.39'_—_ —_ � 10' BRL S 70'04'24" W 0 38.56' I LOT 78, H 12055 SO.` -FT / I N 89'20'16" W 54, 67- N 89'20'16" W L 1-=o,* / 3606' S 23'30 32 186 E 140.61 % 20' SANITARY r — 10' BRL i EWER EASEMENT W j LOT 7�- 112175 SO., FT•l I h/ 87 10 BR� N 3� 3''3 O\ \ 89.p3 w Z" W 89 SEE SHEET 8 50 0 50 GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT . SOVEREIGN VILLEAGE SECTION 2-A RED BUD DISTRICT — FREDERICK COUNTY VIRGINIA SCALE: 1" = 50' 1 DATE: NOVEMBER 15, 2002 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in, 1971 www•greenwayeng.com . v � ,Jv MARK D. SMITH No.002009 CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C3 525.00' 265.40' 262.54' N 16'19'09" E 28'5753" C5 550.00' 171.94' 171.24' N 65'50'45" E 17'5442" C27 43.00' 62.80' 57.37' S 74'57'05" E 83'40'58" C28 575.00' 116.36" 116.16' S 65'50'45" W 1135'40" C39 575.00' 76.78' 76.72' N 67*01'57" E 07*39'03" TM 65-((A))-39 0 REMAINDER TRACT FUTURE DEVELOPMENT foss Mw 1A, �5B�ULEI/ARDN 50, Rlw E �TL/NE O 315' WA ENE �\ \ I 9.38' 79 LOT 80 ; 12249 SQ. FTIQ1.1' tc, 00 o L 20 DRAINAGE 0 EASEMENT ` _ _ 140.64 —0 / LOT �8.1. I h 12260 SO. FT. I � •,lam � �jl � z 10' BRL�J O W ar 10' BRL 25' O � � W I� 84 � I 0� m � LOT 82 m � � � o � ' � o �I 12938 SO. FT' I c5Q �i oo I �o I N � 10_BRL 167.29' _ I 8.32' I 83 50 0 50 SEE SHEET 6 GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE T SECTION 2—A RED BUD DISTRICT — FREDERICK -COUNTY VIRGINIA MARK D. SMITH SCALE: 1" = 50' 1 DATE: NOVEMBER 15, 2002 No.002009 GREENWAY ENGINEERING ! /' 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Fa "And in f 97f www.jzreenwaveng.com 9 f R_5 SNFFT .S OF f R CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C7 200.00' 63.98' 63.70 : S 23'5646" E 18' 19'41 " C8 300.00' 98.08' 97.64' " + • S 81 ' 17'46" W 18'4355" C9 300.00' 17.21 ' 17.21 ' N 73'3427" E OX 17' 15" C24 275.00' 89.9 1' 89.51 ' N 81 ' 17'46" E 18'4355" C25 43.00' 65.08' 59.04' S 283427" W 864245" C26 175.00' 55.98' 55.74' S 23'5646" E 18' 19'41 " C40 275.00' 48.59' 48.53' ,' S 76'5932" W 10'0726" C41 275.00' 41.32' 41.28" S 86.21 '29" W 08'3629" B ioRw / N Olt- 20' '30MW I ( 4, SEWER EASEMENT I SEESHEET7 i o �o'BR8,3.,9 / !y I 79 44 9 _ J� i LOT 84 ,�/�`�i•o 13006L SO. FT 1 / /1 °' 10, W J. 25' 11 40 ..�0--T 80.77' 44.78 N 70 8'04 24 5.35' 25.58' 20' SAN/TARY�--, 1 I g SEWER EASEMENT 1 � � � r • 25' BRL 25, I w�1�'1 82 A. W 0' I LOT 83 �► N SEE SHEET 5 V o ►� I 18482 SQ. FT 6. I h \ • 3'. Iy 1WN1GEa. 2 ASEMENT I `s N3114�6. 1.43 cgs 33.06 36 S 14_46'55" E _ C7 _ N S R/W ss 13' DO ER DRIVE 50 _ / SEE SHEET 15 50 0 50 GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT . SOVEREIGN VILLAGE SECTION 2 A RED BUD DISTRICT — FREDERICK COUNTY VIRGINIA SCALE: 1 " = 50' DATE: NOVEMBER 15, 2002 GREENWAY ENGINEERING 151 WINDY' Mue LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540)' 722-9628 Founded in 1971 MARK D. SMITH No.002009 N EASEMENTS LINE BEARING' DISTANCE L 1 S 1532'57" W 30.40' L2 S 74'27'03" E 53.92' L3 N 74'27'03" W 44.79' MERIDIAN OF DB 843 PG 417 88 SEE SHEET 8 N 00'3944" E 10. BRL 77 LOT 87 o N M 12000 SO. FT 10' BRL N 00'39'44" • 150:00' : � � LAJ 10' BRL m LOT 86 c4 W 78 � 12035 SO. FT "� N :I 14.48' I.j W L . — _ . _ f0' BRL _ 36.35' N O0'39'44_E_ I 2 r 10' BRL 3 + I N �m .LOT 85 %°►�; 1`I 79 13472 SO. FT ,�/ I� i �Y _ .4 • —1o' I 1 10 20 DRAINAGE A f0 BRL 1� S DO 58'17_E _ 1 1 O I 183.96' �20' SANITARY SEWER EASEMENT \ \ 84 SEE SHEET 6 FINAL SUBDIVISION PLAT SOVEREIGN VILA GE SECTION 2_A EASEMENT 50 0 50 GRAPHIC SCALE (IN FEET) RED BUD DISTRICT — FREDERICK COUNTY. VIRGINIA SCALE: 1" = 50' 1 DATE: ``NOVEMBER 15, 2002 GREENWAY:: ENGINEERING 161 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9628 onnded in 1971 www.greenwayeng.com V v - V MARK D. SMITH No.002009 �4 sv� CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE Cl 1000.00' 277.83' 276.94' , N 37*4753" E 15'55'07" C2 925.00' 468.89' 463•.$9' N 60'1645" E 29'0238" C4 900.00' 706.27' 688.29 N 52'19'12" E 44'5745" C22 55.00' 271.31 ' 68.75' N 00'3944" E 28238'08" C23 25.00' 22.39' 21.65" N 63'40'44" W 51'19'04" C29 875.00' 443.55' 438.82' • S 60' 1645" W 29'02'38" C30 500.00' 141.OX 140.56' S 3740'37" W 16'09'39" C31 500.00' 122,58' 122.27' N 36'37'10" E 14'0247" C32 500.00' 18.45' 18.45' N 44'42'00" E 02'06'52" C33 875.00' 150.52' 150.34' N 50'41 '08" E 09'51 '23" 04 875.00' 53.44' 53.43' N 57'21'48" E 03'2958" C42 55.00' 51.08' 49.27' N 64'3737" W 53'12'49" C43 55.00' 1 46.63' 45.Z5' S 64'2836" W 483446" C44 55.00' 1 46.63' 45.25' S 15153'500 W 48'3446" 41 \�.9 - � MERIDIAN OF PLAT 52.90 S� j y �\ �DB 843 PG 417 F 50 0 50 20' DRAINAGE N 24'18'31" W ;:� EASEMENT - 11.90' 2 GRAPHIC SCALE srS (IN FEET) //. / _ : N; •::;:;:�::;�::.:: moo; �' sz N1\..` 18.16 a��JJ SEE SHEET 9 1 15101 So. FTARY SEWE'EWEE � - 3S" 1 /' tK1Dc 10 �C22 \ 13772SO. FT cl _ 10' BRL _ O 5.00'''``� N O 1' 14'01 " W I �� _ 166.66' LIJ 4 i 10' BRL - - 88 16448 SO. FT 15' WATERLINE BR j • 313 \ W I p SEMENT � v� _ _ 10' BRL S 00'39 44 �W / ....__p 77 i 25' 150. 00 SEE SHEET 4 i SEE SHEET 7 I I 87 FINAL SUBDIVISION PLAT N SOVEREIGN VILLIAGE °F�1 SECTION 2-A ; : RED BUD DISTRICT -- FREDERICK COUNTY VIRGINIA C-) MARK D. SMITH SCALE: in = 50,1 DATE: . NOVEA4BER 15, 2002 No. 002009 GREENWAYYENGINEERING 11�" Istoz, 151 WINDMLL LANE Engineers WINCHESTER, VA. 22602 ' u Surveyors TELEPHONE: (640) 862-4185 FAX: (540) 722-9528 Founded in 1971 wvmgre6riwayengxom 2185SHEET 8 OF 18 co w c� w CURVE CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE Cl 1000.00' 277.83' 276.94' N 37.47'53" E 15'55'07" C4 900.00' 706.27' 688.29' N 52'19'12" E 445745" C22 55.00' 271.31 ' 68.75' N 00'3944" E 282.38'08" C45 55.00' 46.63' 45.25' N 32.40'55" W 48.3446" `\EMq�iy�ERJ-39A RE pEVELOPMCT ENT `'`•50_19 a E SEE � Via,. SyE�18 z RIDS P' 4yt MpB g43 1 E p� p�cT N ` FNr 295Q•19p 110 1 . S6'IN ON o BCE' /\ �4iQ 35 47" LOT 15 �Orj / SOVEREIGN VILLAGE ' SECTION ONE LOT 16:.:::' 58.20' 20' DRAINAGE EASEMENT 50 0 50 GRAPHIC SCALE (IN FEET) N �\ c13\ LOT 91 \\'�r 18736 SO. FT ,• � 92 FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2 A RED BUD DISTRICT - FREDERICK COUNTY, VIRGINIA SCALE: i " = 50'1 DATE: NOVEMBER 15, 2002 /e:j7,N\ GREENWAY'' ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER,' VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com ' SANITARY VER EASEMENT TH MARK D. SMITH No.002009 L4. sUxx C? C-0 cy� Lfl CURV RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C21 25.00' 22.39' 21.65' N 65'00'12" E 51.19'04" C22 55.00' 271.31' 68.75' N 00'3944" E 282.38'08" C46 55.00' 46.63' 45.25' S 81.1541 " E 48'3446" C47 1 55.00' 33.70' 33.17' N 565348" E 35.06'17" MERIDIAN OF PLAT F�F�F Q DB 843 PG 417 LOT 17 91 SEE SHEET 9 LOT 18 �l /LOT 92 ... ' 13801 SO. FT m' o SOVEREIGN VILLAGE ::•:•' : v SECTION ONEcb "0� _J 0 10" E o yyo \ S �i6RL�- LOT 19 0 o LOT 93 _ `f',� 12819 SO. FT _ o , sr� 10' BRL S 00'39'44 W = i - �t � � 150.00' L 10' BRL : o m LOT 94 m - o N to 0 0 0� I 12000 SO. FT 10' BRL V 3 25 ........................ S 00'39 44 W :::::::::.::. ' LAJ OUTLOT co :150.0 2' _ ............................... PARCEL "C" 0 10' BRL SEE SHEET 17 •��, g m LOT 95 Z I N 12000 SO. FT 10' BRL J S 00739'44'rW _O 150.00' SEE SHEET 11 96 50 0 50 Tmmmmml GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT SOVEREIGN VILL-VAIGE T �1 SECTION 2-A' RED BUD DISTRICT — FREDERICK COUNTY VIRGINIA MARK D. SMITH SCALE: 1" = 50' 1 DATE: N.OVEMBER 15, 2002 No.002009 GREENWAYYENGINEERING Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 682-4185 0 FAX: (540) 722-9528 Founded in, 1971 wew.greenwayeng.com 91 R.5 .SI-IFFT in nF 1 R CURIE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C8 300 000' 98.08, 9Z64' N 81'17'46" E 18'43'55 C20 325.00' 106.25' 105.78' S 81'17'46" W 18'4355" C49 325.00' 31.94' 31.92' N 87*50'49" E 05'37'49" C50 I 325.00' 1 71.85' 71.70' N 78'41 '55" E 12'40100" I95 I I SEE SHEET 10 I N 00'3944" E 150.Q0'_ _ I f0' BRL _ LOT 96 12000 sa.�FT IN o L f0_BRL � � _ S 00'3944 p� W 150.00' 3 , _ _ r _ 10' BRL 1 2. fs ouTLor PARCEL "C" SEE SHEET 17 LOT 97 m I 12601 SQ. -FT .. � z 10' J 69. �.- 15' I I 15'�3� °N LOT _98_�, N. \ 4 w` N \ 0' gRl. E i �38 p5 moor `m \� .00' 1 A \ 99 SEE SHEET 12 MERIDIAN OF PLAT DB 843 PG 417 r� W 3 _ I �-1 \ � z 50 0 50 GRAPHIC SCALE (IN FEET) 151 LANE . FINAL SUBDIVISION PLAT SOVEREIGN V/L/AGE T �l SECTION 2-A RED BUD DISTRICT — FREDER/CK COUNTY I/lRG/N/A � MARK D. SMITH � SCALE: 1 " = 50' DATE: No.IEMBER 15, 2002 No.002009 GREENWAYWINDY ENGINEERING Engineers WINCHESTER, VA. 22602 `,1! Surveyors TELEPHONE: (540) 662-4186 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com 21 R.5 SHFFT 11 OF 1 R CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C8 300.00' 98.08' 97.64' N 81' 1746" E 18'4355" C9 300.00' 17.21 ' 17.21 ' S 73'3427" W 03' 17'15" C10 300.00' 210.12' 205.86' S 84'43'00" E 40'07'51 " C19 275.00' 208.39' 203.44' N 86'21'38" W 43'25'06" C20 325.00' 106.25' 105.76' S 81'1746" W 18'4355" C51 325.00' 2.47' 2.47' N 72'08'52" E 00'26'06" C52 275.00' 46.52' 46.47' N 76'4636" E 09*41'33" C53 275.00' 116.91 ' 116.03' S 86' 11 '54" E 24'21 '27" OUTLOT PARCEL "C" SHEET 17 98 SEE SHEET 11 N 1738'05" W _ _ 149.65 _' W• 10' BRL _ — — — N I m LOT 99 ml In I N 12016 SO. FT, Z L _ 10' BRL J S 18'04' 11 " E 150.50, h r fOrRL — — • v � O 1 h LOT 100 m `O N 12181 SO. FT, L �o• BRc • 15' OBRB� OF P r Q 1 10'�.16054• (" LOT 101 15.28' \ 13124 SO. fT 'SS40. l 102 SEE SHEET 13 17.79' / I SEE SHEET 6 DOVER DR. 50' R/W v SEE SHEET 15 O � i i .' 50 0 50 / GRAPHIC SCALE (IN FFFT) FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2-A RED BUD DISTRICT — FREDERICK COUNTY VIRGINIA SCALE: 1" = 50' 1 DATE: NOVEMBER 15, .2002 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 MARK D. SMITH No.002009 Founded in 1971 www.greenwayeng.com r CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C 10 300.00' 227.34' 221.94' S 86'21 '38" E 4325'06" C 17 55.00, 271.31 ' 68.75' S 25'20'55" W 282'38'08" C 18 25.00' 22.39' 21.65' '' S 38'59'33" E 51' 19'04" C 19 1 275.00' 208.39' 203.44' N 86'21 '38" W 43'25'06" C54 275.00' 44.96' 44.9 1' S 69'20'08" E 09'22'06" C55 55.00' 6.03' 6.03' S 16'28'30" E 06'1659" C56 55.00' 6Z20' 63.10' S 54'37'12" E 70'00'24" C57 55.00' 46.63' 45.25' N 66'05'14" E 48'3446" OUTLOT PARCEL "C" SEE SHEET 17 101 Z SHEET 12 N 1 5•58'49 "E - ��.,..-- 150•00•_ ANT — ' 10 BRL •�1SEM I ml m LOT 102 1 12744 SO. FT RJ L f0 I — ' BRL / .•�' S_ 25'20'55_" W 141.80' 10' BRL ° 7 c`l h ! � N , j LOT 103 12460 SO. FT MI 10' "25' rjyh 1c'e Qt]", 1 �5 0 52 p1 r � � • � ? .......... ::.1,,-BRA ' ' =\ 10 i 10 :::' WAT£RUN£ `: Ir EASEMENT LOT 104 - I,op I m 18135 SO. FT ,ry �Ia �� 105 CO ' ^ 25' BRL --- S 28'32'30" W TM 65-((A))-40 FU-SHEP FARM PARTNERSH/P ZONE. RP USE.* VACANT D8 789 PG 1022 FINAL SUBDIVISION PLAT SOVEREIGN VILLAGE SECTION 2-A. RED BUD DISTRICT - FREDERICK COUNTY, VIRGINIA W 50 0 50 GRAPHIC SCALE (IN FEET) SCALE: 1 " = 50, 1 DATE: NOVEMBER 15, 2002 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (546) 862-4185 FAX: (540) 722-9528 ounded in 1971 wympeenwayeng.com MARK D. SMITH No.002009 CURVE RADIUS ARC LENGTH CHORD L NGTH CHORD BEARING DELTA ANGLE C16 25.00' 22.39' 21.65' S 89*41'23" W 51'19'04" C 17 55.00' 271.31 ' 68.75' S 25'20'55" W 282'38'08" C58 55.00' 46.63' 45.25' N 17'30'28" E 48'3446" C59 55.00' 46.63' 45.25' N 31'04'18" W 48 J4'46" C60 55.00' 58.18' 55.50' N 85'3955" W 6O'3628" 108 II I SEE SHEET 15 25' I 15' WATERUNL' " EASEMENT oc* ' VrrrL Lw CID_ N 25'20'55" E _ O 150.00 Q 3 10BRL h \Yr i� W I P N 42.09'05 LOT ) 07 coo 13.26' c-, \ 12121 SO. FT o 0 a �o 55.00' 10, � V o SWffARY EASEMENT; S.R�O' BRL _ ' 0 I C58 �s : — O �0 / A3 I WATfRUNE 10' 1 LOT 106 EASEMENT 18290 SO. FT J 35' BRL p . \ cA • „� . N ' N N 104 � �^� � LOT 105�� j N o: a l �' b 13176 SO. FT �`\�- cry �o _L _ 25_BRL _ _ \ I �25_BRL J 165.24' Yo � 60.19' S 28'32'30" W 1067.02' FU—SHEP FAW ARTNERSH/P 5 ZONE.- RP USE- VACANT DB 789 PG 1022 FINAL SUBDIVISION PLAT SO VEREI GN VILLA GE SECTION 2 -A RED BUD DISTRICT — FREDERICK .COUNTY VIRGINIA SCALE: 1" = 50' 1 DATE: NOVEMBER 15, 2002 GREENWAY ENGINEERING 161 WINDY PTAs• LANE Engineers WINCHESTER, VA. 22802 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com APHIC SCALE (IN FEET) MARK D. SMIH No.002009 .m C7- 200.00' 63.98' 63. 70' N 23'5646" W 18' 19'41 " C9 300.00' 17.21 ' 1 Z21 ' � S 73 :3427" W 03' 17' 15" CIO .300.00' 210.12' 205.86' . N 8443'00" W 40'07'51 " C 13 225.00' 71.97' 71.67' S 23 5646" E 18' 19'41 " C 14 43.00' 59.55' 54.9 1' N 54 2728" W 79'21 '06" C 15 325.00' 167.23' 165.39' . ' S 79'23'33" E 29'2856" C61 325.00' 54.03' 53.97' N 69'24'50" W 09*31'30" C62 325.00' 77.39' 77.21 ' N 80'5952" W 13'3836" C63 325.00' 35.82' 35.80 S 89'01 '24" W 06' 18'51 " C64 225.00' 59.56' 59.39' N 22'21 '56" W 15' 10'00" A� Q I, ill SEE SHEET 16 4) h SO st •� LOT 110 12s84' SO. Fr \ 10, pgL . 8� io9roo 1g U 1p 9 �67!RL . � ca W LOT 109LO m \�13547 SO. FT � o � � yew 10''49BRL'6» E '. 148.87 10'MT NE` 10' BRL �� co 20LO rT 03 � m Ix LOT 108 , . I I 12746 SO. FT 01 10' BRL I I S 25'20 55' W �i 150.00' -p.I SEE SHEET 14 107 50 0 50 GRAPHIC SCALE (IN FEET) FINAL SUBDIVISION PLAT - SOVEREIGN VILLAGE SECTION 2-- : RED BUD DISTRICT — FREDERICK COUNTY, VIRGINIA SCALE: 1 " = 50' 1 DATE: • NOVEMBER 15, 2002 GREENWAY : ENGINEERING 151 WMY..UII1 LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 ounded in. 1971 www.greenwayeng.com v- - -, N--.- - MARK D. SMITH No.002009 a a CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C3 525.00' 726.49' 669.90' ' : N 35'09'32" E 79' 17'07" C6 550.00' 106.10' 105.94' N 5121 '48" E 11103'11 " C7 200.00' 63.98' 63.70'. N 23'5646" W 18' 1941 " C 11 575.00' 47.53' 47.51 ' N 48' 12'17" E 04'44'09" C 12 43.00' 62.80' 57.37' N 08'4353" E 83'40'58" C13 225.00' 71.97' 71.67' S 2356 46" E 18'19'41 " C65 225.00' 12.4 1' 12.41 ' N 3131 '46" W 03'09'41 " IM REMA/NDERAJ7RACT FUTURE DEVELOPMENT ROSSMANN BOULt -, 50' R/W GA W I 25' N O y L.15' 35' 6RL W 1 V �a o 01 ESMT. 25' BRL 115.36' 34.64' f N 5605324" E 150.00' 1 F BRL z o� ,m LOT 112 m oro 3 I 12000 SO. FT N w 10, BRL J N 56'53'24'` E 150.00' f0' BRL `O f.. LOT 111 12327 SQ. FT I 10' BRL -� 10' S 6 J 0'03 04 {v 150.57' ' ; 110 G ' SEE SHEET 15 FINAL SUBDIVISION PLAT.' SOVEREIGN VILLAGE SECTION 2—A RED BUD DISTRICT - FREDERICK COUNTY VIRGINIA SCALE: 1" = 50' 1 DATE: NOVEMBER 15, 2002 GREENWAY ENGINEERING 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 0 FAX: (640) 722-9528 Founded in 1971 www.greenwayeng.com 0 0 50 GRAPHIC SCALE (IN FEET) &'MARK D. SMITH No.022837 sllr►�', SjONAL 2185 SHEET 16 OF 18 4 . , ---20' DRAINAGE EASEMENT 92 18 I o 93 P�� / N p G q.1� 6¢O6p8 1s 94 —' - - '� 20' DRAINAGE • // EASEMENT 95 20 �. 96 Q 21 2 97 Qj N O W o 22 o - - cv)' 98 - N23 js�`?, 99 W 20 EASEMENT �� 100 25 W 24 '/ -- _ - - N 78.08'03" W 'a+ 47.46' rns "�,, 101 s' OUTLOT PARCEL "C" - ~ 0 4.5256 ACRES �.N o 102 26 3' N STORM DRAINAGE J_N _Z �:; EASEMENT ,� 103 cq 2 W L m 27 ✓20' DRAINAGE o t EASEMENT 28 ` 104 S 28.32'30" W •: •. •'336.73'• • .. ' TM 65-((A))-40 100 0 100 FU-SHEP FARM PARTNERSHIP EX. 20' STORM ZONE. • RP DR41NAGE EASEMENT GRAPHIC SCALE USE.- VACANT INST.# 010017361 I �, (IN FEET) FINAL SUBDIVISION PLAT' SOVEREIGN VI L, LA GE TH SECTION 2-=A RED BUD DISTRICT — FREDERICK COUNTY VIRGINIA MARK D. SMITH SCALE: 1" = 100' DATE: NOVEMBER 15, 2002 No.022837 GREENWAY- .E GINEERING �c)-z 151 WINDY HILL LANE S I C1 ,**Iv_ Engineers WINCHESTER, 'VA. 22602 SIGNAL Surveyors TELEPHONE: (540) 682-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com 2185 SHEET 17 OF 18 0 w W A ' ` r E s , LOT 91 N 6558'12" W 26.52' 16 It \ o) V W 0 ��\ 1 CL Z A ocpX I wk- io 40' SOVEREIGN VILLAGE . p1 i SECTION ONE IN 0 _-_�-- LwI. olc. J � 14 � o� Q f ' • W ,,, _ 04941" w 0 80.00' - - � a y ' 50 0 50 W m°p I GRAPHIC SCALE I i (IN FEET) i FINAL SUBDIVISION PLAT .. SOVEREIGN VlL-f_AGE T F� 2 SECTION -2-A- RED BUD DISTRICT - FREDERICK - COUNTY VIRGINIA MARK D. SMITH SCALE: 1 " = 50' DATE:. -NOVEMBER 15, 2002 No.002009 GREENWAY ENGINEERING l l �Su2- 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22802 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9528 Founded in 1971 www.greenwayeng.com 2185 SHEET 18 OF 18 %-OUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 April 3, 2006 Manning & Ross Developers, LLC c/o Mr. Dave Madison and Mr. Greg Bancroft PO Box 27 Winchester, VA 22604 RE: Sovereign Village Existing Zoning and Subdivision Ordinance Violations Dear Dave and Greg: In reviewing the zoning and subdivision files for the Sovereign Village development, I have identified a number of ordinance violations that require your attention. Until these ordinance violations are addressed, the County will refrain from issuing zoning and subdivision approvals for any aspect of the Sovereign Village development. The violations pertain to the failure to: • Establish a Property Owners Association that is governed by the new residential property owners. Based on correspondence from your firm, you indicated that a new Board of Directors comprised of residents of the development would be elected in January at a POA meeting. My understanding is that this meeting and election did not occur. • Complete Phases 1 and 2, as identified on the approved master development plan, prior to seeking approval for additional Phase 3 and 4 developments. Phase 2 includes a portion of Channing Drive which has not been dedicated, bonded, nor constructed. • Complete the proffered recreation center, as you have already created the building lots adjacent to the center's location. • Guarantee completion, via right-of-way dedication and bonding, of Channing Drive, from Senseny Road to the project's northern property line. I would also note that the Channing Drive Rezoning application, of which Sovereign Village was a part, limited the number of homes to 474 that could be built without the completion of Channing Drive. County records indicate that 388 lots have been approved and recorded. The County will cease approval of building lots once lot 474 is created unless the entire length of 107 North Dent Street a Winchester, Virginia 2260I-5000 Page 2 Manning & Ross Developer;,, —LC Re: Sovereign Village April 3, 2006 Channing Drive is constructed and open to the public. As noted above, the guaranteed completion of Channing Drive should be immediately addressed via right-of-way dedication and bonding. We are prepared to discuss these violations with you, and strive towards achieving resolution. Please contact me should you wish to discuss. Sincerely, Mark R. Cheran Zoning and Subdivision Administrator ERL/MRC/rsa Cc: Phil Lemieux, Red Bud District Supervisor Richard Shickle, Chairman, Board of Supervisors John R. Riley, Jr., County Administrator Eric R. Lawrence, AICP, Planning Director LIJ2 Ff1Ep�;' COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 October 27, 2003 Mr. Mark Smith Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 RE: Sovereign Village - Section 2C: Final Plats review Dear Mark: I have had the opportunity to review the Subdivision Final Plats for Sovereign Village - Section 2C, and offer the following comments: 1. Proffers. The proffer amount due is $3,658.73. This amount includes $100 allocated to the construction of the bridge. 2. Revise the vicinity map to show recorded sections of Lynnehaven and Sovereign Village 2A and 2B. Label other surrounding subdivisions as well. 3. Provide a note regarding the Open space allocation for Section 2C. An appropriate guarantee is required prior to final plat approval. I am available should you have questions. Sincerely, G� . � �Jal-'�rth Patrick T. Davenport, C.Z.A. Zoning and Subdivision Administrator PTD/bad U-..\Patrick\Comnron\S_D Reviews\Charming Drive MP\Sov Village\.Sov Village Sec 2C final plats_review.wpd 107 North Kent Street - Winchester, Virginia 22601-5000 M la copy COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 September 15, 2003 Mr. Mark Smith Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 RE: Sovereign Village - Section 2B Final Plats Dear Mark: This letter is to confirm that the Final Plats for Sovereign Village, Section 2B, have been approved and signed. Today, a representative from Manning and Ross, LLC, was contacted to collect the plats for recordation. This phase allows for the development of 21 single-family detached dwellings. Frederick County currently holds a letter of credit in the amount of $140,130.66 to guarantee the construction in this subdivision. Please provide this office with a copy of the recorded plats and deed of dedication. If you have any questions, please feel free to call. Sincerely, AM//7dw?a Patrick T. Davenport, CZA Zoning and Subdivision Administrator PTD/bad cc: q-Ja`j Anderson, Real Estate reg Bancroft, Manning & Ross Developers, LLC em: Ana Forester, Red Bud District Supervisor Gochenour, Red Bud District Commissioner --Marie Straub, Red Bud District Commissioner UAPatrick\Common\S_D Reviews\Sov Village\SV Sec I Phase 3 final plat_apM.wpd 107 North Kent Street • Winchester, Virginia 22601-5000 COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 September 8, 2003 Mr. Mark Smith Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 RE: Sovereign Village - Section 2B: Final Plats review Dear Mark: I have had the opportunity to review the Subdivision Final Plats for Sovereign Village - Section 2B, and offer the following comments: 1. Proffers. The proffer amount due is $3,658.73. This amount includes $100 allocated to the construction of the bridge. 2. Revise the vicinity map to show recorded sections of Lynnehaven and Sovereign Village. A letter from Evan Wyatt dated January 16, 2003, was received, in which he requested the approval of the final plats for Section "2A" prior to the approval of Section 1, Phase 3 of Sovereign Village. Due to the delays associated with the wetlands regulatory issues located in Section 1, Phase 3, your request to approve Section "2A" prior to Section 1, Phase3 was granted. However, the final Plats for Section 1, Phase 3 must be recorded prior to obtaining the approval of Section 2B. An appropriate guarantee is required prior to final plat approval. I am available should you have questions. Sincerely, Pa -a Mz-lrik Patrick T. Davenport, C.Z.A. Zoning and Subdivision Administrator PTD/bad ljAPatrick\Common\S_D Reviews\Sov Village\Sov Village Sec 2B final plats_review.wpd 107 North Kent Street • Winchester, Virginia 22601-5000 COUNTY of FREDERICK Department of Public Works 540/665-5643 FAX: 540/678-0682 September 3, 2003 Mr. Kurt Pennington Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE: Subdivision Plan Comments - Sovereign Village - Section B Frederick County, Virginia Dear Kurt: Upon review of the revised subdivision plan dated July 15, 2003, and received on August 5, 2003, it appears that all of our previous comments have been addressed. Therefore, we recommend approval of the subject subdivision plan. Sincerely, Joe C. Wilder Civil Engineer JCW/rls / cc: Patrick Davenport, Zoning and Subdivision Administrator . o/ file A:lsovviHage,sec3revcom.wpd 107 North Kent Street • Winchester, Virginia 22601-5000 L-7 Page 2 Subdivision Plat Checklist AT. Location of proposed buffers. U. Location and description of monuments and markers. ►/ V. Certified by registered engineer or surveyor. / W. Notarized signature of the owner. X. Signature lines as required. 3,66W 73 Y Y. Statement listing all requirements and conditions placed .�j00 F� b.-A!- on the land resulting from conditional zoning. - JZ. Indication of the portion of the allowable density from the parent tract which is to be allocated to each parcel resulting from the subdivision. v �J,G� O t/OS�o3 I� CHECKLIST FOR SUBDIVISION FINAL PLATS A. The title of the subdivision ("Final Plat 'for........") AA. Notarized owner's certification IAW 15.1-477 COV. B. The page number and total pages on each page. C. Vicinity Map (Scale 1:2,000) showing roads, properties ` and subdivisions within 1,000 feet. I/ D. A written and graphic scale. So V[ 1� 4 Y1Al 1V&t- :rh11 IW,# E. Day, month and year plan prepared and revised. F. North Arrow. G. Magisterial District in which the subdivision is located. VT H. Zoning and use of land to be subdivided and adjoining land. / I. Boundary survey of all lots, parcels and Fights -of -way. V J. Names of owners of adjoining properties with deed book and page number references. K. Area of each lot, total area of subdivision and area in lots. L. Location and area of each parcel of open space and total e/ area of open space. V M. Location, names and ROW widths of existing and planned roads, streets and shared private driveways adjacent to and on the property. JN. Existing and proposed utilities, utility easements and 1/ other easements with dimensions. V O. Existing proposed drainage and ro osed draia easements with dimensions g and locations. P. Location of flood plain limits. Q. Location of land to be dedicated or reserved for public 7use. R. Location of required setback lines on each lot. S. Location of proposed recreational areas. j FILE COPY COUNTY of Department of Planning and Development 5401665-5651 FAX: 540/ 665-6395 February 27, 2003 Mr. Kurt Pennington Greenway Engineering l ,> 1 Windy Hill Lane \i7inchester, VA 22602 RE: Sovereign Village Section 2A - Final flats Dear Kurt: 'l'.11is letter is to confirm that the Final Plats for Sovereign Village, Section 2A; have been administratively approved. Section 2A allows for the development of thirty-seven (37) single-family detached urban residential lots. For your information, the final plats for Section 1, Phase 3, must be approved and recorded prior to obtaining any additional approvals for other Sections within the Sovereign Village subdivision. Frederick County currently holds a Letter of Credit in the amount of $318,839.00 to guarantee the development of this subdivision. Today, a representative from Manning and Ross, LLC was contacted to collect the three approved copies of the plats for recordation. Please return a copy of the recorded plats to this office. if you have any questions, please feel free to call. Sincerely, w Patrick T. Davenport Zoninsa and Subdivision Administrator PTD/kac11 cc: Kina Forrester, Red Bud District Supervisor Marie Straub, Red Bud District Supervisor �t Crochenhour, Red Bud District Planning Commissioner 416he Anderson, Real Estate \Caf'e'g Bancroft, Manning & Ross Developers, LLC (3 approved plats) U;',Patrick\Common\S_D Reviews\Sov Village\Sovereign Village Sec 2A final plats_apprV.wpd 107 North Dent Street - Winchester, Virginia 22601-5000 M 66 M Favy COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 January 30, 2003 Mr. Kurt Pennington Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22604 RE: Sovereign Village Section 2: Subdivision Design Plan Dear Kurt: This letter is to confirm that the Subdivision Design Plan (SDP) for Sovereign Village, Section 2, has been approved. Enclosed are four signed SDP cover sheets for your records and distribution. The final plats for Section 2A are preliminarily approved and have been received containing the appropriate signatures. Once an appropriate guarantee is provided, final approval will be granted by this office. I am available should you have any questions. Sincerely, pr,4� �104111{ Patrick T. Davenport, CZA Zoning and Subdivision Administrator PTD/cih Enclosure cc: Jane Anderson, Real Estate Marcus Lemasters, GIS Gina Forrester, Red Bud Board Representative em: Pat Gochenour and Marie Straub, Red Bud Planning Commissioners FileU.\Patrick\Common\S D Reviews\Sov Village\Sov Village Sect 2 SDP_appmwpd 107 North Kent Street 9 Winchester, Virginia 22601-5000 40 mat COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 January 23, 2003 Mr. Kurt Pennington Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 RE: Sovereign Village - Sections 2A; Final Plats review Dear Kurt: I have had the opportunity to review the Subdivision Final Plats for Sovereign Village - Section "2A" and offer the following comments: 1. Proffers. Provide a statement listing all requirements and conditions placed on the land resulting from conditional rezoning. 2. Naming of the Section. The naming of the phases within Section 2 should be consistent with Section 1. Please explain the reason for the change. The letter from Evan Wyatt dated January 16, 2003 was received in which he requested the approval of the final plats for Section "2A" prior to the approval of Section 1, Phase 3 of Sovereign Village. Due to the delays associated with the wetlands regulatory issues located in Section 1, Phase 3, your request to approve Section "2A" prior to Section 1, Phase3 is hereby granted. However, the final Plats for Section 1, Phase 3 must be recorded prior to obtaining the approval of any other Phases within Section 2. An appropriate guarantee is required prior to final plat approval. I am available should you have questions. Sincerely, Patrick T. Davenport Zoning and Subdivision Administrator PTD/sce L:\Patrick\Common\S_D Reviews\Sov Village\Sov Village Sec 2A final plats_review.wpd 107 North Kent Street • Winchester, Virginia 22601-5000 /to 011.23103 '+ CHECKLIST FOR SUBDIVISION FINAL PLATS ,#X C- A. The title of the subdivision ("Final Plat for........") AA. Notarized owner's certification IAW 15.1-477 COV. ��- B. The page number and total pages on each page. C. Vicinity Map (Scale 1:2,000) showing roads, properties and subdivisions within 1,000 feet. -�--D. A written and graphic scale. 1��E. Day, month and year plan prepared and revised. North Arrow. Magisterial District in which the subdivision is located. Zoning and use of land to be subdivided and adjoining land. Boundary survey of all lots, parcels and rights -of -way. ioe—J. Names of owners of adjoining properties with deed book and page number references. Area of each lot, total area of subdivision and area in lots. L. Location and area of each parcel of open space and total area of open space. ley"O". Location, names and ROW widths of existing and planned roads, streets and shared private driveways adjacent to and on the property. 4Vz``N. Existing and proposed utilities, utility easements and other easements with dimensions. /9L_0. Existing and proposed drainage easements with dimensions and locations. P. Location of flood plain limits. Nlt4 Q. Location of land to be dedicated or reserved for public use. R. Location of required setback lines on each lot. /r✓f S. Location of proposed recreational areas. Page 2 Subdivision Plat Checklist T . Location of proposed buffers. U. Location and description of monuments and matrkers. V. Certified by.registered engineer or surveyorl. VV/ W. Notarized signature of the owner. X. Signature lines as required. Y. Statement listing all requirements and conditions placed on the land resulting from conditional zoning- Z. Indication of the portion of the allowable density from the parent tract which is to be allocated to leach parcel resulting from the subdivision. 40 Go GREENWAY ENGINEERING 151 Windy Hill Lane Winchester, Virginia 22602 Founded in I M TRANSMITTAL Project Name: File No.: Date: Sovereign Village -Section 2A 2185 January 29, 2003 To: FC Planning Attn: Patrick Davenport Copied: From: Kurt Pennington/dls GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 Remarks: r Urgent f4 For Your Review [7 As You Requested f7 Please Comment Message: Patrick, Attached are 3 signed paper copies and 1 signed mylar copy of the final subdivision plat for your final signature. Thank you for your assistance with this project. Call with any concerns RECEIVED JAN 2 9 2003 FREDERiCK GOi.IWY PLANNING & DEVELOPMENT Engineers Surveyors Telephone 540-662-4185 FAX 540-722-9528 greenway@visuallink.com j P FIECOPY COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/665.6395 January 10, 2003 1\4r. Kurt Pennington Creenway Engineering 151 Windy Hill Lane vinchester, VA 22602 ICE: Sovereign Village Section 2A - Final Plats Dear Kurt: On January 3, 2003, you submitted the Sovereign Village, "Section 2A," Subdivision final plats to this office. Fie final plats contained the approval signatures of VDOT and FCSA. Approval of the subject final plats by this office is not possible at this time for the following three reasons: l . Final plats preview. The preliminary final plats were not circulated to this office prior to request for approval. 2. Unapproved design plan. The subdivision design plan for this portion of the development was recently submitted and is not yet approved. 3. Phasing. The final plats for Sovereign Village, Section 1, Phase 3, have not yet been approved. These final plats must be approved prior to the approval of any plats within Section 2. 'Ilierefore, the final plats are being returned to you to keep until it is the appropriate time for submittal. I am available should you have questions. Si:icerely, Patrick T. Davenport Zcning and Subdivision Administrator PT'D/sce Enclosure L:\Patrick\Common\S_D Reviews\Sov Village\Sovereign Village Sec 2A final plats retum.wpd 107 North Kent Street • Winchester, Virginia 22601-5000 COUNTY of FREDERICK Department of Public Works 540/665-5643 FAX: 540/ 678-0682 MEMORANDUM TO: Patrick Davenport, Zoning and Subdivision Administrator, Department of Planning and Development FROM: Joe C. Wilder, Civil Engineer, Department of Public Worksl,)D SUBJECT: Request for Final Plat Approval for Sovereign Village Subdivision, Section 2A DATE: February 20, 2003 In response to your memorandum dated January 31, 2003, I reviewed the construction estimate in the amount of $318, 839 provided by the developer and performed a site inspection for the subject project. It is my opinion that this amount will be adequate to cover the costs associated with the completion of the required infrastructure associated with this phase of the subject project. If you have any questions, do not hesitate to contact me. JCW/rls cc: file A:\bnd-itrofcred\newbnds-ltrofcredit\sovvil2Amem.wpd 107 North Kent Street • Winchester, Virginia 22601-5000 i GREENWAY ENGINEERING 151 Windy Hill Lane, Winchester, VA 22602 Telephone (540) 662-4185 Fax (540) 722-9528 BOND ESTIMATE Project Name Prepared By Checked By A. Clearing and Grading 1. Clearing and Grubbing 2. Disposal 3. Excavation (cut) 4. Embankment (fill) 5. Borrow 6. Spoil/Disposal 7. Topsoil Removal/Storage 8. Sub -Total for Clearing and Grading B. Erosion/Sediment Control 1. Earth Berm 2. Diversion Dike 3. Sediment Trap 4. Silt Fence 5. Gravel Filters: (Excl. filters w/ basins) 6. Inlet Protection 7. Sod 8. Seeding (disturbed area minus pvmt and buildings) 9. Sediment Basins (including filters) 10. Construction Entrance 11. Outlet protection Sub -Total for Erosion/Sediment Control C. Streets 1. Bituminous Concrete Surface: 1.5" -12.5A 2.0" -12.5A 2. Base Course: 3" BM-25 4" BM-25 3. Aggregate Sub -base 8" 21-A 4. Cement Treated Aggregate 5. Cement Treated Sub -grade 6. Surface Treatment 7. Gravel Shoulder 8. Curb & Gutter 9. Header Curb Sovereign Village - Section 2A Kurt Pennington Date 24-Jan-03 Date Item Quantity Unit Unit Price Cost Acre L.S. C.Y. C.Y. C.Y. C.Y. C.Y. C.Y. $3.00 $0.00 $0.00 L.F. L.F. Each L.F. C.Y. 13.00 Each $75.00 $975.00 S.Y. S.Y. Each Each 12.00 S.Y. $40.00 $480.00 $1,455.00 437.00 TON $45.00 $19,665.00 571.00 TON $45.00 $25,695.00 60.00 TON $40.00 $2,400.00 1086.00 TON $40.00 $43,440.00 4617.00 TON $12.00 $55,404.00 C.Y. C.Y. S.Y. S.Y. 5520.00 L.F. $12.00 $66,240.00 L.F. S 10. Median Curb 11. Curb Cut Ramps 12. Commercial Entrance 13. Driveway Entrance 14. Guard Rail 15. Traffic Barricade 16. Edge Delineators 17. Sidewalk (4' wide, concrete) 18. Rock Excavation 19. Soil Testing (Road) 20, L.F. 10.00 Each $500.00 $5,000.00 L.F. 37.00 Each $900.00 $33,300.00 L.F. Each Each 5520.00 L.F. $12.00 $66,240.00 C.Y. L. F. Sub Total for Streets $317,384.00 D. Storm Sewer 1. Easement Clearing & Restoration L. F. 2. Pipe RCCP, Classes II -IV: 15" L. F. 18" L.F. 21" L.F. 24" L. F. 27" L.F. 30" L. F. 33" L.F. 36" L.F. 42" L.F. 48" L.F. 3. Pipe, ADS N-12 15" L.F. 18" L. F. $23.00 $0.00 21" L.F. 24" L.F. 27" L.F. 30" L.F. 33" L. F. 36" L.F. 4. Endwall 15" Each 1899 8" Each 21" Each 24" Each 27" Each 30" Each 33" Each 36" Each 5. End Section 15" Each 18" Each 21" Each 24" Each 2T' Each 30" Each 33" 36" 42" 48" 6. Curb Inlet 7. Other Inlets 8. Junction Box JB-1 Pipe size: 9. Manhole 10. Modified Structure 11. Connect to Existing Structure 12. Remove Existing Structure 13. Pavement Restoration 14. Curtain Wall 15. Concrete Cradle/Encasement 16. Concrete Anchors 17. Paved Ditch 18. Sod Ditch 19. Rip Rap: Class I Ungrouted Class I Grouted Class II 20. Piling 21. Box Culvert (compute Cost in Box Culvert Computation Form) 22. Underdrains 23. Sub -Total for Storm Sewer E. Sanitary Sewer 1. Easement Clearing & Restoration 2. Pipe,(Including 0-8' Trenching & Select Fill): 8" 10" 3. Pipe,RCCP(Including 0-8' Trenching & Select Fill): 8" 10" 4. Pipe, D.I.P.(Including 0-8' Trenching & Select Fill): 8" 10" 5. Extra Trenching (Not including Pipe): 8'-12' 12'-16' 16'+ 6. Manhole (All Manholes) 0-8' (Depth over 8') 8'+ 7. Drop Connection 8. Concrete Encasement Each Each Each Each Each $2,000.00 $0.06 Each Each Each Each Each Each Each Each Each Each Each S.Y. C.Y. L.F. C.Y. C.Y. S.Y. C.Y. C.Y. C.Y. L.S. L.S. L.F. $0.00 L.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. Each V.F. V.F. L.F. 9. Concrete Cradle L.F. 10. Concrete Anchors C.Y. 11. Rock Excavation C.Y. 12. Sheeting and Shoring L.S. 13. Pavement Replacement L.F. 14. Laterals: 4" L.F. 5" L.F. 15. Risers V.F. 16. "T' or "Y" Connection: Each 8"x4" Each 8"x5" Each 101#x4" Each 17. Lateral Connection to Manhole Each 18. Connect to Existing Structure Each 19. Aerial Pipe Supports L.S. 20. Boring or Jacking L.F. 21. Select Fill Material C.Y. 22. Sub -Total for Sanitary Sewer F. Water Line 1. Easement Clearing & Restoration L.F. 3. Pipe, D.I.P.: 3" L.F. 4" L.F. 6" L.F. 8" L.F. 10" L.F. 3. Valve: 3" Each 4" Each 6" Each 8" Each 10" Each 4. Fittings (Tees, Bends, Crosses, Reducers and Offsets) LB. 5. Copper Water Service (Includes Curb Stop) Tap fee may cover this item L.F. 6. Wet Tap Each 7. Fire Hydrant Each 8. Blow -off Each 9. Air Release Each 10. Rock Excavation C.Y. 11. Boring and/or Jacking L.F. 12. Pavement Restoration L.F. 13. Shoulder Restoration L.F. 14. Concrete Anchor/Encasement C.Y. 15. Concrete Cradle L.F. 16. Relocate Existing Hydrant Each 17. Sheet and Shoring L.F. 18. Select Fill Material C.Y. s 19. Sub -Total for Water Line G. Miscellaneous 1. Septic Field 2. Pump 3. Monuments and Pipes 4. Monuments and Pipes 5. Walkways and Trails: 4' Asphaft 8' Asphaft 4' Gravel 4' Woodchip 6. Landscaping 7. Recreational Amenities 8. Screening 9. Fencing 10. Retaining Wall 11. Well 12. Street Sign 13. Wheel Stops 14. Remaining in Section One Sub -Total for Miscellaneous H. Total Cost 1. Sub -Totals: Grand Total Note: Cost Data taken from available records L.S Each L.S. Lot L.F. L.F. L.F. L.F. L.S. L.S. L.S. L.S. L.S. Each Each Each 4"U, vvv. vv $45,500.00 Clearing and Grading $0.00 Erosion/Sediment Control $1,455.00 Streets $317,384.00 Storm Sewer $0.00 Sanitary Sewer $0.00 Water Line $0.00 Misc (Remaining in Sec. One) $45,500.00 $364,339.00 CQ—>ECZA 318�,DS-p.o flOJ7\ GREENWAY ENGINEERING %47 151 Windy Hill Lane Winchester, Virginia 22602 Founded in 1971 TRANS M ITTAL Project Name: File No.: Date: To: Attn: Copied: Sovereign Village -Section II 2185 January 28, 2003 FC Planning Mark Cheran Patrick Davenport From: Kurt Pennington/dls GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 Remarks: 1 . Urgent ' For Your Review r' As You Requested Please Comment Message: Mark/Patrick, Attached are the following for final signature: -2 signed complete copies of the revised subdivision plan per FC Planning comments -Comment response letter -4 signed copies of the cover sheet Thank you for your assistance with this project. Call with any concerns Engineers Surveyors Telephone 540-662-4185 FAX 540-722-9528 greenway@visualLink.com COUNTY of FREDERICK Department of Public Works 540/665-5643 FAX: 540/ 678-0682 April 22, 2002 Kurt Pennington Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE: Sovereign Village, Section H - Subdivision Comments Frederick County, Virginia Dear Curt: The revised subdivision plan for Sovereign Village, Section H dated March 15, 2002, has adequately addressed our previous comments. Therefore, we recommend approval of the subject plan. Should you have any questions, do not hesitate to contact me. /rls cc: Frederick County Planning and Zoning file A:\so.viHL.pa Sincerely, Joe C. Wilder Civil Engineer 107 North Kent Street • Winchester, Virginia 22601-5000 COMMONWEALTH ®f VIRGINIA DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY 14031 OLD VALLEY PIKE EDINBURG, VA 22824 RAY D. PETHTEL INTERIM COMMISSIONER Mr. Kurt Pennington C/O Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 March 27, 2002 Ref: Sovereign Village, Section Two Route 657, Senseny Road Frederick County Dear Kurt: JERRY A. COPP RESIDENT ENGINEER TEL (540) 984-5600 FAX (540) 984-5607 This is to acknowledge receipt of your revised plans dated March 14, 2002 for the referenced project. The plans appear satisfactory and are approved. Please advise the developer accordingly. Please provide eight (8) sets of approved construction plans with signed seal for VDOT distribution. I offer the following comments: • A preconstruction conference be held by the engineer and/or developer with the attendance of the contractor, various County agencies and VDOT prior to initiation of work. • Materials used and method of construction shall apply to current observed VDOT Road & Bridge Specifications applicable during construction of this development. • Our review and comments are general in nature. Should conditions in the field exist such that additional measures are warranted, such measures shall be completed to the satisfaction of the Department prior to inclusion into the Secondary Road System. • Attached is a copy of the minimum requirements and information needed prior to acceptance of subdivision streets into the Secondary System. This is the responsibility of the developer. • All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe or drainage easement. WE KEEP VIRGINIA MOVING Mr. Kurt Pennington Ref: Sovereign Village, Section Two March 27, 2002 Page #2 • The contractor shall notify VDOT when work is to begin or cease for any undetermined length of time. VDOT will also require 48 hours notice for inspections. • The appropriate land use permits shall be obtained before any work is performed on the State's right-of-way. The permit is issued by this office and will require a minimum processing fee, surety bond coverage, and the salary & expenses of a State assigned Inspector. • If mailboxes are to be placed along the roadway fronting lots, a minimum of 4' shall be between the edge of pavement and the front of mailbox as shown on the attached. • Private entrances will be installed in accordance with VDOT Standard CG-913. This is the developer's responsibility. • Any entrances constructed from the referenced street(s) shall meet VDOT minimum standards. This is the developer's responsibility. • Any signs to be installed will be in accordance with attachments. • 1 suggest any utilities and/or storm sewer placed within the proposed right-of-way be backfilled completely with C.R. Type 21-B Stone. This will greatly reduce the possibility of any pavement settlement. • A copy of any/all RECORDED PLATS of dedication to public use (the County of Frederick) for drainage easements or additional right-of-way required for implementation of this proposed project should be provided for VDOT review prior to issuance of any land use permit. Should you need additions! information, do not hesitate to call. Sin cer , Barry J. Sweitzer, Tr s. Roadway En neer For: Steven A. Melnikoff, Transportation Engineer BJS/rf Attachments xc: Mr. Dave Heironimus Mr. Evan Wyatt 41, � �VEU MAR 2, 9 2002 REQUEST FOR CONDITIONAL SUBIDVISION C fist) VDOT - Edinburg Residency Virginia Department of Transportation Attn: Resident Engineer MAR 2 6 2007 14031 Old Valley Pike Edinburg, Virginia 22824 ®JAC ❑ HFC ❑ BHL (540) 984-56M ® LAI ® SAM The local office of the Transportation Department is located at 1550 Commerce St. in Winchester if you prefer to hand deliver this from. Applicant's name, address and phone number: 151 Windy Hill Lane Winchester, VA 22602 Name of development and/or description of the request: Sovereign Village - Section Two Location: North side of Senseny Road (Rt 657) at the north extension of Rossmann Boulevard Va. Dept. of Transportation Comments: The application for subdivision of this property appears to have a significant impact on Route 657, §enseny Road, the VDDT facility which would provide access to the property. This sections street is currently not in the State's Secondary Road bystem.However, ail entrance esign anrainage features must meet a r streeE is to be elignie for acceptance. A comptete set of construction 2 from VDOT Signature and Date: _ C. 1 46- (NOTICE TO RESIDENT ENGINEER -PLEASE RETURNJVHS FORM TO APPLICANT.) NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Also, please attache two (2) copies of your application form, location map and all other pertinent information. ti REQUEST FOR CONDITIONAL SUBDIVISION COMMENTS Frederick County Department of GIS Attn: Marcus Lemasters, GIS Manager 107 North Kent Street Winchester, Va. 22601 (540) 665-5651 The GIS Manager will review the proposed street names for this project to ensure their acceptability into the Frederick County Street Name System. Proposed street names will also be routed through the Communication Center Supervisor for review. This step will prevent duplicate street names from being entered. Please attach one copy of the plan indicating proposed names. Applicant's name, address and phone number: Greenway Engineering 151 Windy Hill Lane, Winchester, VA 22602 540-6624185 Name of development and/or description of the request: Sovereign Village Section Two Location: North side of Senseny Road (RT 657) at the north extension of Rossmann Boulvard GIS Department Comments: S E P 2 0 2002 OEPTOFPLAINNING/DEVELOP ENT N DEPT. OF GEOGRAPHIC INFORMATION SYSTEMS FREDERICK COUNTY, VIRGINIA STREET NAME COMMENTS SUBDIVISION COMMENTS DATE: September 25, 2002 STAFF MEMBER: Marcus Lemasters, Directo SUBDIVISION: Sovereign Village, Section H COMMENTS: The Frederick County Department of GIS has reviewed the requested road names for use in the Sovereign Village, Section H subdivision, and has made the following determinations: 1. The following road names are APPROVED and reserved for use by Sovereign Village, Section H in the Frederick County Road Naming and Structure Numbering System: Rossmann Boulevard (extension) Canyon Road (extension) Whickham Terrace Wales Court 2. The following road names are DENIED for use by Sovereign Village, Section H- Oxford Drive - currently assigned to Albin Village Greenwich Court - currently assigned to Town At Village Green NOTE: The Department is no longer allowed to accept any road name with the same first word , either spelling or phonetically the same, as any other road name currently in the system. Frederick County Planning and Development, 107 North Kent Street, Winchester, VA 22601, (540)665-5651) FAX: (540)665-6395 -EMAIL: mlemaste@co.frederick.va.us t, i APPLICATION AND CHECKLIST SUBDIVISION FREDERICK COUNTY VIRGINIA Date: 12/5/02 Application # 4�o Applicant/Agent: Greenway Engineering / Kurt Pennington Address: 151 Windy Hill Lane Winchester, VA 22602 Phone: 662-4185 Owners Name: Manning & Ross Developers, LLC Address: 141 Featherbed Lane Winchester, VA 22602 Phone: 723-9868 Please list names of all owners, principals and/or majority stockholders: Dave Madison Contact Person: Kurt Pennington on Phone: 622-4185 Greg Bancroft Name of Subdivision: Sovereign Village Section 2 Number of Lots: 82 Total Acreage 39.43 Od Fee Paid 0, Property Location: 900' north of Senseny Road Kt 657) at the north extension of Rossmann Boulveard (Give State Rt. #, name, distance and direction from intersection) Magisterial District Red Bud Property Identification Number (PIN) 65-((A))-39. 39A Property zoning and present use: RP / Vacant Adjoining property zoning and use: RP / Residential & Vacant Has a Master Development Plan been submitted for this project? If yes, has the final MDP been approved by the Board of Supervisors? ►1 RM■] What was the MDP title? Master Development Plan for Phases 1-10 Channing Drive Does the plat contain any changes from the approved MDP? Yes ❑ No If yes, specify what changes: ❑ Minimum Lot Size (smallest lot) 12000 Number and types of housing units in this development: Number 82 Types SF Detached Urban FILE COPY COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 January 16, 2003 Mr. Mark Smith Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22604 RE: Sovereign Village Section II; Subdivision Design Plan Cursory Review (SUBD # 22-02) Dear Mr. Smith: I have had the opportunity to review the Sovereign Village, Section II, Subdivision Design Plan #22- 02 received by our office on December 6, 2002 and offer the following comments: 1. Add North arrow on vicinity map, Pages 1 and 25. 2. Add under Conditional Zoning Tabulation, Page 1A, to include all conditions and proffers of the Channing Drive Rezoning (15-99) approved December 8, 1999. 3. Delineate all sidewalks and walkways on plans. 4. The use of Greenwitch Court on Sheet 8 as a road name has been denied by Frederick County. Please contact Marcus Lemasters, Director, Frederick County GIS, about this street name. 5. Provide a profile sheet of nature trails and delineate nature trails on the plans as per the Channing Drive Rezoning (15-99). 6. Revise the labeling of the phases within Section 2 from "Section 2A to Section 2, Phase L" 7. Provide profile of all traffic signs on Page 22. 8. Provide zoning and right-of-way easements for all adjoining properties on Page 2. 9. Change the spelling of Boulvard to Boulevard. 107 North Kent Street • Winchester, Virginia 22601-5000 Page 2 Mr. Mark Smith Re: Sovereign Village, Sect. 11, SDP. January 16, 2003 10. Remove all building foot prints on the plans. 11. Label all utility easements and provide legal references for utility easements. Please contact me regarding any questions that you may have at (540) 665-5651. Sincerely, /arR.0 eran Planner I M RC/sce cc: Patrick Davenport, Zoning Administrator File: U:\Mark\Sovereign_sdp.wpd SUBDIVISION DESIGN PLAN CHECKLIST The subdivision design plan shall be drawn at a scale that is acceptable to the Subdivision Administrator. The subdivision design plan shall include a sheet depicting the full subdivision submitted. The subdivision design plan shall include the following information: 4WC-- title "Subdivision Design Plan for with a notation of all previous names of the subdivision. original property identification number. JA�C-- page number and total pages on each page. name of the owner and/or subdivider vicinity map (scale of one to two thousand (1:2000)] showing all roads, properties and subdivisions within one thousand (1000) feet of the subdivision. written and graphic scale. day, month and year plan prepared and revised. North arrow. fW- -- d ,v yr c„V// name of the Magisterial District where located. zoning of all land to be subdivided. 10 ILI oundary survey of all lots, parcels and rights -of -way showing bearings to the nearest minute and distances to the nearest one-hundreth (1/100) of a foot. topography shown at a contour interval acceptable to the Subdivision Administrator but in no case greater than five (5) feet. names of owners, zoning and use of all adjoining properties and deed book and page number references for each adjoining parcel. ?e,. ,,Z Zo.v,- 6- VSee' proposed use of each lot, with the number of lots in each use category. -� area of each lot and parcel, the total area of the subdivision and the total area in lots. 10 location and area of each parcel of common open space and the total area of common open space. f/`lam- location, names, right-of-way widths and classifications of existing and planned roads, streets and shared private driveways adjacent to and on the property. �C- existing or proposed utilities, sewer and water lines, manholes, fire hydrants and easements. existing and proposed drainage ways, drainage facilities, culverts and drainage easements with dimensions and j design details. stormwater management plan with calculations describing how stormwater management requirements are being met, including the location and design details of proposed facilities. _proposed grading plan including spot elevations and flow arrows. cross sections, profiles and design details of all proposed streets, roads, culverts, storm sewers, sanitary sewers and water mains. locations, dimensions and cross sections of existing and proposed sidewalks and walkways. location of environmental features including floodplain, steep slopes, wetlands, sinkholes, woodlands and natural stormwater detention areas. �C names of all streams and bodies of water, including all one -hundred -year flood limits'as mapped by FEMA. location of all land to be dedicated or reserved for public use. ----location of required setback lines on each lot. lo -f44. location of proposed recreational areas and facilities. location of proposed buffers and screening with design details, locations and types of plants and screening. &,C proposed landscaping with location and types of plants. _t4__— certification by an engineer, surveyor or other qualified professional of the accuracy of the plat. 11 4&�-� signature of the owner or principals certifying ownership the property. V------�statement listing all requirements and conditions placed on the land included in the subdivision resulting from approval of conditional zoning or a conditional use / ---Permit. signature line for the Subdivision Administrator. 12 %44�P7 Founded in 1971 /t\ EN�INEERIN6 151 Windy Hill Lane Winchester, Virginia 22602 January 27, 2003 County of Frederick Department of Planning and Development 107 North Kent Street Winchester, VA 22601 Attn: Mark Cheran, Planner I Re: Sovereign Village Section II Comments Dear Mr. Cheran: We are in receipt of the comments dated January 16, 2003 and offer the following responses: Comments from Frederick County Department of Planning and Development Comment 1: Add North arrow on vicinity map, Pages I and 25. Response: North arrows have been added. Comment 2: Add under Conditional Zoning Tabulation, page IA, to include all conditions and proffers of the Channing Drive Rezoning (15-99) approved December 8, 1999. Response: No changes to the Conditional Zoning Tabulations have been made as per our telephone conservation on January 24, 2003. Comment 3: Delineate all sidewalks and walkways on plans. Response: Sidewalks and walkways have been delineated on plans. Comment 4: The use of Greenwitch Court on Sheet 8 as a road name has been denied by Frederick County. Please contact Marcus Lemasters, Director, Frederick County GIS, about this street name. Response: Road name on sheet 8 changed to the approved name Godwin Court. Comment 5: Provide a profile sheet of nature trails and delineate nature trails on the plans as per the Channing Drive Rezoning (15-99). Response: No nature trails are proposed or required per this plan. See "Exhibit A" of the approved Channing Drive Rezoning. Comment 6: Revise the labeling of the phases within Section 2 from "Section 2A to Section 2, Phase I. " Response: Section "2A" and "213" used to avoid confusion with MDP phasing. File #2185/KP/dls Engineers Surveyors Telephone 540-662-4185 FAX 540-722-9528 www.greenwayeng.com Comment 7. Provide profile of all traffic signs on Page 22. Response: Sign detail, as provided by VDOT, has been added to sheet 22 Comment 8: Provide zoning and right-of-way easements for all adjoining properties on Page 2. Response: Zoning and right-of-way information has been added to sheet 2 Comment 9: Change the spelling of Boulvard to Boulevard. Response: Spelling has been corrected. Comment 10: Remove all building footprints on the plans. Response: Building footprints, as shown, must remain as per Frederick County Public Works Department. Comment 11: Label all utility easements and provide legal references for utility easements. Response: Easement labels and legal references for existing utilities have been added. Please contact us at your convenience if you have any questions or to schedule a meeting if any of the comments need further discussion. Thank you for your time in this matter. Sincerely, Greenway Engineering Kurt Pennington File #2185/KP/dls COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY 14031 OLD VALLEY PIKE EDINBURG, VA 22824 RAY D. PETHTEL INTERIM COMMISSIONER Mr. Kurt Pennington C/O Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 March 27, 2002 JERRY A. COPP RESIDENT ENGINEER TEL (540) 984-5600 FAX (540) 984-5607 Ref: Sovereign Village, Section Two Route. 657, Senseny Road Frederick County Dear Kurt: This is to acknowledge receipt of your revised plans dated March 14, 2002 for the referenced project. The plans appear satisfactory and are approved. Please advise the developer accordingly. Please provide eight (8) sets of approved construction plans with signed seal for VDOT distribution. I offer the following comments: • A preconstruction conference be held by the engineer and/or developer with the attendance of the contractor, various County agencies and VDOT prior to initiation of work. • Materials used and method of construction shall apply to current observed VDOT Road & Bridge Specifications applicable during construction of this development. • Our review and comments are general in nature. Should conditions in the field exist such that additional measures are warranted, such measures shall be completed to the satisfaction of the Department prior to' inclusion into the Secondary Road System. • Attached is a copy of the minimum requirements and information needed prior to acceptance of subdivision streets into the Secondary System. This is the responsibility of the developer. • All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe or drainage easement. WE KEEP VIRGINIA MOVING Mr. Kurt Pennington Ref: Sovereign Village, Section Two March 27, 2002 Page #2 • The contractor shall notify VDOT when work is to begin or cease for any undetermined length of time. VDOT will also require 48 hours notice for inspections. • The appropriate land use permits shall be obtained before any work is performed on the State's right-of-way. The permit is issued by this office and will require a minimum processing fee, surety bond coverage, and the salary & expenses of a State assigned Inspector. • If mailboxes are to be placed along the roadway fronting lots, a minimum of 4' shall be between the edge of pavement and the front of mailbox as shown on the attached. • Private entrances will be installed in accordance with VDOT Standard CG-913. This is the developer's responsibility. • Any entrances constructed from the referenced street(s) shall meet VDOT minimum standards. This is the developer's responsibility. • Any signs to be installed will be in accordance with attachments. • 1 suggest any utilities and/or storm sewer placed within the proposed right-of-way be backfilled completely with C.R. Type 21-B Stone. This will greatly reduce the possibility of any pavement settlement. • A copy of any/all RECORDED PLATS of dedication to public use Frederick) for drainage easements or additional right-of-way implementation of this proposed project should be provided for VDO issuance of any land use permit. Should you need additional information, do not hesitate to call. Sincer , Barry J. Sweitzer, Tr s. Roadway En neer For: Steven A. Melnikoff, Transportation Engineer BJS/rf Attachments xc: Mr. Dave Heironimus Mr. Evan Wyatt T (the County of required for review prior to REQUEST FOR CONDITIONAL SUBIDVISION C VDOT - Edinburg Residency Virginia Department of Transportation Attn: Resident Engineer MAR 2 6 2002 14031 Old Valley Pike Edinburg, Virginia 22824 [3JAC ❑ HFC ❑ BHL (540) 984-5600 LAl 0 SAM The local office of the Transportation Department is located at 1550 Commerce St. in Winchester if you prefer to hand deliver this from. Applicant's name, address and phone number: 151 Windv Hill Lane Winchester, VA 22602 Name of development and/or description of the request: Sovereign Village - Section Two Location: North side of Senseny Road (Rt 657) at the north extension of Rossmann Boulevard _ Va. Dept. of Transportation Comments: The application for subdivision of this property appears to have a significant impact on Route 657, Senseny Road, the VDar facility which would provide access to the property. This section of street is currently not in the state, s Secondary Road system., all entrance design ana drffinage features must of construction 2 from VDOT Signature and Date: - (NOTICE TO RESIDENT ENGINEER *PLEASE RETURNAVUS FORM TO APPLICANT) NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Also, please attach6 two (2) copies of your application form, location map and all other pertinent information. REQUEST FOR CONDITIONAL SUBIDVISION COMMENTS Frederick County Inspections Department ATTN: Building Official 107 North Kent Street Winchester, Virginia 22601 (540) 665-6350 The Frederick County Inspections Department is located at 107 North Kent Street, 4th Floor of the County Administration Building in Winchester, if you prefer to hand deliver this review. Applicant's name, address and phone number: Greenway Engineering (Kurt Pennington) 151 Windy Hill Lane Winchester, VA 22602 Name of development and/or description of the request: Sovereign Village - Section Two Location: North side of Senseny Road (Route 657) at the north extension of Rossmann Boulevard Inspection Department Continents: MATZAT;=W-1 - Fame. W-Ax"A".. , Code Administrator Signature and Date: v (NOTICE TO INSPECTIONS DEPTIKEASE RETURN THIS FogodTo PLICANT.) NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Also, please attach a copy of your application form, location map and all other pertinent information. Dwellings shall comply with The Virginia Uniform Statewide Building code and section 310, use group R (Residential) of The BOCA National Building Code / 1996 and The ICABO One And Two Family Dwelling Code/1995. REQUEST FOR CONDITIONAL SUBIDVISION COMMENTS Frederick County Firer Marshal ATTN: Fire Marshal 107 North Kent Street Winchester, Virginia 22601 (540) 665-6350 The Frederick County Fire Marshal is located at 107 North Kent Street, 1st Floor of the County Administration Building in Winchester, if you prefer to hand deliver this review. Applicant's name, address and phone number: Greenway Engineering (Kurt Pennington) 151 Windy Hill Lane Winchester, VA 22602 Name of development and/or description of the request: Sovereign Village - Section Two Location: North side of Senseny Road (Route 657) at the north extension of Rossmann Boulevard Fire Marshal Comments: Fire Marshal Signature and Date: (NOTICE TO FIRE MARSHAL. *PLEASE THIS FORM TO APPLICANT.) NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Also, please attach a copy of your application form, location map and all other pertinent information. Control number Date received SD02-0001 1 /25/02 Project Name Sovereign Village Section 2 Address 151 Windy Hill Lane City Winchester Type Application Subdivision Current Zoning RP Automatic Sprinkler System No Other recommendion Emergency Vehicle Access Adequate Fire Lane Required Yes Roadway/Alsleway Width Adequate Date reviewed 1/30/02 Applicant Creenway Engineering State Zip VA 22602 Tax 10 Number 65-A-39 & 39 Election District Red Bud Recommendations Automatic Fire Alarm System No Requirements Hydrant Location Adequate Siamese Location Not identified Special Hazards No Date Revised Applicant Phone 540.662.4185 Fire District 18 Rescue District 18 Residential Sprinkler Syst Yes Emergency Vehicle Access Fire lanes and no parking signs shall be provided to indicate "No Parking within 20 feet of Fire Hydrants." Access Commen &- Additional Comments Reviewed By Signift Timothy L. Welsh Plan Approval Reecommended Title Yes 1 GREENWAY ENGINEERING 151 Windy Hill Lane Fmauka in 197I Winchester, Virginia 22602 T R A N S MITT A L Project Name: Sovereign Village _ Section Two File No: 2185 Date April 5, 2002 To: Frederick County From: Kurt Pennington Sanitation Authority Attn: Engineer Director GREENWAY ENGINEERING Phone: 540-662-4185 Copied Fax: 540-722-9528 ❑ Urgent ® For Your Review ❑ As You Requested ❑ Please Comment Message: Copies of Revised Subdivision Design Plans as per comments. Kurt Pennington Zf 71 RF VII—C Ham,4 /T.S'A, Greenway Engineering Telephone 540-662-4185 FAX 540-722-9528 Greenway@visuallink.com _. deot8 M A,_- Administrative Assistant to the Superintendent �y 0 E Frederick County Public Schools Visit us at www.frederick.k12.va.us February 4, 2002 Kurt Pennington Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 RE: Sovereign Village — Section Two Dear Mr. Pennington: e-mail: ' orndorfa®frederick.k12.va.us This letter is in response to your request for comments concerning the planning application for the Sovereign Village — Section II. Based on the information provided, it is anticipated that the 82 new residences in Section II will yield 41 new students. The 2001-02 projected per pupil cost is $7,473 of which $3,635 comes from local revenue. The 41 new students will cost the school division $306,393 annually at the current dollar value. Out of this amount, the locality will provide $149,035. These figures do not reflect capital expenditures for buildings and their debt service. Significant residential growth in this portion of Frederick County has resulted in the schools serving this area having student enrollment near or exceeding their design capacity. The cumulative impact of this project and others of a similar nature, coupled with the number of approved, undeveloped residential lots in the area, will necessitate the future construction of new school facilities to accommodate increased student enrollment. The impact of this subdivision on current and future school needs should be considered during the approval process. Sincerely Al Orndorff Administrative Assistant to the. Superintendent cc: Dr. William C. Dean, Superintendent of Schools, Frederick County Public Schools Robert W. Cleaver, Asst. Superintendent for Administration, Frederick County Public Schools - a 540-662-3889 Ext 112 1415 Amherst Street, Post Office Box 3508, Winchester, VA 22604-2546 FAX 540-722-2788 L:/Planning/Sovereip VillageSectionTwo COUNTY of FREDERICK Department of Public Works 540/665-5643 FAX: 540/678-0682 April 22, 2002 Kurt Pennington Greenway Engineering 151 Windy Bill Lane Winchester, Virginia 22602 RE: Sovereign Village, Section H - Subdivision Comments Frederick County, Virginia Dear Curt: The revised subdivision plan for Sovereign Village, Section II dated March 15, 2002, has adequately addressed our previous comments. Therefore, we recommend approval of the subject plan. Should you have any questions, do not hesitate to contact me. /rls cc: Frederick County Planning and Zoning file A-.UowllH.wpd Sincerely, Joe C. Wilder Civil Engineer 107 North Kent Street - Winchester, Virginia 22601-5000 ;L C z. REQUEST FOR CONDITIONAL SUBIDVISION COMMENTS Frederick County Parks and Recreation Dept. Attn: Director of Parks and Recreation 107 North Kent Street Winchester, Va. 22601 (540) 665-5678 The Frederick County Parks and Recreation Department is located on the second floor of the Frederick County Administration Building,107, North Kent Street, Winchester, if you prefer to hand deliver this review form. Applicant's name, address and phone number: - --Greenway E (Kurt Pennington) - 151 Windy Hill Lane Winchester, VA 22602 Name of development and/or description of the request: Sovereign Village - Section Two Location: i North side of Senseny Road (Route 657) at the north extension of Rossmann Boulevard Parks and Recreation Department Comments: Plan appears to meet open space requirements Parks Signature and Date:'' (NOTICE TO PARKS *PL E RETURN THIS FORM TO APPLICANT.) NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Also, please attach a copy of your application form, location map and all other pertinent information. n GREENWAY ENGINEERING 151 Windy Hill Lane %*TW7 Winchester, Virginia 22602 Founded in 1971 T R A N S M I T T A L Project Name: Sovereign Village -Section 2 File No.: 2185 Date: December 6, 2002 To: FC Planning Attn: Patrick Davenport From: Kurt Pennington/dls GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 Copied: Remarks: r- Urgent r For Your Review r As You Requested r Please Comment Message: Patrick, Attached are the following for the above project: -3 copies of the subdivision site plan -Subdivision Application -Application fee check -All Agencies comment sheets -3 copies of Section 2A final subdivision plats Section 2B final subdivision plats will be submitted at a later date. Thank you for your assistance with this project and call with any concerns. RECEIVED DEC 0 6 2002 FREDERICK COUNW PLANNING & DEVELOPMENT Engineers Surveyors Telephone 540-662-4185 FAX 540-722-9528 greenway@visuallink.com COUNTY of FREDERICK Department of Public Works 540/665-5643 FAX: 540/678-0682 July 14, 2003 Mr. Kurt Pennington Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE: Subdivision Plan Comments - Sovereign Village - Section B Frederick County, Virginia Dear Kurt: Upon review of the subject subdivision plan, we offer the following comments: 1) Provide the location of stormwater pond #1 on the subdivision plan. Provide outlet structure details on the plan for the proposed stormwater ponds. It will be necessary to furnish a description of the structure and outlet pipe (i.e., size and type of pipe to be utilized). 2) Check all areas within the development to ensure that any area in which drainage collects from more than three (3) lots is placed within a platted drainage easement. Once these comments have been addressed, submit two (2) copies of the plan for further review. Sincerely, ! L 2 Joe C. Wilder Civil Engineer JCW/rls cc: Patrick Davenport, Zoning and Subdivision Administrator file A:lsovvillage,seckom.wpd 107 North Kent Street • Winchester, Virginia 22601-5000 SUBDIVISION # 22-02 SOVERIGN VILLAGE Red Bud SECTION II, A, B & c "_, pjytrs t J) Please note: The subdivision p:'lons assac;ialcU with this file are locateci iri she library. n c��