SUBDIVISION CHECKLIST
Comment sheets from the following agencies, along with any marked copies of the plan:
DOT /v ty of Winchester GIS
Sanitation Authority :Health Department
Inspections Department
Fire Marshall
% Parks & Recreation
County Engineer
One copy of the subdivision application
TRACKING SHEET
Date
Application received
Fee paid (Amount: $ % 20,9
To be filled in if an MDP is associated with
this subdivision
MDP # 07" 07
Approved by BOS: f7
Admin. Approval:
Information entered in d-BASE and Reference Manual
File given to Renee' to add to Application Action Summary
Plat(s) signed by Subdivision Administrator
Approval letter to applicant/agent
Copy of final subdivision plat(s) [with signatures] made and given to
Mapping and Graphics Manager for structure numbering assignment
Updated d-BASE and Reference Manual
File given to Renee' to update Application Action Summary
Final plat(s) submitted with review agency signatures along with:
Recorded Deed of Dedication
Bond estimate (if required) $_
e
0
DATE
NO.
m
RECEIVED FROM
o--
-- ---- -----------
a
ADDRESScc
o,n
J ��
1a — DOLLARS
❑FOR RENT
❑ FOR
AMT. OF
ACCOUNT
CASH
II
AMT. PAID
CHECK
BALANCE
DUE
MONEY
ORDER
BY
0
m
co
LID
a�
N
CD
N N
�
¢ O
CD
Q O V)
N
o Q >
DATE Aj� 4 0 D NO. 9.075
RECEIVED FROM
ADDRESS
��—
L] FOR RENT
J FOR _
AMT.OF
CASH
ACCOUNT
AMT. PAID
BALANCE
MONEV
DUE
..77-
ORDER
BY 1) - l A-) OJ %S &
December 22, 2009
Patton Harris Rust & Associates
Attention: Mark Jerussi
208 Church Street, SE
Leesburg, VA 20175
RE: Opequon Crossing Phase I (Final approval)
PIN Nos. 55-A-212 and 55-A-212A
Dear Mr. Jerussi:
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 5401665-6395
9 f
a
This letter is to confirm that Opequon Crossing Phase I, received by our office on July 13, 2009,
has been approved. Attached are two (3) full sets of plans for your records and distribution.
It is now appropriate for you to submit the final plats for this subdivision. Remember that
subdivision plats must reflect the approved subdivision plans.
Should you have any questions,
Sincer ly,.i
/ IF
6
/La M. Johnsto
Zoning Inspecto
Attachments
please do not hesitate to call me at (540) 665-5651
cc: The Canyon, LC, PO Box 3276, Winchester, VA 22604
Philip Lemieux, Red Bud Magisterial District Supervisor
Christopher Mohn, Red Bud Magisterial District Commissioner
Jane Anderson, Real Estate
Commissioner of Revenue
Y,
107 North Kent Street, Suite 202 • Winchester, '
Patton Harris Rust & Associates
Engineers. Surveyors. Planners. Landscape Architects.
208 Church Street, SE
PR+A Leesburg, 7. 20175
H F: 703.777.3725
F: 703.777.3725
To: Mark Cheran
Organization/Company:
Address:
Telephone Number:
Date:
From:
Project Name/Subject:
Via:
Transmittal
JUL 1 3 2009
(__ 1
Frederick County Department of Planning and Development
107 North Kent St., Suite 202
Winchester, VA 22601
(540) 665-5651
07/13/09
Mark Jerussi, P.E.
Opeguon Crossing Phase I / 3rd Submission Review and Approval
Hand Delivery Internal Project File #: 14121-2-0
Quantity
File #
Date
Description
Transmitted
Subdivision Design Plan and Rough
N
Herewith
2 Sets
14121-2-0
07/13/09
Grading Plan (4 plan sets total)
❑
Under separate cover
2"d Submission Review Comment
1
14121-2-0
07/13/09
Response Letter
Material
❑
Originals
1
14121-2-0
07/13/09
Building Inspections Approval Letter
N
Photocopies
❑
Diskette
1
14121-2-0
07/13/09
GIS Approval Letter
❑
Shop Drawings
❑
Mylar
1
14121-2-0
07/13/09
Public works Approval Letter
❑
Prints
❑
Invoice
1
14121-2-0
07/13/09
Fire Marshal Approval Letter
❑
Sepia
1 14121-2-0 07/13/09 FCSA Approval Letter Purpose
❑ Your Use
1 14121-2-0 07/13/09 VDOT Approval Letter ❑ Your Files
Notes: ® Approval
Mark, ❑ Please Return:
Please find attached the 2"d submission comment response letter to Dana Johnston.
All comments have been addressed. Per discussion with Dana, all approval letters are Corrected Prints
attached, along with 2 sets of the final plans, for Planning & Development approval. ❑ Please Submit:
Also, please let me know when approval is recommended, so that we may prepare
signature sets. Please call with any questions. (703) 777-3616 Revised Prints
Received by: Date:
Patton Harris Rust & Associates
Surveyors. Planners. Landscape Architects.
208 Church Street, SE
Leesburg, 7. 20175
PR+A
F: 703.777.3725
H T: 703.777.3725
TransmittalEngineers.
To:
Mark Cheran
Organ izationlCompany:
Frederick County
Department of Planning and Development
Address:
107 North Kent St., Suite 202
Winchester, VA 22601
Telephone Number:
(540) 665-5651
Date:
07/13/09
From:
Mark Jerussi, P.E.
Project Name/Subject:
Opeguon Crossing
Phase I / 3`d Submission Review and Approval
Via:
Hand Delivery
Internal Project File #:
14121-2-0
Quantity File #
Date
Description
Transmitted
Subdivision Design Plan and Rough
®
Herewith
2 Sets 14121-2-0
07/13/09
Grading Plan (4 plan sets total)
❑
Under separate cover
2nd Submission Review Comment
1 14121-2-0
07/13/09
Response Letter
Material
❑
Originals
1 14121-2-0
07/13/09
Building Inspections Approval Letter
®
Photocopies
❑
Diskette
1 14121-2-0
07/13/09
GIS Approval Letter
❑
Shop Drawings
❑
Mylar
1 14121-2-0
07/13/09
Public works Approval Letter
❑
Prints
❑
Invoice
1 14121-2-0
07/13/09
Fire Marshal Approval Letter
❑
Sepia
1 14121-2-0
07/13/09
FCSA Approval Letter
Purpose
❑
Your Use
1 14121-2-0
07/13/09
VDOT Approval Letter
❑
Your Files
Notes:
®
Approval
Mark,
❑
Please Return:
Please fmd attached the 2"' submission comment response letter to Dana Johnston.
Corrected Prints
All comments have been addressed. Per discussion with Dana, all approval letters are
attached, along with 2 sets of the final plans, for Planning & Development approval. ❑ Please Submit:
Also, please let me know when approval is recommended, so that we may prepare
Revised Prints
signature sets. Please call with any questions. (703) 777-3616
Received by: Date:
Patton Harris Rust & Associates,pc
Engineers. Surveyors. Planners, Landscape Architects.
July 13, 2009
TO: Dana Johnston
Zoning Inspector
County of Frederick
Department of Planning and Development
107 North Kent Street, Suite 202
Winchester, VA 22601-5000
RE: 2"d Review Comments for Opequon Crossing Phase 1
Property Identification Number: 55-A-212 & 212A
Dear Mf-* Johnston:
We have addressed the comments dated January 28, 2009 and offer the following in
response.
PHl + i Comment 1. Note what the open .fpace acreage is between lots 271 and 272.
Response 1. he open space bcmcc:n lots 271 axed 272 is part of a contiguous
CORPORATE: piece of. a 0.23 ..`l.c open space. This open space ce is now labeled
Chantilly p ' 1 ' p� • '' 1 ' 1 � • ,
between lots2 / and 272 for clarification.
VIRGINIA OFFICES: iSee Sheet 9"'Subdivision Plan}
Chantilly
Bridgewater Comment 2. Should there be a berm put in place in front of lots 209, 208, 207, 206, 308,
Fredericksburg and 3092If so, annotate a detail. 54.,A— elf
Leesburg
Richmond Response 2. 1n annotated detail of the 50' reduced distance road effic. en.c\7 buffer
Virginia Beach
Winchester is now shown on the landscape plan. )(See Sheet 23-Subdivlslon I'lan.}
Woodbridge
Comment 3. Along the limits of clearing and grading, please show how the natural pond will be
LABORATORIES: protected If a fence is wl)at is being used to protect, please provide detail (ree sheet
Chantilly 14)
Fredericksburg
MARYLAND OFFICES: Resj�()nse 7. A. fence will be used to protect the natural pond. A deta.11 has been
Baltimore provided on the Dough Grading flan.. {See Shects 9 & 13-Rough
Columbia Grading flan
Frederick
Germantown We trust the above responses address all of your comments and concerns. Should you
Hollywood have any questions concerning these responses, please feel free to call us at
Hunt Volley
(703) 777-3616.
WEST VIRGINIA
OFFICE:
Martinsburg Sincerely,
PMTON ON HARRIS RUST & ASSOCIATES
T 800.553.PHRA
T 703.777.3616
F 703.777.3725
208 Church St., S.E.
/
Leesburg, VA
Mark Jerus R.L.
20175
Senior Project Manager ,
Request :For Subdivision Plan Comments
Frederick County Inspections Department
Mail to: Hand deliver to:
Frederick County Inspections Department 2"` Floor
Attu: Buildinf; 0I.Ticial 107 North .Kent Street
107 North.Kent Street Winchester. Virginia
Winchester; Virginia 22601 (540) 665-5650
Please fill out the information as accurately as possible in order to assist the Inspections
Department with their review. Please attach one (1) copy of the Subdivision Plan with
this sheet.
Applicant's Name: ?_P%-tTDA-) ��C���S JS► �s��-I Ajt
Address: 90$_
Phone Number: a7o3) ?77 - 1 (o - UO-1 gI3`i
Name of Development and/or description of the request:
5u3DiyisioA/ Dif'stc-7AJ ?LA-/u
Location of property: A I�X t hd Al CL`r 96M r'6 C 1 � l�S l O F-
V A-t-L EY M t L L P &S7` 1 IZ I 7 /��5 &C%/a
Frederick,County Inspections Department's Comments:
Fre(leiick County Inspections Department use only
Date received Review Number: I ) 3 -t 5 (please circle one)
Date rcvic:wed 2 1.1 U Y Date approve /jO/`j
Revision Required X-.-
Signature and Date .._
}° y Please return this form to applicant
-18-
N
INFORMATION TECHNOLOGIES
COUNTY OF FREDERICK, VIRGINIA
W E
STREET NAME COMMENTS
SUBDIVISION COMM WkEO
S DATE: November 26, 2008
SUBDIVISION: Opequon Crossing, la;e I
STAFF MEMBER: Annie Cahill, GIS Technician
APPLICANT: Patton Harris Rust & Associates, pc
ATTN: Mark Jerussi_, P.E.
208 Church St, SE
Leesburg, VA 20175
COMMENTS: Frederick County Information Technologies has reviewed the requested road
names for use by the subdivision and has made the following determinations:
The following road names have been APPROVED and ADDED into the Frederick
County Road Naming and Structure numbering system:
Pequot Lane
Sioux Lane
Natchez Lane
Pueblo Lane
2. Structure numbering will be assigned during the permitting and construction phase of
development.
3. Road names are not approved and accepted into the Frederick County Road Naming
and Structure Numbering System without plats or plans delineating location, access from current
road system, location, entire length
Frederick County Information Technologies, 107 North Kent Street, Winchester, VA 22601, (540)665-5614
_ COUNTY of .FREDERICK
Departrrierit of,P_tiblic Works
540/665=5643
FAY . �540/ 678=0682
July 8,.'2009
R'onald.A.-MislowskyT.E.
Vice President
Patton�Harris Rust,&.Associates, p.c.
11'..7, E.,Piccadilly -Street
Winchester, Virginia22601
RE. Opequorr,Crossing base, I "SubdivisionTlan Comments
Frederick, County Viiginia
Dear Ron:
We have conipl'eted`our review of•the revised.subdivisidii,plan dated November 18, 2008,
andthe stormwater.analysi's>dated.July 6;'2009 All of our -previous comments have,been
addressed; therefore, weirecomriiehd;approvai of,tlie:subjecVplan.
Sincerely
Joe C. Wilder
.D'eputy.Director: of Public Works
JCS/rl's
cc: Planning and Development
file
T•\Rhonda\TtNIPC0;11AlENTS\OPEQUONCROSSING' PIIASEIREVSUBCOAI:doc
I07"Norio Kent Sireei Win6esief, Virginia;22601 5000.
Dee 09 08 09:06a
From LIi=ESAFE
PHRR WINCHESTER 540-665-0493 p.2
tV.V-T 1•JJV I VVIr VVr
aG�f';.'
V t Rti r W r'I'•
Control numb(
_;::J�C'J lilkk
Prpiert Name
OpagUOn CrOSSM-3-Phase 1
Aodroe9
20B Church St., SE
Type Appliration
Subdivision- 3rd Submrsston
Current Zoning
nr'
Automatic. Sprinkler System
`IV
Other recommendation
Emergency Vehicle Access
Adequate
SiOmeSe LOCation
Not Identified
Emergency Vehicle access Comments
Access Commcnls
Additional Comments
Oate reCt ived Cate reviewed Date Revired
1213r1006 12rK006
Applicant
Patton Harris Ru$l & A$soCaales
City 518110 Up Appitcdt'lt l him.
L0tN5burq VA 20175 703-777-3616
Tax 10 Number Fitt bintrict
55-A-212 Reeve District
16 18
Recommendations
Automatic Fire Alarm System
No
Hydrant LgCati011
Adequalo
RoadwayrAtsleway width
Adequate
Election District
Red Bud
ftesidentlal Sprinkler Syt.tem
No
File Lane Requited
Yes
Special Hazards
No
Plan Approval Reearmended Royiewed By Slgnatura Y
Ye:: J. Neal
Tide
t
FREE :ICK COUNTY SANITATION JTHORITY
SITE PLAN REVIEW COMMENTS
PO Box 1877, Winchester, VA 22604
315 Tasker Road, Stephens City, VA 22655
540.868.1061 Voice
540.868.1429 Fax
Applicant
/4 � j'�? ti
REVIEW STATUS
review number 3
correct & resubmit approved as noted
proved
DRAWINGS
attention 4 ffjQl< t/.�USS/
number of items to be corrected
You may submit just cover sheet and the revised sheets.
send me by
1. print of sheets
2. two CDs: each disc shall contain the following plan sheets s .r�,F 43- 16GY 1i2—F
a) One CD (containing all of the above noted sheets) shall be in PDF format. Each sheet shall
be in its own file and be in landscape orientation. Each file shall be titled with the project
name and appropriate sheet number.
b) One CD (containing all of the above noted sheets) shall be in DWG format. Each sheet shall
be in its own file and each sheet shall be titled with the project na►ne and with the
appropriate sheet number. Each sheet shall (1) be in landscape orientation, (2) be without
border, (3) be in state plane coordinate system NAD 83, and (4) be compatible with
AutoCAD 2006.
c) Each of the two CDs shall be labeled with its format and project name, and placed in its own
paper CD envelope.
EASEMENTS
N I need a copy of the recorded onsite water and 14w sewer easement(s).
Y /0 I need a copy of the recorded offsite water and / or sewer easement(s).
I need a copy of the recorded deed(s) of easement before service will be authorized.
OTHER
Y (9 This project also requires DEQ -Valley Region approval.
4411 Early Road, P.O. Box 3000, Harrisonburg, IAA 22801 (540-574-7814)
Y S This project also requires VDH — Lexington Office approval.
131 Walker St., Lexington, VA 24450 (540-463-7136)
Y 0 This project has a sewer purnp station that FCSA will own. Title to the pump station site
shall be granted to the Authority in fee simple absolute. Also, I require (1) a copy of DEQ's
Certificate to Construct, (2) a copy of DEQ's Certificate to Operate, and (3) two copies of
the station's O & M manual. These documents must be received before water meters will be
released.
Date: 3 2)16__C �S
ohn G. Whitacre - Senior Engineer 1 11 NOV 08
COMMONWEALTH ®f VIRGINI A
DEPARTMENT OF TRANSPORTATION
P.O. Box 2249
Staunton, VA 24402-2249
www.VirainiaDOT.oro
DAVID S. EKERN, PE
COMMISSIONER
May 27, 2009
Mr. Jason Dooley
C/O Patton, Harris, ':Rust & Associates, Inc.
208 Church St. S.E.'
Leesburg, Virginia 20175
Ref: Opequon Crossing, Phase I — VDOT Plan Approval
Dear Mr. Dooley:
This is to acknowledge receipt of your revised plans signed and sealed 5/06/09 for the
referenced project.'' The plans appear satisfactory and are approved. Please advise the
developer accordingly. please provide 5 sets of approved construction plans with
signed seal for VDOT distribution.
I offer the following comments:
• A preconstruction conference be held by the engineer and/or developer with the attendance
of the contractor, various County agencies and VDOT prior to initiation of work.
• Materials used and method of construction shall apply to current observed VDOT Road &
Bridge Specifications applicable during construction of this development.
• Our review and comments are general in nature. Should conditions in the field exist such
that additional 'measures are warranted, such measures shall be completed to the
satisfaction of the Department prior to inclusion into the Secondary Road System.
• Attached is a :copy of the minimum requirements and information needed prior to
acceptance of subdivision streets into the Secondary System. This is the responsibility of
the developer.
• All drainage is to be carried within the right-of-way in ditch lines or gutters along the street
to a pipe or drainage easement.
• The contractor shall notify VDOT when work is to begin or cease for any undetermined
length of time. VDOT will also require 48 hours notice for inspections.
WE KEEP VIRGINIA MOVING
Mr. Jason Dooley
Ref: Opequon Crossing, Phase I
May 27, 2009
Paae #2
• The appropriate land use permits shall be obtained before any work is performed on the
State's right-of-way. The permit is issued by this office and will require a minimum
processing fee, surety bond coverage, and the salary & expenses of a State assigned
Inspector.
• If mailboxes are to be placed along the roadway fronting lots, a minimum of 6" shall be
between the face of curb and the front of mailbox as shown on the RFD-1.
• Private entrances will be installed in accordance with the CG-913 detail. This is the
developer's responsibility.
• Any entrances constructed from the referenced street(s) shall meet VDOT minimum
standards. This' is the developer's responsibility.
• Any signs to be installed will be in accordance with the Manual on Uniform Traffic Control
Devices, 2003 Edition, and the approved plans.
• I suggest any utilities and/or storm sewer placed within the proposed right-of-way be
backfilled completely with C.R. Type 21-B Stone. This will greatly reduce the possibility of
any pavement settlement.
• A copy of any/all recorded plats of dedication for drainage easements or additional right-of-
way required for implementation of this proposed project should be provided to VDOT prior
to issuance of any land use permit. Dedication should be made to the Commonwealth of
Virginia.
• A copy of any/all RECORDED PLATS of dedication to public use (the County of Frederick)
for drainage easements or additional right-of-way required for implementation of this
proposed project should be provided for VDOT review prior to issuance of any land use
permit.
Should you need additional information, do not hesitate to call.
Sincerely,
qwutm - 'ho 1
Matthew B. Smith; P.E., Staff Ekeer
Virginia Department of Transption - Edinburg Residency
14031 Old Valley Pike
Edinburg, VA 22824
Phone #540.984.5615 / Fax #540.984.5607
MBS/rf
Attachment
Department of Planning and Development
540/665-5651
FAX: 540/ 665-6395
January 28, 2009
Patton Harris Rust & Associates
Attn: Mark Jerussi
117 East Piccadilly Street, Suite 200
Winchester, VA 22601
RE: Opequon Crossing Phase I
Dear Mark:
I have had the opportunity to review the Subdivision Plans for Opequon Crossing Phase 1,
submitted to this office on November 24, 2008. The Planning Department needs clarification
on a couple of things before approval is met. Also, approval cannot be met until staff receives
all review agencies having no additional comments.
1. Note what the open space acreage is between lots 271 and 272..
2. Should there be a berm put in place in front of lots 209, 208, 207, 206, 308, 309? If
so, annotate a detail.
3. Along the limits of clearing and grading, please show how the natural pond will be
protected. If a fence is what is being used to protect; please provide detail (see sheet
14).
Please address the above comments and resubmit. I have enclosed a marked copy of the
plans to assist with the revisions. If you have any questions, please feel free to call, 540-665-
5651.
t
/ana Johnston
Zoning Inspector
DMJ/bad
Attachment
cc: The Canyon, LC, PO Box 3276, W :nchester, VA 22604
107 North Dent Street, Suite 202 v Winchester, Virginia 22601-5000
Patton Harris Tcust & Associates, pc
Engineers. Surveyors. Planners. Landscape Architects.
November 19, 2008
TO: Angela Crone
Planning Technician
County of Frederick
Department of Planning and Development
107 North Kent Street, Suite 202
Winchester, VA 22601-5000
RE: 1" Review Comments for Opequon Crossing Phase I
Property Identification Number: 55-A-212 & 212A
Dear Ms. Crone:
NOV 2 4 2008
We have addressed the comments dated March 28, 2008 and offer the following in
Put + l response.
l 1 Comment 1. Proffers. Provide a profferpage within the Subdivision Design Plan.
CORPORATE:
Chantilly l.Zcsponse 1. _-1 proffer Sheet has been provided. {Sce. Sheet 3}
VIRGINIA OFFICES:
Comment 2.
Master Development Plan. Provide a sheet showing the complete layout of
Chantilly
the property as determined by the Haggerty MDP.
Bridgewater
Fredericksburg
Response 2.
Master Develc:>pnnen.t Plan ;Sheet has been provided to show the
Leesburg
complete layout of the property as deternn ned by the -laggycrh
Richmond
�. ScSheet 4 f
Virginia Beach
Winchester
Woodbridge
Comment 3.
Setbacks. Provide the required setbacks and maximum heights for each lot and
housing type on the plans.
LABORATORIES:
Chantilly
Fredericksburg
Response 3.
l he required Setbacks and maxin-tun] heights have been pr(wlded. for
each lot. and he>using-pe. ,_See Sheer. 5
MARYLAND OFFICES:
Baltimore
Comment 4.
Townhouse. Provide the ratio of imperviousness for the townhouses as required
Columbia
by § 165-65 K (3) of the .Frederick County Zoning Ordinance.
Frederick
Germantown
Hollywood
[ZCsponse 4.
'.1 he ratio o tnnperviousness for the townhouses has been provided.
Hunt Valley
{See Sheet. 5}
WEST VIROINIA
OFFICE:
Comment 5. 4- Roads. Provide the ROV> class cation> pp and ro ored .rpee l d limit or all ublic
'
Martinsburg
and rivate roads located on the plan.
T 800.553.PHRA 1Zcsponse 5. 7111c R0w, classification, and proposed speed hi nit have. been.
T 703.777.3616 provided for all lanbl.i.c and private roads. {ties. Sheets 9-1.1 }
F 703.777.3725
208 Church St-S.E.
Leesburg, VA
20175
Angela Crone
Department of Planning and Development
Opequon Crossing Phase 1
Subdivision Design Plans
November 19, 2008
Page 2 of 5
Comment 6. Bike Trail Label the bike trail on all pager. Also, provide a diagram of said
trail.
Response 6. The bile trail has been labeled on all pages and a diagram. of said trail.
has been provided. f See Sheets 10, 1.1, & 1 S
Comment 7. Streetlights. Provide streetlights within the townhouse complex vicinity.
Response 1. Thestreetlights have been provided within the townhouse coniple-\
vIcinit�-. 'See Slicers 9 & 10'
Comment 8. Lighting Provide a detail ofproposed street lighting.
PT TR+A R.esporise 8. 1 street lighting detail has been provided. ,See. Sheet 10
Comment 9. Handicap Ramp. Provide handicap ramp where the sidewalk breaks for the
en ce of the .Frederick County Sanitary Authority Pump Station.
Response 9. CG-9B has been provided instead of a handicap ramp, where the
sidewalk breaks for the entrance of the Frederick (,aunty Sani.tary
:luthori.tv Purnp Station. (See Sheet 1.01
Comment 10. Open Space. Provide the acreage of each section of open space.
Response. 10. The acreage of each section of open space has been prov-ided. 'See
Sheets 9-11 }
Comment 11. WSA Buffer. Show the 600 foot buffer boundary from the FVSA (Proffer
11.4).
Response II. The 600 foot buffer boundary has been shown as depicted oil the
NIDI? (Prc)ffer 11.4).'See Sheet. 5
Comment 12.,g Housing Type. Provide a more detailed diagram of proposed house types that
includes labels for housing elements such asgarage, deck, etc.
IZespcnnse. 1.2. :1 more detailed diagram of the proposed IIOL1Se t\-pcs, that inch:ides
labels for hotcsing elements such as garages and porches, has been
pi.-ovlded. fSee sheet 5f
Comment 13 Road Efficiency Buffer. Indicate the location of the arterial road firll
distance buffer and the collector road reduced jjiciency ba f er as set forth by the
Haggerty Master Development Plan. Provide the appropriate landscaping for these
bi f er areas preferably to scale.
Angela Crone
Department of Planning and Development
Opequon Crossing Phase 1
Subdivision Design Plans
November 19, 2008
^ Page 3 of 5
Response 13. 'he l.c>cati.on of the arterial road full distance buffer and the collector
. d reduced efficiency buffer has been provided, as set forth. bN- the
IDP. _Uso, the appropriate landscaping has been provided for the
buffer areas. 'Sec. Sheets 10, 1.1, & 231
Comment 14. t0,
foot Road Efficiency Buffer, Between the spine road and pnva
te alley
yservicing services Lots 206, 207, 208, 209, 308, 309, an earthen berm that is
rix (6) feet in height above the average grade and containing a single roan of
evergreen trees placed no more than ten (10) feet apart and are a minimum of four
(4) feet in height when planted should be provided as required by § 165-37 E (3)
of the Frederick County Zoning Ordinance.
PResponse 14. Duc to the nature of the. Trading, there is more than. 6' of drop from
H Haggerty Boulevard to the said lots. 1hereEoie, the grade diffc once
along with the eN ei-01teen. plantings, will porovic.l.c the necessary
screening between the said lots and Haggerty- I3oule -, rd. 'See Sheets
13 & 141
Comment 15Y Additional Screening. The corner lot, Lot 210, located at Mascouten Drive
and Haggerty Boulevard, should have additional screening along its western edge so
that it may be further shielded from headlights turning into the development. This
lot should also be additionally screened from headlights utilising the hammerhead
turnaround located behind it.
Response 1.5.
Addit1cmal screening has been provided for L,ot 21.0, located at
l-lascc>uten D.riVe and Fla
ggerq Boul.ei-ard, Via the "50' Reduced Road
1__ffic1enC- Buffer" (detail shown on Shcet 23), along its western. edge,
and at the rear of the lot_. 'See. Sheet: 23"
Landscaping. Staff has calculated that the required number of ornamental
plantings is 341, which is not satisfied by the amount provided (137). Alro, Staff
has calculated that the required number of shrubs is 1022. Adjust there numbers
accordingly.
IZcspcon:se 16. Tlic number Of oinarnent .]. trees and slirubs has been updated .in the.
chart "Ornamental I.,andscaping per 165-361A (2) v) show, 341
c.3rnanlental trees and 1022 shrubs provided. {See Sheet 23'
Comment 17. Landscaping Diagrams. The landscaping diagrams provided for the road
efficiency barfferr are not to scale. Provide a scaled diagram or add a note clarifying
that they are not to scale.
Response 17. The landscaping diagrams for the road ef-ficieriC l-niffers have, been
revised to show "NotTo Scale". ',.See Sh.ect: 231.
Angela Crone ' -
Department of Planning and Development
Opequon Crossing Phase 1
Subdivision Design Plans
November 19, 2008
Page 4 of 5
Comment 18. Single Family Small Lot (Q. Lots 208 and 209 are to be counted as two
(2) units; the landscaping requirements need to be adjusted according to this
representation.
Response :1.8. The lanctscaping .requi.:remcants have been adjusted to incorporate lots
208 & 209 as indizridual. lots. {See Sheet 231-
Comment 19. Landscaping Note. If required plantings are to be located off lot, provide the
number of those off lot plantings and provide the general location.
Response 19. The nu.tnber of .required off lot. plantings and their: general location
have beery provided.
PR+ 1 Comment 20. ?Zoute 37 Landscaping Note. The 20 foot landscaped ba�er is to be
H adjacent and continuous along .Route 37 as stated by Proffer 13.7. Also, this
proffer is in addition to the road efficiency buffers required by § 165-37 E of the
.Frederick County Zoning Ordinance.
Response 20. PHR+.A '«-orke.d with l rederick Count:v Planning Staff during the
Master Developrrient Plan (NfDI?) phase of the project: to pr-owide
increased buffers from. those that were proffered. 1.n doing so, the
1.pp.l.i.can.t maintained the planting; scheme provided per Proffer 1.3.
but increased the distance component of the buffer to accommodate a
road efficiency- buffer in areas adjacent to residential uses. A.s such
the 20' buffer is not in addition to the road efficiency buffer. The
apprc ed buffer schen.-e is shown on the, approved ME) I' for: the
project. and the Siibdivisicnn Design .flan is In conforniance. with the
approved buffer: scheme.
Comment 21. Rt. 37ROW. As ageneral note, prior to construction and disturbance, fencing
will be required to ensure and furtherprotect the Route 37 right-of-:vay.
Response 21. , general note, "Prior to construction and clrsturbance, fencing will. be
required to ensure and further protect. the Route 37 right-of-waNI", has
been. provided. fSee Note # ; on Sheet 21
Comment 22. Wetlands Boundary..Hatch the entirety of the wetland boundary as it runs
east west along and throughout theproperty.
lesponse 22. "I:he entiret.�T of the wetland boundary has been hatched. {See Sheets
10 & 1it
Angela Crone
Department of Planning and Development
Opequon Crossing Phase 1
Subdivision Design Plans
November 19, 2008
Page 5 of 5
Comment 23. Cut and Fill Slope. Proper analyses need to be provided to determine whether
or not a retaining wall would be more appropriate for the slope along the eastern
side of the property.
Response 23. A slope stahihty amalvsis performed 1..)v a qualified gcotechni.c::al.
en�i.neer rill be proviclecl pr:i.<.ir to hard distarrbance perrnit appro5-al.
Comment 24. Water Main. Indicate and label the location of the installation of the water
main connection to FVSA Opequon Vater Sewer Plant property line as
proffered.
Response 24. The subject area is not .included with this plan. Please see the
Opequon Crossing Access 1Zoad Improvement flans — A.Ugust 2006 -
PHR+Pl� � HR+A — trrchester, V1, for the location of the installation of th.e
water main connection to 1 WSA Opequon Water Sew e.r lolant.
Comment 25. Sheet 42. There are several references to `Sheet 42" throughout the plan. Please
remove these references as there is no such sheet.
Response 25. The references to "Sheet 42" have 1:occn removed.
We trust the above responses address all of your comments and concerns. Should
you have any questions concerning these responses, please feel free to call us at
(703) 777-3616.
Sincerely,
PATTON HARRIS RUST & ASSOCIATES
Mark Jerussi, P.
Senior Project Manager
Patton Harris Rust & Associates
Engineers. Surveyors. Planners. Landscape Architects. NQU 2 4 2008
208 Church Street, SE
PHR+A Leesburg, 20175
T: 703.777.7.3
F: 25703.777.3725725
Transmittal
To: Angela Crone — Planning Technician
Organization/Company: Frederick County Department of Planning and Development
Address: 107 North Kent St., Suite 202
Winchester, VA 22601
Telephone Number: (540) 665-5651
Date: 11 /20/08
From: Mark erussi, P.E.
Project Name/Subject: Opequon Crossing Phase I / 2"`' Submission Review
Via: Hand Delivery Internal Project File #:
14121-2-0
Quantity File # Date Description
Transmitted
®
Herewith
2 Sets 14121-2-0 11 /20/08 Subdivision Design Plan
❑
Under separate cover
1" Submission Review Comment
1 14121-2-0 11/20/08 Response Letter
Material
❑
Originals
®
Photocopies
❑
Diskette
❑
Shop Drawings
❑
Mylar
❑
Prints
❑
Invoice
❑
Sepia
Notes:
Received by: Date:
Purpose
❑ Your Use
❑ Your Files
® Approval
❑ Please Return:
Corrected Prints
❑ Please Submit:
Revised Prints
bra
APR 3 21008 COUNTY of FREDERICK
Department of Public Works
540/ 665-5043
FAX: 540/678-0682
April 2, 2008
Mr. Mark Jerussi
Patton Harris Rust & Associates
14532 Lee Road
Chantilly, Virginia 20151
RE: Site Plan Comments — Opequon Crosssing, Phase I
Rough Grading and Erosion and Sediment Plans
Frederick County, Virginia
Dear Mr. Jerussi:
Upon review of the site plan dated January 18, 2008, we offer the following comments:
I. Cut and fill slopes shall be adequately stabilized. Fill slopes greater than 3:1 will require a slope
stability analysis and maintenance plan.
2. Provide adequate stabilization for on -site channels and outlets - no concentrated flow shall be
unstabilized.
3. Provide adequate drainage or other protection whenever water seeps from a slope face.
4. Provide calculations for outlet protection for pipes and channels.
5. Provide measures to minimize channel damage when conducting in -stream construction.
6. All applicable federal, state and local regulations pertaining to working in or crossing live
watercourses shall be met - all applicable permits shall be submitted with application (§79-
3.A.2 Frederick County Code).
7. Provide a note stating that the bed and banks of a watercourse shall be stabilized immediately
after work in the watercourse is completed.
8. Demonstrate that two (2)-year runoff from the site does not overtop banks of natural channels
and does not cause erosion.
9. Provide an analysis of the existing and ultimate characteristics of the watershed.
10. Provide responsible party and maintenance plan for the proposed detention facilities.
107 North Kent Street • Winchester, Virginia 22601-5000
Opequon Crossing
April 2, 2008
Page 2
1 l . Provide energy dissipaters at the outfall of all detention facilities.
12. E & S Narrative Requirements - Critical areas — Provide a description of areas on the site which
have potentially serious erosion problems. Include slopes which are steeper than 3:1 as critical
areas.
13. E & S Narrative Requirements - Stormwater runoff considerations - Will the development site
cause an increase in peak runoff rates? Will it cause flooding? Describe the strategy to control
Stormwater runoff.
14. Label areas with potentially serious erosion problems.
15. Provide the Responsible Land Disturber signature block on the plans.
16. Ensure that the backwater condition for the post -developed 100-year storm does not impact
adjacent properties .
17. Include the standard MS-19 E&S notes. Please contact Michael Newlin of the Frederick County
Public Works Department for a copy of these notes.
18. The site specific seeding schedule shown on the E&S notes and details sheets reference the
Piedmont area. The site is located in the Mountain area of the state.
19. All slopes that are steeper than three horizontal feet to one vertical foot will require a slope
stability analysis performed by a qualified geotechnical engineer. Please note that the slope
stability analysis will be required prior to land disturbance permit approval. Should grading
changes be required in order to achieve slope stability after site plan approval, a revised site plan
will be required prior to granting a land disturbance permit.
20. The proposed grading plan shows filling in the 100-year floodplain of Opequon Creek. An
approved flood plain study will be required prior to the issuance of a land disturbance permit. In
addition to this, all fill in flood plain areas will require special annorment to prevent erosion
from flood waters. This design shall be certified by a professional engineer.
21. Provide storm water management calculations for the site.
21 Provide calculations for the proposed triple box culvert. Due to the proximity of the dam
upstream from the culverts, the backwater condition for the 100-year storm shall not reach the
downstream toe of the dam.
23. Per the approved proffer statement, provide Water Quality BMPs for the site according to Table
2-3 of the Virginia Stormwater Management Regulations.
24. Indicate the location of wetlands on the plan sheets.
25. Basins shall maintain structural integrity during 100-year, 24 hour storm event. (79-3.A.1
Frederick County Code)
",sequon Crossing
April 2, 2008
Page 3
26. Install temporary stream crossings of non -erodible material.
27. On Sheet 13, remove unreinforced detail, as all silt fence shall be wire reinforced.
28. The installation of the proposed triple box culverts appears to be disturbing more than 300-linear
feet of stream bed. A copy of the wetlands permit from the USACE will be required prior to
issuance of a land disturbance permit.
29. On sheet 3, provide silt fence at the northern side of the stream at the location of the proposed
triple box culverts.
30. On sheet 3, the drainage area just west of Sediment Basin D is too large to be controlled by silt
fence.
31. On sheet 7, the silt fence coming down the hill toward the construction entrance will likely
channel water toward the bottom of the Swale. Provide super silt fence near the downstream side
of the stream crossing to provide additional support where the water will collect.
Once these comments have been addressed, submit one (1) copy of the plan for further
review.
Sincerely,
Joe C. Wilder
Deputy Director
JCW/mlr
cc: Planning and Development
file
COUNTY of FREDERICK
APR I C0ug
Department of Public Works
540/665-5643
FAX: 540/678-0682
April 2, 2008
Mr. Mark Jerussi
Patton Harris Rust & Associates
14532 Lee Road
Chantilly, Virginia 201151
RE: Site Plan Comments — Opequon Crosssing, Phase 1
cSubdivision Design -Plan
Frederick County, Virginia
Dear Mr. Jerussi:
Upon review of the site plan dated January 18, 2008, we offer the following comments:
1. Cut and fill slopes shall be adequately stabilized. Fill slopes greater than 3:1 will require
a slope stability analysis and maintenance plan.
2. Provide adequate stabilization for on -site channels and outlets -. no concentrated flow
shall be unstabilized.
3. Provide adequate drainage or other protection whenever water seeps from a slope face.
4. Provide calculations for outlet protection for pipes and channels.
5. Provide measures to minimize channel damage when conducting in -stream construction.
6. All applicable federal, state and local regulations pertaining to working in or crossing live
watercourses shall be met - all applicable permits shall be submitted with application
(§79-3.A.2 Frederick County Code).
7. Provide a note stating that the bed and banks of a watercourse shall be stabilized
immediately after work in the watercourse is completed.
8. Demonstrate that two (2)-year runoff from the site does not overtop banks of natural
channels and does not cause erosion.
107 North Kent Street . Winchester, Virginia 22601-5000
Opequon Crossing
April 2, 2008
Page 2
9. Provide an analysis of the existing and ultimate characteristics of the watershed.
1.0. Provide responsible party and maintenance plan for the proposed detention facilities.
11. Provide energy dissipaters at the outfall of all detention facilities.
12. E & S Narrative Requirements - Critical areas — Provide a description of areas on the site
which have potentially serious erosion problems. Include slopes which are steeper than
3:1 as critical areas.
13. E & S Narrative Requirements - Stormwater runoff considerations - Will the development
site cause an increase in peak runoff rates? Will it cause flooding? Describe the strategy
to control stormwater runoff
14. Label areas with potentially serious erosion problems.
15. Provide the Responsible Land Disturber signature block on the plans.
16. Ensure that the backwater condition for the post -developed 100-year storm does not
impact adjacent properties.
17. Include the standard MS-19 E&S notes. Please contact Michael Newlin of the Frederick
County Public Works Department for a copy of these notes.
18. The site specific seeding schedule shown on the E&S notes and details sheets reference
the Piedmont area. The site is located in the Mountain area of the state.
19. All slopes that are steeper than three horizontal feet to one vertical foot will require a
slope stability analysis performed by a qualified geotechnical engineer. Please note that
the slope stability analysis will be required prior to land disturbance permit approval.
Should grading changes be required in order to achieve slope stability after site plan
approval, a revised site plan will be required prior to granting a land disturbance permit.
20. The proposed grading plan shows filling in the 1.00-year floodplain of Opequon Creek.
An approved flood plain study will be required prior to the issuance of a land disturbance
permit. In addition to this, all fill in flood plain areas will require special armorment to
prevent erosion from flood waters. This design shall be certified by a professional
engineer.
21. Provide storm water management calculations for the site.
22. Provide calculations for the proposed triple box culvert. Due to the proximity of the dam
upstream from the culverts, the backwater condition for the 100-year storm shall not
reach the downstream toe of the dam.
Opequon Crossing
April 2, 2008
Page 3
23. Per the approved proffer statement, provide Water Quality BMPs for the site according to
Table 2-3 of the Virginia Stormwater Management Regulations.
24. Indicate the location of wetlands on the plan sheets.
25. The project description on page 11 references the rough grading plan, not the actual plan
submitted.
Once these comments have been addressed, submit one (1) copy of the plan for further
review.
Sincerely,
11
/OeC. Wilder
Deputy Director
JC W/mlr
cc: Planning and Development
file
aV r
ilaCOPY
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/ 665-6395
March 28, 2008
Patton Harris Rust & Associates
Attn: Mark Jerussi
117 East Piccadilly Street, Suite 200
Winchester, Va. 22601
RE: 1" Review Comments for Opequon Crossing Phase 1
Property Identification Number: 55-A-212 & 212A
Dear Mark:
Planning Staff has reviewed the above -referenced subdivision design plan to determine if
administrative approval can be granted. At this time, administrative approval cannot be granted.
This site plan is denied until the issues in this letter, as well as all issues of the other review
agencies, have been adequately addressed. Please review Staff s comments listed below and then
prepare a revised site plan which adequately addresses each concern.
1) Proffers. Provide a proffer page within the Subdivision Design Plan.
2) Master Development Plan. Provide a sheet showing the complete layout of the property
as determined by the Haggerty MDP.
3) Setbacks. Provide the required setbacks and maximum heights for each lot and housing
type on the plans.
4) Townhouse. Provide the ratio of imperviousness for the townhouses as required by
§165-65 K (3) of the Frederick County Zoning Ordinance.
5) Roads. Provide the ROW, classification, and proposed speed limit for all public and
rip vate roads located on the plan.
6) Bike Trail. Label the bike trail on all pages. Also, provide a diagram of said trail.
7) Streetlights. Provide streetlights within the townhouse complex vicinity.
8) Lighting. Provide a detail of proposed street lighting.
9) Handicap Ramp. Provide handicap ramps where the sidewalk breaks for the entrance of
the Frederick County Sanitary Authority Pump Station.
10) Open Space. Provide the acreage of each section of open space.
11) FWSA Buffer. Show the 600 foot buffer boundary from the FWSA (Proffer 11.4).
12) Housing Type. Provide a more detailed diagram of proposed housing types that includes
labels for housing elements such as garage, deck, etc.
13) Road Efficiency Buffer. Indicate the location of the arterial road full distance buffer and
the collector road reduced efficiency buffer as set forth by the Haggerty Master
Development Plan. Provide the appropriate landscaping for these buffer areas preferably
to scale.
14) 50 foot Road Efficiency Buffer. Between the spine road and the private alley servicing
services Lots 206, 207, 208, 209, 308, and 309, an earthen berm that is six (6) feet in
height above the average grade and containing a single row of evergreen trees placed no
more than ten (10) feet apart and are a minimum of four (4) feet in height when planted
should be provided as required by §165-37 E (3) of the Frederick County Zoning
Ordinance.
107 North Kent Street, Suite 202 a Winchester, Virginia 22601-5000
t
Mark Jerussi
Re: Opequon Crossing Phase 1
March 28, 2008
Page 2
15) Additional Screening. The corner lot, Lot 210, located at Mascouten Drive and
Haggerty Boulevard, should have additional screening along its western edge so that it
may be further shielded from headlights turning into the development. This lot should
also be additionally screened from headlights utilizing the hammerhead turnaround
located behind it.
16) Landscaping. Staff has calculated that the required number of ornamental plantings is
341, which is not satisfied by the amount provided (137). Also, Staff has calculated that
the required number of shrubs is 1022. Adjust these numbers accordingly.
17) Landscaping Diagrams. The landscaping diagrams provided for the road efficiency
buffers are not to scale. Provide a scaled diagram or add a note clarifying that they are
not to scale.
18) Single Family Small Lot (C). Lots 208 and 209 are to be counted as two (2) units; the
landscaping requirements need to be adjusted according to this representation.
19) Landscaping Note. If required plantings are to be located off lot, provide the number of
those off lot plantings and provide the general location.
20) Route 37 Landscaping Note. The 20 foot landscaped buffer is to be adjacent and
continuous along Route 37 as stated by Proffer 13.7. Also, this proffer is in addition to
the road efficiency buffers required by § 165-37 E of the Frederick County Zoning
Ordinance.
21) Rt. 37 ROW. As a general note, prior to construction and disturbance, fencing will be
required to ensure and further protect the Route 37 right-of-way.
22) Wetlands Boundary. Hatch the entirety of the wetland boundary as it runs east west
along and throughout the property.
23) Cut and Fill Slope. Proper analyses need to be provided to determine whether or not a
retaining wall would be more appropriate for the slope along the eastern side of the
property.
24) Water Main. Indicate and label the location of the installation of the water main
connection to FWSA Opequon Water Sewer Plant property line as proffered.
25) Sheet 42. There are several references to "Sheet 42" throughout the plan. Please remove
these references as there is no such sheet.
Please address the above comments and resubmit. I have enclosed a marked copy of the plans to
assist with the revisions. If you have any questions, please feel free to call, 540-665-5651.
Since ely,
f
Angela Crone
Planning Technician
cc: The Canyon, LC, PO Box 3276, Winchester, VA 22624
Attachment
AJC/bad
Proffer Checklist for Opequon Crossing
1. No more than 75 COs shall in requested in 12 month period during the first 48
months of development beginning with approval of MDP; no more than 50 COs
shall be requested in any 12 month period thereafter
2. Units not to exceed 300
3. minimum of 60 single family detached -maximum of 150 single family detached
4. 10' asphalt bike trail (location determined by Haggerty MDP)
5. dedication of lands and easements to FCSA to implement Senseny Road Regional
Sewage Pump Station project
6. Provide a 600' buffer from FWSA site; no residences are to be within buffer
limits
7. Installation of water main to point of connection with FWSA Opequon Sewer
Plant property line
8. Implementation of BMPs
9. Construction of North -South Major Collector (Haggerty Boulevard)
a. 80' ROW (from Point A to Point D of MDP)
b. 60' ROW (from Point D to Point C of MDP)
10. Improvements, turn lanes and signalization, to intersection of Route 7 and
Haggerty Boulevard
11. Construction of an East-West Collector (U4D)
a. 90' reservation area dedication
b. landscaped buffer or road efficiency buffer
c. designed to accommodate Route 37 fly over bridges
12. Construction of an entrance from Haggerty Boulevard to Opequon Regional
Wastewater Facility
13. Provide 250' ROW for Route 37
14. Landscaping for Route 37 ROW
a. 20' landscape easement along both sides
b. three trees for each 10 linear feet , 4 feet in height at time of planting
15. Direct lot access to North -South and East-West Collector prohibited
16. Ensure the vertical and horizontal alignment with Route 37
17. Construction of inter -parcel connections (Phase 2)
APPLICATION AND CIIECI{LIST
SUBDIVISION
FREDERICK COUNTY, VIRGINIA
Date:d Application # Q� O M1)P? Yes No
It'no, had N DP requirement been waived by the Planning Director? Yes No
if MDI' requirement has not been waived, fill in the following public hearing dates:
Planning Coil] in Board of Supervisors:
Applicant/Agent AST i ON PrtZ s RosT � kswco-ws
Address: '�Dg__ C t4y RCtl ST S E
Lc e`SZylk% A9D t75
Phone Number: (701 7
ONvner's Name: Tt�e CA iv yot !�
Address: l�. o T3 ox -3 0n (0
W I Ncvt ,,Te- R . _UAaa�a�
Phone Number: CJ-g -) ('0 (0-? a�
Please list games oi'all owners, principals, and/or majority stockholders:
T V� e CPrW>✓ON G _
Contact Person: MAV,S � 1 R . SS I }�.E. ��� 14 tZt A
Phone Number: —L03) 93 ` oS
NAME OF SUBDIVISION: O?e(Q 0 OA/ CRo S51AX, - h�fi�J0
Number of Lots: _I pq Total Acreage: 7Q. �y
Property Location: ��)(J.A4A Et-Y Z000 /=-EEl 6,t( 6 t'
VhLj,EV M /LL !Z b %Te (,Sy) # _R(_E 7 /AtT6- 5&t i ,0A1
(Clive State Route # and -flame, distancc"and direction from intersection)
/la,psterial District: �E-D —bV�
Property Identification Number (PAX): Ss— A — &dot 4 a la A
(Parent Tract)
Property zoning and present use: eIGUi- Uh2ts
E S �>C ►vT 1 /�L __—
Adjoining property zoning and use:---1ZIGU C ?U2 t✓
Has, a Master Development Plan been submitted for this project'? Yes No
IPyes, has the final iVIDP been approved by the Board of Supervisors? _ZYes No
What was the Master Development Plan title?_H A• n6,r 01 i 7RORCEKPY
Does the plat contain any changes from the approved MDP? ___Yes No
If yes, specify What changes:
N illinlu111 Lot Size (smallest lot): 1000 Si a 1 I Og St�
Number and types of housing units in this development: 31 Towy Ho Q5tF S
hJ &t%5 1- AM i 4- `f S Alfl-LL 1-6-1 .
I have read the material included in this package and understand what is required by the
Frederick County Planning Department. I also understand that all required material \gill
be complete prior tyithe subAi my site plain.
Signature:
Date:
ME
Special Limited Power of Attorney
County of Frederick, Virginia
Frederick Planning Web Site: www.co.frederick.va.ns
Department of Planning & Development, County of Frederick, Virginia,
107 North Kent Street, Winchester, Virginia 22601
Phone 540-665-5651 Facsimile 540-665-6395
Know All Men By Those Present: That I (We)
(Name) The Canyon, LC (Phone) 540.667.2120
(Address) PO Box 3276, Winchester, VA 22601
the owner(s) of all those tracts or parcels of land ("Property") conveyed to me (us), by deed recorded in the Clerk's Office of the
Circuit Court of the County of Frederick, Virginia, by
Instrument No. 040014715 on Page , and is described as
Parcel: 212,212A Lot: Block: A Section: 55 Subdivision: N/A
do hereby make, constitute and appoint:
(Name) Patton Harris Rust & Associates Phone: 667.2139
(Address) 117 E. Piccadilly Street Winchester, VA 22601
To act as my true and lawful attorney -in -fact for and in my (our) name, place, and stead with full power and authority I (we) would
have if acting personally to file planning applications for my (our) above described Property, including:
Rezoning (including proffers)
Conditional Use Permits
Master Development Plan (Preliminary and Final)
X Subdivision
Site Plan
My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered
conditions except as follows:
This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or
modified.
In witness thereof, I (we)-4ave hereto set my,(oyr) hand and seal thisday of�,..d4,Y, 2008.
Signature(s)
State of Virginia, City/County of
To -wit:
I, 1 be ✓" -Jo C7—nf Notary Public in and for the jurisdiction
aforesaid, certify that the person(s) who signed to the foregoing instrument persoally appeared before me
and has acknowledged the same before me in the jurisdiction aforesaid this ��J— day of 12008.
My Commission Expires: io -
Notary P c 3-53
J °�
Request For Subdivision flan Continents
Frederick County Department of Planning and Development
Mail to:
Frcderick County
Department of Planning & Development
107 North Kent Street
Winchester, Virginia 22601
Hand deliver to:
Department of Planning & Development
107 North Kent Street, Suite 202
Winchester, Virginia 22601
(540) 665-5651
Please fill out the information as accurately as possible in order toassist the Department
of Planning and Development with their review. Please attach two (2) copies of the
Subdivision Plan with this sheet.
Applicant's Nance: rA- r4A/
RU
Address: 909 Cif u ic.ri 5T 5c _
c_r= usa�,A o c-7 �
Plione Number: (7d
,4 r/v: MA:ki< Jc i2vSS(
Name of Development and/or description of the request:
Q pEQ,UoN C,rZOSSI.y� �l�f�S�
S U:B 3) W- ► S ► oA.) '� c S L (5) A) f?C-h-N _.
Location of property:
o F 6c 11
IN i ER,S�i toA/
Department of Planning & Development's Comments:
Department of Planning; & Development use only
Date received
Date reviewed
Revision Required
Sianature and Date
Review NLIniber: 1 2 3 4 5 (please circle one)
Date approved
n K * Please return this form to applicant * •-' *
—15—
Patton Harris Rust & Associates Transmittal
Engineers. Surveyors. Planners. Landscape Architects.
208 Church Street, SE
PH
R+A
Leesburg, 20175
T: 703. 777.7.3
F: 703.777.3725725
To:
Organization/Company:
Address:
Telephone Number:
Date:
From:
Project Name/Subject:
Via:
Frederick County Department of Planning and Development
107 North Kent St., Suite 202
Winchester, VA 22601
(540) 665-5651
1/18/08
Mark Jerussi, P.E.
Opequon Crossing Phase I / Request for Subdivision Plan Comments
Hand Delivery Internal Project File #: 14121-2-0
Quantity File #
Date
Description
Transmitted
®
Herewith
2 Sets 14121-2-0
1/18/08
Subdivision Design Plan
❑
Under separate cover
"Request For Subdivision Plan
1 14121-2-0
1/18/08
Comments" Form
Material
❑
Originals
1 14121-2-0
1/18/08
Subdivision Application
®
Photocopies
❑
Diskette
1 14121-2-0
1/18/08
Subdivision Application Checklist
❑
Shop Drawings
❑
Mylar
❑
Prints
❑
Invoice
❑
Sepia
Purpose
❑
Your Use
❑
Your Files
Notes:
®
Approval
❑
Please Return:
Corrected Prints
❑
Please Submit:
Revised Prints
Received by: "' Date:
�' -,' '% B;^nn
Document Approval Form
PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS YOUR
APPROVAL PLEASE INITIAL AND PROVIDE THE DATE AND TIME OF YOUR
APPROVAL.
IF THIS DOCUMENT DOES NOT MEET YOUR APPROVAL PLEASE PROVIDE
COMMENTS AS TO WHAT YOU WOULD LIKE TO HA VE COMPLETED.
INITIALS DATE & TIME
Angie
Mark
Dana
Eric
Mike
John
Amber
COMMENTS:
Received by Clerical Staff (Date & Time):
U:\Pam\Common\Document Approval Form.wpd
COUNTY of JI+REDERICK
Department of Planning and Development
540/665-5651
FAX: 540/ 665-6395
December 22, 2009
Patton Harris Rust & Associates
Attention: Mark Jerussi
208 Church Street, SE
Leesburg, VA 20175
RE: Opequon Crossing Phase I (Final approval)
PIN Nos. 55-A-212 and 55-A-212A
Dear Mr. Jerussi:
This letter is to confirm that Opequon Crossing Phase I, received by our office on July 13, 2009,
has been approved. Attached are two (3) full sets of plans for your records and distribution.
It is now appropriate for you to submit the final plats for this subdivision. Remember that
subdivision plats must reflect the approved subdivision plans.
Should you have any questions, please do not hesitate to call me at (540) 665-5651
Sincertly,/
14�
6ana M. Johnstc
Zoning ]nspecto
Attachments
cc: VThe Canyon, LC, PO Box 3276, Winchester, VA 22604
Philip Lemieux, Red Bud Magisterial District Supervisor
Christopher Mohn, Red Bud Magisterial District Commissioner
Jane Anderson, Real Estate
Commissioner of Revenue
107 North Dent Street, Suite 202 • Winchester, Virginia 22601-5000
COUNTY of FREDERICK
Department of Planning and Development
540/ 665-5651
FAX: 540/ 665-6395
January 28, 2009
Patton Harris Rust & Associates
Attn: Mark Jerussi
117 East Piccadilly Street, Suite 200
Winchester, VA 22601
RE: Opequon Crossing Phase I
Dear Mark:
I have had the opportunity to review the Subdivision Plans for Opequon Crossing Phase I,
submitted to this office on November 24, 2008. The Planning Department needs clarification
on a couple of things before approval is met. Also, approval cannot be met until staff receives
all review agencies having no additional comments.
1. Note what the open space acreage is between lots 271 and 272..
2. Should there be a berm put in place in front of lots 209, 208, 207, 206, 308, 309? If
so, annotate a detail.
3. Along the limits of clearing and grading, please show how the natural pond will be
protected. If a fence is what is being used to protect; please provide detail (see sheet
14).
Please address the above comments and resubmit. I have enclosed a marked copy of the
plans to assist with the revisions. If you have any questions, please feel free to call, 540-665-
5651.
t
i)ana M. Johnston
Zoning Inspector
DMJ/bad
Attachment
CC' 11e Canyon, LC, PO Box 3276, Winchester, VA 22604
107 North Kent Street, Suite 202 o Winchester, Virginia 22601-5000
COUNTY of FREDERICK
Department of Planning & Development
107 North Kent Street, Suite 202
Winchester, Virginia 22601
FED 3 2009
22SO
The Canyon, LC
PO Box 3276
Winchester, V
lu 01/29/2009
Mailed From 22601
US POSTAGE
N 2 X:1 n;' 2 0 1 rdt;. L 02/0.1/oa
-m
ATTEMFOTE-D --- NOT KNOWN
UNAMLE TO FORWARD
COUNTY of FREDERICK
Department of Planning & Development
107 North Kent Street, Suite 202
Winchester, Virginia 22601
Cep-TwoA
LJ
JAN 4 2010
The Canyon, LC
PO Box 3276
Winchester, VA 22604
016H265082243
$00.440
12/22/2009
Mailed From 22601
US POSTAGE
NTX'11E ISCLIL SE. 1. 00
RETURN TO SENDER
ATTEMPTED — NOT KNOWN
UNADLE TO FORWARD
MC: 22601SO009ID *2617-15997-22-46
226010-5000
Please note: The Subdivision/MDP plans associated SUBDIVISION #01-08 OPEQUON CROSSING PH
with this file are located in the file room. Red Bud 104 LOTS 72.9 A