Loading...
HomeMy WebLinkAbout05-08 Opequon Crossing Phase II 167 Lots 34.8 Acres Red Buc - Backfile2. SUBDIVISION CHECKLIST Comment sheets from the following agencies, along with any marked copies of the plan: VDOT Sanitation Authority Inspections Department Fire Marshall City of Winchester GIS Health Department Parks & Recreation County Engineer One copy of the subdivision application TRACKING SHEET Date To be filled in if an MDP is associated with this subdivision MDP # 04- Q h Approved by BOS: 7 Admin. Approval: 141) Application received 5S 6 Fee paid (Amount: $ o 0 S Information entered in d-BASE and Reference Manual 8 File given to Renee' to add to Application Action Summary Plat(s) signed by Subdivision Administrator Approval letter to applicant/agent Copy of final subdivision plat(s) [with signatures] made and given to Mapping and Graphics Manager for structure numbering assignment Updated d-BASE and Reference Manual File given to Renee' to update Application Action Summary Final plat(s) submitted with review agency signatures along with: Recorded Deed of Dedication Bond estimate (if required) $_ 1. 0 a� ro ¢ N Q. a LL C+- O O N U� j It � O � wa�3�n TIE RECEIVED FROM nnnRGss �"1 Z (,) CA ❑ FOR J FOR AMT. OF CASH ACCOUNT AMT. PAID C ' CHECK BALANCE MONEY DUE ORDER tio. G 7,08 LLARS $ ���� Eric Lawrence From: Amber Powers [apowers@co.frederick.va.us] Sent: Thursday, January 22, 2009 12:03 PM To: 'Eric Lawrence' Subject: FW: Opequon Crossing Comments Attachments: 1st Review Phase 2.doc Hi Eric, I received an Email from Patton Harris and Rust this morning with a few urgent questions about a review I issued in May of last year. Opequon Crossing was a project that went through my hands as well as Angie's and Laurens so there are probably some inconsistencies. I did try however to stay in line with the standard comments that Lauren usually issued, including a request that landscaping be provided or corner lots to block headlight glare, and the replacement of white pines with a tree more likely to survive in the dry summers. The Opequon Crossing drawings should be in my office, and I've attached my review letter that I issued in May. (The rest of the correspondence and some notes about the project are in Angie's file.) Thanks, Amber Powers Planner I Frederick County Dept of Planning 107 North Kent St Winchester, VA 22601 540-665-5651 From: Amber Powers [mailto:apowers@co.frederick.va.us] Sent: Thursday, January 22, 2009 11:42 AM To: 'Stephanie L. Watts' Subject: RE: Opequon Crossing Comments Ms. Watts, A �r�- I Lf I wanted to get back with you as quickly as possible to let you know that I am no longer working full time with the County, and that I am not in the office today so I do not have the benefit of refreshing my memory of your last drawing submissions. I have forwarded your questions to Mr. Lawrence, along with a copy of my review letter which was issued in May. In regards to you question about the number of off lot trees, I would just clarify that the number of trees required per lot should be accounted for, so if they are to be planted on the off -lot, this should be stated on the subdivision design plan. Again I apologize for being unable to fully respond to your questions today. Sincerely, Amber Powers Planner I Frederick County Dept of Planning 107 North Kent St Winchester, VA 22601 540-665-5651 From: Stephanie L. Watts[mailto:Stephanie.Watts@phra.com] Sent: Thursday, January 22, 2009 10:23 AM To: apowers@co.frederick.va.us Subject: Opecluon Crossing Comments Amber, We are currently reviewing your comments made on November 12, 2008 for Opequon Crossing Phase 2. We are concerned that the changes requested by you will make Phase 2 submission inconsistent with Phase I of Opequon Crossing, which has gone through review and is nearly approved. For the Phase 2 submission we propose to duplicate the same processes and layout format for approval. For example we showed the "potential off lot ornamental tree locations" on Phase 1 and will also provide that note on Phase 2, however the number of 'off lot' trees is not provided. Also, in Phase 1 corner lots were not screened from headlights because this is not required. In addition, White Pines are on Frederick County's acceptable tree list and we believe the are a good screening tree for the site and location in which we placed them. You've asked us to replace them with a "comparable permitted evergreen species". We've also proposed them for Phase 1, which is nearly approved. If you could please respond to these concerns, as soon as possible, it would be greatly appreciated. We are trying to wrap this up today. Sincerely, Stephanie Watts Patton Harris Rust & Associates DL 703.777.2290 ext. 104 FAX 703.777.3725 www.phra.com May 12, 2008 Patton Harris Rust & Associates Attn: Mark Jerussi 117 East Piccadilly Street, Suite 200 Winchester, Va. 22601 RE: 1" Review Comments for Opequon Crossing Subdivision Design Plan Phase 2 Property Identification Numbers: 55-A-212 & 212A Dear Mark: Planning Staff has reviewed the above -referenced Subdivision Design Plan (SDP) to determine if administrative approval can be granted. At this time, administrative approval cannot be granted. This SDP submission contains an unusually large number of errors and deviations from the approved MDP and County Code regulations. The following is an initial review of the SDP. However, due to the need for a substantial re -design of the SDP, the comments below are not exhaustive. This SDP will not be approved until these and any future Planning Department comments are sufficiently addressed, as well as all issues raised by other review agencies. Please review Staff s comments listed below and then prepare a revised SDP. General Comments: 1) Proffers. Provide a proffer page within the Subdivision Design Plan. 2) Master Development Plan Layout Overview. Provide a sheet showing the complete layout of the property as determined by the Haggerty MDP and correct the SDP to match the approved MDP layout. This will include corrections to the location of the proposed community center and SLA housing types. 3) Housing Type Totals. Correct housing type totals to match those indicated on the MDP. 4) Setbacks. Provide the required setback values and maximum heights for each lot and housing type on the plans in a chart on Sheet 2. On sheets 5 through 8, label all setback values for each lot. Note that corrections to setbacks are necessary in several locations. 5) Housing Type Details Diagram. Provide a more detailed diagram of proposed housing types that includes labels for housing elements such as garage, deck, etc. 6) Imperviousness Information. Provide the ratio of imperviousness for the townhouses as required by §165-65 K (3) of the Frederick County Zoning Ordinance. The maximum imperviousness ratio is limited to 40% of each town home parcel. Mark Jerussi Re: Opequon Crossing Phase 2 May 12, 2008 Page 2 of 4 7) Opequon Boulevard Profile. To assure appropriate clearance, provide sheet(s) with elevation drawings illustrating the road's profile, and the future Route 37 overpass. 8) Road Information. Provide the right-of-way width, classification, designation as a Private Access Drive (PAD) if applicable, and indicate proposed speed limit for all public and private roads located on the plan, and show this in ormation on every sheet. 9) Interparcel Connections. Fully extend all interparcel road and pedestrian path/ sidewalk connections to the property line. 10) Property Lines and Private Access Drives (PAD). PADS should be designated as such and provide a minimum of 20 feet of right-of-way. Property lines should not extend into any Public road or PAD/Alley. Non-public streets and alleys should be dedicated to the HOA for maintenance. Revise all property lines, lot square footages, townhouse imperviousness calculations, and building restriction lines. 11) Sidewalks. All sidewalks located along roads should be included within the road right-of-way. Sidewalks that do not run along a road should be located within a pedestrian access easement and this easement should be shown on the SDP. 12) Cul-De-Sac Islands. Include a Landscaped island in the center of the three cul-de- sacs and provide one-way and no -parking signs along the cul-de-sacs. See marked -up drawings for further clarification. 13) Open Space. Provide the acreage of each section of open space on all relevant sheets. 14) Rt. 37 ROW. Include a general note stating that, prior to construction and disturbance, fencing will be required to ensure and further protect the Route 37 right- of-way. 15) Phase Approval Order. Phase 2 will not be approved until the SDP for Phase 1 has been approved. Pedestrian Access - Related Comments: 16) Bike Trail. Label the bike trail on all pages. Also, provide a diagram of said trail. Clarify materials to be used, particularly in areas where trail intersects with and runs along concrete sidewalks. 17) Sidewalks across Private Access Drives. Concrete sidewalks should be extended across all private access drives, along with stop bar, and stop signs. See marked -up drawings for further clarification on locations. 18) Sidewalk Extension. Extend the sidewalk that links Manasquan Road, Porno Lane, and Haida Lane all the way to across Lakota Lane to tie into the ten foot Pedestrian Path. Where the sidewalk intersects with these roads, provide sidewalk ramps, Yield for Pedestrian signs, and either a crosswalk indicated with striping and/or a change in material (such as stamped concrete). Include a detail of the yield signs in the SDP. Mark Jerussi Re: Opequon Crossing Phase 2 May 12, 2008 Page 3 of 4 19) Crosswalks: Show crosswalks, stop bar and stop sign as noted on the marked -up drawings included with this letter. Landscaping, Signage, and Lighting Comments: 20) Landscaping. Show the location of all landscaping, including shrubs, on all landscaping sheets. To preserve readability, it may be necessary to reduce the line weight or darkness of contour lines and grading limit lines. Please preserve the line weights and darkness of the right-of-ways and property lines as shown, as well as the current line weight of the proposed driveway and house locations. 21) Landscape Plantings. Only plant types listed in County Code § 165-36.13 are to count toward the minimum required landscaping. 22) Landscape Groupings. While landscape groupings are permitted, planting should still be provided in both the front and rear of all housing types. 23) Landscaping Note. If required plantings are to be located off lot, provide the number of those off -lot plantings and provide the general location. 24) Additional Screening. Corner lots, particularly the front portions of corner lots along public streets in the development, should have additional screening so that they are shielded from vehicle headlights. 25) Landscaping. Staff has calculated that the required number of ornamental plantings as stated in the SDP is incorrect. The correct minimum number of ornamental shrubs and trees are 905, and 302, respectively. This number is, however, based on the units proposed in the current SDP submission, (which is in need of revision in order to match the MDP). Assure that the next submission provides accurate minimum requirements as per County Code §165-36.A.(2). See marked -up drawings for further clarification. 26) Residential Separation Buffers. Provide a buffer as per County Code §165-37.C.(3) and indicate buffer planting locations. "This buffer shall be designated as a continuous landscaped easement that will be placed between single family detached traditional and cluster dwellings," (noted in design plan as SFD and SLA), "and other housing types," (which includes Town Houses). "This landscape easement shall be at least ten feet in depth and contain a double row of evergreen trees." This landscaping is in addition to what is required as per County Code § 165-36.A.(2). 27) Road Efficiency Buffer. Show the location road efficiency buffers, and buffer plantings. See County Code § 165-37.E for road efficiency buffers. 28) Buffer Plantings. Replace all white pines with a comparable, permitted evergreen species. 29) Route 37 Landscaping Note. The 20 foot landscaped buffer is to be adjacent and continuous along Route 37 as stated by Proffer 13.7. Also, this proffer is in addition to the road efficiency buffers required by §165-37 E of the Frederick County Zoning Ordinance. Mark Jerussi Re: Opequon Crossing Phase 2 May 12, 2008 Page 4 of 4 30) Landscaping Diagrams. The landscaping diagrams provided for the road efficiency buffers are not to scale. Provide a scaled diagram for all road efficiency buffers. 31) Sign and Lighting Details. Provide details of all signs and lighting proposed. 32) Streetlight Locations. Provide streetlights within the townhouse complex vicinity. See marked -up drawings for further clarification on locations. Please address the above comments as well as those clarified in the marked -up set of drawings included with this letter and resubmit. If you have any questions, please feel free to call, 540-665-5651. Sincerely, Amber Powers Planning Technician cc: The Canyon, LC, PO Box 3276, Winchester, VA 22604 Attachment AJC/bad Patton Harris Rust & Associates,pc Engineers. Surveyors. Planners. landscape Architects. January 22, 2009 TO: Amber Powers Planning Technician Department of Planning and Development County of Frederick 107 North Kent Street, Suite 202 Winchester, VA 22601 JA N 2 8 2009 RE: 1" Review Comments for Opequon Crossing Subdivision Design Plan Phase 2, Property Identification Numbers: 55-A-212 & 212A Dear Ms. Powers: PT TR+n We have addressed the comments dated May 12, 2008 and offer the following in 1Hil 1 response. General Comments CORPORATE: Chantilly Comment 1. Proffers. Provide a proffer page within the Subdivision Design Plan. VIRGINIA OFFICES: Chantilly Response 1. A proffer sheet has been provided. {See Sheet 3) Bridgewater Fredericksburg Comment 2. Master Development Plan Layout Overview. Provide a sheet showing Leesburg Richmond the complete layout of the properly as determined by the Haggerty MDP and Virginia Beach correct the SDP to match the mved MDP la out. This will include core ions �p y Winchester to the location ofthepmposed community center and SLA housing types. Woodbridge Response 2. A 1%laster Development Plan Sheet has been provided to show the LABORATORIES: Chantilly complete layout of the property as determined by the Haggerty '\1DP. Fredericksburg The SDP, including Future SLA Lots, has been revised to match the Approved NIDP. The location of the proposed community center is MARYLAND OFFICES: shown on the MDP as well as the landscape plan and is subject to Baltimore change pending future Phase III MDP approval. The communinT Columbia center is currenth shown on the Phase II 'N1DP and not on the Frederick Germantown geometric or grading plans, since the future community center area Hall wood y will ultimately be single family home lots. The communit< center will Hunt Valley be shown on the future Phase III 1\,fDP upon a roi, al. The SLA p pp housing types have been provided as requested. 'See Sheets 2, 3A, & WEST VIRGINIA OFFICE: 7-} Martinsburg Comment 3. Housing Type Totals. Correct housing types totals to match those indicated T 800.553.PHRA on the MDP. T 703.777.3616 F 703.777.3725 208 Church St.,S.E. Leesburg, VA 20175 Amber Powers Planning Technician Department of Planning and Development Opequon Crossing Sultlivisisn Design Plan Phase 2 Neveml.er 12, 2008 Page 2 of 8 Response 3. The current house type totals are now shoN in. They do not match the INIDP exactly, yet the total proposed number of units (281) does not etceed the total shown on the MDP (300) {See Sheet 2} "C.omment 4. Setbacks. Provide the required setback values and maximum hei hts o g r each lot .f housing type on the plans in a chart on Sheet 2. On sheets 5 through 8, label all setback values for each lot. Note that corrections to setbacks are necessary in several locations. Response 4. The required setbacks and maximum heights have been provided for each lot and housing type. {See Sheet 21 ✓ Comment 5. Housing Type Details Diagram. Provide a more detailed dia r g gam of Pproposed housing types that includes labels for housing elements such as garage, Hdeck, etc. Response 5. A more detailed diagram of proposed house n.'Pes that includes labels for housing elements such as garages and porches have been ji6!�. ro�-ided. (See sheet 21 Commperviousness Information. Provide the ratio ofimperviousness forthe wnhouses as required by § 165-65 K (3) of the Frederick County Zoning Ordinance. The maximum imperviousness ratio is limited to 4 0 % of each town home panel. Response 6. The ratio of imperviousness for the townhouses to open space has been provided. {See Sheet 21 Icomment 7. Opequon Boulevard Profile. To assure appropriate clearance, provide sheet(s) wrath elevation drawings illustrating the road's profile, and the future Route 37 overpass. Response 7. A profile of the proposed Opequon Crossing Boulevard and the future Route 37 overpass has been proviyed to assure appropriate ` clearance. {See Sheet 38 it Comment 8. Road Information. Provide the right-of-zvay width, classification, designation as a Private Access Drive (PAD) if applicable, and indicate proposed speed limit for all public and pnvate roads located on the plan, and show this information on every sheet. Response 8. The Road information for all public and private roads located on the plan has been provided. ,.See Sheets 6-10 J Amber Powers Planning Technician Department of Planning and Development Opequon Crossing Subdivision Design Plan Phase 2 November 12, 2008 Page 3 of 8 Comment 9. Interparcel Connections. Fully extend all interparcel road and pedestrian pathl sidewalk connections to the property line. Response 9. All Inrerparcel road and pedestrian path; sidewalk connections have been extended to the property .line. iSee Sheets 6-10} Comment 10. Property Lines and Private Access Drives (PAD). PADS should be designated as such and provide a minimum of 20 feet of right-of-way. Property lines should not extend into any Public road or PAD/Alley. Non public streets and alleys should be dedicated to the HOA for maintenance. Revise all property lines, lot square footages, townhouse imperviousness calculations, and building restriction lines. P H Response 10. Private access drives are designed as an easement located on lots. The easement will. be dedicated to the HOA so that the HOA. will be responsible for road m,,untenance. As such, it is unnecessary, to revise lot lines so the allev way- is tech1U'caUv open space. Both scenarios serve an identical purpose. Comment 11. Sidewalks. All sidewalks located along roads should be included within the road right-of-way. Sidewalks that do not run along a road should be located within a pedestrian access easement and this easement should the shown on the SDP. Response l 1. All side-,valks located along roads are included within the road right- of-way. Sidewalks that do not run along a road are located tvitlun a pedestrian access easement, which is shown on the SDP. {See Sheets 6-10 it Comment 12. Cul-De-Sac Islands. Include a Landscaped island in the center of the three ( cul-de-sacs and provide one-way and no parking signs along the cul-de-sacs. See 4 marked -up drawings for further clarification. Response 12. Any, cul-de-sacs located on public streets as depicted on the plans are designed in accordance with ZTDOT standards. We are unaware of any zoning or subdivision ordinance requirement that would require raised, landscaped islands within the proposed cul-de-sacs. Pleas advise of and County- Code Section re g dus require. ... Comment �3-JOpen Space. Provide the acreage of each section of open space on all relevant sheets. Response 13. The acreage of each section of open space on all relevant sheets has been pro-vided. {See. Sheets 6-10" Amber Powers Planning Technician Department of Planning and Development Opequon Crossing Subdivision Design Plan Phase 2 Nov�ber 12, 2008 Pe4of8 Comment 14. Rt. 37ROW. Include ageneral note stating that, prior to construction and disturbance, fencing will be required to ensure and further protect the Route 37 right-of-tvay. Response 14. Ageneral note, "Prior to construction and disturbance, fencing will be required to ensure and further protect the Route 37 right-of-way", has been provided.. {See Sheet 21 Comment 13. Phase Approval Order. Phas e se 2 well not be approved until the SDP for Phase 1 has been approved. Response 15. General note #14 now states that "Phase 2 will not be approved until the SDP for Phase 1 has been approved." 'See Sheet 21 PT TRA Pedestrian Access — Related Comments: Comment 16. Bike Trail. Label the bike trail on all pages. Also, provide a diagram of said trail. Clarify materials to be used, particularly in areas where trail intersects with and runs along concrete sidewalks. Response 16. The bike trail has been labeled on all pages and a diagram of said trail, has been provided. 'See Sheets 6-10 & 30} Comment 17. Sidewalks across Private Access Drives. Concrete sidewalks should be extended across all private access drives, along with stop bar, and stop sign See marked -up dratwings for further clarification locations. Response 17. Concrete side-,a-alks have been eltended across all private access drijres, along with stop bar, and stop signs.'See Sheets 6-10 & 32-361 ✓ "Comment 18. Sidewalk Extension. Extend the sidewalk that links Manasquan q an Road, Pomo Lane, and Haida Lane all the way to across Lakota Lane to tie into the ten foot Pedestrian Path. Where the sidewalk intersects with these roads, provide sidewalk ramps. Yield for Pedestrian signs, and either a crosswalk indicated with striping andl or a change in material such as stamped concrete. Include a detail of theyield signs in the SDP. Response 1.8. The above mentioned sidewalk has been extended up to southern side of Haida Lane. The sidewalk could not be extended as requested to Lakota Lane due to the presence of a curb uilet where the sidewalk Would have been extended to. Instead, the sidewalk- was extended along the south side of Haida Lane to provide further access. Ramps have been provided where the sidewalk intersects with these roads. Yield signsand crosswalks with striping for pedestrian have been provided. {See Sheets 6 & 32 PHRI� CORPORATE Chantilly VIRGINIA OFFICES: Chantilly Bridgewater Fredericksburg Leesburg Richmond Virginia Beach Winchester Woodbridge LABORATORIES: Chantilly Fredericksburg MARYLAND OFFICES: Baltimore Columbia Frederick Germantown Hollywood Hunt Valley VEST VIRGINIA OFFICE: Martinsburg T 800.553.PHRA T 703.777.3616 F 703.777.3725 208 Church St., S.E. Leesburg, VA 20175 Patton Harris Rust & Associates, pc Engineers. Surveyors. Planners. Landscape Architects. January 22, 2009 TO: Amber Powers Planning Technician Department of Planning and Development County of Frederick 107 North Kent Street, Suite 202 Winchester, VA 22601 JA N 2 8 2009 RE: 1" Review Comments for Opel Crossing Subdivision Design Plan Phase 2, Property Identification Numbers: 55-A-212 & 212A Dear Ms. Powers: We have addressed the comments dated May 12, 2008 and offer the following in response. General Comments Comment 1. Proffers. Provide a proffer page within the Subdivision Design Plan. Response 1. A. proffer sheet has been provided. {See Sheet 3} Comment 2. Master Development Plan Layout Overview. Provide a sheet showing the complete layout of the property as determined by the Hagerty MDP and correct the SDP to match the approved MDP layout. This will include corrections to the location of the proposed community center and SLA housing des. Response 2. A Master Development Plan Sheet has been provided to show the complete lad out of the property as deternuned by the .Haggerty, -1�1DP. The. SDP, including Future SI.A Lots, has been revised to match the. Approved \I.DP. The location of the proposed community center is shown on the \'IDP as well as the landscape plan and is subject to change pending future Phase III -MDP approval. The eominuniny center is currently sh.ovvn on the Phase II \[DP and not on. the geometric or grading plans, since the future community- center area will ultimately be single family home lots. The communiu, center N ill be shown on the future Phase III. MDP upon approval. The SI.A 1l0usuig t}-pes have been provided as requested. "See Sheets 2, 3 1, & -, i Comment 3. Housing Type Totals. Correct housing des totals to match those indicated on the jAIDR Amber Powers Planning Technician Department of Planning and Development Opequon Crossing Subdivision Design Plan Phase 2 November 12, 2008 Page 2 of 8 Response 3. The current house type totals are riow shcm n. They do not match the -1DP elacdy, vet the total proposed number of units (281) does not exceed the total sho\ n on ilic NIDP (300) {See Sheet 21 Comment 4. Setbacks. Provide the required setback values and maazmzrm heights for each lot housinge on the plans in a chart on Sheet 2. On sheets 5 through 8, label all setback values for each lot. Note that corrections to setbacks are necessary in several locations. Response 4. The required setbacks and ma_-HiMurn heights have been provided for each lot and housing type. {See Sheet 2} Comment 5. Housing Type Details Diagram. Provide a more detailed diagram of proposed housing des that includes labels for housing elements such as garage, Pul + l deck, etc. Response 3. A more detailed diagram of proposed house t-,-pes that includes labels for housing elements such as garages and porches have been provided. 'See sheet 21 Comment 6. Imperviousness Information. Provide the ratio of imperviousness for the townhouses as required by § 165-65 K (3) of the Frederick County Zoning Ordinance. The maximum imperviousness ratio is limited to 40% of each town home panel. Response 6. The ratio of irmpeiviousness for the to—,-vrehouses to open space has been provided. {See Sheet 21 Comment 7. Opequon Boulevard Profile. To assure appropriate clearance, provide sheets) with elevation drawings illustrating the road's profile, and the future Route 37 overpass. Response 7. A profile of the proposed Opequon Crossing Boulevard and the future Route 37 overpass has been provided to assure appropriate clearance. {See Sheet 3S1 Comment S. Road Information. Provide the right-of-way width, classification, designation as a Private Access Drive (PAD) if applicable, and indicate proposed speed limit for all public and private roads located on the plan, and show this information on every sheet. Response S. The Road information for all public and private roads located. on the plan has been provided. See. Sheets 6-101 Amber Powers Planning Technician Department of Planning and Development Opequon Crossing Subdivision Design Plan Phase 2 November 12, 2008 Page 3 of 8 Comment 9. Interparcel Connections. Fuly extend all interparcel road andpedestrian pathI sidewalk connections to the propery line. Response 9. All Inierparcel road and pedestrian path; sidewalk connections have been extended to the property line. 'See. Sheets 6-10' Comment 10. Property Lines and Private Access Drives (PAD). PADS should be designated as such and provide a minimarm of 20 feet of right -of zvay. Property lines should not extend into ary Public road or PADIAIIey. Non-public streets and allgis should be dedicated to the HOA for maintenance. Revise all property lines, lot square footages, townhouse imperviousness calculations, and building restriction lines. Response 10. private access drives are designed as an easement.located on lots. The R+Acasement will. be dedicated to the 1-I01 so that the HO,1 will be PH responsible for road inainten. ante. As such, it is unnecessary to revise lot lines so the alley- -, a�, is technically open space. Both scenarios serve. an identical purpose. Comment 11. Sidewalks. All sidewalks located along roads should be included within the road right-of-way. Sidewalks that do not nin along a road should be located within a pedestrian access easement and this easement should the shown on the SDP. Response 11. Afl side -walks located along roads are included within the road right - of -wad. Sidewalks that do not -run along a road are located within a pedestrian access easement, which is shown on the SDP. {See Sheets 6-10 Comment 12. Cul-De-Sac Islands. Include a Landscaped island in the center of the three cul-de-sacs and provide one-way and no parking signs along the cul-de-sacs. See marked-ip drawings for further clarification. Response 12. Any cul-de-sacs located on public streets as depicted on the plans are designed u1 accordance with V%DOT' standards. We are unaware of any zon ng or subdiision ordinance requirement that would require raised, landscaped islands within the proposed cul-de-sacs. Please advise of any Count\, Code Section regarding this requirement. Comment 13. Open Space. Provide the acreage of each section of open space on all relevant sheets. Response 13. The acreage of each section of open space on all relevant sheets has been proA ided. {See Sheets 6-10-k Amber Powers Planning Technician Department of Planning and Development Opequon Crossing Subdivision Design Plan Phase 2 November 12, 2008 Page 4 of 8 Comment 14. Rt. 37ROW. Include ageneral note stating that, prior to construction and disturbance, fencing will be required to ensure and furtherprotect the Route 37 fight -of -way. Response 14. r1 general note, "Prior to construction and disturbance, fencing %rill be required to ensure and further protect the Route 37 right-of-way", has been provided. {_See Sheet 2� Comment 15. Phase Approval Order. Phase 2 will not be approved until the SDP for Phase 1 has been approver. Response 1 �. C.�eneral note ;� 14 no�v states that. "I'hasc 2 ��ill nc:�t be apptx>vcd until the SDP for Phase 1 has been approved." I.See Sheet 2j Pul + l Pedestrian Access — Related Comments: Comment 16. Bike Trail. Label the bike trail on all pages. Also, provide a diagram of said trail. Clarify materials to be used, particularly in areas where trail intersects with and funs along concrete sidewalks. Response 1.6. The l.)ike trail has been. labeled on all. pages and a diagram of said trail. has been provided. {Sec Sheets 6-10 & 30} Comment 17. Sidewalks across Private Access Drives. Concrete sidewalks should be extended across all pfivate access drives, along with stop bar, and stop signs. See marked-i p drawiffgs for further clarification locations. Response 1 i . Concrete sidewalks have been extended across all private access drives, along with stop bar, and stop signs. See Sheets 6-10 & 32-361 Comment 18. Sidewalk Extension. Extend the sidewalk that links Manasquan Road, Pomo Lane, and Haida Lane all the way to across Lakota Lane to tie into the ten foot Pedestrian Path. Where the sidewalk intersects with these roads, provide sidewalk ramps. Yield for Pedestrian signs, and either a crosswalk indicated with striping and/or a change in material (such as stamped concrete. Include a detail of theyield signs in the SDP. Response 18. The above mentioned side�wa.lk has been extended up to southern aide of Hajda lane. The sidcwalk could nor be extended as requested to i.akota 1_.an.e due to the presence of a curb inlet tiX-herc the sidc�,alk vVould have been extended to. Instead, the sidewalk was extended along the south side of Haida Lane to provide further access. Ramps have been provided where the sidewalk intersects with these roads. Yield signs and crosswalks with striping for pedestrian have been provided. iSee Sheets 6 & .32 Amber Powers Planning Technician Department of Planning and Development Opequon Crossing Subdivision Design Plan Phase 2 November 12, 2008 Page 5 of 8 Comment 19. Crosswalks. Show crosswalks, stop bars and stop sign as noted on the marked- ip drawings included with this letter. Response 19. Crosswalks, stop }_gars and stop sign have been provided. {See Sheets 6-10 cti 32-36, Landscaping, Signage, Lighting Comments: Comment 20. Landscaping. Show the location of all landscaping including shrubs, on all landscaping sheets. To preserve readability, it may be necessary to reduce the line weight or darkness of contour lines andgradirag limit lines. Please preserve the line weights and darkness of the rzght-of-ways and property lines as shown, as well as the current line weight of the proposed driveway and house locations. PHResponse 20. Plants for on -lot locations are shown on Sheet 70 of the landscape plans (iri likeness of Phase 1). For readability of shrubs and small ornamental trees per lot, a detail of each lot Type is provided with its required trees and shrubs on Sheer 70. Comment 21. Landscape Plantings. Only plant ypes listed in County Code § 163-36.B are to count toward the minimum required landscaping. Response 21. All plants specified can be found in the "acceptable. Trees and Shrubs" list in. Frederick Countv's General. Code. Comment 22. Landscape Groupings. IVhile landscape groupings are permitted, planting should still be provided in both the front and rear of all housing types. Response 22. Plantings are specified, to be planted, in both the front and rear lawn. for all housing types. Comment 23. Landscaping Note. If required plantings are to be located off lot, provide the number of those off lot plantings and provide the general location. Response 23. The general location of plantings to be located off -lot are specified ,,vith a leader and description. The :nuUTiber of those plantings to be planted off -lot will nor be known until. time of construction; however specific areas will be desismated to place all off -lot plantings. Comment 24. Additional Screening. Corner lots, particularly the front portions of corner lots along public streets in the development, should have additional screening so that they are shielded from vehicle headlights. Response 24. Additional screening is not required for corner lots. Amber Powers Planning Technician Department of Planning and Development Opequon Crossing Subdivision Design Plan Phase 2 November 12, 2008 Page 6 of 8 Comment 23. Landscaping. Staff has calculated that the required number of ornamental plantings as stated in the SDP is incorrect. The correct minimum number of ornamental shrubs and trees are 903, and 302, respectively. This number is, however based on the units proposed in the current SDP submission, (which is in need of revision in order to match the AMP). Assure that the next submission provides accurate minimum requirements as per County Code § 165-36.A(A). See marked -up drawings for fzrrther clarification. Response 25. Landscape requirement for the Small Lot llousing is 15 shrubs per lot and 5 ornamental trees per lot. Landscape requirement for townhouses is 6 shrubs per 5 units and 2 ornamental trees per 5 units. Comment 26. Residential Separation Buffets. Provide a buffer as per County Code PHT T�§ 165-37. C(3) and indicate uffer planting locations. `This buffer shall be designated as a continuous landscaped easement that will be placed between single family detached traditional and cluster dwellings, " (noted in design plan as SFD and SLA), `and other housing des, " (which includes Town Houses). `This landscape easement shall be at least ten feed in depth and contain a double row of evergreen trees. " This landscaping is in addition to what is required as per Coun y Code § 165-36.A. (2). Response 26. Section 165-37,C(3) does indeed require interior residential. screening. Asyou have pointed out in Four letter, landscaping; i.s required between single family detached traditional or cluster housing types and other housing tl-pes. 'L'he . ousing r� pe iclerttificcl on the plans as SPD or SL_1 are "single family small lot" as defined by, the Zoiiitlb Ordinance and not detached "traditicreal" or "cluster" housing; types as you have staged. 1s such, no interior residential screening is required for the development. tlSee. Sheets 47 6-10, & 611 Comment 27. Road Efficiency Buffer. Show the location road eidency buffers, and buffer plantings, See County Code § 163-37. E for road effitiency biffers. 1esponse 271. The location of the Road i fficicncly Buffers, and Buffer plantings have been provided as set forth by the lIDP. 'See Sheets 41 6-10, & 61} Comment 28. Buffer Plantings. Replace all white pines with a comparable, permitted evergreen species. Rcsponsc 28. White pines area found on. the 1 redcr_ick County ":Acceptable -Frces and Shrubs" list (pg. 32). 7'hc proposed White1'iucs are suitable fc>r the location specified. PHIS Amber Powers Planning Technician Department of Planning and Development Opequon Crossing Subdivision Design Plan Phase 2 November 12, 2008 Page 7 of 7 Comment 29. Route 37 Lan dscaping Note. The 20 foot landscaped buffer is to be adjacent and continuous along Route 37 as stated by Proffer 13.7. Also, this proffer is in addition to the road efficiency buffers required by § 165-37.E of the .Frederick County Zoning Ordinance. Response 29. PHR+_-1 worked with Frederick Count\, Planning Staff during the Master Development Plan (;I -DP) phase of the project to provide increased buffers from. those that were proffered. In doing so, the Applicant maintained the planting scheme provided per Proffer 13.7 but increased the distance component of the buffer to accommodate a road efficiency- buffer in areas adjacent to residential uses. As such the 20' buffer is not in addition to the road efficiency- buffer. 'I`he approved buffer scheme is shown on the approved NfDP for the 17ro1eCt and the Subdivision 1)cs.iga Plan l:� in conformance bvlth the. approved buffer scheme. Comment 30. Landscaping Diagrams. The landscaping diagrams provided for the road efficiency buffers are not to scale. Provide a scaled diagram for all road �#icieneg buffers. Response 30. Issue resolved. Comment 31. Sign and Lighting Details. Provide details of all signs and lighting proposed. Response 31. Sign and lighting details are provided_ {See Sheets 31 & 321 Comment 32. Streetlight Locations. Provide streetlights within the townhouse complex vicinity. See marked-ap drawings forfurther clarification on locations. Response 32. Streetlights within the townhouse complex vicinity have been provided. {See Sheets 4 & 6-10} We trust the above responses address all of your comments and concerns. Should you have any questions concerning these responses, please feel free to call us at (703) 777-3616. Sincerely, PATTON HARRIS RUST & ASSOCIATES Mark Jerussi, Senior Project Manager Patton Harris Rust & Associates _.� Engineers. Surveyors. Planntrs. Landscape Architects. 208 Church Street, SE PR+A Leesburg, 7. 20175 H F 703.777.3725 E 703.777.3725 JAN 2 8 2oog Transmittal fo: Amber Powers Organization/Company: Frederick County Department of Planning and Development Addiess: 107 North Kent St., Suite 202 Winchester, VA 22601 Telephone Number: (540) 665-5651 Date: 01 /27/09 From: Mark Jerussi, P.E. Project Name/Subject: Opeguon Crossing Phase II - 2"d Submission Via: Hand Delivery Internal Project File #: 14121-2-0 Quantity File # Date Description Transmitted ® Herewith 5 Sets 14121-2-0 01 /26/09 Site Plan ❑ Under separate cover 1 14121-2-0 01/26/09 Comment Response Letter Material ❑ Originals ® Photocopies ❑ Diskette ❑ Shop Drawings ❑ hlylar ❑ Prints ❑ Invoice ❑ Sepia Purpose ❑ Your Use ❑ Your Files Notes: ® Approval ❑ Please Return: Corrected Prints ❑ Please Submit: Revised Prints Received by: Date: r I June 24, 2008 Mr. Mark Jerussi, P.E. Patton Harris Rust & Associates, p.c. 208 Church Street, S.E. Leesburg, Virginia 20175. RE: Opequon Crossing Phase 2 — Subdivision Plan Comments Frederick County, Virginia Dear Mr. Jerussi: COUNTY of FREDERICK Department of Public Works 540/665-5643 FAX: 540/678-0682 We have completed our review of the subject su.bdi-,vision plan dated March 28, 2008, an offer the following comments: 1. On sheet 25, the site specific seeding schedule shown on the E&S notes and details sheets reference the Piedmont area. The site is located in the Mountain area of the state. 2. All slopes that are steeper than three horizontal feet to one vertical foot will require a slope stability analysis performed by a qualified geotechnical engineer. Please note that the slope stability analysis shall be submitted prior to land disturbance permit approval. The site plan can be processed and approved without the aforementioned slope stability analysis; however, should the geotechnical engineer determine that grading changes will be necessary to achieve slope stability after site plan approval, a revised site plan will be required prior to issuance of a land disturbance permit. 3. Provide storm water management calculations for the site. 4. Per the approved proffer statement, provide Water Quality BMPs for the site according to Table 2-3 of the Virginia Stormwater Management Regulations. 107 North Dent Street a Winchester, Virginia 22601-5000 J Opequon Crossing, Phase II Page 2 June 24, 2008 5. The project description on page 28 references the rough grading plan, not the actual plan submitted. 6. Refer to Sheet 25: With the exception of single family dwelling construction, the use of regular silt fence for commercial or subdivision projects is not permitted in Frederick County. The county requires the use of wire reinforced silt fence or a diversion berm for perimeter control. 7. In accordance with Frederick County's erosion and sediment control ordinance (Section 70-3.A.1), the outfall system shall be designed to maintain the structural integrity of the basin during a 100-year storm of twenty-four hour duration. Revise the basin calculations referenced in MS-6.b. to comply with these standards. 8. Any area in which drainage collects from more than three (3) lots, shall be placed within a platted drainage easement. In addition, it will be the developer's responsibility to construct all drainage ditches that are located within any easement within the subdivision. Once these comments have been addressed, submit one (1) set of the revised plan for further review. MSN/rls cc: Planning and Development, file JUN 2 5 2DO8 Sincerely, Michael S. Newlin Civil Engineer Department of Public Works T:\rsargent\Rhonda\TEMPCOMMENTS\Opequon Crossing Phase 2.doe Patton Harris Rust & Associates Transmittal Engineers. Surveyors. Planners. Landscape Architects. 208 Church Street, SE PR+A Leesburg, 7. 20175 H T: 703.777.3725 JAN 2 8 F: 703.777.3725 2009 To: Organization/Company: Address: Telephone Number: Date: From: Project Name/Subject: Via: Amber Powers Frederick County Department of Planning and Development 107 North Kent St., Suite 202 Winchester, VA 22601 (540) 665-5651 01 /27/09 Mark Jerussi, P.E. Opequon Crossing Phase I1 - 2°1 Submission Hand Delivery Internal Project File #: 14121-2-0 Quantity File # Date Description Transmitted ® Herewith 5 Sets 14121-2-0 01 /26/09 Site Plan ❑ Under separate cover 1 14121-2-0 01/26/09 Comment Response Letter Material ❑ Originals ® Photocopies ❑ Diskette ❑ Shop Drawings ❑ Mylar ❑ Prints ❑ Invoice ❑ Sepia Purpose ❑ Your Use ❑ Your Files Notes: ® Approval ❑ Please Return: Corrected Prints ❑ Please Submit: Revised Prints Received by: Date: COUNTY. of-FREDERICK U, Department of Public Works -- 540/665-5643 FAX: 540/678-0682 August 18, 2008 Mr. Jonathan Welling E.I.T. Patton Harris Rust & Associates 177 East Piccadilly Street Winchester, Virginia 22601 RE: Opequon Crossing Phase 2 — Flood Plain Comments Frederick County, Virginia Dear Mr. Welling: We have completed our review of the subject flood plain study received July 3, 2008, and offer no comments at this time. Therefore, we recommend approval of the subject flood plain study. Sincerely, 4 Michael S. Newlin Civil Engineer Department of Public Works MSN/rls //- cc: Planning and Development '✓ file T:\rsargent\Rhonda\TE1iPCOMMENTS\Opequon Crossing Phase 2FLOODPLAINSTUDYCOM.doc 107 North Kent Street - Winchester, Virginia 22601-5000 COU A PfF�REWERICK Department of PIanning and Development 540/ 665-5651 FAX: 540/ 665-6395 May 12, 2008 Patton Harris Rust & Associates Attn: Mark Jerussi 117 East Piccadilly Street, Suite 200 Winchester, Va. 22601 RE: I" Review Comments for Opequon Crossing Subdivision Design Plan Phase 2 Property Identification Numbers: 55-A-212 & 212A Dear Mark: Planning Staff has reviewed the above -referenced Subdivision Design Plan (SDP) to determine if administrative approval can be granted. At this time, administrative approval cannot be granted. This SDP submission contains an unusually large number of errors and deviations from the approved MDP and County Code regulations. The following is an initial review of the SDP. However, due to the need for a substantial re -design of the SDP, the comments below are not exhaustive. This SDP will not be approved until these and any future Planning Department comments are sufficiently addressed, as well as all issues raised by other review agencies. Please review Staff s comments listed below and then prepare a revised SDP. General Comments: 1) Proffers. Provide a proffer page within the Subdivision Design Plan. 2) Master Development Plan Layout Overview. Provide a sheet showing the complete layout of the property as determined by the Haggerty MDP and correct the SDP to match the approved MDP layout. This will include corrections to the location of the proposed community center and SLA housing types. 3) Housing Type Totals. Correct housing type totals to match those indicated on the MDP. 4) Setbacks. Provide the required setback values and maximum heights for each lot and housing type on the plans in a chart on Sheet 2. On sheets 5 through 8, label all setback values for each lot. Note that corrections to setbacks are necessary in several locations. 5) Housing Type Details Diagram. Provide a more detailed diagram of proposed housing types that includes labels for housing elements such as garage, deck, etc. 6) Imperviousness Information. Provide the ratio of imperviousness for the townhouses as required by §165-65 K (3) of the Frederick County Zoning Ordinance. The maximum imperviousness ratio is limited to 40% of each town home parcel. 107 North Kent Street, Suite 202 a Winchester, Virginia 22601-5000 Mark Jerussi Re: Opequon Crossing Phase 2 May 12, 2008 Page 2 of 4 7) Opequon Boulevard Profile. To assure appropriate clearance, provide sheet(s) with elevation drawings illustrating the road's profile, and the future Route 37 overpass. 8) Road Information. Provide the right-of-way width, classification, designation as a Private Access Drive (PAD) if applicable, and indicate proposed speed limit for all public and private roads located on the plan, and show this information on every sheet. 9) Interparcel Connections. Fully extend all interparcel road and pedestrian path/ sidewalk connections to the property line. 10) Property Lines and Private Access Drives (PAD). PADs should be designated as such and provide a minimum of 20 feet of right-nf ;x,aA, Prnrnerty lines should not extend into'any Public road or PAD/Alley. Non-public streets and alleys should be dedicated to the HOA for maintenance. Revise all property lines, lot square footages, townhouse imperviousness calculations, and building restriction lines. 11) Sidewalks. All sidewalks located along roads should be included within the road right-of-way. Sidewalks that do not run along a road should be located within a pedestrian access easement and this easement should be shown on the SDP. 12) Cul-De-Sac Islands. Include a Landscaped island in the center of the three cul-de- sacs and provide one-way and no -parking signs along the cul-de-sacs. See marked -up drawings for further clarification. 13) Open Space. Provide the acreage of each section of open space on all relevant sheets. 14) Rt. 37 ROW. Include a general note stating that, prior to construction and disturbance, fencing will be required to ensure and further protect the Route 37 right- of-way. 15) Phase Approval Order. Phase 2 will not be approved until the SDP for Phase 1 has been approved. Pedestrian Access - Related Comments: 16) Bike Trail. Label the bike trail on all pages. Also, provide a diagram of said trail. Clarify materials to be used, particularly in areas where trail intersects with and runs along concrete sidewalks. 17) Sidewalks across Private Access Drives. Concrete sidewalks should be extended across all private access drives, along with stop bar, and stop signs. See marked -up drawings for further clarification on locations. 18) Sidewalk Extension. Extend the sidewalk that links Manasquan Road, Porno Lane, and Haida Lane all the way to across Lakota Lane to tie into the ten foot Pedestrian Path. Where the sidewalk intersects with these roads, provide sidewalk ramps, Yield for Pedestrian signs, and either a crosswalk indicated with striping and/or a change in material (such as stamped concrete). Include a detail of the yield signs in the SDP. Mark Jerussi Re: Opequon Crossing Phase 2 May 12, 2008 Page 3 of 4 19) Crosswalks: Show crosswalks, stop bar and stop sign as noted on the marked -up drawings included with this letter. Landscaping, Signage, and Lighting Comments: 20) Landscaping. Show the location of all landscaping, including shrubs, on all landscaping sheets. To preserve readability, it may be necessary to reduce the line weight or darkness of contour lines and grading limit lines. Please preserve the line weights and darkness of the right-of-ways and property lines as shown, as well as the current line weight of the proposed driveway and house locations. 21) Landscape Plantings. Only plant types listed in County Code § 165-36.B are to count toward the minimum required landscaping. 22) Landscape Groupings. While landscape groupings are permitted, planting should still be provided in both the front and rear of all housing types. 23) Landscaping Note. If required plantings are to be located off lot, provide the number of those off -lot plantings and provide the general location. 24) Additional Screening. Corner lots, particularly the front portions of corner lots along public streets in the development, should have additional screening so that they are shielded from vehicle headlights. 25) Landscaping. Staff has calculated that the required number of ornamental plantings as stated in the SDP is incorrect. The correct minimum number of ornamental shrubs and trees are 905, and 302, respectively. This number is, however, based on the units proposed in the current SDP submission, (which is in need of revision in order to match the MDP). Assure that the next submission provides accurate minimum requirements as per County Code §165-36.A.(2). See marked -up drawings for further clarification. 26) Residential Separation Buffers. Provide a buffer as per County Code § 165-37.C.(3) and indicate buffer planting locations. "This buffer shall be designated as a continuous landscaped easement that will be placed between single family detached traditional and cluster dwellings," (noted in design plan as SFD and SLA), "and other housing types," (which includes Town Houses). "This landscape easement shall be at least ten feet in depth and contain a double row of evergreen trees." This landscaping is in addition to what is required as per County Code § 165-36.A.(2). 27) Road Efficiency Buffer. Show the location road efficiency buffers, and buffer plantings. See County Code §165-37.E for road efficiency buffers. 28) Buffer Plantings. Replace all white pines with a comparable, permitted evergreen species. 29) Route 37 Landscaping Note. The 20 foot landscaped buffer is to be adjacent and continuous along Route 37 as stated by Proffer 13.7. Also, this proffer is in addition to the road efficiency buffers required by §165-37 E of the Frederick County Zoning Ordinance. Mark Jerussi Re: Opequon Crossing Phase 2 May 12, 2008 Page 4 of 4 30) Landscaping Diagrams. The landscaping diagrams provided for the road efficiency buffers are not to scale. Provide a scaled diagram for all road efficiency buffers. 31) Sign and Lighting Details. Provide details of all signs and lighting proposed. 32) Streetlight Locations. Provide streetlights within the townhouse complex vicinity. See marked -up drawings for further clarification on locations. Please address the above comments as well as those clarified in the marked -up set of drawings included with this letter and resubmit. If you have any questions, please feel free to call, 540-665-5651. Sincerely, v Amber Powers Planning Technician - cc: The Canyon, LC, PO Box 3276, Winchester, VA 22604 Attachment AJC/bad APPLICATION AND CHECKLIST SUBDIVISION FREDERICK COUNTY, VIRGINIA Date: oV Application # 0 S ' 1751 m1)P? v If no, 11,11i19 P requirement been waived by the Planning Director? Yes If MDP requirement has not been waived, fill in the following public hearing dates: Planning Commission: Board of Supervisors: Yes No No Applicant/Agent: TArrc A/ 14A ►IRIS R JS i 55�Gt�-TcS Address: 9,OV C Ify-e(--H S T 56 Phone Number: N3 Owner's Name: T (-}E C-,,k;jyo lV ) �- C Address: d. lox 2.1-fD wrNeitcST ��vA aacoay Phone Number: L5qQ) 6 0 — d o� Please list names ofall owners, principals. and/or majority stockholders: T,+c CAWYoiu , L. C- Contact Person: e IZuSS1 �.� • ����fi>4 Pl1011e Nltlllbel': (D 3O — ag IS NAIVIE OF SUBDIVISION: 6TC Q U 0A1 C I�Ssc/V6, — I�14ASE 1T Number of Lots: 16 l Total Acreage: Property Location: Ajj?RAy, IM,Ar1E1-! d000 t-EC�T E&SL— d'F VNI.LEY AL-t✓ RT6 %Szh i 1ZTE 7 /Ae ERSEc.T60/I, (Give State Route gand name, distance and direction fi-om intersection) Pvlagisterial District: �Ke —7— Property Identification Number (P.f.N.): SJr ' A — 01 ia- 4 (Parent Tract) Property zoning and present use: ,4Gi. t cu LTua 0 tZ�s I, t7�lllTl �L __ _._._.- Adjoining property zoning and use:�� Has a Master Development Plan been submitted for this project? V-11yes No If yes, has the final MDP been approved by the Board of Supervisors? V Yes No What was the \Master Development Plan title? �A(n67 RT Y ?&Oje& Z �' Does the plat contain any changes from the approved MDP'? Yes No If yes; specify what changes: i\Minimum Lot Size (smallest lot): Number and types of housing units in this development: 1 1 (0 TaWN E}OyS� t 13 Sri 3 -3 01 f - I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submissicy.e my site plan. ` Signature: Date: Request For Subdivision Plan Comments Frederick County Department of Planning and Development Mail to: Hand deliver to: Frederick County Department of Planning & Development Department of Planning & Development 107 North Kent Street, Suite 202 107 North Kent Street Winchester, Virginia 22601 Winchester. Virginia 22601 (540) 665-5651 Please till out the information as accurately as possible in order to assist the Department of Planning and Development with their review. Please attach two (2) copies of the Subdivision Plan with this sheet. Applicant's Name: Address: V LFEsa� v/k ao 17!SI- Phone Number: (70:!! ? 3 Cpl tp A--tT,v: /" ,+R K J 6R USs 1 Name of Development and/or description of the request: O-e GLuoN G-RosS IIVC, - P/4 A-Sf-:-- %— Location of property: AiT &ox[MA: e7L Y 67600 F EGl 6[- VA t,t.EY j�Et� �( -RaE 4a," $ lA/-7-FR S c e jJD/V Department of Planning & Development's Comments: Department of Planning & Development use only Date received Review Number: 1 ? 3 4 5 (please circle one) Date reviewed Date approved Revision Required Skanature and Date Y * ` Please return this form to applicant ;; ;, -15- APPLICATION PACKAGE CHECKLIST SUBDIVISION CHECKLIST This Subdivision Plan application is incomplete if the items listed below- are not present at the time of submission. A complete application is necessary to begin processing the Subdivision Plan, and to place it on the Planning Commission and the Board of Supervisors agendas. It is recommended that the applicant meet with a representative from the Department of Planning and Development staff when submitting applicatio�ls in order to review the materials for completeness. Subdivision Package 1. One set of approvedcomment sheets from the following agencies cleemed necessary by the Department of Planning and Development staff along with any marked copies of the plan. Applicants should contact the Department of Planning and Development to determine which review agencies are relevant to their Subdivision Plan application. ✓ Virginia Department of Transportation Frederick County Sanitation Authority Frederick County Tire Marshal /Department of Parks and Recreation Department of Public Works Department of Planning and Development �GIS — Street Names Review Frederick County Public Schools Inspections Department Airport Authority Health Department City of Winchester Town of Stephens City Town of Middletown 2. One copy of the Subdivision application. 3. The Application Review Fee (check made payable to "Frederick County Treasurer"). 4. Three (3) copies of the plan. -2- SUBDIVISION DESIGN PLAN CHECKLIST The subdivision design plan shall be drawn at a scale that is acceptable to the Subdivision Administrator. The subdivision design plan shall include a sheet depicting the full subdivision submitted. The subdivision design plan shall include the followin" information: -Z title "Subdivision Design Plan for" with a notation of all previous names of the subdivision original property identification number page number and total pages on each page name of the owncr and/or subdivider vicinity map (scale of one to two thousand (1:2000)) showing all roads, properties and subdivisions within one thousand (1000) feet of the subdivision ✓ written and graphic scale day, mouth and year plan prepared and revised North arrow name of the 'tMagisterial District xwherc located zoning of all land to be subdivided boundary survey ofall lots, parcels and rights -of -sway showing bearings to the nearest minute and distances to the nearest one -hundredth (I/100) of a boot topography shown at a contour interval acceptable to the Subdivision / ,Administrator but in no case greater than five (5) feet. ✓ names of owners, zoning and use of all adjoining properties and deed book and page number references for each adjoining parcel. proposed use of each lot, with the number of lots in each use catecyory area of each lot and parcel, the total area of the subdivision and the total area in lots —9— location and. area of each parcel of common open space and the total Area of common open space location, names, right-of=vvay, xwidths and classifications of existing and planned roads. streets and shared private driveways adjacent to and on the property existing or proposed utilities; sexwer and water Lines, manholes; fire hydrants and easements. existing and proposed drainage ways. drainage facilities, culverts and drainage easements .with dimensions and design details storm water management plan with calculations describing ho w storm water management requirements are being met. II1Cludlllg the location and design details of proposed facilities. proposed grading plan including spot elevations and flow arrows cross sections, profiles and design details of all proposed streets, roads, culverts, storm sewers, sanitary sewers and water mains. locations, dimensions and cross sections of existing and proposed sidewalks and walkways. location of environnicutal features including floodplain, steep slopes, wetlands, sinkholes, woodlands and natural storm water detention areas. names of all streams and bodies of water, including all one -hundred -year / flood limits as mapped by FEMA. location of all land to be dedicated or reserved for public use. location of required setback lines on each lot. location of proposed recreational areas and facilities. location of proposed buffers and screening with design details, locations and types of plants and screening. proposed landscaping with location and types of plants. certification by an engineer. surveyor or other qualified professional of the accuracy of the plat. signature of the ovvner or principals certifying ownership of the property. —10— statement listing all requirements and conditions placed on the land included in the subdivision resetting from approval of conditional zoning, or a conditional use permit. siOInature Line for the Subdivision Administrator. -11- Patton Harris Rust & Associates TransmittalEngineers. Surveyors. Planners. Landscape Architects. 208 Church Street, SE Leesburg, VA 20175 F H R: 703.777.3616 P: 703.777.3725 To: Organ izationlCompany: Address: Telephone Number: Date: From: Project Name/Subject: Via: Frederick County- Department of Planning and Development 107 North Kent St., Suite 202 Winchester, VA 22601 (540) 665-5651 04/02/08 Mark Jerussi, P.E. Opequon Crossing Phase II / Request for Subdivision Plan Comments Hand Deliven, Internal Project File #: 14121-2-0 Quantity File # Date Description Transmitted ® Herewith 2 Sets 14121-2-0 04/02/08 Subdivision Design Plan ❑ Under separate cover "Request For Subdivision Plan 1 14121-2-0 04/02/08 Comments" Form Material ❑ Originals 1 14121-2-0 04/02/08 Subdivision Application ® Photocopies ❑ Diskette 1 14121-2-0 04/02/08 Subdivision Application Checklist ❑ Shop Drawings ❑ Mylar ❑ Prints ❑ Invoice ❑ Sepia Purpose ❑ Your Use ❑ Your Files Notes: ® Approval ❑ Please Return: Corrected Prints ❑ Please Submit: Revised Prints Received by: Date: Eric Mike Fr f f i _ :... .. i - ` ltr q Ji I r 1 ' A � f \ }n e i@