Loading...
HomeMy WebLinkAboutHamilton Court Townhouse - Backfile (2)) FW: Hamilton Court Townhouses Page 1 of 2 Mark Cheran From: Ingram, Lloyd[Lloyd.ingram@VDOT.Virginia.gov] Sent: Wednesday, August 29, 2007 2:28 PM To: Mark Cheran Subject: FW: Hamilton Court Townhouses Mark, F.Y.I. Lloyd From: Funkhouser, Rhonda On Behalf Of Ingram, Lloyd Sent: Thursday, August 16, 2007 12:48 PM To: 'Anne Judy' Cc: Ingram, Lloyd; Hoffman, Gregory; Davis, John Subject: Hamilton Court Townhouses ' __a "_.._,t Attention: Mr. Jamie Judy As requested, an inspection has been performed on the subject land use permit. The following items were found to be in need of repairs: • Stop sign to be 30"x30" and 7' from ground level and 18" above sign. Place 24" stop bar and double yellow and white line. All pavement marking to be in thermoplastic Class B paint. • Place wheelchair ramp across from existing ramp and replace broken sidewalk and ramp in existing. • Place right turn lane into sight. • Backfill and stabilize behind curb and around walk where needed. • All damaged concrete marked with orange paint to be replaced. • Place invert in DI at House #201 and all structures in easement areas. • Place stop sign 30N30" encapsulated lenses at all private and State maintained roadways. • Clean pipe between DI "E" in parking lot and DI "D" in cul-de-sac. • Structure C-1 place weep hole in structure and remove wood forms. Parge all voids. • Structure "D" place under in hole so it will drainage. • All water valves and sanitary sewer structures in street to be adjusted properly. • Structure C-2A lower under drain, clean pipe and parge set holes or place rubberized sealant in set holes. • Low fire hydrant to proper grade next to Structure C-2A. Should you have any questions, do not hesitate to give Greg Hoffman or John Davis a call at (540) 535-1818. 11/14/2007 FW: Hamilton Court Townhouses Page 2 of 2 Lloyd A. Ingram, Transportation Engineer Virginia Department of Transportation Edinburg Residency — Land Development 14031 Old Valley Pike Edinburg, Virginia 22824 Phone #(540) 984-5611 Fax #(540) 984-5607 11 /14/2007 2v) Poi FREDERICK COUNTY SANITATION AUTHORITY P.O. Box 1877 Winchester, VA 22604-8377 ROBERT P. MOWERY, C.P.A., Chairman JOHN STEVENS, Vice-chairman RICHARD A. RUCKMAN, P.E., Sec -treasurer JAMES T. ANDERSON DARWIN S. BRADEN September 28, 2006 DAVID B. HOLLIDAY Mr. David B. Holliday 420 West Jubal Early Drive, Suite 103 Winchester VA 22601 REFERENCE: Hamilton Court Townhouse Complex SUBJECT: Acceptance of Work Dear Mr. Holliday: Wellington H. Jones, P.E. Engineer -Director Ph. - (540) 868-1061 Fax - (540) 868-1429 A copy of the recorded Bill of Sale for the above -referenced project is enclosed for your files. The Authority now owns the newly installed water and sewer facilities and appurtenances. Your one-year warranty period began on the date we signed the document /ths Enclosures c£ Zoning Administrator Respectfully, John G. Whitacre Senior Engineer WATER AT YOUR SERVICE PAINTER-LEWIS, P.L.C. CONSULTING ENGINEERS 116 South Stewart Street Winchester, VA 22601 16 NOVEMBER 2005 Mr. Mark Cheran Frederick County Planning Dept. 107 N. Kent St. Winchester, VA 22601 RE: HAMILTON COURT Dear Mark: tel.: (540)662-5792' fax.: (540)662-5793 email: office@painterlewis.com Enclosed, please find (3) sets of revised sheets 5/17, 5A/17, 7/17, and 7A/17 to be inserted into the existing set of approved plans for the above referenced project. The revised sheets reflect the Final Plat of Subdivision submitted back on 11/09/05. Please do not hesitate to contact this office if you would have any questions or need additional information. erely, 1. S ers Enclosures C: Mr. Dave Ostrander The Ryland Group, Inc. 0305028 PAINTER-LEWIS, P.L.C. plelise note: The tiuhdivision/MDP plans associated with this file are located in the file room. Hamilton Court Tttwnho)wit, _-