Loading...
HomeMy WebLinkAboutGilpin Industrial Park Stonewall - Backfile (2)ZAcrcf-s / 5'GC-nEs lost 4,-3 P. w COVENANTS AND RESTRICTIONS FOR STONEWALL Property Line Set -Back Reauirements: 1. No building shall be constructed upon any Site within seventy-five (75) feet of the curb line of any street in existence, or on a recorded map at the time of such construction or within fifty (50) feet of any rear line or within twenty-five (25) feet of any side line, nor shall more than forty per cent (40%) of the area of any Site be covered by buildings. 2. With the required setback area from streets there shall be maintained on each Site only walks, paved driveway, lawns and landscaping; and the surface of so much of the remainder of each Site as is not covered by buildings, by lawns or by landscaping shall be treated so as to be dust free. At least two-thirds (2/3) of the surface of the required setback area from streets shall be maintained in lawns or other landscaping. 3. No accessory buildings or other structures shall be permitted within the required front, side or rear yards, with the exception of transformer pads or fire hose cabinets. Parking and Unloading Facilities: 4. No vehicular parking whatsoever will be permitted on any street within the park. There shall be maintained on each site facilities for parking, materials loading and unloading sufficient to serve the business conducted thereon without using adjacent streets. All driveways and offstreet parking areas shall be paved or treated in such a manner as to be dust -free. 5. Employee Parking - At least one (1) parking space (316" x 18'-0) with sufficient maneuvering space shall be provided for each employee per shift. No parking shall be allowed directly within the front setback area in front of the main structure. Front setback areas to the side of the main structure may be -utilized for passenger car parking, but no nearer than 25'-0 from the right of way line of any street or road. 6. Loading and Unloading, Truck Parking and Storage - The loading and unloading of materials shall not be allowed within the front setback area of any building. No truck parking shall be allowed in the front setback area. Uses: 7. Each site shall be used only for fabricating,manufacturing, processing, wholesaling, retailing, warehouse, distribution center, office, laboratory, professional, research and development activities, and other activities similar in nature and there shall not be permitted any junk or salvage yard. 8. No use will be allowed that is offensive to the park by reason of odor, industrial waste, fumes, dust, dirt, smoke, glare and heat vibration, electronic, television or radio interference, or pollution or will be hazardous by reason of danger of fire or explosion. Covenants and Restrictions for Stonewall Page 2 Landscaping, Screening and Site Preparation: 9. The exterior of all structures and all walks,driveways, parking areas, lawns and landscaping on each Site shall be maintained in good repair and condition. 10. No excavation shall be made on, and no sand, gravel, soil or other material shall be removed from any site, except in connection with Site preparation or with construction of Building or Improvements. Upon completion of construction, exposed openings shall be backfilled to grade. 11. The front yard area from the road to the building not covered by walks, parking areas, planted areas, trees, etc., shall be seeded with grass and maintained as a green area. All other areas not covered by construction shall be properly landscaped and/or stabilized to maintain a dust free surface. All grass shall be cut to a four (4) inch 12. No open storage shall be permitted on any Site unless adequately protected by screening. Utilities 13. All exterior lighting shall be installed with concealed wiring. 14. All exterior lighting shall be installed so that it will be concealed from view from the street. 15. All on -site electrical, telephone and other utility lines shall be under- ground from street to building and shall be installed in buried conduit. Destruction of Building or other Structures: 16. Any building within the estate which has been destroyed or partially damaged by fire or other causes must either be repaired or completely demolished and removed from the Site by its owner. Repair must be started within a period of six (6) months after damage. Demolition and removal must be finished within six (6) months after destruction or damage. Uniformity of Signs: ' 17. No flashing, blinking, sequential, intermittent or moving signs or lights shall be permitted within the park. Each site shall be permitted two (2) identifica- tion signs, one of which may be placed on the building erected on the said site and one of which may be erected at the entrace to said site. In the event that an identification sign is placed on the building then the same shall be in letters only and constructed parallel to the s=de of the building to which it is attached, below the roof line and project not more than six (6) inches from said side of the building with the area of said sign not to cover over twenty per cent (20%) of the side of the building to which it is attached. In the event that an identification sign is placed at the entrance to the site, then said sign shall not be more than thirty (30) square feet in area. Covenants and Restrictions for Stonewall Page 3 18. No signs erected, either on the building or at the entrance, shall be illuminated by interior lights and all lighting, in regard to said signs, shall be shielded from direct view. Enforceability of Covenants and Restrictions: 19. These covenants and restrictions shall be considered covenants real, running with the land and shall be binding on all successive owners thereof and enforceable by the Grantor herein. Reservation of Right to Amend Covenants and Restrictions: 20. The Grantor reserves the right to amend the above referenced covenants and restrictions, with the consent of the Grantee herein, but in no event shall the covenants and restrictions be amended to be less restrictive. Assignability of Enforcement Rights Reserved to the Grantor: 21. The right(s) reserved to the Grantor to enforce the above referenced covenants and restrictions shall be an assignable right and may be assigned to other owners of arjy lot purchased for industrial purposes, within the industrial park, from the Grantor herein. STONEWALL Industry and Living In A Planned Environment STONEWALL Box 117 / Boyce, VA 22620 / 703-8844hM or Tennessee 615-986-8027 0 'g lid Another Project Of Lenoir City Company ..... ........ 5 a 0 z -4 MIF STONEWALL DEVELOPMENT PARK WINCHESTER, VIRGINIA al PREPARED BY ENWRONMENTAL INTERFACE LTD. CHARLOTTESVILLE, VIRGINIA '41,1 EXISTING CONDITIONS Stonewall is located approxi- mately one and one-half miles north of Winchester, Virginia, a city of over 20,000. It is situated at the intersection of five U.S. highways: 50, 522, 11, 17, 340. It is also on Interstate 1-81, a major north -south artery; Stonewall is less than a quarter mile from exit 82 of 1-81 and is immediately accessible to all the key inter- sections in the transportation network. The Winchester Municipal Air- port, just two miles southeast of the city, serves the area. Twenty- four hour charter service is available on a 4500 foot runway. Dulles International Airport is an hour's drive from the area. In addition, major carriers provide truck service to the area, with two having Winchester terminals, as well as regular Greyhound bus service. Rail service is available and borders the property for several hundred yards. Stonewall is in an area of ample labor supply and growing mar- kets. Its 500 acres have been designated as desirable for light industry. Presently, utilities are under construction and several parcels have been sold. Here exists a tract of land with broad and flexible possibilities. Whatever your special needs and wishes, we hope you will contact us for further details or a visit of inspection. Ourspecialists will answer your inquiries. Call our resident manager Thomas Gilpin anytime at (703) 837-2209. He will welcome your inquiries. Col. Charles M. McGhee, C.S.A. JUILDING ON TRADITION The Lenoir City Company, owner of Stonewall, has been a pioneer in responsible land de- velopment. Founded in 1890 by the great-grandfather of the pre- sent principal owners, the Com- pany is continuing its tradition of wedding the needs of the market place to the capability of the land. Aware of the current sensitivi- ties toward land development, as well as the priorities of business, The Lenoir City Company has retained the services of special- ists in creative and practical plan- ning for the development of Stonewall. In addition, restrictive covenants have been established to protect and ensure the overall quality of Stonewall for the future. Stonewall's location, historic Winchester, has its own tradi- tion. George Washington's head- quarters are here as well as Stonewall Jackson's —to men- tion just a few illustrious names associated with the area. Since pre-Revolutionary days this his- toric Northern Virginia city at the beginning of the Shenandoah Valley has been a traditional, center of commerce to all parts of the compass. Today, Winchester offers con- venient access to highway, rail, and air transportation. Most eas- tern metropolitan centers and seaboard ports are within easy overnight distances: Washington 75 miles New York 290 miles Norfolk 230 miles Baltimore 100 miles Atlanta 590 miles Philadelphia 195 miles LAND USE PLAN An inventory of existing and prospective conditions of the economic area was made. This preliminary study of the land and its developmental implicationsde- termined the general road align- ments, land parcels, land use, access, buffer areas, etc. The report concluded that a mix of industrial customers with require- ments ranging from truck and rail facilities to research and office space is indicated. As the indust- rial uses expand, there will be a corresponding need for com- mercial facilities. The objective is to divide the land to meet the prospective tenants' needs and still remain within the limits of the initial street pattern planned for the site. In general the plan is designed to insure compatibility between the industrial operation inside Stonewall and existing uses and character of the sur- rounding area. Conceptually, the land use exhibit breaks down into parcels reflecting the anticipated uses. Several industrial districts will accommodate a variety of poten- tial customers. It is expected that the greatest demand will exist for tracts conveniently providing ac- cess and facilities for trucks. The largest parcel (154 acres) is currently being developed for this purpose with additional ad- jacent tracts available for expan- sion of this district. The site is characterized by gentle topography. Most of the land lies in open fields with gently rolling hills as the dominant land - form. As stream flow is not hampered by constrictions in the flood plain, flooding is no pro- blem. THE PRELIMINARY DEVELOPMENT PLAN Since road layout, arrange- ment of building sites, and lot sizes vary widely, Stonewall has been subdivided to permit flexi- bility within the overall master plan. The various districts are served by a road scheme which ensures compatibility between the industrial operations therein. These districts may be subdivid- ed into a variety of shapes and sizes without disturbing the plan- ned concept. Parcel A, for example, is divid- ed into a number of sections (18 to 20 acres in each). One section has been subdivided to illustrate the ability of layout to accommo- date a variety of industries. The 20 acre section can serve the needs of clients requiring 20 acres, 10 acres, 5 acres, 2 acres, 1 acre or any combination thereof. This scheme maximizes depth of sites based on known demands. In general, the less the depth of the site, the more streets, utilities, rail spurs, rights of way, capital outlay, etc., will be required. Rail service is available for the forty acres of Parcel B or an expansion thereof. It is recom- mended that the initial rail spur enter the parcel at the diagonal as shown. This type of layout offers a greater choice of lot shapes and requires less space for the track to become parallel to buildings. This type of spur is usually the most economical, and it avoids rail/road conflicts since there are no crossings. Vehicular access to the devel- opment is from a single entry on Route 661. This road has been built as shown on the Existing Conditions map. Other roads may be added as phasing of the project permits. The road plan shown may also be extended to serve the industrial expansion area if needed. Minor streets and cul-de-sacs may be connected if necessary. Additional acreage has been set aside for research facilities, offices, and other potential users requiring an auto dominated area. These parcels are separ- ated from the truck/rail districts by the collector street in the project. Nineteen acres have been set aside to accommodate future commercial demands. The park, existing industries, present and potential residential growth all indicate future needs for such services as gas stations, banks, restaurants, convenience shop- ping, etc. This area will be carefully planned to ensure com- patibility. I STONEWALL Box 117 / Boyce, VA 22620 / 703-837-2209 or Tennessee 615-986-8027 STONEWALL Industry and Living In A Planned Environment wo - Of L Lenoir City Company EXISTING CONDITIONS Stonewall is located approxi- mately one and one-half miles north of Winchester, Virginia, a city of over 20,000. It is situated at the intersection of five U.S. highways: 50, 522, 11, 17, 340. It is also on Interstate 1-81, a major north -south artery; Stonewall is less than a quarter mile from exit 82 of 1-81 and is immediately accessible to all the key inter- sections in the transportation network. The Winchester Municipal Air- port, just two miles southeast of the city, serves the area. Twenty- four hour charter service is available on a 4500 foot runway. Dulles International Airport is an hour's drive from the area. In addition, major carriers provide truck service to the area, with two having Winchester terminals, as well as regular Greyhound bus service. Rail service is available and borders the property for several hundred yards. Stonewall is in an area of ample labor supply and growing mar- kets. Its 500 acres have been designated as desirable for light industry. Presently, utilities are under construction and several parcels have been sold. Here exists a tract of land with broad and flexible possibilities. Whatever your special needs and wishes, we hope you will contact us for further details or a visit of inspection. Our specialists will answer your inquiries. Call our resident manager Thomas Gilpin anytime at (703) 837-2209. He will welcome your inquiries. Col. Charles M. McGhee, C.S.A. BUILDING ON TRADITION The Lenoir City Company, owner of Stonewall, has been a pioneer in responsible land de- velopment. Founded in 1890 by the great-grandfather of the pre- sent principal owners, the Com- pany is continuing its tradition of wedding the needs of the market place to the capability of the land. Aware of the current sensitivi- ties toward land development, as well as the priorities of business, The Lenoir City Company has retained the services of special- ists in creative and practical plan- ning for the development of Stonewall. In addition, restrictive covenants have been established to protect and ensure the overall quality of Stonewall for the future. Stonewall's location, historic Winchester, has its own tradi- tion. George Washington's head- quarters are here as well as Stonewall Jackson's —to men- tion just a few illustrious names associated with the area. Since pre-Revolutionary days this his- toric Northern Virginia city at the beginning of the Shenandoah Valley has been a traditional. center of commerce to all parts of the compass. Today, Winchester offers con- venient access to highway, rail, and air transportation. Most eas- tern metropolitan centers and seaboard ports are within easy overnight distances: Washington 75 miles New York 290 miles Norfolk 230 miles Baltimore 100 miles Atlanta 590 miles Philadelphia 195 miles LAND USE PLAN An inventory of existing and prospective conditions of the economic area was made. This preliminary study of the land and its developmental implications de- termined the general road align- ments, land parcels, land use, access, buffer areas, etc. The report concluded that a mix of industrial customers with require- ments ranging from truck and rail facilities to research and office space is indicated. As the indust- rial uses expand, there will be a corresponding need for com- mercial facilities. The objective is to divide the land to meet the prospective tenants' needs and still remain within the limits of the initial street pattern planned for the site. In general the plan is designed to insure compatibility between the industrial operation inside Stonewall and existing uses and character of the sur- rounding area. Conceptually, the land use exhibit breaks down into parcels reflecting the anticipated uses. Several industrial districts will accommodate a variety of poten- tial customers. It is expected that the greatest demand will exist for tracts conveniently providing ac- cess and facilities for trucks. The largest parcel (154 acres) is currently being developed for this purpose with additional ad- jacent tracts available for expan- sion of this district. The site is characterized by gentle topography. Most of the land lies in open fields with gently rolling hills as the dominant land - form. As stream flow is not hampered by constrictions in the flood plain, flooding is no pro- blem. THE PRELIMINARY DEVELOPMENT PLAN Since road layout, arrange- ment of building sites, and lot sizes vary widely, Stonewall has been subdivided to permit flexi- bility within the overall master plan. The various districts are served by a road scheme which ensures compatibility between the industrial operations therein. These districts may be subdivid- ed into a variety of shapes and sizes without disturbing the plan- ned concept. Parcel A, for example, is divid- ed into a number of sections (18 to 20 acres in each). One section has been subdivided to illustrate the ability of layout to accommo- date a variety of industries. The 20 acre section can serve the needs of clients requiring 20 acres, 10 acres, 5 acres, 2 acres, 1 acre or any combination thereof. This scheme maximizes depth of sites based on known demands. In general, the less the depth of I the site, the more streets, utilities, rail spurs, rights of way, capital outlay, etc., will be required. Rail service is available for the forty acres of Parcel B or an expansion thereof. It is recom- mended that the initial rail spur enter the parcel at the diagonal as shown. This type of layout offers a greater choice of lot shapes and requires less space for the track to become parallel to buildings. This type of spur is usually the most economical, and it avoids rail/road conflicts since there are no crossings. Vehicular access to the devel- opment is from a single entry on Route 661. This road has been built as shown on the Existing Conditions map. Other roads may be added as phasing of the project permits. The road plan shown may also be extended to serve the industrial expansion area if needed. Minor streets and cul-de-sacs may be connected if necessary. Additional acreage has been set aside for research facilities, offices, and other potential users requiring an auto dominated area. These parcels are separ- ated from the truck/rail districts by the collector street in the project. Nineteen acres have been set aside to accommodate future commercial demands. The park, existing industries, present and potential residential growth all indicate future needs for such services as gas stations, banks, restaurants, convenience shop- ping, etc. This area will be carefully planned to ensure com- patibility. c� BtFartment of flannins anb Plef elaymeen# c.- ly- JOHN RILEY 601 PLANNING D/RECTOR - _ P. 0• BOX SQUARE 9 COURT SQUARE JOHN T. P. HORNS WINCHESTER. VIRGINIA 22601 DaUTT DIRECToR M E M O R A N D U M March,5, 1981 TO: The Frederick County Board of Supervisors FROM: The Frederick County Planning Commission SUBJECT: AVAILABILITY OF SANITARY WATER IN LENOIR CITY, INC. INDUSTRIAL PARK The Planning Commission and staff of the Permit Center have been experiencing increasing problems on the inconsistency of public water being available to existing industrial sites within the Lenoir City, Inca Industrial Park. Problems experienced by the Planning Commission relate to final site plan approval. On several occasions site plans have been submitted to the Planning Commission indicating inconsistencies in the availability of, public utilities. This problem is also facing the Permit Center staff regarding their preliminary review of a site plan proposal. In many cases the applicant is assuming that public water will be available to the site and has based his plans for fire suppression equipment accordingly. Upon determining that public water is not available, the applicant must seek alternate means of design from the Director of Inspections for adequate fire suppression as outlined in the appropriate building codes. In summary, these inconsistencies on the availability of public utilities create confusion on what is actually being approved. As a result of the information as presented to the Planning Commission, the Commission, by unanimous vote, recommends that this concern regarding the lack of availability of public water to existing industrial sites be expressed to the Frederick County Board of Supervisors. It is further requested that the Board express this concern to the Frederick County Industrial Development Authority. The reason that the Planning Commission is requesting that the Industrial Development Authority be familiar with this is because of the pending funding for additional public utilities in the Lenoir City, Inc. Industrial Park. 703/662-4532 It.was felt that, before new lines were installed to other areas of the Park, that the existing industrial sites should have access to public utilities. The reason that the Planning Commission is requesting that the Frederick County Industrial Development Authority closely review this matter is that the existing condition in the Lenoir City Industrial Park is not effectively promoting industry in its present condition. The primary function of the. Industrial Development Authority is to promote industry; and, if the County is experiencing inconsistencies in the provision of public water to existing industrial sites, it is most difficult to promote industry in the County without accurate information regarding the availability of public utilities in these areas, If you have any questions regarding this matter, please do not hesitate to contact this office. JRR:bjs Industries Presently Located in Stonewall Firm Browning -Ferris, Inc. CEDE Cives Corp. Davenport Insulation Johnny Blue L & L Builders Simon Newlin, Inc. Z&MCo. Business Employees Trash Removal 19 Warehousing 3 Steel 156 Insulation Installation 20 r Sanitary Services 3 Building 9 Paving 12 Sheet Metal 19 241 WATER SERVICE TO STONEWALL INITIAL PHASE The attached diagram labelled "Preliminary Design" shows the initial phase of water supply contemplated by the engineers. This concept with one exception noted in his letter of August 8, has the basic agreement of Mr. Jones of the Sanitation Authority. SEWER LINE STATUS Sewer line construction is now in progress to provide Stonewall with sewer facilities. The contract was awarded on April 5, 1979, to Perry Engineering. Perry Engineering has until November 23, 1979, to complete the project. At the present time almost 25% of the construction has been completed. Gilpin Industrial Park (Stonewall) �I