Loading...
HomeMy WebLinkAbout03-13 The Townes at Tasker - BackfileMASTER DEVELOPMENT PLAN TRACKING SHEET (Note: The application does not need to be complete to be accepted, but will not be scheduled for the PC or BOS until all items have been received.) Submission Package Comment sheets from the following agencies along with any marked copies of the plan: ✓ VDOT Fire Marshall Sanitation Authority Inspections Dept. �— Health Dept. v/ County Engineer City of Winchester GIS Parks & Recreation Winchester Regional Airport One copy of the master development plan application. Appropriate number of plans, colored maps, etc., to cover PC & BOS meetings Submission Fee 10 11 13 Application received Q 1 ( Fee Paid Preliminary MDP heard by Planning Commission ACTION: 1a - 11- I I Preliminary MDP heard by Board of Supervisors ACTION: ►'10 Ck0� 1)0 (if required) Final-lYiIIl' submitted with review a enc C ressed 1 a ! Administratively approved; letter sent to applicant, copy to file and cc's Sys ID 4 t . OPEN FILE: 1 0 l ► t3 File opened 10 In l t 3 Reference Manual updated/number assigned t o D-base updated I 0 3 List of adjoiners given to staff member for verification 1 0 I 1 13 Location maps requested from Mapping 3 Application Action Summary updated CLOSE FILE: Approval (or denial) letter mailed to applicant, copy for file, cc's Public Works and Real Estate File stamped "approved", "denied" or "withdrawn" Reference Manual updated D-base updated 4*0t -- Application Action Summary updated • C7 March 12, 2014 Mr. Scott Stickley, PE Pennoni Associates, Inc. 117 E. Piccadilly Street, Suite 200 Winchester, Virginia 22601 Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 RE: MASTER DEVELOPMENT PLAN #03-13 FOR THE TOWNES AT TASKER Master Development Plan Approval Property Identification Numbers (PINS): 75-A-86 Dear Scott: Frederick County administratively approved the above -referenced final revised Master Development Plan (MDP) on March 12, 2014. This MDP is approved for the potential development of 10.25 acres of land zoned RA (Rural Areas) District with a total of 81 single family attached units. This property is being developed as a receiving property with RP (Residential Performance) District standards through the use of the Transfer of Development Rights (TDR) Program. All requirements of the Frederick County Zoning and Subdivision Ordinance have been addressed in the plan. Please note that approval of a subdivision design plan is required prior to the subdivision or development of this parcel. I am providing you with five (3) copies of the approved final master development plan. Please ensure that these plans are distributed accordingly. Feel free to contact me if you have any questions. Sincerely, Candice E. Perkins, AICP Senior Planner Attachments CEP/pd cc: Dave Holliday, 420 W Jubal Early Drive, Suite 103, Winchester, VA 22601 Gene Fisher, Shawnee District Supervisor H. Paige Manuel and Lawrence Ambrogi Shawnee District Planning Commissioners Jane Anderson, Real Estate Commissioner of Revenue 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 >_ +PR 1r •�� d`Ubp \�.�,:r OFFICIAL RECEIPT FREDERICK COUNTY CIRCUIT COURT 5 N. KENT STREET WINCHESTER, VA 22601 540-677-5770 DEED RECEIPT DATE: 03/05/14 TIME: 16:14:04 ACCOUNT: 069CLR140001666 RECEIPT: 14000003660 CASHIER: EAB REG: WE17 TYPE: DBS PAYMENT: FULL PAYMENT INSTRUMENT 140001666 BOOK: PAGE: RECORDED: 03/05/14 AT 16:14 GRANTOR: HOLLIDAY, DAVID B EX: N LOC: CO GRANTEE: SHAWNEE VILLAGE LC EX: N PCT: 100%s AND ADDRESS 420 JUBAL EARLY DRIVE, STE 103 WINCHESTER, VA. 22601 RECEIVED OF HOLLIDAY DATE OF DEED: 03/04/14 CHECK: $46.00 DESCRIPTION 1: SH DIST PAGES: 3 OP 0 2: 11.345 ACRES NAMES: 0 CONSIDERATION: '00 A/VAL: .00 MAP: 75-A-86 PIN: 301 DEEDS 14.50 145 VSLF 1.50 212 TRANSFER FEE 1.00 106 TECHNOLOGY TRST FND 5.00 035 VOF FEE 1.00 TENDERED 46.00 AMOUNT PAID: 23.00 CHANGE AMT : 23.00 CLERK OF COURT: REBECCA P. HOGAN PAYOR'S COPY RECEIPT COPY 1 OF 2 DEED OF TRANSFER THIS DEED OF TRANSFER is made as of by and between DAVID B. HOLLIDAY, (to be indexed as "Grantor"), and SHAWNEE VILLAGE, L.C., a Virginia limited liability company, (to be indexed as "Grantee"). �� �• `� `�'-�i 1. r� vQ- S-t� '� d3 W ��.��.�c• c- v c1�- =X-a to 0 t WITNESSETH: That for and in consideration of the sum often dollars, cash in hand paid, and other good and O valuable consideration, the receipt of which is hereby acknowledged, the Grantor does hereby Izt quitclaim, release, and convey and transfer to the Grantee, all right, title, and interest ofthe Grantor in 27 residential development rights (the "Severed Development Rights"), which Grantor acquired aJ pursuant to those certain Deeds of Severance by and between DAVID B. HOLLIDAY, as Grantor, 41 and the COUNTY OF FREDERICK, VIRGLWA, as Grantee, and recorded in the Clerk's Office �i of the County of Frederick at instrument numbers 140001407,140001408, and 140001409. v Grantor hereby transfers the Severed Development Rights unto Grantee, and the Severed Development .Rights shall hereafter be affixed to the following described property located in the County of Frederick, Virginia (the "Property"): Parcel One (Property Identification Number 75 A-86): All that certain tract or parcel of land in the Shawnee Magisterial District, Frederick County, Virginia, containing 11.345 acres, fronting on Virginia Route 642, and being more particularly described by that certain plat and survey by Lee A. Ebert, L. S. dated June 17, 1976 of record in the Clerk's Office of the Circuit Court of Frederick County in Deed Book 553 at page 288; AND BEING designated as Parcel Two of the land conveyed to Shawnee Village, L. C., by Deed dated November 10, 2001 from David B. Holliday, of record in the aforesaid Clerk's Office by instrument number 010017570. WITNESS the following signatures and seals: GRANTOR COMMONWEALTH OF VIRGINIA [CITY] [COUNTY] OF 6eeJezlckI The foregoing instrument was .;2o by j d My Commission Expires: 10` 0 ( - l 15 Virginia Notary Registration Number: 310 3j?3 [AFFIX SEAL] GRANTEE COMMONWEALTH OF VIRGINIA [CITY] [COUNTY] OF �( r� ��'iUJ1— me this 01 day of J�"W,444zl�� 0 C.e.) F� The foregoing instrument was ck owe ge before rye this 0 day of by �'f i . Y PUBLIC My Commission Expires: . C. Virginia Notary Registration, Number: �3 1 [AFFIX SEAL] , VIRGINIA: FREDERICR COUNTY, SCT. This instrument of writing was produced to me on ^ ' at lA14 PM id with certificate of acknowledgement thereto annexed as admitted to record. Tax imposed by Sec. 58.1-802 of 3 Z&A3# and 58.1-801 have been paid, if assessable 0 2_ryf Gam=1, ,o\\ r OFFICIAL RECEIPT FREDERICK COUNTY CIRCUIT COURT 5 N. KENT STREET WINCHESTER, VA 22601 540-677-5770 DEED RECEIPT DATE: 03/05/14 TIME: 16:11:54 ACCOUNT: 069CLR140001665 RECEIPT: 14000003659 CASHIER: EAB REG: WE17 TYPE: DBS PAYMENT: FULL PAYMENT INSTRUMENT 140001665 BOOK: PAGE: RECORDED: 03/05/14 AT 16:11 GRANTOR: DAVID B HOLLIDAY EX: N LOC: CO GRANTEE: SHAWNEE VILLAGE LC EX: N PCT: 100% AND ADDRESS 420 JUBAL EARLY DRIVE, STE 103 WINCHESTER, VA. 22601 RECEIVED OF DAVID B HOLLIDAY DATE OF DEED: 03/04/13 CHECK: $69.00 DESCRIPTION 1: SH DIST PAGES: 3 OP 0 2: 11.345 ACRES NAMES: 0 CONSIDERATION: .00 A/VAL: .00 MAP: 75-A-86 PIN: 301 DEEDS 14.50 145 VSLF 1.50 212 TRANSFER FEE 1.00 106 TECHNOLOGY TRST FND 5.00 035 VOF FEE 1.00 TENDERED 69.00 AMOUNT PAID: 23.00 CHANGE AMT : 46.00 CLERK OF COURT: REBECCA P. HOGAN PAYOR'S COPY RECEIPT COPY 1 OF 2 t.140001665 DEED OF TRANSFER THIS DEED OF TRANSFER is made as of i by and between DAVID B. HOLLIDAY and KATHY G. HOLLIDAY, husbanct and wife, (to be indexed as "Grantors"), and SHAWNEE VILLAGE, L.C., a Virginia limited liability company, (to be indexed as "Grantee"). WITNESSETH: That for and in consideration of the sum often dollars, cash in hand paid, and other good and valuable consideration, the receipt of which is hereby acknowledged, the Grantors do hereby quitclaim, release, and convey and transfer to the Grantee, all right, title, and interest of the Grantors in 20 residential development rights (the "Severed Development Rights"), which Grantors acquired pursuant to that certain Deed of Severance by and between DAVID B. HOLLIDAY and KATHY G. HOLLIDAY, as Grantors, and the COUNTY OF FREDERICK, VIltGINIA, as Grantee, and recorded in the Clerk's Office of the County of Frederick at instrument number 140001411. Grantors hereby transfer the Severed Development Rights unto Grantee, and the Severed v Development Rights shall hereafter be affixed to the following described property located in the County of Frederick, Virginia (the "Property"): Parcel One (Property Identification Number 75 A-86): All that certain tract or parcel of land in the Shawnee Magisterial District, Frederick County, Virginia, containing 11.345 acres, fronting on Virginia Route 642, and being more particularly described by that certain plat and survey by Lee A. Ebert, L. S. dated June 17, 1976 of record in the Clerk's Office of the Circuit Court of Frederick County in Deed Book 553 at page 288; AND BEING designated as Parcel Two of the land conveyed to Shawnee Village, L. C., by Deed dated November 10, 2001 from David B. Holliday, of record in the aforesaid Clerk's Office by instrument number 010017570. O N N co Ll WITNESS the following signatures and seals: GRANTOR 3 COMMONWEALTH OF VTRGWTA [CITY] [COUNTY] OF Fr'e�{P�►uk- fir.; 0 N a Q0 The foregoing instrunwas acknowled a be ore me this � day of bC\4 ,te a. JN(��RY PUBLIC M Commission Ex ires: + �J Y p �Q 31 '�� <t Virginia Notary Registration Number: 3i0 3i' 76 a [AFFIX SEAL] GRANTOR EAL) COMMONWEALTH OF VIRGINIA [CITY] [COUNTY] OF e(z.dW, 4 .The foregoing instrument was acknowledizgd pefore me this 0 day of byIid — TARY PUBLIC My Commission Expires: Virginia Notary Registration Number: 3I o 31' 3 [AFFIX SEAL] 2 • GRANTEE COMMONWEALTH OF VIR - IN1 [CITY] [COUNTY] OF F ee-1 _d. • �qr''i O ox"- N The foregoing inTrum nt was acknoyvI ged before me this 413day of ar, �l , ��ei by �;� �, ti�llici2q , O Y PUBLIC My Commission Expires: 31- iS " Virginia Notary Registration Number: 3 j 3f 3 ' . ' • ' [AFFIX SEAL] VIRGINIA: FFc.-'.DERICK COUNTY.SCI. This instrument of writing was produced to me on _ 0 3 - 65 . OLk at q : 11 N and with certificate acknowledgement thereto annexed was admitted to record. Tax imposed by Sec. 58.1-802 of sekmc, and 58.1-801 have been paid, if assessable. 4e4e , Clerk x 0 �,,� ��., ter•,: i OFFICIAL RECEIPT FREDERICK COUNTY CIRCUIT COURT 5 N. KENT STREET WINCHESTER, VA 22601 540-677-5770 DEED RECEIPT DATE: 03/05/14 TIME: 16:16:02 ACCOUNT: 069CLR140001667 RECEIPT: 14000003661 CASHIER: EAB REG: WE17 TYPE: DBS PAYMENT: FULL PAYMENT INSTRUMENT 140001667 BOOK: PAGE: RECORDED: 03/05/14 AT 16:16 GRANTOR: DAVE HOLLIDAY RENTALS LLC EX: N LOC: CO GRANTEE: SHAWNEE VILLAGE LC EX: N PCT: 10096 AND ADDRESS 420 W JUBAL EARLY DR STE 103 WINCHESTER, VA. 22601 RECEIVED OF HOLLIDAY DATE OF DEED: 03/04/14 CHECK: $23.00 DESCRIPTION 1: SH DIST PAGES: 3 OP 0 2: 11.345 ACRES NAMES: 0 CONSIDERATION: .00 A/VAL: .00 MAP: 75-A-86 PIN: 301 DEEDS 14.50 145 VSLF 1.50 212 TRANSFER FEE 1.00 106 TECHNOLOGY TRST FND 5.00 035 VOF FEE 1.00 TENDERED 23.00 AMOUNT PAID: 23.00 CHANGE AMT : .00 CLERK OF COURT: REBECCA P. HOGAN PAYOR'S COPY RECEIPT COPY 1 OF 2 i 0 YCD DEED OF TRANSFER .> THIS DEED OF TRANSFER is made as of by and between DAVE HOLLIDAY RENTALS L.L.C., a Virginia limited liability company, (to be indexed as "Grantor"), and SHAWNEE VILLAGE, L.C., a Virginia limited liability company, (to be indexed as "Grantee"). W • 'Z� WITNESSETH: That for and in consideration ofthe sum of ten dollars, cash in hand paid, and other good and valuable consideration, the receipt of which is hereby acknowledged, the Grantor does hereby quitclaim, release, and convey and transfer to the Grantee, all right, title, and interest ofthe Grantor in seven 7 residential development rights (the "Severed Development Rights"), which Grantor acquired pursuant to that certain Deed of Severance by and between DAVE HOLLIDAY RENTALS L.L.C., as Grantor, and the COUNTY OF FREDERICK, VIRGLWA, as Grantee, and recorded in the Clerk's Office ofthe County ofFrederick at instrument numbers 140001410 and 1040001406. Grantor hereby transfers the Severed Development Rights unto Grantee, and the Severed Development Rights shall hereafter be affixed to the following described property located in the County of Frederick, Virginia (the "Property"): Parcel One (Property Identification Number 75 A-86): All that certain tract or parcel of land in the Shawnee Magisterial District, Frederick County, Virginia, containing 11.345 acres, fronting on Virginia Route 642, and being more particularly described by that certain plat and survey by Lee A. Ebert, L. S, dated June 17, 1976 of record in the Clerk's Office of the Circuit Court of Frederick County in Deed Book 553 at page 288; AND BEING designated as Parcel Two of the land conveyed to Shawnee Village, L. C., by Deed dated November 10, 2001 from David B. Holliday, of record in the aforesaid Clerk's Office by instrument number 010017570. 0 WITNESS the following signatures and seals: GRANTOR (SEAL) COMMONWEALTH OF VIRGINIA [CITY] [COUNTY) OF F(ed erfGje-- CD rQ c� The foregoing instrum nt was. acknowl dPedZore me �1 ►, this day of by v d L/jOtARY PUBLIC �tZ:�,`•i.:� My Commission Expires: = Virginia Notary Registration Number: .lip'•' .r.. L `,f,•!�` [AFFIX SEAL] (SEAL) COMMONWEALTH OF VIRGINIA [CITY] [COUNTY] OF(e� p� The foregoing instrume t was acknowledged before me this L%+'day of by J; d g �-}� I �i Gil ��/ Nlg��• 7 N6TAkYP1BLIC My Commission Expires: 10. 31-1 G Virginia Notary Registration Number: �j 031'3 [AFFIX SEAL] VIRGINIA: FREDERICK COUNTY, SCT. This instrument of writing was produced to me on 03 '05 A101 4 at � � to r'onl � :ind with certificate of acknowledgement thereto annexed was admitted to record. Tax imposed by Sec. 58.1-802 of $ Q i ss ,and 58.1-SOl have been paid, if asseable 31 • • March 12, 2014 Mr. Scott Stickley, PE Pennoni Associates, Inc. 117 E. Piccadilly Street, Suite 200 Winchester, Virginia 22601 RE: MASTER DEVELOPMENT PLAN #03-13 FOR THE TOWNES AT TASKER Master Development Plan Approval Property Identification Numbers (PINS): 75-A-86 Dear Scott: Frederick County administratively approved the above -referenced final revised Master Development Plan (MDP) on March 12, 2014. This MDP is approved for the potential development of 10.25 acres of land zoned RA (Rural Areas) District with a total of 81 single family attached units. This property is being developed as a receiving property with RP (Residential Performance) District standards through the use of the Transfer of Development Rights (TDR) Program. All requirements of the Frederick County Zoning and Subdivision Ordinance have been addressed in the plan. Please note that approval of a subdivision design plan ' equired prior to the subdivision or development of this parcel. I am providing you with fi _ copies of the approved final master development plan. Please ensure that these plans are d'stri�ute accordingly. Feel free to contact me if you have any questions. Sincerely, 2 "� Candice E. Perkins, AICP Senior Planner Attachments CEP/ cc: Dave Holliday Shawnee District Supervisor . Shawnee District Planning Commissioners Jane Anderson, Real Estate Commissioner of Revenue S:\Office on Blackbox\Agendas\Approval (or denial) ltrs\MDP's\townesatTasker.docx MASTER DEVELOPMENT PLAN #03-13 The Townes at Tasker Staff Report for the Board of Supervisors Prepared: December 5, 2013 Staff Contact: Candice E. Perkins, AICP, Senior Planner Reviewed Planning Commission: 11/06/13 Board of Supervisors: 11/13/13 Planning Commission (revised MDP): 12/04/13 Board of Supervisors (revised MDP): 12/11/13 PROPOSAL: To develop 10.25 acres of land zoned RA (Rural Areas) District with a total of 81 single family attached (townhouse) units. This receiving property will be utilizing transferred development rights as permitted by the Transfer of Development Rights (TDR) ordinance to develop with RP (Residential Performance) District standards. The subject receiving parcel will be utilizing 54 transferred development rights from six parcels (72-A-30, 72-A-34, 72-A-29C, 21-A-7A, 31-A-34 and 34-A-34B) that are located in the County's sending area. Utilizing the TDR conversation rate for single family attached dwelling units the development has 81 units, (54 x 1.5 = 81). This is the first property to develop under the adopted TDR ordinance. MAGISTERIAL DISTRICT: Shawnee LOCATION: The subject property is located on the east side of Route 642, (Tasker Road) and north of Route 846, (Rutherford Lane) approximately 0.7 miles south of the I-81 Interchange 310. STAFF CONCLUSIONS FOR THE 12/11/13 BOARD OF SUPERVISORS MEETING: The Master Development Plan for The Townes at Tasker depicts appropriate land uses and appears to be consistent with the requirements of Article III, Transfer of Development Rights (TDR) Program and Article VIII, Master Development Plan, of the Zoning Ordinance. Following the Planning Commission and Board of Supervisors review of the MDP, staff will proceed with the severing and application process for the TDR rights from the sending property to the receiving property and proceed with approval of the MDP. All of the issues brought forth by the Board of Supervisors should be appropriately addressed by the applicant. It appears that the application meets all requirements. Following presentation of the application to the Planning Commission and the Board of Supervisors, and the incorporation ofyour comments, staff is prepared to move forward with the TDR transfer and approve the MDP. • • MDP #03-13, The Townes at Tasker December 5, 2013 Page 2 This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist in the review of this application. It may also be useful to others interested in this zoning matter. LOCATION: The subject property is located on the east side of Route 642, (Tasker Road) and north of Route 846, (Rutherford Lane) approximately 0.7 miles south of the I-81 Interchange 310. MAGISTERIAL DISTRICT: Shawnee PROPERTY ID NUMBER: 75-A-86 PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas) using RP (Residential Performance) District development standards through the use of the Transfer of Development Rights (TDR) Ordinance. Use: Vacant ZONING & PRESENT USE OF ADJOINING PROPERTIES: North: B2 (Business General) Use: Self Storage Facility South: RP (Residential Performance) Use: Residential & Vacant East: RA (Rural Areas) Use: Residential & Church West: Interstate 1-81 Use: Interstate PROPOSAL: To develop 10.25 acres of land zoned RA (Rural Areas) District with a total of 81 single family attached (townhouse) units. This receiving property will be utilizing transferred development rights as permitted by the Transfer of Development Rights (TDR) ordinance to develop with RP (Residential Performance) District standards. The subject receiving parcel will be utilizing 54 transferred development rights from six parcels (72-A-30. 72-A-34. 72-A-29C. 21-A-7A. 31-A-34 and 34-A-34B) that are located in the County's sending area. Utilizing the TDR conversation rate for single family attached dwelling units the development has 81 units (54 x 1.5 = 81). This is the first property to develop under the adopted TDR ordinance. i r MDP #03-13, The Townes at Tasker December 5, 2013 Page 3 REVIEW EVALUATIONS: Virginia Department of Transportation: The Master Development Plan for this property appears to have a significant measurable impact on Route, 642, the VDOT facility which would provide access to the property. Before making any final comments, this office will require a complete set of site plans, drainage calculations and traffic flow data from the I.T.E. Trip Generation Manual, 8th Edition for review. VDOT reserves the right to comment on all right-of-way needs, including right-of-way dedications, traffic signalization, roadway improvements and drainage. Prior to, construction on the State's right-of-way the developer will need to apply to this office for issuance of appropriate permits to cover said work. Frederick County Fire & Rescue: Plan approval recommended. Frederick County Fire Marshal: Plan approved Frederick County Public Works: All of our previous comments have been addressed. Frederick County Inspections Department: No comments at this time. Comments will be made at site plan and subdivision plan submittal. Frederick County Sanitation Authority: Approved Frederick County Parks and Recreation: Plan appears to meet the recreation unit and open space ordinance. It may be helpful to make sure the three recreation units will fit the site. Recreation units are now $32,500.00 each. Virginia Department of Health Comment: Health Department has no objections so long as public sewer and water are utilized. Frederick County Public Schools: The applicant has worked with Frederick County Public Schools to provide adequate turning area for a bus as well as a shelter for students. Planning & Zoning: A) Master Development Plan Requirement A master development plan is required prior to development of this property. Before a master development plan can be approved, it must be reviewed by the Planning Commission, the Board of Supervisors and all relevant review agencies. Approval may only be granted if the master development plan conforms to all requirements of the Frederick County Zoning and Subdivision Ordinances. The purpose of the master development plan is to promote orderly and planned development of property within Frederick County that suits the characteristics of the land, is harmonious with adjoining property and is in the best interest of the general public. Also, pursuant to Article III, Transfer of Development Rights (TDR) Program. (§ 165-303.02. Development Approval Procedures.), a request to utilize transferred development rights on an • 0 MDP #03-13, The Townes at Tasker December 5, 2013 Page 4 eligible receiving property must be in the form of a Master Development Plan and a Subdivision Design Plan submitted to the Department of Planning and Development in accordance with the Zoning and Subdivision regulations contained in Chapters 165 and 144 of the County Code. B) Site History The original Frederick County Zoning Map (U.S.G.S. Stephens City, VA Quadrangle) identifies the subject property as being zoned R-1 (Residential Limited). The parcel was re -mapped from R-1 to A-2 (Agricultural General) pursuant to the County's comprehensive downzoning initiative (Zoning Amendment Petition #011-80), which was adopted on October 8, 1980. The County's agricultural zoning districts were subsequently combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the re -mapping of the subject property and all other A-1 and A-2 zoned land to the RA District. C) Site Suitability & Project Scope Comprehensive Policy Plan: The Frederick County Comprehensive Policy Plan is an official public document that serves as the community's guide for making decisions regarding development, preservation, public facilities and other key components of community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. [Comprehensive Policy Plan, p. 1-1] Land Use Compatibility: The parcel comprising this MDP application is located within the County's Urban Development Area (UDA) and Sewer and Water Service Area (SWSA). The Urban Development Area defines the general area in which more intensive forms of residential development will occur. The Townes at Tasker Development is proposed to develop with a density of 7.9 units per acre, which is consistent with the maximum RP density permitted in the Zoning Ordinance. The 2030 Comprehensive Plan shows this property with a residential land use designation. The residential designation was approved by the Board of Supervisors on January 25, 2013, (CPPA request #01-11, institutional designation to residential). Transfer of Development Rights (TDR) Program: The TDR program allows properties designated as receiving properties to be developed to RP standards. Therefore, the program allows RA -Zoned receiving properties that are proposing townhouses to develop with a maximum density of 10 units per acre. The MDP depicts the road network, entrances, buffers, sidewalks and recreational amenities. Site Access and Transportation: The Townes at Tasker is proposed to be accessed via one full entrance on Tasker Road. It should be noted that in 2011-2012 during the Comprehensive Plan change for this parcel, it was discussed that the entrance for this development should be via Rutherford Lane. The applicant, however, opted for a full intersection on Tasker Road instead. The MDP also depicts the MDP #03-13, The Townes at Tasker December 5, 2013 Page 5 required sidewalk along Tasker Road. Recreational Amenities: The MDP proposes a tot lot and picnic shelter as the recreational amenities for the 49 townhouse units. PLANNING COMMISSION DISCUSSION SUMMARY OF THE 11/06/13 MEETING Commission members had a number of safety concerns with the only entrance to the development being on Tasker Road. Their concerns were based on a number of issues, including the vertical curve coming down the hill towards the entrance and whether adequate site distances could be achieved; vehicles coining down the hill typically exceed the posted 45mph; considering the amount of trips leaving the development, service degradation was expected to occur and a vehicular back-up from the Route 37 signal was expected to extend down to the proposed entrance. Staff agreed with the points made and noted the applicant was encouraged to relocate the entrance to Rutherford Lane.. Staff noted this development does not meet the threshold for staff to require a TIA (transportation impact analysis) in order to specifically comment on back-up queuing information. Staff noted their greater concerns are with exiting traffic at this location, more so than traffic entering the development, and staff predicted a future service degradation problem. However, it was noted the applicant is constructing a left -turn lane and there has been considerable exchange between the applicant and VDOT as they work to come up with an approvable entrance under VDOT standards. The applicant's representative felt confident the proposed entrance onto Tasker Road will meet VDOT's road design requirements for site distance, turn lanes, length of turn lanes, etc. He said an entrance onto Rutherford Lane was initially attempted; however, not only were the saine improvements needed on Rutherford Lane as on Tasker Road, but some additional obstacles were encountered on Rutherford as well. He said a large power pole is situated on the northeast corner of the Rutherford Lane-Tasker Road intersection; the applicant would be required by VDOT to straighten out this intersection, which would require the relocation of the power pole. Additionally, the widening would need to be extended across the box culvert which carries Opequon Creek under Tasker Road; this would require lengthening of the culvert as well. Lastly, the entrance on Rutherford Lane would result in the site being roughly 30 feet lower than where it is presently. The applicant's representative believed these conditions added a far more complex condition to the entrance design than what would be required on Tasker Road. The applicant's representative noted they were utilizing the older TDR ordinance for this development, but expects to come back with a revised MDP as the TDR condition changes. It was noted the developer is working on acquiring additional TDRs in order to fully build out the site. It was further noted that all of the studies were done using a total of 80 townhouses, as well as the trip calculations for the proposed entrance. No other issues were raised. No action was needed by the Commission at this time. (Note: Commissioners Dunlap, Kenney, and Manuel were absent from the meeting.) • • MDP #03-13, The Townes at Tasker December 5, 2013 Page 6 BOARD OF SUPERVISORS DISCUSSION SUMMARY OF THE 11/13/13 MEETING: Staff presented the Master Development Plan and noted that a revised MDP would be brought before the Board at their December 11, 2013 meeting to reflect the adopted TDR Ordinance changes. The Board requested clarification that VDOT would need to approve the subdivision design plan before the entrance could be constructed. Staff noted that the design plan would need to be approved and if VDOT could not approve the Tasker Road entrance location then a revised MDP would be necessary. No other issues were raised. No action was needed by the Board of Supervisors. PLANNING COMMISSION DISCUSSION SUMMARY OF THE 12/04/13 MEETING: Staff presented the Master Development Plan and noted that it consisted of the same layout reviewed by the Planning Commission on November 6, 2013. The only revision pertains to the number of residential units, based on the approval of the TDR Ordinance amendments. The Board of Supervisors approved the TDR conversion rate which is based on the type of housing unit being developed on the receiving property — single-family detached, single-family attached or multifamily. Based on the single-family attached TDR conversion rate, the property owner now has the ability to build 81 single-family attached units on this property. Staff reported the property is using 54 transferred rights from six parcels within the sending area; the 54 development units multiplied by the conversion rate of 1.5 equals the 81 units they now have rights to develop. A Commissioner commented that VDOT seemed to have questions and safety concerns about the amount of trips on Tasker Road (Route 642) and he inquired about the applicant's discussions with VDOT. The applicant's representative stated the major concerns that will need to be overcome involve the widening of Tasker Road north of the site and the construction of a retaining wall. He explained that working out how the retaining wall is constructed, as well as how VDOT will provide future maintenance of it, are the major issues at this time. He said VDOT has asked them to try and acquire an easement from an adjoining property owner and they are in the process of working on this. The applicant's representative stated they will need to get VDOT's approval of the site plan before Frederick County will sign their site plan, which would allow the applicant to subdivide the property. A Commissioner commented this was the first time a TDR application has come through and he asked the applicant about the experience and if it was easy to accomplish. The applicant stated it was an easy process and they were guided and assisted by the Planning Staff and the process has worked out well. No action was needed by the Planning Commission. STAFF CONCLUSIONS FOR THE 12/11/13 BOARD OF SUPERVISORS MEETING: The Master Development Plan for The Townes at Tasker depicts appropriate land uses and appears to be consistent with the requirements of Article III, Transfer of Development Rights (TDR) Program and Article VIII, Master Development Plan, of the Zoning Ordinance. Following the Planning Commission and Board of Supervisors review of the MDP, staff will proceed with the severing and application process for the TDR rights from the sending property to the receiving property and proceed with MDP #03-13, The Townes at Tasker December 5, 2013 Page 7 approval of the MDP. All of the issues brought forth by the Board of Supervisors should be appropriately addressed by the applicant. It appears that the application meets all requirements. Following presentation of the application to the Planning Commission and the Board of Supervisors, and the incorporation of your comments, staff is prepared to move forward with the TDR transfer and approve the MDP. �r .7► MW r y, Applications Parcels Building Footprints B1 (Business, Neighborhood District) B2 (Business, General Distrist) B3 (Business, Industrial Transition District) EM (Extractive Manufacturing District) 4° HE (Higher Education District) M1 (Industrial, Light District) M2 (Industrial, General District) MH1 (Mobile Home Community District) MS (Medical Support District) OM (Office - Manufacturing Park) R4 (Residential Planned Community District) R5 (Residential Recreational Community District) RA (Rural Area District) RP (Residential Performance District) N 4 Note: Frederick County Dept of MDP # 03 - 13 Planning Developments 107 N Kentt St The Townes at Tasker Suite 202 PINS: Winchester, VA 22601 75 - A - 86 540 - 665 - 5651 Map Created: October 17, 2013 Staff: cperkins 0 130 260 520 Feet 0 FCSA PROJECT INFORMATION WATER AND SANITARY SEWER USAGE WATER DEMAND 19,035 CPO SANITARY SEWER DISCHARGE 19,035 GPO CALCULATION OF DEMAND/DISCHARGE WATER DEMAND RESIDENTIAL: 235 GPD PER CONNECTION COMMERCIAL: 75 GPD PER 1,000 S.F. INDUSTRIAL: 25 GAL. PER PERSON PER DAY 0 10 PERSONS PER ACRE SEWER DISCHARGE SEWER DISCHARGE EQUALS WATER DEMAND b1�� � 1- 1,��R? D � ;V� � Ll O P 1111,- T' P L - A -1J rJO R TIN -71EE TfilOWNES A Tril TIPASKER SHAWNEE MAGETC RAL DBTRCT G REDERCK OOUN'N, VRG� NR MAY 309 2013 OWNER: SHAWNEE VILLAGE, L.C. 420 W. JUBAL EARLY DRIVE WINCHESTER, VIRGINIA 22601 PHONE: 540-667-2120 DEVELOPER: DAVE HOLLIDAY CONSTRUCTION CO. INC. 420 W. JUBAL EARLY DRIVE WINCHESTER, VIRGINIA 22601 PHONE: 540-667-2120 ENGINEER / SURVEYOR: PENNONI ASSOCIATES INC. 117 EAST PICCADILLY STREET, SUITE 200 WINCHESTER, VIRGINIA 22601 PHONE:540-667-2139 FAX:540-665-0493 @E pL TIf OF � 2 MICHAEL S. STICKLEY a Uc. No. 031162 ��S`SfONALG� OWNER / DEVELOPER SHAWNEE VILLAGE, L.C. C/O DAVE HOLLIDAY CONSTRUCTION CO. INC. 420 W. JUBAL EARLY DRIVE WINCHESTER, VIRGINIA 22601 PHONE: 540-667-2120 OWNER'S SIGNATURE DATE APPROVED BY: DIRECTOR OF PLANNING AND DEVELOPMENT DATE COUNTY ADMINISTRATOR DATE N1DEX OF SHEETS COVER SHEET I OF 4 MASTER DEVELOPMENT PLAN 2 OF 4 DETAILS/FCSAJOF4 TASKER ROAD IMPROVEMENT PUN 4 OF 4 PROJECT SUMMARY TOTAL AREA, 11.3458 ACRES 17 AC. 411E AREA EXISTING ZONING: RA (RURAL AREAS) WITH RP STANDARDS VIA TOR'S EXISTING USE: VACANT PROPOSED USE: RESIDENTIAL (SINGLE FAMILY ATTACHED) TAX ID NO.: 75-A-86 MAGISTERIAL DISTRICT SHAWNEE OPEN SPACE AREA REWIRED: 30% kW. DENSITY ALLOWED: 10 D.U. PER ACRE PROPOSED DENSITY: 7.9 D.U. PER ACRE TOTAL ALLOWED UNITS: 81 TOTAL PROPOSED UNITS: 81 NOTES: I. ALL PROPOSED UTILITIES ARE TO BE CONSTRUCTED UNDERGROUND. SEWER AND WATER CAPACITY ARE AVAILABLE FROM FCSA j 2. THIS PROPERTY IS SUBJECT TO THE REQUIREMENTS OF THE RP (RESIDENTIAL PERFORMANCE DISTRICT). TDR TABLE DENSITY RIGHTS DENSITY RIGHTS RECEIVED SENDING PROPERTY AVAILABLE BY 75-A-86 37-A-34 3 3 37-A-349 6 6 21-A-7A 6 6 72-A-30 4 4 72-A-34 15 15 72-A-29C 20 20 TOTAL 54 54 TOR RIGHTS BEING USED FOR A SINGLE FAMILY ATTACHED DEVELOPMENT (54X1.5=81) RIGHTS BEING USED=81 PROPERTY UNE — — BUILDIN6 RESTRICTION LINES I SMKKS — — — EXISTING CONTOURS CONTOURS DXSTING TREEUNEr 100 YR. EL000PUJN OWNS STORY STORM DRAIN DRSONG WATER MAN - - — - MNG WATER VALVE z PROPOSED WATER WIN EXISIINC WARY SEWER •.� PROP00 SWWTf SEWER PROPOSED SATURANT! FORCDMN EXISRN, GlS LINE PROPOSED GAS UNE G SLEEP SLOPES 2 25% STEEP SLOPES ] 50% REVISIONS DATE DESCRIPTION BY CKD 1 06-11-13 REVISED PER FCSA COMMENTS KLM MSS 2 10-02-13 REVISED PER COUNTY COMMENTS KLM MSS fN0. 3 10-10-13 REVISED PER COUNTY COMMENTS KLM MSS 4 10-30-13 REVISED BOUNDARY LINE KLM MSS 5 11-18-13 REVISED FOR 80 LOTS KLM MSS 6 11-20-13 ADDED ONE LOT KLM MSS NOTES 1. ON LOT LANDSCAPING SWILL BE PROVIDED PER SECTION 165-203.01 OF THE FREDERICK COUNTY ZONING ORDINANCE. 6 ORWAIENTAL SHRUBS AND 2 ORNAMENTAL TREES SHALL BE PROVIDED PER 5 LOTS. 1 2. 4.14 (40%) ACRES OF TOTAL OPEN SPACE ARE PROPOSED. (PHASE I=1.38 AC., PHASE 11=0.79 AC., PHASE III=0.3B AC., PHASE N =1.59 AC.) 3. NO TREES OR SHRUBS SHALL BE PLANTED WITHIN FCSA EASEMENTS. 4. THE DEVELOPMENT'S COVENANTS SHALL GRANT FCSA THE RIGHT TO ENTER ONTO ANY LOT AND PERFORM NECESSARY REPAIRS OF THE UTILITIES. AREA OF ACCESS SBE TO THE UTILITIES ONLY. PROPERTY ADJ. PROPERTY PROPOSED SITE BUFFER 30' I 20' ACTIVE BUR BUFFER 6' HIGH, OPAQUE FENCE PROVIDE 3 RANTS PER 10 L-F. (1/3 DECIOUWS, 1/3 EVERGREEN, 1/3 SHRUBS) 10 LANDSCAPED ESMT. SECTION PROVIDE 3 PLANTS PER 10 LF. (1/3 DECIDUOUS, 1/3 EVERGREEN, 1/3 SHRUBS) - - 20' 10 LWOSCI�PED ESNT' ::.iBUFFER EER 50• PROPOSED SITE 5 - - - AD,ACENT PROPERTY Imo- 6' HIGH, OPAQUE FENCES PLAN RESIDENTIAL SEPARATION BUFFER MOT To SCALE F- I I I I VARIES , 2000' TYP. I 20,00' TYP. I TOWNHOUSE 40.00' I TYP, 2,00' TYR 25-W-SEMKK _ 20.00' T I 11YP. TIP. SDEWALK TYP. 27.00' CONC. SIDEWALK 5.00' TYR 1.4D' -W W W W W= -S S 5 S S 15.1 WATER AND 22.00' oR 24.00 - SEWER EASEMENT RAGE OF CURN TO 2•R 1YP FACE OF CURB TYPICAL LOT DETAIL STALL I'=20' RIGHT-OF-WAY 40' NACINE R 10' ACTIVE EARTHEN BERM I BUFFER AND WD501PED AREA PROVIDE 3 PLVAS PER 10 l.F. (1/3 DECIDUOUS, 1/3 EVERGREEN, 1/3 SHRUBS) 14,1 r -,I ABOVE AVG. ROAD GRADE X I SECTION 6' EARTHEN BERM AND LANDSCAPED AREA PROVIDE 3 RANTS PER 10 LF. (1/3 DECIDUOUS, 1/3 EVERGREEN, 1/3 SHRUBS) 5 36� 40' INACINE 50' _ - D' RIGHT-OF-WAY - - - PLAN -_ - ROAD EFFICIENCY BUFFER NOT TO SCALE ADJ. PROPERTY PROPOSED SITE BUFFER 25' IL�TIVE 21' ACTIVE BUFFER BUFFER 6' HIGH, OPAQUE FENCE PROVIDE 3 PLANTS PER 10 L.F. (1/3 DECIDUOUS, 1/3 EVERGREEN, 1/3 SHRUBS) 10 LANDSCAPED ESMI. SECTION FPROVIDE 3 PLANTS PER 10 L.F. (1/3 DECIDUOUS, 1/3 EVERGREEN, 1/3 SHRUBS) - - 25ACTIVE BUFFER 5 30 LAW - - 25' MUGTNE Bl1fTER 50' PROPOSED SITE ADJACENT PROPERTY 5 _ 10' 6' HIGH, OPAQUE FENCE ZONING DISTRICT BUFFER NOT TO SOME AREA PHASING SUMMARY AREAN AEA N AREA N NUMBER R4ESE PROP. USE TOTAL AREA OPEN SPACE ROADS/PKG. SEA LOTS OF LOTS 1 I RESIDENTIII 2.75 AC. `JS9OS� 0.52 AC. 0.85 AC. 16 0134855_q�C 1 RESIDENTIAL 1.75 AC 0.16 AC. 0.80 AC. IS O1L�L'�RI) II RESIDENTIAL 1.70 AC. 0.17 AC. 1.15 AC. 18 1.59 AL. N RESIOENTAL 4.05 AC. 1 (39%) 1 0.19 AC. 1 2.27 AC. 32 RECREATIONAL AMENITIES SUMMARY 3�. TYR MACER OF PROPOSED TOWNHO4ES: 81 -)' WATER METER TYP. RECREATIONAL UNITS REQUIRED (I PER 30 UMTS): 23 RECREATIONAL UNITS PROPOSED: 3 -SANITARY SEWER STUB TYP. PROPOSED RECREATIONAL UNfS ,,10.00' TYP. DESCRIFDON RUC UNITS PROVIDED F6.50' TYP. Tor LOT 1 MUTIPURPOSE COURT I PICNIC SHELTER I W W - 11 IMl pl-CFNIFR S S - N SEWER LIFE ENE / PROPOSED 5 R I! A, TNAN PROP. EECIRIC, / L ¢� E%. R/W LINES APPROKTM,IE I345ED DR VDOT STATE HIGHWAY 9 PLANS FOR TASKER ROAD DATED OCT. 20, 1983 PIN 7 -A-7 HACK L ND IR ST DB 780 PG 703 �'' I jareeRP I7}{ _ se: ocont I t jjj SCHRAMM LOOP (TYPE 3) URBAN ENTRAJNCE DRIVE - WIDTH VARIES RESIDENTIAL PERFORMANCE ZONI STRICT ENVIRONMENTAL FEATURES TOWNHOUSE DIMENSIONAL REQUIREMENT 4NNAA LOT SIZE: 1,500 S.F. AREA N ACRES TOTAL S DISTURBED S N O.S. AREA N OS 4WMU11 GROSS UNSNF': 10 UNITS PER ACRE 4N4W LOT WIDTH: 22' (END UNT) 18' (INTERIOR ROODPLVNS 0 0 0 0 OFF SRBET PAINING SPACES REOURED 2 SP. PER UNIT UWD% SETBACK FROM R1HC/PRIVATE R.OW.: 25 FT. (WITH GARAGE) LIKES AND PONDS 0 0 0 0 BADING SETBO FROM OFF-STREET PARKING LOT: 15 FT. BEAR BUILDING SETBACK 20 Fr. SIDE BUIONG SETBACK 10 FT. SETBACKS FOR UNROOFED DECK. STOOPS, LANDINGS, SWILAR FEATURES FRONT FROM OFF-STREET PAM: 10 "IT. FRONT FAUN PRIVATE/PUBLIC ROAD 15 FT. SIDE (END UNIT). 5 Fr. REAR 5 FT. NATURAL RETENTION A" 0 I 0 0 0 STEEP SLOPES (♦25S) 0.66 51.52% 48,48% 0,32 NEIIANUS 0 0 0 0 WOODLW05 0.53 30.19% 6921% 0.37 YWWAI BUILDING HEIGHT ON PRINCPAL BURNING. 40 FT. PROPOSED 5' TASKER R0 IgIl 45 MPH VA. SEC ROUrt OR6"2POSV_D SPEED URBC Tr (RP) � Q NIT) C C Q C III PROPOSED N4045'11i GUARDRAIL S -c-- _ _ G REDUCED -DISTANCE ROAD EFFICIENCY t BUFFER (40' RACTNE/10' ACTN•E) S MULTI COURT SEE DETAIL THIS SHEET c 1 t 1 .` TOT LOT 50' ZONING DISTRICT BUFFER 1 1 �•,� (SEE DETAR THIS SHEET' SCHRAMM LOOP (TYPE 2) URBAN 24' PRIVATE DRIVE OpICryC 1 1 1 1 PHASE N 32 SINGLE FAMILY ATTACHED sNOEWAIJc T TOTOPOGRAPHY SHELTER 1 1 1 1 720' WATER ESMr. �� / (TOWNHOMES) LOTS 1 - 1 E • • • • • • OPEN SPACE STREET TREES PLANTED 40' • o O.C. PER FREDOBCK COUNtt N ZONING OROINWCE. ACTUAL % w.--- s.- v.� - I LOCATION TO BE _ s.w- sw--� AT SITE PLAN sr/GF; �- 25' PVC NE 35 WYi �I " i Fes. SEWER LINE I SMC1AE� VNACINF♦ v / /� 8• PVC SOB 21 • • I . IBUFTERIBUFFER WATER LINE I � I SE LOT / / • yT.PIN � • 75V-A-86 LC I P DOT / 1�INS010017570 J I I I U U / r • 10.2541 ACRES I • I 4 a SAN. 611R. ESMT. L FCSA SEWAGE/ I I I ~ i6 SIPHASE SEFAMILY • ' • " • PUMP STATION \A i • I I I I PIN 75-A-86C \x J ATTACHED I PAUL E. B ROBERTA ry /50' REDUCED DISTANCE ROAD EFFICIENCY I(TOWNHOMES) LOTS FILTER•I"I• II I eBFcN�NSK PC BUFFER (40' NACTIVE/10' ACTIVE) e6"5�bl. / SEE DETAIL THIS SHEET I I I Z-ed' 82 / SWIM7F-- SEWER ESMT. 30. WATER AND �• •� �• • 3' FORCE"• y I SCHRAMM LOOP P (TYPE 1) URBAN • OPEN SPACE 22' PRIVATE DRIVE F,Iq SCHRAMM LOOP I I • i •� W� LWWW WWI W� - - - � (TYPE 2) URBAN • �� • • 30' WATER AND NI 3 24' PRIVATE ERNE , SEWER ESMT. I I 9 - - - I PHASE II I I'I 18 SINGE FAMILY ASE IIII ` • I I I 1 I 15 SINGLE FAMILY • • ATTACHED • ( I 45� • R I I �ATTACHED " I'I (TOWNHOMES) LOTS I I I TOWNHOMES) LOTS � { � • I I � Y12.6S I I I • I� • � 14 • i I N - - -�i 1A917AC. 1 I I • - - - -�O' I WATER uLINE SDR 21 I '� _ W_ SCHRAM LOOP I 22' PRIVATE DRK J 50 RESIDENTIAL SEPARATION BUFFER - 8• PVC 5. 1!" A IITARY (30' INACTIVE/20'ACTIVE) SLQL I _. Si*"E SEE DETAIL AI THIS SHEET 99. $ t � _ - _ LSPACE 307,78' PIN 75-A-87A 310. 13 �. �. '^"' _ _ -�' AGAPE CHRI.STTAN fELLONSH/P --- - S4529'39T- - - - _ 'L\ OB j 566 PC 302 Use.' Re7ig�uus nstitulion ` Zared RA Too PIN 75 A B6A GRAPHIC SCALE GARY D. RUTHERFORD AND CAROL YN S RUTHERF51RD 50' 25' 0'; 50' Too' kl\ 08 512 PC 899 ' Use: Slen FamA Residence. - _ y. \ 1 NCN �.88'N 4 3 3 ) 3 7 3 3 3 3 3 3 m o o 0 - i R _ i � a3 o0 W� Wwo �0 pAY00 PRp� k c1 U (D LL_ zQ U cl- Y Z cl- (/) Q F_ Z U F- F- LLJ g s CLGOWoJ Q Ns Z Z U s W 0 4 0 � LL_1 _ W cnn J O cnLLJ Q Q 2 J � Q ti DDEUBLxrs PnLPwrtn Rr rtn[D[A Assau¢s art nrL V.J �Mv -1 OF a RESPEC'[ mL PROJfC[. OR IDOpFDI 4J R[U5[ BrOwMCR OR "I DR ON urc DM[R PRWECL n _1 RLVY Y ,PIwEGI ,mrt(x SFn(xY.igN 0R gVfxROR BY P[MOR [y FrPMXH r0 PE xOx wSSOCURS: AM�O[wtpl SxRLL f E_ xwGROSSLS tx0 EnC I B. L R RISixc 0 ESULiIwG CR((ROB, O.NOB [p 16724-1-0 s+"cr 2 OF 4 xaRn[ -xB '=so' O 1 +� KLM 5/30/13 MSS SO DEW ROIT-OF-WAY MATCHLINE SHEET 2 _ n x f; _ \ - """` Aga - `' ' '. z \ •, /`` X � P�c4E ECM ;• � I 7 I \ EX. SAN. NH T{¢ ,. I\ ) ' �:' i l � , � �"-�-� r� � � ilk i' �. �.:�•: •: �. �':\ �. ` ---- � = __ --- _ � 1 �� 5' CONCRETE SIDEWALK 2' GRASS STRIP III I11. ,\ 5 CONCRETE SIDEWALK 2' GRASS STRIP 5' CM&TE SIDEWALK 2' GRASS STRIP 22.00' PRIVATE DRIVE 2' GRASS STRIP 5' CO 11.00' DRIVE LANE MDO' DRIVE LANE E VDOT CG-6 IN REV. GUTTER SLOPE ��Ar�LJ't1�'Ti1•�•• �'['t [� 7V HE 21 DRIVE •0 L EI TO SCALE ml DRIVE IANE CC-6 24.00' PRIVATE MOE 2' GRASS STRIP 5' CONCRETE SIDEWALK IS DRIVE • PRIVATE ENTRANCE DRIVE NOT TO SCALE TYPE 3 - PRIVATE ENTRANCE DRIVE SECTION (WIDTH VARIES) NOT TO Sw — -- - mm 2' SM 9.5A 6' 21R WELL CdAPACTED SUDCPIADE 2' GRASS STRIP 5' CONCRETE SIDEWALK r VDOT CC-6 SY 9.5A 219 C 3 •Zr0 o i � 'sic ism 4 u r r O n VO-IZW Z F O h Qod d � z Go L4O �a3 �O F woa 4Ro IT � Z ot (D �QLLJ Z U a � Q CD Q-ul oZ.-� � z o LLJ M O E D Q+ L..J W O _ c Q LLI o � n? wi oaalrms rxoiao of rEwon rmocu�rzs ua �1MNEXI4 Of SONCE XI REYECf « TXE MPKIR. A any. VJ M N U E S TONES •I RRX[SL ON N XEVSE Rv R Nq a oNER a E.IEART RS SE PNU1[Ci OR ON ANY 011pl PRpXLK. NM1 REUSE nRgll RRIIFX nlsWYl FR R•PLSTEM 8/ RIEI .5504a1E5 ip X[ }ftii RWV2 RIIp•fD •LLK •I Ry U IfG1L ORMEIK oX. R9l /1• SES, AND ON [ D.— W NflR10• .SSOMI Mn 0•IIEII S XOCYNX MID Xo • NRAILESs p[XNONI EN`ENS.S R.REXSF. ARTS NO OUT O •DR RE LASSES THEREFROM. RISING OUT Of OR RESULTING EREfROY. O 16724-1-0 0 3 OF 4 • (�I Xam � awwn - 1'=50' �j KLM � 5/30/13 [� LI _MSS 12' RIGHT TURN TAPE 12' THRU LANE PROPO4D ENTRANCE 740 -� I I I 740 L -E STING GRADE II D GRADE 735 - D I CN ONSTRUCTION E 730- - I - - \-0.73.11 1730 � 1.44 73.M LP I 725 - Go 125 � I Loa DATUAM ELEV o No c'�o �� i 720 00 0+00 0+50 14DO ENTRANCE PROFILE HORIZONTAL SCALE. 1-=50' VERTICAL SCALE. 1'=5' TPT-1 81 PROPOSED LOTS 5.81 TRIPS/DAY/LOT TOTAL TRIPS-471 CONSTRUCTION ENTRANCE NOTES: I. SHOULD THE TRACKING O MUD ONTO THE PUBLIC ROADS BECOMES A PROBLEM, THE f1ElERE)( COUNTY INSPECTOR WAY REOURE WASH RAW BE INSTALLED AS REWIRED (If THE CONSIRUCDON ENTRANCE DETAIL ON SHEET 3. 2. THE CONTRACTOR WILL REMOVE ANY MUD THAT 6 TRACKED ONTO THE ROADMYS NT THE END OF WONT( THAT DAY NOTES: 1. ALL PAVEMENT STRPNG SHALL BE IN ACCORDANCE WITH THE VDOT STANDARD DETAIL PM-3. 2. THRU LANE PAVEMENT STRIPING SIVLL MEET AND WATCH THE EXSDNG 10' SNIPS/30' SPACING. 3, ALL PAVEMENT MRRNGS EXCEPT FOR THE W44T TURN LANE CROSS HATCHING STALL BE TYPE B. CUSS R. 4, CONTRACTOR TO PROVIDE ROADWAY STRIPING PUN 10 VOOT INSPECTOR FOR RENEW AND APPROVAL PRIOR TO APPLICATION 5. VDOT EROSION AND SEDIMENT CONTROL CONTRACTOR CERTIFICATION 6 REOURED, 6. ALL SIGN$ INSTALLED ON THE PROPERTY WALL COMPLY WITH THE REW MENTS OF FREDERICA COUNTY ZONING ORDINANCE. NO SIGNS BEYOND STOP S06 ARE PROPOSED WITH 1H6 PLAN. LIMIT OF x'wp DISTURBANCE �. 'NIP PD STL- P P. WRPO STL- - S (BY OTFIERS) rA 1 I i FOR ROAD WIDENING SECTIONS SEE SHEET , 29 OF SITE PU1fF' 45 11 UTE 642 "S1Ep SPEED ER ADMTrr74oD MPH L3W SEC. RE TOR " PO E* RET_ WALL TYPE STIR ORBAN �U C ROAD y f RIM ELEV. 745.05 .WIDENING -��' z VP-2 ' STR 6.0 EXISTING PAVEMENT _ 4',HP'NR�S L TYPE DI-3B - RIM ELEV= 735.91 STR 5.0 - _- TYPE DI-3C ELEV.= 731.41 � s ? ° ' PLOP. 8M HP WRPD S.TL GAS; LINE ' �� 1 : \07 A�° (BY OTHtRS) i._ moo sop I 7316¢ U = woo sop FOR ROAD WIDENING ' SECTIONS SEE SHEET 29 OF SITE PLAN PROPOSED 20' WASHINGTON ICHT GAS EASEMENT DISTURBANCE STOP SIGN STR 4.0 . DIS AN TYPE DI-3C rNT RIM :ELEV.= 731.41 � PROP. GRAVEL SHOULDER PROVIDE ES-1 INV. OUT=724.66 PROP/1.P PROVIDE EC-1 nl VDOT CL Al RIPRAP `s, L=22 l\ PROVO& CLASS Al RIP -RAP LINING 7 r (SEE SHEET 33 OF SITE PLAN FOR CHANNEL CAL60LADONS.) (SEE DETAIL PG-3 SHEET 30 OF STTE. PLAN) -ft •r R/W APPLIES 12 MIm ' W Z 1/4-1 MIN., MATCH EX. i­ CROSS SLOPE Q� J00 EX. R/W LINE IS =� APPROXIMATE BASED ON ~ ` VDOT STATE HIGHWAY PLANS FOR,TASKER ROAD DATED OCT. 20, 1983 �) SIGNING AND PAVEMENT MARKING NOTES L NO proposes sg,ng Ond Povanont mmAng !tall be in mdmdanae .Iw. Uw most rrant -A.- al each of the fNloenmere g ond y rev,snon thto: A.Monuol m Unlloo- Toff, Control Devic® 9. The Yr9niu SWer,Nnt to the Monuy on Uniform Trofre control DANKO . G the Wgna Department of T Onporlatlm Road and Brld9e SPeGlllcatleas. 0. The Yrgnio Dpartrn t of frmgortotton Rood on° Bridge StvWad, 2 All porarnmt mmkirM shall be Mermoploalic (Type B. Dan I). EXCEPT Imo Fines elti h Nall be point (Type A) 3. Prp .d igrT locations or. oapppp -to d Nall be modified n the field to -M conflict 'th drgro Und utilt iw or other obstructimf, and to GomPly with stmdord. refrerload in Not* t. { My TA isting m povYant markings, ebi h will conflict with propaaed Rosemont morkng. ha be cO pl•toly (1001) rROUoctod. 5. Lmnts No+n of propoa*d morkn9a aro aPplovmale and sholl to mod Red n Mo Held to in -re Ehat the Prpoaod Pav t marknga cmtxwe Lntd esfat'ng po-1 markings cm be, matched. 6 All Mg., steal be An a Glance .ith VDOT Stmdord WSP 1 un ns noted. 7 Sign support posts Ndl not be located .'thus 3' of the S-toot eke siderall.. 8. PTapos°d poet" spoed Imnts require an engineering (peed Rudy flampod by a limo,00d Pofs..iwo, enginee, be *ubm'lted to VD.O.T, for Teens, and .W.- Pr to eroctmg aigne. All ogre ord pavement markngs Rholl to r*.*eed -n Me field eth the VDOT Infpeetar Prim to it ollation. 10. N1 pornwnont sprl posts to be tub* type posts VDOT STP-1. Wooden posts only allo.*d Tx cp -,tim trafrx .gnoga 6" GRASS STRIP UD-4, SEE DETAIL TO OA`rL R TASKER ROAD (WITH CURB & GUTTER) N Ts x 2• 1.5• 2 1 $AWCUT x LESENQ� 0 SM-9.5A SURFACE ASPHALT IM-19.OA INTERMEDIATE ASPHALT '• BM-25.0 BASE ASPHALT VDOT-21B AGGREGATE OPEN GRADED SELECT MATERIAL -PER VDOT SP. DasrHg 4 3 5 G WELL COMPACTED SUBGRADE 6 a' AT MATCH EXISTING CROSS SLOPE •• OR MATCH EX, TASKER ROAD PVMT. SECTION. WHICHEVER IS GREATER TASKFR ROAD VADENING PAVEMENT DESIGN VADENING PAVEMENT DESIGN TILE& tp1M"sjef MttlfA 1p1NE � ..Ll f TW 746.00 END RET. WALL 746.00 • 744.00 .Or TW 746.00 oolims74 BW 742.00 PROPOSED 189 LF. q 1 CONCRETE RETAINING 1 WALL SEE DETAIL SHEET 24 OF SITE TO, 1 PLAN. \ A, I 1 G3 1 GRAPHIC SCALE 40 » 0' 40' 3 1101=40 N. o� LEGEND w LL�W � Go a. OStYIA N3d PROPERLY UE BULW RESTRICTION LIES / 50BALTS - - - - - - O EXISRNG CONTOURS _�0-------- N OI i3a d 2 �-.d Qo e, AG. o 922 O o PROPOSED CONTOURS 920 y o M o < . a `�'p s 4`�y EX19MG STORM ORION -. _...- _ �tt�i AA'o3 e¢0 PROPOSED STORM DRAM 73.00 PROPOSED SPOT ELEVATION 73,00 TC PROPOSED TOP O CURB 01VATION PROPOSED EDGE O PAVEMENT ELEVATION - 73.00 EP ' UMT O DISTURBANCE PROPOSED ASPHALT PAVEMENT - O PROPOSED ASPHALT PAVEMENT (MIL OVERLAY) - PROPOSED ASPHALT PAVEMENT (COMM. ENIWNCEI - I LIp� q U co °o OL Z O ¢ !a W U ci- U) ZZ O = Z�q &W� dCn �UZ9s �Z Wl 2CLQO; B�O:f =OLLJ LLJF Z O U M � >cn ` E1 � VJ `ES RRE IILL WnslwO •R[P A er RE . OF 11rs1RUYERrs a swvlcE Ix NESREn ar "NE Rrtattt. nn'R OR RnoE941 �i Go A NAM OR I' OARRR OR TIERS w CI..1 A p 011 PROSE Pt R ON RRaEtt. N Y RCOSE HE RRa[Ci OR Ox xr C cV Go fIMWT eanw tERRYInOx N. gVfPTgx c R OR, TES r� MAn'P ANDM RFAKRn xaOpm Al AL AT OWNERS ertxdlT IlI0 IM ILGI "o°0 „1 µo �xoN ' o.Nw GRALL SSOCYTES YSRSLO U SEE ARl TROYILL CVIYS. O OR LOSSES ATH EIPEISEG SIxG OUT Or OR GR [BOLTING FR[fROY. O 16724-1-0 0Ia 4 OF 4 (�I "" wAe.w No. 1- IF, KLM 5/30/13 � MSS �I 5� E MASTER DEVELOPMENT PLA,r APPLICATION FORM - Department of Planning & Development Use Only — Application # Date Application Received: PC Meeting Date hi' ' .) BOS Meeting Date Fee Amount Paid $ 1 0" Initials: P 0 Receipt # fj -73(v 1. Project Title: The Townes at Tasker 2. Applicant: Name: _Pennoni Associates Inc. Telephone: 540-667-2139 Attn: Scott Stickley, PE Address: 117 E. Piccadilly Street, Suite 200 Winchester. VA 22601 3. Property Owner (if different than above): Name: Shawnee Village LC Address: 420 W. Jubal Early Drive, Suite 103 Winchester, VA 22601 4. Design Company: Name: Pennoni Associates Inc. Address: 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Telephone: 540-667-2120 Telephone: 540-667-2139 5. Please list names of all owners, principals, and/or majority stockholders: Shawnee Village LC 6. Magisterial District: Shawnee 10 0CT 1 ., t: ��;, ;;i.TY.J • • 7. Property Location: mast side of Rt. 642, Tasker Road and nUl cn of Rt. 846, Rutherford Lane, approximately 0.7 miles south of the 1-81 Interchange 310. (Give State Route # and name, distance and direction from intersection) S. Is this an original or amended Master Development Plan? Original Amended , Previous MDP# 9. Property Information: a) Property Identification Number (PIN) b) Total Acreage: c) Current Zoning: d) Present Use: e) Proposed Uses: 75-A-86 AALacres RA with RP Standards VIA TDR;s Vacant Residential 10. If residential uses are proposed, provide the following: a) Density: ?,q Units Per Acre b) Number of Units: -5� / _ c) Housing Types: Single Family Attached 11. Adjoining Property use and zoning: USE North Commercial East Residential South Vacant West Interstate 81 ZONING B2 RA RP I have read the material included in this package and understand what is required by the Frederick County Department of Planning and Development. I also understand that the master development plan shall include all contiguous land under single or common ownership. All required material will be complete prior to the submission of my master development plan application. I (we) hereby certify that this application and its accompanying materials are true and accurate to the best of my (our) knowledge. Applicant(s): Date: b U 1'� Date: Owner(s): Date: Date: Adjoining Property Owners MASTER DEVELOPMENT PLAN Owners of property adjoining the land will be notified of the Planning Commission and the Board of Supervisors meetings. For the purpose of this application, adjoining property is any property abutting the requested property on the side or rear or any property directly across a public right-of-way, a private right-of-way, or a watercourse from the requested property. The applicant is required to obtain the following information on each adjoining property including the parcel identification number which may be obtained from the office of the Commissioner of Revenue. The Commissioner of the Revenue is located on the 1st floor of the Frederick County Administration Building, 107 North Kent Street. Name and Property Identification Number Address Name Hack Winifred W Etals c/o Hackwoods LL C 974 Tasker Road Stephens City, VA 22655 Property # 75-A-78 Name Boyd John L 521 Tasker Road Stephens City, VA 22655 Property # 75-A-78C Name Rutherford Gary D. & Carolyn 163 Rutherford Lane Stephens City, VA 22655 Property # 75-A-86A Name The Hall Partnership II LLC 373 Tasker Road Stephens City, VA 22655 Property # 75-A-86C Name Agape Christian Fellowship 199 Agape Way Stephens City, VA 22655 Property # 75-A-87C Name Property # Name Property # Name Property # Name Property # pv-nn()n , asScc 12 Sco R ,'S+.C^�`.� 14 LEA � � (C:o • Special Limited Power of Attorney County of Frederick, Virginia Frederick Planning Website: www.co.frederick.va.us Department of Planning & Development, County of Frederick, Virginia 107 North Kent Street, Winchester, Virginia 22601 Phone (540) 665-5651 Facsimile (540) 665-6395 Know All Men By These Presents: That I (We) (Name) Shawnee Village LC (Phone) 540-667-2120 (Address) 420 West Jubal Early Drive, Suite 103, Winchester, VA 22601 the owner(s) of all those tracts or parcels of land ("Property") conveyed to me (us), by deed recorded in the Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by instrument No. 010017570 on Page and is described as Parcel: 86 Lot: Block: A Section: 75 Subdivision: do hereby make, constitute and appoint: (Name) Pennoni Associates Inc. (Phone) 540-667-2139 (Address) 117 E. Piccadilly Street, Suite 200, Winchester, VA 22601 To act as my true and lawful attorney -in -fact for and in my (our) name, place and stead with full power and authority I (we) would have if acting personally to file planning applications for my (our) above described Property, including: Rezoning (including proffers) Conditional Use Permit Master Development Plan (Preliminary and Final) _Subdivision 7_Site Plan _=Variance or Appeal My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered conditions except as follows: This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or modified. In witness thereof, I ()Ke) have hereto se��y(our) hand and seal this I ,�i yopf Jtj ,L ,!�: , 20 (:3 , A. Signature(s) a i : � :• #8157 74 •;� State of Viia, CitypEG n/County of / 2� �lr� , le :To-2 i MY C0MM1SS10N ; t FXPIRES = S I, 61 i ch nL: l L+yg h't ►-n L" ✓Z a Notary jurisdiction aforesaid, certify that the person(s) who signed to the foregoing instrument'��jo al • ed before me and has acknowledged the same before mein the jurisdiction aforesaid this / r''Fd4`v`w = , 20 13 . My Commission Expires: Feb, � q, � of (o N tary Public MASTER DEVELOPMENT PLAN #03-13 The Townes at Tasker Staff Report for the Board of Supervisors Prepared: December 5, 2013 Staff Contact: Candice E. Perkins, AICP, Senior Planner Reviewed Planning Commission: 11/06/13 Board of Supervisors: 11/13/13 Planning Commission (revised MDP): 12/04/13 Board of Supervisors (revised MDP): 12/11/13 PROPOSAL: To develop 10.25 acres of land zoned RA (Rural Areas) District with a total of 81 single family attached (townhouse) units. This receiving property will be utilizing transferred development rights as permitted by the Transfer of Development Rights (TDR) ordinance to develop with RP (Residential Performance) District standards. The subject receiving parcel will be utilizing 54 transferred development rights from six parcels (72-A-30, 72-A-34, 72-A-29C, 21-A-7A, 31-A-34 and 34-A-34B) that are located in the County's sending area. Utilizing the TDR conversation rate for single family attached dwelling units the development has 81 units (54 x 1.5 = 81). This is the first property to develop under the adopted TDR ordinance. MAGISTERIAL DISTRICT: Shawnee LOCATION: The subject property is located on the east side of Route 642, (Tasker Road) and north of Route 846, (Rutherford Lane) approximately 0.7 miles south of the I-81 Interchange 310. STAFF CONCLUSIONS FOR THE 12/11/13 BOARD OF SUPERVISORS MEETING: The Master Development Plan for The Townes at Tasker depicts appropriate land uses and appears to be consistent with the requirements of Article III, Transfer of Development Rights (TDR) Program and Article VIII, Master Development Plan, of the Zoning Ordinance. Following the Planning Commission and Board of Supervisors review of the MDP, staff will proceed with the severing and application process for the TDR rights from the sending property to the receiving property and proceed with approval of the MDP. All of the issues brought forth by the Board of Supervisors should be appropriately addressed by the applicant. It appears that the application meets all requirements. Following presentation of the application to the Planning Commission and the Board of Supervisors, and the incorporation of your comments, staff is prepared to move forward with the TDR transfer and approve the MDP. MDP #03-13, The Townes at Tasker December 5, 2013 Page 2 This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist in the review of this application. It may also be useful to others interested in this zoning matter. LOCATION: The subject property is located on the east side of Route 642, (Tasker Road) and north of Route 846, (Rutherford Lane) approximately 0.7 miles south of the I-81 Interchange 310. MAGISTERIAL DISTRICT: Shawnee PROPERTY ID NUMBER: 75-A-86 PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas) using RP (Residential Performance) District development standards through the use of the Transfer of Development Rights (TDR) Ordinance. Use: Vacant ZONING & PRESENT USE OF ADJOINING PROPERTIES: North: B2 (Business General) Use: Self Storage Facility South: RP (Residential Performance) Use: Residential & Vacant East: RA (Rural Areas) Use: Residential & Church West: Interstate I-81 Use: Interstate PROPOSAL: To develop 10.25 acres of land zoned RA (Rural Areas) District with a total of 81 single family attached (townhouse) units. This receiving property will be utilizing transferred development rights as permitted by the Transfer of Development Rights (TDR) ordinance to develop with RP (Residential Performance) District standards. The subject receiving parcel will be utilizing 54 transferred development rights from six parcels (72-A-30, 72-A-34, 72-A-29C, 21-A-7A, 31-A-34 and 34-A-34B) that are located in the County's sending area. Utilizing the TDR conversation rate for single family attached dwelling units the development has 81. units (54 x 1.5 = 81). This is the first property to develop under the adopted TDR ordinance. MDP #03-13, The Townes at Tasker December 5, 2013 Page 3 Ii us I�i:'I��lf7li�4�1 CI]`► Virlzinia Department of Transportation: The Master Development Plan for this property appears to have a significant measurable impact on Route 642, the VDOT facility which would provide access to the property. Before making any final comments, this office will require a complete set of site plans, drainage calculations and traffic flow data from the I.T.E. Trip Generation Manual, 8th Edition for review. VDOT reserves the right to comment on all right-of-way needs, including right-of-way dedications, traffic signalization, roadway improvements and drainage. Prior to construction on the State's right-of-way the developer will need to apply to this office for issuance of appropriate permits to cover said work. Frederick County Fire & Rescue: Plan approval recommended. Frederick County Fire Marshal: Plan approved Frederick County Public Works: All of our previous comments have been addressed. Frederick County Inspections Department: No comments at this time. Comments will be made at site plan and subdivision plan submittal. Frederick County Sanitation Authority: Approved Frederick County Parks and Recreation: Plan appears to meet the recreation unit and open space ordinance. It may be helpful to make sure the three recreation units will fit the site.' Recreation units are now $32,500.00 each. Virginia Department of Health Comment: Health Department has no objections so long as public sewer and water are utilized. Frederick County Public Schools: The applicant has worked with Frederick County Public Schools to provide adequate turning area for a bus as well as a shelter for students. Planning & Zonina: A) Master Development Plan Requirement A master development plan is required prior to development of this property. Before a master development plan can be approved, it must be reviewed by the Planning Commission, the Board of Supervisors and all relevant review agencies. Approval may only be granted if the master development plan conforms to all requirements of the Frederick County Zoning and Subdivision Ordinances. The purpose of the master development plan is to promote orderly and planned development of property within Frederick County that suits the characteristics of the land, is harmonious with adjoining property and is in the best interest of the general public. Also, pursuant to Article III, Transfer of Development Rights (TDR) Program (§165-303.02. Development Approval Procedures.), a request to utilize transferred development rights on an MDP #03-13, The Townes at Tasker December 5, 2013 Page 4 eligible receiving property must be in the form of a Master Development Plan and a Subdivision Design Plan submitted to the Department of Planning and Development in accordance with the Zoning and Subdivision regulations contained in Chapters 165 and 144 of the County Code. S) Site History The original Frederick County Zoning Map (U.S.G.S. Stephens City, VA Quadrangle) identifies the subject property as being zoned R-1 (Residential Limited). The parcel was re -mapped from R-1 to A-2 (Agricultural General) pursuant to the County's comprehensive downzoning initiative (Zoning Amendment Petition #011-80), which was adopted on October 8, 1980. The County's agricultural zoning districts were subsequently combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the re -mapping of the subject property and all other A-1 and A-2 zoned land to the RA District. C) Site Suitability & Project Scope Comprehensive Policy Plan: The Frederick County Comprehensive Policy Plan is an official public document that serves as the community's guide for making decisions regarding development, preservation, public facilities and other key components of community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. [Comprehensive Policy Plan, p. 1-11 Land Use Compatibility: The parcel comprising this MDP application is located within the County's Urban Development Area (UDA) and Sewer and Water Service Area (SWSA). The Urban Development Area defines the general area in which more intensive forms of residential development will occur. The Townes at Tasker Development is proposed to develop with a density of 7.9 units per acre, which is consistent with the maximum RP density permitted in the Zoning Ordinance. The 2030 Comprehensive Plan shows this property with a residential land use designation. The residential designation was approved by the Board of Supervisors on January 25, 2013, (CPPA request #01-11, institutional designation to residential). Transfer of Development Rights (TOR) Program: The TDR program allows properties designated as receiving properties to be developed to RP standards. Therefore, the program allows RA -Zoned receiving properties that are proposing townhouses to develop with a maximum density of 10 units per acre. The MDP depicts the road network, entrances, buffers, sidewalks and recreational amenities. Site Access and Transportation: The Townes at Tasker is proposed to be accessed via one full entrance on Tasker Road. It should be noted that in 2011-2012 during the Comprehensive Plan change for this parcel, it was discussed that the entrance for this development should be via Rutherford Lane. The applicant, however, opted for a full intersection on Tasker Road instead. The MDP also depicts the • • MDP #03-13, The Townes at Tasker December 5, 2013 Page 5 required sidewalk along Tasker Road. Recreational Amenities: The MDP proposes a tot lot and picnic shelter as the recreational amenities for the 49 townhouse units. PLANNING COMMISSION DISCUSSION SUMMARY OF THE 11/06/13 MEETING Commission members had a number of safety concerns with the only entrance to the development being on Tasker Road. Their concerns were based on a number of issues, including the vertical curve coming down the hill towards the entrance and whether adequate site distances could be achieved; vehicles coming down the hill typically exceed the posted 45mph; considering the amount of trips leaving the development, service degradation was expected to occur and a vehicular back-up from the Route 37 signal was expected to extend down to the proposed entrance. Staff agreed with the points made and noted the applicant was encouraged to relocate the entrance to Rutherford Lane. Staff noted this development does not meet the threshold for staff to require a TIA (transportation impact analysis) in order to specifically comment on back-up queuing information. Staff noted their greater concerns are with exiting traffic at this location, more so than traffic entering the development, and staff predicted a future service degradation problem. However, it was noted the applicant is constructing a left -turn lane and there has been considerable exchange between the applicant - and VDOT as they work to come up with an approvable entrance under VDOT standards. The applicant's representative felt confident the proposed entrance onto Tasker Road will meet VDOT's road design requirements for site distance, turn lanes, length of turn lanes, etc. He said an entrance onto Rutherford Lane was initially attempted; however, not only were the same improvements needed on Rutherford Lane as on Tasker Road, but some additional obstacles were encountered on Rutherford as well. He said a large power pole is situated on the northeast corner of the Rutherford Lane-Tasker Road intersection; the applicant would be required by VDOT to straighten out this intersection, which would require the relocation of the power pole. Additionally, the widening would need to be extended across the box culvert which carries Opequon Creek under Tasker Road; this would require lengthening of the culvert as well. Lastly, the entrance on Rutherford Lane would result in the site being roughly 30 feet lower than where it is presently. The applicant's representative believed these conditions added a far more complex condition to the entrance design than what would be required on Tasker Road. The applicant's representative noted they were utilizing the older TDR ordinance for this development, but expects to come back with a revised MDP as the TDR condition changes. It was noted the developer is working on acquiring additional TDRs in order to fully build out the site. It was further noted that all of the studies were done using a total of 80 townhouses, as well as the trip calculations for the proposed entrance. No other issues were raised. No action was needed by the Commission at this time. (Note: Commissioners Dunlap, Kenney, and Manuel were absent from the meeting.) • . MDP #03-13, The Townes at Tasker December 5, 2013 Page 6 BOARD OF SUPERVISORS DISCUSSION SUMMARY OF THE 11/13/13 MEETING: Staff presented the Master Development Plan and noted that a revised MDP would be brought before the Board at their December 11, 2013 meeting to reflect the adopted TDR Ordinance changes. The Board requested clarification that VDOT would need to approve the subdivision design plan before the entrance could be constructed. Staff noted that the design plan would need to be approved and if VDOT could not approve the Tasker Road entrance location then a revised MDP would be necessary. No other issues were raised. No action was needed by the Board of Supervisors. PLANNING COMMISSION DISCUSSION SUMMARY OF THE 12/04/13 MEETING: Staff presented the Master Development Plan and noted that it consisted of the same layout reviewed by the Planning Commission on November 6, 2013. The only revision pertains to the number of residential units, based on the approval of the TDR Ordinance amendments. The Board of Supervisors approved the TDR conversion rate which is based on the type of housing unit being developed on the receiving property — single-family detached, single-family attached or multifamily. Based on the single-family attached TDR conversion rate, the property owner now has the ability to build 81 single-family attached units on this property. Staff reported the property is using 54 transferred rights from six parcels within the sending area; the 54 development units multiplied by the conversion rate of 1.5 equals the 81 units they now have rights to develop. A Commissioner commented that VDOT seemed to have questions and safety concerns about the amount of trips on Tasker Road (Route 642) and he inquired about the applicant's discussions with VDOT. The applicant's representative stated the major concerns that will need to be overcome involve the widening of Tasker Road north of the site and the construction of a retaining wall. He explained that working out how the retaining wall is constructed, as well as how VDOT will provide future maintenance of it, are the major issues at this time. He said VDOT has asked them to try and acquire an easement from an adjoining property owner and they are in the process of working on this. The applicant's representative stated they will need to get VDOT's approval of the site plan before Frederick County will sign their site plan, which would allow the applicant to subdivide the property. A Commissioner commented this was the first time a TDR application has come through and he asked the applicant about the experience and if it was easy to accomplish. The applicant stated it was an easy process and they were guided and assisted by the Planning Staff and the process has worked out well. No action was needed by the Planning Commission. STAFF CONCLUSIONS FOR THE 12/11/13 BOARD OF SUPERVISORS MEETING: The Master Development Plan for The Townes at Tasker depicts appropriate land uses and appears to be consistent with the requirements of Article III, Transfer of Development Rights (TDR) Program and Article VIII, Master Development Plan, of the Zoning Ordinance. Following the Planning Commission and Board of Supervisors review of the MDP, staff will proceed with the severing and application process for the TDR rights from the sending property to the receiving property and proceed with • MDP'#03-13, The Townes at Tasker December 5, 2013 Page 7 approval of the MDP. All of the issues brought forth by the Board of Supervisors should be appropriately addressed by the applicant. It appears that the application meets all requirements. Following presentation of the application to the Planning Commission and the Board of Supervisors, and the incorporation of your comments, staff is prepared to move forward with the TDR transfer and approve the MDP. MASTER DEVELOPMENT PLAN #03-13 The Townes at Tasker Staff Report for the Planning Commission Prepared: November 18, 2013 Staff Contact: Candice E. Perkins, AICP, Senior Planner .... ........... _ _ ..,, ,, .............._—o"", . . . .................. Reviewed Planning Commission: 11/06/13 Board of Supervisors: 11/13/13 Planning Commission (revised MDP): 12/04/13 Board of Supervisors (revised MDP): 12/11/13 PROPOSAL: To develop 10.25 acres of land zoned RA (Rural Areas) District with a total of 81 single family attached (townhouse) units. This receiving property will be utilizing transferred development rights as permitted by the Transfer of Development Rights (TDR) ordinance to develop with RP (Residential Performance) District standards. The subject receiving parcel will be utilizing 54 transferred development rights from six parcels (72-A-30, 72-A-34, 72-A-29C, 21-A-7A, 31-A-34 and 34-A-34B) that are located in the County's sending area. Utilizing the TDR conversation rate for single family attached dwelling units the development has 81 units (54 x 1.5 = 81). This is the first property to develop under the adopted TDR ordinance. MAGISTERIAL DISTRICT: Shawnee LOCATION: The subject property is located on the east side of Route 642, (Tasker Road) and north of Route 846, (Rutherford Lane) approximately 0.7 miles south of the I-81 Interchange 310. STAFF CONCLUSIONS FOR THE 12/04/13 PLANNING COMMISSION MEETING: The Master Development Plan for The Townes at Tasker depicts appropriate land uses and appears to be consistent with the requirements of Article III, Transfer of Development Rights (TDR) Program and Article VIII, Master Development Plan, of the Zoning Ordinance. Following the Planning Commission and Board of Supervisors review of the MDP, staff will proceed with the 'severing and application process for the TDR rights from the sending property to the, receiving property and proceed with approval of the MDP. All of the issues brought forth by the Board of Supervisors should be appropriately addressed by the applicant. It appears that the application meets all requirements. Following presentation of the application to the Planning Commission and the Board of Supervisors, and the incorporation of your comments, staff is prepared to move forward with the TDR transfer and approve the MDP. 0 • MDP #03-13, The Townes at Tasker November 18, 2013 Page 2 This report is prepared by the Frederick County Planning Staff to provide information to ' the Planning Commission and the Board of Supervisors to assist in the review of this application. It may also be useful to others interested in this zoning matter. LOCATION: The subject property is located on the east side of Route 642, (Tasker Road) and north of Route 846, (Rutherford Lane) approximately 0.7 miles south of the I-81 Interchange 310. MAGISTERIAL DISTRICT: Shawnee PROPERTY ID NUMBER: 75-A-86 PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas) using RP (Residential Performance) District development standards through the use of the Transfer of Development Rights (TDR) Ordinance. Use: Vacant ZONING & PRESENT USE OF ADJOINING PROPERTIES: North: B2 (Business General) Use: Self Storage Facility South: RP (Residential Performance) Use: Residential & Vacant East: RA (Rural Areas) Use: Residential & Church West: Interstate I-81 Use: Interstate PROPOSAL: To develop 10.25 acres of land zoned RA (Rural Areas) District with a total of 81 single family attached (townhouse) units. This receiving property will be utilizing transferred development rights as permitted by the Transfer of Development Rights (TDR) ordinance to develop with RP (Residential Performance) District standards. The subject receiving parcel will be utilizing 54 transferred development rights from six parcels (72-A-30, 72-A-34, 72-A-29C, 21-A-7A, 31-A-34 and 34-A-34B) that are located in the County's sending area. Utilizing the TDR conversation rate for single family attached dwelling units the, development has 81 units (54 x 1.5 = 81). This is the first property to develop under the adopted TDR ordinance. 0 0 MDP #03-13, The Townes at Tasker November 18, 2013 Page 3 REVIEW EVALUATIONS: Virl4inia Department of Transportation: The Master Development Plan for this property appears to have a significant measurable impact on Route 642, the VDOT facility which would provide access to the property. Before making any final comments, this office will require a complete set of site plans, drainage calculations and traffic flow data from the I.T.E. Trip Generation Manual, 8th Edition for review. VDOT reserves the right to comment on all right-of-way needs, including right-of-way dedications, traffic signalization, roadway improvements and drainage. Prior to construction on the State's right-of-way the developer will need to apply to this office for issuance of appropriate permits to cover said work. Frederick County Fire & Rescue: Plan approval recommended. Frederick County Fire Marshal: Plan approved Frederick County Public Works: All of our previous comments have been addressed. Frederick County Inspections Department: No comments at this time. Comments will be made at site plan and subdivision plan submittal. Frederick County Sanitation Authority: Approved Frederick County Parks and Recreation: Plan appears to meet the recreation unit and open space ordinance. It may be helpful to make sure the three recreation units will fit the site. Recreation units are now $32,500.00 each. Virginia Department of Health Comment: Health Department has no objections so long as public sewer and water are utilized. Frederick County Public Schools: The applicant has worked with Frederick County Public Schools to provide adequate turning area for a bus as well as a shelter for students. Planniniz & Zonina: A) Master Development Plan Requirement A master development plan is required prior to development of this property. Before a master development plan can be approved, it must be reviewed by the Planning Commission, the Board of Supervisors and all relevant review agencies. Approval may only be granted if the master development plan conforms to all requirements of the Frederick County Zoning and Subdivision Ordinances. The purpose of the master development plan is to promote orderly and planned development of property within Frederick County that suits the characteristics of the land, is harmonious with adjoining property and is in the best interest of the general public. MDP #03-13, The Townes at Tasker November 18, 2013 Page 4 Also, pursuant to Article III, Transfer of Development Rights (TDR) Program (§ 165-303.02. Development Approval Procedures.), a request to utilize transferred development rights on an eligible receiving property must be in the form of a Master Development Plan and a Subdivision Design Plan submitted to the Department of Planning and Development in accordance with the Zoning and Subdivision regulations contained in Chapters 165 and 144 of the County Code. B) Site History The original Frederick County Zoning Map (U.S.G.S. Stephens City, VA Quadrangle) identifies the subject property as being zoned R-1 (Residential Limited). The parcel was re -mapped from R-1 to A-2 (Agricultural General) pursuant to the County's comprehensive downzoning initiative (Zoning Amendment Petition #011-80), which was adopted on October 8, 1980. The County's agricultural zoning districts were subsequently combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the re -mapping of the subject property and all other A-1 and A-2 zoned land to the RA District. C) Site Suitability & Project Scope Comprehensive Policy Plan: The Frederick County Comprehensive Policy Plan is an official public document that serves as the community's guide for making decisions regarding development, preservation, public facilities and other key components of community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. [Comprehensive Policy Plan, p. 1-1] Land Use Compatibility: The parcel comprising this MDP application is located within the County's Urban Development Area (UDA) and Sewer and Water Service Area (SWSA). The Urban Development Area defines the general area in which more intensive forms of residential development will occur. The Townes at Tasker Development is proposed to develop with a density of 7.9 units per acre, which is consistent with the maximum RP density permitted in the Zoning Ordinance. The 2030 Comprehensive Plan shows this property with a residential land use designation. The residential designation was approved by the Board of Supervisors on January 25, 2013, (CPPA request #01-11, institutional designation to residential). Transfer of Development Rights (TDR) Program: The TDR program allows properties designated as receiving properties to be developed to RP standards. Therefore, the program allows RA -Zoned receiving properties that are proposing townhouses to develop with a maximum density of 10 units per acre. - The MDP depicts the road network, entrances, buffers, sidewalks and recreational amenities. Site Access and Transportation: The Townes at Tasker is proposed to be accessed via one full entrance on Tasker Road. It should be noted that in 2011-2012 during the Comprehensive Plan change for this parcel, it was • MDP #03-13, The Townes at Tasker November 18, 2013 Page 5 discussed that the entrance for this development should be via Rutherford Lane. The applicant, however, opted for a full intersection on Tasker Road instead. The MDP also depicts the required sidewalk along Tasker Road. Recreational Amenities: The MDP proposes a tot lot and picnic shelter as the recreational amenities for the 49 townhouse units. PLANNING COMMISSION DISCUSSION SUMMARY OF THE 11/06/13 MEETING Commission members had a number of safety concerns with the only entrance to the development being on Tasker Road. Their concerns were based on a number of issues, including the vertical curve coming down the hill towards the entrance and whether adequate site distances could be achieved; `vehicles coming down the hill typically exceed the posted 45mph; considering the amount of trips leaving the development, service degradation was expected to occur and a vehicular back-up from the Route 37 signal was expected to extend down to the proposed entrance. Staff agreed with the points made and noted the applicant was encouraged to relocate the entrance to Rutherford Lane. Staff noted this development does not meet the threshold for staff to require a TIA (transportation impact analysis) in order to specifically comment on back-up queuing information. Staff noted their greater concerns are with exiting traffic at this location, more so than traffic entering the development, and staff predicted a future service degradation problem. However, it was noted the applicant is constructing a left -turn lane and there has been considerable exchange between the applicant and VDOT as they work to come up with an approvable entrance under VDOT standards. The applicant's representative felt confident the proposed entrance onto Tasker Road will meet VDOT's road design requirements for site distance, turn lanes, length of turn lanes, etc. He said an entrance onto Rutherford Lane was initially attempted; however, not only were the same improvements needed on Rutherford Lane as on Tasker Road, but some additional obstacles were encountered on Rutherford as well. He said a large power pole is situated on the northeast corner of the Rutherford Lane-Tasker Road intersection; the applicant would be required by VDOT to straighten out this intersection, which would require the relocation of the power pole. Additionally, the widening would need to be extended across the box culvert which carries Opequon Creek under Tasker Road; this would require lengthening of the culvert as well. Lastly, the entrance on Rutherford Lane would result in the site being roughly 30 feet lower than where it is presently. The applicant's representative believed these conditions added a far more complex condition to the entrance design than what would be required on Tasker Road. The applicant's representative noted they were utilizing the older TDR ordinance for this development, but expects to come back with a revised MDP as the TDR condition changes. It was noted the developer is working on acquiring additional TDRs in order to fully build out the site. It was further noted that all of the studies were done using a total of 80 townhouses, as well as the trip calculations for the proposed entrance. No other issues were raised. No action was needed by the Commission at this time. • • MDP #03-13, The Townes at Tasker November 18, 2013 Page 6 (Note: Commissioners Dunlap, Kenney, and Manuel were absent from the meeting.) BOARD OF SUPERVISORS DISCUSSION SUMMARY OF THE 11/13/13 MEETING: Staff presented the Master Development Plan and noted that a revised MDP would be brought before the Board at their December 11, 2013 meeting to reflect the adopted TDR Ordinance changes. The Board requested clarification that VDOT would need to approve the subdivision design plan before the entrance could be constructed. Staff noted that the design plan would need to be approved and if VDOT could not approve the Tasker Road entrance location then a revised MDP would be necessary. No other issues were raised. No action was needed by the Board of Supervisors. STAFF CONCLUSIONS FOR THE 12/04/13 PLANNING COMMISSION MEETING: The Master Development Plan for The Townes at Tasker depicts appropriate land uses and appears to be consistent with the requirements of Article III, Transfer of Development Rights (TDR) Program and Article VIII, Master Development Plan, of the Zoning Ordinance. Following the Planning Commission and Board of Supervisors review of the MDP, staff will proceed with the severing and application process for the TDR rights from the sending property to the receiving property and proceed with approval of the MDP. All of the issues brought forth by the Board of Supervisors should be appropriately addressed by the applicant. It appears that the application meets all requirements. Following presentation of the application to the Planning Commission and the Board of Supervisors, and the incorporation of your comments, staff is prepared to move forward with the TDR transfer and approve the MDP. M1 (Industrial, Light District) M2 (Industrial, General District) • MH1 (Mobile Home Community District) MS (Medical Support District) OM (Office - Manufacturing Park) R4 (Residential Planned Community District) R5 (Residential Recreational Community District) RA (Rural Area District) RP (Residential Performance District) Note: Frederick County Dept of MDP # 03 - 13 Planning Developments 107 N Kentt St The Townes at Tasker Suite 202 PINS: Winchester, VA 22601 75 - A - 86 540 - 665 - 5651 Map Created: October 17, 2013 Staff: cperkins 0 130 260 520 Feet 0 E • VICINITY MAP SCALE: 1 = 2,000 FCSA PROJECT INFORMATION WATER AND SANITARY SEWER USAGE WATER DEMAND 19.035 GPD SANITARY SEWER DISCHARGE 19.035 GPO CALCULATION OF DEMAND/DISCHARGE WATER DEMAND RESIDENTIAL: 235 GPD PER CONNECTION COMMERCIAL: 75 GPD PER I,000 S.F. INDUSTRIAL: 25 GAL. PER PERSON PER DAY 0 10 PERSONS PER ACRE SEWER DISCHARGE SEWER DISCHARGE EQUALS WATER DEMAND �1 r MASTER �,�R1 DEVELOPMENT PLAN ��O R TH' .RE-1 T-ElOWNEN AT T.-PASKER SHAWNEE VAG STERIAL T: T FREDE 0CK COUNTY, VRGG 0Q MAY 301 2013 OWNER: SHAWNEE VILLAGE, L.C. 420 W. JUBAL EARLY DRIVE WINCHESTER, VIRGINIA 22601 PHONE: 540-667-2120 DEVELOPER: DAVE HOLLIDAY CONSTRUCTION CO. INC. 420 W. JUBAL EARLY DRIVE WINCHESTER, VIRGINIA 22601 PHONE: 540-667-2120 ENGINEER / SURVEYOR: PENNONI ASSOCIATES INC. 117 EAST PICCADILLY STREET, SUITE 200 WINCHESTER, VIRGINIA 22601 PHONE:540-667-2139 FAX:540-665-0493 Pe�l NLTH 0 MICHAEL S. STICKLEY y y� Uc. No. 031162 ��SS70N'ALGZ OWNER / DEVELOPER SHAWNEE VILLAGE, L.C. C/O DAVE HOLLIDAY CONSTRUCTION CO. INC. 420 W. JUBAL EARLY DRIVE WINCHESTER, VIRGINIA 22601 PHONE: 540-667-2120 OWNER'S SIGNATURE DATE APPROVED BY-. DIRECTOR OF PLANNING AND DEVELOPMENT DATE COUNTY ADMINISTRATOR DATE ILEX OF SHEETS COVER SHEET I OF 4 MASTER DEVELOPMENT PUN 2 OF 4 30F 4 TASKER ROAD IMPROVEMENT PLAN 4 OF 1 TOTAL .AREA: 11.3458 ACRES -I. 917 B SITE ARFA EXISTING ZONING: RA (RURAL ARFAS) WITH RP STANDARDS VIA TDR'S EXISTING USE: VACANT PROPOSED USE: RESIDENTIAL (SINGLE FAMILY ATTACHED) TAX ID NO.: 75-A-86 MAGISTERIAL DISTRICT SHAWNEE OPEN SPACE AREA REWIRED: 30% MAX. DENSITY ALLOWED: 10 D.U. PER ACRE PROPOSED DENSITY: 7.9 D.U. PER ACRE TOTAL ALLOWED UNITS: 81 TOTAL oROPGSED UNITS: 81 NOTES: 1. ALL PROPOSED UTILITIES ARE TO BE CONSTRUCTED UNDERGROUND. SEWER AND WATER CAPACITYARE AVAILABLE FROM FCSA 1. THIS PROPERTY IS SUBJECT TO THE REQUIREMENTS OF THE RP (RESIDENTIAL PERFORMANCE DISTRICT). TDR TABLE DENSITY RIGHTS DENSITY RIGHTS RECEIVED SENDING PROPERTY AVAILABLE BY 75-A-86 37-A-34 3 3 37-A-34B 6 6 21-A-7A 6 6 72-A-30 4 4 72-A-34 15 15 72-A-29C 20 20 TOTAL 54 54 FOR RIGHTS BEING USED FOR A SINGLE FAMILY ATTACHED DEVELOPMENT (54X1.5=81) RIGHTS 9ENG USED=81 PROPERTY UNE - - BUILDING RESTRICTION LNES / SETBACKS — - EXISTING CONTOURS EXISTING 1REDINE 100 YR. RCODPLAA/ — — DO NG STORM DRNN EXISTING WATER MAIN OOSHNG WATER VALVE - I PROPOSED WATER MAR- EXISIING SVATARY SEWER ---. - . PROPOSED SNHRARY SEXIER PROP033D SANTARY FORCE" -—�u---._—s�-- EXISTING GAS TIE PROPOSED GAS I►E G G STEEP SLOPES 2 25% - STEEP SLOPES 2 SOS REVISIONS DATE DESCRIPTION BY DOD 06-11-13 REVISED PER FCSA COMMENTS KLM MSS 10-02-13 REVISED PER COUNTY COMMENTS KLM MSS L54 10-10-1.3 REVISED PER COUNTY COMMENTS KLM MSS 10-30-13 REVISED BOUNDARY LINE KLM MSS 11-18-13 REVISED FOR 80 LOTS KLM MSS 6 11-20-13 ADDED ONE LOT KLM MSS NOTES Nw 1. ON LOT LANDSCAPING SHALL BE PROVIDED PER SECTION 165-203.01 OF THE FREDERICK COUNTY ZONING ORDNANCE. 6 ORNAMENTAL SHRUBS AND 2 ORNAMENTAL TREES SHALL BE PROVIDED PER 5 LOTS. 1 2. 4.14 (40%) ACRES OF TOTAL OPEN SPICE ARE PROPOSED. (PHASE I=1.38 AC., PHASE 11=0.79 AC., PHASE III=0.38 AC., PHASE IV =1.59 AC.) 3. NO TREES OR SHRUBS SHALL BE PLANTED WITHIN FCSA EASEMENTS. 4. THE DMOPMEN0'S COVENANTS SHALL GRANT FCSA THE RIGHT TO ENTER ONTO ANY LOT AND PERFORM PROPERTY REPAIRS OF THE UTILITIES. AREA OF ACCESS SHALL BE TO TIME URUTIES ONLY. ADJ. PROPERTY PROPOSED SITE 56 DAM 30' ItyCINF 20' ACTIVE Bil BUFFER 6' HIGH, OPAQUE FENCE I PROVIDE 3 RANTS PER 10 LF. (1/3 DECDUOUS, 1/3 EVERGREEN, I I 1/3 SHRUBS) I I 10 LANDSCAPED ESMT. I I SECTION PROVIDE 3 PLANTS PER 10 LF. (I/3 DECIDUOUS, 1/3 EVERGREEN, 1/3 SHRIBS) - - - - - - - - - - 20' ACTIVE BUFFER TMdLANDSGWED ESMS 5' - - 30' INACTIVE BUFFER 50, - PROPOSED AYE 5 - - - ADJACENT PROPERTY 10 6' HIGH, OPAQUE FENCE PLAN RESIDENTIAL. SEPARATION BUFFER MOT 10 SOLE I RIGHT-OF-TAY a' INACTIVE I l-10' ACTIVE EARTHEN BERM I I BUFFER AND LADSCAPED AREA PROVW3E 3 P ANTS PER 10 LF. (1/3 DECIDUOUS, 1/3 EVERGREEN, 1/3 SHRUBS) 6' ABOVE AVG. ROAD GRADE 36 I I SECTION 6' EARTHEN EERY AND LANDSCAPED AREA PROVIDE 3 PAPAS PER 10 LF. (1/3 DECIDUOUS, i/3 EVERGREEN, 1/3 SHRUBS) Z.5 1D AC1A£- - 36 15' - - - konko a' NACINE 50' RIGHT-OF-WAY - - - F-T- I I I VARIES , 20.00' TYP. 1 20.00' TYP. TOWNHOUSE ' r. AREA PHASING SUMMARY AREA N ARIA N AREA IN NUMBER ROE;E PROP. USE TOTAL AREA OPEN SPACE ROADS/PKG. SFA LOTS OF LOTS I RESIDENTIAL 2.75 AC. 17500%f 0.52 AC, 0.85 AC. 16 OL74 1 RESIDENTIAL 1.75 AC. If. 0.16 AC. 0.80 AC. 15 0(7�J II RESDETML 1.70 AC 0.17 AC. 1.15 AC. is 1.59 AC. N IESDDRYL 1 4.05 AC. 1 (39%) 1 0.19 AO I 227 AC. 1 32 RECREATIONAL AMENITIES SUMMARY 2,00' 350 NUMBER OF PROPOSED TOWNHOMES 81 • i' WATER METER TAP. RECRFATIOIYL UNTS REQUIRED (I PER 30 UNITS): 27 25 NOG. SETBAX RECREATOIIK UNTS PROPOSED: 3 20.00" 12�• I IYP. IYP. I $W- iJ f SEWER SR1B TYP. PROPOSED RECRUnaHY UNITS SIDEWALK IYP. 27.00' I 0.00' TYP. 1.W' DESCRIPTION REC UNITS PROVIDED CONC. SIDEWMK 5.00' TYP. - TW. .56 TYR TOT LOT I MULIFURPOSE COURT 1 - PICNIC SHELTER I -W W W W W W- _ YN. ON-CEIOER _ Ts -S S 5 S S- 10 PLAN -.--- _-.. _J ROAD EFFICIENCY BUFFER NOT TO SCALE ADJ. PROPERTY PROPOSED SITE 50' BUFFER 25' f1ACThE 25' ACTIVE NFi� BUFFER 6' HIGH, OPAQUE FENCE PROVIDE 3 PUNTS PER 10 LF. (1/3 DECIDUOUS, 1/3 EVERGREEN. 1/3 SHRUBS) I I I I 10 LANDSCAPED ESM7. SECTION PROVIDE 3 PUNTS PER 10 LF. (1/3 DECIDUOUS. i/3 EVERGREEN, 1/3 SHRUBS) - - 25' ACTIVE REEFER JO-IANDSCAKII E PROF ADJACENT PROPERTY 5 10' HIGH. OPAQUE FENCE �- ZONING DISTRICT BUFFER NOT TO TAU 3FOO- WATER AND=-"�22D0' OR 24� OARY SEWER LRE SEWER EASEMENT FACE aF CURB TO 2'R TAP. WATER LANE FACE OF CURB TYPICAL LOT DETAIL SOIF; 1'=20' r PROPOSED 5 l PROP UNDERCROIND Et1s!OY i i /El. R/W LINE IS APPROKIWIE BALSED ON VDOT STATE HIGHWAY PLANS FOR TASKER ROAD DATED OCT. 20, 1983 I i _� HA2K CARD TRUST I DB 780 PG 703 1 &1 RP se.' ocon7 A SCHRAMM LOOP (TYPE 3) URBAN ENTRANCE DRIVE - WIDTH VARIES N1 RESIDENTIAL PERFORMANCE ZONING DISTRICT (RP) .C� ENVIRONMENTAL FEATURES AIffA N ACES TOTAL 06RNHD % 0wum ; N O.S. mu N OS FLODWUQRS 0 0 0 0 0 LAKES AND PONDS 0 0 0 0 0 NATURAL RETENTION NEAS 0 0 0 0 0 SEEP SLOPES (N2A 0.66 034 SIS2S 48.48% 0.32 WETLANDS 0 0 0 0 0 W'OOOIANDS 0.53 1 0.16 A19R 69BiS 031 PROPOSED 5' U V ro V b 1-1 ROW 4F 0 03 TASK U111i cam\ C ROUTOR642POSTED SPE ro VACi� ✓ URBAN ��" �' • G.3 i iI N40_45'47'E 50' REDUCED-DLSTANCE ROAD EFFICIENCY � � �.- -- BIRFFR (a' WIACRVE/10' ACTIVE) M51 1 1 SEE PETAL THIS SHEET L� Ib Tor LOT w< 50' ZONING D60tICT BIffER ^V (25' NACW25 AL'TW ` T SCHRNN LOOP 1 i SEE DETAIL THIS SHEET o (TYPE 2) URBNI 1 �- �24' PRIVATE DRIVE w 3 PHASE IV 32 SINGLE FAMILY ATTACHED (TOWNHOMES) LOTS \ > • • • • • SEWER 1SD 3 SN/f 8' PVC SIR 21 • WRIER LIVE I ' j. Lor / / I • rwi yR75yN IgC�E LC INST.010017570 • �! I 10.2541 ACRES �l m' suN IMP EwT r` 7F PHASE S . STATION/ 16 SINGLE FAMILY PUMP STATION I ' ATTACHED • II 50 REDUCED -DISTANCE ROW EFFICIENCY I(TOWNHOMES) LOTS / BUFFER (a' INACTIVE/10' ACTYT77 I ,AI • BMOIETENTION FILTER SEE DETAIL THIS SHEET I / 30' WATER AND 3" FORCEMAIN SHAM FACIUIY SEWER ESMT. y EI✓((((]]'' J • OPEN SPACE rl(TIFE ,.,,MM,HiA MM LOOPr----WWI--- 2) URBAN1PRIVATE DRIVE a PHASII I � h� PHASE III E - - - �_ 18 SINGLE FAMIL - 15 SINGLE FAMILY • • ` ATTACHED 39212MT� R I I I(TOWNHOMES) LOTS I �ATTACHED'1(TOWNHOMES) l BOUNDARY LINE ADJUSTMENT I • b--.ns --arcs g I 1.0917 AC 1 g I I!I am 50' RESIDENTIAL SEPARATION N 22' PRIVATE DRIVE (30' INACTIVE/20' ACTIVE) jW S SEE DETAIL THIS SHEET 99. _ - _ - g' - - - - - - - - a _ - - 310.73- S45'29'J9 1� CARP 0. RY/INL77FOP0 ANO 'tl\ CAROL 512 PGB \`Use .• Smye Fancyy Residencrr Zoned RA MATCHLINE SHEET 3 � pp55 0o55 g d RLf- R �A HOOFED c o WwX SIDEWALK SHELTER LOCATION DUE TO TOPOGRAPHY�GVT41A OPEN SPACE ' e5 GO • . STREET TREEPVNIED a' d0 - - --Y O.C. PER Fl2F7)FSWd( COUIIY N o DISTRICT AT SITE 0ELEW o o I I TILL-- AT SITE PLAN STAGE � � !a I 25 25 !n < < s °NROO PROS ACTIVE NACIMI o e • I • BUFFER I BUFFER � C k I � I PROPOSED I 1 � PARKING IIT I I I •` .I YI I i Huh � Z C Z I I I Ol V!O 0 o (2f U •I ' I• I I I L`aY5 �LLJ Y Ca- Z i I PIN 75-A-@�'C PAUL I 8£NNSKY -R7A ^ 4 Q Z O • I I I• I I I - c-'ecid ~~ W U 7 I Zcvred 82 Z F-LLJ s �¢ �c:) N . I • SDIWW LOOP • ICI (TYPE 1) I I VIER W�� U3 I 22' PRIVATE ORNE8_ > O i I• f I 7 (QJ� � Q+re • 30' WATER ,HAD I LLJ LIJ J . SEWER ESMT. I I I w -r J f < Is I• � I I � Q i I I S o • � Y I• IL' PIIC 60R r I. I v J oocuYurs lavwm e. vcwnr Aamrts we �nT` NK1RU4xiT OF SF 1 IN W.TpCCr OF FINE WOICR. WATER LIE, L.! L W ro' Y airsFpN- a Yr�nm m • sF OF W� W� `IJ n< w+oAlcr on ON NNV omm waa[n lnrt Txcu[ - I. I 1 � AAIrWT Ylrtrp AvswoY a Anvruioi n FOYUA . asoua¢ ran nc vcac ���nm .0 a a.ne Tali •Tx ro a IN ''� .w nYar.'.airoroiA x.winrtsa.o M J I ARTS G 017 O OR RESULTING MO CYMNTET �J ITixC OV1 OF OY [SYCI�x< ix CN[IXOY. �pR ! o ' 05FVIHt LIVE 35"SNID / in .Y• xn _-OPEN'SPACE V J 16724-1-0 2 OF 4 \65� PIN 75-A-Q7A ' AGAPE CHRIS71AN FEUO*Wp r.Ys onA�Frc xo GOB PG 307 1 =50, Z=R�gious /nstitu(ion O med RA WTI GRAPHIC SCALE �j KLM 50 25' 0',, If AOd ry art 11C IL n'^W1I 5/30/13 mss 7 MATCHLINE SHEET 2 d?- ^C t -, \ -. � 3yFnRM" \ �\ } Cal _ An, 1 , I \ �ES�kA Pam;-= _ -_---,���r' � �'4O \\\ 1 t. 11 '• S �. ^ \, �'' r .��,E-5�•,?A •, 1} � APPROXIMATE LOCATION OF EXISTING RIGHT-OF-WAY �30' WATER AND > ` \\ ./ 1 111011111 !ffffff SANITARY SEWER ESMT - - . \' t8 i ' //jj'' yam` •\\ ,�,r ,T. \ f `\ _ 1 a<<; F � �'� � � j 1 / ;' � � `\ ` 1 � i ' � � ` ��' \ ! � `� II •`V ion GO / /.. `•, ' I 1 I I \ T , `I ,, k •'{y1T Pa t\ < 5' CONCRETE SIDEWALK 2' GRASS STRIP 22.00' P18VAIE DRIVE 2' GRASS STRIP 5' CONCRETE SIDEWALK LLoa —4—� "P I� �Y 'R� `\ ,� I I N W ,NIA s„• Z. 5' CONCRETE SIDEWALK 2' GRASS STRIP 24.00' PRIVATE DRIVE 2' GRASS STRIP 5' CONCRETE SID W I I ' 17 DD' nRrJF IAIF I 17DO' DRIVF IANF I I I 5' CONCRETE SIDEWALK 2' GRASS STRIP TYPE 2 • 24' PRIVATE DRIVE SECTION NOT TO SCALE PRIVATE ENTRANCE DRIVE (WIDTH VARIES) 24' INN. n TYPE 3 - PRIVATE ENTRANCE DRIVE SECTION 2' GRASS STRIP 5' CONCRETE SIDEWALK 2' SM 9.5A 8. 218 mP. � U un p om p LL.LLJ U Z � 4a-Q p �F- 3N U $ zQ sU => 0-Uo(n Z= C) p LLJ LLJ ckf w F- O J Q � Q ti 0 ti OOMIEN0 PRpM[D RE,Mw ASSOCMR3 AAF (VT J\ , wsIM.YExrs OE sEm9cc w HIS,- AF or M vRaEcr. xm wmom OR REPRESEwm To a wrtAtE OR K THE PROIF[BTOR ON Iw1' OTNEVH OJECtXRNSgNS aR.MAY REUSE R1fH0Uf NMTFw HE —AIM OR .NWflagll BI PpNCM S EOII n( SPf�C PUSR wR1CfD YLL AL AT —AS SOLE OR LEGAL • E.—UME ANO H0IDIHN1Mlf5SEPf hOY. ASSOCU1fg U ARISING OUT L INS. —El. LOSSES ANO EXPENSES Of OR RESULTING THEREFROM. aI• Nw 16724-1-0 0 — 3 OF 4 0 V=50' ORNMN M fr+I KLM 5/30/13 MSS �N 12' RIGHT TURN TAPE PROPOSED 12' THRU LANE ENTRANCE - I'll Fu/740 I I �- t SW I GRADE IP XOPOSED GRADE I I 735 I 1S AT¢V EGA 720. 00 G400 0+50 1+00 ENTRANCE PROFILE HORIZONTAL SCALE 1"=50' VERTIGY SCALE. 1•=5' TV •/ TPT-1Y�''' g:- 81 PROPOSED LOTS 5.81 TRIPS/DAY/LOT TOTAL TRIPS=471 CONSTRUCTION ENTRANCE NOTES: 1. SHOULD THE TRACKING OF MUD ON10 THE PUBLIC ROADS BECOMES A PROBLEM, THE FEDERICK COUNTY INSPECTOR MAY REQUIRE WASH RACKS BE INSTALLED AS REDUCED BY THE CONSTRUCTION ENTRANCE DETAIL ON SHEET 3, 2. THE CONTRACTOR WILL RFMO+E ANY MUD THAT IS TRAM ONTO THE ROADWAYS BY THE END OF Am THAT DAY. NOTES: 1. ALL PAVEMENT STRIPING SHALL BE IN ACCORDANCE WITH THE VDGT STMILWm DETAIL P11-3. 2. TICU LANE PAMXNT STRIPING, SHA L MEET AND WATCH THE DUNG 10' SIPS/30' SPACING, 3. ALL PAIEIIENT MIfCNGS EXCEPT FOR THE RIGHT TUN LANE CROSS PATCHING SHALL BE TYPE B, CLASS M. 4. CONTRACTOR TO PROVDE ROAAYAY STRIPING PUN TO VDOT INSPECTOR FOR NEVIEW AND APPRMAL PRIOR TO APPLICATION 5. VOOT EROSION AND SEDIMENT CONTROL CONTRACTOR CERTIFICATION 5 REWIRED. 6. ALL SIGNS INSTALLED ON THE PROPERTY WALL COMPLY WITH TIE REQUIREMENTS OF THE FROXHICK COUNTY ZONING ORDINANCE. NO SANS BEYOND STOP SONS ARE PROPOSED WITH THIS PUN. LIMIT OF DISTURBANCE �j l l "`HP PO STL P P. WRPO Si I (BY OTHERS). i WWEMIRI ! STR 6.0 TYPE DI-3B RIM ELEV.= 735.91 STIR 5.0 TYPE DI-3C� ELEV.= 731.41 ._.AA9T PROP. GRAVEL SHOULDER PROVIDE ES-1 INV. OUT=724.66 PROVIDE EC-1 VDOT CL Al RIPRAP PROVNI6. CLASS A} -RIP-RAP UNING (SEE SHEET33 OF SITE PLAN FOR CHANNEL CALCULATIONS.) 704 - ` ' / (SEE DETAIL PG-3 SHEET 30 OF SITE PLAN) Ian \ Z EXISTING PAVEMENT Q� / IT �O X. R/W LINE IS /AIPIROUKIMATE BASED ON DOT STATE HIGHWAY PLANS FOR.TASKER ROAD /. DATED OCT. 20, 1983 �I m I FOR ROAD WIDENING SECTIONS SEE SHEET 29 OF SITE PLA)I vm D P H 642 " hp SPEED L 11 746.00 ROB " POS , ENO RET. WALL srR zo VA• S �OLLECTOR a SgEY �► TYPE 4 05 URBAN WIDENING RIM ELEV= 745.05 00 y TPT-1 900 _ 1 - 4 V GUARDRAIL _ 4 7 \` 9 TW 746. If END RET.WALE D(ISTING PAVEMENT _ - \ TBW W 74Tpp 744.00 . • w - flow / - - - _ TW 746.00 TW 746:00 4.1 - ° 1; 742) BW 742.00 Pr y PROPOSED 189 LF. �i CONCRETE RETAINING ' WAL✓<, SEE DETAIL SHEET 24 OF SITE • PLAN. ROP. e HP WRPD 1 STL GASI LINE y) 10�+Try ` (@Y OTHtRS) 11 I �T� i _ N 6 Z 000 FOR ROAD WIDENING m4 top SECTIONS SEE SHEET i • 29 OF SITE PLAN1 � HTPROPQSEO 20' WASHINCTON ' 1 Q.)DISTANCE GAS EASEMENT q EASEMENT 1 1 GRAPHIC SCALE '" .- R of w• 20' g• 4D gp• o D' DISTURBANCE I � 3 STOP SIGN w 4 1INCH =aN. STIR 4.0 TYPE DI-3C Go W 3 RIM :ELEV.= 731.41 SIGNING AND PAVEMENT MARKING NOTES LEGEND wan 1. All proposed Signing and POVanent making Wall be m acoardonae RHM. the most rant edllion of eadr of Me falornrg and any mial thereto A. Manua on U.H.- Traff Control D.-. B. The Vrgnvc Spplemeat to Me Manual an Undpm Traffc Coa" OuTAGRe. a me Vrg.,so Department of T a,totian Road and BHdp Specift.tions. D. the Vegn.a Dspo Taeat of Trongortation Road and 11r16ge Standard, 1 Ail pavanant makings Mail be Me 0detic (Type B. Close 1). EXCEPT Two fines .hick ROTOR a pant (Type A) 7. Proposed sign locations appro mate and Wan be modified in Me Mid to o la fllct riM dergiound uHi Ile or ottlsr oWuc trtion. and to comply rith Rtandard. mferena.d n Not. 1. 4, Any e.istn9 pavemant making% wMial N conflict +nth proposed po-ent markings, Mall te'ennpletely (10(m) eradicated. �. Linit. whom of proposed marking. an Oppr .t. and .hall be meddied in Me Mid to nwre t"t Me oroposed paven,mat morkngs aantime un0i eNiting pow ent marking. car, t>a matched. •. All sign. Shon be in a GIRIIG,S .Rh VTOT Standard WSP-1 unlms noted. 7. Sign support pasts Wall not be located ithn 3' of Me 5-foot ride aderalk. BE Proposal posted speed limits regain on engineering speed study stomped ` by a liec.need Profess -di engn..r be eubmilt d to VD.O.T. fa r.Wew and .We-, pAar to >ectAq signs. . All Sign, and paiement mo-gs Wall be r.weed in Me f*d eiM OR VDOT Inapeata prig 1. nrtalaU.. D.AII p-nenl sign posts to be tube type post. `NOT STP-1. Woodan po.t. only Wlored Far aonetrM.U.. Taff. Iiig-9.. R/W VARIES 114•:1' MIN., MATCH U. PVMT. CROSS SLOPE I I I CC-7 8' GRASS STRIP uO-4. SEE DETM TO DAYLIGHT TASKER ROAD (WITH CURB & GUTTER) N1s LEGEND: t 2 1TSAWCUT I� O SM-9.5A SURFACE ASPHALT Re IM-19.10A INTERMEDIATE ASPHALT ee BM-25.0 BASE ASPHALT VDOT-218 AGGREGATE OPEN GRADED SELECT MATERIAL -PER VDOT SP. DaSTWq a 3 5 6 WELL COMPACTED SUBGRADE 6 A" "B '8 t MATCH EXISTING CROSS SLOPE t• OR MATCH EX. TASKER ROAD PVMT. SECTION. WHICHEVER IS GREATER TASKER ROAD WADENING PAVEMENT DESIGN N.T.S. t7 Nm �•G1�1AGG GGm i x o OgnMw - ID Gin e N I E e N) ooa d = z h macro tiro<" 0 4 gJT03 QR° � U ECG O Z !4 LLI 0- Q W F- Z� WELD NI ss CIE,>: dN&o�CULLJ Z OZLLJgQ� E�W�+ �IR O W Q J w H- Z 2 J m � LLJ � � Q oOp- MSRRam el ESPECTYI ' T«urts Mrc (\jU\ wS1RN4NR OR SHORTEDNO OR IY RESPECT Oi TIE VRWER. REUSE . ORMR OORR OIMERs N MSWM Of �� 11E MM.IER OR ON Nor OMEP G CM'FNn PEUSE Chap eRaEN WAe1GT10N OR RatPMigx ITT REWYXR Ass �la REAL `naN°=Me RwroRi NI O.LEGAL • ny E o�OSLR 11PENNOIrI�y LUTES, MID -SNAIL LESS RENNONI 4S10AIE5 RROY ML CLYYS, ONMGpS, LASSES AND ERR `E.IEI SING OUT OR ON RESULTING i O E 16724-1-0 •ea 4 OF 4 iioem l� KLM � 5/30/13 2 ^t 4 MSS • MASTER DEVELOPMENT PA APPLICATION FORM Department of Planning & Development Use Only — Application # l Date Application Received: 1 I PC Meeting Date 111011,3 Fee Amount Paid $ C o" Initials: 1� U 1. Project Title: The Townes at Tasker 2. Applicant: Name: Pennoni Associates Inc. Attn: Scott Stickley, PE Address: 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 3. Property Owner (if different than above): Name: Shawnee Village LC BOS Meeting Date Receipt # Address: 420 W. Jubal Early Drive, Suite 103 Winchester, VA 22601 4. Design Company: Name: Pennoni Associates Inc. Address: 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Telephone: 540-667-2139 Telephone: 540-667-2120 Telephone: 540-667-2139 5. Please list names of all owners, principals, and/or majority stockholders: Shawnee Village LC 6. Magisterial District: Shawnee io - 0CT 1 1 2013 PLANK, .,, ,, rr_,F1 7: Property Loeation�ast side of Rt. 642, Tasker Road and n'StFi of Rt. 846, Rutherford Lane, approximately 0.7 miles south of the 1-81 Interchange 310. (Give State Route # and name, distance and direction from intersection) 8. Is this an original or amended Master Development Plan? Original Amended , Previous MDP# 9. Property Information: a) Property Identification Number (PIN): b) Total Acreage: c) Cut -rent Zoning: d) Present Use: e) Proposed Uses: 16"1!-Alff:% 1- acres ko r -(�,t;OLC. RA with RP Standards VIA TDR;s Vacant Residential 10. If residential uses are proposed, provide the following: a) Density: 7,q Units Per Acre b) Number of Units: c) Housing Types: Single Family Attached 11. Adjoining Property use and zoning: USE North Commercial East Residential South Vacant West Interstate 81 ZONING B2 RA RP I have read the material included in this package and understand what is required by the Frederick County Department of Planning and Development. I also understand that the master development plan shall include all contiguous land under single or common ownership. All required material will be complete prior to the submission of my master development plan application. I (we) hereby certify that this application and its accompanying materials are true and accurate to the best of my (our) knowledge. Applicant(s): k �� Owner(s): Date: Date: Date: Date: Adjoining Property Owners MASTER DEVELOPMENT PLAN Owners of property adjoining the land will be notified of the Planning Commission and the Board of Supervisors meetings. For the purpose of this application, adjoining property is any property abutting the requested property on the side or rear or any property directly across a public right-of-way, a private right-of-way, or a watercourse from the requested property. The applicant is required to obtain the following information on each adjoining property including the parcel identification number which may be obtained from the office of the Commissioner of Revenue. The Commissioner of the Revenue is located on the 1st floor of the Frederick County Adininistration Building, 107 North Kent Street. Name and Property Identification Number Address Name Hack Winifred W Etals c/o Hackwoods L C 974 Tasker Road Stephens City, VA 22655 Property # 75-A-78 Name Boyd John L 521 Tasker Road Stephens City, VA 22655 Property # 75-A-78C Name Rutherford Gary D. & Carolyn 163 Rutherford Lane Stephens City, VA 22655 Property # 75-A-86A Name The Hall Partnership II LLC 373 Tasker Road Stephens City, VA 22655 Property # 75-A-86C Name Agape Christian Fellowship 199 Agape Way Stephens City, VA 22655 Property # 75-A-87C Name Property # Name Property # Name Property # Name Property # 12 i 1--� �� c c� Cl ►�l �� S I-. 5�� ev v W 1 nA-V-S4 " VA Special Limited Power of Attorney County of Frederick, Virginia Frederick Planning Website: www.co.frederick.va.us Department of Planning & Development, County of Frederick, Virginia 107 North Kent Street, Winchester, Virginia 22601 Phone (540) 665-5651 Facsimile (540) 665-6395 Know All Men By These Presents: That I (We) (Name) Shawnee Village LC (Phone) 540-667-2120 (Address) 420 West Jubal Early Drive, Suite 103, Winchester, VA 22601 the owner(s) of all those tracts or parcels of land ("Property") conveyed to me (us), by deed recorded in the Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by Instrument No. 010017570 on Page Parcel: 86 Lot: Block: A Section do hereby make, constitute and appoint: (Name) Pennoni Associates Inc. and is described as 75 Subdivision: (Phone) 540-667-2139 (Address) 117 E. Piccadilly Street, Suite 200, Winchester, VA 22601 To act as my true and lawful attorney -in -fact for and in my (our) name, place and stead with full power and authority I (we) would have if acting personally to file planning applications for my (our) above described Property, including: _Rezoning (including proffers) _Conditional Use Permit _Master Development Plan (Preliminary and Final) _Subdivision Site Plan _Variance or Appeal My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered conditions except as follows: This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or modified. In witness thereof, I (fie) have hereto sey yy(our) hand and seal this y,gf. 20 e 3 , A. N. Signature(s) State of Vi nia, City /County of j 2� /C,� , h .-1`04VI # 157974 • MY COMMISSION. 2 " FYPIRES i, 61 (4lrt rrt r'Z a Notary P'g1�1'd%jni MZD* A�Alirisdiction aforesaid, certify that the person(s) who signed to the foregoing instrument" "'i Tall �t$ed before me and has acknowledged the same before me in the jurisdiction aforesaid this /5t't1q•• 20 13 . Z tale-«( - , , t My Commission Expires: r6 b , 02 q� PD! (o N tary Public COUNTY of FREDERICK Department of Planning and Development 5401665-5651 FAX: 540/ 665-6395 October 10, 2013 Mr. Scott Stickley, PE Pennoni Associates, Inc. 117 E. Piccadilly Street, Suite 200 Winchester, Virginia 22601 RE: Master Development Plan for the Townes at Tasker Property Identification Numbers (PINS): 75-A-86 Second Review Dear Scott: Thank you for providing me with the opportunity to review the master development plan for the proposed development referred to as the Townes at Tasker. Please adequately address each of the comments listed below ° prior to formal submission of the master development plan referenced above: Preliminary Review Comments: 1. Transfer of Development Rights. This project proposes to utilize transfer of development rights (TDR's). The following needs to be addressed: • As discussed, the TDR's need to be severed from the sending property and applied to the receiving property before the MDP can be processed and approved. • Update the TDR table on the coversheet to reference 49 units not 50. 2. Tasker Road Sidewalk. A sidewalk is required along the site's Tasker Road frontage; a waiver is not available for sidewalks required along collector roadways. 3. Future Development Area. Revise the note on sheet 2 to state "future development area — Revised MDP Required (rezoning/additional TDR's required)". 4. BRL's. Label the BRL as indicated on sheet 2. 5. Fees and Public Meeting. The fee for this application includes a $3,000.00 base fee plus $100.00 per acre for the first 150 acres and $50 per acre for the remainder. Fees may change. In,order to continue the review of this Master Development Plan, you will need to submit a complete MDP application, a signed and notarized Special Limited Power of Attorney Form, all review agency comments and review fee, to this department. Approval comments are required from the following agencies: Frederick County Department of Public Works, Frederick County Department of G.I.S., Frederick County Public Schools 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 Mr. Scott Stickley RE: Townes at Tasker MDP October 10, 2013 Page 2 and the Virginia Department of Transportation. Please do not hesitate to contact me with questions regarding this letter. Sincerely, Candice E. Perkins, AICP Senior Planner CEP/pd Attachment Pennoni PENNONI ASSOCIATES INC. CONSULTING ENGINEERS OCT 2 20 ii -UK' C"JUNTY October 2, 2013 PI ANN rf7l."cl �"!ENT Ms. Candice Perkins, AICP County of Frederick Department of Planning and Development 107 North Kent Street Winchester, VA 22601 RE: PRELIMINARY MASTER DEVELOPMENT PLAN TOWNES OF TASKER FIRST REVIEW Dear Candice: We have received your comments dated August 28, 2013 and have revised the plans accordingly. The following are our responses to the comments: 1. Comment: Transfer of Development Rights: This project proposes to utilize transfer of development rights (TDR's). The following needs to be addressed: • The TDR's need to be severed from the sending property. • This project proposes more lots than proposed available TDR's. The MDP can only show the portion of the property where development rights are being applied; the remaining property will need to be shown as vacant (no roads or units can be shown) and a separate MDP processed once more TDR's are acquired or the property is rezoned. • A table needs to be provided on the coversheet stating the number of TDR's being utilized on this property. Response: We are now showing 49 lots as proposed so that we are not exceeding the available TDR's. A TDR table has been added to the cover sheet. 2. Comment: Zoning: The zoning on the coversheet needs to be revised. This property is currently zone RA (Rural Areas) with development rights consistent with the RP (Residential Performance) District through the use of the TDR program. A statement also needs to be provided stating that this property is subject to the requirements of the RP (Residential Performance District). Response: The zoning has been revised and a statement has been added to the cover sheet that the property is subject to the requirements of the RP district. 3. Comment: Proposed Entrance: The VDOT comment provided is not adequate to proceed with this MDP as it does not approve the entrance location and design or state that VDOT is satisfied with the location or the ability to approve this entrance location in the future. Frederick will not schedule the MDP for Planning Commission or Board of Supervisor review or provide approval for an entrance location shown on a MDP that VDOT is not 117 East Piccadilly Street • Winchester, VA 22601 • Ph: 540-667-2139 • Fx: 540-665-0493 www.pennoni.com 1672410 • October 2, 2013 • Page 2 Ms. Candice Perkins Townes at Tasker MDP satisfied with. Please work with VDOT further and submit a VDOT approval. Also indicate why Rutherford Lane was not utilized for site access as discussed during the Comprehensive Plan change. Response: VDOT has signed and approved the MDP as evidenced by the Request for MDP Comments form. The items VDOT mentions in their accompanying e-mail are Site Plan issues related to the design of the entrance and ability to obtain sight distance which we will provide during the site plan stage. The entrance on Rutherford was initially attempted. VDOT would have required realignment of the entire Rutherford and Tasker intersection which would have required a relocation of a heavily laden power pole out of line. VDOT had not foreseen the Tasker Road intersection impacts when reviewed previously. VDOT indicated that they had previously approved an entrance location on Tasker and that site distance could be obtained. Therefore we moved in that direction. 4. Comment: Tasker Road Sidewalk: A sidewalk is required along the site's Tasker Road frontage. Response: We are requesting a waiver of this requirement from the subdivision ordinance due to restrictions in the right-of-way consisting of steep slopes and drainage ditches and due to no other sidewalks remotely in the vicinity of this site. Sidewalks are provided internally from parking areas and provide pedestrian access to each lot and use. 5. Comment: Project Summary: On the coversheet, provide the maximum density, the proposed density, the total allowed units and the actual number being constructed with the development. Response: The project summary has been updated. 6. Comment: Townhouse Dimensional Requirements: the dimensional requirements shown on sheet 2 are incorrect. Response: The dimensional requirements have been updated. 7. Comment: Typical Lot Detail: Revise the lot detail to conform to the revised townhouse dimensional standards. Response: The 25' setback line has been added,to the typical lot detail and the 20' dimension to from the house to the sidewalk has been clarified. 8. Comment: Zoning District Buffer Detail: The detail shows the distance but states no landscaping or fencing is required; these elements are required and need to be shown on the detail. Response: The detail has been revised. 1672410 • October 2, 2013 0 Page 4 Ms. Candice Perkins Townes at Tasker MDP Enclosed are 2 sets of revised plans, the MDP application, Power of Attorney and agency approval sheets for your review. If you have any questions regarding this project please contact us at your convenience. Sincerely, PENNONI ASSOCIATES INC. Enclosures P:\Project\16724-Tasker Rd Parc 86\1-0\Engr\Admin\Correspondence\MDP\Response to Co First Review Comments 10-2-13.docx 1672410 • October 2, 2013 • Page 3 Ms. Candice Perkins Townes at Tasker MDP 9. Comment: Road Efficiency Buffer Detail: The buffer plantings are not consistent with the revised road efficiency buffer standards. Response: The detail has been revised. 10. Comment: BRL's: Remove the BRL's from the buffer areas. Response: The BRL's have been removed. 11. Comment: Lot Lines and Parking Lots: MDP's are general in nature, the lot lines and proposed parking lots need to be removed. Bubbles or shaded areas depicting land uses and recreational units are appropriate. Specific details will be shown at the design plan stage. Response: Lot lines and parking lots have been removed to show a more generalized plan. 12. Comment: Separation Buffers: Parcel 75-A-86A contains a single family detached dwelling; therefore a 50' full screen is. required. It appears that this area is wooded; therefore a tree preservation area may be appropriate. Response: The plan has been revised to show the residential separation buffer and a detail has been added. 13. Comment: Type 3 Drive: Sidewalks need to be shown on both sides of this road detail, a minimum width also needs to be provided. Comment: Sidewalks and a minimum width have been added. 14. Comment: Graphic on Sheet 3: the graphic on sheet 3 should be expanded to show how it relates to the subject property; Rutherford Lane also needs to be labeled along with any easements. Response: The viewport has been expanded and Rutherford Lane has been labeled. 15. Comment: Sheet References: Sheet 4 of the MDP references a number of different sheets (sheets 5, 7 and 11), indicate what plan this is referring to. Response: These notes have been revised. 16. Comment: Fees and Public Meeting: The fee for this application includes a $3,000.00 based fee plus $100.00 per acre for the first 150 acres and $50 per acre for the remainder. This is based on fees as of April 28, 2008. Fees may change. The fees for this MDP need to account for areas that were not subject to the previous MDP and all areas being modified. Please note that your fee check is being returned to you, you may submit the fee when the -• plan is in an approvable form and is ready to be scheduled for review by the Planning Commission and the Board of Supervisors. Response: Acknowledged. • • MASTER DEVELOPMENT PLAN APPLICATION FORM - Department of Planning & Development Use Only — Application # Date Application Received: PC Meeting Date _ _ _ BOS Meeting Date_ Fee Amount Paid $ _ Initials: Receipt # 1. Project Title: The Townes at Tasker 2. Applicant: Name: Pennoni Associates Inc. Telephone: 540-667-2139 Attn: Scott Stickley, PE Address: 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 3. Property Owner (if different than above): Name: Shawnee Village LC Telephone: 540-667-2120 Address: 420 W. Jubal Early Drive, Suite 103 Winchester, VA 22601 4. Design Company: Name: Pennoni Associates Inc. Address: 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Telephone: 540-667-2139 5. Please list names of all owners, principals, and/or majority stockholders: Shawnee Village LC 6. Magisterial District: Shawnee to OCT 2 2013 F : Ty 7. Property Location: East side of Rt. 642, Tasker Road and north of Rt. 846, Rutherford Lane, approximately 0.7 miles south of the 1-81 Interchange 310. (Give State Route # and name, distance and direction from intersection) 8. Is this an original or amended Master Development Plan? Original Amended , Previous MDP# 9. Property Information: a) Property Identification Number (PIN). 75-A-86 b) Total Acreage: 11.35 acres c) Current Zoning: RA d) Present Use: Vacant e) Proposed Uses: Residential 10. If residential uses are proposed, provide the following: a) Density: 8 Units Per Acre b) Number of Units: 80 c) Housing Types: Single Family Attached 11. Adjoining Property use and zoning: USE ZONING North Commercial B2 East South West Residential Vacant Interstate 81 GE I have read the material included in this package and understand what is required by the Frederick County Department of Planning and Development. I also understand that the master development plan shall include all contiguous land under single or common ownership. All required material will be complete prior to the submission of my master development plan application. I (we) hereby certify that this application and its accompanying materials are true and accurate to the best of my (our) knowledge. ft��Applicant(s): Date: Datc: Owner(s)- 11 Date: Date: 0 0 Adjoining Property Owners MASTER DEVELOPMENT PLAN Owners of property adjoining the land will be notified of the Planning Commission and the Board of Supervisors meetings. For the purpose of this application, adjoining property is any property abutting the requested property on the side or rear or any property directly across a public right-of-way, a private right-of-way, or a watercourse from the requested property. The applicant is required to obtain the following information on each adjoining property including the parcel identification number which may be obtained from the office of the Commissioner of Revenue. The Commissioner of the Revenue is located on the 1st floor of the Frederick County Administration Building, 107 North Kent Street. Name and Property Identification Number Address Name Hack Winifred W Etals c/o Hackwoods L C 974 Tasker Road Stephens City, VA 22655 Property # 75-A-78 Name Boyd John L 521 Tasker Road Stephens City, VA 22655 Property # 75-A-78C Name Rutherford Gary D. & Carolyn 163 Rutherford Lane Stephens City, VA 22655 Property # 75-A-86A Name The Hall Partnership II LLC 373 Tasker Road Stephens City, VA 22655 Property # 75-A-86C Name Agape Christian Fellowship 199 Agape Way Stephens City, VA 22655 Property # 75-A-87C Name Property # Name Property # Name Property # Name Property # 12 • General Information Checklist 1. Location map (scale 1:2000). 2. Scale of the MDP is not to exceed 1:100. 3. North Arrow. 4. Legend describing all symbols. 5. Surveyed boundaries of all lots and parcels. 6. Acreage of all parcels included in the MDP. 7. Topography contour lines at acceptable intervals. 8. A schedule of phases, boundary of phases, and order of development. 9. Use, zoning, and property owner of all adjoining properties. 10. Location of proposed uses (location, boundaries, arrangement). 11. Location and treatment of historic structures and sites. 12. History of all land divisions in relation to this tract. 13. Acreage, Location and boundaries of environmental features: floodplains, lakes and ponds, wetlands, natural stormwater retention areas, steep slopes, woodlands. 14. Amount and percentage of disturbed and protected land in common open space. 15 • • Residential Development Information Checklist 1. Location and dimension of Residential Separation Buffers. 2. Acreage in common open space, in housing type, in road rights -of -way, and for the entire development (by Phase). 3. Location and boundaries of housing types. Residential Performance (RP) dimensional requirements should be indicated. 4. Number of dwelling units (by type, phase, and in total). 5. Location and configuration of required recreational facilities. 6. Statement of required and type of facilities to be provided. Infrastructure Information Checklist 1. Location of adjoining streets and utilities. 2. Location, arrangements, and right-of-way widths of roads and property access. 3. Location and arrangement of street entrances, driveways, and parking areas. 4. Location of entrances to the development from public streets. 5. Type of road design (rural or urban). 6. Use of inter -parcel connectors. 7. Traffic impact analysis. To be submitted to the Frederick County Deputy Director — Transportation. 16 • r: 8. Location of sewer and water mains with statements concerning the connection with and availability of facilities. 9. Location and arrangement of electric and gas utilities. Other Design Information Checklist I. Location of Zoning District and Road Efficiency buffers, and examples specifying the screening to be provided. 2. Plan for stormwater management. Location of stormwater facilities. 3. Acreage of each type of environmental protection land. (Amount and percentage of disturbed and protected land in common open space.) Shown in a table format. 4. Amount, boundaries, and location of common open space. (Indicate the percentage of the entire site to be placed in common open space.) 5. Location of environmental protected areas to be included in common open space. County Health Department information Checklist l . Statements and locations pertaining to sewer and water availability. 2. Statements and locations concerning any existing pre- or post -water treatment facilities. —1 L 3. Statements and location of any planned private treatment facilities. 17 bI Special Limited Power of Attorney County of Frederick, Virginia Frederick Planning Website: www.co.frederick.va.us Department of Planning & Development, County of Frederick, Virginia 107 North Kent Street, Winchester, Virginia 22601 Phone (540) 665-5651 Facsimile (540) 665-6395 Know All Men By These Presents: That I (We) (Name) Shawnee Village LC (Phone) 540-667-2120 (Address) 420 West Jubal Early Drive Suite 103, Winchester, VA 22601 the owner(s) of all those tracts or parcels of land ("Property") conveyed to me (us), by deed recorded in the Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by Instrument No. 010017570 on Page and is described as Parcel: 86 Lot: Block: A Section: 75 Subdivision: do hereby make, constitute and appoint: (Name) Pennoni Associates Inc. (Phone) 540-667-2139 (Address) 117 E. Piccadilly Street Suite 200, Winchester, VA 22601 To act as my true and lawful attorney -in -fact for and in my (our) name, place and stead with full power and authority I (we) would have if acting personally to file planning applications for my (our) above described Property, including: _Rezoning (including proffers) FConditional Use Permit F T_Master Development Plan (Preliminary and Final) _Subdivision Site Plan _Variance or Appeal My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered conditions except as follows: This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or modified. In witness thereof, I (We) have hereto se a r (our) hand and seal this I A11\JAY�q,�� 1,J _ , 20(3, A. Signature(s) e / • �'• � EG# 157974 State of ' PUBLIC Vi�nia/County of % 2c. cl ek < c 1c »'To-2 iF. MY COMMISSION ; K r, F" nIRES _ I, ►/b1 �h v� 1 !� l--V+ W m n a Notary Nblid -.in'- a3t&6c�t� � % jurisdiction aforesaid, certify thatthe person(s) who signed J the foregoing instrument', fatly' ,� ed before me and has acknowledged the same before me in the jurisdiction aforesaid this / d4 ��,� 20 13 . / d e-& � My Commission Expires: r& b , � g, ilo I (o tary Public REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS Virginia Department of Transportation Mail to: Virginia Department of Transportation Attn: Resident Engineer 14031 Old Valley Pike Edinburg, Virginia 22824 Phone: (540) 984-5600 Hand deliver to: Virginia Department of Transportation Attn: Resident Engineer 2275 Northwestern Pike Winchester, Virginia 22603 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach three t3) copies of the Master Development Plan with this sheet. Applicant's Name: Pennoni Associates Inc. Mailing Mailing Address: Attn: Scott Stiekley, PE 117 E. Piccadi I Street, Suite 200 Winchester, VA 22601 Name of development and/or description of the request: The Townes at Tasker Telephone: 540-667-2139 Location of Property: East side of Rt. 642, Taske_ r Road and north of Rt. 846, Rutherford Lane, approximately 0.7 miles south of the 1-81 Interchange 310. Virginia Department of Transportation Comments: See attached email from _Matt Smith. VDOT to -Scott Stickley with Pennon Associates dated July 9, 2013. -VDOT USE ONLY - Date Received/3 Review Numbe6 2 3 4 5 (circle one) Date Reviewed ^, / Revision Required Date Approved �/'/9 ;3 VDOT Signature & Date: ���—�-_ii ` �1 ** Please Return Form to Applicant** 18 w • • Karen Flynn From: Scott Stickley Sent: Tuesday, July 09, 2013 10:37 AM To: Ronald Mislowsky Cc: Karen Flynn Subject: FW: Master Development Plan for The Townes At Tasker, Route 642 - Frederick County Attachments: Scanned from EDNXerox.pdf Scott Stickley, PE Pennoni Associates Inc. Office 540-667-2139 1 Direct 540-771-2086 Fax 540-665-0493 1 Mobile 540-622-3405 From: Funkhouser, Rhonda (VDOT) [mailto:Rhonda. Fun khouser VDOT^Virginia. oy] On Behalf Of Smith, Matthew, P.E. (VDOT) Sent: Tuesday, July 09, 2013 10:35 AM To: Scott Stickley Cc: Bishop, John. (VDOT); Ingram, Lloyd (VDOT); Smith, Matthew, P.E. (VDOT) Subject: Master Development Plan for The Townes At Tasker, Route 642 - Frederick County A VDOT review has been conducted on the Master Development Plan (MDP) for The Townes at Tasker dated 5/30/2013. Based off of the review of the MDP, VDOT has no objection to the proposed development concept with the caveat that VDOT has not approved the proposed entrance and associated roadway improvements design. Obtaining minimum required sight distance and entrance grades may be challenging at the shown entrance location. An entrance design meeting VDOT's minimum commercial standards will need to be included with the development's Site Plan submitted to this office for review and approval prior to any development. If you have any questions or need further information, please do not hesitate to contact me. Matthew B. Smith, P.E. Area Lund Use Engineer- VDOT - Land Development Clarke, Frederick, Shenandoah & Warren Counties 14031 Old Valley Pike Edinburg, VA 22824 Phone # (540) 984-5615 Fax # (540) 984-5607 • REQUEST FO"j ASTER DEVELOPMEN' PLAN COMMENTS Frederick County Frederick County Inspections Department Comment Mail to: Frederick County Inspections Department Attn: Building Official 107 North Kent Street, Winchester, Virginia 22601 Hand deliver to: Frederick County Inspections Dept. 107 North Kent Street, 2nd Floor f` L) Winchester, Virginia 22601 Public b ork�"k Counc Phone: (540) 665-5650 inspections Applicant: It is your responsibility to complete this fonn as accurately as possible in order to assist the agency with their review. PIcasc attach two (2) gopics of the MustMust�lopnn:nt Plan with this slx 4t. Applicant's Name: Pennoni Associates Inc. Telephone: 540-667-2139 Mailing Address: Attn: Scott Stiekley, PE _ 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Name of development and/or description of the request: The Townes at Tasker Location of Property: East side of Rt. 642, Tasker Road and north of Rt. 846 Rutherford Lane approximately 0.7 miles 5guth of the 1-81 Interchange 310. — Inspection-,; Comments: - - RI:DERICK COUNTY INSPECTIONS DEPARTMENT USE ONLY - Date Received Review Number 1 2 3 4 5 (circle one) Date Reviewed 1 1 Revision Required j._ Date Approved COI Signature & Date:- G** Please Return Form to Applicant** 20 Frederick County Public Schools to ensure all students an excellent education K. Wayne Lee, Jr. LEED GA - Coordinatorof Planning and Development - leew@frederick.k12.va,us July 9, 2013 Mr. Scott Stickley Pennoni Associates Inc. 117 East Piccadilly Street, Suite 200 Winchester, VA 22601 Re: The Townes at Tasker — Master Development Plan Dear Scott: Frederick County Public Schools has reviewed the Townes at Tasker master development plan submitted to us on June 5, 2013. We offer the following comments: 1. The cumulative impact of this development and other developments in Frederick County will require construction of new schools and support facilities to accommodate increased student enrollment. We estimate that the 80 single-family attached units in in this development will house 28 students: 8 high school students, 7 middle school students, and 13 elementary school students. In order to properly serve these additional students, Frederick County Public Schools would spend $292,000 more per year in operating costs (or $3,650 per unit per year) and $1,059,000 in one-time capital expenditures (or $13,238 per unit). You will find, enclosed with this letter, a more detailed assessment of the estimated impact 'of The Townes at Tasker on FCPS, including attendance zone information. 2. It is noted that the proposed streets will be private, that a taper is provided as a right turn lane into the development, and that the development's entrance is located on a curve in Tasker Road. This arrangement presents us with a safety issue. We don't stop buses in Tasker Road travel lanes unless we have to, because of problems we have experienced over the years. The taper does not provide enough room for a 40' bus to completely pull off of the road. We do not enter private lanes and parking lots with buses. Private lanes are often not maintained well enough, especially in the winter, for us to provide safe, reliable bus service. For the safety of the children who will live in this development, and those who ride the buses with them, we would like to see a designated area, outside of travel lanes, for a school bus stop. 1415 Amherst Street P.O. Box 3508 Winchester, Virginia 22604-2546 www,frederick. k12,va, us 540-662-3889 Ext. 88249 540-662-4237fax i Please feel free to contact meat leew a,frederick.kl2.va.us or 540-662-3888 x88249 if you have any questions of comments. Sincerely, K. Wayne Lee, Jr., LEED GA Coordinator of Planning and Development enclosure cc: Dr. David Sovine, Superintendent of Schools Mr. Albert Orndorff,, Assistant Superintendent for Administration Mr. John Grubbs, Transportation Director Mrs. Elizabeth Brown, Supervisor of Driver Operations Project Name: Assessment Date: Housing Type Single -Family Detached Single -Family Attached Mobile Home/Other Totals School Cost Program Capacity Per Student Cost Students Generated by this Development This Development's Impact on FCPS { Frederick County Public Schools Development Assessment The Townes at Tasker July 8, 2013 Student Generation Housing Units 0 80 0 0 80 Costs Elementary School Student Generation 0 13 0 0 13 Costs Elementary School Cost (2014-19 CIP) $23,475,000 850 $27,618 13 $359,000 Middle School Student Generation 0 7 0 0 7 Middle School Cost (2014-19 CIP) $38,930,000 940 $41,415 7 $2 High School Student Generation 0 8 0 0 8 High School Cost (2014-19 CIP) $64,140,000 1250 $51,312 8 Total Student Generation 0 28 0 0 Total Capital Costs • i Annual Operational Costs FY 2013 Budgeted Cost Total Student Annual Per Student Generation Impact This Development's Impact on FCPS Operational Costs $10,437 28 -S2921001 i School Facility Information Elementary School (Grades Middle School High School K-5) (Grades 6-8) (Grades 9-12) 2012-13 School Attendance Zone* Orchard View Admiral Byrd Sherando September 14, 2012 Student Enrollment 401 953 1,440 2012-13 Program Capacity 564 850 1,400 * - School Attendance Zones are subject to change. • 0 i COUNTY of FREDERICK Department of Public Works 540/665-5643 FAX.- 540/678-0682 June 20, 2013 Mr. Scott Stickley, P.E. Pennoni Associates, Inc. 117 E. Piccadilly Street, Suite 200 Winchester, Virginia 22601. RE: The Townes at Tasker Master Development Plan Comments Frederick County, Virginia Dear Scott: We have completed our review of the subject master development plan and offer the following comments: 1. In order to perform the necessary road improvements, off -site excavation will be required to extend the culvert located north of the property. It will be necessary to obtain easements from Paul E. and Roberta Bennsky prior to site plan approval. Please submit copies of the recorded easements. 2. All stormwater facilities shall conform to the water quantity and water quality standards of Frederick County and the Virginia Department of Conservation (DCR) and Recreation/Department of Environmental Quality (DEQ). 3. Verify whether or not DEQ permits will be required to cross the 100-year flood plain during the installation of the water and sewer lines. Verification that all off - site easements have been obtained shall be provided prior to site plan approval. 4. The pavement design proposed for the Tasker Road widening project indicates a requirement of 8.0 inches of BM-25.0 Base Asphalt. Ensure that this pavement thickness is correct. 5. An overlot grading plan shall be submitted for all proposed structures at the time of site plan submittal. T:\Rhonda\TEMPCOMMEN'rS\TO W NES@TASKERPMDPCOM.doe The Townes at Tasker Master Development Plan Comments Page 2 June 20, 2013 If you should have any questions, do not hesitate to contact me. Please submit one.(1) copy of the revised plan for further review.. Sincerely, AC 4/d/,OZ- Joe C. Wilder Deputy Director of Public Works JCW/rls cc: Planning and Development file T:U2ttottdakTGMPCOMMCiY'rWl'oir'Ni:So'r11SKF RPMllPCUDt.doe riull=rleuelll:K t,u CI1e aOcue 34U 0/o 4iJy UQIUOl1IJ I3.ul MIJ3 r.uulluuL Frederick County Fire and Rescue Department Office of the Fire Marshal Plan Review and Comments Date received Control number MD? 13 -0 0 01 6/3/2013 Project Name Townts at Tasker- Tasker Rd. N. of Rutherford Ln. Address City 117 E. Piccadilly St., Suite 20C Winchester Type Application Tax 10 Number Master Development Plan 75-A-86 Current Zoning Date reviewed 6/6/2013 Applicant Scott Stickley, PE State Zip VA 22601 Fire District 11 Residential Pert Recommendations Automatic Sprinkler System Automatic Fire Alarm System No No Other recommendation Requirements Emergency Vehicle Access Hydrant Location Adequate Not Identified Siamese Location Roadway/Aisleway Width Not Identified Adequate Emergency Vehicle Access Comments Access Comments Additional Comments Pian Approved Plan Approval Recommended Reviewed By Yes Kenneth S: ott Date Revised Applicant Phone 540-667-2139 Rescue District 11 Election District Shawnee Residential Sprinkler System Yes Fire Lane Required Yes Special Hazards No Signature Title rruIll. rIUUe[IGK uu rrIt! a 19CUe 34u oro 41Jy vorus i.t io:uc #iyo r.uueiuue RECEIVED JON 03 2M REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS Frederick County Fire Marshal Comment Mail to: Frederick County Fire Marshal Attn: Fire Marshal 1800 Coverstone Drive Winchester, Virginia 22602 Hand deliver to: Public Safety Building 1800 Coverstone Drive Winchester, Virginia 22602 Phone: (540) 665-6350 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the Master Development Plan with this sheet. Applicant's Name Mailing Address: Pennoni Associates Inc. Telephone: 540-667-2139 Attn: Scott Stickler PE 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Dame of development and/or description of the request: The Townes at Tasker Location of Property: East side of Rt. 642, Tasker Road and north of Rt. 846, Rutherford Lane approximately D.7 miles south of the 1-81 Interchange 310. Fire Marshal Comments: ►- _ t^ h t C -FREDERICK COUNTY FIRE ,MARSHAL USE ONLY - Date Received 13 Review Number 1 2 3 4 5 (circle one) DateReviewed L13 Revi�S 1 Revision Acquired / Date Approved Signature & Date: /r, ( � ' Please Return Form to Applicant"* 22 • • �Pennom D � �f PENNON) ASSOCIATES INC. CONSUMNO ENGINEM 117 East Piccadilly Street Winchester, VA 22601 Tel: 540 — 667 - 2139 Fax 640 — 665 - 0493 LYY` LETTER OF TRANSMITTAL Jam'• Frederick County Sanitation Authority Y.O. Box 1877 Winchester, VA 22604 DATE June , 2013 JOB NO. 1672410 ATTH1f10 Earl Wiley RE: I The Townes at Tasker WE ARE SENDING YOU ® Attached ❑ Under separate cover via the following items: ❑ Shop Drawings ❑ Prints ® Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Change Order ❑ -- THESE ARE TRANSMITTED as checked below: ® For approval ❑ Approved as submitted ❑ For your use ❑ Approved as noted ❑ As requested (j Returned for corrections ❑ For review and comment ❑ __ ❑ FOR BIDS DUE _ REMARKS ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US COPY TO Scott Stickley, PE If enclosures are -nowt as noted, kindly notify us at once. pfoury W1)P � i TR8100 11120113 • • REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS Frederick County Parks and Recreation Comment Mail to: Frederick County Department of Parks & Recreation 107 North Kent Street Winchester, Virginia 22601 Hand deliver to: 107 North Kent Street Second Floor Winchester, Virginia 22601 Phone: (540) 665-5678 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach one (I ► eoi)Y___Qth _ aster Dcvcicmm� nt.l'I:m with this sheet. Applicant's Name: Pennoni Associates Inc. Telephone. 540-667-2139 Mailing Address: Attn: Scott Stickley, PE 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Name of development and/or description of the request: The Townes at Tasker Location of Property: East side of Rt. 642 Tasker Road and north of Rt. 846, Rutherford Lane, approximately 0.7 miles south of the 1-81 Interchange 310. _ -FREDERICK COUNTY PARKS AND RECREATION USE ONLY - Date Received Review Number 1 2 3 4 5 (circle one) d Date Revewe Revision Reduced 1 1 proved Signature & Date: AJ? ** Please Return Form to Applicant** • REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS Virginia Department of Health Comment Mail to: Hand deliver to:�� Virginia Department of Hcalth 2°' Floor — Suite 200 Attn: Sanitation Eneineer 107 North Kent Street 107 North Kent Street Winchester. Virginia 22601 Winchester, Virginia 22601 Phone: (540) 722-3480 Applicunc It is your responsibility to complete this limn as accurately as possible in oiler to assist the agency witit their review. Please attach one (1) copy orthe ivla,ter Developtncat Plan with this sheet. Applicant's Name: Pennoni Associates Inc. 'Telephone: 540-667-2139. Mailing Address: Attn: Scott Stickley, PE 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Name of development and/or description of the request: The Townes at Tasker Location of Property: East side of Rt. 642, Tasker Road and north of Rt. 846, Rutherford Lane, approximated 0.7 miles south of the 1-81 Interchange 310. VDH Comments: _�'��.�E1�.peL���'+1��1+3.•li'..�jct):ht"'..ycL_tr•1q_�1jJt_i1�..LLlctltiL si.LS'-�!"•��tlt_4�t�L�^�- _ NIRCINIADEPAR'rNIENTOFUEAL HUSEONLY- Date Received Review `'umber I ? : -4 5 (circle anel Datc Reviewed Revision Required Signature & Date; = Date Approved _. ** Please Return Norm to Applicant** 25 • • REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS Virginia Department of Transportation Mail to: Virginia Department of Transportation Attn: Resident Engineer 14031 Old Valley Pike Edinburg, Virginia 22824 Phone: (540) 984-5600 Hand deliver to: Virginia Department of Transportation Attn: Resident Engineer 2275 Northwestern Pike Winchester, Virginia 22603 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency witi, their review. Please attach three (3) copies of the Master Development Plan with this sheet. Applicant's Name: Pennoni Associates Inc. Telephone: 540-667-2139 Mailing Address: Attn: Scott Stickley, PE 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Name of development and/or description of the request: The Townes at Tasker Location of Property: East side of Rt. 642, Tasker Road and north of Rt. 846, Rutherford Lane, approximately 0.7 miles south of the 1-81 Interchange 310. Virginia Department of Transportation Comments: _See attached email from Matt Smith, VDOT to Scott Stickley with Pennoni _ Associates dated July 9, 2013. _ -VDOT USE ONLY - Date Received ! Review Numbed 2 3 4 5 (circle one) Date Reviewed Ar Revision Required _ Date Approved VDOT Signature & Date: �r ** Please Return Form to Applicant' 1* Karen Flynn From: Scott Stickley Sent: Tuesday, July 09, 2013 10:37 AM To: Ronald Mislowsky Cc: Karen Flynn Subject: FW: Master Development Plan for The Townes At Tasker, Route 642 - Frederick County Attachments: Scanned from EDNXerox.pdf Scott Stickley, PE Pennoni Associates Inc. Office 540-667-2139 1 Direct 540-771-2086 Fax 540-665-0493 1 Mobile 540-622-3405 From: Funkhouser, Rhonda (VDOT)[mailto:Rhonda. Funkhouser@VDOT.Vir iq nia.gov] On Behalf Of Smith, Matthew, P.E. (VDOT) Sent: Tuesday, July 09, 2013 10:35 AM To: Scott Stickley Cc: Bishop, John. (VDOT); Ingram, Lloyd (VDOT); Smith, Matthew, P.E. (VDOT) Subject: Master Development Plan for The Townes At Tasker, Route 642 - Frederick County A VDOT review has been conducted on the Master Development Plan (MDP) for The Townes at Tasker dated 5/30/2013. Based off of the review of the MDP, VDOT has no objection to the proposed development concept with the caveat that VDOT has not approved the proposed entrance and associated roadway improvements design. Obtaining minimum required sight distance and entrance grades may be challenging at the shown entrance location. An entrance design meeting VDOT's minimum commercial standards will need to be included with the development's Site Plan submitted to this office for review and approval prior to any development. If you have any questions or need further information, please do not hesitate to contact me. Matthew B. Smith, P.E. Arent Lund Use Engineer VDOT - Land Development Clarke, Frederick, Shenandoah & Warren Counties 14031 Old Valley Pike Edinburg, VA 22824 Phone # (540) 984-5615 Fax # (540) 984-5607 Pennon PENNONI ASSOCIATES INC. CONSULTING ENGINEERS MEMORANDUM TO: Candice Perkins, Frederick County Planning FROM: Ron Mislowsky, PEOM DATE: July 23, 2013 SUBJECT: Townes at Tasker CC: Dave Holliday, Shawnee Village LC To support a development on the 11 acre parcel on Tasker Road, Tax Map ID 75-A-86, we have prepared a TDR application and Master Plan as required by the County ordinance. Both applications along with MDP comment sheets are provided. The Master Plan proposes 80 townhouse lots be developed off of a new entrance on Tasker Road. This location has been approved by VDOT. Public water is available on Tasker. Sewer service will be extended from the Shawnee Village Apartments site. Easements are in hand to allow this extension. The TDR application proposes the transfer of 50 units from 4 lots to the development site. This will allow Phase One of the project to proceed. Once construction is underway, the owner will submit a request for rezoning of the parcel to allow "the remaining 30 units, conditioning the zoning on proffered mitigation as determined by the impact model or as negotiated with the Board of Supervisors. If you have any questions on this application please feel free to contact me or Mike Hammer. 117 East Piccadilly Street • Winchester, VA 22601 • Ph: 540-667-2139 • Fx: 540-665-0493 www.pennoni.com Application # PC Meeting Date Fee Amount Paid S • • MASTER DEVELOPMENT PLAN APPLICATION FORM - Department of Planning & Development Use Only — Date Application Received: Initials: 1. Project Title: The Townes at Tasker 2. Applicant: BOS Meeting Date_ Receipt # Name: Pennoni Associates Inc. Telephone: 540-667-2139 Attn: Scott Stickley, PE Address: 117 E. Piccadilly Street, Suite 200 Winchester. VA 22601 3. Property Owner (if different than above): Name: Shawnee Village LC Address: 420 W. Jubal Early Drive, Suite 103 Winchester, VA 22601 4. Design Company: Name: Pennoni Associates Inc. Address: 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Telephone: 540-667-2120 Telephone: 540-667-2139 5. Please list names of all owners, principals, and/or majority stockholders: Shawnee Village LC 6. Magisterial District: Shawnee 10 7. Property Locationfast side of Rt. 642, Tasker Road and north of Rt. 846, Rutherford Lane, approximately 0.7 miles south of the 1-81 Interchange 310. (Give State Route # and name, distance and direction from intersection) 8. Is this an original or amended Master Development Plan? Original Amended , Previous MDP# 9. Property Information: a) Property Identification Number (PIN): 75-A-86 b) Total Acreage: 11.35 acres c) Current Zoning: RA d) Present Use: Vacant e) Proposed Uses: Residential 10. If residential uses are proposed, provide the following: a) Density: 8 Units Per Acre b) Number of Units: 80 c) Housing Types: Single Family Attached 11. Adjoining Property use and zoning: USE ZONING North Commercial B2 East Residential South Vacant West Interstate 81 m I have read the material included in this package and understand what is required by the Frederick County Department of Planning and Development. I also understand that the master development plan shall include all contiguous land under single or common ownership. All required material will be complete prior to the submission of my master development plan application. I (we) hereby certify that this application and its accompanying materials are true and accurate to the best of my (our) knowledge. Applicant(s): Date: Date: Owner(s): Date: Date: • Adjoining Property Owners g P tY MASTER DEVELOPMENT PLAN Owners of property adjoining the land will be notified of the Planning Commission and the Board of Supervisors meetings. For the purpose of this application, adjoining property is any property abutting the requested property on the side or rear or any property directly across a public right-of-way, a private right-of-way, or a watercourse from the requested property. The applicant is required to obtain the following information on each adjoining property including the parcel identification number which may be obtained from the office of the Commissioner of Revenue. The Commissioner of the Revenue is located on the 1st floor of the Frederick County Administration Building, 107 North Kent Street. Name and Property identification Number Address Name Hack Winifred W Etals c/o Hackwoods L C 974 Tasker Road Stephens City, VA 22655 Property # 75-A-78 Name Boyd John L 521 Tasker Road Stephens City, VA 22655 Property # 75-A-78C Gary D. & Carolyn 163 Rutherford Lane Stephens City, VA 22655 peRutherford erty # 75-A-86A Name The Hall Partnership 11 LLC 373 Tasker Road Stephens City, VA 22655 Property # 75-A-86C Name Agape Christian Fellowship 199 Agape Way Stephens City, VA 22655 Property # 75-A-87C Name Property # Name Property # Name Property # Name Property # 12 Required Information Checklist MASTER DEVELOPMENT PLAN The following information must be included on the master development plan. If the submitted master development plan is incomplete or is missing information, it will not be reviewed and will be returned to you for revisions. Administrative Information Checklist l . Name of proposed development. 2. Name, address, and telephone number of owner. 3. Name, address, and telephone number of developer. 4. Name, address, and telephone number of designer. 5. Signed certificate of surveyor, engineer, or architect. 6. Date plan prepared and date of revisions. 7. A listing of all conditions placed on the site as a result of a conditional zoning approval. Rezoning file number should be cited. 8. A space labeled "Approved by the Director of Planning and Development" for the approval signature and date of approval. 9. A space labeled "Approved by the County Administrator" for the approval signature and date of approval. 10. Magisterial District. 11. Sheet size less than 42 inches. 14 General Information Checklist 1. Location map (scale 1:2000). 2. Scale of the MDP is not to exceed 1:100. 3. North Arrow. 4. Legend describing all symbols. 5. Surveyed boundaries of all lots and parcels. 6. Acreage of all parcels included in the MDP. 7. Topography contour lines at acceptable intervals. 8. A schedule of phases, boundary of phases, and order of development. 9. Use, zoning, and property owner of all adjoining properties. 10. Location of proposed uses (location, boundaries, arrangement). 11. Location and treatment of historic structures and sites. 12. History of all land divisions in relation to this tract. 13. Acreage, Location and boundaries of environmental features: floodplains, lakes and ponds, wetlands, natural stormwater retention areas, steep slopes, woodlands. 14. Amount and percentage of disturbed and protected land in common open space. MI Residential Development Information Checklist 1. Location and dimension of Residential Separation Buffers. 2. Acreage in common open space, in housing type, in road rights -of -way, and for the entire development (by Phase). 3. Location and boundaries of housing types. Residential Performance (RP) dimensional requirements should be indicated. 4. Number of dwelling units (by type, phase, and in total). 5. Location and configuration of required recreational facilities. 6. Statement of required and type of facilities to be provided. Infrastructure Information Checklist 1. Location of adjoining streets and utilities. 2. Location, arrangements, and right-of-way widths of roads and property access. 3. Location and arrangement of street entrances, driveways, and parking areas. 4. Location of entrances to the development from public streets. 5. Type of road design (rural or urban). 6. Use of inter -parcel connectors. 7. Traffic impact analysis. To be submitted to the Frederick County Deputy Director — Transportation. 16 8. Location of sewer and water mains with statements concerning the connection with and availability of facilities. 9. Location and arrangement of electric and gas utilities. Other Design Information Checklist 1. Location of Zoning District and Road Efficiency buffers, and examples specifying the screening to be provided. 2. Plan for stormwater management. Location of stormwater facilities. 3. Acreage of each type of environmental protection land. (Amount and percentage of disturbed and protected land in common open space.) Shown in a table format. 4. Amount, boundaries, and location of common open space. (Indicate the percentage of the entire site to be placed in common open space.) 5. Location of environmental protected areas to be included in common open space. County Health Department Information Checklist 1. Statements and locations pertaining to sewer and water availability. 2. Statements and locations concerning any existing pre- or post -water treatment facilities. C 3. Statements and location of any planned private treatment facilities. WA Special Limited Power of Attorney County of Frederick, Virginia Frederick Planning Website: www.co.frederick.va.us Department of Planning & Development, County of Frederick, Virginia 107 North Kent Street, Winchester, Virginia 22601 Phone (540) 665-5651 Facsimile (540) 665-6395 Know All Men By These Presents: That I (We) (Name) Shawnee Village LC (Phone) 540-667-2120 (Address) 420 West Jubal Early Drive, Suite 103, Winchester, VA 22601 the owner(s) of all those tracts or parcels of land ("Property") conveyed to me (us), by deed recorded in the Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by Instrument No. 010017570 on Page and is described as Parcel: 86 Lot: Block: A Section: 75 Subdivision: do hereby make, constitute and appoint: (Name) Pennoni Associates Inc. (Phone) 540-667-2139 (Address) 117 E. Piccadilly Street, Suite 200, Winchester, VA 22601 To act as my true and lawful attorney -in -fact for and in my (our) name, place and stead with full power and authority I (we) would have if acting personally to file planning applications for my (our) above described Property, including: Rezoning (including proffers) _Conditional Use Permit Master Development Plan (Preliminary and Final) _Subdivision 571 Site Plan Variance or Appeal My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered conditions except as follows: This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or modified. In witness thereof, I OKe) have hereto sey y�(our) hand and seal this , a _ y�af_ 111 lu C , 20(3, A. Signature(s) c PUBLIC P ' G # 157974 State of Vi nia, City/County of��rLc'/re 1 c- (e, � o-s�viFE r^ ; MY COMMISSION � t EXPIRES 2 I, iM � r-h vtc= L m t ►'Z a Notary I;itl. l)c•.in:. "18or'� jurisdiction aforesaid, certify that the person(s) who signed to the foregoing instrument` al ed before me and has acknowledged the same before me in the jurisdiction aforesaid this /9 'd� , v' _ , 20 1 S . ,i My Commission Expires: F&b. ;2 g. 9-016 tary Public REQUEST FOIKMASTER DEVELOPMEN) PLAN COMMENTS Frederick County Frederick County Inspections Department Comment Mail to: Frederick County Inspections Department Attn: Building Official 107 North Kent Street, Winchester, Virginia 22601 Hand deliver to: Frederick County Inspections Dept. 107 North Kent Street, 2"" Floor —• V ED Winchester, Virginia 22601 Public Works:! runty Phone: (540) 665-5650 pectionS Applicant: It is your responsibility to complete this fonn as accurately as possible in order to assist the agency with their review. Please attach two (2 ) copies of the Master Development Plan with this sheet. Applicant's Name: Pennoni Associates Inc. Mailing Address: Attn: Scott Stickler, PE 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Name of development and/or description of the request: The Townes at Tasker Telephone: 540-667-2139 Location of Property: East side of Rt. 642 Tasker Road and north of Rt. 846 Rutherford Lane, approximately 0 7 miles south of the 1-81 Interchange 310 Inspections Date Received Date Reviewed Revision Requi Signature & Date: CK COUNTY INSPECTIONS DEPARTMENT USE ONLY - Review Number 1 2 3 4 5 (circle one) Date Approved 441711-3 ** Please Return Form to Applicant** 20 Department of Public Works 5401665-5643 FAX: 540/ 678-0682 June 20, 2013 Mr. Scott Stickley, P.E. Pennoni Associates, Inc. 117 E. Piccadilly Street, Suite 200 Winchester, Virginia 22601. RE: The Townes at Tasker Master Development Plan Comments Frederick County, Virginia Dear Scott: We have completed our review of the subject master development plan and offer the following comments: 1. In order to perform the necessary road improvements, off -site excavation will be required to extend the culvert located north of the property. It will be necessary to obtain easements from Paul E. and Roberta Bennsky prior to site plan approval. Please submit copies of the recorded easements. ` 2. All stormwater facilities shall conform to the water quantity and water quality standards of Frederick County and the Virginia Department of Conservation (DCR) and Recreation/Department of Environmental Quality (DEQ). 3. Verify whether or not DEQ permits will be required to cross the 100-year flood plain during the installation of the water and'sewer lines. Verification that all off - site easements have been obtained shall be provided prior to site plan approval. 4. The pavement design proposed for the Tasker Road widening project indicates a requirement of 8.0 inches of BM-25.0 Base Asphalt. Ensure that this pavement thickness is correct. 5. An overlot grading plan shall be submitted for all proposed structures at the time of site plan submittal. T:\Rbonda\TEMPCOMMENTS\TOW NES@TASKERPMDPCOM.doc The Townes at Tasker Master Development Plan Comments Page 2 June 20, 2013 If you should have any questions, do not hesitate to contact me. Please submit one (1) copy of the revised plan for further review. Sincerely, Joe C. Wilder Deputy Director of Public Works JCW/rls cc: Planning and Development file T:\Rhonda\TEMPCOMMENTS\TOWNES@TASKERPMDPCOM.doe r i um : r l eue i I UK l,U r i l e a rie (tUe R D4u 0/0 41Jy uoiuf/Lull) ID.Ul iflyo r.uuituuL Control number Date received Date reviewed Date Revised MDP 13 -0 001 6/3/2013 6/6/2013 Project Name Applicant Towat5 at Tasker - Tasker Rd. N. of Rutherford Ln. Scott Stickley, PE Address City State Zip 117 E. Piccadilly St., Suite 200 Winchester VA 22601 Type Application Tax ID Number Fire District Master Development Plan 75-A-86 11 Current Zoning Residential Perf Recommendations Automatic Sprinkler System Automatic Fire Alarm System No No Other recommendation Requirements Emergency Vehicle Access Hydrant Location Adequate Not Identified Siamese Location Roadway/Aisleway Width Not Identified Adequate Emergency Vehicle Access Comments Access Comments Additional Comments Plan Approved Plan Approval Recommended Reviewed By Yes Kenneth Scott Applicant Phone 540-667-2139 Rescue District 11 Election District Shawnee Residential Sprinkler System Yes Fire Lane Required Yes Special Hazards No Signature Title �� �✓L—�i�/~��.i��Ll rrum:rreuericrc uu rire a nine o4u oro 4r3y uoiulleuij io:uc #ivo r.uueiuue RECEIVED JUN 43 2m REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS Frederick County Fire Marshal Comment Mail to: Frederick County Fire Marshal Attn: Fire Marshal 1800 Coverstone Drive Winchester, Virginia 22602 Hand deliver to: Public Safety Building 1800 Coverstone Drive Winchester, Virginia 22602 Phone: (540) 665-6350 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the aA__a-__.n„_._t..�........a nr�.,...,:•t, rl.:�.�hser .. .. _ .. Applicant's Name: Pennoni Associates Inc. Mailing Address: Attn: Scott Stickley, PE 117 E. Piccadilly Street Suite 200 Winchester, VA 22601 Name of development and/or description of the request: The Townes at Tasker Telephone: 540-667-2139 Location of Property: East side of Rt. 642, Tasker Road and north of Rt. 846, Rutherford Lane, approximately 0 7 miles south of the 1-81 Interchange 310. 22 with their • Pennon[' ennn ,�► PENNONI ASSOCIATES INC. CONSULTING ENGINEERS 117 East Piccadilly Street Winchester, VA 22601 Tel: 540 — 667 - 2139 Fax: 540 — 665 - 0493 LETTER OF TRANSMITTAL Frederick County Sanitation Authority P.O. Box 1877 Winchester, VA 22604 DATE I June/ , 2013 JOB NO. 11672410 A 10 Earl Wiley RE: I The Townes at Tasker WE ARE SENDING YOU ® Attached ❑ Under separate cover via ❑ Shop Drawings ❑ Prints ® Plans ❑ Copy of Letter ❑ Change Order ❑ the following items: ❑ Samples ❑ Specifications LIST OF ITEMS TRANSMITTED COPIES DATE NO: I DESCRIPTION 2 1 1 Master Development Plan Revised per your comments THESE ARE TRANSMITTED as checked below: ® For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit _ copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO NED. Scott Stickley, PE If enclosures are not as noted, kindly notify us at once. TR8100 1 /2013 • • REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS Frederick County Parks and Recreation Comment Mail to: Frederick County Department of Parks & Recreation 107 North Kent Street Winchester, Virginia 22601 Hand deliver to: 107 North Kent Street Second Floor Winchester, Virginia 22601 Phone: (540) 665-5678 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach one (l l copy of the Master Development Plan with this sheet Applicant's Name: Pennoni Associates Inc. Mailing Address: Attn: Scott Stiekley, PE 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Name of development and/or description of the request: The Townes at Tasker Telephone: 540-667-2139 Location of Property: East side of Rt. 642 Tasker Road and north of Rt. 846 Rutherford lane approximately 0 7 miles south of the 1-81 Interchange 310.---- Date Received Date Reviewed Revision Requit Signature & Dal -FREDERICK COUNTY PARKS AND RECREATION USE ONLY - Review Nurnber 1 2 3 4 5 (circle one) ** Please Return Form to Applicant** ft REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS Virginia Department of flealth Comment Mail to: Virginia Department of Health Attn: Sanitation Engineer 107 North Kent Street Winchester, Virginia 22601 Hand deliver to: 2"t Floor —Suite 200 107 North Kent Street Winchester. Virginia 22601 Phone: (540) 722-3480 Applicant: It is your responsibility to complete this torn as accurately as possible in order to assist the agency with their review. Please attach one ( I ) copy of the Master Development Plan with this sheet. Applicant's Name: Pennoni Associates Inc. Telephone Mailintr Address: Attn: Scott Stickley, PE 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Name of development and/or description of the request: The Townes at Tasker 540-667-2139 Location of Property: East side of Rt. 642, Tasker Road and north of Rt. 846, Rutherford Lane, approximately 0 7 miles south of the 1-81 Interchange 310. VDH Comments: r ^fY/� TT /�+� l�> 7...r r.t' G.-. .)t�4'1�" t..u(•f .nrl S'-or•.".fh t�/r�7-��. Date Received Date Reviewed _ Revision Required Signature & -VIRGINIA DEPARTMEN'C OF REAL: H USE ONLY - Review Number 1 2 3 4 5 (circle one) Date Approved — ** Please Return Form to Applicant** 25 �Fredf rick County Pubill Schools ... to ensure all students an excellent education K. Wayne Lee, Jr. LEED GA . Coordinator of Planning and Development . leew@frederick.kl2.va.us July 9, 2013 Mr. Scott Stickley Pennoni Associates Inc. 117 East Piccadilly Street, Suite 200 Winchester, VA 22601 Re: The Townes at Tasker — Master Development Plan Dear Scott: Frederick County Public Schools has reviewed the Townes at Tasker master development plan submitted to us on June 5, 2013. We offer the following comments: 1. The cumulative impact of this development and other developments in Frederick County will require construction of new schools and support facilities to accommodate increased student enrollment. We estimate that the 80 single-family attached units in in this development will house 28 students: 8 high school students, 7 middle school students, and 13 elementary school students. In order to properly serve these additional students, Frederick County Public Schools would spend $292,000 more per year in operating costs (or $3,650 per unit per year) and $1,059,000 in one-time capital expenditures (or $13,238 per unit). You will find, enclosed with this letter, a more detailed assessment of the estimated impact of The Townes at Tasker on FCPS, including attendance zone information. 2. It is noted that the proposed streets will be private, that a taper is provided as a right turn lane into the development, and that the development's entrance is located on a curve in Tasker Road. This arrangement presents us with a safety issue. We don't stop buses. in Tasker Road travel lanes unless we have to, because of problems we have experienced over the years. The taper does not provide enough room for a 40' bus to completely pull off of the road. We do not enter private lanes and parking lots with buses. Private lanes are often not maintained well enough, especially in the winter, for us to provide safe, reliable bus service. For the safety of the children who will live in this development, and those who ride the buses with them, we would like to see a designated area, outside of travel lanes, for a school bus stop. 1415 Amherst Street www.frederick,k12.va.us 540-662-3889 Ext. 88249 RO. Box 3508 540-662-4237 fax Winchester, Virginia 22604-2546 0 • Please feel free to contact meat leew@frederick.kl2.va.us or 540-662-3888 x88249 if you have any questions or comments. Sincerely, u V .w K. Wayne Lee, Jr., LEED GA Coordinator of Planning and Development enclosure cc: Dr. David Sovine, Superintendent of Schools Mr. Albert Orndorff, Assistant Superintendent for Administration Mr. John Grubbs, Transportation Director Mrs. Elizabeth Brown, Supervisor of Driver Operations Project Name: Assessment Date: Housing Type Single -Family Detached Single -Family Attached Home/Other Frederick County Public Schools Development Assessment The Townes at Tasker July 8, 2013 Student Generation Housing Units 0 80 0 0 80 School Cost Program Capacity Per Student Cost Students Generated by this Development This Development's Impact on FCPS Capital Costs Elementary School Student Generation 0 13 0 0 13 Capital Costs Elementary School Cost (2014-19 CIP) $23,475,000 850 $27,618 13 Middle School Student Generation 0 7 0 0 7 Middle School Cost -_ (2014-19 CIP) $38,930,000 940 $41,415 7 $290,000 High School Student Generation 0 8 0 0 8 High School Cost (2014-19 CIP) $64,140,000 1250 $51,312 8 $410,000 Total Student Generation 0 28 0 0 28. Total Capital Costs 0 U Annual Operational Costs FY 2013 Budgeted Cost Total Student Annual Per Student - Generation Impact This Development's Impact on FCPS Operational Costs $10,437 28 $2922000 School Facility Information Elementary School (Grades Middle School High School K-5) (Grades 6-8) (Grades 9-12) 2012-13 School Attendance Zone* Orchard View Admiral Byrd Sherando September 14, 2012 Student Enrollment 401 953 1,440 2012-13 Program Capacity 564 850 1,400 X - School Attendance Zones are subject to change. 0 0 REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS Frederick County Department of Planning & Development Mail to: Frederick County Department of Planning & Development 107 North Kent Street, Winchester, Virginia 22601 Phone: (540) 665-5651 Hand deliver to: Frederick County Department of Planning & Development 107 North Kent Street, 2nd Floor Winchester, Virginia 22601 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the Master Development Plan with this sheet. Applicant's Name: Pennoni Associates Inc. Telephone: 540-667-2139 Mailing Address: Attn: Scott Stickley, PE 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Name of development and/or description of the request: The Townes at Tasker Location of Property: East side of Rt. 642, Tasker Road and north of Rt. 846, Rutherford Lane, approximately 0.7 miles south of the 1-81 Interchange 310. Department of Planning & Development Comments: -PLANNING DEPARTMENT USE ONLY - Date Received Review Number 1 2 3 4 5 (circle one) Date Reviewed Revision Required Date Approved Signature & Date: ** Please Return Form to Applicant** 19 From:Frederick Co Fire & Res* 540 678 4739 06/0*13 15:04 #196 P.002/002 RECEIVED JUN 03 2013 REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS Frederick County Fire Marshal Comment Mail to: Frederick County Fire Marshal Attn: Fire Marshal 1800 Coverstone Drive Winchester, Virginia 22602 Hand deliver to: Public Safety Building 1800 Coverstone Drive Winchester, Virginia 22602 Phone: (540) 665-6350 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their r.t_..Wn_...__r%_..lt-._..___.ift__��.:.A_..t.:_.:a_..:":,:."._.:,:".:.:s:.:..`.;...:.:. Applicant's Name: Pennoni Associates Inc. Telephone: 540-667-2139 Mailing Address: Attn: Scott Stickley, PE 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Name of development and/or description of the request: The Townes at Tasker Location of Property: East side of Rt. 642, Tasker Road and north of Rt. 846, Rutherford Lane, approximately 0.7 miles south of the 1-81 Interchange 310. Fire Marshal Comments: r �E�j'�F -FREDERICK COUNTY FIRE MARSHAL USE ONLY - Date Received ash? Review Number 1 2 3 4 5 (circle one) Date Reviewed-- 13 Revision Required Date Approved Signature & Dat, _�� x* Please Return Form to Applicant-'* 22 From:Frederick Co Fire & Res* 540 678 4739 06/07.13 15:03 #196 P.001/002 Department Office of the Fire Marshal A Plan Review and Comments .� x \ 1 Control number Date received Date reviewed Date Revised MDP13 - 0 0 01 6/3/2013 6/6/2013 Project Name Applicant Towflt3 at Tasker - Tasker Rd. N. of Rutherford Ln. Scott Stickley, PE Address City State Zip Applicant Phone 117 E. Piccadilly St-, Suite 200 Winchester VA 22601 540-667-2139 Type Application Tax ID Number Fire District Rescue District Master Development Plan 75-A-86 11 11 Current Zoning Residential Perf Recommendations Automatic Sprinkler System Automatic Fire Alarm System No No Other recommendation Requirements Emergency Vehicle Access Hydrant Location Adequate Not Identified Siamese Location Roadway/Aisleway Width Not Identified Adequate Emergency Vehicle Access Comments Access Comments Additional Comments Plan: Approved Plan Approval Recommended Reviewed By Yes Kenneth Scott Election District Shawnee Residential Sprinkler System Yes Fire Lane Required Yes Special Hazards No Signature Title - - ---- - -"11 0« _�,__� JUL 2 3 2013 Document Approval Form PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS YOUR APPROVAL PLEASE INITIAL AND PROVIDE THE DATE AND TIME OF YOUR APPROVAL. IF THIS DOCUMENT DOES NOT MEET YOUR APPROVAL, PLEASE PROVIDE COMMENTS AS TO WHAT YOU WOULD LIKE TO HA VE COMPLETED. Initials Date & Time Candice Mark Dana Eric Mike John COMMENTS: Received by Clerical Staff (Date & Time): (S:Gffice on BfackboxTorms0ocument Approval Forth — 08/15/12) 0 REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS Virginia Department of Transportation Mail to: Virginia Department of Transportation Attn: Resident Engineer 14031 Old Valley Pike Edinburg, Virginia 22824 Phone: (540) 984-5600 Hand deliver to: Virginia Department of Transportation Attn: Resident Engineer 2275 Northwestern Pike Winchester, Virginia 22603 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach threeA�jcgp es of the Master Development Plan with this sheet. Applicant's Name: Pennon! Associates Inc. Telephone: - 540-667-2139 Mailing Address: Attn: Scott Stickley, PE _ 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Name of development and or description of the request: The Townes at Tasker Location of Property: East side of Rt. 642, Tasker Road and north of Rt. 846, Rutherford Lane, approximately 0.7 miles south of the 1-81 Interchange 310. Virginia Department of Transportation Comments: See attached email from Matt Smith, VDOT to Scott Stickley with Pennoni Associates dated July 9, 2013. -VDOT USE ONLY - Date Received 3 / Review Numbetj 2 3 4 5 (circle one) Date Reviewed Revision Required___- _ Date Approved VDOT Signature & Date: ** Please Return Form to Applicant" 18 Karen Flynn From: Scott Stickley Sent: Tuesday, July 09, 2013 10:37 AM To: Ronald Mislowsky Cc: Karen Flynn Subject: FW: Master Development Plan for The Townes At Tasker, Route 642 - Frederick County Attachments: Scanned from EDNXerox.pdf Scott Stickley, PE Pennoni Associates Inc. Office 540-667-2139 1 Direct 540-771-2086 Fax 540-665-0493 1 Mobile 540-622-3405 From: Funkhouser, Rhonda (VDOT) [maiIto: Rhonda. Funkhouser(cbVDOT.Virginia.gov] On Behalf Of Smith, Matthew, P.E. (VDOT) Sent: Tuesday, July 09, 2013 10:35 AM To: Scott Stickley Cc: Bishop, John. (VDOT); Ingram, Lloyd (VDOT); Smith, Matthew, P.E. (VDOT) Subject: Master Development Plan for The Townes At Tasker, Route 642 - Frederick County A VDOT review has been conducted on the Master Development Plan (MDP) for The Townes at Tasker dated 5/30/2013. Based off of the review of the MDP, VDOT has no objection to the proposed development concept with the caveat that VDOT has not approved the proposed entrance and associated roadway improvements design. Obtaining minimum required sight distance and entrance grades may be challenging at the shown entrance location. An entrance design meeting VDOT's minimum commercial standards will need to be included with the development's Site Plan submitted to this office for review and approval prior to any development. If you have any questions or need further information, please do not hesitate to contact me. Matthew B. Smith, P.E. Area Land Use Engineer VDOT - Land Development Clarke, Frederick, Shenandoah & Warren Counties 14031 Old Valley Pike Edinburg, VA 22824 Phone # (540) 984-5615 Fax # (540) 984-5607 • 0 Candice Perkins From: Smith, Matthew, P.E. (VDOT) [Matthew.Smith@vdot.virginia.gov] Sent: Tuesday, October 15, 2013 1:07 PM To: Candice Perkins Cc: Ronald Mislowsky; Funkhouser, Rhonda (VDOT); Rhodes, Timothy. (VDOT) Subject: Townes at Tasker MDP The Master Development Plan for this property appears to have a significant measurable impact on Route 642, the VDOT facility which would provide access to the property. Before making any final comments, this office will require a complete set of site plans, drainage calculations and traffic flow data from the I.T.E. Trip Generation Manual, 8th Edition for review. VDOT reserves the right to comment on all right-of-way needs, including right-of-way dedications, traffic signalization, roadway improvements and drainage. Prior to construction on the State's right- of-way the developer will need to apply to this office for issuance of appropriate permits to cover said work. Thank you for allowing us the opportunity to comment. Matthew B. Smith, P.E. Area Land Use Engineer VDOT - Land Development Clarke, Frederick, Shenandoah & Warren Counties 14031 Old Valley Pike Edinburg, VA 22824 Phone # (540) 984-5615 Fax # (540) 984-5607 1 From:Frederick Co Fire & R * e 540 676 4739 06/ 0013 15:01 #195 P.001/002 r Frederick County Fire and Rescue Department Office of the Fire Marshal Plan Review and Comments Control number Date received Date reviewed Date Revised MDP 13 -0 0 01 6/3/2013 6/6/2013 Project Name 'j'ownu at Tasker - Tasker Rd. N. of Rutherford Ln. Address City 117 E. Piccadilly St., Suite 200 Winchester Type Application Tax ID Number Master Development Plan 75-A-86 Current Zoning Applicant Scott Stickley, PE State Zip VA 22601 Fire District 11 Residential Perf Recommendations Automatic Sprinkler System Automatic Fire Alarm System No No Other recommendation Requirements Emergency Vehicle Access Hydrant Location Adequate Not Identified Siamese Location Roadway/Aisieway Width Not Identified Adequate Emergency Vehicle Access Comments Access Comments Additional Comments Plan Approved Plan Approval Recommended Reviewed By Yes Kenneth Scott Applicant Phone 540-667-2139 Rescue District 11 Election District Shawnee Residential Sprinkler System Yes Fire Lane Required Yes Special Hazards No Signature p Title 06/07/2013 3:02PM (GMT-04:00) From:Frederick Co Fire & R * e 540 678 4739 06/00013 15:02 #195 P.002/002 RECEIVED JUN 03 2gU REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS Frederick County Fire Marshal Comment Mail to: Frederick County Fire Marshal Attn: Fire Marshal 1800 Coverstone Drive Winchester, Virginia 22602 Hand deliver to: Public Safety Building 1800 Coverstone Drive Winchester, Virginia 22602 Phone: (540) 665-6350 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the Master Development Plan with this sheet. Applicant's Name: Pennoni Associates Inc. Mailing Address: Attn: Scott Stickler PE 117 E. Piccadilly Street Suite 200 Winchester, VA 22601 Name of development and/or description of the request: The Townes at Tasker Telephone: 54 0-667-2139 Location of Property: East side of Rt. 642, Tasker Road and north of Rt. 846, Rutherford Lane, approximately 0.7 miles south of the 1-81 Interchange 310. Fire Marshal Comments: ____....... .... .............. ._._...._._..._.. __..- _ -FREDERICK COUNTY FIRE MARSHAL USE ONLY - Date Received 3 I2J Review Number 1 2 3 4 5 (circle one) Date Reviewed P Revision Required Date Approved Signature & Dater "Please Return Form to Applicant" 22 06/07/2013 3:02PM (GMT-04:00) n u LETTER OF TRANSMITTAL -Pennom w, PENNONI ASSOCIATES INC. CONSULTING ENGINEERS 117 East Piccadilly Street Winchester, VA 22601 Tel: 540 — 667 - 2139 Fax: 540 — 665 - 0493 Frederick County Sanitation Authority P.O. Box 1877 Winchester, VA 22604 DATE I June , 2013 JOB NO. 1672410 A 10 Earl Wiley RE: I The Townes at Tasker WE ARE SENDING YOU ® Attached ❑ Under separate cover via ❑ Shop Drawings ❑ Prints ® Plans ❑ Copy of Letter ❑ Change Order ❑ the following items: ❑ Samples ❑ Specifications LIST OF ITEMS TRANSMITTED COPIES DATE NO: DESCRIPTION 2 1 Master Development Plan Revised per your comments THESE ARE TRANSMITTED as checked below ® For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS _ - COPY TO SIGNED: Scott Stickley, PE If enclosures are not as noted, kindly notify us at once. ONO �57wf) TR8100 1I2013 • REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS Frederick County Public Works Comment Mail to: Frederick County Public Works Department Attn: County Engineer 107 North Kent Street, Winchester, Virginia 22601 Hand deliver to: Public Works Department 107 North Kent Street, 2nd Floor Winchester, Virginia 22601 Phone: (540) 665-5643 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the Master Development Plan with this sheet Applicant's Name: Pennoni Associates Inc. Telephone: 540-667-2139 Mailing Address: Attn: Scott Stickley, PE 117 E. Piccadilly Street, Suite 200 Winchester. VA 22601 Name of development and/or description of the request: The Townes at Tasker Location of Property: East side of Rt. 642, Tasker Road and north of Rt. 846, Rutherford Lane, approximately 0.7 miles south of the 1-81 Interchange 310. Date Received _ Date Reviewed _ Revision Required Signature & -FREDERICK COUNTY PUBLIC WORKS USE ONLY - Review Number 1 2 3 4 5 (circle one) Date Approved 21 REQUEST FO MASTER DEVELOPMENT PLAN COMMENTS Frederick County Frederick County Inspections Department Comment Mail to: Frederick County Inspections Department Attn: Building Official 107 North Kent Street, Winchester, Virginia 22601 Hand deliver to: Frederick County Inspections Dept 107 North Kent Street, 2nd Floor _� , V ® Winchester, Virginia 22601 public Worhs kC Unty Phone: (540) 665-5650 pections Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach two 121 copies of the Master Development Plan with this sheet. Applicant's Name Mailing Address: Pennoni Associates Inc. Attn: Scott Stickley, PE 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Name of development and/or description of the request: The Townes at Tasker Telephone: 540-667-2139 Location of Property: East side of Rt. 642 Tasker Road and north of Rt. 846 Rutherford Lane, approximately 0 7 miles south of the 1-81 Interchange 310 Inspections Comments: - •'REDERICK COUNTY INSPECTIONS DEPARTMENT USE ONLY - Date Received SW Review Number 1 2 3 4 5 (circle one) Date Reviewed � 1 f / Revision Required Date Approved Signature & Date: G** Please Return Form to Applicant** 20 REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS Frederick County Parks and Recreation Comment Mail to: Hand deliver to: Frederick County 107 North Kent Street Department of Parks & Recreation Second Floor 107 North Kent Street Winchester, Virginia 22601 Winchester, Virginia 22601 Phone: (540) 665-5678 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach one I l) copy of the Master Development Plan with this sheet. Applicant's Name Pennoni Associates Inc. Telephone: 540-667-2139 Mailing Address: Attn: Scott Stickley, PE 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Name of development and/or description of the request: The Townes at Tasker Location of Property: East side of Rt. 642 Tasker Road and north of Rt. 846 Rutherford Lane, approximately 0 7 miles south of the 1-81 Interchange 310 Date Received _ Date Reviewed _ Revision Redui ei Signature & Date -FREDERICK COUNTY PARKS AND RECREATION USE ONLY - Review Number 1 2 3 4 5 (circle one) ** Please Return Form to Applicant** • • REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS Virginia Department of Health Comment Mail to: Virginia Department of Health Attn: Sanitation P.neineer 107 North Kent Street Winchester. Virginia 22601 Hand deliver to: 2n" Floor - Suite 200 107 North Kent Street Winchester. Virginia 22601 Phone: (540) 722-3480 :%pplicant: It is your responsibility to complete this Corm as accurately as possible in order to assist the agency with their review. Please attach one ( I ) copy of the Master Development Plan with this sheet. Applicant's Name: Pennoni Associates Inc. Mailing Address: Attn: Scott Stickley, PE 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Name of development and/or description of the request: The Townes at Tasker Telephone: 540-667-2139 Location of Property: East side of Rt. 642, Tasker Road and north of Rt. 846, Rutherford Lane, approximately 0.7 miles south of the 1-81 Interchange 310. VDH Comments: PA/JA / h., 110AVf1 iO�&-SjaVb1,'G IMII-ef ad wew -nA a L x-L -%'IRGINI:% DEPAR-rJiENT OF HEALTH USE ONLY - Date Received Review Number 1 2 3 4 5 (circle one) Date Reviewed Revision Required — Date Approved Signature & Date' 6 ** Please Return Form to Applicant** 25 0 0 Frederick County Public Schools ... to ensure all students an excellent education K. Wayne Lee, Jr. LEED AP . Coordinator of Planning and Development . leew@frederick.kl2.va.us October 8, 2013 Nfi•. Scott Stickley Pennoni Associates Inc. 117 East Piccadilly Street, Suite 200 Winchester, VA 22601 Re: The Townes at Tasker — Site Plan Dear Scott: Frederick County Public Schools has reviewed the Townes at Tasker site plan submitted to us on September 13, 2013. We offer the following comment: The currently proposed arrangement of streets creates a safety hazard for our school buses. The proposed streets will be private, a taper only is provided as a right turn lane into the development, and the development's entrance is located on a curve in Tasker Road. Stopping a school bus in the travel lane of Tasker Road is something we do not do unless there is no other solution, because of incidents we have experienced over the years. The taper does not provide enough room for a 40' bus to completely pull off of the road. We do not enter private lanes and parking lots with buses. For the safety of the children who will live in this development, and those who ride the buses with them, we would like to see a designated area, outside of travel lanes, for a school bus to stop. Please feel free to contact me at leew(cr�,froderick.kl2.va.us or 540-662-3888 x88249 if you have any questions or comments. Sincerely, K. Wayne Lee, Jr., LEED GA Coordinator of Planning and Development cc: Dr. David Sovine, Superintendent of Schools Mr. Albert Orndorff, Assistant Superintendent for Administration Mr. John Grubbs, Transportation Director 1415 Amherst Street www.frederick.k12.va.us 540.662-3889 Ext. 88249 P.O. Box 3508 540-662-4237 fax Winchester, Virginia 22604-2546 ,�Frederick County Public Schools O... to ensure all students an excellent education K. Wayne Lee, Jr. LEED GA . Coordinator of Planning and Development . leew@frederick.k12.va.us July 9, 2013 Mr. Scott Stickley Pennoni Associates Inc. 117 East Piccadilly Street, Suite 200 Winchester, VA 22601 Re: The Townes at Tasker — Master Development Plan Dear Scott: Frederick County Public Schools has reviewed the Townes at Tasker master development plan submitted to us on June 5, 2013. We offer the following comments: The cumulative impact of this development and other developments in Frederick County will require construction of new schools and support facilities to accommodate increased student enrollment. We estimate that the 80 single-family attached units in in this development will house 28 students: 8 high school students, 7 middle school students, and 13 elementary school students. In order to properly serve these additional students, Frederick County Public Schools would spend $292,000 more per year in operating costs (or $3,650 per unit per year) and $1,059,000 in one-time capital expenditures (or $13,238 per unit). You will find, enclosed with this letter, a more detailed assessment of the estimated impact of The Townes at Tasker on FCPS, including attendance zone information. 2. It is noted that the proposed streets will be private, that a taper is provided as aright turn lane into the development, and that the development's entrance is located on a curve in Tasker Road. This arrangement presents us with a safety issue. We don't stop buses in Tasker Road travel lanes unless we have to, because of problems we have experienced over the years. The taper does not provide enough room for a 40' bus to completely pull off of the road. We do not enter private lanes and parking lots with buses. , Private lanes are often not maintained well enough, especially in the winter, for us to provide safe, reliable bus service. For the safety of the children who will live in this development, and those who ride the buses with them, we would like to seea designated area,,outside of travel lanes, for a school bus stop. 1415 Amherst Street www.frederick.k12.va.us 540-662-3889 Ext. 88249 P.O. Box 3508 540-662-4237 fax, Winchester, Virginia 22604-2546 • Please feel free to contact me at leew@frederick.kl2.va.us or 540-662-3888 x88249 if you have any questions or comments. Sincerely, toa�-T— K. Wayne Lee, Jr., LEED GA Coordinator of Planning and Development enclosure cc: . Dr. David Sovine, Superintendent of Schools Mr. Albert Orndorff, Assistant Superintendent for Administration Mr. John Grubbs, Transportation Director Mrs. Elizabeth Brown, Supervisor of Driver Operations Project Name: Assessment Date: Housing Type Single -Family Detached Single -Family Attached Multifamily Mobile Home/Other Totals School Cost . Program Capacity Per Student Cost Students Generated by this Development This Development's Impact on FCPS ( Frederick County Public Schools Development Assessment The Townes at Tasker July 8, 2013 Student Generation Housing Units 0 80 0 0 80 Costs Elementary School Student Generation 0 13 0 0 13 Capital Costs Elementary School Cost (2014-19 CIP) $23,475,000 850 $27,618 13 $359,000 Middle School Student Generation 0 7 0 0 7 Middle School Cost (2014-19 CIP) $38,930,000 940 $41,415 7 $290,000 High School Student Generation 0 8 0 0 8 High School Cost (2014-19 CIP) $64,140,000 1250 $51,312 8 $410,000 Total Student Generation 0 28 0 0 Total Capital Costs i Annual Operational Costs FY 2013 Budgeted Cost Total Student Annual Per Student Generation Impact This Development's Impact on FCPS Operational Costs $10,437 28 $292,000 School Facilitv Information Elementary School (Grades Middle School High School K 5) (Grades 6-8) (Grades 9-12) 2012-13 School Attendance Zone* Orchard View Admiral Byrd Sherando September 14, 2012 Student Enrollment 401 953 1,440 2012-13 Program Capacity 564 850 1,400 * - School Attendance Zones are subject to change. i 40 0 I June 20, 2013 Mr. Scott Stickley, P.E. Pennoni Associates, Inc. 117 E. Piccadilly Street, Suite 200 Winchester, Virginia 22601. RE: The Townes at Tasker Master Development Plan Comments Frederick County, Virginia Dear Scott: COUNTY of FREDERIiCK Department of Public Works 5401665-5643 FAR: 540/678-0682 We have completed our review of the subject master development plan and offer the following comments: 1. In order to perform the necessary road improvements, off -site excavation will be required to extend the culvert located north of the property. It will be necessary to obtain easements from Paul E. and Roberta Bennsky prior to site plan approval. Please submit copies of the recorded easements. 2. All stormwater facilities shall conform to the water quantity and water quality standards of Frederick County and the Virginia Department of Conservation (DCR) and Recreation/Department of Environmental Quality (DEQ). 3. Verify whether or not DEQ permits will be required to cross the 100-year flood plain during the installation of the water and sewer lines. Verification that all off - site easements have been obtained shall be provided prior to site plan approval. . 4. The pavement design proposed for the Tasker Road widening project indicates a requirement of 8.0 inches of BM-25.0 Base Asphalt. Ensure that this pavement thickness is correct. 5. An overlot grading plan shall be submitted for all proposed structures at the time of site plan submittal. T:\Rhonda\TEMPCOMMENTS\TO W NES@TASKERPMDPCOM.doc The Townes at Tasker Master Development Plan Comments Page 2 June 20, 2013 If you should have any questions, do not hesitate to contact me. Please submit one (1) copy of the revised plan for further review. Sincerely, Joe C. Wilder Deputy Director of Public Works JCW/rls cc: Planning and Development file T:\Rhonda\TEMPCOMMENTS\TO WNES@TASKERPMDPCOM.doe Document Approval Form OCT 1 1 2013 1 PLAN. 7 PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS YOUR APPROVAL PLEASE INITIAL AND PROVIDE THE DATE AND TIME OF YOUR APPROVAL. IF THIS DOCUMENT DOES NOT MEET YOUR APPRO VAL, PLEASE PRO BIDE COMMENTS AS TO WHAT YOU WOULD LIKE TO HA VE COMPLETED. Initials Date & Time Candice l� � �� Mark Dana Eric Afike John COMMENTS: 0(, " ` 1 I —o Received by Clerical Staff (Date & Tune): P. `D (9:0-Mce on SlackboxlForms0ocoment Approval Form — 09/15/12) 91 (Pennoni) I PENNONI ASSOCIATES INC. CONSULTING ENGINEERS OCT 2013 i October 11, 2013 �-- FRi_iii.i ;K COUNTY PIANO,: i^ P'VEI C?iJIENT Ms. Candice Perkins, AICP County of Frederick Department of Planning and Development 107 North Kent Street Winchester, VA 22601 RE: PRELIMINARY MASTER DEVELOPMENT PLAN TOWNES OF TASKER SECOND REVIEW Dear Candice: We have received your comments dated October 10, 2013 and have revised the plans accordingly. The following are our responses to the comments: 1. Comment: Transfer of Development Rights: This project proposes to utilize transfer of development rights (TDR's). The following needs to be addressed: • As discussed the TDR's need to be severed from the sending property and applied to the receiving property before MDP can be approved and processed. • Update the TDR table on the cover sheet to reference 49 units not 50. Response: The TDR table has been revised to reflect the 49 units. 2. Comment: Tasker Road Sidewalk: A sidewalk is required along the site's Tasker Road frontage; a waiver is not available for sidewalks required along collector roadways. Response: A sidewalk has been added to the plan. 3. Comment: Future Development Area: Revise the note on sheet 2 to state "future development area — Revised MDP Required (rezoning/additional TDR's required)". Response: The note has been revised as requested. 4. Comment: BRL's. Label the GBRL as indicated on sheet 2. Response: The BRL label has been provided. 5. Comment: Fees and Public Meeting: The fee for this application includes a $3,000.00 base fee plus $100.00 per acre for the first 150 acres and $50 per acre for the remainder. Fees may change. Response: Review fee is attached. 117 East Piccadilly Street • Winchester, VA 22601 • Ph: 540-667-2139 • Fx: 540-665-0493 www.pennoni.com 1672410 • October 11, 2013 Page 2 Ms. Candice Perkins Townes at Tasker MDP Enclosed are 2 sets of revised plans, the MDP application, Power of Attorney, review fee and the agency approval/comment sheets. We have received the School's comments regarding a bus pull off location, since we cannot find an ordinance requirement we are not providing a bus pull off lane. In addition, there is not'a form for GIS in the MDP package, however it will be provided during the Site Plan approval process. If you have any questions regarding this project please contact us at your convenience. Sincerely, PENNONI ASSOCIATES INC. M. SsQtt Stickley, RE Enclosures P:\Project\16724-Tasker Rd Parc 86\1-0\Engr\Admin\Correspondence\MDP\Response to Co 2nd Review Comments 10-11-13.docx COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/665-6395 NOTIFICATION OF PUBLIC MEETING November 22, 2013 TO: THE APPLICANTS) AND/OR ADJOINING PROPERTY OWNERS(S) RE: MASTER DEVELOPMENT PLAN #03-13 THE TOWNES AT TASKER You are hereby notified of a Frederick County Planning Commission public meetinz beinm held on Wednesday, December 4, 2013 at 7. 00 p.m. and a Board ofSupervisors public meeting beinz held on Wednesday, December 11, 2013, at 7.00 p.m., in the Board Room of the Frederick County Administration Building at 107 North Kent Street, Winchester, Virginia for the following application: This meeting is to consider Master Development Plan #03-13 for The Townes at Tasker, submitted by Pennoni Associates Inc., to develop 81 unit townhouse development. The subject property is located on the east side of Route 642, Tasker Road, and north of Route 846, Rutherford Lane, approximately 0.7 miles south of the I-81 Interchange 310 and is identified with Property Identification Number 75-A-86 in the Shawnee Magisterial District. Please note this item is presented for informational purposes only. A copy of the application will be available for review at the Handley Library and the Bowman Library the week of the meeting or at the Department of Planning and Development located at 107 North Kent Street in Winchester, Virginia. Information regarding this application will also be available via the Planning Department's Web Page at www.co.frederick.va.us. Sincerely, Candice E. Perkins, AICP Senior Planner CEP/pd 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 i I i This s to certify that the attached correspondence was mailed to the following on 1 l -,I j-- 1 13 from the Department of Planning and Development, Frederick Count , Virginia: 75 A- - 86- SHAWNEE VILLAGE LC CIO DAVE HOLLIDAY CONSTR. INC 420 W JUBAL EARLY OR STE 103 WINCHESTER VA 22601.6435 75 -A- . 78- HACK WINIFRED W ETALS CIO HACKWOODS LLC 974 TASKER RD STEPHENS CITY VA 75 A- - 78-C BOYD JOHN L 521 TASKER RD STEPHENS CITY VA 22655.2319 22655.2224 - -- — — - ------ - - ---75 A. - 87-C AGAPE CHRISTIAN FELLOWSHIP 199 AGAPE WAY STEPHENS CITY VA 22655.2211 II i 75 -A- - 86-A RUTHERFORD GARY D RUTHERFORD CAROLYN S 163 RUTHERFORD LN STEPHENS CITY VA 22655.6011 75 - A- - 86-C -- THE HALL PARTNERSHIP II LLC 373 TASKER RD STEPHENS CITY VA 22655.2220 Candice E. Perkins, Senior Planner Frederick County Planning Dept. . STATE OF VIRGINIA COUNTY OF FREDERICK 1, ��c, C , a Notary Public in and for the State and County aforesaid, do hereby certify that Candice E. Perkins, Senior Planner for the Department of Planning and Development, whose name is signed to the foregoing, dated 1( =2 a j ( , has personally appeared before me and acknowledged the same in my State and d County aforesaid. Given under my hand this day of 0-b-",t �-R , 0 3 My commission expires on CJ �" '2/ '--2 Q f --2 PAMALA D,EETER NOTARY PUBLIC REGISTRATtON # 354474 COMMONWEALTH OF VIRGINIA MY COMMISSION FYPIRES DECEMBER 31, 2017 arnr..+nrM1m9S�VM�'''gY'F,YM4C`'wn�' v0a,7 2co-/4 --- NOTARY PUBLIC COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 FAX: 540/ 665-6395 NOTIFICATION OF PUBLIC MEETING November 22, 2013 TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNERS(S) RE: MASTER DEVELOPMENT PLAN 403-13 THE TOWNES AT TASKER You are hereby notified of a Frederick County Planning Commission public meeting being held on Wednesday, December 4, 2013 at 7. 00 p.m. and a Board ofSupervisors public meeting being held on Wednesday, December 11, 2013, at 7.00 p.m., in the Board Room of the Frederick County Administration Building at 107 North Kent Street, Winchester, Virginia for the following application: This meeting is to consider Master Development Plan #03-13 for The Townes at Tasker, submitted by Pennoni Associates Inc., to develop 81 unit townhouse development. The subject property is located on the east side of Route 642, Tasker Road, and north of Route 846, Rutherford Lane, approximately 0.7 miles south of the I-81 Interchange 310 and is identified with Property Identification Number 75-A-86 in the Shawnee Magisterial District. Please note this item is presented for informational purposes only. A copy of the application will be available for review at the Handley Library and the Bowman Library the week of the meeting or at the Department of Planning and Development located at 107 North Kent Street in Winchester, Virginia. Information regarding this application will also be available via the Planning Department's Web Page at www.co.frederick.va.us. Sincerely, Candice E. Perkins, AICP Senior Planner CEP/pd 107 North Kent Street, Suite 202 - Winchester, Virginia 22601-5000 COUNTY of FREDERICK Department of Planning and Development 5401665-5651 FAX: 540/ 665-6395 NOTIFICATION OF PUBLIC MEETING November 22, 2013 TO: THE APPLICANT(S).AND/OR ADJOINING PROPERTY OWNERS(S) RE: MASTER DEVELOPMENT PLAN #03-13 THE TOWNES AT TASKER You are hereby notified of a Frederick County Planning Commission public meeting being held on Wednesday, December 4, 2013 at 7. 00 p.m. and a Board ofSugervisors public meeting being held on Wednesday, December 11, 2013, at 7.00 p.m., in the Board Room of the Frederick County Administration Building at 107 North Kent Street, Winchester, Virginia for the following application: This meeting is to consider Master Development Plan #03-13 for The Townes at Tasker, submitted by Pennoni Associates Inc., to develop 81 unit townhouse development. The subject property is located on the east side of Route 642, Tasker Road, and north of Route 846, Rutherford Lane, approximately 0.7 miles south of the I-81 Interchange 310 and is identified with Property Identification Number 75-A-86 in the Shawnee Magisterial District. Please note this item is presented for informational purposes only. A copy of the application will be available for review at the Handley Library and the Bowman Library the week of the meeting or at the Department of Planning and Development located at 107 North Kent Street in Winchester, Virginia. Information regarding this application will also be available via the Planning Department's Web Page at www.co.frederick.va.us. Sincerely, Candice E. Perkins, AICP Senior Planner CEP/pd 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 MASTER DEVELOPMENT PLAN #03-13 The Townes at Tasker Staff Report for the Planning Commission Prepared: October 21, 2013 Staff Contact: Candice E. Perkins, AICP, Senior Planner Reviewed Action Planning Commission: 11/06/13 Pending Board of Supervisors: 11/13/13 Pending PROPOSAL: To develop ,l 1.3458 acres of land zoned RA (Rural Areas) District with a total of 49 single family attached (townhouse) units. This receiving property will be utilizing transferred development rights as permitted by the Transfer of Development Rights (TDR) ordinance to develop with RP (Residential Performance) District standards. The subject receiving parcel will be utilizing 49 transferred development rights from four parcels (72-A-30, 72-A-34, 72-A-29C and 21-A-7A) that are located in the County's sending area. The applicant currently has the TDR rights to develop half of the site; the remainder of the site could be developed through the transfer of additional TDR rights (revised MDP would also be required) or through a rezoning. This is the first property to develop under the adopted TDR ordinance. MAGISTERIAL DISTRICT: Shawnee LOCATION: The subject property is located on the east side of Route 642, (Tacker Road) and north of Route 846, (Rutherford Lane) approximately 0.7 miles south of the I-81 Interchange 310. STAFF CONCLUSIONS FOR THE 11/06/13 PLANNING COMMISSION MEETING: The Master Development Plan for The Townes at Tasker depicts appropriate land uses and appears to be consistent with the requirements of Article III, Transfer of Development Rights (TDR) Program and Article VIII, Master Development Plan, of the Zoning Ordinance. Following the Planning Commission and Board of Supervisors review of the MDP, staff will proceed with the severing and application process for the TDR rights from the sending property to the receiving property and proceed with approval of the MDP. All of the issues brought forth by the Planning Commission should be appropriately addressed by the applicant. It appears that the application meets all requirements. Following presentation of the application to the Planning Commission and the Board of Supervisors, and the incorporation of your comments, staff is prepared to move forward with the TDR transfer and approve the MDP. MDP #03-13, The Townes at Tasker October 21, 2013 Page 2 This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist in the review of this application. It may also be useful to others interested in this zoning matter. LOCATION: The subject property is located on the east side of Route 642, (Tacker Road) and north of Route 846, (Rutherford Lane) approximately 0.7 miles south of the I-81 Interchange 310. MAGISTERIAL DISTRICT: Shawnee PROPERTY ID NUMBER: 75-A-86 PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas) using RP (Residential Performance) District development standards through the use of the Transfer of Development Rights (TDR) Ordinance. Use: Vacant ZONING & PRESENT USE OF ADJOINING PROPERTIES: North: B2 (Business General) Use: Self Storage Facility South: RP (Residential Performance) Use: Residential & Vacant East: RA (Rural Areas) Use: Residential & Church West: Interstate I-81 Use: Interstate PROPOSAL: To develop 11.3458 acres of land zoned RA (Rural Areas) District with a total of 49 single family attached (townhouse) units. This receiving property will be utilizing transferred development rights as permitted by the Transfer of Development Rights (TDR) ordinance to develop with RP (Residential Performance) District standards. The subject receiving parcel will be utilizing 49 transferred development rights fiom four parcels (72-A-30, 72-A-34, 72-A-29C and 21-A-7A) that are located in the County's sending area. The applicant currently has the TDR rights to develop half of the site; the remainder of the site could be developed through the transfer of additional TDR rights (revised MDP would also be required) or through a rezoning. This is the first property to develop under the adopted TDR ordinance.' MDP #03-13, The Townes at Tasker October 21, 2013 Page 3 REVIEW EVALUATIONS: Virginia Department of Transportation: The Master Development Plan for this property appears to have a significant measurable impact on Route 642, the VDOT facility which would .provide access to the property. Before snaking any final comments, this office will require a complete set of site plans, drainage calculations and traffic flow data from the I.T.E. Trip Generation Manual, 8th Edition for review. VDOT reserves the right to comment on all right-of-way needs, including right-of-way dedications, traffic signalization, roadway improvements and drainage. Prior to construction on the State's right-of-way the developer will need to apply to this office for issuance of appropriate permits to cover said work. Frederick County Fire & Rescue: Plan approval recommended. Frederick County Fire Marshal: Plan approved Frederick County Public Works: All of our previous comments have been addressed. Frederick County Inspections Department: No comments at this time. Comments will be made at site plan and subdivision plan submittal. Frederick County Sanitation Authority: Approved Frederick County Parks and Recreation: Plan appears to meet the recreation unit and open space ordinance. It may be helpful to make sure the three recreation units will fit the site. Recreation units are now $32,500.00 each. Virginia Department of Health Comment: Health Department has no objections so long as public sewer and water are utilized. Frederick County Public Schools: The currently proposed arrangement of streets creates a safety hazard for our school buses: The proposed streets will be private, a taper only is provided as a right turn lane into the development and the development's entrance is located on a curve in Tasker Road. Stopping a school bus in the travel lane of Tasker Road is something we do not do unless there is no other solution, because of incidents we have experienced over the years. The taper does not provide enough room for a 40' bus to completely pull off of the road. We do not enter private lanes and parking lots with buses. For the safety of the children who will live in this development, and those who ride the buses with them, we would like to see a designated area, outside of travel lanes, for a school bus to stop. Planning & Zoning: A) Master Development Plan Requirement A master development plan is required prior to development of this property. Before a master development plan can be approved, it must be reviewed by the Planning Commission, the Board of Supervisors and all relevant review agencies. Approval may only be granted if the master development plan conforms to all requirements of the Frederick County Zoning and Subdivision MDP #03-13, The Townes at Tasker October 21, 2013 Page 4 Ordinances. The purpose of the master development plan is to promote orderly and planned development of property within Frederick County that suits the characteristics of the land, is harmonious with adjoining property and is in the best interest of the general public. Also, pursuant to Article III, Transfer of Development Rights (TDR) Program (§165-303.02. Development Approval Procedures.), a request to utilize transferred development rights on an eligible receiving property must be in the form of a Master Development Plan and a Subdivision Design Plan submitted to the Department of Planning and Development in accordance with the Zoning and Subdivision regulations contained in Chapters 165 and 144 of the County Code. B) Site History The original Frederick County Zoning Map (U.S.G.S. Stephens City, VA Quadrangle) identifies the subject property as being zoned R-1 (Residential Limited). The parcel was re -mapped frorn R-1 to A-2 (Agricultural General) pursuant to the County's comprehensive downzoning initiative (Zoning Amendment Petition #011-80), which was adopted on October 8, 1980. The County's agricultural zoning districts were subsequently combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the re -mapping of the subject property and all other A-1 and A-2 zoned land to the RA District. C) Site Suitability & Project Scope Comprehensive Policy Plan: The Frederick County Comprehensive Policy Plan is an official public document that serves as the community's guide for making decisions regarding development, preservation, public facilities and other key components of community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. [Comprehensive Policy Plan, p. 1-1] Land Use Compatibility: The parcel comprising this MDP application is located within the County's Urban Development Area (UDA) and Sewer and Water Service Area (SWSA). The Urban Development Area defines the general area in which more intensive forms of residential development will occur. The Townes at Tasker Development is proposed to develop with a density of 4.3 units per acre, which is consistent with the maximum RP density permitted in the Zoning Ordinance. The 2030 Comprehensive Plan shows this property with a residential land use designation. The residential designation was approved by the Board of Supervisors on January 25, 2013, (CPPA request #01-11, institutional designation to residential). Transfer of Development Rights (TDR) Program: The TDR program allows properties designated as receiving properties to be developed to RP standards. Therefore, the program allows RA -Zoned receiving properties that are proposing townhouses to develop with a maximum density of 10 units per acre. The MDP depicts the road network, entrances, buffers, sidewalks and recreational amenities. MDP #03-13, The Townes at Tasker October 21, 2013 Page 5 Site Access and Transportation: The Townes at Tasker is proposed to be accessed via one full entrance on Tasker Road. It should be noted that in 2011-2012 during the Comprehensive Plan change for this parcel, it was discussed that the entrance for this development should be via Rutherford Lane. The applicant, however, opted for a full intersection on Tasker Road instead. The MDP also depicts the required sidewalk along Tasker Road. Recreational Amenities: The MDP proposes a tot lot and picnic shelter as the recreational amenities for the 49 townhouse units. STAFF CONCLUSIONS FOR THE 11/06/13 PLANNING COMMISSION MEETING: The Master Development Plan for The Townes at Tasker depicts appropriate land uses and appears to be consistent with the requirements of Article III, Transfer of Development Rights (TDR) Program and Article VIII, Master Development Plan, of the Zoning Ordinance. Following the Planning Commission and Board of Supervisors review of the MDP, staff will proceed with the severing and application process for the TDR rights fiom the sending property to the receiving property and proceed with approval of the MDP. All of the issues brought forth by the Planning Commission should be appropriately addressed by the applicant. It appears that the application meets all requirements. Following presentation of the application to the Planning Commission and the Board of Supervisors, and the incorporation of your comments, staff is prepared to move forward with the TDR transfer and approve the MDP. m 5 low '000" SITE �.0 1 Na 7 r �G NG VICINITY MAP SCALE: i = 2,000 FCSA PROJECT INFORMATION WATER AND SANITARY SEWER USAGE WATER DEMAND 18,800 GPD SANITARY SEWER DISCHARGE 18.800 GPD CALCULATION OF DEMAND/DISCIWRGE WATER DEMAND RESIDENTIAL: 235 GPD PER CONNECTION COMMERCIAL: 75 GPD PER 1,000 S.F. INDUSTRIAL: 25 CAL. PER PERSON PER DAY 0 10 PERSONS PER ACRE SEWER DISCHARGE SEWER DISCHARGE EQUALS WATER DEMAND r J � 5�TPEIR DEVEbOPMENT FbAN FOR T"H ..j .3E T.POWNESK AT TA SKER SHAWNEE MAGISTERIAL D STR CT FREDERCK COUN-ff, VRGI Q MAY 309 2013 OWNER: SHAWNEE VILLAGE, L.C. 420 W. JUBAL EARLY DRIVE WINCHESTER, VIRGINIA 22601 PHONE: 540-667-2120 DEVELOPER: DAVE HOLLIDAY CONSTRUCTION CO. INC. 420 W. JUBAL EARLY DRIVE WINCHESTER, VIRGINIA 22601 PHONE: 540-667-2120 ENGINEER / SURVEYOR: PENNONI ASSOCIATES INC. 117 EAST PICCADILLY STREET, SUITE 200 WINCHESTER, VIRGINIA 22601 PHONE:540-667-2139 FAX:540-665-0493 ��pLTH DA, c�a MICHAEL S. STICKLEY y Lic. No. a31162 o��SSIONALG2 OWNER / DEVELOPER SHAWNEE VILLAGE, L.C. C/O DAVE HOLLIDAY CONSTRUCTION CO. 420 W. JUBAL EARLY DRIVE WINCHESTER. VIRGINIA 22601 PHONE: 540-667-2120 OWNER'S SIGNATURE DATE APPROVED BY: DIRECTOR OF PLANNING AND DEVELOPMENT DATE COUNTY ADMINISTRATOR DATE INDEX OF SHEETS COVER SHEET 1 OF 4 MASTER DEVELOPMENT PLAN 2 OF 4 N F 3OF4 TASNER ROAD IMPROVEMENT PLAN 4 OF 4 PROJECT SUMMARY TOTAL AREA 11.3458 ACRES EXISTING ZONING. RA (RURAL AREAS) WITH RP STANDARDS VIA TDR'S EXISTING USE: VACANT PROPOSED USE: RESIDENTIAL (51NGLE FAMILY ATTACHED) TAX ID NO.. 75-A-86 MAGISTERIAL DISTRICT SHAWNEE OPEN SPACE AREA REQUIRED: 30% MAX. DENSITY ALLOWED: 8 D.U. PER ACRE PROPOSED DENSITY: 4.3 D.U. PER ACRE TOTAL ALLOWED UNITS: 49 TOTAL PROPOSED UNITS: 49 NOTES: 1. ALL PROPOSED UTILITIES ARE TO BE CONSTRUCTED UNDERGROUND. SEWER AND WATER CAPACITY ARE AVAILABLE FROM FCSA 2, THIS PROPERTY IS SUBJECT TO THE REQUIREMENTS OF THE RP (RESIDENTIAL PERFORMANCE DISTRICT). - - MR TABLE DENSITY RIGHTS DENSITY RIGHTS RECEIVED SENDING PROPERTY AVAILABLE BY 75-A-86 72-A-30, 72-A-34, AND 72-A-29C 42 42 21-A-7A 7 7 TOTAL - 49-- - 49 PROPERTY UNE - BUILDING RESTRICTION RESTRICTION LINE / SETBAM - — — EXISTING CONTOURS CONTOURS -------- ________ __ �Q________ EXISTING TREBR$ IDO YR. HOODPUW — EXISTING STORM STORM DRAIN EXISTING WATER - EXISTING 'WATER VALVE S PROPOSED WATER MAIN - -- • - . — • - DISIING SANITARY SEWER — PROPOSED SANITARY SEWER — PROPOSED SANITARY FORCE" EXSIING GAS LINE - - G — G -- PROPOSED GAS UIE - - - - - - - - MR SLOPES 2 25X STEEP SLOPES ) 5BX - - REVISIONS NO. DATE DESCRIPTION BY CKD 1 06-11-13 REVISED PER FCSA COMMENTS KLM MSS 2 10-02-13 REVISED PER COUNTY COMMENTS KLM MSS 3 10-10-13 REVISED PER COUNTY COMMENTS KLM MSS I NOTES 1. ON LOT LANDSCAPING SHALL BE PROVIDED PER SECTION 165-203.01 OF THE FREDERICK COUNTY ZONING ORDINANCE. 6 ORNAMENTAL SHRUBS AND 2 ORNAMENTAL TREES SHALL BE PRODDED PER 5 LOTS. I 2. 5.34 (47%) ACRES OF TOTAL OPEN SPACE ARE PROPOSED. 3. NO TREE OR SHRUBS SHAM BE PLATTED WITHIN FCSA EASEMENTS. 4. THE DEVELOPMENT'S COVENANTS SHALL GRANT FCSA THE RIGHT TO ENTER ONTO ANY LOT AND PERFORM NECESSARY REPAIRS OF THE UTILITIES. AREA OF ACCESS SHALL. BE TO THE UTILMES ONLY. PROPERTY ADJ. PROPERTY PROPOSED SITE BUFFER 30' BIIFN� 20' ACTIVE EER &INFER 6' HIGH, OPAQUE FENCE PROVIDE 3 PANTS PER 10 LF. (1/3 DECIDUOUS , 1/3 EVERGREEN, I I I 1/3 SHRUBS) 10 LANDSCAPED EST. I SECTION PROVIDE 3 PLANTS PER 10 LF. (1/3 DECIDUOUS. 1/3 EVERGREEN. 1/3 SHRUBS) — — 10 LANDSCAPED ESUT.PRIDI'MED Elo- 9Fy 5 — ADIACENr PROPERTY 10' t 6' {ACFI, OPAQUE FENCE PLAN RESIDENTIAL SEPARATION BUFFER NOT TO SCALE 25' BLDG_SETBACK 2000.TO,SIDEWALK TYP. CONC. SIDEWALK' 5.00' TYP. -2.00' TYPE 30.00- WATER AND SEWER EASEMENT F I I I I VARIES 20.00' W. 111.00' TV. I TOWNHOUSE 10WNDISE TOWNHOUSE I w.oD' I TYP. 2.00' I RIGHI-OF-WAY 40 INACTIVE allEII -1 D' x7K EARTHEN BERM I I BUFFER AND LANDSCAPED AREA PROVIDE 3 PLANTS PER 10 LF. (1/3 DECIDUOUS. 1/3 EVERGREEN i/3 SHRUBS) I 6' ABOVE AVG. ROAD GRADE r— �I 36 I SECTION I 6' EARTHEN BERM NO LANDSCAPED AREA PROVIDE 3 PLANTS PER 10 LF. (1/3 DECIDUOUS, 1/3 EVERGREEN, 1/3 SHRUBS) 36 10' ACTIVE 0' INACTIVE RIGHT-OF-WAY 1 / D' PLAN ROAD EFFICIENCY BUFFER Nor TO Sul AOA. PROPERTY PROPOSED SITE BUFFER IX. 25' NACTIVE 25' ACTIVE PPROOMA VDOT BUFFER BUFFER P1N6 FOR S 6' HIGH, OPAQUE FENCE PROVIDE 3 PLANTS PER 10 LF. (1/3 DECIDUOUS, 1/3 EVERGREEN. 1/3 SHRUBS) I I - DATED d / r r 1 1 �— 10 LANDSCAPED ESMT. I SECTION PROVIDE 3 PLATS PER 10 L.F. (1/3 DECIDUOUS, 1/3 EVERGREEN, 1/3 SHRUBS) — — — — — — — — — — 25' ACTIVE BUFFER .EO-W�CWC0.E SITE — 2. — — 25' INACTIVE BUFFER SO' 5 _PROPOSED AD,WCENT PROPERTY 10' 6' HIGH, 0 IAOUE FENCE ZONING DISTRICT BUFFER NOT TO SCALE FACE OF CURB TO \-2TR M. � FACE OF CURB TYPICAL LOT DETAIL SCALE: 1'=20' APPROX. LOCATION PROP. - UNDERGROUND ELECTRIC AREA PHASING SUMMARY AREA N ITEM N AREA N NUMBER PHASE PROP. USE T06H NO OPEN SPACE RODS/PKG. SEA LOTS OF LOTS 1E5�MT I RESDENTR 2.75 A. 052 AC. GAS AC 16 1 RESIDENTIAL 2B4 AC. T, 0.16 AC. OBO AC 15 W REIODRYL 1.70 AC. 0(71A)' 0.17 AC, 1.15 AC. 18 RECREATIONAL AMENITIES SUMMARY MEMBER OF PROPOSED TOWNHOME: 49 RECIEATONL URNS REQUIRED (1 PER 30 WITS): 2 0' TYR RECREATIONAL UNITS PROPOSED: 2 WATER METER TV, PROPOSED RECREATIONAL UNITS VUALiY SEWER STUB M. M05E DECRPEIDN REC UNITS PROVIDED DO. IMP. I TOT LOT NO PICNIC SHILTER 2 0' IMP. FUTAE Tol LOT 1 SCHRAMM LOOP (TYPE 3) URBAN ENTRANCE DRIVE - WIDTH VARIES UIZII. VIwIIJ/l/ I I / 11.3458 ACRES 50' RESDWIAL SEPARATION BUFFE L� (30' INACTIVE/20' SFF IIFTAII THIS SHF ACTIVE ENVIRONMENTAL FEATURES AREA N ACRE T074 DISTURBED % DERRUD % N OS, AREA N O.S. TOOOPIANS 0.02 O 0 1005 0.02 LVES AND PONDS 0 0 0 0 0 NIETURA RETENTION AREAS 0 0 0 0 0 STEEP MOPES (425%) 0.91 0.34 37.36% 62A4A D.57 WETLANDS 0 0 0 0 0 WOODLANDS 0.67 0.16 ll. 76.12A 0.11 RESIDENTIAL PERFORMANCE ZONING DISTRICT (RP) WAY LOT Siff: Pvv ^`Ij00 Sf.vRR", •`••, MAXYUI GROSS DOM B LINES PER ACRE MN!" LOT WIDTH: 22' (END UNIT) 16' (INTERIOR OFF STREET PARKING SPACES REQUIRED: 2 SP. PER UNIT & IING SETBACK FROM PUBUC/MMATE RO.W_ 25 Fl. (WITH CAW6E) RAIDING SETBACK FROM OFF-STREET PNEUIG LOT: 15 FT. REAR BALK SETBACK 2D FT. SIDE BUILDING SETBACK 10 FT. SETBACKS FOR UNROOFED DECK STOOPS, LANDINGS. SIMILAR FFAVO FRONT FROM OFF-STREET PARKING: 10 IT FRONT FROM MWTE/PUBLIC ROAD 15 T. SIDE (END LAAT): 5 FT. FEAR: 5 FT. MAX" BUIEM HEIGHT ON PRINCIPAL BALDING 40 FT. MAX" BUIDNG_HEIGHT ON ACCESSORY BLSPAS:_- 20. FT. 1ASKER ROAD 45 MIPH SEC ROUTE 642P�� cloR IL-�_ 'ACT BUFFERI SET STREET TREES PLANTED w' O.C. PER COUNTY N 2rMNC 'L" LOCATION TO BE TIED SED e, AT SIDE PUN SEAGE. -TER•I Nisl�� 1 I I Loll Y T • MINI Y ff SCHMM4 LOOP l.. wl , (TYPE Ip 22' PRIVATE DRIVE I SIP • I ;RII • C 30' WATER AND �� � SEWER ESYT. AIILY• I o LETS, SOTS r TARTER {YE, N ER Y� 16Y!` Rl�:o . � � I • I I SCIRAIAM LOOP-- R (TYPE 1) URBAN CDR x l I I 22' PRIVATE ERNE -... . - - �S[YIPR1,f W I — — — - — — — --wEa -PILL S 11i560 /i R'N 75-A-BRA 1 AGAPE CHRIS77AN FELLOMSMRJ _ 09 566 PC 302 Um: I gadVo's filulion f 75-A-e6a , y -- - y RA GRAPHIC SCALE 50' RSUA7£RF([d4�DF AND • 25• 0• SO' 100' FomEy Revdents -- 1 ned RA 4 S 1 NCH • 50 R MATCHLINE SHEET 3 E u 8 Hi S i i i V <3 �o� u goo �W ¢G\T1IA O I 2i�-' < h Asa � o I a SE N V « AFRQW FO3 3 U m NElfZ I o° O Z O a ZO Lil v n �12 O a Ln F- L.Ja s �Q a_ CIO O J N Z . O> Zp�� ; 6� Q� W LE- L- (N O c) Q Q 2 U � Q 0 nNN PPPulons —I n P[rNlPw AsaxrEa R . VJ Mv,YQ .POI IR.CL N R6Rti Of GR MWCCI. N—I RR owswrtP o � v TOR NNY W NINCR ON —.—OF 4J nRRo,s,T ON oR .NI mxu room. EEn REuu NRmp—= CZ ASSOCIATES FOR M SPECi1C PUINOSE RPD®ZN t ONiT6 SN£ R[iR AND Nf110V1 UNRIIY NL LE- E—.-- R53pt 1[S; ,YIP ONION SNALL UI GE.— RRO NOLO —LESS PETU NN /SSOCIR S INOY 6L UUT O 'wRESULTING ES MID EXPENSES O AXIS 1 oa NO � SST16724-1-0 2 OF 4 ti FOy ; - m0 PN.NNc YO. A� KLM 1� 5/30/13 '�I MASS MATCHLINE SHEET 2 i� _ J % /.: i- /` I,Ry)i J•`` -•tea'• �'� ��� RWHERFOORRDTELANE + ' • •�� J I - r i i I /rfORCEYW \k\ `\\•y tQ k al`ot' y./ J /• APPRDXWTE LOCATION OF WSW Poplf-Of-WAY i i •F-•' ` \_�1 - `````�_ t a� 'mot •~-J ___�-'�' _-----`'r - �, � I j�� \.� N�� � ` �_! \ .`� ..• •t \� '\I .�9,'�V,1,i,,\ ` ', P 1�� ` •. mw EL SAM NH 'lili'ilg ,!'V- �, ',i•}•t \ \` , `gip,' \` iJK \ I /'• — � G 12, �'t - -----ice 1 i i • J / � i I 1 , ``! ` � / t I I 5• CONCRETE SIDEWALK 2• GRASS STRIP 22.00' PRIVATE DIM 2' GRASS STRIP 5' CONCRETE SIDEWALK I ,1.00' DRNE LANE 11.00' DRIVE LANE VDO.T Cr-6 I• 1 1 VDOT CG-6 W REV. GUTTER SLOPE —III 1 C:I' — 1•:1•. I=1 11:- 2' SM9.5A B TYPE 1 - 22' PRIVATE DRIVE SECTION I WELL COMPACTED SUBGRADE NOT TO SCALE cd 1 � "i'I /�; �i k - _ - �•'E--•t. ` '. ''fig T -' �+- �_ �` ' ! - _ - ` 5' CONCRETE SIDEWALK 2' GRASS STRIP 24.00' PRIVATE DRIVE 2' GRASS STRIP 5' CONCRETE SDEWNX / 12.00' DRIVE LANE 12.DO' DRIVE LANE VWT CC-6 VOOT cc-6 W REV. G111IER SIOPE 1•.1• _—III , ra• - — '�'— ,�.� I1-1I F -1 —111=1 I— '\ 2 SN 9_'A I I -II I �I �t COMPACTED SUBGRADE TYPE 2 - 24' PRIVATE DRIVE SECTION NOT TO SCALE PRIVATE ENTRANCE DRIVE (WIDTH VARIES) 5' CONCRETE SIDEWALK 2' GRASS STRIP 24' INN. 2' GRASS SW 5 CONCRETE 910WK DRIVE LANE DR LAW DRIVE LANE VDOT CG-6 III - I111�- -III=1I =1I1=� iI_III II1-1II—I" IIIIIII I1=111=11I-1I1=1I — I1=111=1I I TYPE 3 - PRIVATE ENTRANCE TDRNVE SECTION (WIDTH VARIES) rSE Ir SM 9.% NOT C i L 3 a �o� coa \4�iTAlA 2i% In rc O Y = a ro z N h *no QQ'" om O w h � � z Q � s Z� LLJ �g :¢o'er D o 6 1, Z i` O W J O —IzFt W2� Q U;i E�j O 0 W W J U = .Q J � Q �N y Q ti weRwm w ra.o. ARwcxrFs Aw �DDcuons Fws a sGRYCC w Rwm a M nlDcn. ARC xm wlDrm a RwRSNIm ro ff rIRIAe[ rope RU4 w ORI[R a pINCRS ON FYIURIM a M PRO.CG1 a pl AIO' ODG rRQIFCI. wusF wDw11 wTp NJRIKAMN q ApYM1Op w rpnr .V50R1R Iql M Y[aX AlIR4Y MAQO 4 IC owcls mM uli An wINOUr INOIRf DII Irrx � F1PoCUw To roepR AiOCN}6: AMD awn MWl DCYMiY IIID NMO MARIRf1f anRaw A(IIOCYII[S J PCa5GF5 ANO FInRSFS R RESUITIMG TNCRFCROY. ACIS IRINC OUT ALL OOr ON V .IDR xD. 16724-1-0 — 3 OF 4 Rr.IA wWwG N0. OT'=so' alwOl w f� KLM Q) 5/30/13 11 AISS 12' RIGHT TURI 12' THR 74 7.2 7; DArW XLrF 720.00 80 PROPOSED LOTS 5.81 TRIPS/DAY/LOT TOTAL TRIPS-465 CONSTRUCTION ENTRANCE NOTES: 1. SIOILD THE TRAGW OF MUD ONIO THE FUKC ROING BECOMES A PROBLEM, THE FREDEW CDU(TY IMSPECTOR MAY REOLIRE RASH RINGS BE IRSTMIED AS RETUNED BY THE CONSTRICTION ENTRANCE DETAIL ON SHEET 3. 2. THE CONTRACTOR MILL REMOVE ANY MUD THAT 15 TRACKED ONTO THE ROAMYS BY THE END OF WORK THAT TRADE DAY. GRADE NOTES: 1, ALL PAVEMENT STRIPING SHWA BE IN ACCORW WITH THE VDOT STWARD DETAIL PM-3. 2. THRU LANE PAVEMENT STRIPING. SHALL MEET A40 1I THE EXISTING 10 SKIPS/V SPACING. 3, ALL PAVEMENT MARKINGS EXCEPT FOR THE NIGHT TURN LANE CROSS HATCHING SHAII BE TYPE 0, CLASS 1. 4. CONTRACTOR TO PROVIDE ROIDIIAY STRIFING RAN TO VDOT INSPECTOR FOR REVIEW AND Al"WAL PRIOR 10 APPLICATION. 5. VDOT EROSION AND SEDIMENT CONTROL CONTRACTOR CERTIFICATION IS REQUIRED. 6. ALL SIGNS INSTALLED ON THE PROPERTY WILL COMPLY WITH 74 REWIREMOTTS OF THE FFEEERO( CUM ZONING ORDNANCE NO SIGNS BEYCOID STOP S06 ARE PROPOSED INITH THIS PLAN. LIMIT OF DISTURBANCE 0+00 0+50 1+00 ENTRANCE PROFILE HORIZONTAL SCALE 1'=50' VERTICAL SCALE: -S' WRPIAl S FOR ROAD WIDENING SECTIONS SEE SHEET 7 1 10 A A, .?Rdl% J (SEE SHEI 0 c4ma OF �l STR 6.0 TYPE DI-3. RIM ELEV, 735.91 STR 5.0 TYPE DI-3C ELEV. 731.41 32 ZOP. GRAVEL I SHOULDER )E ES-), . , N Lif =724.$ 6 )E EC-1 CL All, RIPRAP� % I ESKPEROAD 45 P H 5- "JASDK A gp SEIROl0R,lp* TR S7 TYPE -B r4 RIM ELEV.= -ROAD- --WP- NRNNN F �EMET IR TW An NRQW 74 Q I -T r� 'w:pia ,,•I ,l !Nil ,i a ,;' 1` i P. *R HP PD LINE 0 Noss, 7 woo 000 FOf ROAD WIDENING SECTIONS SEE SHEET 29 OF SITE PLAIN PROPOSED 20' WASHINGTON OHT GAS EASEMENT � DISTANCE EASEMENT LIMIT OF D! DISTURBANCE iI STgp SIGN .STR 4.0 TYPEDI-3C RIM �ELEV.= 731.41 SIGNING AND PAVEMENT MARKING NOTES 1. As sa,csi-ANd ..q.- - -I - ­g tn.' 6. W, ­k tt-k. rfft F."m- GAw__ c_ Tlc ,R, AN D-INFNNI sf T­NN­i,bw ROGN1 clod bmdW SpRI SOFT, r) IR,, WWmi It T­Np-l.fi- RUINUi U- en.ps SA-th, 2. 0 PR:+'P t -WNW* OW be 11WIRNOO-WAt (Ty" ti LIM 0). L;100-1 IG,- RNARN N.. hNA INS, vibe (TgNN, A). h­_d or i[Imbbr ers w.i".t. - -.1 SIR m,N,ttlNrl In I,A ISAW w qw OthAR, afatr..ci.­ NNTJ U ­MAV pHN q1tsp61ift IRA INNARN I "I 'k An, tr-1,­9 ONARNARRI III, ­i& AN wrliat FRItt, VIRPOIR,Si PI ­vAttNt, `$cm T.4 GO tw. th. VaRANNNAs 0­1 _0q. -11 RNI NO-NA, -.1,9. .. NAR _tG"ARa 6 As sNns SRI K n G-4- N­ WT Sxmr,4a4 WSP-1 .-w FRI 5;W RUMUl SRN- Y.d a d I.vRAd . . . S eI eNM 5-IN., - ARRIANNew A-Upastia P"ted spsmea INN"te '"J'q OF, "o-D P"l gi,* t, 0 HOW4.0 OWOWP•4 NrI 1A, -b,ftd IS V.DDT Nor rW- q,4 RNI PARR, . RRA'" Adq­ As Nq.. - p- ­_ ►.I - Ia_ A. 11-A, S.d A,Ibs,fttv p4o W wNstai*Ot, to As Pismgyet Or P.*. IN 1AA, iAl t*- peel. YE)Ot 51 1 IIANNANRI pert. _tF .11INANNNI WWI. RNWOV. R/W NAMES I t l RAN. CC-7 1/4':1' MN..j!ATCN EX. PVTAIT- CROSS SLOPE EXISTING PAWAISW� G"ASS smp 3. X-4. SEE DETAILTO DkYL,G. E 0/ty IIS 4,00AYE * AN TASKER ROAD (VAIN CURB & CUTTER) M'T STATE' HWAY N N PLANS ItR !T4 ROMf MTED OTI I, IN3 � A I 2' 1.5' SM-9.5A SURFACE ASPHALT IT TT 0 IM- 9.OA INTERMEDIATE ASPHALT BM-25.0 BASE ASPHALT VDOT-218 AGGREGATE OPEN GRADED SELECT MATERIAL -PER VDOT SP. EXlstwc 4 3 5 6 WELL COMPACTED SUBGRADE A- MATCH EXISTING CROSS SLOPE PA OR MATCH EX. TASKER ROAD PVMT. SECTION. WHICHEVER IS GREATER TASKER ROAD WANING PAVEMENTJJENK NNNN, TPT_ I -,Cz: ;ED AIL 146tCS RE . .&L A_ lj,.�46 pp I .1 W'74iRo IN 74 PROPOSED 189 )_F. RETAINING W4RETE SEt,,DETAIL', SHEET, 23 OF SITE" PLAN. % J st COMMON GRAPHIC SCALE � a 40- 20' 0, 40' w I I I I I I Q I INCH = 40 ft. LEGEND PROPERTY LINE GRAPHIC SCALE � a 40- 20' 0, 40' w I I I I I I Q I INCH = 40 ft. LEGEND PROPERTY LINE BUILDING RESTFICTION L1M / SEIB= DUSTING CONTOURS -------- ------- PROPOSED CONTOURS 922 920 DOING STOW DRAIN - --- - - - PROPOSED S70RU DIRM 73.00 PROPOSED SPOT MATION PROPOSED TOP OF CM ELEVATION 73.00 TC + PROPOSED EDGE OF PKMW ELEVATION 73.00 EP + UNIT OF DISTURaVICE RAN PROPOSED ASPHALT PAVEMENT - PROPOSED ISPHALT PAVEMENT (1111. OVERLAY) PROPOSED ASPHALT PAVEMENT (CDMM+ ENTRANCE) boa Z 5: DO DO GO Z. 0 03 r) i;� CV g C)Qr_ IRS ILL-i S2 CL M 0- C)LU V) mu S3 Z R 6 CLI �, c)m? (-) j CD Ln C:) c) ti ti D.U.- _,_ G, ­­ __ ANT =-' G=.DTA'ZlQ`WT._._� FOR .01UP.- SY T.- A ON ­_ OF THE - ON ON A. 0­ RI- ANY 11 e. FOR LIES "U."OSE "'Doev, w BE AT - - As. - U- ON LEGAL E-E TO -1 -IRIES, AND - SAMA """" "' "DID FRO A� cwUFS. DMES"LOW"S"AND-EMPEMNSE1 ARISING OUT OF DR RESULTING 71[REFROM, C) co ANS - 16724-1-0 0 - 4 OF 4 No 0 KLM 5/30/13 MSS Planning Commission: Board of Supervisors: MASTER DEVELOPMENT PLAN #03-13 The Townes at Tasker Staff Report for the Board of Supervisors Prepared: November 7, 2013 Staff Contact: Candice E. Perkins, AICP, Senior Planner Reviewed 11/06/13 11/13/13 PROPOSAL: To develop 10.25 acres of land zoned RA (Rural Areas) District with a total of 49 single family attached (townhouse) units. This receiving property will be utilizing transferred development rights as pennitted by the Transfer of Development Rights (TDR) ordinance to develop with RP (Residential Performance) District standards. The subject receiving parcel will be utilizing 49 transferred development rights from four parcels (72-A-30, 72-A-34, 72-A-29C and 21-A-7A) that are located in the County's sending area. The applicant currently has the TDR rights to develop half of the site; the remainder of the site could be developed through the transfer of additional TDR rights (revised MDP would also be required) or through a rezoning. This is the first property to develop under the adopted TDR ordinance. MAGISTERIAL DISTRICT: Shawnee LOCATION: The subject property is located on the east side of Route 642, (Tasker Road) and north of Route 846, (Rutherford Lane) approximately 0.7 miles south of the I-81 Interchange 310. STAFF CONCLUSIONS FOR THE 11/13/13 BOARD OF SUPERVISORS MEETING: The Master Development Plan for The Townes at Tasker depicts appropriate land uses and appears to be consistent with the requirements of Article III, Transfer of Development Rights (TDR) Program and Article VIII, Master Development Plan, of the Zoning Ordinance. Following the Planning Commission and Board of Supervisors review of the MDP, staff will proceed with the severing and application process for the TDR rights from the sending property to the receiving property and proceed with approval of the MDP. All of the issues brought forth by the Board of Supervisors should be appropriately addressed by the applicant. It appears that the application meets all requirements. Following presentation of the application to the Planning Commission and the Board of Supervisors, and the incorporation of your comments, staff is prepared to move.forward with the TDR transfer and approve the MDP. MDP 403-13, The Townes at Tasker November 7, 2013 Page 2 This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist in the review of this application. It may also be useful to others interested in this zoning matter. LOCATION: The subject property is located on the east side of Route 642, (Tacker Road) and north of Route 846, (Rutherford Lane) approximately 0.7 miles south of the I-81 Interchange 310. MAGISTERIAL DISTRICT: Shawnee PROPERTY ID NUMBER: 75-A-86 PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas) using RP (Residential Perfonnance) District development standards through the use of the Transfer of Development Rights (TDR) Ordinance. Use: Vacant ZONING & PRESENT USE OF ADJOINING PROPERTIES: North: B2 (Business General) Use: Self Storage Facility South: RP (Residential Performance) Use: Residential & Vacant East: RA (Rural Areas) Use: Residential & Church West: Interstate I-81 Use: Interstate PROPOSAL: To develop 10.25 acres of land zoned RA (Rural Areas) District with a total of 49 single family attached (townhouse) units. This receiving property will be utilizing transferred development rights as permitted by the Transfer of Development Rights (TDR) ordinance to develop with RP (Residential Performance) District standards. The subject receiving parcel will be utilizing 49 transferred development rights from four parcels (72-A-30, 72-A-34, 72-A-29C and 21-A-7A) that are located in the County's sending area. The applicant currently has the TDR rights to develop half of the site; the remainder of the site could be developed through the transfer of additional TDR rights (revised MDP would also be required) or through a rezoning. This is the first property to develop under the adopted TDR ordinance. . MDP #03-13, The Townes at Tasker November 7, 2013 Page 3 REVIEW EVALUATIONS: Virginia Department of Transportation: The Master Development Plan for this property appears to have a significant measurable impact on Route 642, the VDOT facility which would provide access to the property. Before making any final comments, this office will require a complete set of site plans, drainage calculations and traffic flow data from the I.T.E. Trip Generation Manual, 8th Edition for review. VDOT reserves the right to comment on all right-of-way needs, including right-of-way dedications, traffic signalization, roadway improvements and drainage. Prior to construction on the State's right-of-way the developer will need to apply to this office for issuance of appropriate permits to cover said work. Frederick County Fire & Rescue: Plan approval recommended. Frederick County Fire Marshal: Plan approved Frederick County Public Works: All of our previous comments have been addressed. Frederick County Inspections Department: No comments at this time. Comments will be made at site plan and subdivision plan submittal. Frederick County Sanitation Authority: Approved Frederick County Parks and Recreation: Plan appears to meet the recreation unit and open space ordinance. It may be helpful to make sure the three recreation units will fit the site. Recreation units are now $32,500.00 each. Virginia Department of Health Comment: Health Department has no objections so long as public sewer and water are utilized. Frederick County Public Schools: The applicant has worked with Frederick County Public Schools to provide adequate turning area for a bus as well as a shelter for students. Planning & Zoning: A) Master Development Plan Requirement A master development plan is required prior to development of this property. Before a master development plan can be approved, it must be reviewed by the Planning Commission, the Board of Supervisors and all relevant review agencies. Approval may only be granted if the master development plan conforms to all requirements of the Frederick County Zoning and Subdivision Ordinances. The purpose of the master development plan is to promote orderly and planned development of property within Frederick County that suits the characteristics of the land, is harmonious with adjoining property and is in the best interest of the general public. Also, pursuant to Article III, Transfer of Development Rights (TDR) Program (§ 165-303.02. Development Approval Procedures.), a request to utilize transferred development rights on an MDP #03-13, The Townes at Tasker November 7, 2013 Page 4 eligible receiving property must be in the form of a Master Development Plan and a Subdivision Design Plan submitted to the Department of Planning and Development in accordance with the Zoning and Subdivision regulations contained in Chapters 165 and 144 of the County Code. B) Site History The original Frederick County Zoning Map (U.S.G.S. Stephens City, VA Quadrangle) identifies the subject property as being zoned R-1 (Residential Limited). The parcel was re -snapped from R-1 to A-2 (Agricultural General) pursuant to the County's comprehensive downzoning initiative (Zoning Amendment Petition #011-80), which was adopted on October 8, 1980. The County's agricultural zoning districts were subsequently combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the re -mapping of the subject property and all other A-1 and A-2 zoned land to the RA District. C) Site Suitability & Project Scope Comprehensive Policy Plan: The Frederick County Comprehensive Policy Plan is an official public document that selves as the community's guide for making decisions regarding development, preservation, public facilities and other key components of community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. [Comprehensive Policy Plan, p. 1-11 Land Use Compatibility: The parcel comprising this MDP application is located within the County's Urban Development Area (UDA) and Sewer and Water Service Area (SWSA). The Urban Development Area defines the general area in which more intensive forms of residential development will occur. The Townes at Tasker Development is proposed to develop with a density of 4.3 units per acre, which is consistent with the maximum RP density permitted in the Zoning Ordinance. The 2030 Comprehensive Plan shows this property with a residential land use designation. The residential designation was approved by the Board of Supervisors on January 25, 2013, (CPPA request #01-11, institutional designation to residential). Transfer of Development Rights (TOR) Program: The TDR program allows properties designated as receiving properties to be developed to RP standards. Therefore, the program allows RA -Zoned receiving properties that are proposing townhouses to develop with a maximum density of 10 units per acre. The MDP depicts the road network, entrances, buffers, sidewalks and recreational amenities. Site Access and Transportation: The Townes at Tasker is proposed to be accessed via one full entrance on Tasker Road. It should be noted that in 2011-2012 during the Comprehensive Plan change for this parcel, it was discussed that the entrance for this development should be via Rutherford Lane. The applicant, however, opted for a full intersection on Tasker Road instead. The MDP also depicts the MDP #03-13, The Townes at Tasker November 7, 2013 Page 5 required sidewalk along Tasker Road.. Recreational Amenities: The MDP proposes a tot lot and picnic shelter as the recreational amenities for the 49 townhouse units. PLANNING COMMISSION DISCUSSION SUMMARY OF THE 11/06/13 MEETING Commission members had a number of safety concerns with the only entrance to the development being on Tasker Road. Their concerns were based on a number of issues, including the vertical curve coming down the hill towards the entrance and whether adequate site distances could be achieved; vehicles corning down the hill typically exceed the posted 45mph; considering the amount of trips leaving the development, service degradation was expected to occur and, a vehicular back-up from the Route 37 signal was expected to extend down to the proposed entrance. Staff agreed with the points made and noted the applicant was encouraged to relocate the entrance to Rutherford Lane. Staff noted this development does not meet the threshold for staff to require a TIA (transportation impact analysis) in order to specifically comment on back-up queuing information. Staff noted their greater concerns are with exiting traffic at this location, more so than traffic entering the development, and staff predicted a future service degradation problem. However, it was rioted the applicant is constructing a left -turn lane and there has been considerable exchange between the applicant and VDOT as they work to come up with an approvable entrance under VDOT standards. The applicant's representative felt confident the proposed entrance onto Tasker Road will meet VDOT's road design requirements for site distance, turn lanes, length of turn lanes, etc. He said an entrance onto Rutherford Lane was initially attempted; however, not only were the same improvements needed on Rutherford Lane as on Tasker Road, but some additional obstacles were encountered on Rutherford as well. He said a large power pole is situated on the northeast corner of the Rutherford Lane-Tasker Road intersection; the applicant would be required by VDOT to straighten out this intersection, which would require the relocation of the power pole. Additionally, the widening would need to be extended across the box culvert which carries Opequon Creek under Tasker Road; this would require lengthening of the culvert as well. Lastly, the entrance on Rutherford Lane would result in'the site being roughly 30 feet lower than where it is presently. The applicant's representative believed these conditions added a far more complex condition to the entrance design than what would be required on Tasker Road. The applicant's representative noted they were utilizing the older TDR ordinance for this development, but expects to come back with a revised MDP as the TDR condition changes. It was noted the developer is working on acquiring additional TDRs in order to fully build out the site. It was further noted that all of the studies were done using a total of 80 townhouses, as well as the trip calculations for the proposed entrance. No other issues were raised. No action was needed by the Commission at this time. (Note: Commissioners Dunlap, Kenney, and Manuel were absent from the meeting.) MDP 903-13, The Townes at Tasker November 7, 2013 Page 6 STAFF CONCLUSIONS FOR THE 11/13/13 BOARD OF SUPERVISORS MEETING: The Master Development Plan for The Townes at Tasker depicts appropriate land uses and appears to be consistent with the requirements of Article III, Transfer of Development Rights (TDR) Program and Article VIII, Master Development Plan, of the Zoning Ordinance. Following the Planning Commission and Board of Supervisors review of the MDP, staff will proceed with the severing and application process for the TDR rights from the sending property to the receiving property and proceed with approval of the MDP.. All of the issues brought forth by the Board of Supervisors should be appropriately addressed by the applicant. It appears that the application meets all requirements. Following presentation of the application to the Planning Commission and the Board of Supervisors, and the incorporation of your comments, staff is prepared to move.forward with the TDR transfer and approve the MDP. COUNTY of FREDERICK Department of Planning and Development 5401665-5651 FAX: 540/665-6395 NOTIFICATION OF PUBLIC MEETING October 25, 2013 TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNERS(S) RE: MASTER DEVELOPMENT PLAN #03-13 THE TOWNES AT TASKER You are hereby notified of a Frederick County Planning Commission public meeting being held on Wednesday, November 6, 2013 at 7. 00 p.m. and a Board ofSupervisors public meeting being held on Wednesday, November 13, 2013, at 7.00 p.m., in the Board Room of the Frederick County Administration Building at 107 North Kent Street, Winchester, Virginia for the following application: This meeting is to consider Master Development Plan #03-13 for The Townes at Tasker, submitted by Pennoni Associates Inc., to develop a -9-unit townhouse development. The subject property is located on the east side of Route 642, Tasker Road, and north of Route 846, Rutherford Lane, approximately 0.7 miles south of the I-81 Interchange 310 and is identified with Property Identification Number 75-A-86 in the Shawnee Magisterial District. Please note this item is presented for infoilnational purposes only. A copy of the application will be available for review at the Handley Library and the Bowman Library the week of the meeting or at the Department of Planning and Development located at 107 North Kent Street in Winchester, Virginia. Information regarding this application will also be available via the Planning Department's Web Page at www.co.frederick.va.us. Sincerely, Candice E. Perkins, AICP Senior Planner CEP/pd 107 North Kent Street; Suite 202 • Winchester, Virginia 22601-5000 ` This is to certify that the attached correspondence was mailed to the following on ,a 10 a6 l l 5 from the Department of Planning and Development, Frederick CoulAy, Vi ginia: 75 A 86- SHAWNEE VILLAGE LC CIO DAVE HOLLIDAY CONSTR. INC 420 W JUBAL EARLY OR STE 103 WINCHESTER VA 22601-6435 75 - A- . 78- HACK WINIFRED W ETALS CIO HACKWOODS LLC 974 TASKER RD STEPHENS CITY VA 22655.2319 75 A- 78-C BOYD JOHN L 521 TASKER RD STEPHENS CITY VA 22655.2224 75 - A. . 86-A RUTHERFORD GARY D RUTHERFORD CAROLYN S 163 RUTHERFORD LN STEPHENS CITY VA 75 A• - 86-C THE HALL PARTNERSHIP II LL 373 TASKER RD 22655.6011 C STEPHENS CITY VA 22655.2220 I I _. 75 - A- 87-C AGAPE CHRISTIAN FELLOWSHIP 199 AGAPE WAY STEPHENS CITY VA 22655.2211 Candice E. Perkins, Senior Planner Frederick County Planning Dept. STATE OF VIRGINIA COUNTY OF FR` EDERICK 1, 7 0✓Yy`Q )C' 1 2-Q e , a Notary Public in and for the State and County aforesaid, do hereby certify that Candice E. Perkins, Senior Planner for the Department of Planning . and Development, whose name is signed to the foregoing, dated 1 � , has personally appeared before me and acknowledged the same in my State And Co my aforesaid. r Given under my hand this day of ("&1j.,, - 013 My commission expires on PAMALA DEFTER NOTARY PUBLIC; REGISTRATION # 354474 COMMONWEALTH Of VIRGINIA MY COMMISSION EXPIRES DECEMBER 31, 2017 NOTARY PUBLIC 'J11,C),4 NOTIFICATION OF PUBLIC MEETING October 25, 2013 TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNERS(S) RE: MASTER DEVELOPMENT PLAN #03-13 THE TOWNES AT TASKER You are hereby notified of a Frederick County Planning Commission public meeting being held on Wednesday, November 6, 2013 at 7:00 p.m and a Board of Supervisors public meeting being held on Wednesday, November 13, 2013, at 7.00 p.m., in the Board Room of the Frederick County Administration Building at 107 North Kent Street, Winchester, Virginia for the following application: This meeting is to consider Master Development Plan #03-13 for The Townes at Tasker, submitted by Pennoni Associates Inc., to develop a 49 unit townhouse development. The subject property is located on the east side of Route 642, Tasker Roac,4nd north of Route 846, Rutherford Lane, approximately 0.7 miles south of the I-81 Interchange 310 and is identified with Property Identification Number 75-A-86 in the Shawnee Magisterial District. Please note t this item is presented for informational purposes only. A copy of the application will be available for review at the Handley Library and the Bowman Library the week of the meeting or at the Department of Planning and Development located at 107 North Kent Street in Winchester, Virginia. Information regarding this application will also be available via the Planning Department's Web Page at www.co.frederick.va.us. Sincerely, Candice E. Perkins, AICP Senior Planner CEP/pd LV `1 NOTIFICATION OF PUBLIC MEETING October 25, 2013 TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNERS(S) RE: MASTER DEVELOPMENT PLAN #03-13 THE TOWNES AT TASKER You are hereby notified of a Frederick County Planning Commission public meeting being held on Wednesday. November 6, 2013 at 7. 00 p.m. and a Board of Supervisors public meeting being held on Wednesday. November 13, 2013, at 7.00 p.m., in the Board Room of the Frederick County Administration Building at 107 North Kent Street, Winchester, Virginia for the following application: This meeting is to consider Master Development Plan 903-13 for The Townes at Tasker, submitted by Pennoni Associates Inc., to develop a 49 unit townhouse development. The subject property is located on the east side of Route 642, Tasker Road and north of Route 846, Rutherford Lane, approximately 0.7 miles south of the I-81 Interchange 310 and is identified with Property Identification Number 75-A-86 in the Shawnee Magisterial District. Roai r •-kv.cx .��, ���2�.r�, A copy of the application will be available for review at the Handley Library and the Bowman Library the week of the meeting or at the Department of Planning and Development located at 107 North Kent Street in Winchester, Virginia. Information regarding this application will also be available via the Planning Department's Web Page at www.co.frederick.va.us. Sincerely, Candice E. Perkins, AICP Senior Planner CEP/pd LJR, I_ NOTIFICATION OF PUBLIC MEETING October 25, 2013 TO: THE APPLICANTS) AND/OR ADJOINING PROPERTY OWNERS(S) RE: MASTER DEVELOPMENT PLAN #03-13 THE TOWNES AT TASKER On behalf of the Frederick County Planning Commission, you are hereby notified of a public meeting being held on Wednesday, November 6, 2013 at 7:00 p.m. in the Board Room of the Frederick County Administration Building at 107 North Kent Street, Winchester, Virginia. Then on Wednesday, November 13, 2013, at 7:00 p.m. on behalf of the Frederick County Board of Supervisors you are hereby notified of a public meeting being held in the Frederick County Administration Building at 107 North Kent Street, Winchester, Virginia. This meeting is to consider Master Development Plan #03-13 for The Townes at Tasker, submitted by Pennoni Associates Inc. The subject property is located on the east side of Route 642, Tasker Road and north of Route 846, Rutherford Lane, approximately 0.7 miles south of the I-81 Interchange 310 and is identified with Property Identification Number 75-A-86 in the Shawnee Magisterial District. A copy of the application will be available for review at the Handley Library and the Bowman Library the week of the meeting or at the Department of Planning and Development located at 107 North Kent Street in Winchester, Virginia. Information regarding this application will also be available via the Planning Department's Web Page at www.co.frederick.va.us. Sincerely, Candice E. Perkins, AICP Senior Planner CEP/pd P TO: BARBARt DATA. PROCESSING `FROM:M - Planning Dept. 9 Adjoining Property Owners Please. print L sets of labels by MASTER DEVELOPMENT PLAN' - i °1 zZ 1 Ll THANKSI Owners of property adjoining the land will be notified of the Planning Commission and the Board of Supervisors meetings. For the purpose of this application, adjoining property is any property abutting the requested property on the side or rear or any property directly across a public right-of-way, a private right-of-way, or 'a watercourse from the requested property. The applicant is required to obtain the following information on each adjoining property including the parcel identification number which may be obtained from the office of the Commissioner of Revenue. The Commissioner of the Revenue is located on the Istfloor of the Frederick County Administration Building, 107 North Kent Street. Name and Property Identification Number Address ame Hack Winifred W Etals c/o Hackwoods LL C 974 Tasker Road Stephens City, VA 22655 Propertyi# 75-A-78 Name Boyd John L 521 Tasker Road Stephens City, VA 22655 Property # 75-A-78C ame Rutherford Gary D. & Carolyn 163 Rutherford Lane Stephens City, VA 22655 Property # 75-A-86A Name The Hall Partnership II LLC 373 Tasker Road Stephens City, VA 22655 Property # 75-A-86C Name Agape Christian Fellowship. 199 Agape Way Stephens City, VA 22655 Property # 75-A-87C Name Property # Name Property # Name Property # Name Property # 12 J`�c(- 14 S+.Ok�� TO: BARBAR DATA PROCESSING FROM : � 7 \ � - lanning Dept. Adjoining Property Owners Please rint If sets of labels by -PIEN 5 _A_ MASTER DEVELOPMENT PLAN - i ° F�z l 13 THANKS! 10 Owners of property adjoining the land will be notified of the Planning Commission and the Board of Supervisors meetings. For the purpose of this application, adjoining property is any property abutting the requested property on the side or rear or any property directly across a public right-of-way, a private right-of-way, or a watercourse from the requested property. The applicant is required to obtain the following information on each adjoining property including the parcel identification number which may be obtained from the office of the Commissioner of Revenue. The Commissioner of the Revenue is located on the 1st floor of the Frederick County Administration Building, 107 North Kent Street. Name and Property Identification Number Address ame Hack Winifred W Etals c/o Hackwoods LL C 974 Tasker Road Stephens City, VA 22655 Property_;# 75-A-78 Name Boyd John L 521 Tasker Road Stephens City, VA 22655 Property # 75-A-78C ,Name Rutherford Gary D. & Carolyn 163 Rutherford Lane Stephens City, VA 22655 Property # 75-A-86A Name The Hall Partnership 11 LLC 373 Tasker Road Stephens City, VA 22655 Property # 75-A-86C Name Agape Christian Fellowship 199 Agape Way Stephens City, VA 22655 Property # 75-A-87C Name Property # Name Property # Name Property # Name Property # '10ba&- ""L� 1/ Can 6 12 sc io S+: c,k� y W N I E M RLECOPY DEPT. OF GEOGRAPHIC INFORMATION SYSTEMS FREDERICK COUNTY, VIRGINIA an C�11 cI GIS, MAPPING, GRAPHICS WORK REQUEST DATE RECEIVED: 1011 , l 3 REQUESTED COMPLETION DATE: 1 G 1 ­�- I I I REQUESTING AGENT. Y(:,- x— Department, Agency, or Company:_ Mailing and/or Billing Address: Telephone: E-mail Address: ESTIMATED COST OF PROJECT: \?Rv FAX: DESCRIPTION OF REQUEST: (Write additional information on back of request) 'j,-TI�i oo �, -7 -r 5 � DIGITAL: PAPER: FAX: E-MAIL: SIZES: COLOR: BLACK/WHITE: NUMBER OF COPIES: STAFF MEMBER: COMPLETION DATE: MATERIALS: DATE OF PICK-UP/DELIVERY: AMOUNT DUE: AMOUNT BILLED: METHOD OF PAYMENT: HOURS REQUIRED: AMOUNT PAID: CHECK NO.# Frederick County GIS, 107 North Kent Street, Winchester, VA 22601, (540)665-565 1 )