Loading...
HomeMy WebLinkAbout10-08 I-81 Distribution Center Warehouse Office - Stonewall - Backfile (2)C MASTER DEVELOPMENT PLAN TRACKING SHEET (Note: The application does not need to be complete to be accepted, but will not be scheduled for the PC or BOS until all items have been received.) Submission Package Comment sheets from the following agencies along with any marked copies of the plan: VDOT �i Fire Marshall Sanitation Authority Inspections Dept. t/ Health Dept. County Engineer City of Winchester v GIS Parks & Recreation Winchester Regional Airport One copy of the master development plan application. Appropriate number of plans, colored maps, etc., to cover PC & BOS meetings Submission Fee l/ Application received 60 d a� )Oe Fee Paid ($ J DI?' Preliminary MDP heard by Planning Commission ACTION: Preliminary MDP heard by Board of Supervisors ACTION: Letter to applicant regarding Board action (if required) Final MDP submitted with review agency, PC & BOS comments addressed Administratively approved; letter sent to applicant, copy to file and cc's Sys ID # OPEN FILE: /oZ File opened /-� Z'Reference Manual updated/number assigned �D-base updated /a 41A d List of adjoiners given to staff member for verification l� LcR-3 0 Location maps requested from Mapping Application Action Summary updated CLOSE FILE: v2L;t� Approval (or denial) letter mailed to applicant, copy for file, cc's Public Works and Real Estate k4— File stamped "approved", "denied" or "withdrawn" P,Reference Manual updated oZ�04 DD-base updated 3 Application Action Summary updated � o _ N v r ON O �Q O�N Y U N „mod :3 cn U �; o to N DATE 3 �� N0. 1006 1 RECEIVED FROM '0-�-ti.`n ADDRESS �C� i n S Y C� S I is Cia l/1�Q ci.l,DJa'Y\ i�'Ut DOLLARS $ �✓"` ' UFOR RENT I❑FOR �--. _ U I �✓ 5}-Y� c� V�L n l p (\T�di�kJL. Tailie AMT. OF ACCOUNT CASH I� AMT. PAID CHECK BY `/ BALANCE DUE MONEY ORDER re CO14 RICK Department of Planning and Development 540/ 665-5651 FAX: 540/ 665-6395 February 23, 2009 Mr. Dennie Dunlap, PE Triad Engineering, Inc. 200 Aviation Drive Winchester, Virginia 22602 RE: MASTER DEVELOPMENT PLAN #10-08 FOR I-81 DISTRIBUTION CENTER Final Master Development Plan Approval Property Identification Numbers (PINS): 33-A-109 and 33-A-110 Dear Dennie: Frederick County administratively approved the above -referenced final master development plan on February 18, 2009. This master development plan is approved for the potential development of 59.0770 acres in the B3 (Industrial Transition) Zoning District within the Stonewall Magisterial District. This site is approved for up to 750,000 square feet of office and warehousing uses. The properties which would comprise this development are located approximately .61 miles north of Route 11 intersection with Cedar Hill (Route 671), bounded on the west by 1-81 and on the east by Martinsburg Pike. The Frederick County Board of Supervisors granted staff administrative approval authority on February 11, 2009. All requirements of the Frederick County Zoning and Subdivision Ordinance have been addressed in the plan. Please note that approval of a site plan is required prior to the subdivision or development of this parcel. I am providing you with three (3) copies of the approved final master development plan. Please ensure that these plans are distributed accordingly. Feel free to contact me if you have any questions. Sincerely, Candice E. Perkins, AICP Senior Planner CEP/bad cc: Frederick County Investors, LLC, 770 Township Line Rd., Ste. 150, Yardley, PA 19067 Charles S. DeHaven, Jr., Stonewall District Supervisor Gary Oates and Richard Ruckman, Stonewall District Planning Commissioners Jane Anderson, Real Estate Patrick Barker, EDC Commissioner of Revenue Public Works 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 MASTER DEVELOPMENT PLAN #10-08 1-81 DISTRIBUTION CENTER Staff Report for the Board of Supervisors Prepared: February 2, 2009 Staff Contact: Candice E. Perkins, AICP, Senior Planner This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist in the review of this application. It may also be useful to others interested in this zoning matter. Reviewed Planning Commission: 01/21/2009 Board of Supervisors: 02/11/2009 Action Recommended Approval Pending LOCATION: The subject properties are located approximately .61 miles north of Route 1 I intersection with Cedar Hill (Route 671), bounded on the west by I-81 and on the east by Martinsburg Pike. MAGISTERIAL DISTRICT: Stonewall PROPERTY ID NUMBERS: 33-A-109 and 33-A-110 PROPERTY ZONING & PRESENT USE: Zoned: 133 (Industrial Transition) Use: Residential/Vacant ZONING & PRESENT USE OF ADJOINING PROPERTIES: North: RA (Rural Areas) Use: Residential/Agricultural South: RA (Rural Areas) Use: Residential/Agricultural East: RA (Rural Areas) Use: Residential/Agricultural West: RA (Rural Areas) Use: Residential/Agricultural PROPOSED USE: Office and Warehouse Uses (up to 750,000 square feet) MDP #10-08, I-81 Distribution Center February 2, 2009 Page 2 REVIEW EVALUATIONS: Virginia Department of Transportation: The Master Development Plan appears to reflect the proposed proffers, Please advise the owner of our approval. The Master Development Plan for this property appears to have significant measurable impact on Route 11, the VDOT facility which provides access to the property. Before making any final comments, this office will require a complete set of site plans, drainage calculations and traffic flow data from the I.T.E. Trip Generation Manual, Seventh Edition for review. VDOT reserves the right to comment on all right-of-way needs, including right-of- way dedications, traffic signalization and off -site roadway improvements and drainage. Prior to construction on the State's right-of-way, the developer will need to apply to this office for issuance of appropriate permits to cover said work. Frederick County Fire Marshal: Plan approval recommended. Frederick County Public Works: The revised MDP dated December 12, 2008, for the proposed I-81 Distribution Center, has adequately addressed our previous review comments dated November 7, 2008. Therefore, we grant our approval for the subject MDP. Frederick County Inspections Department: Existing structures shall require demolition permit and asbestos inspection, per the Virginia Uniform Statewide Building Code/2006, prior to removal. No additional comments at this time. Frederick County -Winchester Health Department: The Health Department has no objection under the following conditions: 1) All buildings on site are to be served by the public water and sewer system as approved by the Frederick County Sanitation Authority. 2) All wells are to be abandoned according to Private Well Regulations. 3) All septic tanks are to be pumped by an approved septic hauler and abandoned by filling with sand or gravel. 4) Permits are to be obtained from the Health Department for any proposal for a motel, hotel or restaurant. 5) All designs submitted should provide for protection of the Branson Spring from any contaminants or drainage due to the proposed future construction. Please note that these are the same comments sent to the previous applicant, Michael J. Coughlin of Walsh Colucci Lubley & Walsh on June 11, 2008. Frederick County Sanitation Authority: Approved. GIS Department: No road names are required at this time. Structure numbering will be assigned during the permit/construction phase of development. Winchester Regional Airport: Parking lot lighting should be of the shielded type and amber in color to minimize light pollution to pilots on approach to the airport from the north. . Parks and Recreation Department: No comments. Frederick County Public Schools: We offer no comments on this application. MDP # 10-08, I-81 Distribution Center February 2, 2009 Page 3 Planning Department: Please see attached letter dated October 29, 2008 signed by Candice E. Perkins, Senior Planner. Planning & Zoning: A) Master Development Plan Requirement A master development plan is required prior to development of this property. Before a master development plan can be approved, it must be reviewed by the Planning Commission, Board of Supervisors and all relevant review agencies. Approval may only be granted if the master development plan conforms to all requirements of the Frederick County Zoning and Subdivision Ordinances. The purpose of the master development plan is to promote orderly and planned development of property within Frederick County that suits the characteristics of the land, is harmonious with adjoining property and is in the best interest of the general public. B) Location The subject properties are located approximately .61 miles north of Route 11 intersection with Cedar Hill (Route 671), bounded on the west by I-81 and on the east by Martinsburg Pike. C) Site History The original Frederick County zoning map (U.S.G.S. Inwood Quadrangle) identifies the subject parcels as being zoned A-2 (Agricultural General). The County's agricultural zoning districts were subsequently combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the re -mapping of the subject property and all other A-1 and A-2 zoned land to the RA District. On September 24, 2008 the Board of Supervisors approved Rezoning #05-08 which rezoned the subject parcels to the B3 (Industrial Transition) District with proffers. D) Site Suitability & Project Scope Comprehensive Policy Plan: The Frederick County Comprehensive Policy Plan is an official public document that serves as the community's guide for making decisions regarding development, preservation, public facilities and other key components of community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. [Comprehensive Policy Plan, p. 1-1] Land Use Compatibility: The parcels comprising this Master Development Plan application are located within the County's Sewer and Water Service Area (SWSA) and are within the limits of the Northeast Land Use Plan. The plan designates the site for business use. With Rezoning #05-08 the site was rezoned to the B3 (Industrial Transition) District which is consistent with the Northeast Land Use Plan. MDP #10-08, I-81 Distribution Center February 2, 2009 Page 4 Site Access: The Northeast Land Use Plan discourages individual lot access on the Martinsburg Pike corridor, encourages inter -parcel connections, and recommends adequate screening from adjoining land uses and recommends greater setbacks and buffers and screening along Martinsburg Pike. With the rezoning for the site, the applicant proffered that the site would only have one entrance on Martinsburg Pike as shown on the MPD. This "initial entrance" will be closed and relocated per proffer 3.3 once specified conditions have been satisfied. The project has also proposed interparcel connectivity with the adjacent parcel to the north. Pedestrian accommodations have been provided along the projects frontage with Route 11. Proffers: See Attached Proffer Statement. PLANNING COMMISSION SUMMARY AND ACTION OF THE 01/21/09 MEETING: A member of the Commission recalled some off -site intersection improvements proffered during rezoning. The applicant responded that a monetary contribution was made to be used at the discretion of Frederick County. The issue'of parking lot lighting was raised and staff noted this will be addressed during the site plan stage. No other issues or areas of concern were raised by the Planning Commission. There were no public comments. It was the opinion of the Planning Commission that the MDP appeared to be consistent with the requirements of the zoning ordinance and a motion was made, seconded, and unanimously passed to recommend the staff be given administrative approval authority for this MDP. (Note: Commissioner Ours was not present for this vote and Commissioner Kriz was absent from the meeting.) STAFF CONCLUSIONS FOR THE 02/11/2009 PLANNING COMMISSION MEETING: The master development plan for the I-81 Distribution Center depicts appropriate land uses and appears to be consistent with the requirements of Article XVII, Master Development Plan, of the Zoning Ordinance. The MDP is also in accordance with the proffers for Rezoning #05-08. It appears that the application meets all requirements. Following presentation of the application to the Planning Commission and the Board of Supervisors, and the incorporation of your comments, staff is prepared to proceed to approval of the application. • MucT ,4'4-1 KDERICK Department of Planning and Development 540/ 665-5651 FAX: 540/ 665-6395 October 29, 2008 Mr. Dennie Dunlap, PE Triad Engineering, Inc. 200 Aviation Drive Winchester, Virginia 22602 RE: Preliminary Master Development Plan for the I-81 Distribution Center Property Identification Numbers (PINS): 33-A-109 and 33-A-110 First Review Dear Mr. Dunlap: Thank you for providing me with the opportunity to review the preliminary master development plan for the proposed development referred to as the I-81 Distribution Center. Please adequately address each of the comments listed below prior to formal submission of the preliminary master development plan referenced above: Preliminary Review Comments: 1. Project Summary. Revise the project summary to show the new zoning. Revise the proposed use to show warehouse/distribution. 2. Approved Proffers. Revise the MDP to show the approved proffers (revision date of September 17, 2008). 3. Proffers. The proffered GDP needs to be provided on the MDP. 4. Signature Blocks. Signature blocks for the owner of the property need to be provided. The address and phone number for the property owner needs to be provided as well. 5. Existing Structures. Label all existing structures that are going to be removed. 6. Legend. A legend needs to be provided on the MDP. 7. Dimensional and Intensity Requirements. The table for the dimensional and intensity requirements needs to be revised. Route 11 is an arterial road, not a collector, and the height portion needs to be updated when the pending height ordinance amendment is decided. 8. Notes. Statements regarding water and sewer availability need to be provided on the MDP. 9. Proffered Improvements. The proffered improvements need to reference their proffer number. 10. Interparcel Access. Show on the MDP how proffer 3.5 will be implemented. 11. Martinsburg Pike. Label Martinsburg Pike and provide the speed limit. 12. Branson Springs Road. Show the location of the intersection with Route 11 and Branson Springs Road. 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 Mr. Dennie Dunlap, PEO RE: I-81 Distribution Center MDP October 29, 2008 Page 2 13. Entrances. Label the entrance shown as the "initial entrance" and show the location of the "future entrance". Also, all intersections and driveways within 200 feet of this property need to be shown on the MDP. 14. Zoning District Buffer. A Zoning District buffer (in addition to proffer 5.1) is required along Martinsburg Pike. This buffer needs to consist of three deciduous trees (two inch caliper) and two evergreen trees (four feet at time of planting) per ten linear feet. 15. Route 11 Buffer. Proffer 7.3 states that a split rail fence will be constructed along Route 11. The Route 11 buffer detail needs to be revised to incorporate this fence along with the three foot berm. In order to continue the review of this Master Development Plan, you, will need to submit a complete MDP application, a signed and notarized Special Limited Power of Attorney Form, all review agency comments and review fee, to this department. Once this information is received, and all review comments addressed, staff will schedule the application for review by the Planning Commission. Review comments are required from the following agencies: Frederick County Fire Marshal, Frederick County Department of Building Inspections, Frederick County Department of Public Works, Frederick County Department of G.LS., Frederick County Health Department, Frederick County Parks & Recreation, Frederick County Sanitation Authority, Frederick County Public Schools and the Virginia Department of Transportation. Please do not hesitate to contact me with questions regarding this letter. Sincerely, Candice E. Perkins, AICP Senior Planner CEP/bad Attachment 1-81 Distribution MDP#10-08 PIN: 33 - A - 109, 33 - A - 110 Case Planner: Candice rd t Future Rt37 Bypass Zoning M2 (Industrial, General District) QApplication III (Business, Neighborhood District) - Mill (Mobile Hume Community District) Buildings B2 (Business, General Distrist) - MS (Medical Support District) ��• r / Urban Development Area 40 B3 (Business, Industrial Transition District) -, RJ (Residential Planned Communih District) SWSA EM (Extractive Manufacturing District) R5 (Residential Recreational Communiy District) - HE (Higher Education District) RA (Rural Area District) - Ml (Industrial, Light District) RP (Residential Performance District) 0 250 500 1,000 Feet Map Document (F\ 1 — _Distribution Distribution Center— MDP1008.mxd) 12123l2008--3:1749 PM 9 yRoFFE(R STAAEMENT REZO-1-TING. RZ!,-r1qq-9q RA to B-3 (Ind-Listrial TrAnsitioh) PROPERTY: A-59Acres, TaxMap Parcel,No.,'s 33-A-110' 33-A-109 ROY R 1, Y. and Kay Marie Boyce RECORD 0'\NTNER:: Estate, of . -1 c Boyce,,'Jr,, .APPLICANT:: BPOTroperties, Ltd. and/ot its as'sigiis PROJECT NAME: I-SlDistribution Center PROFFER DATE: June 19,2008' R M81ON,I)ATE:, July 3, 2008 REV E I VISION DATE: July 21, 2008 REVISION DATE'. August 25, 2:008 REVISION DATE: September 17,2008 The undersigned hereby proffers:I that the. use and, development, of the subject property ("Property") as described above,. shall- be in strict conf6rmancewitli'tho following conditions', which shall supersede all other proffers;I . hat may have been made prior hereto. ID.theevcntthat: the 'above . rbf6renedd. rezoning; is not granted as, applied for by the applicant ("Applicant"), these proffers shall be deemed with . drawn and shall be null and. void. 'Further, these proffers are contingent 'upon., final, rezoning, of the Property with "final rezoning" defified as that rezoning the day following-Ahe last day upon which.the Fredefick Count Board of which is 1 in effect, on, Y Supen isors' (the Modr&) decision ,granting the rezoning may be contested -in the,,appropfiate .y eburt. The "headings: of The proffers set .forth below have been ' prepared for convenience, of reference oDly,hild shall. not 6ontoll*oraff66ttlie. meaning or:b e taken asalil-'intei , -pretation.of any provision of the proffers. The term ".Applicant" as referenced herein include within its meaning all present and future owners and successors in interest. The,dev6lopment of the Property shall be in gen&all'confoiinancO with the plan entitled TPG Properties, Ltd ., Frederick derick'County, Virginia Gbn&ialized Development Plan" dated Jui-le , subj'eot to reasonable clianges.approved by the County in connection M ,�008 ', (the "GDP"), with Master De�relopmeiitflan and FinalSitePlan review, meludi i-1 g revisions required for final ongincering considerations'. code and regulatory cpmpliancej, and revisions. to parking,layout and the location of structures to accommodate the potojitid for multiple buildings on the Property. The Applicant hereby proffers' the following: 1. Land Use'Re strictions. 1.1, The Property shall be developbdwfth,not.more than sevon'liuiidi-edfifty "t4ou,SO'A.d, (750,000) square teet dpom, tied -uses,,, as. -.those use§ are modified hereby, which located ' 7 5q,000 square feet, and permitted uses, shall, be li catod entitely, W1ibin on building or within p)-ulfiple,buildings on the:,Property. BPG Properties Proffer Statement Page 2 of 7 1 2, 'office uses nj be 6m� loyed on the Pyoperty only as accessory ,uses and .shall be located I entirely Aklithinthe. structure(s)'for the primary use(s), Jnn6event: shall, there be stand-alone office buildings on the Property. 1.3, TheApplicant shall ernploy the yard dnd,setback requirements f6r. uses as- provided in the-A41 District, rather than han those othOnAliseapplicable, to the. B3 District. 2. Proffered-OutUses, The following uses shall nQtUpernlitted on the Property. 2.1 Transportation. By Air and all Uses Classified as SIC 45 2.2 Transpoitation Servi:6q§,'ajidz11 Uses Classified as SIC 47 2.3 Automotive Dealers- and Gasoline, Sei-wiceStations, and. all, Uses Classified as SIC 55 2.4 Restaurant, except food services as maybe provided to. service ernploYees 01-1Site 2.5 Ainusement.andrecreatioll services ces operated indoors 2.6 Drive-iii.motion picture theaters' 2.7 Local and suburban transitandint6turban higliway passenger transportation ,2,8 Outdoor ad. services 2.9 Autoinobile recovery service 2.10 0 Automotive rep*, services and parkg 2. I'l Automobile repossession, sel vice 2.12 Product sterilization service- 2. 13 Repossession service 2.14 Automotive repair,. services and parking 2.15 Building rnaterialsi'hardware, 'garden supply, riiobile home dealers and retail nurseries, provided that this proffek does not exclude from the ,Property warehouse facilities that store and distribute goods; associated with these uses. 116 Food stores or groceries. 3. Transportation Mitigation. 3.1. At.the enitancelo the Prol?ey'W, the Applicant' will construct entrance improve rents consi.stefitvith Virginia Deparftnent of Transportation (VDQT) requirements'. BPG Properties Proffer Statement, - Page 3 of 7 3.2. There shall be.no more'than one entrAirbeto the Property. The first"sucln entrance shall be constructed alo ng Route 11 in the general location identified.on the GDP as, the ,jnitj.al,Enttapce which shall be separated at."least'7Q0' froiu the intersection of Branson Sprung Road and Route 11, unless otherwise: approved by Frederick County and. VDOT.. 3.3. The Initial Entrance shall be, closed by the. Applicant, at:its expense, within thirty. (30) days after all of the"follolviiig conditions have been met: i) an entrance to the Property has"been constructed by, others in the general location identified .oh the GDP as "Future Entrance".and ii) a right tarn and deceleration: lane meeting VDOT requirements has been constructed by others into the Future Entrancc. The Applicant. shall grant any necessary construction, grading and access easennents .over the 1roperty necessary for the construction of the Future'Entranec and an, associated:i!6t tuna lane -into such Entrance; provided that the Applicant expressly`approves ofthe plans forinnprovements, associated witli the Future Entrance, such approval no't.to be unreasonably withheld. 3.4. Atsuch time as -the Future Entrance is constructed as provided herein; the Applicant shall close the Initial Entranice and shall pay fifty (50) percent: of the total audited.:costs incurred in constructing the Future Entrance to. VDOT standards, which may include signalization thereof, such paysinent'not to exceed �125,00000. The "not to p):ceed" value.of $125,000.00 is subject to'tl e;Escalator ClauseSei forth below and represents the Applicant':s "estimate of fifty (50) percent ofthe total costs of replacing the Initial Entrance and constructing alight turn lane deceleration lane and traffic"signal at the. Future Entrance's intersection orith.Itnute 11, The payment required by this Proffer, 3.4 shall be used exclusively for costs. associated with improvements necessary for the issuance of:a.. VDOT entrance permit for the Future Entrance and shall be made to the party designated by the Zoning Administrator for the 'construction of 'the, Future Entrance upon written demand of the Zoning .Administrator and within thirty (30) days after the following conditions have 13eeri met, i) the Future Entrance is opened for public- -use, though not accepted -into the State System of Secondary1ligh-Ways, and ii) the party responsible therefor provides the Zoning Administrator satisfactory, 'proof .of its audited costs. 3.5. The Applicant shall grant an acces"s. easement over the Property to and for the benefit of the adjoining parcel to the north of the Property —to accommodate access- to the Future Entrance. 3 A The Applicaiit.sban enter into; a,signalization agreement for-the:Initial.Eiitrance with VI7OT as a.,conditioxn of final site plan approval. 3.7 The Applicant shall.ded sate right-of-way along'tlie. Ptop6 ty's Route .1.1 frontage that is ten (10) feet wideefi-om the existing edge of;right-of �Aray. Such dedication shall be made prior to the approval of the fnrst.site plan for developnxnent. of the Property. The Applicant: shall construct a ten (l;0) foot wide asphalt trail. outside BPG'Properties Proffer Statonlett Pagc 4 of 7 of but adjacent to said rigInt.-of-N.Vay,, and dedicate, all easement to the County for public purposes for such trail; drainage and grading improvements upon written, request by the-Colunty. The maintenance of the asphalt trial shall be the TOSP94sibility of the owner- of the Property of pfolibAYO-Knor's.associafion. created for such purpose, unless and until the County affirmatiVOINassumes. maintenance of the nail in waiting. 3.8. The Applicant will, contribute to Fredbiicic County the sum of Five Hundred Fifty Thousand and, 00/100 Doll . ars ($5,50,000,00) to be used for inipr6vement§,in thb Route 11 north corridor, payment to bemade at the ti-rnf,, of issuance of the first building pmui�tfbr a use: on the Property. Such funds may be used bly,fhe,Board in its discretion for, bfanspoitation inzprovenients. 4. Fire and Rescue; The Applicant "shall, contribute the, suin of Ten Thousand Dollars .($10,000M) to Frederick Gounty,at the time of issuance°of the.first Wldirig,pennit for the Property,, for use by the Board in ifs 'discretion, for fire and, rescue purposes. 5.. Site landscaping: 5.1. The Applicant shall pr&vidd a landscape strip within the area between `the asphalt, trail 'identifiedlin ' Prof66r 1.7 and the parking area identified .on the GDP that is a minimum of ton (10) feet in width (the. -"Route 11 Buffer"), The Route, 11 Buffer shall be comprised of three street: trees (per, Z6:ftiiig, Ordinance § 165-M.B.1, or equivalent) per one hundred ,linear. feet, , and twc1-ity-five shnm.bs per one hundred linear feet. Those plantings shall, be in addition to those required by the County's buffering and screening re . quirpinents. If no berm or hedgerow along the Route 14 frontage is othei6se, required, - -\T the -Applicant agrees "to install a three foot berm or he.dgerow along the Route 11 fiontakp withfil'the* Route 11, Buffer. 5,2. The Applicant shall plant street trees* (per Zoijing Ordinande §1 65-�6'.BAor equivalent) in the area between the rear .parking area the Property's western property line, - ata. Tate of Mo, f6yer than one tree per farty (40') linear feet.. 6.. Architectural. Facingfft4tpiials, of buildings,, facing Route and Interstate 91 shall be pffi,na lly of I I concrete fnasonry unit, brick; architectural block,. Dryvit or other simulated stucco, or real, or simulated wood or -glass. 7, Site development requirements. 7.1. A-11 -utilities will be underground. 7.2. 'Stomwater management facilities Will.be maintained by the Applicant. BPO Properties Proffer Stateipent Page a of 7 7..3. Prior to fhe issuance of an occupancy perm, it for a building on the Property; the Applicant shall constract a split rail, fence no more than five feet in height along: the Property's Route 1.1 fiontage in a location to be determined by the Applicant in consultation ',,ith the. County. 8. Deed. The Applicant proffers and agrees that; any deed conveying the Property shall affix ,as an. attaclunont and incorporation into said deed, a -fall, copy,of these proffers in order to fully advise ahy subsequent purchaser of these proffered ferias' and conditions. 9. Dedicatton of Right of-Wqy. for Branson Suring Road Extension. Upon VDOT's approval. of a.functional plan for the extension of Branson. Spring Road through the l'zoperty in a location generally consisteiitwitli"the current termination point of that. Road and parallel to the northers property line of the Property (the "Branson Spring Road Extension"), the Applicant'shail,.'upou written request. from the. Couzity.or NfDOT, dedicate not more. than 100, feet of right -of ix.ay fZom that property line tothe. County at no cost. No additibnatlandsc,ap ing,.buffering or setbacks shall be required of.the.Applicarit as a consequence, of such dedication. 10. Escalator. hi the event: the monetary contributions `set forth mi tie Proffer Statemp'nt are paid to Frederick County within eighteen (18) months: of the approval of. this rezoning, as applied for by. the Applicant, said contributions shall be, in the, amounts as stated. herein. Any monetary contributions set faith'in this Proffer Statoment which are."paid to the County after eighteen (18) months followin,g".the approval of :this rezoning shall: be, adjusted in. accordance with the Urban, Consumer Price Index (' CPI U") published by the United" States: Department of Labor, spelt that at the time. contributions are paid they shallbe adjusted, by,the. percentage: change in the CPI-U from that date eighteen (1 S) :months after ,the approval 'of`'this rezoning to the most .recently available CPI-U to the date the contz butions..are paid,, subject to a cap: of 6 percent (6%) per year, noncompounded; [SIGNATURES AND NOTARIES APPEAR ON FOLLOWING PAGES] E 11 BPG Properties, Proffer Statetneut Page 6 of 7 BPQ PROPERTIES,,Upl By: BPG-GP,.LLC,Iits GencralTaitiu By: Narne: Daniel M. Ditefla. Jt Its:. Vice President STATE OF CQUNTY/elly 00 O-IAA-bAz . ; To -wit: Tlaq foregollig, -instrument was ac,kiTmyledged before ine this jAay of 2008, byDanic . I M. DiLella, Jr., as: Vicc, President of BP -GP, LLC. General Partner ofBPQ-.Propcf1ies,'Ltd. -NOTARY PUBLIC My commission expires' az�vtx err Awl [SIGNATURE AN' D NOTARY APPEAR ON FOLLOWING PAGE] • 9 BPG Properties Proffer Statehicat Page 7 of 7 13STATE OF ROY RILEY BOYCE, JR. By.. l Name: Kay M. Bo ce Title: Executor 'Z Kay Marie t-BycMe- STATE OF C&GNT=Y/CITY 01i u: zNc pc-6--rgR ; To -wit: TIie foredoiiig histmment was aclrnmvIcdged: before .me this day of ;-; em 4`�t-�k , 2008, by Kay M. Boyce as Executor of the Estate of Roy Riley Boyce, Jr NOTARY PUBLIC My co711tnission expires: ;� +tom, Q; i 43 i �1313 c[) � LORETTA,M. Wo SONNatry I'ubli�, Commonwealth of�VirgiriiaRegistration Number:. � G r3 6 ( jssjOh `3sso3s;% tv3y Commusiori Ezps. Auy. 3i, 2009 AMENDMEi T .Action: PLANNING COMMISSIOM " S.eptember '17, 2008 - Icecornmcndcd. Appm Val BOARD OF SUPERVISORS:. September 24,, 2008 . APPROVE? DENTIED AIRY .oRDIN.ANCE AMEI�WING THE ZONING DISTRICT MAP REZONNI G905-08 OF BPG PROPERTIES,.ILTD./1-81 DISTRIBUTION CENTER WHEREAS ,Rezoning #Q5=08 of SPA JProperti es, L'I'D.II�81 Distribution Center, subniit(:ed by BPG Yroperties, Ltd., to rezone 59 acres from RA (Rural Areas) District to B3 (Business, -Industrial Transition) District, `vith proffers last dated Septetber 17, 20,08, for Office and Warehouse -Uses «ias considered. The properties arelocated approximately 0,61,miles north"of the Route 11 intersectionwith Cedar Hill Road (Route 671), bounded on the crest by Interstate 81 and "on the, east by Martinsburg Pike (Roc. ,te 11) .in the StoneAvall Magisterial District and are identified; by property Identification Numbers 33-A-109 and 33-A- 110, in. the Stonewall v/Iagisterial District-, ax�rElz El, the Pl`anniiig Caxrziuisszon Held a public. hearins on'tliis"rezonixig anAugust 6, 2008, at3cl a public meeting on September 17, 2008; and W IEREAS, the Board :of S :ipervisors;held a public hearing on this rezoning on September: 24, 2008; and. WHERCAS,,.the, Frederick County Board"of Supervisors finds the approval of this rezozung to be in the best interest, of the public health; safety, welfare', and in cor0rrria1jce with the Comprehensive Policy Plan;, NOW, TH)KREFOR.E, BE IT ORDAINED by the Frederick County Board. of Supervisors that "Chapter 165 of the FrederickCounty Code, Zoning, is amended to revise,the "Zoxaing District Map to change,59 acres' from RA (Rural Areas) District to B3 (Busin'ess, Irdustrial Transition).District for Office and "��larehouse uses, gubiect to the attached°conditions voluntarily pro.5ared fn «Titing by the: applicant and the property! owner. Mkes. 427-08 `FlijS ordiijarice shall be in effwt on the date of adoption. Passed this 24th day -of' Stptenibcr, 2008 by tjjc.follbkNiing,°r&cokded Yote; Richard C. Shickle, Chaiffilah. -Aye Qary A. Lofton Adze Gary W. Dove Aye - Gene E Fisher Aye Charles 3. DeFlaven, Jr. Aye K Philii).A.,Lemi C'ux Y� A COPY ATTEST J Jolui,R. Piley'j, Frederievc6igity Administrator PIDR&S. #27-08' Frederick County, Master DevelopnWt Plan Application Package APPLICATION MASTER DEVELOPMENT PLAN Department of Planning and Development Use Only. Date application received Complete. Date of acceptance. Incomplete. Date of return. /Q�o F Application 4 / 0 � 1. Project Title: I-81 Distribution Center 2. Owner's Name: Frederick County Investors, LLC 770 Township Line Road, Suite 150 Yardley, PA 19067 (215) 575-2436 (Please list the names of all owners or parties in interest) 3. Applicant: Frederick County Investors, LLC Address: 770 Township Line Road, Suite 150 Yardley, PA 19067 Phone Number: (215) 575-2436 4. Design Company: Address: Triad En ingi eerina, Inc. 200 Aviation Dr. Winchester, VA 22602 Phone Number: (540) 667-9300 Contact Name: Dennie Dunlap, PE Frederick County, Virginia Master Development Plan Application Package APPLICATION cont'd MASTER DEVELOPMENT PLAN 5. Location of Property: Approximately .61 +/- miles north of Route 11 intersection with state Route 671 (Cedar Hill). Bounded on the West by I-81 and on the east by Route 11(Martinsburg Pike . 6. Total Acreage: 7. Property Information: 59.077 a) Property Identification Number (PIN): 33-A-109 110 b) Current Zoning: RA c) Present Use: Agriculture with existing Residence d) Proposed Uses: Warehousing Office e) Adjoining Property Information: Property Identification Numbers North 33-A-108 South 33-A-112, 33-A-111 East 33-A-87, 33-A-87B,33-A-105B West 33-12-24, 33-A86A, 33-A86B f) Magisterial District: Property Uses Agricultural/Residential _Agricultural/Residential Agricultural/Residential Agricultural/Residential Stonewall 8. Is this an original or amended Master Development Plan? Original _X_ Amended I have read the material included in this package and understand what is required by the Frederick County Department of Planning and Development. I also understand that the master development plan shall include all contiguous land under single or common ownership. All required material will be complete prior to the submission of my master development plan application. Signature: 0) j D. D-/ - z/ : Date: ) z/ 1 2 % 0 8 Frederick County, Virginia Master Development Plan Application Package Adjoining Property Owners MASTER DEVELOPMENT PLAN Owners of property adjoining the land will be notified of the Planning Commission and the Board of Supervisors meetings. For the purpose of this application, adjoining property is any property abutting the requested property on the side or rear or any property directly across a public right-of-way, a private right-of-way, or a watercourse from the requested property. The applicant is required to obtain the following information on each adjoining property including the parcel identification number which may be obtained from the office of the Commissioner of Revenue. The Commissioner of the Revenue is located on the 1st floor of the Frederick County Administration Building, 107 North Kent Street. NAME ADDRESS / PROPERTY NUMBER Name Donald S. Cline 4123 Martinsburg Pike Clearbrook, VA 22624 Property it 33-A-108 Fairfield Farm of Frederick Co. LLC 2897 Martinsburg Pike Stephenson, VA 22656 33-A-112 Kay B Boyce PO Box 67 Clearbrook, VA 22624 33-A-86A Kay B Boyce PO Box 67 Clearbrook, VA 22624 33-A-86B Fairfield Farm of Frederick Co. LLC 2897 Martinsburg Pike Stephenson, VA 22656 33-12-24 David C. Cook 4030 Martinsburg Pike Clearbrook, VA 22624 33-A-87B Glen E & Judy S Russell 2619 Woodside Rd. Clearbrook, VA 22624 33-A-87 Martinsburg Pike Associates, LLC 4150 Martinsburg Pike Clearbrook, VA 33-A-105B Frederick County, Virginia Master Development Plan Application Package PO Box 174 Maine Clearbrook, VA 22624 David Lee Bragg Property# 33-A-111 Know All Men By Those Present: That I (We) (Name) �j2i✓���i C - &N.rq L N UPS i D EZD } l- IT V (Phone) JSrr S �.� (p (Address) 1bwN6HiP)- N6 e-'PSQI-(G �SU , Y LbLV PA ��06T tine owner(s) of all those tracts or parcels of land ("Property") conveyed to nne (us), by deed recorded in the Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by (� 00133 O5� on Pa e , and is described as 1 M 33- A ' 169 Instrunnent No. g T r� 33 . A - 1 10 [o61 Parcel: Lot: in6 Black; A Section: Subdivision: do hereby make, constitute and appoint: (Name) .Tf-IAh WzuU(. , INC. (Phone) 5110- (6 ggoc) (Address)yAT, o, b,2tu•r, t W wctt6s 6r_ , VA ozO 6 U' To act as my true and lawful attorney-in-fact'for and in my (our) .name, place, and steadwith frill power and authority I (we) would have if acting personally to file planning applications for my (our) above described Property, includiing: Rezoning (including proffers) Conditional Use Permit t/ Master Development Plan (Preliminary and Final) Subdivision Site Plan, Variance or Appeal Comprehensive Policy Plan Amendment My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered conditions except as follows: This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or modified. A Li witness thereof, I (we) have hereto set my (our) hand and seal this // day off&,-5V bC,e ; 200._L, Signature(s) , State of Virginia., City/County of �n 1 I'� i C� , To -wit; I, rnam a Notary Public in and for the jurisdiction aforesaid, certify that the person(s) who signed to the foregoing instrument pe •gonally ppeared befor no and has acknowledged the same before me in the jurisdiction aforesaid this � ay of��.200 . 1 wt r+w C1F PENtvaYL.V'ANIA C, My Commission Expi �� — Notary Pu is MARY E. ROBINSON, Notary Public Revised 3/17/08 City of Philadelphia, Phila. County My Commission Expires April 26, 2011 0 • COUNTY of FREDERICK Department of Public Works 540/665-5643 FAX: 540/678-0682 Mr. Dennie Dunlap III, P.E. Triad Engineering, Inc. 200 Aviation Drive Winchester, Virginia 22602 November 7, 2008 RE: Master Development Plan (MDP) for the I-81 Distribution Center Frederick County, Virginia Dear Mr. Dunlap: We have completed our review of the proposed MDP for the I-81 Distribution Center and offer the following comments: 1. Expand note #3 under the public works notes to include a requirement for a demolition permit. The results of the asbestos inspection shall be submitted with the demolition permit application. 2. Note #4 under the public works notes references the possible use of "retention" basins for stormwater management. If this option is utilized, a liner will, most probably, be required to insure long term ponding as required in a "retention basin". 3. Label the culverts crossing under Route 11 with the type of material and size. This action will aid future design efforts. 4. Identify the location of the future entrance as referenced in note #3 under the proffer statement. Also, label the location of Branson Spring Road at its intersection with Route 11. I can be reached at 722-8214 if you should have any questions regarding the above comments. Sincerely, (f(9- ri � 9 auj&'ke4 11 03. Harvey E. Strawsnyder, Jr., P.E. 161& Director of Public Works HES/rls cc: Planning and Developm ent V file T:\rsargent\Rhonda\TEMPCOMMENTS\1-81DISTCTRREVMDPCOM.doe 107 North Kent Street 9 Winchester, Virginia 22601-5000 0 • OCT Mr. Dennie Dunlap III, P.E. Triad Engineering, Inc. 200 Aviation Drive Winchester, Virginia 22602 October 28, 2008 COUNTY of FREDERICK RE: Master Development Plan (MDP) for the I-81 Distribution Center Frederick County, Virginia Dear Mr. Dunlap: Department of Public Works 540/665-5643 FAX: 540/678-0682 Our initial review of the proposed MDP foi the I-81 Distribution Center revealed that our previous rezoning comments dated July 21, 2008, have not been satisfactorily addressed. Therefore, we will defer any further reviews until such time that we receive a satisfactory resolution to these comments. Sincerely, Harvey E. StravQnyder, Jr., P.E. Director of Public Works HES/rls cc: Planning and Development file T:\rso rgent\Rhonda\TEMPCOMMENTS\I-S I D ISTCTRMDPCOM.d oc 107 North Kent Street • Winchester, Virginia 22601-5000 MASTER DEVELOPMENT PLAN #10-08 1-81 DISTRIBUTION CENTER Staff Report for the Planning Commission Prepared: January 6, 2009 Staff Contact: Candice E. Perkins, AICP, Senior Planner This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist in the review of this application. It may also be useful to others interested in this zoning matter. Reviewed Action Planning Commission: 01/21/2009 Pending Board of Supervisors: 02/11/2009 Pending LOCATION: The subject properties are located approximately .61 miles north of Route 11 intersection with Cedar Hill (Route 671), bounded on the west by I-81 and on the east by Martinsburg Pike. MAGISTERIAL DISTRICT: Stonewall PROPERTY ID NUMBERS: 33-A-109 and 33-A-110 PROPERTY ZONING & PRESENT USE: Zoned: 133 (Industrial Transition) Use: Residential/Vacant ZONING & PRESENT USE OF ADJOINING PROPERTIES: North: RA (Rural Areas) Use: Residential/Agricultural South: RA (Rural Areas) Use: Residential/Agricultural East: RA (Rural Areas) Use: Residential/Agricultural West: RA (Rural Areas) Use: Residential/Agricultural PROPOSED USE: Office and Warehouse Uses (up to 750,000 square feet) MDP #10-08, I-81 Distributio'Ti Center January 6, 2009 Page 2 REVIEW EVALUATIONS: Virginia Department of Transportation: The Master Development Plan appears to reflect the proposed proffers, Please advise the owner of our approval. The Master Development Plan for this property appears to have significant measurable impact on Route 11, the VDOT facility which provides access to the property. Before making any final comments, this office will require a complete set of site plans, drainage calculations and traffic flow data from the I.T.E. Trip Generation Manual, Seventh Edition for review. VDOT reserves the right to comment on all right-of-way needs, including right-of- way dedications, traffic signalization and off -site roadway improvements and drainage. Prior to construction on the State's right-of-way, the developer will need to apply to this office for issuance of appropriate permits to cover said work. Frederick County Fire Marshal: Plan approval recommended. Frederick County Public Works: The revised MDP dated December 12, 2008, for the proposed I-81 Distribution Center, has adequately addressed our previous review comments dated November 7, 2008. Therefore, we grant our approval for the subject MDP. Frederick County Inspections Department: Existing structures shall require demolition permit and asbestos inspection, per the Virginia Uniform Statewide Building Code/2006, prior to removal. No additional comments at this time. Frederick County -Winchester Health Department: The Health Department has no objection under the following conditions: 1) All buildings on site are to be served by the public water and sewer system as approved by the Frederick County Sanitation Authority. 2) All wells are to be abandoned according to Private Well Regulations. 3) All septic tanks are to be pumped by an approved septic hauler and abandoned by filling with sand or gravel. 4) Permits are to be obtained from the Health Department for any proposal for a motel, hotel or restaurant. 5) All designs submitted should provide for protection of the Branson Spring from any contaminants or drainage due to the proposed future construction. Please note that these are the same comments sent to the previous applicant, Michael J. Coughlin of Walsh Colucci Lubley & Walsh on June 11, 2008. Frederick County Sanitation Authority: Approved. GIS Department: No road names are required at this time. Structure numbering will be assigned during the permit/construction phase of development. Winchester Regional Airport: Parking lot lighting should be of the shielded type and amber in color to minimize light pollution to pilots on approach to the airport from the north. Parks and Recreation Department: No comments. Frederick County Public Schools: We offer no comments on this application. MDP #10-08, I-81 Distribut�Center • January 6, 2009 Page 3 Planning Department: Please see attached letter dated October 29, 2008 signed by Candice E. Perkins, Senior Planner. Planning & Zoning: A) Master Development Plan Requirement A master development plan is required prior to development of this property. Before a master development plan can be approved, it must be reviewed by the Planning Commission, Board of Supervisors and all relevant review agencies. Approval may only be granted if the master development plan conforms to all requirements of the Frederick County Zoning and Subdivision Ordinances. The purpose of the master development plan is to promote orderly and planned development of property within. Frederick County that suits the characteristics of the land, is harmonious with adjoining property and is in the best interest of the general public. B) Location The subject properties are located approximately .61 miles north of Route 11 intersection with Cedar Hill (Route 671), bounded on the west by I-81 and on the east by Martinsburg Pike. C) Site History The original Frederick County zoning map (U.S.G.S. Inwood Quadrangle) identifies the subject parcels as being zoned A-2 (Agricultural General). The County's agricultural zoning districts were subsequently combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the re -mapping of the subject property and all other A-1 and A-2 zoned land to the RA District. On September 24, 2008 the Board of Supervisors approved Rezoning #05-08 which rezoned the subject parcels to the B2 (Industrial Transition) District with proffers. D) Site Suitability & Project Scope Comprehensive Policy Plan: The Frederick County Comprehensive Policy Plan is an official public document that serves as the community's guide for making decisions regarding development, preservation, public facilities and other key components of community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the .future physical development of Frederick County. [Comprehensive Policy Plan, p. 1-1] Land Use Compatibility: The parcels comprising this Master Development Plan application are located within the County's Sewer and Water Service Area (SWSA) and are within the limits of the Northeast Land Use Plan. The plan designates the site for business use. With Rezoning #05-08 the site was rezoned to the B3 (Industrial Transition) District which is consistent with the Northeast Land Use Plan. MDP #10-08, I-81 DistributiaFi Center January 6, 2009 Page 4 Site Access: The Northeast Land Use Plan discourages individual lot access on the Martinsburg Pike corridor, encourages inter -parcel connections, and recommends adequate screening from adjoining land uses and recommends greater setbacks and buffers and screening along Martinsburg Pike. With the rezoning for the site, the applicant proffered that the site would only have one entrance on Martinsburg Pike as shown on the MPD. This "initial entrance" will be closed and relocated per proffer 3.3 once specified conditions have been satisfied. The project has also proposed interparcel connectivity with the adjacent parcel to the north. Pedestrian accommodations have been provided along the projects frontage with Route 11. Proffers: See Attached Proffer Statement. STAFF CONCLUSIONS FOR THE 01/21/2009 PLANNING COMMISSION MEETING: The master development plan for the I-81 Distribution Center depicts appropriate land uses and appears to be consistent with the requirements of Article XVII, Master Development Plan, of the Zoning Ordinance and this MDP is in a form that is administratively approvable. The MDP is also in accordance with the proffers for Rezoning #05-08. All of the issues brought forth by the Planning Commission should be appropriately addressed prior to a recommendation to the Board of Supervisors. Following the Planning Commission discussion, it would be appropriate to forward a recommendation to the Board of Supervisors regarding this MDP. All issues and concerns raised by the Planning Commission will be forwarded to the Board of Supervisors for their consideration. Staff is ultimately seeking administrative approval authority of the Master Development Plan. COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 FAX: 540/ 665-6395 NOTIFICATION OF PUBLIC MEETING January 28, 2009 TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNERS(S) RE: MASTER DEVELOPMENT PLAN#10-08 OF I-81 Di.sTRIBUTION CENTER On behalf of the Frederick County Board of Supervisors, you are hereby notified of a public meeting being bald wi Wednesday, February 11, 2009 at 7:15 p.m. in the Board Room of the Frederick County Administration Building at 107 North Kent Street, Winchester, Virginia,. This meeting is to consider Master Development Plan #10-08 for I-81 Distribution Center, submitted by. Triad Engineering, Inc,, for up to 750,000 square. feet of warehouse/office use. The properties are located approximately .61 miles north of Route I 1 intersection with Cedar Hill (Route 671), bounded on the west by I-81 and on the Past by Martinsburg Pike, in the Stonewall Magisterial District, and are identified by Property Identification -Numbers 33-A=109 and 33-A-110. A copy of the application will be available for review at the 'Handley Library and the Bowman Library the week of the meeting, or at the Department of Planning and. Development located at 107 North Kent Street in Winchester, Virginia. Information regarding this application will also be available yia the Planning Department's Web Page at www.co.frederick.va.us. Sincerely,. �f � `/aej Candice E. Perkins, AICP Senior Planner CEP/bad 107 North Kent Street, Suite 202 • Winchester, Virginia 2260175000 This is .. to cepi that the attached correspondence was mailed to the following on from the Department of Planning and Development, Frederick County, Virginia: --- -- - - --- -- __ - - - — — -- - -- 33 - A- - 87- -- - 33 - A-:-109 RUSSELL GLEN E & JUDY S FREDERICK COUNTY INVESTORS LLC 2619 WOODSIDE RD 226241355 770 TOWNSHIP LINE RD STE 150 I CLEAR BROOK VA YARDLEY PA 19067 - ---- 1 " 33 - A- • 105•B TRIAD Engineering, Inc. MARTINSBURG PIKE ASSOCIATES LLC c/o Stephen M. Gyurisin 4150 MARTINSBURG PIKE P.O. Box 2397 CLEAR BROOK VA _ 226241534 Winchester, VA, 22604 33 -A- . 111- --- BRAGG DAVID LEE CLINE DONALD S. CLEAR BROOK VA 22624.0174 4123 MARTINSBURG PIKE � i'- - _ - - - - -- I CLEAR BROOK VA 22624.1535 33 A 112 F ORNOOFF CHARLES WILLIAM SR & JOLINE SHEPARD 33 A 112 FAIRFIELD FARM OF FREDERICK COLLC STEP MARTINSBURG PIKE 2897 MARTINSBURG PIKE STEPHENSON VA 22656 1721 STEPHENSON VA 22656.1721 33 A 88 - -- - - - - 1 GRAY DAVID K. & BRENDA S. 33 • A- - 86•A I 332 THISTLE LN BOYCE KAY CLEAR BROOK VA 22624.1563 PO BOX 67 CLEAR BROOK VA 22624-0067 33 A• - 87•B COOK DAVID C ' 4030 MARTINSBURG PIKE CLEAR BROOK VA 22624-1536 -Candice E. Perkins, Senior Planner - - J Frederick County Planning Dept. STATE OF VIRGINIA COUNTY OF FREDERICK ` �hbyce��ifythat Cand' E. a Notary Public in and for the State and County aforesai ,dPerkins, Senior Planner fort e Department of Planning and Development, whose name is signed to the foregoing, dated Ma 9 , has personally appeared before me and acknowledged the same in my State an County aforesaid. Given under my hand this day of My commission expires on - BEVERLY R. DELLINGER NOTARY ID 4 331878 NOTARY PUBLIC COMMONWEALTH OF VIRGINIA PAT ;,;VPTF.S JULY31,2011 NOTARY UBLIC • .7 COUNTY of FREDERICK Department of Planning and Development 5401665-5651 FAX: 540/ 665-6395 NOTIFICATION OF PUBLIC MEETING January 9, 2009 TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNERS(S) RE: MASTER DEVELOPMENT PLAN #10-08 OF I-81 DISTRIBUTION CENTER On behalf of the Frederick County Planning Commission, you are hereby notified of a public meeting being held on Wednesday, January 21, 2009 at 7:00 p.m. in the Board Room of the Frederick County Administration Building at 107 North Kent Street, Winchester, Virginia. This meeting is to consider Master Development Plan #10-08 for I-81 Distribution Center, submitted by Triad Engineering, Inc., for up to 150,000 square feet of warehouse/office use. The properties are located approximately .61 miles north of Route 11 intersection with Cedar Hill (Route 671), bounded on the west by I-81 and on the east by Martinsburg Pike, in the Stonewall Magisterial District, and are identified by Property Identification Numbers 33-A-109 and 33-A-110. A copy of the application will be available for review at the Handley Library and the Bowman Library the week of the meeting, or at the Department of Planning and Development located at 107 North Kent Street in Winchester, Virginia. Information regarding this application will also be available via the Planning Department's Web Page at www.co.frederick.va.us. Sincerely, Candice E. Perkins, AICP Senior Planner CEP/bad 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 This is to certify that the attached correspondence was mailed to the following on �, from the Department of Planning and Development, Frederick County, Virginia: - — 33 -A- - 8 - 33 - A• • 109- GLEN E & JUDY S FREDERICK COUNTY INVESTORS LLC 2619 WL 619 WOODSIDE RD 770 TOWNSHIP LINE RD STE 150 CLEAR BROOK VA 22624.1355 YARDLEY PA 19067 r --- - TRIAD Engineering, Inc. - 33 - A- - 105-B c/o Stephen M. Gyurisin MARTINSBURG PIKE ASSOCIATES LLC 4150 MARTINSBURG PIKE P.O. Box 2397 CLEAR BROOK VA 22624.1534 Winchester, VA 22604 ' 33 •A••111- 33 -A- -108• BRAGG DAVID LEE CLINE DONALD S. PO BOX 174 4123 MARTINSBURG PIKE CLEAR BROOK VA 22624.0174 CLEAR BROOK VA 22624.1535-- - - _ -- -- - 33 - A- -112• ORNDOFF CHARLES WILLIAM SR FAIRFIELD FARM OF FREDERICK COLLC & JOLINE SHEPARD 2897 MARTINSBURG PIKE 2897 MARTINSBURG PIKE STEPHENSON VA 22656.1721 STEPHENSON VA 22656-1721 33 • A - 86 A GRAY DAVID K. & BRENDA S. BOYCE KAY 332 THISTLE LN I PO BOX 67 CLEAR BROOK VA 22624.1563 CLEAR BROOK VA 22624.0067 33 -A- - 87-B COOK DAVID C 4030 MARTINSBURG PIKE f/"1 CLEAR BROOK VA 22624.1536 ((a Candice E. Perkins, Senior Planner Frederick County Planning Dept. STATE OF VIRGINIA COUNTY OF FREDERICK a Notary Public in and for the State and County aforesaid, do reby 4 certify that C dice E. Perkins, Senior Planner fort e D partment of Planning and Development, whose name is signed to the foregoing, dated 1J 0 y has personally appeared before me and acknowledged e same in my St e and County aforesaid. Given under my hand this day of d� My commission expires on �91/adVi AA-1ji-On. NOTARY HBLIC Q VERLY H. DELLINGER `"OTARY ID � 331878NWEAL HUOFIVIRGINIA SSION EXPIRES DULY31, NI )1 V k/ MA M I/ J RAF Frederick County, Virginia Master Deve] TO:BARBARA-DATA PROCESSING AD P *- 110 -0g FROW BEV - PI nning Dept. Please tint sets of Y 1 ' Adjoining Property Owe p . I HANK . P� S `'���°XASTERDEVIELOPMENIri-,.AiN �o Owners of property adjoining the land will be notified of the Planning Commission and the Board of Supervisors meetings. For the purpose of this application, adjoining property is any property abutting the requested property on the side or rear or any property directly across a public right-of-way, a private right-of-way, or a watercourse from the requested property. The applicant is required to obtain the following information on each adjoining property including the parcel identification number which may be obtained from the office of the Commissioner of Revenue. The Commissioner of the Revenue is located on the 1st floor of the Frederick County Administration Building, 107 North Kent Street. NAME ADDRESS / PROPERTY NUMBER Name Donald S. Cline 4123 Martinsburg Pike Clearbrook, VA 22624 Property#33-A-108 L/ Fairfield Farm of Frederick Co. LLC 2897 Martinsburg Pike Stephenson, VA 22656 33-A-112ai-" Kay B Boyce PO Box 67 Clearbrook, VA 22624 33-A-86A ✓` Kay B Boyce PO Box 67 Clearbrook, VA 22624 33-A-86B Fairfield Farm of Frederick Co. LLC 2897 Martinsburg Pike Stephenson, VA 22656 33-12-24 David C. Cook 4030 Martinsburg Pike Clearbrook, VA 22624 33-A-87B Glen E & Judy S Russell 2619 Woodside Rd. Clearbrook, VA 22624 33-A-87 Martinsburg Pike Associates, LLC 4150 Martinsburg Pike Clearbrook, VA 33-A-105B Frederick County, Virginia Master Development Plan Application Package /ame David Lee Bragg PO Box 174 Clearbrook, VA 22624 Property # 3 3 -A-111 �` Frederick County, Virginia Master Development Plan Application Package R_eauest for Master Development Plan Comments Virginia Department of Transportation Mail to: Hand deliver to: Virginia Department of Transportation Virginia Department of Transportation Attn: Resident Engineer 2275 Northwestern Pike 14031 Old Valley Pike Winchester, VA 22603 Edinburg, Virginia 22824 (540) 535-1818 (540) 984-5600 Please fill out the information as accurately as possible in order to assist the Virginia Department of Transportation with their review. Please attach three (3) copies of the MDP with the sheet. Applicant's Name: BPG Properties, Ltd. Address: c/o Triad Engineering Inc. 200 Aviation Dr. Winchester VA 22602 Phone Number: _(540) 667 9300 Name of development and/or description of the request: 181 Distribution Center MDP for proposed 750,000 sq. ft. uses) on 59.077 acres arc,I identified as TM 33-A-109 110 Location of property: A roximatel .bl +/- miles north of Route 11 _ __ intersection with state Route 671 Cedar Hill . Bounded on the West by I-81 and on the east by Route 11 (Martinsbure Pike). Virginia Department of Transportation's Comments: See attached email. from VDOT to TRIAD Engineering dated I-81 Distribution Center / G Properties - VDOT Comments to 1 Page 1 of 1 (6 Dennie Dunlap From: Funkhouser, Rhonda [Rhonda.Funkhouser@VDOT.Virginia.gov] on behalf of Hoffman, Gregory [Gregory.Hoffman@VDOT.Virginia.gov] Sent: Thursday, October 09, 2008 7:48 AM To: dennied@triad-winc.com Cc: Hoffman, Gregory; John Bishop Subject: 1-81 Distribution Center / BPG Properties - VDOT Comments to MDP Follow Up Flag: Follow up Flag Status: Red Attachments: SCN_20081009074550_001.pdf We have reviewed the master development plan for the I-81 Distribution Center as received by this office on September 2, 2008. This master development plan appears to reflect the proposed proffers. Please advise the owner of our approval. The master development plan for this property appears to have significant measurable impact on Route 11, the VDOT facility which would provide access to the property. Before making any final comments, this office will require a complete set of site plans, drainage calculations and traffic flow data from the I.T.E. Trip Generation Manual, Seventh Edition for review. VDOT reserves the right to comment on all right-of-way needs, including right-of-way dedications, traffic signalization, and off -site roadway improvements and drainage. Prior to construction on the State's right-of-way the developer will need to apply to this office for issuance of appropriate permits to cover said work. Thank you for allowing us the opportunity to comment. <<S C N_20081009074550_001. pd f>> Gregory T. Hoffman, Supervisor Virginia Department of Transportation Edinburg Residency — Land Development 2275 Northwestern Pike Winchester, VA 22603 Phone #(540) 535-1824 Fax # (540) 535-1846 10/9/2008 From:LIFESAFE • 0W/2008 14:11 #355 P.001/001 and Rescue tart 'ei N Office �6if th-e Fir6: farw al ,�, ,, :•. i. FCC ': .. : .... .4.r ty .VxP, '+.�'ftof�`ien4S IRGf2tiIS ' .a,ndf Control number Date received Date reviewed Date Revised MDP08-0007 8/29/2008 9/4/2008 Project Name Applicant 1-81 Distribution Center BPG Properties, Ltd. Address City State Zip Applicant Phone 200 Aviation Dr. Winchester VA 22602 540-667-9300 Type Application Tax ID Number Fire District Rescue District Master Development 33-A-109,110 13 13 Current Zoning B 3 Election District Recommendations Stonewall Automatic Sprinkler System Automatic Fire Alarm System Residential Sprinkler System Yes Yes No Other recommendation Emergency Vehicle Access Hydrant Location Fire Lane Required Not Identified Not Identified No Siamese Location Roadway/Aisleway Width Special Hazards Not Identified Not Identified No Emergency Vehicle Access Comments Access Comments Additional Comments Plan Approval Recommended Reviewed By Signature _ ,I Yes J Neal 4xk�-'r!- , �� Title f D6partment-, bf, Public'*Wbirks, 5401,66 5-5643 ma FAX:54 67&Q682 . De(jeinbef 22I2008 Mr. Denhid DWAEtp 111,1P.E. Triad ad Engineering, InO*. 20Q Aviation Drive Winchesferi Virginia 22602 RE- Master, Developinent Plan (MDP) for the 1-81 Distribution Center Frederick County;.' ,...trgjniq. Dear Mr. . Dunlap: Thb,fevised MDP .dated bec'6tnbor 142608,, for thq'pf4posed 1-81 Distribution Center hasddo' wolyaddtdssed our -roviow'conuhe nt8 dated Novehiber 7, 2008,.: Therefore, we grMit our approval for the subject MDP: 'Sinderely, lawsr y Ijdr'Vqy.E..: Str yder;jr.; P.E. Director of Public Works PC:,. Candice Perkins, Plaim.ing and:Developm.enf. file* t.\rs,.trgent\Rliditdh\TEhiCOMM,ENTS1l:,'81DISTCTR2NDREVMDPCOM.doi 107 NOA.Kent-S­trleet Winehi!s,ter,,Virginiit,22601-5000 COUNTY. ,T+?>1 ERUCK Department .of:.PubHc Works 5401665-5643 FAX: 540/678-0682 November 7, 2008 Mr. Dennie Dunlap III, P.E. Triad Engineering, Inc. 200 Aviation Drive Winchester, Virginia 22602 RE: Master Development Plan (MDP) for the I-81 Distribution Center Frederick County, Virginia Dear Mr. Dunlap: We have completed our review of the proposed MDP for the I-81 Distribution Center and offer the following comments: 1. Expand note 43 under the public works notes to include a requirement for a demolition permit. The results of the asbestos inspection shall be submitted with the demolition permit application. 2. Note #4 under the public works notes references the possible use of "retention" basins for stormwater management. If this option is utilized, a liner will, most probably, be required to insure long term ponding as required in a "retention basin". 3. Label the culverts crossing under Route 11 with the type of material and size. This action will aid future design efforts. 4. Identify the location of the future entrance as referenced in note 43 under the proffer statement. Also, label the location of Branson Spring Road at its intersection with Route 11. I can be reached at 722-8214 if you should have any questions regarding the above comments. Sincerely, Harvey E. Strawsnyder, Jr., P.E. Director of Public Works HES/rls cc: Planning and Development file T:\rsargent\Rlionda\TEMPCOMMENTS\1-81DISTCTRREVMDPCOM.doe 107 North Dent Street a Winchester, Virginia 22601-5000 Frederick County, VR'ginia Master DevelopMent Plan Application Package Request for Master Development Plan Comments Frederick County Inspections Department Mail to: Hand deliver to: Frederick County Inspections Department 4th Floor Attn: Building Official 107 N. Kent Street Winchester, Virginia 22601 107 N. Kent Street Winchester, VA (540) 665-5650 Please fill out the information as accurately as possible in order to assist the Inspections Department with their review. Please attach one (1) copy of the MDP with this sheet. Applicant's Name: BPG Properties, Ltd. Address: c/o Triad En 'neerin Inc. 200 Aviation Dr. Winchester, VA 22602 Phone Number: 540 667-9300 Name of development and/or description of the request: I-81 Distribution Center, MDP for proposed 750,000 sq. ft. use(s) on 59.077 acres parcel identified as TM 33-A-109 110 Location of property: Approximately .61 +/- miles north of Route 11 intersection with state Route 671 (Cedar Hill). Bounded on the West by I-81 and on the east by Route 11 (Martinsburg Pike). / Frederick County Inspections Department's Comments: Frederick County Inspections Department use only Date received Review Number: 1 2 3 4 5 (please circle one) Date reviewed Date approv /7 ,07 Revision required 0-111111111111111 Rre,gvf AU6 2 QU ?009 Iy Frederick County, Virginia Master Development Plan Application Package Request for Master Development Plan Comments Frederick County Sanitation Authority Mail to: Hand deliver to: Frederick County Sanitation Authority 315 Tasker Road Attn: Engineer Stephens City, Virginia P.O. Box 1877 (540) 868-1061 Winchester, Virginia 22604 Please fill out the information as accurately as possible in order to assist the Frederick County Sanitation Authority with their review. Please attach two (2) copies of the MDP with the sheet. Applicant's Name: BPG Properties, Ltd. Address: c/o Triad Engineeriniz, Inc. 200 Aviation Dr. Winchester, VA 22602 Phone Number: 540) 667-9300 Name of development and/or description of the request: 1-81 Distribution Center, MDP for proposed 750,000 sq. ft. use(s) on 59.077 acres parcel identified as TM 33-A-109 110 Location of property: Approximately .61 +/- miles north of Route 11 intersection with state Route 671 (Cedar Hill). Bounded on the West by I-81 and on the east by Route 11 (Martinsburg Pike). Frederick County Sanitation Authority's Comments: Frederick County Sanitation Authority use only Date received Review Number: 1 2 3 4 5 (please circle one) Date reviewed Date approved Revisions required Signature and Date ���� LORD W-1 FAIRFAX HEALTH DISTRICT 0 0 Lord Fairfax Health. District Frederick / Winchester Environmental Health 107 North Kent Street - Suite # 201 Winchester, Virginia 22601 Tel. (540) 722-3480 - Fax (540) 722-3479 www.vdh.virginia.gov To: BPG Properties, Ltd. c/o Triad Engineering, Inc., 200 Aviation Drive Winchester, VA 22602 (� Q From: Doug Dailey, Environmental Health Specialist Senior Date: September 4, 2008 4' Subject: I-81 Distribution Center for TM #'s 33-A-109 and 33-A-110 The health department has no objection under the following conditions: VIRGINIA DEPARTMENT VIDHF HEALTH Protecting You and Your Environment 1) All buildings on site are to be served by the public water and sewer system as approved by the Frederick County Sanitation Authority. 2) All wells are to be abandoned according the Private Well Regulations 3) All septic tanks are to be pumped by an approved septic hauler and abandoned by filling with sand or gravel. 4) Permits are to be obtained from the health department for any proposal for a motel, hotel, or restaurant. 5) All designs submitted should provide for protection of the Branson Spring from any contaminants or drainage due to the proposed future construction. Please note that these are the same comments sent to the previous applicant, Michael J. Coughlin of Walsh Colucci Lubley Emrich & Walsh on June 11, 2008. Frederick County, Virginia Master Development Plan Application Package Mail to: Request Master Development Plan Comments Department of GIS (Geographic Information Systems) Department of GIS, Attn: GIS Manager 107 North Kent Street Winchester, VA 22601 (540) 665-5614 Hand deliver to: Department of GIS 107 North Kent Street Winchester, VA 22601 (540) 665-5614 The GIS Department will review the proposed street names for this project to ensure their acceptability into the Frederick County Street Name System. Proposed street names will also be routed through the Communication Center Supervisor for review. This step will prevent duplicate street names from being entered. Please attach one copy of the plan indicating proposed names. Applicant's Name: BPG Properties, Ltd. Address: c/o Triad Engineering, Inc. 200 Aviation Dr. Winchester, VA 22602 Phone number: 540 667-9300 Name of development and/or description of the request: _I-81 Distribution Center, MDP for proposed 750,000 sq. ft. use(s) on 59.077 acres parcel identified as TM 33-A-109,110 Location of property: Approximately .61 +/- miles north of Route 11 intersection with state Route 671 (Cedar Hill). Bounded on the West by 1-81 and on the east by Route 11 (Martinsburg Pike). GIS OFFICE USE O II— Date received Incomplete 11 Datereviewed 13� Signature and Date: Date revision received Date approved Incomplete Date reviewed Frederick County, Master Development Plan Application Package Request for Master Development Plan Comments Frederick County Department of Parks and Recreation Mail to: Hand deliver to: Frederick County 2nd Floor Department of Parks and Recreation 107 N. Kent Street 107 N. Kent Street Winchester, VA Winchester, Virginia 22601 (540) 665-5678 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the MDP with the sheet. Applicant's Name: BPG Properties, Ltd. Address: c/o Triad En 'neerin 200 Aviation Dr. Winchester, VA 22602 Phone Number: (540) 667-9300 Name of development and/or description of the request: I-81 Distribution Center, MDP for proposed 750,000 sq. ft. use(s) on 59.077 acres parcel identified as TM 33-A-109 110 Location of property: Approximately .61 +/- miles north of Route 11 intersection with state Route 671 (Cedar Hill). Bounded on the West by I-81 and on the east by Route 11(Martinsburg Pike). Department of Parks and Recreation's Comments: No Comments Department of Parks and Recreation use only Date received Review Number: 1 2 3 4 5 (please circle one) Date reviewed Date approved Revision required Signature and Date 4ad", Frederick County, Virginia Master Development Plan Application Package Request for Master Development Plan Comments Winchester Regional Airport Mail to: Hand deliver to: Winchester Regional Airport 491 Airport Road Attn: Executive Director (Route 645, off of Route 522 South) 491 Airport Road (540) 662-2422 Winchester, Virginia 22602 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the MDP with the sheet. Applicant's Name: BPG Properties, Ltd. Address: c/o Triad Engineering, eering, Inc. 200 Aviation Dr. Winchester, VA 22602 Phone Number: (540) 667-9300 Name of development and/or description of the request: I-81 Distribution Center, MDP for proposed 750,000 sq. ft. use(s) on 59.077 acres parcel identified as TM 33-A-109 110 Location of property: Approximately .61 +/- miles north of Route 11 intersection with state Route 671 (Cedar Hill). Bounded on the West by I-81 and on the east by Route 11 (Martinsburg Pike). Winchester Regional Airport Comments: Winchester Regional Airport use only Date received Review Number. 1 2 3 4 5 (please circle one) Date reviewed Date approved Revision required Signature and Date �_4l�_An�c` (\ ma , ice, . � IbI61-00 0 0 WINCHESTER REGIONAL AIRPORT SERVING THE 491 AIRPORT ROAD TOP OF VIRGINIA WINCHESTER, VIRGINIA 22602 qV1 HOR��� (540) 662.2422 October 6, 2008 Dennie D. Dunlap, III Triad Engineering, Incorporated 200 Aviation Drive Winchester, Virginia 22602 Re: Master Development Plan Comment 1-81 Distribution Center Stonewall Magisterial District Dear Mr. Dunlap: The proposed master development plan has been reviewed and the following comment(s) are offered on behalf of the Winchester Regional Airport Authority: 1. Parking lot lighting should be of the shielded type and amber in color to minimize light pollution to pilots on approach to the airport from the North. Thank you for providing this information to us for review and your cooperation during this process. If you have any questions or need additional information, please do not hesitate contacting my office. Sincerely, Serena R. Manuel Executive Director Frederick County, Master Development Plan Application Package Request Master Development Plan Comments Superintendent of Frederick County Public Schools Mail to: Frederick County Public Schools Attn: Superintendent P.O. Box 3508 Winchester, Virginia 22604 (540) 662-3888 Hand deliver to: Frederick County Public Schools Attn: Superintendent School Administration Building 1415 Amherst Street Winchester, Virginia Please fill out the information as accurately as possible to assist the agency with their review. Please attach one (1) copy of the MDP with the sheet. Applicant's Name: BPG Properties, Ltd. Address: c/o Triad Engineering, Inc. viation Dr. Winchester. VA 22602 Phone Number: (540) 667-9300 Name of development and/or description of the request: I-81 Distribution Center, MDP for proposed 750,000 sq. ft. use(s) on 59.077 acres arcel identified as TM 33-A-109 110 Location of property: Approximately .61 +/- miles north of Route 11 intersection with state Route 671 (Cedar Hill). Bounded on the West by 1-81 and east by Route 11 (Martinsburiz Pike County Public School Comment: LUl e, G�� viz — /0106 GIS OFFICE USE ONLY: Date received Date revision received Date approved Incomplete Incomplete Date reviewed Date reviewed Signature and Date: • TRANSMITTAL LETTER • :JJA L TRIAD ENGINEERING, INC. Civil Engineering ' Geotechnical Engineering Environmental Services ' Land Surveying Construction Testing & Monitoring • Drilling Water & Wastewater ' Landscape Architecture To: Frederick Co. Dept. Planning and Development 107 N. Kent Street Winchester, VA 22601 Attn: Candice Perkins WE ARE SENDING YOU THE FOLLOWING ITEMS: 200 Aviation Drive Winchester, VA 22602 (540) 667-9300 (540) 667-2260 facsimile www.triadeng.com Date: 15 December 2008 Re: 1-81 Distribution Center MDP Project No.: 07-06-0072 D EC 1 5 Zoos COPIES DATED NUMBER DESCRIPTION 45 08-28-08 MDP MDP for the 1-81 Distribution Center (revised 12-15-08) 1 Request for MDP comments 1 08-29-08 MDP Application 1 12-11-08 Limited Power of Attorney Form 1 09-04-08 270 Check payable to 'Treasurer of Frederick County" for $9,000.00 THESE ARE TRANSMITTED: ❑ For Approval ❑ As Requested ❑ Other ❑ For Your Use ® For Review and Comment REMARKS COPY TO: SIGNED: D' Z) "= Dennie D. Dunlap III If attachments are not as noted, kindly notify us at once. 200 Aviation Dr. Winchester, VA 22602 Phone 540-667-9300 FAX 540-667-2260 www.triadeng.com TRIAD ENGINEERING, INC. December 12, 2008 Candice E. Perkins Department of Planning and Development 107 North Kent Street Suite 200 Winchester, VA 22601 RE: 1-81 Distribution Center, MDP Review Property Identification Number (PIN): 33-A-109 & 33-A-110 Dear Candice: The following represents Triad Engineering, Inc. responses to your comments, dated October 29, 2008, concerning the 1-81 Distribution Center MDP. Review comments are shown in bold italics. We are responding on a point -by -point basis to correlate with your comments. 1. Revise the project summary to show the new zoning. Revise the proposed use to show warehouse/distribution. The new zoning of B-3 and proposed use of warehouse/distribution is shown in the project summary. 2. Revise the MDP to show the approved proffers (revision date of 9117108). The approved proffers, dated 9/17/08, are included on the MDP. 3. The proffered GDP needs to be provided on the MDP. The proffered GDP, per the approved rezoning application, is provided. 4. Signature blocks for the owner of the property need to be provided. The address and phone number of the property owner needs to be provided as well. The signature block includes address, phone number, and signature line for the property owner. FYI — since the preliminary MDP submittal, the property has been sold to Frederick County Investors, LLC, which is an affiliate of BPG Properties, Ltd. 5. Label all existing structures that are going to be removed. The existing house and accessory buildings are shown to be removed. 6. A legend needs to be provided on the MDP. A legend identifying different linetypes and symbols is provided. 7. The table for the dimensional and intensity requirements needs to be revised. Route 11 is an arterial road, not a collector, and the height portion needs to be updated when the pending height ordinance amendment is decided. The table is revised to now include the provided setback distance for arterial highways. The height portion reflects the recent ordinance amendment allowing 45' for B-3 zoning under certain conditions. 8. Statements regarding water and sewer availability need to be provided on the MDP. A statement regarding water and sewer availability is provided (see project summary). 9. The proffered improvements need to reference their proffer number. The plan improvements reference their associated proffer, where applicable. 10. Show on the MDP how proffer 3.5 will be implemented The interparcel access easement is shown from the future entrance to the adjacent Cline parcel to the north of the property. Practical Engineering and Science Solutions Since 1975 West Virginia Pennsylvania Maryland Virginia 11. Label Martinsburg Pike and provide the speed limit. Martinsburg Pike is labeled and the speed limit (45 MPH) is shown. 12. Show the location of the intersection with Route 11 and Branson Spring Road. The Route 11/Branson Spring Road intersection is shown. 13. Label the entrance shown as the "initial entrance" and show the location of the "future entrance': Also, all intersections and driveways within 200 feet of this property need to be shown on the MDP. The initial and future entrances and all driveway entrances for adjoining properties are shown. 14. A Zoning District Buffer (in addition to proffer 5.1) is required along Martinsburg Pike. This buffer needs to consist of one deciduous tree (2-inch caliper) and two evergreen trees (four feet at time of planting) per ten linear feet. An additional street tree and shrub is proposed, in addition to the proffered landscape buffer along Rte. 11, to bring the proposed landscaping in conformance with a zoning district buffer along the Rte. 11 corridor (see proffered buffer detail along Rte. 11). 15. Proffer 7.3 states that a split rail fence will be constructed along Route 11. The Route 11 buffer detail needs to be revised to incorporate this fence along with the three foot berm. The split rail fence is added to the Rte. 11 buffer detail. All proposed shrubbery will be installed at a minimum height of 36", eliminating the need for the 3' high berm along Rte. 11 and satisfying the conditions of proffer 5.1. Please find the attached MDP application, 45 copies of the MDP, the Special Limited Power of Attorney Form, and the review fee of $9000.00. Also attached are comment letters from the Frederick County Fire Marshal, Frederick County Dept. of Building Inspections, Frederick County Dept. of Public Works, Frederick County Dept. of GIS, Frederick County Health Dept., Frederick County Parks and Recreation, Frederick County Sanitation Authority, Frederick County Public Schools, and VDOT. Please review the attached and let me know if you have any questions. Thank you for your time and consideration regarding this matter. Sincerely, Dennie Dennie D. Dunlap III, P.E. Director of Civil Engineering TRANSM ITT AL4PETTER :qJA t TRIAD ENGINEERING, INC. Civil Engineering ' Geotechnical Engineering Environmental Services ' Land Surveying Construction Testing & Monitoring • Drilling Water & Wastewater • Landscape Architecture To: Frederick Co. Dept. Planning and Development 107 N. Kent Street Winchester, VA 22601 Attn: Michael Ruddy WE ARE SENDING YOU THE FOLLOWING ITEMS: 200 Aviation Drive Winchester, VA 22602 (540) 667-9300 (540) 667-2260 facsimile www.triadeng.com Date: 29 August 2008 Re: 1-81 Distribution Center MDP Project No.: 07-06-0072 AS 29 W COPIES DATED NUMBER DESCRIPTION 2 08-28-08 MDP MDP for the 1-81 Distribution Center 1 Request for MDP comments 1 08-29-08 MDP Application THESE ARE TRANSMITTED: ❑ For Approval ❑ As Requested ❑ Other ❑ For Your Use ® For Review and Comment REMARKS The application fee and limited power of attorney form will be submitted once the other review agency comment sheets are received. COPY TO: SIGNED: D DV Dennie D. Dunlap III If attachments are not as noted, kindly notify us at once. 0 Frederick County, Virginia Master Development Plan Application Package Required Information Checklist MASTER DEVELOPMENT PLAN The following information must be included on the- master development plan. If the submitted master development plan is incomplete or is missing information, it will not be reviewed and will be returned to you for revisions. Administrative Information Yes No 1. Name of proposed development. ✓ 2. Name, address, and telephone number of owner. ✓ 3. Name, address, and telephone number of developer. ,/ 4. Name, address, and telephone number of designer. ✓ 5. Signed certificate of surveyor, engineer, or architect. 6. Date plan prepared and date of revisions. 0 A listing of all conditions placed on the site as a result of a C--i T9 conditional zoning approval. Rezoning file number should — be cited. 8. A space labeled "Approved by the Director of Planning and Development" for the approval signature and date of approval. ✓ 9. A space labeled "Approved by the County Administrator" for the approval signature and date of approval. ✓ 10. Magisterial District. ✓ 11. Sheet size less than 42 inches. Page 13 • Frederick County, Virginia Master Development Plan Application Package General Information Yes No ✓ 1. Location map (scale 1:2000). _ 2. Scale of the MDP is not to exceed 1:100. ✓ 3. North Arrow. 4. Legend describing all symbols. ✓ 5. Surveyed boundaries of all lots and parcels. ✓ 6. Acreage of all parcels included in the MDP. r✓ 7. Topography contour lines at acceptable intervals. �✓/� S. A schedule of phases, boundary of phases, and order of development. 9. Use, zoning, and property owner of all adjoining properties. ✓ 10. Location of proposed uses (location, boundaries, arrangement). AIZA 11. Location and treatment of historic structures and sites. ✓ 12. History of all land divisions in relation to this tract. 13. Acreage, Location and boundaries of environmental features: floodplains, lakes and ponds, wetlands, natural stormwater retention areas, steep slopes, woodlands. ✓ _ 14. Amount and percentage of disturbed and protected land in common open space. Page 14 Frederick County, Virginia Master Development Plan Application Package Residential Development Information Yes No 1. Location and dimension of Reside 'al Separation Buffers. 2. Acreage in common open s ce, in housing type, in road rights -of -way, and the entire development (by Phase). 3. ocation an oundaries of housing types. Residential Pe rf ce (RP) dimensional requirements should be indicated. Number of dwelling uni type, phase, and in total). 5. Location and configuration of requi creational facilities. Statement of required and type of facilities to be provided. Infrastructure Information Yes No 1. Location of adjoining streets and utilities. 2. Location, arrangements, and right-of-way widths of roads and property access. ✓ 3. Location and arrangement of street entrances, driveways, and parking areas. 4. Location of entrances to the development from public streets. 5. Type of road design (rural or urban). 0 Use of inter -parcel connectors. Page 15 • • Frederick County, Virginia Master Development Plan Application Package Other Design Information Yes V No 7. Traffic impact analysis. To be submitted to the Virginia Department of Transportation. 8. Location of sewer and water mains with statements concerning the connection with and availability of facilities. 9. Location and arrangement of electric and gas utilities. 1. Location of Zoning District and Road Efficiency buffers, and examples specifying the screening to be provided. 2. Plan for stormwater management. Location of stormwater facilities. (�DAcreage of each type of environmental protection land. (Amount and percentage of disturbed and protected land in common open space.) Shown in a table format. 4. Amount, boundaries, and location of common open space. (Indicate the percentage of the entire site to be placed in common open space.) 5. Location of environmental protected areas to be included in common open space. Page 16 Frederick County, Virginia Master Development Plan Application Package County Health Department Information Yes No 1. Statements and locations pertaining to sewer and water availability. 2 j Statements and locations concerning any existing pre- or post -water treatment facilities. 3. Statements and location of any planned private treatment facilities. Page 17 Document Approval Form PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS YOUR APPROVAL PLEASE INITIAL AND PROVIDE THE DATE AND TIME OF YOUR APPROVAL. IF THIS DOCUMENT DOES NOT MEET YOUR APPROVAL PLEASE PROVIDE COMMENTS AS TO WHAT YOU WOULD LIKE TO HAVE COMPLETED. Candice Mark Dana Eric Mike John Amber COMMENTS: INITIALS DATE & TIME CLf— \-Z � C�> Received by Clerical Staff (Date & Time): ?5 p 1:�:I a 3 1 d 2- U:\Pam\Common\Document Approval Form.wpd