HomeMy WebLinkAbout10-08 I-81 Distribution Center Warehouse Office - Stonewall - Backfile (2)C
MASTER DEVELOPMENT PLAN TRACKING SHEET
(Note: The application does not need to be complete to be accepted, but will not be
scheduled for the PC or BOS until all items have been received.)
Submission Package
Comment sheets from the following agencies along with any marked copies of the plan:
VDOT
�i
Fire Marshall
Sanitation Authority
Inspections Dept.
t/
Health Dept.
County Engineer
City of Winchester
v GIS
Parks & Recreation
Winchester Regional Airport
One copy of the master development plan application.
Appropriate number of plans, colored maps, etc., to cover PC & BOS meetings
Submission Fee
l/ Application received
60
d a� )Oe Fee Paid ($
J DI?' Preliminary MDP heard by Planning Commission
ACTION:
Preliminary MDP heard by Board of Supervisors
ACTION:
Letter to applicant regarding Board action (if required)
Final MDP submitted with review agency, PC & BOS comments addressed
Administratively approved; letter sent to applicant, copy to file and cc's
Sys ID #
OPEN FILE:
/oZ File opened
/-� Z'Reference Manual updated/number assigned
�D-base updated
/a 41A d List of adjoiners given to staff member for verification
l� LcR-3 0 Location maps requested from Mapping
Application Action Summary updated
CLOSE FILE:
v2L;t� Approval (or denial) letter mailed to applicant, copy for file, cc's
Public Works and Real Estate
k4— File stamped "approved", "denied" or "withdrawn"
P,Reference Manual updated
oZ�04 DD-base updated
3 Application Action Summary updated
� o
_ N
v r ON
O
�Q O�N
Y U N
„mod
:3 cn
U �; o
to N
DATE 3 �� N0. 1006
1
RECEIVED FROM '0-�-ti.`n
ADDRESS �C� i n S Y C� S I is Cia
l/1�Q ci.l,DJa'Y\ i�'Ut DOLLARS $ �✓"` '
UFOR RENT I❑FOR �--. _ U I �✓ 5}-Y� c� V�L n l p (\T�di�kJL.
Tailie
AMT. OF
ACCOUNT
CASH
I�
AMT. PAID
CHECK
BY `/
BALANCE
DUE
MONEY
ORDER
re
CO14
RICK
Department of Planning and Development
540/ 665-5651
FAX: 540/ 665-6395
February 23, 2009
Mr. Dennie Dunlap, PE
Triad Engineering, Inc.
200 Aviation Drive
Winchester, Virginia 22602
RE: MASTER DEVELOPMENT PLAN #10-08 FOR I-81 DISTRIBUTION CENTER
Final Master Development Plan Approval
Property Identification Numbers (PINS): 33-A-109 and 33-A-110
Dear Dennie:
Frederick County administratively approved the above -referenced final master development plan on
February 18, 2009. This master development plan is approved for the potential development of 59.0770
acres in the B3 (Industrial Transition) Zoning District within the Stonewall Magisterial District. This site
is approved for up to 750,000 square feet of office and warehousing uses. The properties which would
comprise this development are located approximately .61 miles north of Route 11 intersection with Cedar
Hill (Route 671), bounded on the west by 1-81 and on the east by Martinsburg Pike.
The Frederick County Board of Supervisors granted staff administrative approval authority on February
11, 2009. All requirements of the Frederick County Zoning and Subdivision Ordinance have been
addressed in the plan. Please note that approval of a site plan is required prior to the subdivision or
development of this parcel. I am providing you with three (3) copies of the approved final master
development plan. Please ensure that these plans are distributed accordingly. Feel free to contact me if
you have any questions.
Sincerely,
Candice E. Perkins, AICP
Senior Planner
CEP/bad
cc: Frederick County Investors, LLC, 770 Township Line Rd., Ste. 150, Yardley, PA 19067
Charles S. DeHaven, Jr., Stonewall District Supervisor
Gary Oates and Richard Ruckman, Stonewall District Planning Commissioners
Jane Anderson, Real Estate
Patrick Barker, EDC
Commissioner of Revenue
Public Works
107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000
MASTER DEVELOPMENT PLAN #10-08
1-81 DISTRIBUTION CENTER
Staff Report for the Board of Supervisors
Prepared: February 2, 2009
Staff Contact: Candice E. Perkins, AICP, Senior Planner
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist in the review of this application. It may
also be useful to others interested in this zoning matter.
Reviewed
Planning Commission: 01/21/2009
Board of Supervisors: 02/11/2009
Action
Recommended Approval
Pending
LOCATION: The subject properties are located approximately .61 miles north of Route 1 I intersection
with Cedar Hill (Route 671), bounded on the west by I-81 and on the east by Martinsburg Pike.
MAGISTERIAL DISTRICT: Stonewall
PROPERTY ID NUMBERS: 33-A-109 and 33-A-110
PROPERTY ZONING & PRESENT USE:
Zoned: 133 (Industrial Transition)
Use: Residential/Vacant
ZONING & PRESENT USE OF ADJOINING PROPERTIES:
North: RA (Rural Areas)
Use: Residential/Agricultural
South: RA (Rural Areas)
Use: Residential/Agricultural
East: RA (Rural Areas)
Use: Residential/Agricultural
West: RA (Rural Areas)
Use: Residential/Agricultural
PROPOSED USE: Office and Warehouse Uses (up to 750,000 square feet)
MDP #10-08, I-81 Distribution Center
February 2, 2009
Page 2
REVIEW EVALUATIONS:
Virginia Department of Transportation: The Master Development Plan appears to reflect the
proposed proffers, Please advise the owner of our approval. The Master Development Plan for this
property appears to have significant measurable impact on Route 11, the VDOT facility which provides
access to the property. Before making any final comments, this office will require a complete set of site
plans, drainage calculations and traffic flow data from the I.T.E. Trip Generation Manual, Seventh
Edition for review. VDOT reserves the right to comment on all right-of-way needs, including right-of-
way dedications, traffic signalization and off -site roadway improvements and drainage. Prior to
construction on the State's right-of-way, the developer will need to apply to this office for issuance of
appropriate permits to cover said work.
Frederick County Fire Marshal: Plan approval recommended.
Frederick County Public Works: The revised MDP dated December 12, 2008, for the proposed I-81
Distribution Center, has adequately addressed our previous review comments dated November 7, 2008.
Therefore, we grant our approval for the subject MDP.
Frederick County Inspections Department: Existing structures shall require demolition permit and
asbestos inspection, per the Virginia Uniform Statewide Building Code/2006, prior to removal. No
additional comments at this time.
Frederick County -Winchester Health Department: The Health Department has no objection under
the following conditions: 1) All buildings on site are to be served by the public water and sewer system
as approved by the Frederick County Sanitation Authority. 2) All wells are to be abandoned according
to Private Well Regulations. 3) All septic tanks are to be pumped by an approved septic hauler and
abandoned by filling with sand or gravel. 4) Permits are to be obtained from the Health Department for
any proposal for a motel, hotel or restaurant. 5) All designs submitted should provide for protection of
the Branson Spring from any contaminants or drainage due to the proposed future construction. Please
note that these are the same comments sent to the previous applicant, Michael J. Coughlin of Walsh
Colucci Lubley & Walsh on June 11, 2008.
Frederick County Sanitation Authority: Approved.
GIS Department: No road names are required at this time. Structure numbering will be assigned
during the permit/construction phase of development.
Winchester Regional Airport: Parking lot lighting should be of the shielded type and amber in color
to minimize light pollution to pilots on approach to the airport from the north. .
Parks and Recreation Department: No comments.
Frederick County Public Schools: We offer no comments on this application.
MDP # 10-08, I-81 Distribution Center
February 2, 2009
Page 3
Planning Department: Please see attached letter dated October 29, 2008 signed by Candice E.
Perkins, Senior Planner.
Planning & Zoning:
A) Master Development Plan Requirement
A master development plan is required prior to development of this property. Before a master
development plan can be approved, it must be reviewed by the Planning Commission, Board of
Supervisors and all relevant review agencies. Approval may only be granted if the master
development plan conforms to all requirements of the Frederick County Zoning and Subdivision
Ordinances. The purpose of the master development plan is to promote orderly and planned
development of property within Frederick County that suits the characteristics of the land, is
harmonious with adjoining property and is in the best interest of the general public.
B) Location
The subject properties are located approximately .61 miles north of Route 11 intersection with
Cedar Hill (Route 671), bounded on the west by I-81 and on the east by Martinsburg Pike.
C) Site History
The original Frederick County zoning map (U.S.G.S. Inwood Quadrangle) identifies the subject
parcels as being zoned A-2 (Agricultural General). The County's agricultural zoning districts
were subsequently combined to form the RA (Rural Areas) District upon adoption of an
amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding
revision of the zoning map resulted in the re -mapping of the subject property and all other A-1
and A-2 zoned land to the RA District. On September 24, 2008 the Board of Supervisors
approved Rezoning #05-08 which rezoned the subject parcels to the B3 (Industrial Transition)
District with proffers.
D) Site Suitability & Project Scope
Comprehensive Policy Plan:
The Frederick County Comprehensive Policy Plan is an official public document that serves as
the community's guide for making decisions regarding development, preservation, public
facilities and other key components of community life. The primary goal of this plan is to
protect and improve the living environment within Frederick County. It is in essence a
composition of policies used to plan for the future physical development of Frederick County.
[Comprehensive Policy Plan, p. 1-1]
Land Use Compatibility:
The parcels comprising this Master Development Plan application are located within the
County's Sewer and Water Service Area (SWSA) and are within the limits of the Northeast Land
Use Plan. The plan designates the site for business use. With Rezoning #05-08 the site was
rezoned to the B3 (Industrial Transition) District which is consistent with the Northeast Land
Use Plan.
MDP #10-08, I-81 Distribution Center
February 2, 2009
Page 4
Site Access:
The Northeast Land Use Plan discourages individual lot access on the Martinsburg Pike corridor,
encourages inter -parcel connections, and recommends adequate screening from adjoining land
uses and recommends greater setbacks and buffers and screening along Martinsburg Pike. With
the rezoning for the site, the applicant proffered that the site would only have one entrance on
Martinsburg Pike as shown on the MPD. This "initial entrance" will be closed and relocated per
proffer 3.3 once specified conditions have been satisfied. The project has also proposed
interparcel connectivity with the adjacent parcel to the north. Pedestrian accommodations have
been provided along the projects frontage with Route 11.
Proffers: See Attached Proffer Statement.
PLANNING COMMISSION SUMMARY AND ACTION OF THE 01/21/09 MEETING:
A member of the Commission recalled some off -site intersection improvements proffered during
rezoning. The applicant responded that a monetary contribution was made to be used at the discretion of
Frederick County. The issue'of parking lot lighting was raised and staff noted this will be addressed
during the site plan stage. No other issues or areas of concern were raised by the Planning Commission.
There were no public comments.
It was the opinion of the Planning Commission that the MDP appeared to be consistent with the
requirements of the zoning ordinance and a motion was made, seconded, and unanimously passed to
recommend the staff be given administrative approval authority for this MDP. (Note: Commissioner
Ours was not present for this vote and Commissioner Kriz was absent from the meeting.)
STAFF CONCLUSIONS FOR THE 02/11/2009 PLANNING COMMISSION MEETING:
The master development plan for the I-81 Distribution Center depicts appropriate land uses and appears
to be consistent with the requirements of Article XVII, Master Development Plan, of the Zoning
Ordinance. The MDP is also in accordance with the proffers for Rezoning #05-08.
It appears that the application meets all requirements. Following presentation of the application to
the Planning Commission and the Board of Supervisors, and the incorporation of your comments,
staff is prepared to proceed to approval of the application.
•
MucT ,4'4-1 KDERICK
Department of Planning and Development
540/ 665-5651
FAX: 540/ 665-6395
October 29, 2008
Mr. Dennie Dunlap, PE
Triad Engineering, Inc.
200 Aviation Drive
Winchester, Virginia 22602
RE: Preliminary Master Development Plan for the I-81 Distribution Center
Property Identification Numbers (PINS): 33-A-109 and 33-A-110
First Review
Dear Mr. Dunlap:
Thank you for providing me with the opportunity to review the preliminary master
development plan for the proposed development referred to as the I-81 Distribution Center.
Please adequately address each of the comments listed below prior to formal submission of
the preliminary master development plan referenced above:
Preliminary Review Comments:
1. Project Summary. Revise the project summary to show the new zoning. Revise the
proposed use to show warehouse/distribution.
2. Approved Proffers. Revise the MDP to show the approved proffers (revision date
of September 17, 2008).
3. Proffers. The proffered GDP needs to be provided on the MDP.
4. Signature Blocks. Signature blocks for the owner of the property need to be
provided. The address and phone number for the property owner needs to be
provided as well.
5. Existing Structures. Label all existing structures that are going to be removed.
6. Legend. A legend needs to be provided on the MDP.
7. Dimensional and Intensity Requirements. The table for the dimensional and
intensity requirements needs to be revised. Route 11 is an arterial road, not a
collector, and the height portion needs to be updated when the pending height
ordinance amendment is decided.
8. Notes. Statements regarding water and sewer availability need to be provided on
the MDP.
9. Proffered Improvements. The proffered improvements need to reference their
proffer number.
10. Interparcel Access. Show on the MDP how proffer 3.5 will be implemented.
11. Martinsburg Pike. Label Martinsburg Pike and provide the speed limit.
12. Branson Springs Road. Show the location of the intersection with Route 11 and
Branson Springs Road.
107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000
Mr. Dennie Dunlap, PEO
RE: I-81 Distribution Center MDP
October 29, 2008
Page 2
13. Entrances. Label the entrance shown as the "initial entrance" and show the location
of the "future entrance". Also, all intersections and driveways within 200 feet of this
property need to be shown on the MDP.
14. Zoning District Buffer. A Zoning District buffer (in addition to proffer 5.1) is
required along Martinsburg Pike. This buffer needs to consist of three deciduous
trees (two inch caliper) and two evergreen trees (four feet at time of planting) per ten
linear feet.
15. Route 11 Buffer. Proffer 7.3 states that a split rail fence will be constructed along
Route 11. The Route 11 buffer detail needs to be revised to incorporate this fence
along with the three foot berm.
In order to continue the review of this Master Development Plan, you, will need to submit a
complete MDP application, a signed and notarized Special Limited Power of Attorney Form,
all review agency comments and review fee, to this department. Once this information is
received, and all review comments addressed, staff will schedule the application for review
by the Planning Commission. Review comments are required from the following agencies:
Frederick County Fire Marshal, Frederick County Department of Building Inspections,
Frederick County Department of Public Works, Frederick County Department of G.LS.,
Frederick County Health Department, Frederick County Parks & Recreation, Frederick
County Sanitation Authority, Frederick County Public Schools and the Virginia Department
of Transportation. Please do not hesitate to contact me with questions regarding this letter.
Sincerely,
Candice E. Perkins, AICP
Senior Planner
CEP/bad
Attachment
1-81 Distribution
MDP#10-08
PIN: 33 - A - 109, 33 - A - 110
Case Planner: Candice
rd t Future Rt37 Bypass Zoning M2 (Industrial, General District)
QApplication III (Business, Neighborhood District) - Mill (Mobile Hume Community District)
Buildings B2 (Business, General Distrist) - MS (Medical Support District)
��•
r / Urban Development Area 40 B3 (Business, Industrial Transition District) -, RJ (Residential Planned Communih District)
SWSA EM (Extractive Manufacturing District) R5 (Residential Recreational Communiy District)
- HE (Higher Education District) RA (Rural Area District)
- Ml (Industrial, Light District) RP (Residential Performance District)
0 250 500 1,000 Feet
Map Document (F\ 1 — _Distribution Distribution Center— MDP1008.mxd) 12123l2008--3:1749 PM
9
yRoFFE(R STAAEMENT
REZO-1-TING. RZ!,-r1qq-9q RA to B-3 (Ind-Listrial TrAnsitioh)
PROPERTY: A-59Acres, TaxMap Parcel,No.,'s 33-A-110' 33-A-109
ROY R 1, Y. and Kay Marie Boyce
RECORD 0'\NTNER:: Estate, of . -1 c Boyce,,'Jr,,
.APPLICANT:: BPOTroperties, Ltd. and/ot its as'sigiis
PROJECT NAME: I-SlDistribution Center
PROFFER DATE:
June 19,2008'
R M81ON,I)ATE:,
July 3, 2008
REV E
I VISION DATE:
July 21, 2008
REVISION DATE'.
August 25, 2:008
REVISION DATE:
September 17,2008
The undersigned hereby proffers:I that the. use and, development, of the subject property
("Property") as described above,. shall- be in strict conf6rmancewitli'tho following conditions',
which shall supersede all other proffers;I . hat may have been made prior hereto. ID.theevcntthat:
the 'above . rbf6renedd. rezoning; is not granted as, applied for by the applicant ("Applicant"), these
proffers shall be deemed with . drawn and shall be null and. void. 'Further, these proffers are
contingent 'upon., final, rezoning, of the Property with "final rezoning" defified as that rezoning
the day following-Ahe last day upon which.the Fredefick Count Board of
which is 1 in effect, on, Y
Supen isors' (the Modr&) decision ,granting the rezoning may be contested -in the,,appropfiate
.y
eburt.
The "headings: of The proffers set .forth below have been ' prepared for convenience, of
reference oDly,hild shall. not 6ontoll*oraff66ttlie. meaning or:b e taken asalil-'intei , -pretation.of any
provision of the proffers. The term ".Applicant" as referenced herein include within its
meaning all present and future owners and successors in interest.
The,dev6lopment of the Property shall be in gen&all'confoiinancO with the plan entitled
TPG Properties, Ltd
., Frederick derick'County, Virginia Gbn&ialized Development Plan" dated Jui-le
,
subj'eot to reasonable clianges.approved by the County in connection
M ,�008 ', (the "GDP"),
with Master De�relopmeiitflan and FinalSitePlan review, meludi i-1 g revisions required for final
ongincering considerations'. code and regulatory cpmpliancej, and revisions. to parking,layout and
the location of structures to accommodate the potojitid for multiple buildings on the Property.
The Applicant hereby proffers' the following:
1. Land Use'Re strictions.
1.1, The Property shall be developbdwfth,not.more than sevon'liuiidi-edfifty "t4ou,SO'A.d,
(750,000) square teet dpom, tied -uses,,, as. -.those use§ are modified hereby, which
located '
7 5q,000 square feet, and permitted uses, shall, be li catod entitely, W1ibin on
building or within p)-ulfiple,buildings on the:,Property.
BPG Properties
Proffer Statement
Page 2 of 7
1 2, 'office uses nj be 6m� loyed on the Pyoperty only as accessory ,uses and .shall be
located I entirely Aklithinthe. structure(s)'for the primary use(s), Jnn6event: shall,
there be stand-alone office buildings on the Property.
1.3, TheApplicant shall ernploy the yard dnd,setback requirements f6r. uses as- provided
in the-A41 District, rather than
han those othOnAliseapplicable, to the. B3 District.
2. Proffered-OutUses, The following uses shall nQtUpernlitted on the Property.
2.1 Transportation. By Air and all Uses Classified as SIC 45
2.2 Transpoitation Servi:6q§,'ajidz11 Uses Classified as SIC 47
2.3 Automotive Dealers- and Gasoline, Sei-wiceStations, and. all, Uses Classified as SIC
55
2.4 Restaurant, except food services as maybe provided to. service ernploYees 01-1Site
2.5 Ainusement.andrecreatioll services
ces operated indoors
2.6 Drive-iii.motion picture theaters'
2.7 Local and suburban transitandint6turban higliway passenger transportation
,2,8 Outdoor ad. services
2.9 Autoinobile recovery service
2.10 0 Automotive rep*, services and parkg
2. I'l Automobile repossession, sel vice
2.12 Product sterilization service-
2. 13 Repossession service
2.14 Automotive repair,. services and parking
2.15 Building rnaterialsi'hardware, 'garden supply, riiobile home dealers and retail
nurseries, provided that this proffek does not exclude from the ,Property warehouse
facilities that store and distribute goods; associated with these uses.
116 Food stores or groceries.
3. Transportation Mitigation.
3.1. At.the enitancelo the Prol?ey'W, the Applicant' will construct entrance
improve rents consi.stefitvith Virginia Deparftnent of Transportation (VDQT)
requirements'.
BPG Properties
Proffer Statement, -
Page 3 of 7
3.2. There shall be.no more'than one entrAirbeto the Property. The first"sucln entrance
shall be constructed alo ng Route 11 in the general location identified.on the GDP
as, the ,jnitj.al,Enttapce which shall be separated at."least'7Q0' froiu the
intersection of Branson Sprung Road and Route 11, unless otherwise: approved by
Frederick County and. VDOT..
3.3. The Initial Entrance shall be, closed by the. Applicant, at:its expense, within thirty.
(30) days after all of the"follolviiig conditions have been met: i) an entrance to the
Property has"been constructed by, others in the general location identified .oh the
GDP as "Future Entrance".and ii) a right tarn and deceleration: lane meeting
VDOT requirements has been constructed by others into the Future Entrancc.
The Applicant. shall grant any necessary construction, grading and access
easennents .over the 1roperty necessary for the construction of the Future'Entranec
and an, associated:i!6t tuna lane -into such Entrance; provided that the Applicant
expressly`approves ofthe plans forinnprovements, associated witli the Future
Entrance, such approval no't.to be unreasonably withheld.
3.4. Atsuch time as -the Future Entrance is constructed as provided herein; the
Applicant shall close the Initial Entranice and shall pay fifty (50) percent: of the
total audited.:costs incurred in constructing the Future Entrance to. VDOT
standards, which may include signalization thereof, such paysinent'not to exceed
�125,00000. The "not to p):ceed" value.of $125,000.00 is subject to'tl e;Escalator
ClauseSei forth below and represents the Applicant':s "estimate of fifty (50)
percent ofthe total costs of replacing the Initial Entrance and constructing alight
turn lane deceleration lane and traffic"signal at the. Future Entrance's intersection
orith.Itnute 11, The payment required by this Proffer, 3.4 shall be used exclusively
for costs. associated with improvements necessary for the issuance of:a.. VDOT
entrance permit for the Future Entrance and shall be made to the party designated
by the Zoning Administrator for the 'construction of 'the, Future Entrance upon
written demand of the Zoning .Administrator and within thirty (30) days after the
following conditions have 13eeri met, i) the Future Entrance is opened for public-
-use, though not accepted -into the State System of Secondary1ligh-Ways, and ii)
the party responsible therefor provides the Zoning Administrator satisfactory,
'proof .of its audited costs.
3.5. The Applicant shall grant an acces"s. easement over the Property to and for the
benefit of the adjoining parcel to the north of the Property —to accommodate access-
to the Future Entrance.
3 A The Applicaiit.sban enter into; a,signalization agreement for-the:Initial.Eiitrance
with VI7OT as a.,conditioxn of final site plan approval.
3.7 The Applicant shall.ded sate right-of-way along'tlie. Ptop6 ty's Route .1.1 frontage
that is ten (10) feet wideefi-om the existing edge of;right-of �Aray. Such dedication
shall be made prior to the approval of the fnrst.site plan for developnxnent. of the
Property. The Applicant: shall construct a ten (l;0) foot wide asphalt trail. outside
BPG'Properties
Proffer Statonlett
Pagc 4 of 7
of but adjacent to said rigInt.-of-N.Vay,, and dedicate, all easement to the County for
public purposes for such trail; drainage and grading improvements upon written,
request by the-Colunty. The maintenance of the asphalt trial shall be the
TOSP94sibility of the owner- of the Property of pfolibAYO-Knor's.associafion.
created for such purpose, unless and until the County affirmatiVOINassumes.
maintenance of the nail in waiting.
3.8. The Applicant will, contribute to Fredbiicic County the sum of Five Hundred Fifty
Thousand and, 00/100 Doll . ars ($5,50,000,00) to be used for inipr6vement§,in thb
Route 11 north corridor, payment to bemade at the ti-rnf,, of issuance of the first
building pmui�tfbr a use: on the Property. Such funds may be used bly,fhe,Board
in its discretion for, bfanspoitation inzprovenients.
4. Fire and Rescue;
The Applicant "shall, contribute the, suin of Ten Thousand Dollars .($10,000M) to
Frederick Gounty,at the time of issuance°of the.first Wldirig,pennit for the Property,, for use by
the Board in ifs 'discretion, for fire and, rescue purposes.
5.. Site landscaping:
5.1. The Applicant shall pr&vidd a landscape strip within the area between `the asphalt,
trail 'identifiedlin ' Prof66r 1.7 and the parking area identified .on the GDP that is a
minimum of ton (10) feet in width (the. -"Route 11 Buffer"), The Route, 11 Buffer
shall be comprised of three street: trees (per, Z6:ftiiig, Ordinance § 165-M.B.1, or
equivalent) per one hundred ,linear. feet, , and twc1-ity-five shnm.bs per one hundred
linear feet. Those plantings shall, be in addition to those required by the County's
buffering and screening re . quirpinents. If no berm or hedgerow along the Route
14 frontage is othei6se, required,
- -\T the -Applicant agrees "to install a three foot berm
or he.dgerow along the Route 11 fiontakp withfil'the* Route 11, Buffer.
5,2. The Applicant shall plant street trees* (per Zoijing Ordinande §1 65-�6'.BAor
equivalent) in the area between the rear .parking area the Property's western
property line, - ata. Tate of Mo, f6yer than one tree per farty (40') linear feet..
6.. Architectural.
Facingfft4tpiials, of buildings,, facing Route and Interstate 91 shall be pffi,na lly of I I
concrete fnasonry unit, brick; architectural block,. Dryvit or other simulated stucco, or real, or
simulated wood or -glass.
7, Site development requirements.
7.1. A-11 -utilities will be underground.
7.2. 'Stomwater management facilities Will.be maintained by the Applicant.
BPO Properties
Proffer Stateipent
Page a of 7
7..3. Prior to fhe issuance of an occupancy perm, it for a building on the Property; the
Applicant shall constract a split rail, fence no more than five feet in height along:
the Property's Route 1.1 fiontage in a location to be determined by the Applicant
in consultation ',,ith the. County.
8. Deed.
The Applicant proffers and agrees that; any deed conveying the Property shall affix ,as an.
attaclunont and incorporation into said deed, a -fall, copy,of these proffers in order to fully advise
ahy subsequent purchaser of these proffered ferias' and conditions.
9. Dedicatton of Right of-Wqy. for Branson Suring Road Extension.
Upon VDOT's approval. of a.functional plan for the extension of Branson. Spring Road
through the l'zoperty in a location generally consisteiitwitli"the current termination point of that.
Road and parallel to the northers property line of the Property (the "Branson Spring Road
Extension"), the Applicant'shail,.'upou written request. from the. Couzity.or NfDOT, dedicate not
more. than 100, feet of right -of ix.ay fZom that property line tothe. County at no cost. No
additibnatlandsc,ap ing,.buffering or setbacks shall be required of.the.Applicarit as a consequence,
of such dedication.
10. Escalator.
hi the event: the monetary contributions `set forth mi tie Proffer Statemp'nt are paid to
Frederick County within eighteen (18) months: of the approval of. this rezoning, as applied for by.
the Applicant, said contributions shall be, in the, amounts as stated. herein. Any monetary
contributions set faith'in this Proffer Statoment which are."paid to the County after eighteen (18)
months followin,g".the approval of :this rezoning shall: be, adjusted in. accordance with the Urban,
Consumer Price Index (' CPI U") published by the United" States: Department of Labor, spelt that
at the time. contributions are paid they shallbe adjusted, by,the. percentage: change in the CPI-U
from that date eighteen (1 S) :months after ,the approval 'of`'this rezoning to the most .recently
available CPI-U to the date the contz butions..are paid,, subject to a cap: of 6 percent (6%) per
year, noncompounded;
[SIGNATURES AND NOTARIES APPEAR ON FOLLOWING PAGES]
E
11
BPG Properties,
Proffer Statetneut
Page 6 of 7
BPQ PROPERTIES,,Upl
By: BPG-GP,.LLC,Iits GencralTaitiu
By:
Narne: Daniel M. Ditefla. Jt
Its:. Vice President
STATE OF
CQUNTY/elly 00 O-IAA-bAz . ; To -wit:
Tlaq foregollig, -instrument was ac,kiTmyledged before ine this jAay of
2008, byDanic . I M. DiLella, Jr., as: Vicc, President of
BP -GP, LLC. General Partner ofBPQ-.Propcf1ies,'Ltd.
-NOTARY PUBLIC
My commission expires' az�vtx err Awl
[SIGNATURE AN' D NOTARY APPEAR ON FOLLOWING PAGE]
•
9
BPG Properties
Proffer Statehicat
Page 7 of 7
13STATE OF ROY RILEY BOYCE, JR.
By.. l
Name: Kay M. Bo ce
Title: Executor
'Z
Kay Marie t-BycMe-
STATE OF
C&GNT=Y/CITY 01i u: zNc pc-6--rgR ; To -wit:
TIie foredoiiig histmment was aclrnmvIcdged: before .me this day of
;-; em 4`�t-�k , 2008, by Kay M. Boyce as Executor of the Estate of Roy
Riley Boyce, Jr
NOTARY PUBLIC
My co711tnission expires: ;� +tom, Q; i 43 i �1313 c[)
� LORETTA,M. Wo SONNatry I'ubli�, Commonwealth of�VirgiriiaRegistration Number:. � G r3 6 ( jssjOh `3sso3s;% tv3y Commusiori Ezps. Auy. 3i, 2009
AMENDMEi T
.Action:
PLANNING COMMISSIOM " S.eptember '17, 2008 - Icecornmcndcd. Appm Val
BOARD OF SUPERVISORS:. September 24,, 2008 . APPROVE? DENTIED
AIRY .oRDIN.ANCE AMEI�WING
THE ZONING DISTRICT MAP
REZONNI G905-08 OF BPG PROPERTIES,.ILTD./1-81 DISTRIBUTION CENTER
WHEREAS ,Rezoning #Q5=08 of SPA JProperti es, L'I'D.II�81 Distribution Center, subniit(:ed by BPG
Yroperties, Ltd., to rezone 59 acres from RA (Rural Areas) District to B3 (Business, -Industrial Transition)
District, `vith proffers last dated Septetber 17, 20,08, for Office and Warehouse -Uses «ias considered. The
properties arelocated approximately 0,61,miles north"of the Route 11 intersectionwith Cedar Hill Road
(Route 671), bounded on the crest by Interstate 81 and "on the, east by Martinsburg Pike (Roc. ,te 11) .in the
StoneAvall Magisterial District and are identified; by property Identification Numbers 33-A-109 and 33-A-
110, in. the Stonewall v/Iagisterial District-,
ax�rElz El, the Pl`anniiig Caxrziuisszon Held a public. hearins on'tliis"rezonixig anAugust 6, 2008, at3cl
a public meeting on September 17, 2008; and
W IEREAS, the Board :of S :ipervisors;held a public hearing on this rezoning on September: 24, 2008;
and.
WHERCAS,,.the, Frederick County Board"of Supervisors finds the approval of this rezozung to be in
the best interest, of the public health; safety, welfare', and in cor0rrria1jce with the Comprehensive
Policy Plan;,
NOW, TH)KREFOR.E, BE IT ORDAINED by the Frederick County Board. of Supervisors that
"Chapter 165 of the FrederickCounty Code, Zoning, is amended to revise,the "Zoxaing District Map to
change,59 acres' from RA (Rural Areas) District to B3 (Busin'ess, Irdustrial Transition).District for
Office and "��larehouse uses, gubiect to the attached°conditions voluntarily pro.5ared fn «Titing by the:
applicant and the property! owner.
Mkes. 427-08
`FlijS ordiijarice shall be in effwt on the date of adoption.
Passed this 24th day -of' Stptenibcr, 2008 by tjjc.follbkNiing,°r&cokded Yote;
Richard C. Shickle, Chaiffilah. -Aye Qary A. Lofton Adze
Gary W. Dove Aye -
Gene E Fisher Aye Charles 3. DeFlaven, Jr. Aye
K
Philii).A.,Lemi C'ux Y�
A COPY ATTEST
J
Jolui,R. Piley'j,
Frederievc6igity Administrator
PIDR&S. #27-08'
Frederick County,
Master DevelopnWt Plan Application Package
APPLICATION
MASTER DEVELOPMENT PLAN
Department of Planning and Development Use Only.
Date application received
Complete. Date of acceptance.
Incomplete. Date of return.
/Q�o F Application 4 / 0 �
1. Project Title: I-81 Distribution Center
2. Owner's Name: Frederick County Investors, LLC
770 Township Line Road, Suite 150
Yardley, PA 19067
(215) 575-2436
(Please list the names of all owners or parties in interest)
3. Applicant: Frederick County Investors, LLC
Address: 770 Township Line Road, Suite 150
Yardley, PA 19067
Phone Number: (215) 575-2436
4. Design Company:
Address: Triad En ingi eerina, Inc.
200 Aviation Dr.
Winchester, VA 22602
Phone Number: (540) 667-9300
Contact Name: Dennie Dunlap, PE
Frederick County, Virginia Master Development Plan Application Package
APPLICATION cont'd
MASTER DEVELOPMENT PLAN
5. Location of Property: Approximately .61 +/- miles north of Route 11
intersection with state Route 671 (Cedar Hill). Bounded
on the West by I-81 and on the east by
Route 11(Martinsburg Pike .
6. Total Acreage:
7. Property Information:
59.077
a) Property Identification Number (PIN): 33-A-109 110
b) Current Zoning: RA
c) Present Use: Agriculture with existing Residence
d) Proposed Uses: Warehousing
Office
e) Adjoining Property Information:
Property Identification Numbers
North 33-A-108
South 33-A-112, 33-A-111
East 33-A-87, 33-A-87B,33-A-105B
West 33-12-24, 33-A86A, 33-A86B
f) Magisterial District:
Property Uses
Agricultural/Residential
_Agricultural/Residential
Agricultural/Residential
Agricultural/Residential
Stonewall
8. Is this an original or amended Master Development Plan?
Original _X_ Amended
I have read the material included in this package and understand what is required by the
Frederick County Department of Planning and Development. I also understand that the
master development plan shall include all contiguous land under single or common
ownership. All required material will be complete prior to the submission of my master
development plan application.
Signature: 0) j D. D-/ - z/ :
Date: ) z/ 1 2 % 0 8
Frederick County, Virginia Master Development Plan Application Package
Adjoining Property Owners
MASTER DEVELOPMENT PLAN
Owners of property adjoining the land will be notified of the Planning Commission and
the Board of Supervisors meetings. For the purpose of this application, adjoining
property is any property abutting the requested property on the side or rear or any
property directly across a public right-of-way, a private right-of-way, or a
watercourse from the requested property. The applicant is required to obtain the
following information on each adjoining property including the parcel identification
number which may be obtained from the office of the Commissioner of Revenue. The
Commissioner of the Revenue is located on the 1st floor of the Frederick County
Administration Building, 107 North Kent Street.
NAME
ADDRESS / PROPERTY NUMBER
Name
Donald S. Cline
4123 Martinsburg Pike
Clearbrook, VA 22624
Property it 33-A-108
Fairfield Farm of Frederick Co. LLC
2897 Martinsburg Pike
Stephenson, VA 22656
33-A-112
Kay B Boyce
PO Box 67
Clearbrook, VA 22624
33-A-86A
Kay B Boyce
PO Box 67
Clearbrook, VA 22624
33-A-86B
Fairfield Farm of Frederick Co. LLC
2897 Martinsburg Pike
Stephenson, VA 22656
33-12-24
David C. Cook
4030 Martinsburg Pike
Clearbrook, VA 22624
33-A-87B
Glen E & Judy S Russell
2619 Woodside Rd.
Clearbrook, VA 22624
33-A-87
Martinsburg Pike Associates, LLC
4150 Martinsburg Pike
Clearbrook, VA
33-A-105B
Frederick County, Virginia Master Development Plan Application Package
PO Box 174
Maine Clearbrook, VA 22624
David Lee Bragg
Property# 33-A-111
Know All Men By Those Present: That I (We)
(Name) �j2i✓���i C - &N.rq L N UPS i D EZD } l- IT V (Phone) JSrr S �.� (p
(Address) 1bwN6HiP)- N6 e-'PSQI-(G �SU , Y LbLV PA ��06T
tine owner(s) of all those tracts or parcels of land ("Property") conveyed to nne (us), by deed recorded in
the Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by
(� 00133 O5� on Pa e , and is described as 1 M 33- A ' 169
Instrunnent No. g T r� 33 . A - 1 10
[o61
Parcel: Lot: in6 Black; A Section: Subdivision:
do hereby make, constitute and appoint:
(Name) .Tf-IAh WzuU(. , INC. (Phone) 5110- (6 ggoc)
(Address)yAT, o, b,2tu•r, t W wctt6s 6r_ , VA ozO 6 U'
To act as my true and lawful attorney-in-fact'for and in my (our) .name, place, and steadwith frill power
and authority I (we) would have if acting personally to file planning applications for my (our) above
described Property, includiing:
Rezoning (including proffers)
Conditional Use Permit
t/ Master Development Plan (Preliminary and Final)
Subdivision
Site Plan,
Variance or Appeal
Comprehensive Policy Plan Amendment
My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to
previously approved proffered conditions except as follows:
This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or
modified. A
Li witness thereof, I (we) have hereto set my (our) hand and seal this // day off&,-5V bC,e ; 200._L,
Signature(s) ,
State of Virginia., City/County of �n 1 I'� i C� , To -wit;
I, rnam a Notary Public in and for the jurisdiction
aforesaid, certify that the person(s) who signed to the foregoing instrument pe •gonally ppeared befor no
and has acknowledged the same before me in the jurisdiction aforesaid this � ay of��.200 .
1 wt r+w C1F PENtvaYL.V'ANIA
C, My Commission Expi �� —
Notary Pu is MARY E. ROBINSON, Notary Public
Revised 3/17/08 City of Philadelphia, Phila. County
My Commission Expires April 26, 2011
0
•
COUNTY of FREDERICK
Department of Public Works
540/665-5643
FAX: 540/678-0682
Mr. Dennie Dunlap III, P.E.
Triad Engineering, Inc.
200 Aviation Drive
Winchester, Virginia 22602
November 7, 2008
RE: Master Development Plan (MDP) for the I-81 Distribution Center
Frederick County, Virginia
Dear Mr. Dunlap:
We have completed our review of the proposed MDP for the I-81 Distribution Center and offer
the following comments:
1. Expand note #3 under the public works notes to include a requirement for a demolition permit.
The results of the asbestos inspection shall be submitted with the demolition permit application.
2. Note #4 under the public works notes references the possible use of "retention" basins for
stormwater management. If this option is utilized, a liner will, most probably, be required to
insure long term ponding as required in a "retention basin".
3. Label the culverts crossing under Route 11 with the type of material and size. This action will aid
future design efforts.
4. Identify the location of the future entrance as referenced in note #3 under the proffer statement.
Also, label the location of Branson Spring Road at its intersection with Route 11.
I can be reached at 722-8214 if you should have any questions regarding the above comments.
Sincerely,
(f(9- ri � 9 auj&'ke4 11 03.
Harvey E. Strawsnyder, Jr., P.E. 161&
Director of Public Works
HES/rls
cc: Planning and Developm
ent V
file
T:\rsargent\Rhonda\TEMPCOMMENTS\1-81DISTCTRREVMDPCOM.doe
107 North Kent Street 9 Winchester, Virginia 22601-5000
0
•
OCT
Mr. Dennie Dunlap III, P.E.
Triad Engineering, Inc.
200 Aviation Drive
Winchester, Virginia 22602
October 28, 2008
COUNTY of FREDERICK
RE: Master Development Plan (MDP) for the I-81 Distribution Center
Frederick County, Virginia
Dear Mr. Dunlap:
Department of Public Works
540/665-5643
FAX: 540/678-0682
Our initial review of the proposed MDP foi the I-81 Distribution Center revealed that our
previous rezoning comments dated July 21, 2008, have not been satisfactorily addressed.
Therefore, we will defer any further reviews until such time that we receive a satisfactory
resolution to these comments.
Sincerely,
Harvey E. StravQnyder, Jr., P.E.
Director of Public Works
HES/rls
cc: Planning and Development
file
T:\rso rgent\Rhonda\TEMPCOMMENTS\I-S I D ISTCTRMDPCOM.d oc
107 North Kent Street • Winchester, Virginia 22601-5000
MASTER DEVELOPMENT PLAN #10-08
1-81 DISTRIBUTION CENTER
Staff Report for the Planning Commission
Prepared: January 6, 2009
Staff Contact: Candice E. Perkins, AICP, Senior Planner
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist in the review of this application. It may
also be useful to others interested in this zoning matter.
Reviewed Action
Planning Commission: 01/21/2009 Pending
Board of Supervisors: 02/11/2009 Pending
LOCATION: The subject properties are located approximately .61 miles north of Route 11 intersection
with Cedar Hill (Route 671), bounded on the west by I-81 and on the east by Martinsburg Pike.
MAGISTERIAL DISTRICT: Stonewall
PROPERTY ID NUMBERS: 33-A-109 and 33-A-110
PROPERTY ZONING & PRESENT USE:
Zoned: 133 (Industrial Transition)
Use: Residential/Vacant
ZONING & PRESENT USE OF ADJOINING PROPERTIES:
North: RA (Rural Areas)
Use: Residential/Agricultural
South: RA (Rural Areas)
Use: Residential/Agricultural
East: RA (Rural Areas)
Use: Residential/Agricultural
West: RA (Rural Areas)
Use: Residential/Agricultural
PROPOSED USE: Office and Warehouse Uses (up to 750,000 square feet)
MDP #10-08, I-81 Distributio'Ti Center
January 6, 2009
Page 2
REVIEW EVALUATIONS:
Virginia Department of Transportation: The Master Development Plan appears to reflect the
proposed proffers, Please advise the owner of our approval. The Master Development Plan for this
property appears to have significant measurable impact on Route 11, the VDOT facility which provides
access to the property. Before making any final comments, this office will require a complete set of site
plans, drainage calculations and traffic flow data from the I.T.E. Trip Generation Manual, Seventh
Edition for review. VDOT reserves the right to comment on all right-of-way needs, including right-of-
way dedications, traffic signalization and off -site roadway improvements and drainage. Prior to
construction on the State's right-of-way, the developer will need to apply to this office for issuance of
appropriate permits to cover said work.
Frederick County Fire Marshal: Plan approval recommended.
Frederick County Public Works: The revised MDP dated December 12, 2008, for the proposed I-81
Distribution Center, has adequately addressed our previous review comments dated November 7, 2008.
Therefore, we grant our approval for the subject MDP.
Frederick County Inspections Department: Existing structures shall require demolition permit and
asbestos inspection, per the Virginia Uniform Statewide Building Code/2006, prior to removal. No
additional comments at this time.
Frederick County -Winchester Health Department: The Health Department has no objection under
the following conditions: 1) All buildings on site are to be served by the public water and sewer system
as approved by the Frederick County Sanitation Authority. 2) All wells are to be abandoned according
to Private Well Regulations. 3) All septic tanks are to be pumped by an approved septic hauler and
abandoned by filling with sand or gravel. 4) Permits are to be obtained from the Health Department for
any proposal for a motel, hotel or restaurant. 5) All designs submitted should provide for protection of
the Branson Spring from any contaminants or drainage due to the proposed future construction. Please
note that these are the same comments sent to the previous applicant, Michael J. Coughlin of Walsh
Colucci Lubley & Walsh on June 11, 2008.
Frederick County Sanitation Authority: Approved.
GIS Department: No road names are required at this time. Structure numbering will be assigned
during the permit/construction phase of development.
Winchester Regional Airport: Parking lot lighting should be of the shielded type and amber in color
to minimize light pollution to pilots on approach to the airport from the north.
Parks and Recreation Department: No comments.
Frederick County Public Schools: We offer no comments on this application.
MDP #10-08, I-81 Distribut�Center •
January 6, 2009
Page 3
Planning Department: Please see attached letter dated October 29, 2008 signed by Candice E.
Perkins, Senior Planner.
Planning & Zoning:
A) Master Development Plan Requirement
A master development plan is required prior to development of this property. Before a master
development plan can be approved, it must be reviewed by the Planning Commission, Board of
Supervisors and all relevant review agencies. Approval may only be granted if the master
development plan conforms to all requirements of the Frederick County Zoning and Subdivision
Ordinances. The purpose of the master development plan is to promote orderly and planned
development of property within. Frederick County that suits the characteristics of the land, is
harmonious with adjoining property and is in the best interest of the general public.
B) Location
The subject properties are located approximately .61 miles north of Route 11 intersection with
Cedar Hill (Route 671), bounded on the west by I-81 and on the east by Martinsburg Pike.
C) Site History
The original Frederick County zoning map (U.S.G.S. Inwood Quadrangle) identifies the subject
parcels as being zoned A-2 (Agricultural General). The County's agricultural zoning districts
were subsequently combined to form the RA (Rural Areas) District upon adoption of an
amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding
revision of the zoning map resulted in the re -mapping of the subject property and all other A-1
and A-2 zoned land to the RA District. On September 24, 2008 the Board of Supervisors
approved Rezoning #05-08 which rezoned the subject parcels to the B2 (Industrial Transition)
District with proffers.
D) Site Suitability & Project Scope
Comprehensive Policy Plan:
The Frederick County Comprehensive Policy Plan is an official public document that serves as
the community's guide for making decisions regarding development, preservation, public
facilities and other key components of community life. The primary goal of this plan is to
protect and improve the living environment within Frederick County. It is in essence a
composition of policies used to plan for the .future physical development of Frederick County.
[Comprehensive Policy Plan, p. 1-1]
Land Use Compatibility:
The parcels comprising this Master Development Plan application are located within the
County's Sewer and Water Service Area (SWSA) and are within the limits of the Northeast Land
Use Plan. The plan designates the site for business use. With Rezoning #05-08 the site was
rezoned to the B3 (Industrial Transition) District which is consistent with the Northeast Land
Use Plan.
MDP #10-08, I-81 DistributiaFi Center
January 6, 2009
Page 4
Site Access:
The Northeast Land Use Plan discourages individual lot access on the Martinsburg Pike corridor,
encourages inter -parcel connections, and recommends adequate screening from adjoining land
uses and recommends greater setbacks and buffers and screening along Martinsburg Pike. With
the rezoning for the site, the applicant proffered that the site would only have one entrance on
Martinsburg Pike as shown on the MPD. This "initial entrance" will be closed and relocated per
proffer 3.3 once specified conditions have been satisfied. The project has also proposed
interparcel connectivity with the adjacent parcel to the north. Pedestrian accommodations have
been provided along the projects frontage with Route 11.
Proffers: See Attached Proffer Statement.
STAFF CONCLUSIONS FOR THE 01/21/2009 PLANNING COMMISSION MEETING:
The master development plan for the I-81 Distribution Center depicts appropriate land uses and appears
to be consistent with the requirements of Article XVII, Master Development Plan, of the Zoning
Ordinance and this MDP is in a form that is administratively approvable. The MDP is also in
accordance with the proffers for Rezoning #05-08. All of the issues brought forth by the Planning
Commission should be appropriately addressed prior to a recommendation to the Board of Supervisors.
Following the Planning Commission discussion, it would be appropriate to forward a recommendation to the
Board of Supervisors regarding this MDP. All issues and concerns raised by the Planning Commission will be
forwarded to the Board of Supervisors for their consideration. Staff is ultimately seeking administrative
approval authority of the Master Development Plan.
COUNTY of FREDERICK
Department of Planning and Development
540/ 665-5651
FAX: 540/ 665-6395
NOTIFICATION OF PUBLIC MEETING
January 28, 2009
TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNERS(S)
RE: MASTER DEVELOPMENT PLAN#10-08 OF I-81 Di.sTRIBUTION CENTER
On behalf of the Frederick County Board of Supervisors, you are hereby notified of a public meeting
being bald wi Wednesday, February 11, 2009 at 7:15 p.m. in the Board Room of the Frederick
County Administration Building at 107 North Kent Street, Winchester, Virginia,.
This meeting is to consider Master Development Plan #10-08 for I-81 Distribution Center,
submitted by. Triad Engineering, Inc,, for up to 750,000 square. feet of warehouse/office use. The
properties are located approximately .61 miles north of Route I 1 intersection with Cedar Hill (Route
671), bounded on the west by I-81 and on the Past by Martinsburg Pike, in the Stonewall Magisterial
District, and are identified by Property Identification -Numbers 33-A=109 and 33-A-110.
A copy of the application will be available for review at the 'Handley Library and the Bowman
Library the week of the meeting, or at the Department of Planning and. Development located at 107
North Kent Street in Winchester, Virginia. Information regarding this application will also be
available yia the Planning Department's Web Page at www.co.frederick.va.us.
Sincerely,.
�f � `/aej
Candice E. Perkins, AICP
Senior Planner
CEP/bad
107 North Kent Street, Suite 202 • Winchester, Virginia 2260175000
This is .. to cepi that the attached correspondence was mailed to the following on
from the Department of Planning and Development, Frederick
County, Virginia:
--- -- - - --- --
__ - - - — —
-- - -- 33 - A- - 87-
-- - 33 - A-:-109
RUSSELL GLEN E & JUDY S
FREDERICK COUNTY INVESTORS LLC
2619 WOODSIDE RD 226241355
770 TOWNSHIP LINE RD STE 150
I CLEAR BROOK VA
YARDLEY PA 19067
- ----
1
"
33 - A- • 105•B
TRIAD Engineering, Inc.
MARTINSBURG PIKE ASSOCIATES LLC
c/o Stephen M. Gyurisin
4150 MARTINSBURG PIKE
P.O. Box 2397
CLEAR BROOK VA _ 226241534
Winchester, VA, 22604
33 -A- . 111-
---
BRAGG DAVID LEE
CLINE DONALD S.
CLEAR BROOK VA 22624.0174
4123 MARTINSBURG PIKE
�
i'- - _ - - - - -- I
CLEAR BROOK VA 22624.1535
33 A 112 F
ORNOOFF CHARLES WILLIAM SR
& JOLINE SHEPARD
33 A 112
FAIRFIELD FARM OF FREDERICK COLLC
STEP MARTINSBURG PIKE
2897 MARTINSBURG PIKE
STEPHENSON VA 22656 1721
STEPHENSON VA 22656.1721
33 A 88
- -- - - - -
1 GRAY DAVID K. & BRENDA S.
33 • A- - 86•A
I
332 THISTLE LN
BOYCE KAY
CLEAR BROOK VA 22624.1563
PO BOX 67
CLEAR BROOK VA 22624-0067
33 A• - 87•B
COOK DAVID C
'
4030 MARTINSBURG PIKE
CLEAR BROOK VA 22624-1536
-Candice
E. Perkins, Senior Planner
- - J Frederick County Planning Dept.
STATE OF VIRGINIA
COUNTY OF FREDERICK
` �hbyce��ifythat Cand' E. a Notary Public in and for the State and County
aforesai ,dPerkins, Senior Planner fort e Department of Planning
and Development, whose name is signed to the foregoing, dated Ma 9 , has
personally appeared before me and acknowledged the same in my State an County aforesaid.
Given under my hand this day of
My commission expires on
- BEVERLY R. DELLINGER
NOTARY ID 4 331878
NOTARY PUBLIC
COMMONWEALTH OF VIRGINIA
PAT ;,;VPTF.S JULY31,2011
NOTARY UBLIC
•
.7
COUNTY of FREDERICK
Department of Planning and Development
5401665-5651
FAX: 540/ 665-6395
NOTIFICATION OF PUBLIC MEETING
January 9, 2009
TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNERS(S)
RE: MASTER DEVELOPMENT PLAN #10-08 OF I-81 DISTRIBUTION CENTER
On behalf of the Frederick County Planning Commission, you are hereby notified of a public
meeting being held on Wednesday, January 21, 2009 at 7:00 p.m. in the Board Room of the
Frederick County Administration Building at 107 North Kent Street, Winchester, Virginia.
This meeting is to consider Master Development Plan #10-08 for I-81 Distribution Center,
submitted by Triad Engineering, Inc., for up to 150,000 square feet of warehouse/office use. The
properties are located approximately .61 miles north of Route 11 intersection with Cedar Hill (Route
671), bounded on the west by I-81 and on the east by Martinsburg Pike, in the Stonewall Magisterial
District, and are identified by Property Identification Numbers 33-A-109 and 33-A-110.
A copy of the application will be available for review at the Handley Library and the Bowman
Library the week of the meeting, or at the Department of Planning and Development located at 107
North Kent Street in Winchester, Virginia. Information regarding this application will also be
available via the Planning Department's Web Page at www.co.frederick.va.us.
Sincerely,
Candice E. Perkins, AICP
Senior Planner
CEP/bad
107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000
This is to certify that the attached correspondence was mailed to the following on
�,
from the Department of Planning and Development, Frederick
County, Virginia:
- —
33 -A- - 8 -
33 - A• • 109-
GLEN E & JUDY S
FREDERICK COUNTY INVESTORS LLC
2619 WL 619 WOODSIDE RD
770 TOWNSHIP LINE RD STE 150
CLEAR BROOK VA 22624.1355
YARDLEY PA 19067
r --- -
TRIAD Engineering, Inc.
- 33 - A- - 105-B
c/o Stephen M. Gyurisin
MARTINSBURG PIKE ASSOCIATES LLC
4150 MARTINSBURG PIKE
P.O. Box 2397
CLEAR BROOK VA 22624.1534
Winchester, VA 22604
'
33 •A••111-
33 -A- -108•
BRAGG DAVID LEE
CLINE DONALD S.
PO BOX 174
4123 MARTINSBURG PIKE
CLEAR BROOK VA 22624.0174
CLEAR BROOK VA 22624.1535--
- - _ --
-- -
33 - A- -112•
ORNDOFF CHARLES WILLIAM SR
FAIRFIELD FARM OF FREDERICK COLLC
& JOLINE SHEPARD
2897 MARTINSBURG PIKE
2897 MARTINSBURG PIKE
STEPHENSON VA 22656.1721
STEPHENSON VA 22656-1721
33 • A - 86 A
GRAY DAVID K. & BRENDA S.
BOYCE KAY
332 THISTLE LN
I
PO BOX 67
CLEAR BROOK VA 22624.1563
CLEAR BROOK VA 22624.0067
33 -A- - 87-B
COOK DAVID C
4030 MARTINSBURG PIKE f/"1
CLEAR BROOK VA 22624.1536
((a
Candice E. Perkins, Senior Planner
Frederick County Planning Dept.
STATE OF VIRGINIA
COUNTY OF FREDERICK
a Notary Public in and for the State and County
aforesaid, do reby 4 certify that C dice E. Perkins, Senior Planner fort e D partment of Planning
and Development, whose name is signed to the foregoing, dated 1J 0 y has
personally appeared before me and acknowledged e same in my St e and County aforesaid.
Given under my hand this day of d�
My commission expires on
�91/adVi AA-1ji-On.
NOTARY HBLIC
Q
VERLY H. DELLINGER `"OTARY ID � 331878NWEAL HUOFIVIRGINIA
SSION EXPIRES DULY31, NI )1
V
k/
MA
M
I/
J
RAF
Frederick County, Virginia Master Deve] TO:BARBARA-DATA PROCESSING
AD P *- 110 -0g FROW BEV - PI nning Dept.
Please tint sets of Y
1 ' Adjoining Property Owe p . I HANK .
P� S
`'���°XASTERDEVIELOPMENIri-,.AiN
�o
Owners of property adjoining the land will be notified of the Planning Commission and
the Board of Supervisors meetings. For the purpose of this application, adjoining
property is any property abutting the requested property on the side or rear or any
property directly across a public right-of-way, a private right-of-way, or a
watercourse from the requested property. The applicant is required to obtain the
following information on each adjoining property including the parcel identification
number which may be obtained from the office of the Commissioner of Revenue. The
Commissioner of the Revenue is located on the 1st floor of the Frederick County
Administration Building, 107 North Kent Street.
NAME
ADDRESS / PROPERTY NUMBER
Name
Donald S. Cline
4123 Martinsburg Pike
Clearbrook, VA 22624
Property#33-A-108 L/
Fairfield Farm of Frederick Co. LLC
2897 Martinsburg Pike
Stephenson, VA 22656
33-A-112ai-"
Kay B Boyce
PO Box 67
Clearbrook, VA 22624
33-A-86A ✓`
Kay B Boyce
PO Box 67
Clearbrook, VA 22624
33-A-86B
Fairfield Farm of Frederick Co. LLC
2897 Martinsburg Pike
Stephenson, VA 22656
33-12-24
David C. Cook
4030 Martinsburg Pike
Clearbrook, VA 22624
33-A-87B
Glen E & Judy S Russell
2619 Woodside Rd.
Clearbrook, VA 22624
33-A-87
Martinsburg Pike Associates, LLC
4150 Martinsburg Pike
Clearbrook, VA
33-A-105B
Frederick County, Virginia Master Development Plan Application Package
/ame
David Lee Bragg
PO Box 174
Clearbrook, VA 22624
Property # 3 3 -A-111 �`
Frederick County, Virginia
Master Development Plan Application Package
R_eauest for Master Development Plan Comments
Virginia Department of Transportation
Mail to: Hand deliver to:
Virginia Department of Transportation Virginia Department of Transportation
Attn: Resident Engineer 2275 Northwestern Pike
14031 Old Valley Pike Winchester, VA 22603
Edinburg, Virginia 22824 (540) 535-1818
(540) 984-5600
Please fill out the information as accurately as possible in order to assist the Virginia
Department of Transportation with their review. Please attach three (3) copies of the
MDP with the sheet.
Applicant's Name: BPG Properties, Ltd.
Address: c/o Triad Engineering Inc.
200 Aviation Dr. Winchester VA 22602
Phone Number: _(540) 667 9300
Name of development and/or description of the request:
181 Distribution Center MDP for proposed 750,000 sq. ft. uses) on 59.077 acres
arc,I identified as TM 33-A-109 110
Location of property: A roximatel .bl +/- miles north of Route 11 _ __
intersection with state Route 671 Cedar Hill . Bounded on the West by I-81 and
on the east by Route 11 (Martinsbure Pike).
Virginia Department of Transportation's Comments:
See attached email. from VDOT to TRIAD Engineering dated
I-81 Distribution Center / G Properties - VDOT Comments to 1 Page 1 of 1
(6
Dennie Dunlap
From: Funkhouser, Rhonda [Rhonda.Funkhouser@VDOT.Virginia.gov] on behalf of Hoffman,
Gregory [Gregory.Hoffman@VDOT.Virginia.gov]
Sent: Thursday, October 09, 2008 7:48 AM
To: dennied@triad-winc.com
Cc: Hoffman, Gregory; John Bishop
Subject: 1-81 Distribution Center / BPG Properties - VDOT Comments to MDP
Follow Up Flag: Follow up
Flag Status: Red
Attachments: SCN_20081009074550_001.pdf
We have reviewed the master development plan for the I-81 Distribution Center as received
by this office on September 2, 2008. This master development plan appears to reflect the
proposed proffers. Please advise the owner of our approval.
The master development plan for this property appears to have significant measurable impact
on Route 11, the VDOT facility which would provide access to the property.
Before making any final comments, this office will require a complete set of site plans,
drainage calculations and traffic flow data from the I.T.E. Trip Generation Manual, Seventh
Edition for review. VDOT reserves the right to comment on all right-of-way needs, including
right-of-way dedications, traffic signalization, and off -site roadway improvements and
drainage. Prior to construction on the State's right-of-way the developer will need to apply to
this office for issuance of appropriate permits to cover said work.
Thank you for allowing us the opportunity to comment.
<<S C N_20081009074550_001. pd f>>
Gregory T. Hoffman, Supervisor
Virginia Department of Transportation
Edinburg Residency — Land Development
2275 Northwestern Pike
Winchester, VA 22603
Phone #(540) 535-1824
Fax # (540) 535-1846
10/9/2008
From:LIFESAFE •
0W/2008 14:11 #355 P.001/001
and Rescue
tart 'ei
N
Office �6if th-e Fir6: farw al
,�, ,, :•. i. FCC
': .. : .... .4.r
ty
.VxP, '+.�'ftof�`ien4S
IRGf2tiIS '
.a,ndf
Control number
Date received Date reviewed
Date Revised
MDP08-0007
8/29/2008 9/4/2008
Project Name
Applicant
1-81 Distribution Center
BPG Properties, Ltd.
Address
City State Zip
Applicant Phone
200 Aviation Dr.
Winchester VA 22602
540-667-9300
Type Application
Tax ID Number Fire District Rescue
District
Master Development
33-A-109,110 13 13
Current Zoning
B 3
Election District
Recommendations
Stonewall
Automatic Sprinkler System
Automatic Fire Alarm System Residential Sprinkler
System
Yes
Yes
No
Other recommendation
Emergency Vehicle Access Hydrant Location Fire Lane Required
Not Identified Not Identified No
Siamese Location Roadway/Aisleway Width Special Hazards
Not Identified Not Identified No
Emergency Vehicle Access Comments
Access Comments
Additional Comments
Plan Approval Recommended Reviewed By Signature _ ,I
Yes J Neal 4xk�-'r!-
, ��
Title f
D6partment-, bf, Public'*Wbirks,
5401,66 5-5643
ma
FAX:54 67&Q682
. De(jeinbef 22I2008
Mr. Denhid DWAEtp 111,1P.E.
Triad
ad Engineering, InO*.
20Q Aviation Drive
Winchesferi Virginia 22602
RE- Master, Developinent Plan (MDP) for the 1-81 Distribution Center
Frederick County;.' ,...trgjniq.
Dear Mr. . Dunlap:
Thb,fevised MDP .dated bec'6tnbor 142608,, for thq'pf4posed 1-81 Distribution Center
hasddo' wolyaddtdssed our -roviow'conuhe nt8 dated Novehiber 7, 2008,.: Therefore, we grMit
our approval for the subject MDP:
'Sinderely,
lawsr y Ijdr'Vqy.E..: Str yder;jr.; P.E.
Director of Public Works
PC:,. Candice Perkins, Plaim.ing and:Developm.enf.
file*
t.\rs,.trgent\Rliditdh\TEhiCOMM,ENTS1l:,'81DISTCTR2NDREVMDPCOM.doi
107 NOA.Kent-Strleet Winehi!s,ter,,Virginiit,22601-5000
COUNTY. ,T+?>1 ERUCK
Department .of:.PubHc Works
5401665-5643
FAX: 540/678-0682
November 7, 2008
Mr. Dennie Dunlap III, P.E.
Triad Engineering, Inc.
200 Aviation Drive
Winchester, Virginia 22602
RE: Master Development Plan (MDP) for the I-81 Distribution Center
Frederick County, Virginia
Dear Mr. Dunlap:
We have completed our review of the proposed MDP for the I-81 Distribution Center and offer
the following comments:
1. Expand note 43 under the public works notes to include a requirement for a demolition permit.
The results of the asbestos inspection shall be submitted with the demolition permit application.
2. Note #4 under the public works notes references the possible use of "retention" basins for
stormwater management. If this option is utilized, a liner will, most probably, be required to
insure long term ponding as required in a "retention basin".
3. Label the culverts crossing under Route 11 with the type of material and size. This action will aid
future design efforts.
4. Identify the location of the future entrance as referenced in note 43 under the proffer statement.
Also, label the location of Branson Spring Road at its intersection with Route 11.
I can be reached at 722-8214 if you should have any questions regarding the above comments.
Sincerely,
Harvey E. Strawsnyder, Jr., P.E.
Director of Public Works
HES/rls
cc: Planning and Development
file
T:\rsargent\Rlionda\TEMPCOMMENTS\1-81DISTCTRREVMDPCOM.doe
107 North Dent Street a Winchester, Virginia 22601-5000
Frederick County, VR'ginia Master DevelopMent Plan Application Package
Request for Master Development Plan Comments
Frederick County Inspections Department
Mail to: Hand deliver to:
Frederick County Inspections Department 4th Floor
Attn: Building Official
107 N. Kent Street
Winchester, Virginia 22601
107 N. Kent Street
Winchester, VA
(540) 665-5650
Please fill out the information as accurately as possible in order to assist the Inspections
Department with their review. Please attach one (1) copy of the MDP with this sheet.
Applicant's Name: BPG Properties, Ltd.
Address: c/o Triad En 'neerin Inc.
200 Aviation Dr. Winchester, VA 22602
Phone Number: 540 667-9300
Name of development and/or description of the request:
I-81 Distribution Center, MDP for proposed 750,000 sq. ft. use(s) on 59.077 acres
parcel identified as TM 33-A-109 110
Location of property: Approximately .61 +/- miles north of Route 11
intersection with state Route 671 (Cedar Hill). Bounded on the West by I-81 and
on the east by Route 11 (Martinsburg Pike). /
Frederick County Inspections Department's Comments:
Frederick County Inspections Department use only
Date received Review Number: 1 2 3 4 5 (please circle one)
Date reviewed Date approv /7 ,07 Revision required
0-111111111111111
Rre,gvf
AU6 2 QU ?009 Iy
Frederick County, Virginia Master Development Plan Application Package
Request for Master Development Plan Comments
Frederick County Sanitation Authority
Mail to: Hand deliver to:
Frederick County Sanitation Authority 315 Tasker Road
Attn: Engineer Stephens City, Virginia
P.O. Box 1877 (540) 868-1061
Winchester, Virginia 22604
Please fill out the information as accurately as possible in order to assist the Frederick
County Sanitation Authority with their review. Please attach two (2) copies of the MDP
with the sheet.
Applicant's Name: BPG Properties, Ltd.
Address: c/o Triad Engineeriniz, Inc.
200 Aviation Dr. Winchester, VA 22602
Phone Number: 540) 667-9300
Name of development and/or description of the request:
1-81 Distribution Center, MDP for proposed 750,000 sq. ft. use(s) on 59.077 acres
parcel identified as TM 33-A-109 110
Location of property: Approximately .61 +/- miles north of Route 11
intersection with state Route 671 (Cedar Hill). Bounded on the West by I-81 and
on the east by Route 11 (Martinsburg Pike).
Frederick County Sanitation Authority's Comments:
Frederick County Sanitation Authority use only
Date received Review Number: 1 2 3 4 5 (please circle one)
Date reviewed Date approved Revisions required
Signature and Date ����
LORD
W-1 FAIRFAX
HEALTH DISTRICT
0 0
Lord Fairfax Health. District
Frederick / Winchester Environmental Health
107 North Kent Street - Suite # 201
Winchester, Virginia 22601
Tel. (540) 722-3480 - Fax (540) 722-3479
www.vdh.virginia.gov
To: BPG Properties, Ltd.
c/o Triad Engineering, Inc.,
200 Aviation Drive
Winchester, VA 22602 (� Q
From: Doug Dailey, Environmental Health Specialist Senior
Date: September 4, 2008 4'
Subject: I-81 Distribution Center for TM #'s 33-A-109 and 33-A-110
The health department has no objection under the following conditions:
VIRGINIA
DEPARTMENT
VIDHF HEALTH
Protecting You and Your Environment
1) All buildings on site are to be served by the public water and sewer system as approved
by the Frederick County Sanitation Authority.
2) All wells are to be abandoned according the Private Well Regulations
3) All septic tanks are to be pumped by an approved septic hauler and abandoned by filling
with sand or gravel.
4) Permits are to be obtained from the health department for any proposal for a motel, hotel,
or restaurant.
5) All designs submitted should provide for protection of the Branson Spring from any
contaminants or drainage due to the proposed future construction.
Please note that these are the same comments sent to the previous applicant, Michael J.
Coughlin of Walsh Colucci Lubley Emrich & Walsh on June 11, 2008.
Frederick County, Virginia
Master Development Plan Application Package
Mail to:
Request Master Development Plan Comments
Department of GIS (Geographic Information Systems)
Department of GIS, Attn: GIS Manager
107 North Kent Street
Winchester, VA 22601
(540) 665-5614
Hand deliver to:
Department of GIS
107 North Kent Street
Winchester, VA 22601
(540) 665-5614
The GIS Department will review the proposed street names for this project to ensure their
acceptability into the Frederick County Street Name System. Proposed street names will also be
routed through the Communication Center Supervisor for review. This step will prevent duplicate
street names from being entered. Please attach one copy of the plan indicating
proposed names.
Applicant's Name: BPG Properties, Ltd.
Address: c/o Triad Engineering, Inc.
200 Aviation Dr. Winchester, VA 22602
Phone number: 540 667-9300
Name of development and/or description of the request:
_I-81 Distribution Center, MDP for proposed 750,000 sq. ft. use(s) on 59.077 acres
parcel identified as TM 33-A-109,110
Location of property: Approximately .61 +/- miles north of Route 11
intersection with state Route 671 (Cedar Hill). Bounded on the West by 1-81 and
on the east by Route 11 (Martinsburg Pike).
GIS OFFICE USE O II—
Date received
Incomplete 11
Datereviewed 13�
Signature and Date:
Date revision received Date approved
Incomplete
Date reviewed
Frederick County,
Master Development Plan Application Package
Request for Master Development Plan Comments
Frederick County Department of Parks and Recreation
Mail to: Hand deliver to:
Frederick County 2nd Floor
Department of Parks and Recreation 107 N. Kent Street
107 N. Kent Street Winchester, VA
Winchester, Virginia 22601 (540) 665-5678
Please fill out the information as accurately as possible in order to assist the agency with
their review. Please attach one (1) copy of the MDP with the sheet.
Applicant's Name: BPG Properties, Ltd.
Address: c/o Triad En 'neerin
200 Aviation Dr. Winchester, VA 22602
Phone Number: (540) 667-9300
Name of development and/or description of the request:
I-81 Distribution Center, MDP for proposed 750,000 sq. ft. use(s) on 59.077 acres
parcel identified as TM 33-A-109 110
Location of property: Approximately .61 +/- miles north of Route 11
intersection with state Route 671 (Cedar Hill). Bounded on the West by I-81 and
on the east by Route 11(Martinsburg Pike).
Department of Parks and Recreation's Comments:
No Comments
Department of Parks and Recreation use only
Date received Review Number: 1 2 3 4 5 (please circle one)
Date reviewed Date approved Revision required
Signature and Date 4ad",
Frederick County, Virginia Master Development Plan Application Package
Request for Master Development Plan Comments
Winchester Regional Airport
Mail to: Hand deliver to:
Winchester Regional Airport 491 Airport Road
Attn: Executive Director (Route 645, off of Route 522 South)
491 Airport Road (540) 662-2422
Winchester, Virginia 22602
Please fill out the information as accurately as possible in order to assist the agency with
their review. Please attach one (1) copy of the MDP with the sheet.
Applicant's Name: BPG Properties, Ltd.
Address: c/o Triad Engineering, eering, Inc.
200 Aviation Dr. Winchester, VA 22602
Phone Number: (540) 667-9300
Name of development and/or description of the request:
I-81 Distribution Center, MDP for proposed 750,000 sq. ft. use(s) on 59.077 acres
parcel identified as TM 33-A-109 110
Location of property: Approximately .61 +/- miles north of Route 11
intersection with state Route 671 (Cedar Hill). Bounded on the West by I-81 and
on the east by Route 11 (Martinsburg Pike).
Winchester Regional Airport Comments:
Winchester Regional Airport use only
Date received Review Number. 1 2 3 4 5 (please circle one)
Date reviewed Date approved Revision required
Signature and Date �_4l�_An�c` (\ ma , ice, . � IbI61-00
0
0 WINCHESTER REGIONAL AIRPORT
SERVING THE 491 AIRPORT ROAD
TOP OF VIRGINIA WINCHESTER, VIRGINIA 22602
qV1 HOR��� (540) 662.2422
October 6, 2008
Dennie D. Dunlap, III
Triad Engineering, Incorporated
200 Aviation Drive
Winchester, Virginia 22602
Re: Master Development Plan Comment
1-81 Distribution Center
Stonewall Magisterial District
Dear Mr. Dunlap:
The proposed master development plan has been reviewed and the following
comment(s) are offered on behalf of the Winchester Regional Airport Authority:
1. Parking lot lighting should be of the shielded type and amber in color to
minimize light pollution to pilots on approach to the airport from the
North.
Thank you for providing this information to us for review and your cooperation
during this process.
If you have any questions or need additional information, please do not hesitate
contacting my office.
Sincerely,
Serena R. Manuel
Executive Director
Frederick County,
Master Development Plan Application Package
Request Master Development Plan Comments
Superintendent of Frederick County Public Schools
Mail to:
Frederick County Public Schools
Attn: Superintendent
P.O. Box 3508
Winchester, Virginia 22604
(540) 662-3888
Hand deliver to:
Frederick County Public Schools
Attn: Superintendent
School Administration Building
1415 Amherst Street
Winchester, Virginia
Please fill out the information as accurately as possible to assist the agency with their review.
Please attach one (1) copy of the MDP with the sheet.
Applicant's Name: BPG Properties, Ltd.
Address: c/o Triad Engineering, Inc.
viation Dr. Winchester. VA 22602
Phone Number: (540) 667-9300
Name of development and/or description of the request:
I-81 Distribution Center, MDP for proposed 750,000 sq. ft. use(s) on 59.077 acres
arcel identified as TM 33-A-109 110
Location of property: Approximately .61 +/- miles north of Route 11
intersection with state Route 671 (Cedar Hill). Bounded on the West by 1-81 and
east by Route 11 (Martinsburiz Pike
County Public School Comment: LUl e, G�� viz
— /0106
GIS OFFICE USE ONLY:
Date received Date revision received Date approved
Incomplete Incomplete
Date reviewed Date reviewed
Signature and Date:
•
TRANSMITTAL LETTER
•
:JJA
L
TRIAD ENGINEERING, INC.
Civil Engineering ' Geotechnical Engineering
Environmental Services ' Land Surveying
Construction Testing & Monitoring • Drilling
Water & Wastewater ' Landscape Architecture
To: Frederick Co. Dept. Planning and Development
107 N. Kent Street
Winchester, VA 22601
Attn: Candice Perkins
WE ARE SENDING YOU THE FOLLOWING ITEMS:
200 Aviation Drive
Winchester, VA 22602
(540) 667-9300
(540) 667-2260 facsimile
www.triadeng.com
Date: 15 December 2008
Re: 1-81 Distribution Center MDP
Project No.: 07-06-0072
D EC 1 5 Zoos
COPIES
DATED
NUMBER
DESCRIPTION
45
08-28-08
MDP
MDP for the 1-81 Distribution Center (revised 12-15-08)
1
Request for MDP comments
1
08-29-08
MDP Application
1
12-11-08
Limited Power of Attorney Form
1
09-04-08
270
Check payable to 'Treasurer of Frederick County" for $9,000.00
THESE ARE TRANSMITTED:
❑ For Approval
❑ As Requested
❑ Other
❑ For Your Use
® For Review and Comment
REMARKS
COPY TO:
SIGNED: D' Z) "=
Dennie D. Dunlap III
If attachments are not as noted, kindly notify us at once.
200 Aviation Dr.
Winchester, VA 22602
Phone 540-667-9300
FAX 540-667-2260
www.triadeng.com
TRIAD ENGINEERING, INC.
December 12, 2008
Candice E. Perkins
Department of Planning and Development
107 North Kent Street Suite 200
Winchester, VA 22601
RE: 1-81 Distribution Center, MDP Review
Property Identification Number (PIN): 33-A-109 & 33-A-110
Dear Candice:
The following represents Triad Engineering, Inc. responses to your comments, dated
October 29, 2008, concerning the 1-81 Distribution Center MDP. Review comments are
shown in bold italics. We are responding on a point -by -point basis to correlate with your
comments.
1. Revise the project summary to show the new zoning. Revise the proposed
use to show warehouse/distribution. The new zoning of B-3 and proposed use of
warehouse/distribution is shown in the project summary.
2. Revise the MDP to show the approved proffers (revision date of 9117108). The
approved proffers, dated 9/17/08, are included on the MDP.
3. The proffered GDP needs to be provided on the MDP. The proffered GDP, per
the approved rezoning application, is provided.
4. Signature blocks for the owner of the property need to be provided. The
address and phone number of the property owner needs to be provided as
well. The signature block includes address, phone number, and signature line for
the property owner. FYI — since the preliminary MDP submittal, the property has
been sold to Frederick County Investors, LLC, which is an affiliate of BPG
Properties, Ltd.
5. Label all existing structures that are going to be removed. The existing house
and accessory buildings are shown to be removed.
6. A legend needs to be provided on the MDP. A legend identifying different
linetypes and symbols is provided.
7. The table for the dimensional and intensity requirements needs to be revised.
Route 11 is an arterial road, not a collector, and the height portion needs to be
updated when the pending height ordinance amendment is decided. The table
is revised to now include the provided setback distance for arterial highways. The
height portion reflects the recent ordinance amendment allowing 45' for B-3 zoning
under certain conditions.
8. Statements regarding water and sewer availability need to be provided on the
MDP. A statement regarding water and sewer availability is provided (see project
summary).
9. The proffered improvements need to reference their proffer number. The plan
improvements reference their associated proffer, where applicable.
10. Show on the MDP how proffer 3.5 will be implemented The interparcel access
easement is shown from the future entrance to the adjacent Cline parcel to the north
of the property.
Practical Engineering and Science Solutions Since 1975
West Virginia Pennsylvania Maryland Virginia
11. Label Martinsburg Pike and provide the speed limit. Martinsburg Pike is labeled
and the speed limit (45 MPH) is shown.
12. Show the location of the intersection with Route 11 and Branson Spring Road.
The Route 11/Branson Spring Road intersection is shown.
13. Label the entrance shown as the "initial entrance" and show the location of
the "future entrance': Also, all intersections and driveways within 200 feet of
this property need to be shown on the MDP. The initial and future entrances and
all driveway entrances for adjoining properties are shown.
14. A Zoning District Buffer (in addition to proffer 5.1) is required along
Martinsburg Pike. This buffer needs to consist of one deciduous tree (2-inch
caliper) and two evergreen trees (four feet at time of planting) per ten linear
feet. An additional street tree and shrub is proposed, in addition to the proffered
landscape buffer along Rte. 11, to bring the proposed landscaping in conformance
with a zoning district buffer along the Rte. 11 corridor (see proffered buffer detail
along Rte. 11).
15. Proffer 7.3 states that a split rail fence will be constructed along Route 11.
The Route 11 buffer detail needs to be revised to incorporate this fence along
with the three foot berm. The split rail fence is added to the Rte. 11 buffer detail.
All proposed shrubbery will be installed at a minimum height of 36", eliminating the
need for the 3' high berm along Rte. 11 and satisfying the conditions of proffer 5.1.
Please find the attached MDP application, 45 copies of the MDP, the Special Limited
Power of Attorney Form, and the review fee of $9000.00. Also attached are comment
letters from the Frederick County Fire Marshal, Frederick County Dept. of Building
Inspections, Frederick County Dept. of Public Works, Frederick County Dept. of GIS,
Frederick County Health Dept., Frederick County Parks and Recreation, Frederick
County Sanitation Authority, Frederick County Public Schools, and VDOT.
Please review the attached and let me know if you have any questions. Thank you for
your time and consideration regarding this matter.
Sincerely,
Dennie
Dennie D. Dunlap III, P.E.
Director of Civil Engineering
TRANSM ITT AL4PETTER
:qJA
t
TRIAD ENGINEERING, INC.
Civil Engineering ' Geotechnical Engineering
Environmental Services ' Land Surveying
Construction Testing & Monitoring • Drilling
Water & Wastewater • Landscape Architecture
To: Frederick Co. Dept. Planning and Development
107 N. Kent Street
Winchester, VA 22601
Attn: Michael Ruddy
WE ARE SENDING YOU THE FOLLOWING ITEMS:
200 Aviation Drive
Winchester, VA 22602
(540) 667-9300
(540) 667-2260 facsimile
www.triadeng.com
Date: 29 August 2008
Re: 1-81 Distribution Center MDP
Project No.: 07-06-0072
AS 29 W
COPIES
DATED
NUMBER
DESCRIPTION
2
08-28-08
MDP
MDP for the 1-81 Distribution Center
1
Request for MDP comments
1
08-29-08
MDP Application
THESE ARE TRANSMITTED:
❑ For Approval
❑ As Requested
❑ Other
❑ For Your Use
® For Review and Comment
REMARKS
The application fee and limited power of attorney form will be submitted once the other review agency comment
sheets are received.
COPY TO:
SIGNED: D DV
Dennie D. Dunlap III
If attachments are not as noted, kindly notify us at once.
0
Frederick County, Virginia Master Development Plan Application Package
Required Information Checklist
MASTER DEVELOPMENT PLAN
The following information must be included on the- master development plan. If the submitted
master development plan is incomplete or is missing information, it will not be reviewed and will
be returned to you for revisions.
Administrative Information
Yes
No
1.
Name of proposed development.
✓ 2.
Name, address, and telephone number of owner.
✓
3.
Name, address, and telephone number of developer.
,/
4.
Name, address, and telephone number of designer.
✓
5.
Signed certificate of surveyor, engineer, or architect.
6.
Date plan prepared and date of revisions.
0
A listing of all conditions placed on the site as a result of a
C--i T9
conditional zoning approval. Rezoning file number should
—
be cited.
8.
A space labeled "Approved by the Director of Planning and
Development" for the approval signature and date of
approval.
✓
9.
A space labeled "Approved by the County Administrator"
for the approval signature and date of approval.
✓
10.
Magisterial District.
✓
11.
Sheet size less than 42 inches.
Page 13
•
Frederick County, Virginia Master Development Plan Application Package
General Information
Yes
No
✓
1.
Location map (scale 1:2000).
_
2.
Scale of the MDP is not to exceed 1:100.
✓
3.
North Arrow.
4.
Legend describing all symbols.
✓
5.
Surveyed boundaries of all lots and parcels.
✓
6.
Acreage of all parcels included in the MDP.
r✓
7.
Topography contour lines at acceptable intervals.
�✓/�
S.
A schedule of phases, boundary of phases, and order of
development.
9.
Use, zoning, and property owner of all adjoining properties.
✓
10.
Location of proposed uses (location, boundaries,
arrangement).
AIZA
11.
Location and treatment of historic structures and sites.
✓ 12.
History of all land divisions in relation to this tract.
13.
Acreage, Location and boundaries of environmental
features: floodplains, lakes and ponds, wetlands, natural
stormwater retention areas, steep slopes, woodlands.
✓
_ 14.
Amount and percentage of disturbed and protected land in
common open space.
Page 14
Frederick County, Virginia Master Development Plan Application Package
Residential Development Information
Yes No
1. Location and dimension of Reside 'al Separation Buffers.
2. Acreage in common open s ce, in housing type, in road
rights -of -way, and the entire development (by Phase).
3. ocation an oundaries of housing types. Residential
Pe rf ce (RP) dimensional requirements should be
indicated.
Number of dwelling uni type, phase, and in total).
5. Location and configuration of requi creational
facilities. Statement of required and type of facilities to be
provided.
Infrastructure Information
Yes No
1. Location of adjoining streets and utilities.
2. Location, arrangements, and right-of-way widths of roads
and property access.
✓ 3. Location and arrangement of street entrances, driveways,
and parking areas.
4. Location of entrances to the development from public
streets.
5. Type of road design (rural or urban).
0 Use of inter -parcel connectors.
Page 15
•
•
Frederick County, Virginia Master Development Plan Application Package
Other Design Information
Yes
V
No
7. Traffic impact analysis. To be submitted to the Virginia
Department of Transportation.
8. Location of sewer and water mains with statements
concerning the connection with and availability of facilities.
9. Location and arrangement of electric and gas utilities.
1. Location of Zoning District and Road Efficiency buffers,
and examples specifying the screening to be provided.
2. Plan for stormwater management. Location of stormwater
facilities.
(�DAcreage of each type of environmental protection land.
(Amount and percentage of disturbed and protected land in
common open space.) Shown in a table format.
4. Amount, boundaries, and location of common open space.
(Indicate the percentage of the entire site to be placed in
common open space.)
5. Location of environmental protected areas to be included in
common open space.
Page 16
Frederick County, Virginia Master Development Plan Application Package
County Health Department Information
Yes No
1. Statements and locations pertaining to sewer and water
availability.
2 j Statements and locations concerning any existing pre- or
post -water treatment facilities.
3. Statements and location of any planned private treatment
facilities.
Page 17
Document Approval Form
PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS YOUR
APPROVAL PLEASE INITIAL AND PROVIDE THE DATE AND TIME OF YOUR
APPROVAL.
IF THIS DOCUMENT DOES NOT MEET YOUR APPROVAL PLEASE PROVIDE
COMMENTS AS TO WHAT YOU WOULD LIKE TO HAVE COMPLETED.
Candice
Mark
Dana
Eric
Mike
John
Amber
COMMENTS:
INITIALS DATE & TIME
CLf— \-Z � C�>
Received by Clerical Staff (Date & Time): ?5 p 1:�:I a 3 1 d 2-