Loading...
HomeMy WebLinkAbout18-01 Spectrum Resources Cross Junction Tower - Gainesboro - Backfile4 1 REVISION REQUEST CUP TRACKING SHEET (To be completed by Frederick Co. Staff only.) CUP # / ff- ( ; / Owner/Applicant 0.,r e To i s_L_ Application Date ( - z Fee Paid 0 yes initials: KA 1, Sign Deposit = yes Submittal Cut -Off Date P/C Mtg. date: „ -a n-QZ BOS Mtg. date: AGENCY REVIEW COMMENTS VDOT Uo A port , ity Inspections City of Winchester / Fire Marshal Co Sanitation Authority Health Dept. i PLANNING COMMISSION RECOMMENDATIONS OF ( a ) APPROVAL (WITH CONDITIONS) yes `rio IT" VQAQ*-.TW DENIAL Signe &JUA Secre ry Date 62 1-0 BOARD OF SUPERVISORS PUBLIC HEARING ACTION Ad �Z c (da ) EZ APPROVAL• Signed co� LcL_., , o yZe. DENIAL Date CUP TRACKING SHEET (To be completed by Frederick Co. Staff only.) CUP # �- I Owner/ApplicantJ>^ Application Date Q Fee Paid yes initials: �A V Sign Deposit yes Sign return date: Submittal Cut -Off Date ! I- q - n l P / C Mtg . date : /,2 - `7 - Q r BOS Mtg . date: 1-23-02. AGENCY REVIEW COMMENTS VDOT ✓ Airport Authority Inspections City of Winchester 1� Fire Marshal Co Sanitation Authority Health Dept. _._.._ 6L PLANNING COMMISSION RECOMMENDATIONS OF /� (date) . / I APPROVAL (WITH CON DIT ON ) �es no �o� l V I VILt DENIAL Signe tary Date BOARD OF SUPERVISORS PUBLIC HEARING ACTION ClCI (dat ) APPROVAL • Signed tygdm . aDENIAL Date 1 - 0-L NOTES Date: �Q- - File opened Reference Manual updated/number assigned D-base updated One black & white location map (8'/2" x 11 ") requested from Mapping Dept, ,/ Four sets of labels requested from Data Processing 10,30-61` File given to Renee' to update Application Action Summary CLOSE OUT FILE: Approval (or denial) letter mailed to applicant/copy made for file I/ File stamped "approved", "denied" or"withdrawn" Reference Manual updated V' D-base updated Q2� File given to Renee' for final update to Application Action Summary d'sctl U\Carol\Common\CUP.TRK Revised 4/12101 Receipt, Date t No. 145849" ($ RECEIVED FROM -DOLLARS 0, FOR RENT 0 FOR 'C FR4 TO ACCOUNT 0 cash PAYMENT check BALANCE DUE 0 money 0 order BY TC118;0 CASH U. 0 RECEIPT Date Received Fro Address For -11 r z ACCOUNT HO% ; ACCOUNT CASH AMT PAID CHECK BALANCE MONEY ORDER 002416 Re: Tower Projects Subject: Re: Tower Projects Date: Wed, 25 Sep 2002 11:18:48 -0400 From: Eric Lawrence <elawrenc@co.frederick.va.us> To: Kamal Doshi <kdoshi@sharedtowers.com> CC: msmith@greenwayeng.com, aestes@rohnnet.com Hello Kamal. In response to your two inquires: 1. A condition was placed on each approved CUP application stating that "In the event a telecommunications tower is not erected within twelve (12) months of the approval of this Conditional Use Permit, then the CUP will be deemed invalid." Therefore, if you anticipate a failure to comply with this condition, it may be appropriate for you to re -apply for a CUP and have the condition modified, and the time frame extended. 2. The Hunting Ridge tower CUP approval enabled the construction of a 195 foot telecommunication tower. Therefore, you'll need to keep the tower under 195-feet tall. Feel free to contact me with questions. -Eric Kamal Doshi wrote: > Hello Eric: > Just a quick update and a request: > - The cell companies have all slowed down as they all are having trouble raising funds after problems at MCI Worldcom, Quest and others. I cannot get any feedback out of Triton (partly because of their emotional attachment to competing sites). Shentel who likes my sites is unable to commit to any specific dates because of its budget constraints. If you have had any other inquiries for Route 522 corridor please let me know. For the time being, I am going ahead with Hunting Ridge (the first tower in the series) and Cross Junction after that. Others will probably wait for more interest level. I may need to come back to you for extensions of time on zoning approvals. Please let me know how that is to be handled. , > - Regarding Hunting Ridge, we have approval for 195' tower. Our plan was to install a lightening rod of 4 feet and stay within the 199' guideline. The tower manufacturer Rohn has informed me that their towers are built in standard sections in 4' increments, thus the nearest available height to our requirement is 196' and they can ship a shorter lightening rod of 3' thus still maintaining 1991. I know this is different from the original plan but only by a small degree (1 foot) and I wanted to get your input on whether this would be acceptable. The other alternative is to build the tower shorter by four foot, which is also OK by me, but could give reason for a uncooperative future carrier to demand a new tower. > Kamal > cc: Alan Estes, Rohn (please wait till I receive feedback on this from Mr. Lawrence at Frederick County) > Mark Smith, Greenway Engineering. Eric R. Lawrence, AICP Director Department of Planning and Development County of Frederick 107 N. Kent Street Winchester, Virginia 22601 540.665.5651 1 of 2 9/25/2002 11:19 AM r 0 COUNTY of FREDERICK Department of Planning and Development 5401665-5651 FAX: 540/ 665-6395 March 14, 2002 Mr. Kamal Doshi Shared Towers, LLC 6501 Sandy Knoll Court McLean, VA 22101 RE: CUP 918-01 for the Cross Junction Telecommunications Facility Property Identification Number 18-A-38 Dear Mr. Doshi: This letter is to confirm action taken by the Frederick County Board of Supervisors at their meeting on March 13, 2002. Your request for a revision to Conditional Use Permit #18-01 for a 260-foot-high lattice - type telecommunications facility, rather than the 195-foot-high lattice -type tower which was approved on January 23, 2002, was approved. The approval also granted a reduction in the setback requirements against the property lines. The application was approved with the following conditions: All Zoning Ordinance requirements and review agency comments shall be addressed and complied with at all times. 2. The tower shall be available for co -locating personal wireless services providers. A minor site plan shall be approved by the County. — 4. The tower shall be removed by the applicant or property owner within twelve (12) months of abandonment of operation. 5. In the event a telecommunications tower is not erected within twelve (12) months of the approval of this Conditional Use Permit, then the CUP will be deeded invalid. If you have any questions regarding this action or the site plan approval process, please feel free to call this office. Since , is R. Lawrence AICP, CZA Deputy Director ERL/ch cc: Mark Smith, Greenway Engineering Sidney Reyes, Gainesboro District Supervisor Commissioner of Revenue Jane Anderson, Real Estate em: George Kriz and Charles Triplett, Gainesboro Planning Commissioners 107 North rent Street • Winchester, Virginia 22601-5000 c ttP icy .�y I.(l! 4WS� Pat 0A Consultant P.O. Box 3106 Winchester, Virginia 22604 Education Specialist Telephone: (540) q 62-2939 - clocRn� 3U I'n1C -C February 23, 2002 Mr. Kamall)oshi Shared Towers; Inc. 6501 Sandy Knoll Court McClean, VA 22101 Dear Mr. Doshi: It was very nice meeting you the other night at our Frederick County Planning Commission meeting, I did -truly appreciate yourgentle-manly approach.to my questions. regarding the Revised Conditional. Use Permit #18-01 Cross Junction Tower. As I indicated to you, I am a new member of the FCPC and had not been involved in the initial proceedings regarding your request to place a lattice -type .telecommunications facility on -property ID Number 18 A-18. I did, however, go out to the si�e on Tuesday morning in preparation for Wednesday night'smeeting, and had an opportunity to meet two members of Mrs. Collins' family. As you know, she is the property owner adjacent to the land on which you are proposing to erect your tower. They are rural residents of Frederick County, and they expressed very deep concerns regarding this proposed tower, mostly in.reference -to "quality of W'.issues. Without having_a_map, I could not -determine what was meant by my Review notes, `The applicant has attempted to place the facility in the middle of the site (property under common ownership), maximizing the structural setback."It appears to me to be. very close to Mrs. Collins property, the road, and a small village. Would you -please clarify this -point for me? I am a lifelong -resident. of the Winchester/Frederick County area, residing in my present home for forty years. When my husband and I built our home, it was "out in the country." I enjoyed the - sounds of nature such as birds, crickets, and frogs. Now, the tractor trailer -sounds of 81 roar through my backyard. Many of the-surrounding_wetlands have been filled in, so I don't hear the frogs anymore._ As a result of all this manmade noise, I could have withdrawn from this turmoil into the peace and silence of my home. However, I chose .to adapt to my natural environment by placing stone shaped, speakers into my flower -gardens allowing tranquil.music to float upon the breeze.. This does not drowned out the truck noise completely, but I'm working on it! This past summer, I had�small pond installed at the back of my yard, and then in the fall friends stocked it with nine frogs. With great.delight, I'm anticipating -that I will hear the "Spring -Peepers" this year. The purpose of the above information is .to ask one simple, question. As you -pursue your. quest to instalLa. communication tower in what is now a very rural area of Frederick County, are you willing to work with the local residents of that small community, such as Mrs. Collins, on " quality of life issues"? This could be something as simple as adding additional landscaping such as planting lots of trees to screen the view of the base of your tower from Mrs. Collins' deck. I am well aware of the fact that the residents of The Summit want this tower, but it is not in their backyard. I am well aware the battle cry of growth, but every person needs to have a game plan, to keep a positive attitude, and to practices the art of conversation, which includes listening. This will results in the whole team winning the game. On a personal note, as an environmentalist, has the field of Telecommunications addressed the issue of towers being in the pathway of migratory birds? This has been a serious problem facing our nation as thousands of these birds have been killed over the last decadeas more _and more of these towers have been erected. Has there been a device invented which can be added to these towers as a warning signal to these transitory birds, and if so, will your tower have such an apparatus? If you have any information on this topic, I wish you would please share it with me. I have taken the liberty of including a copy of my poem, I Don't Hear the Frogs A more_ I wrote this poem as part of an Earth Day celebration in the spring of `95, but the message is still clear today which is asking all of us to be good stewards of God's creation. Looking forward to hearing from you at your earliest convenience. \Aot C d r�r _C4 4___1 Patricia W. Gochenou , Planning Commissioner: Red Biid District: Frederick County cc: Gina A. Forrester, Supervisor Red Bud District Sid A. Reyes, Supervisor. Gainesboro District Richard C. Shickle. Chairman- At Large George J. Kriz, Planning Commissioner. Gainesboro District Charles . Triplett, Planning Commissioner: Gainesboro District Jearlde Collins, Land Owner Evan Hyatt, Director of Planning/ Frederick County I DON'T- HEAR -THE -FROGS -ANYMORE My garden -of -Eden is -where -the -Shawnee -walked, here the great elk roamed and Washington rode. The rainp still come and the winds still blow, but I don't hear the frogs anymore. Oh, my Wonder#'ul-Greatior, All-P-owerful,--Great-Spir4t, do you hear the cries of Mother Earth? She is seeking stewards and counsel tp help her return to prior glory and worth. My garden -of -Eden -is. where 4n -the -spring the daylight lingers and robins sing, Where butterflies dance and tulips nod, l ut I don't hear the frogs anymore. A sprinpme-ehorus-is-singing-off-key the frog section I no longer see, The cho� loft pond has disappeared, because-untuned mamdidn?t-listen or hear. Some mere ar-c-a tmpting4o-erode God's-laws �s they build their empires of stone. But no tter how foolish or thoughtless this seems r0dness and right stand not alone. For east of -the -garden-of_Eden; -I e-places4he-Cher-ubirn flaming sword turns to guard the way to -the tree- of-liffi-1 again. The winds will blow the dust of t$ile into the Hands of God, and all will hear, "I must 00tin anew". -as-He-k-qd "pen -the -sod. Patsy Wheeler: ocW'&aour April 195 PC REVIEW: 02/20/02 BOS REVIEW: 03/13/02 Revised - CONDITIONAL USE PERMIT #18-01 CROSS JUNCTION TOWER Telecommunications Facility LOCATION: This property is located at the corner of Collinsville Road and Cross Junction Road, approximately 290 feet from North Frederick Pike (Rt. 522N). MAGISTERIAL DISTRICT: Gainesboro PROPERTY ID NUMBER: 18-A-38 PROPERTY ZONING & PRESENT USE: Zoned RA (Rural Areas) District; Land Use: Vacant ADJOINING PROPERTY ZONING & USE: Zoned RA (Rural Areas) District; Land Use: Residential and Agricultural PROPOSED USE: 195 foot hik 260-foot high lattice -type telecommunications facility REVIEW EVALUATIONS: Virginia Dept. of Transportation: The application for a conditional use permit for this property appears to have little measurable impact on Rt. 770, the VDOT facility which would provide access to the property. Existing entrance is adequate for proposed use. However, should use ever expand in the future, the entrance may have to be upgraded to VDOT minimum standards. Fire Marshal: Maintenance of roadway for emergency vehicle access. 14.5 foot vertical clearance and entire width per NFPA. Roadway requirements allow for enhancement of Rural Fire Protection in Wildland Fire Control. Plan approval is recommended. Page 2 Cross Junction Tower, Revised CUP #18-01 March 6, 2002 Inspections Department: Structures shall comply with The Virginia Uniform Statewide Building Code and Section 312, Use Group U (Utility) of The BOCA National Building Code/1996. Please note Chapter 17 of BOCA for special inspection requirements for this type structure (concrete/bolt testing, etc.) Public Works/Engineering: Disturbance of more than 10,000 s.f. will require an erosion and sediment control plan and a land disturbance permit. This land disturbance include access roads and site development. Winchester Regional Airport: Please see attached letter from Serena R. Manuel, Executive Director, dated 01122102. Planning and Zoning: The Frederick County Zoning Ordinance allows for Commercial Telecommunication Facilities in the RA (Rural Areas) Zoning District with an approved Conditional Use Permit. The Frederick County Zoning Ordinance specifies that a CUP for a commercial telecommunication tower may be permitted provided that residential properties, land use patterns, scenic areas and properties of significant historic values are not negatively impacted. Furthermore, additional performance standards shall apply to the CUP review in order to promote orderly economic development and mitigate the negative impacts to adjoining properties. The Board of Supervisors granted the initial request for CUP#18-01 on January 23, 2002. This approval enabled the construction of a 195-foot-high lattice -type telecommunications tower. The approval also granted a reduction in the setback requirements against the property's northeast and southeast property lines. The application was approved with the following conditions: 1. All Zoning Ordinance requirements and review agency comments shall be addressed and complied with at all times. 2. The tower shall be available for co -locating personal wireless services providers. 3. A minor site plan shall be approved by the County. 4. The tower shall be removed by the applicant or property owner within twelve (12) months of abandonment of operation. 5. In the event a telecommunications tower is not erected within twelve (12) months of the approval of this Conditional Use Permit, then the CUP will be deeded invalid. Page 3 Cross Junction Tower, Revised CUP #18-01 March 6, 2002 Following discussions with the Planning Commission, the Board of Supervisors, and representatives from SunCom/Triton PCS, the applicant determined that an increase in tower height to 260 feet would better accommodate the needs of the community and personal wireless service providers. Therefore, the applicant has requested the ability to increase the tower's height by 65 feet, bringing the tower height to 260 feet. The applicant contends that the increased tower height will enable personal wireless carriers to provide a more efficient service to the community as topographical restrictions will be lessened. The applicant is requesting a reduction of the setbacks pursuant to Section 165-48.6(B).1 of the Zoning Ordinance as the proposed increase in height would require an increase in structural setback distances. Based on the proposed 260-foot height, the setbacks would be as follows: Required Proposed Requesting a Setback Setback Setback Setback from: Reduction of: Northwest Property line 275 ft 220 ft 55 ft (Collins property) Northeast Property Line 275 ft —135 ft — 135 ft (Hoffman - property owned by applicant) East Property Line 275 ft — 40 ft — 235 ft (Hoffman - property owned by applicant) Southwest Property Line 285 ft 284 ft 1 ft (Route 522 North) The Planning Commission may reduce the required setback distance for commercial telecommunication facilities if it can be demonstrated that the location is of equal or lesser impact. The applicant has attempted to place the facility in the middle of the site (property under common ownership), maximizing the structural setback. The applicant has provided a letter (dated January 2, 2002) certified by the Tower Manufacturers Professional Engineer indicating that the tower can be built with a safety stress point to reduce its fall zone. The applicant is also requesting the ability to continue to utilize lattice -type material construction pursuant to Section 165-48.6(B)2 of the Zoning Ordinance. The Zoning Ordinance requires that new commercial telecommunication facilities be of monopole -type construction. The Planning Commission may allow lattice -type construction for new commercial telecommunication facilities that are located Page 4 Cross Junction Tower, Revised CUP #18-01 March 6, 2002 outside of the Urban Development Area, and are not adjacent to properties that are identified as historic areas. The proposed site is located outside of the UDA,-and is not in close proximity to any identified historic areas. Therefore, allowing a lattice -type tower would be in conformance with the intent of the Zoning Ordinance. This proposed commercial telecommunication facility will be in conformance with Section 704 of the Telecommunication Act of 1996. In evaluating this application, it has been demonstrated that there is a need for the infrastructure within the area of the County identified. STAFF CONCLUSIONS FOR THE 2-20-02 PLANNING COMMISSION MEETING: Staff believes that this application for a Commercial Telecommunication Facility has adequately addressed the requirements of the Zoning Ordinance in that need for this facility, based on a lack of coverage and capacity in this part of the County, has been demonstrated. Further, a reduction of the setback requirements, as well as allowance for a lattice -type tower construction, may be appropriate. Should the Planning Commission choose to recommend approval of this application, the following conditions of approval would be appropriate: All Zoning Ordinance requirements and review agency comments shall be addressed and complied with at all times. 2. The tower shall be available for co -locating personal wireless services providers. A minor site plan shall be approved by the County. 4. The tower shall be removed by the applicant or property owner within twelve (12) months of abandonment of operation. 5. In the event a telecommunications tower is not erected within twelve (12) months of the approval of this Conditional Use Permit, then the CUP will be deemed invalid. PLANNING COMMISSION SUMMARY & ACTION OF 02/20/02 MEETING: Numerous issues were discussed by the Planning Commission. Commissioners asked if SunCom/ Triton PCS had indicated for certain that the additional tower height would now meet their service requirements for this area. They verified with the applicant that the setback requirements regarding the easements would be legally recorded through a lease agreement between Shared Towers and the property owner. Commissioners verified with legal counsel that the County would not be held liable for damages, if the tower collapsed. They discussed the contents of a letter submitted by the applicant's engineer certifying that tower construction will include safety stress points to reduce the fall zone to within the property owners' boundaries and they heard the applicant's explanation of 0 0 Page 5 Cross Junction Tower, Revised CUP #18-01 March 6, 2002 specifications regarding the wind load design. Commission members also discussed the need to specify the exact height of the tower, plus the additional height required for the lightening rod. The applicant spoke with the Commission about why this particular location was selected for tower placement and his primary objectives for service coverage; he spoke of the pros and cons of using lattice structures versus monopoles; he discussed his meetings with SunCom/Triton PCS and county officials; and the Summit community's desire for service coverage. One adjoining property owner came forward and had questions regarding the distance of the tower to her property line, concerns about the possibility of the tower collapsing, and the affect on the viewshed from her home and for the Cross Junction community as a whole. Overall, the Planning Commission was satisfied that their concerns had been adequately addressed. They believed that the increased height of the tower was appropriate in light of the increased service area capability and usability by other service providers. The Commission recommended approval of the Cross Junction Tower CUP #18-01 for a 260-foot lattice telecommunications tower, with a six- foot lightening road placed at the top, with the requested setback waivers, and the following conditions: 1. All Zoning Ordinance requirements and review agency comments shall be addressed and complied with at all times. 2. The tower shall be available for co -locating personal wireless services providers. 3. A minor site plan shall be approved by the County. 4. The tower shall be removed by the applicant or property owner within twelve (12) months of abandonment of operation. 5. In the event a telecommunications tower is not erected within twelve (12) months of the approval of this Conditional Use Permit, then the CUP will be deemed invalid. The vote on this recommendation was as follows: YES (TO APPROVE): Watt, Unger, Morris, Light, Thomas, Ours, Kriz, Fisher, Triplett, Deflaven ABSTAIN: Straub, Gochenour (Note: Commissioner Rosenberry was absent from this meeting.) 0:\Agendas\COMMENTS\CUP's\2001 \CrossJunctionTowecrevi s ed.wpd WINCHESTER REGIONAL AIRPORT SERVING THE TOP OF VIRGINIA / January 22, 2002 Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 491 AIRPORT ROAD WINCHESTER, VIRGINIA 22602 (540) 662-2422 RE:. Revised Site Plan Comments — Share Towers Cross Junction Pole — Height Increase 266' Dear Sir: The Winchester Regional Airport Authority offers the following comments on the above referenced revised site plans as conditions to be included for approval of this site ptan: 1. As required by FAA regulations, structure must be,marked and lighted in accordance with FAA Advisory Circular 70/7460-1 J, Obstruction Marking and lighting, Chapters 4, 8 (M-Dual) & 13 2. Consideration should be given to the owner/operator of the Timber Ridge Airport which is a private airport located approximately four nautical miles from two of the towers as to possible impact on that facility. These comments are based on review provided by our engineering firm, Delta Airport Consultants, Richmond, Virginia. They have determined that the proposed revision in the height of the tower does penetrate any FAR Part 77 surfaces therefore there should be no impact on current or future operations at the Winchester Regional Airport. Final comment will be withheld pending review of the FAA's determination of the aeronautical study. If the above referenced conditions along with any others outlined in the FAA's study are met, the Winchester Regional Airport Authority has no objections to this conditional use permit. Should you have any questions or need additional information, please contact this office (430) 662-5786. Sincerely, S. R. Manuel Executive Director V, Z- c I /- 1. 8 Z- ,T'TO,6T.6C iN NOUV30-1 31VWIXOdddV txioa-2uake.muaa.i�-mAA IZ6t Uz P9PUnoj 9a96-?3Z4, (Ofg) :XVd 99T-T,-a99 (09) :aXOHda'ISL S.IOAaA.ITIS ?0922: *VA 'HILSaHDNIA saaamgug r,4 aNVI 'MH AGNIA T9T r No"IDNa AVMNAAU"`nV 1009 ="Tl:aqvos 88-v-8T TO/81/60 :9,LV(I /kiI-II3V3 SNOIIV3INnWW03 NOIi3Nnr sso?!3 . ts I 4p VII • Submittal Deadline: P/C Meeting: BOS Meeting: APPLICATION FOR CONDITIONAL USE PERMIT FREDERICK COUNTY, VIRGINIA I. Applicant (The applicant if the owner X other) NAME: Greenway Engineering ADDRESS: - 151 Windy Hill Lane, Winchester VA 22602 TELEPHONE: .(5401)662-4185 2. Please list all owners, occupants, or parties in interest of the property: Jeanette Hoffman 3. The property is.located at: PO Box 325 Cross Junction Vira nia 22625 4. The property has a road frontage of -�2 feet and a depth ofWeet and consists of approximately 3 acres to the east of Rt 522 of a 96.41 acre parcel. (See attached exhibit). 5. The property is owned by Jeanette Hoffman as evidenced by deed from 0.6 - Del-ayein .mod_ - nlrl f be N atp&g recorded in deed book no. 16 7— on page_ 448 as recorded in the records of the Clerk of the Circuit Court, County of Frederick. 6. 14-Digit Property Identification No. 18-A-38 Magisterial District Gainsboro District Current Zoning RA, 7. Adjoining Property: USE ZONING North 18-A-32C Single Family RA East 18-A-41 Single Family RA. South 18 A-42A Business B2 18-A-37 Single Family RA 18-A-39 Single Family RA 8. The type of use proposed is (consult with the Planning Dept. before. completing) Unmanned Commercial telecommunications facilities. 1 0 0 CL-Wc e. 9. It is proposed that the following buildings will be constructed: 2 (oO )wer structure inside a 100' x 100' leased area for ground secured by a fence. Q4( Ce.. 10. The following are all of the individuals, firms, or corporations owning property adjacent to both sides and rear and in front of the property where the requested use will be conducted. These people will be notified by mail of this application: NAME Shawnee Canning Co PROPERTY ID# 18-A-42A NAME Shawnee Canning Co PROPERTY ID# 18-A-41 NAME Jearldean D. Collins PROPERTY ID# 18-A-32C NAME Jeanette Hoffman PROPERTY ID# 18-A-37 NAME Jeanette Hoffman PROPERTY ID# 18-A-39 ADDRESS PO Box 657 Cross Junction, 22625 ADDRESS PO Box 657 Cross Junction, 22625 ADDRESS 198 Chestnut Grove Rd, Winchester 22603 ADDRESS PO Box 325 Cross Junction, 22625 ADDRESS PO Box 325 Cross Junction, 22625 12. Additional comments, if any: The landowner also owns parcels # 18-A-39 and 18-A-37 to the south of the proposed property and the land on those parcels may be used to comply with setback requirements. I (we), the undersigned, do hereby respectfully make application and petition the governing body of Frederick County, Virginia to allow the use described in this application. I understand that the sign issued to me when this application is submitted must be placed at the front property line at least seven (7) days prior to the first public hearing and maintained so as to be visible until after the Board of Supervisors' public hearing. Your application for a Conditional Use Permit authorizes any member of the Frederick County Planning Commission, Board of Supervisors or Planning and Development Department to inspect your property where the proposed use will be conducted. Signature of Applicant V V V v \ Signature of Owner Owners' Mailing Address c/o Eddie Cave, PO Box 325 Cross Junction VA 22625 Owners' Telephone No. 540-888-3418 TO BE COMPLETED BY THE ZONING ADMINISTRATOR: USE CODE: RENEWAL DATE: AFFIDAVIT To: Frederick County Department of Planning and Zoning I, the undersigned, Jeanette Hoffman, owner of property located at 301 Cross Junction Road, Cross Junction, Virginia, make this affidavit that I am aware that I may be held responsible for the removal of the commercial telecommunications facility as stated in Frederick County Code §165-48.6B(7), if the developer fails to remove the facility. I own two (2) adjoining parcels located to the south of the proposed property (parcels # 18-A-39,18-A-37) and, if necessary, the setback and access requirements for the project may be met by the land in these parcels. I understand and agree that as placed the tower can potentially fall into these adjoining parcels. Sincerely, to MDS/KD/dis GREENWAY ENGINEERING 151 Windy Hill lane Winchester, Virginia 22602 i Founded in 1971 January 23, 2002 Frederick County Department of Planning and Zoning 107 North Kent Street Winchester, VA 22601 Attn: Eric Lawrence Re: Cross Junction Communications Tower — Height Increase We are requesting an amendment to an original Conditional Use Permit that was approved on January 23, 2002 for the Cross Junction Communications Tower. The approved height of this tower is 195 feet. We are requesting an increase in height to 260 feet to improve cellular coverage provided by this tower. Winchester Regional Airport has provided its comments on this height increase. All other Agencies comments remain unaffected, as the nature of their concerns would not be affected by this height increase. We have also obtained and attached a letter certified by the Tower Manufacturers Professional Engineer indicating that the tower can be built with a safety stress point to reduce its fall zone. The attached sketch indicates that the height increase will require additional setback waivers. We request your approval of the height increase through the Frederick County Planning Commission and the Frederick County Board of Supervisors as the proposed structure will not affect the safety of the adjoining neighbors as we commit to designing stress points for the tower to fall within the landlord's properties. The original application is attached with height related matters updated. Thank you for your assistance with this project. Call with any questions or concerns. SincerelCan Green Mark D. Smith, P.E., S. President Enclosures RECEIVED JAN 2 5 2002 'pT nF PLAN NING1OFVF MIR!, Engineers Surveyors File #3162/MDS/dls Telephone 540-662-4185 FAX 540-722-9528 www.greenwayeng.com World Headquarters 6718 W. Plank Rd. Peoria, IL 61604 USA PH: 30"97-4400 FAX: 309-697-5612 Industries, Inc. January 2, 2002 Shared Towers, LLC 6501 Sandy Knoll Court McLean, VA 22101 Attn: Kamal Doshi Reference: 250' SSV Tower Frederick County, Virginia The referenced tower will be designed to meet the specified loading requirements in accordance with ANSI/TIA/EIA-222-F Standards for a 70 MPH basic wind speed, no ice. The 70 MPH basic wind speed is assumed constant up to 33' above ground level and is escalated to an effective wind speed of approximately 98 MPH at the top of the tower. In the event an extreme wind speed were to occur, failure would not be expected to occur the instant the design wind speed was exceeded. All tower members will be designed to support a minimum of 1.25 times their design load without permanent deformation. This would be equivalent to an effective wind speed of 82 MPH at the base of the tower and escalate to 110 MPH at the top of the tower. Based on customer specifications, the tower may be designed with heavier members than required by analysis in the lower portion of the structure. Therefore, in the unlikely case of failure, the point at which such failure would occur would be in the upper portion of the tower, allowing the upper portion to fold over the lower portion, limiting the area affected by the failure. Please contact us at your convenience should you have further questions concerning the safety of tower structures or other aspects of tower design. ; Please reference this letter with any forthcoming purchase orders where local �ined fall radius. requiremenWto ' Sincer �,(s T Azouri'vwr,' a in2 Adn i tiOr HJ cc: Al Est Ken Cordrey _ r T COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 PICAIFICAMICA'sl Of PUBLIC HEAl"WINIG February 6, 2002 TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNERS(S) RE: HEIGHT REVISION REQUEST FOR CONDITIONAL USE PERMIT APPLICATION #18-01 FOR THE CROSS JUNCTION TOWER On behalf of the Frederick County Planning Commission, you are hereby notified of a public hearing being held on Wednesday, February 20, 2002, at 7:00 p.m. in the Board Room of the Frederick County Administration Building at 107 N. Kent Street, Winchester, Virginia to consider the following: Revision of Conditional Use Permit #18-01 for the Cross Junction Tower, submitted by Shared Towers, Inc., for a height increase from the approved 195-foot lattice -type telecommunications facility to 260 feet. This property is located at the corner of Collinsville Road and Cross Junction Road, approximately 290 feet from Northwestern Pike (Rt. 522N) and is identified with Property Identification Number 18-A-38 in the Gainesboro Magisterial District. Any interested parties braving questions or wishing to speak may attend this public hearing. A copy of the application will be available for review at the Handley Library approximately one week prior to the meeting, or at the Department of Planning and Development located at 107 North Kent Street in Winchester, Virginia. Sinc ely, d Eric R. Lawrence Deputy Planner ERL/ch OA\AgendaAAdjoiner Ltrs\2002\Cross !unction Revised.wpd 107 North Kent Street • Winchester, Virginia 22601-5000 This is to certify that the attached correspondence was mailed to the following on j 00 g�_ from the Department of Planning and Development, Frederick Cetmty, Virginia: 18-A-42A Shawnee Canning Company, Inc. P.O. Box 657 Cross Junction, VA 22625 18-A-32C Collins, Jearldean D. 198 chestnut Grove Road Winchester, VA 22603 17-A-16 THE LORD'S CHAPEL, INC 1244 GREENWOOD RD WINCHESTER, BA 22602-6510 Mr. Mark D. Smith Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 Shared Towers, Inc. Mr. Kamal Doshi 6501 Sandy Knoll Cour McLean, VA 22101 18-A-39 Eaton, Jeannette B. c/o Jeanette Hoffman P.O. Box 325 Cross Junction, VA 22625-0325 26-A-16 Weakley, Ruby M. 271 Fairview Road Gore, VA 22637-1917 11-A-37 Omps, Larry T. & Nancy S. 171 Omps Drive Winchester, VA 22601-2834 Frederick County Planning Department STATE OF VIRGINIA COUNTY OF FREDERICK I, �efh H(i ' I , a Notary Public in and for the State and County aforesaid, do hereby certify that Eric R. Lawrence, Deputy Director for the Department of Planning and Development, whose name is signed to the foregoing, dated , (r , C , has personally appeared before me and acknowledged the same in my State and County aforesaid. Given under my hand this day of My commission expires on �I��� UQm. ARY PUBLIC __REVISION REQUEST - CROSS JUNCTION TOWER Feb. 2002 HEIGHT INCREASE - CUP #18-01 0 • 3 . a Conditional Use Permit Comments • Virginia Department of Transportation �?'�''£' �>'s' °A 3"iYr•"ir, + x�' � ;;� x%;a� _ / . j"Qss'.r"" � x �'r' H. '/�o;� z •.• � ��''�h,,' �,,�`„F" 's' ,�.��' ��' 51;;�� %e:u",u-%�:,.,z,.�..R� .'";wiz; ;6..�.z.�•'e ��E°x:�,�ti%��✓.���«.�=;:a,�„�.>:. .zxr'"7r.;�„3�,��.xw.A• a�o..��. ��£:�..��:'<w.�`��`,7w. r'�i�` :L,�...." ,d.,z.,. Mail to: Virginia Department of Transportation Attn: Resident Engineer 14031 Old Valley Pike Edinburg, Virginia 22824 (540) 984-5600 Hand deliver to: Virginia Department of Transportation Attn: Resident Engineer 1550 Commerce Street Winchester, Virginia Applicant: Please fill out the information as accurately as possible in order to assist the Virginia Department of Transportation with their review. Attach a copy of your. application form, location map, proffer statement, impact analysis, and any other pertinent information. Applicant's Name: Greenway Engineering Address: 151 Windy Hill Lane Winchester, VA 22602 Phone Number: 662-4185 �VD �13 =t .01"b 9 RAcHildomray DIAC [j HFC [3BHL 13 LAI (��, -SAM Name of development and/or description of the request: Unmanned commercial communications facilities. Location of property: Corner of Collinsville Road and Cross Junction Road Virginia Department of Transportation Comments: Bte Wlicatim for a" crA,rli ticn7aI r ip :D rn t frn- c_r_ �r gWwn to •ism 1 i ttl P rrpag rrahl P inpr-t on Mute 770, the VDUr facMty 4adi vDAd provide access to thn property. Bastasg Entr&mce is adegmte for proposed use. tlavm-Er, should use ever e pm-d in the future, the entrance may have to be Lnuaded to V1X)T m-'►_ranm__ camlErcic'11. stmdarrds. M-ff k you for alla m-g us the opportimi.ty camrmt. VDOT Signature & Dater ofteu• 16,11 lei • Conditional Use Permit Comments • �.tinbiYva9:3zI Frederick County Inspections Department Mail to: Frederick County Inspections Dept. Attn: Building Official 107 North Kent Street Winchester, Virginia 22601 (540) 665-5650 Hand deliver to: Frederick County Inspections Department Attn: Building Official County Administration Bldg., 4th Floor 107 North Kent Street Winchester, Virginia Applicant: Please fill out the information as accurately as possible in order to assist the Department of Public Works with their review. Attach a copy of your application form, location map, proffer statement, impact analysis, and any other pertinent information. Applicant's Name: Greenway En ing_eering Address: 151 Windy Hill Lane Winchester, VA 22602 Phone Number: 662-4185 Name of development and/or description of the request: Unmanned commercial communications facilities. Location of property: Corner of Collinsville Road and Cross Junction Road Inspection Department Comments: Structure shall comply with The Virginia Uniform Statewide Building Code and section 312, use group U (Utility) of The BOCA National Building Code/1996. IIFlease note Chapter 17 of BOCA for special inspection requirements for this type structure. (conctete/bolt testing, ect.) Works Signature & Date: Notice to Dept. o#YtNublic Works - Please ReturnXhis Form Conditional Use Permit C • ents Frederick Cots n, , `4- Mail to: Frederick County Fire Marshal Fire & Rescue Dept. 107 North Kent Street Winchester, Virginia 22601 (540) 665-6350 CYiT Ol- 4=Q614 Hand deliver to: Frederick County Attn: Fire Marshal County Administration Bldg., 1st Floor 107 North Kent Street Winchester, Virginia Applicant: Please fill out the information as accurately as possible in order to assist the Frederick County Fire Marshal with their review. Attach a copy of your application form, location map, proffer statement, impact analysis, and any other pertinent information. Applicant's Name: Greenway En ing_ eering Address: 151 Windy Hill Lane Winchester, VA 22602 Phone Number: 662-4185 Name of development and/or description of the request: Unmanned commercial communications facilities. Location of property: Corner of Collinsville Road and Cross Junction Road Fire Marshal's Comments: Fire Marshal's Signature & Date: � Notice to Fire Marshal - Please Return This Form to the Applicant 1 COUNTY OF FREDERICK, VIRGINIA FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS Control No. CUPO1-0020 Date Received 9/18/01 Date Reviewed 10/02/01 Applicant Greenway Engineering Collinsville Road Address 151 Windy Hill Lane Winchester, Va. 22602 Project Name Unmanned Communications Tower Phone No.540-662-4185 Type of Application Conditional Use Current Zoning RA 1st Due Fire Co. 16 1st Due Rescue Co. 16 Election District Gamesboro Tax I.D. No. 18-A-38 RECOMMENDATIONS Automatic Sprinkler System Residential Sprinkler System . Automatic Fire Alarm System Other REQUIREMENTS Emergency Vehicle Access Adequate XX Inadequate Not Identified Fire Lanes Required Yes No XX Comments : Maintenance of roadway for emergency vehicle access: 14.5 ft verticle clearance and entire width per NFPA. Roadway/Aisleway Widths Adequate XX Inadequate Not Identified Special Hazards Noted Yes No XX Comments : Roadway requirements allow for enhancement of Rural Fire Protection In Wildland Fire Control. Hydrant Locations Adequate Inadequate Not Identified XX Siamese Location Adequate Inadequate Not Identified XX Additional Comments Attached? Yes No XX Plan Approval Recommended? Yes XX No Signatures %% Title , — .1�� f CCU • • COUNTY of FREDER.ICK Department of Public Works 540/665-5643 FAX: 540/678-0682 December 17, 2001 Mr. Mark Smith, P.E. Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE: Conditional Use Permits for Four (4) Communication Towers (Hunting Ridge, Reynolds Store, Cross Junction and White Tail Lane) Frederick County, Virginia Dear Mark: We do not have any objections to siting the communication towers at the four (4) proposed locations. However, we do reserve the right to perform a detailed review of the individual site plans prior to final approval. Please note that land disturbance permits will be required for each site prior to initiating any earthwork, activities. HES/rls cc: Frederick County Planning and Zoning file AAcomtwrscup wpd Sincerely, H ey E. awsnyder, Jr., P. Director o " blic Works 107 North Kent Street • Winchester,.Virginia 22601-5000 Conditional Use Permit Comments Frederick County Department of Public Works �z...�� .�.�s.`H.Fw.asap'„xc"i,�'i,'a1w:�"�%�,..W°`..b,�u�,`,"�,�v5.�.,:,'ti�s.�`",.�.'''"'s�r�`,�c�:sc� a�a,3`a�a7��:.a;�k'`fl�e�a.:..;r���.,.s s�k •�;r�".� .rr rua�,s_.a�v Mail to: Frederick County Dept. of Public Works Attn: Director of Engineering 107 North Kent Street ' Winchester, Virginia 22601 (540) 665-5643 Hand deliver to: Frederick' County Dept. of Public Works Attn: Director of Engineering County Administration Bldg., 4th Floor 107 North Kent Street Winchester, Virginia Applicant: Please fill out the information as accurately as possible in order to assist the Department of Public Works with their review. Attach a copy of your application form, location map, proffer statement, impact analysis, and any other pertinent information. Applicant's Name: Greenway En 'veering Address: 151 Windy Hill Lane Winchester, VA 22602 Phone Number: 662-4185 Name of development and/or description of the request: Unmanned commercial communications facilities. Location of property: Corner of Collinsville Road and Cross Junction Road Department of Public Work's Comments: C.2651MA C.,Cd c VKaAJ-t CMA-Q IQ( 0� A/' Ck,�C( 0, AAA Public Works Signature & Date. —AIL—" bIs a Notice to Dept. of Public Wor - lease Return This Form to the Applicant Conditional Use Permit Amments Winchester Regional Airport Mail to: Winchester Regional Airport Attn: Executive Director 491 Airport Road Winchester, Virginia 22602 (540) 662-2422 Hand deliver to: Winchester Regional Airport 491 Airport Road (Rt. 645, off of Rt. 522 South) Winchester, Virginia Applicant: Please fill out the information as accurately as possible in order to assist the Winchester Regional Airport with their review. Attach a copy of your application form, location map, proffer statement, impact analysis, and any other pertinent information. . Applicant's Name: Greenway En 'nig eering Address: 151 Windy Hill Lane Winchester, VA 22602 Phone Number: 662-4185 Name of development and/or description of the request: Unmanned commercial communications facilities. Location of property: Corner of Collinsville Road and Cross Junction Road Winchester Regional Airport's Comments: Winchester Regional Airport's Signature & Date: a o Notice to Winchester Re ional Airport - Please Return Form to AP piicant (• WINCHESTER REGIONAL AIRPORT SERVING THE 491 AIRPORT ROAD TOP OF VIRGI"'^ WINCHESTER, VIRGINIA 22602 %A (540) 662-2422 October 22, 2001 Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE: Site Plan Comments — Share Towers Hunting Ridge Pole, Cross Junction Pole, Reynolds Store Pole Dear Mr. Sir: The Winchester Regional Airport Authority offers the following comments on the above referenced site plans as conditions to be included for approval of this site plan: 1. Although not required by FAA, structure should be marked and lighted in accordance with FAA Advisory Circular 70/7460-1 J, Obstruction Marking and lighting, Chapters 4, 8 (M-Dual) & 13 2. Consideration should be given to the owner/operator of the Timber Ridge Airport which is a private airport located approximately four nautical miles from two of the towers as to possible impact on that facility. These comments are based on the review provided by our engineering firm, Delta Airport Consultants, Richmond, Virginia. They have determined that these. proposed towers do not penetrate any FAR Part 77 surfaces therefore there should be no impact on current or future operations at the Winchester Regional Airport. If the above referenced conditions along with any outlined in the FAA study are met, the Winchester Regional Airport Authority has no objections to these site plans. Should you have any questions or need additional information, please contact this office (430) 662-5786. Sincerely, S. R. Manuel Executive Director 'a LIV AMPORT CONSULTANTS, fmc. engineers - planners Charlotte. NC Austin, TX Harrisburg, PA Kicnmona, VA Ms. Serena R. Manuel Executive Director Winchester Regional Airport 491 Airport Road Winchester, Virginia 22602 T Dear Ms. Wel- RE: Communications Towers Share Towers - Greenway Engineering Winchester Regional Airport Winchester, Virginia Delta Project No. N/A We have reviewed the three (3) Frederick County Conditional Use Permits from Greenway Engineering sent to us with your letter dated October 15, 2001. We find that the none of the towers penetrate any FAR Part 77 Surface associated with Winchester Regional. Airport. The following summary details the positions of the three proposed towers: Hunting Ridge 45,202' (8.6 miles) 17,152' (3.2 miles)- 1,116' MSL Pole right Cross Junction 71,488' (13.5 miles) 16,426' (3.1 miles)- 1,175' MSL Pole right Reynolds Store 85,749' (16.2 miles) 31,479' (6.0 )- right 1,325' MSL Pole These towers are all far enough from the airport that they will not be a factor in any future airport development as currently depicted on the approved Airport Layout Plan. However, two private airports, Al and Timber Ridge, both located about 14 nautical miles from Winchester Regional Airport along the extended RW 32 centerline, may be affected as they are each about four nautical miles from two of the towers. Should you have any questions, please do not hesitate to call. Rincerely, C. Longnaker, P.E. JCL:blg GEN7983 7333 Whitepine Road Telephone (804) 275-8301 Richmond, Virginia 23237 Fax (804)-275=8371 Homepage: http://www.deltaairport.com E-mail: delta@deltaairport.com Wed Towers, LLC 0 6501 Sandy Knoll Court, McLean, VA 22101 (703)-893-1571 Fax 253-423-3800 January 28, 2002 Mr. Eric P. Lawrence County of Frederick 107 North Kent Street Winchester, VA 22601 Dear Mr. Lawrence: Map of Cellular Towers in the County and Update I have enclosed a map showing locations of cell towers in the county. You will recall that we had agreed to provide such a map per discussion with Mr. Harrington Smith at January 23`d meeting of the Board of Supervisors. Greenway Engineering has submitted on January 25th: • An amendment to the application for Cross Junction tower to raise it to 260' to allow placement of Shentel and other carriers at very good heights of 260', 250', 240', 230' respectively. A new application to move Hunting Ridge tower approximately 1100' South. This moves the tower closer to Route 522 and at a meeting hosted by planning department SunCom/Triton had agreed that this location would work better for them. Shentel has agreed to go on this tower at either location. As this move allows the tower to be away from the landowners' driveway, they have agreed to allow lattice structure, so we are requesting permission for that change also. Upon approval, we will withdraw the approved CUP for the original location. I understand that these will be heard by the Planning Commission and later submitted to the Board of Supervisors for action. Sincerely Kamal Doshi Encl: Cc: Members of the Board of Supervisors, with enclosed map. Mark Smith, Greenway Engineering RECEIVED JAN 2 9 2002 '7PT OFPIANNING/TVROPA.47, Frederick County, VA Towers Red dots -Triton/SBA proposed Yellow Triangles- Crown Green Triangles- Shentel Pink Triangles- Shared Towers Blue Triangles -Other American Tower us Reynold's Store Cross Junction Iq n North Gainsboro unti us 50 wNTW p ♦ wusa— -- Route 3 Ridge US 11 i ou ,&ellular One llS 50 ♦ leg ny Poorer .� US 5e ♦ Compiled by Shared Towers January 24, 2002 703-628-2654 Source: FCC and company records. Excludes power poles and antennas on buildings and tanks not registered with FCC. � 0 FILE COPY COUNTY of FREDERICK Department of Planning and Development January 28, 2002 Mr. Kamal Doshi Shared Towers, LLC 6501 Sandy Knoll Court McLean, VA 22101 RE: CUP #18-01 for the Cross Junction Telecommunications Facility Property Identification Number 18-A-38 Dear Mr. Doshi: ;e 540/665-5651 FAX: 540/ 665-6395 This letter is to confirm action taken by the Frederick County Board of Supervisors at their meeting on January 23, 2002. Your Conditional Use Permit, #18-01 for a 195-foot-high lattice -type tele- communications facility, was approved with the following conditions: All Zoning Ordinance requirements and review agency comments shall be addressed and complied with at all times. 2. The tower shall be available for co -locating personal wireless services providers. 3. A minor site plan shall be approved by the County. 4. The tower shall be removed by the applicant or property owner within twelve (12) months of abandonment of operation. 5. In the event a telecommunications tower is not erected within twelve (12) months of the approval of this Conditional Use Permit, then the CUP will be deeded invalid. If you have any questions regarding this action or the site plan approval process, please feel free to call this office. ,CZA ERL/ch cc: , Sidney Reyes, Gainesboro District Supervisor Commissioner of Revenue Mark Smith, Greenway Engineering O:AgendasAppmal 1Us\CU?s\2W2\Cw= Junc ion.wpd 107 North Kent Street - Winchester, Virginia 22601-5000 N N 0 0 N (6 7 C c6 N N C O U OSV` Zn I I I M I" N [•11 M 9:41:4040111 l*7 I U! Computer simulations showing the visual differences between an open 3 legged lattice tower (above) and a standard solid (18" tip diameter) monopole (below) 2 a CC • "Lattice towers allow the sky to been seen" ---Kama) Doshi, Shared Towers LLC Camera to target distance: 1760 ft. 50 mm lens Computer simulation showing the visual differences between a standard solid galvanized monopole (left) and an open 3 legged lattice tower (right).Note: Both structures shown here support 3 cell carriers and are approximately 194' tall exclusive of a 5' lightening rod. •KMqkInIIIII"Ile] 2MK:a[:4NO] 11l•71K: Computer simulations showing the visual differences between an open 3 legged lattice tower (above) and a standard solid (18" tip diameter) monopole (below) •l.'.'lnIIIsI"1[01I=[:a[:4040111l+111: Computer simulations showing the visual differences between an open 3 legged lattice tower (above) and a standard solid (18" tip diameter) monopole (below) • 0 Designed to meet the letter and spirit of County rules Design maxim m �Oloc tion Hunting Ridge North Gainsboro Cross Junction Provide solution Reynolds Store from Wir ester to WV Bord6� Route 522 Place sites trees i Shared Towers Take t e existing towers on Route into account - Virginia family owned small business - Focused on Frederick County, Jefferson County, Berkeley County - Prior experience with larger tower company - Tower sites designed with advice of MLJ (Radio Frequency Engineers) and Greenway Engineering (Professional Engineers) - Emergency services given antenna space of sites - Each site has interested tenant -Addressed all comments of county officials, airport, private airfield owner, state regulators, and landlords - Planning Commission has approved the sites. i • • -Art% GREENWAY ENGINEERING 151 Windy Hill lane v%5nchester, Virginia 22602 Founded in 1971 January 17, 2002 Mr. Sidney Reyes 350 Redland Road Cross Junction, VA 22625 Dear Mr. Reyes: Cross Junction Communication Tower - Update We have made considerable progress towards raising the height of the Cross Junction tower per our earlier discussion for improved coverage. • Airport We have requested Winchester Regional Airport for their comments on increasing the height. Their comments are required by the Planning Department for the Conditional Use Permit (CUP) amendment process. Our consultants provided analysis indicating that new height will not affect the airport. The airport will be providing their comments as soon as they obtain confirmation from their independent consultants. • Historical Preservation We have performed study of a larger area for historical structures and submitted it to State Historical Preservation Officer for their review. We hope to receive their approval as no preservation eligible properties were affected. This approval is necessary for construction but not required by the Planning Department CUP process. • Setbacks Greenway Engineering has prepared a new exhibit showing the tower location and the needed setback waivers with the increased height. We have also received a letter from the tower manufacturer signed by a licensed professional engineer indicating that they can design the structure to have deliberate stress point so that the tower would fall within the property and the waivers will not affect safety of neighbors. • Plannine The Deputy Director of Planning, Mr. Lawrence, advised us that the increase in height would require a hearing with the Planning Commission before it could be considered by the Board of Supervisors. Accordingly, we request approval of the tower at the currently proposed height. We are committed to designing the structure for a height increase to 250'. We will bring the CUP amendment request for the height increase as soon as we can process it through the Planning Department and Planning Commission. We have also attached a letter from Shentel indicating their interest in the towers at the currently proposed heights. Mark Smith, P.E, L.S. Kamal Doshi Greenway Engineering Shared Towers, LLC Enclosure Cc: Mr. Eric Lawrence, Frederick County Planning Department i-it--CEIV J A N 2 2 2002 Engineers Surveyors --T nF PI ANNINGIn;VP ODtm'� File #3162/MDS/KD/dls Telephone 540-662-4185 FAX 540-722-952S www.greenwayeng.com :---***"'*VSHENTEL SHENANDOAH PERSONAL COMMUNICATIONS P.O. sox 280 w Edinburg, Virginia 22824-0280 - (640) 984-3000 January 16, 2002 Mr. K.amal Doshi Shared Towers, LLC 6501 Sandy Knoll Court McLean, VA 22101 Re: Shared Towers Sites — Route 522 Frederick County Dear Kamal: Shenandoah Personal Communications Company (Shentel) is interested in leasing space on the facilities you are developing along State Route 522 north from Winchester, through Frederick County, toward Berkeley Springs, West Virginia. This interest is conditioned on Shentel receiving the top spot on the sites at the currently proposed height and Shared Towers agreeing to lease terms comparable to leases already in place with Shentel. We plan to include your sites in our second quarter budget request for the installation to coincide with your development. As soon as we receive approval we will submit formal applications. Please keep us advised as to your progress along this Route, Do not hesitate to contact me if you have any questions. LLG/dp cc: Mr. William L. Pirtle Mr. Neil Fadely Sincerely yours, Leonard Greisz Project Manager A SUBSIDIARY OF SHENANDOAH TELECOMMUNICATIONS COMPANY WE MUST SERVE WELL TO PROSPER • WE MUST PROSPER TO SERVE WELL • Yf� GREENWAY ENGINEERING 151 Windy Hill Lane Winchester, Virginia 22602 Founded in 1971 I January 17, 2002 Mr. Sidney Reyes 350 Redland Road Cross Junction, VA 22625 Dear Mr. Reyes: Cross Junction Communication Tower - Update We have made considerable progress towards raising the height of the Cross Junction tower per our earlier discussion for improved coverage. • Airport We have requested Winchester Regional Airport for their comments on increasing the height. Their comments are required by the Planning Department for the Conditional Use Permit (CUP) amendment process. Our consultants provided analysis indicating that new height will not affect the airport. The airport will be providing their comments as soon as they obtain confirmation from their independent consultants. • Historical Preservation We have performed study of a larger area for historical structures and submitted it to State Historical Preservation Officer for their review. We hope to receive their approval as no preservation eligible properties were affected. This approval is necessary for construction but not required by the Planning Department CUP process. • Setbacks Greenway Engineering has prepared a new exhibit showing the tower location and the needed setback waivers with the increased height. We have also received a letter from the tower manufacturer signed by a licensed professional engineer indicating that they can design the structure to have deliberate stress point so that the tower would fall within the property and the waivers will not affect safety of neighbors. • Plannine The Deputy Director of Planning, Mr. Lawrence, advised us that the increase in height would require a hearing with the Planning Commission before it could be considered by the Board of Supervisors. Accordingly, we request approval of the tower at the currently proposed height. We are committed to designing the structure for a height increase to 250'. We will bring the CUP amendment request for the height increase as soon as we can process it through the Planning Department and Planning Commission. We have also attached a letter from Shentel indicating their interest in the towers at the currently proposed heights. Mark Smith, P.E, L.S. Kamal Doshi Greenway Engineering Shared Towers, LLC Enclosure Cc: Mr. Eric Lawrence, Frederick County Planning Department �jLVEI V LU J AN 2 2 2002 - -, n; PI ANNINGIIIF\IFI 00w" Engineers Surveyors File #3162/MDS/KD/dls Telephone 540-662-4135 FAX 540-722-9523 www.greenwayeng.com SHENANDOAH PERSONAL COMMUNICATIONS RO. Box 280 - Edinburg, Virginia 22824-0280 • (640) 984-3000 January 16, 2002 Mr. Kamal Doshi Shared Towers, LLC 6501 Sandy Knoll Court McLean, VA 22101 Re: Shared Towers Sites — Route 522 Frederick County Dear Kamal: Shenandoah Personal Communications Company (Shentel) is interested in leasing space on the facilities you are developing along State Route 522 north from Winchester, through Frederick County, toward Berkeley Springs, West Virginia. This interest is conditioned on Shentel receiving the top spot on the sites at the currently proposed height and Shared Towers agreeing to lease terms comparable to leases already in place with Shentel. We plan to include your sites in our second quarter budget request for the installation to coincide with your development. As soon as we receive approval we will submit formal applications. Please keep us advised as to your progress along this Route. Do not hesitate to contact me if you have any questions. LLG/dp cc: Mr. William L. Pirtle Mr. Neil Fadely Sincerely yours, Leonard Greisz Project Manager A SUBSIDIARY OF SHENANDOAH TELECOMMUNICATIONS COMPANY WE MUST SERVE WELL TO PROSPER • WE MUST PROSPER TO SERVE WELL PC REVIEW: 12/05/01 BOS REVIEW: 01/23/02 CONDITIONAL USE PERMIT #18-01 CROSS JUNCTION TOWER Telecommunications Facility LOCATION: This property is located at the corner of Collinsville Road and Cross Junction Road, approximately 290 feet from North Frederick Pike (Rt. 522N). MAGISTERIAL DISTRICT: Gainesboro PROPERTY ID NUMBER: 18-A-38 PROPERTY ZONING & PRESENT USE: Zoned RA (Rural Areas) District; Land Use: Vacant ADJOINING PROPERTY ZONING & USE: Zoned RA (Rural Areas) District; Land Use: Residential and Agricultural PROPOSED USE: 195-foot-high lattice -type telecommunications facility REVIEW EVALUATIONS: Virginia Dept. of Transportation: The application for a conditional use permit for this property appears to have little measurable impact on Rt. 770, the VDOT facility which would provide access to th property.. Existing entrance is adequate for proposed use. However, should use ever expand in the future, the entrance may have to be upgraded to VDOT minimum standards. Fire Marshal: Maintenance of roadway for emergency vehicle access. 14.5 foot vertical clearance and entire width per NFPA. Roadway requirements allow for enhancement of Rural Fire Protection in Wildland Fire Control. Plan approval is recommended. Inspections Department: Structures shall comply with The Virginia Uniform Statewide Building Code and Section 312, Use Group U (Utility) of The BOCA National Building Code/1996. Please note Chapter 17 of BOCA for special inspection requirements for this type structure (concrete/bolt testing, etc.) • • Cross Junction Tower, CUP #18-01 Page 2 January 16, 2002 Public Works/Engineering: Disturbance of more than 10,000 s.f. will require an erosion and sediment control plan and a land disturbance permit. This land disturbance include access roads and site development. Winchester Regional Airport: Please see attached letter from Serena R. Manuel, Executive Director, dated 10122101. Planning and Zoning: The Frederick County Zoning Ordinance allows for Commercial Telecommunication Facilities in the RA (Rural Areas) Zoning District with an approved Conditional Use Permit. The Frederick County Zoning Ordinance specifies that a CUP for a commercial telecommunication tower may be permitted provided that residential properties, land use patterns, scenic areas and properties of significant historic values are not negatively impacted. Furthermore, additional performance standards shall apply to the CUP review in order to promote orderly economic development and mitigate the negative impacts to adjoining properties. The applicant proposes to build a 195-foot lattice -type telecommunication facility that is designed to accommodate commercial telecommunication carriers. The proposed facility will be located on a 96.41-acre site located east of Route 522. The applicant has provided an inventory of existing telecommunication facilities in the area, and staff would concur that there are no existing facilities or appropriate structures available for collocation in this general area. The maps provided within the application analyzing coverage need in this area appear to be sufficient to determine the adequacy of the search area, and the existing coverage and capacity of the licensee holder in the vicinity of the proposed facility. As shown on the maps, the coverage needs will be met by a facility in this location. The applicant will be required to provide lighting to comply with the requirements of the Winchester Regional Airport Authority. The lights shall comply to FAA standards as noted in the letter submitted by the Director of the Airport Authority. The Frederick County Zoning Ordinance requires that these lights be shielded from ground view to mitigate illumination to neighboring properties and right-of- ways. Buffer and screening requirements will be determined at site plan review. The applicant is requesting a reduction of the setbacks pursuant to Section 165-48.6(B).1 of the Zoning Ordinance as they are proposing to locate the commercial telecommunication facility approximately 35 feet from property line boundaries. The Zoning Ordinance provisions require that towers of 195 feet or higher (as is proposed) be placed a minimum of 220 feet from road right-of- ways and 210 feet from side property lines. The Planning Commission may reduce the required setback distance for commercial telecommunication facilities if it can be demonstrated that the location is of equal or lesser impact. The applicant has attempted to place the facility in the middle of the site maximizing the structural setback. The request for a reduced setback of 35 feet from the property line has been made in order to provide increased flexibility in the exact location for the placement of this tower. Cross Junction Tower, CUP #18-01 Page 3 January 16, 2002 The applicant is requesting the ability to utilize lattice -type material construction pursuant to Section 165-48.6(B)2 of the Zoning Ordinance. The Zoning Ordinance requires that new commercial telecommunication facilities be of monopole -type construction. The Planning Commission may allow lattice -type construction for new commercial telecommunication that are located outside ofthe Urban Development Area, and are not adjacent to properties that are identified as historic areas. The proposed site is located outside of the UDA, and is not in close proximity to any identified historic areas. Therefore, allowing a lattice -type tower would be in conformance with the intent of the Zoning Ordinance. This proposed commercial telecommunication facility will be in conformance with Section 704 of the Telecommunication Act of 1996. In evaluating this application, it has been demonstrated that there is a need for the infrastructure within the area of the County identified. STAFF CONCLUSIONS FOR THE 12-05-01 PLANNING COMMISSION MEETING: Staff noted that the applicant has stated by letter, dated November 15, 2001, that this tower will have space available free of charge for Frederick County emergency communications. Staff believes that this application for a commercial telecommunication facility has adequately addressed the requirements of the Zoning Ordinance in that need for this facility, based on a lack of coverage and capacity in this part of the County, has been demonstrated. Further, a reduction of the setback requirements, as well as allowance for a lattice -type tower construction, may be appropriate. Should the Planning Commission choose to recommend approval of this application, the following conditions of approval would be appropriate: All Zoning Ordinance requirements and review agency comments shall be addressed and complied with at all times. 2. The tower shall be available for co -locating personal wireless services providers. 3. A minor site plan shall be approved by the County. 4. The tower shall be removed by the applicant or property owner within twelve (12) months of abandonment of operation. PLANNING COMMISSION SUMMARY & ACTION OF 12/05/01: An attorney representing Triton, PCS, a licensed service provider in Frederick County, requested that the CUP application be denied or deferred until his client could submit their own tower applications for alternative sites. The representative stated that studies conducted by his clients determined that serious transmission gaps would occur along Rt. 522, if the Hunting Ridge and Cross Junction tower sites were used with Triton's system. The 0:\Agendas\COMMENTS\CUP's\2001 \Cross3.wpd Cross Junction Tower, CUP #18-01 Page 4 January 16, 2002 representative said that his client believed a tower should not be constructed until a service provide has a need for the tower in a specific location. A radio frequency engineer and a deployment manager were also present to speak on behalf of Triton, PCS. An adjoining property owner spoke in opposition to the request for a reduction of the setbacks for placement . of the tower. The applicant and the applicant's representative believed their business's success depended on designing towers for multiple users and, if a tower is empty or only has one tenant, their project has failed. They believed the data provided was good, credible data, provided by radio frequency engineers with 40+ years of experience. The applicant stated that he had met with representatives of Triton and he believed a technical solution was available to Triton to meet their particular needs. The applicant believed that the tower locations as proposed were appropriately placed. Planning Commissioners discussed whether it was more appropriate for the service provider or the tower provider to determine the most appropriate tower locations. Some commissioners were not in favor of tower speculators; they believed it would necessitate service providers coming in with "fill-in" tower requests. Other commissioners were of the opinion that Triton, PCS's coverage requirements would not necessarily be duplicated by another service provider. Further, a reduction of the setback requirements, as well as allowance for a lattice -type tower construction, may be appropriate. By a majority vote, the Planning Commission recommended approval of CUP # 18-01 with a reduction of the setback requirements, as well as allowance for a lattice -type tower construction, as requested, with the following conditions: 1. All Zoning Ordinance requirements and review agency comments shall be addressed and complied with at all times. 2. The tower shall be available for co -locating personal wireless services providers. 3. A minor site plan shall be approved by the County. 4. The tower shall be removed by the applicant or property owner within twelve (12) months of abandonment of operation. The vote was as follows: YES (TO APPROVE CUP #18-01): Unger, Light, Thomas, Kriz, Fisher, NO: Watt, Morris, Triplett, DeHaven ABSTAIN: Ours, Rosenberry 0: W gendas\COMMENTS\CUP's\2001 \Cross3.wpd Rey 32 �Ra .� BRNTFANAITE - ��-------___-- 9 18 A 36C naCKAE� 18 A 35A 18 AA 32B a� C, Rd $ 19 A 7 MOSS a 18 A 32D i i i �i� 522 18OCLU i CROSEN i B A 32E 1 qA36 18 A 7A 18 A 35A TRNCCFFELT 18 A 36 39 RAINEST - 18 A 41 SHAVNEE CANNING SRAWt4EECANt`kNC, COWAW INC CCWANY, INC - 19 A 9 18 A 43 18 A 42A ro , CRGAN 18 A 40 EATON 18 A 42y� 1e A it C-M18 01 Location Map For: Spectrum Resources, Inc. Cross Junction Tower PIN* WINCHESTER REGIONAL AIRPORT I�� y IRMN 491 AIRPORT ROAD rOPOFVIRG1 A WINCHESTER, VIRGINIA 22602 14U,,,�„�.� (540) 662 2422 October.22, 2001 Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE: Site Plan Comments — Share Towers Hunting Ridge Pole, Cross Junction Pole, Reynolds Store Pole Dear Mr.. Sir: The Winchester Regional Airport Authority offers the following comments on the above referenced site plans as conditions to be included for approval of this site plan: 1. Although not required by FAA, structure should be marked and lighted in accordance with FAA Advisory Circular 70/7460-1J, Obstruction Marking and lighting, Chapters 4, 8 (M-Dual) & 13 2. Consideration should be given to the owner/operator of the Timber Ridge Airport which is a private airport located approximately four nautical miles from two of the towers as to possible impact on that facility. These comments are based on the review provided by our engineering4irm, Delta Airport Consultants, Richmond, Virginia. They have determined that these proposed towers do not penetrate any FAR Part 77 surfaces therefore there should be no impact on current or future operations at the Winchester Regional Airport. If the above referenced conditions along with any outlined in the FAA study are met, the Winchester Regional Airport Authority has no objections to these site plans. Should you have any questions or need additional information, please contact this office (430) 662-5786. Sincerely, S. R. Manuel Executive Director VELTA A/RPORT CONSULTANTS, /NP engineers - planners Charlotte, NC Austin, TX Harrisburg, PA Richmond, VA c o er I K=' Ms. Serena R. Manuel Executive Director Winchester Regional Airport 491 Airport Road Winchester, Virginia 22602 Dear Ms. Wel. RE: Communications Towers Share Towers - Greenway Engineering Winchester Regional Airport Winchester, Virginia Delta Project No. N/A We have reviewed the three (3) Frederick County Conditional Use Permits from Greenway Engineering sent to us with your letter dated October 15, 2001. We find that the none of the towers penetrate any FAR Part 77 Surface associated with Winchester Regional Airport. The following summary details the positions of the three proposed towers: Hunting Ridge 45,202' (8.6 miles) 17,152' (3.2 miles)- 1,116' MSL Pole right Cross Junction 71,488' (13.5 miles) 16,426' (3.1 miles)- 1,175' MSL Pole right Reynolds Store 85,749' (16.2 miles) 31,479' (6.0 )- right 1,325' MSL Pole These towers are all far enough from the airport that they will not be a factor in any future airport development as currently depicted on the approved Airport Layout Plan. However, two private airports, Al and Timber Ridge, both located about 14 nautical miles from Winchester Regional Airport along the extended RW 32 centerline, may be affected as they are each about four nautical miles from two of the towers. Should you have any questions, please do not hesitate to call. Rincerely, C. Longnaker, P.E. JCL:blg GEN7983 7333 Whitepine Road Telephone (804) 275-8301 Richmond, Virginia 23237 Fax (804) 275-8371 Homepage: http://www.deltaairport.com E-mail: delta@ deltaairport.com CUP # 18-01 Submittal Deadline: fEJ6I P/C Meeting: /.2,7�-01 BOS Meeting: - EIEcr � wZ3�oZ' APPLICATION FOR CONDITIONAL USE PERMIT FREDERICK COUNTY, VIRGINIA 1. Applicant (The applicant if the owner X other) NAME: Greenway En ing eering ADDRESS: 151 Windy Hill Lane, Winchester, VA 22602 TELEPHONE: ,(540) 662-4185 2. Please list all owners, occupants, or parties in interest of the property: Jeanette Hoffman 3. The property is located at: PO Box 325 Cross Junction, Virginia 22625 4. The property has a road frontage of feet and a depth ofeet and consists of approximately 3 acres to the east of Rt 522 of a 96.41 acre parcel. (See attached exhibit). 5. The property is owned'by Jeanette Hoffman as evidenced by deed from 0A. DeWtue, -) (Aim noidie. DL recorded in deed b6`6-1 no. I (i 2 on page �i�4 as recorded in the records of the Clerk of the Circuit Court, County of Frederick. 6. 14-Digit Property Identification No. 18-A-38 Magisterial District Gainsboro District Current Zoning RA 7. Adjoining Property: USE ZONING North 18-A-32C Single Family RA East 18-A-41 Single Family RA South 18-A-42A Business B2 18-A-37 Single Family RA 18-A-39 Single Family RA 8. The type of use proposed is (consult with the Planning Dept. before completing) Unmanned Commercial telecommunications facilities. 0 9. It is proposed that the following buildings will be constructed: 195' tall monopole tower structure inside a 100' x 100' leased area for ground equipment/shelters to be placed on concrete pads All equipment and monopole will be secured by a fence. 10. The following are all of the individuals, firms, or corporations"owning property adjacent to both sides and rear and in front of the property where the requested use will be conducted. These people will be notified by mail of this application: NAME Shawnee Canning Co PROPERTY ID# 18-A-42A NAME Shawnee Canning Co PROPERTY ID# 18-A-41 NAME Jearldean D. Collins PROPERTY ID# 18-A-32C NAME Jeanette Hoffman PROPERTY ID# 18-A-37 NAME Jeanette Hoffman PROPERTY ID# 18-A-39 (( `A v ✓ 7 ADDRESS PO Box 657 Cross Junction, 22625 ADDRESS PO Box 657 Cross Junction, 22625 ADDRESS 198 Chestnut Grove Rd, Winchester 22603 ADDRESS PO Box 325 Cross Junction, 22625 ADDRESS PO Box 325 Cross Junction, 22625 L"I *a 12. Additional comments, if any: The landowner also owns parcels # 18-A-39 and 18-A-37 to the south of the proposed property and the land on those parcels may be used to comply with setback requirements. I (we), the undersigned, do hereby respectfully make application and petition the governing body of Frederick County, Virginia to allow the use described in this application. I understand that the sign issued to me when this application is submitted must be placed at the front property line at least seven (7) days prior to the first public hearing and maintained so as to be visible until after the Board of Supervisors' public hearing. Your application for a Conditional Use Permit authorizes any member of the Frederick County Planning Commission, Board of Supervisors or Planning and Development Department to inspect your property where the proposed use will be conducted. Signature of Applicant Signature of Owner,z�� Owners' Mailing Address c/o Eddie Cave, PO Box 325 Cross Junction VA 22625 Owners' Telephone No. 540-888-3418 TO BE COMPLETED BY THE ZONING ADMINISTRATOR: USE CODE: RENEWAL DATE: • AFFIDAVIT To: Frederick County Department of Planning and Zoning I, the undersigned, Jeanette Hoffman, owner of property located at 301 Cross Junction Road, Cross Junction, Virginia, make this affidavit that I am aware that I may be held responsible for the removal of the commercial telecommunications facility as stated in Frederick County Code §165-48.6B(7), if the developer fails to remove the facility. I own two (2) adjoining parcels located to the south of the proposed property (parcels # 18-A-39, 18-A-37) and, if necessary, the setback and access requirements for the project may be met by the land in these parcels. I understand and agree that as placed the tower can potentially fall into these adjoining parcels. Sincerely, Eddie Cave, Power of Attorney for J Date MDS/KD/dls SEP-18-2001 07:40 AM Shared Towers 7036282654 1 253 423 3200 P.03 i ovvdir Rcsults 4A " . 0,1it1ps wtbjttg 1 %k fcc.govARSTowei RESULTS A routine check of the coordinates, heights, and structure type you provided indicates whether this structure does or does not require registration Any "fail slope" result means that your structure requiresFAA notification and FCC registration. If c)ll results are "pass slope", this means that the structure does not require registration, based on the information you provided. WARNUNG: Because the airport database � e use is updated periodically, it does not take into account the most recent airport construction, nor does it include proposed airports. You still must register with the FCC if your structure is located near one of these airports or if the FAA specifically asks you to register - even if you "pass slope" in all instances. Note: Use your Browser's print function to print your Tow -Air results. THE INITIAL INFORMATION ENTERED: �� �. :....................... ..... ......... ...... ... ...... :....... _... _ _..... . 39"19'10.9 181737.7 E60.7 39.7 2)11.7 POLE ...... .... ............_ .... _ _._ _ _ _ ...... 'Structure does not require registration. There are no airports within 8 kilometers(5 miles) of the coordinates :you provided. 1 of) 9111. 2001 9-00 Ph w �� -�� ,F .ems' P•.�,i£ f. � - tii � 'E; $ tea. ,fir• t ) j .'"'p -- ?i f c„ 2`j %'�- a P fx`�^ k�♦. ,r. �t + '• � * �.. _,'�` fr�' �♦fir x�4 - ,; :,a 4 ` t. t 2 3' Pk Y t _,� F• r IN ! as f l _ it : ♦' iF x .'yallA"7� �a ..'>fi i� fj- �•f" ���r !.y f' 1 1-77 {Jr 1v s CROSS JUNCTION COMMUNICATI❑NS FACILITY DATE: 09/18/01 APPROXIMATE PARCEL 18-A-38 SCALE: 1"= 500' LOCATION N 39019,01.1° G®ENWA/ ENGINEERING W 78°17'37.4' 151 WINDY HILL LANE Engineers WINCHESTER, VA. 22602 Surveyors TELEPHONE: (540) 662-4185 FAX: (540) 722-9628 Founded in 1971 www.greenwayeng.com i A Existing toweres cannot provide coverage from Hunting Ridge to Timber Ridge ... Berkele N = RAD Centers 170' = A ERP 47 j Slope 3.1 ts- Shared Towers Sites In Zoning Access Factor 10, / Frederick County, VA Signal Legend Red 0 -87 Good Coverage Purple -87 -90 Acceptable Coverage------ Store 1 5 I �!� iillt! Blue -90 -93 Poor Coverage �t �t{q ! Green -93 -99 Calls Drop LFrequency 1950 MHz/ Omni DB906 Antenna s =�\ o L! 0 Jeffersor g Ridge 39-16-07.2 78-13-28.3 195' Pole Ground 921' Juction 39-19-10.2 78-17-37.7 195' Pole Ground 975' Ids Store 39-22-28.5 78-17-39.7 195' Pole Ground 1130' A 39-12-53.37 78-12-15 195'SS Ground 940' -asite-Omps 39-24-49.5 78-19-41.7 182' SS Ground 1383 139-14-37.9 78-11-49140' Pole Ground 1190' M;�.-' - \ :..r NOV-13-2001 03:n6 PM Shared Towers 7036282654 1 233 423 3800 P.01 ShA. 'Powers, LLC 6301 Sandy Knoll Court, McLean, VA 22101 (703)-a93- I ri I Fix 233-423-3800 e-mail: kdoshil7a,sharedtowerssam November 1 S, 2001 Mr, Mark R. Chcran, Planner County of Frederick 107 North Kent Street Winchester, VA 22601 Via fax 540-665-A395 Dear Mr. Chcran: We arc happy to assist County emergency communications services,(potice, fire, ambulance) by allowing t]telu to attach up to two ontni antennas on each of our proposed towers. Like all other tenants, when they need the space, they will need to enter into a lease document (however, the rem will be waived). Sincerely, Shared Towers, LLC Kama] Doslli Managing Mcmber Cc: Mark Smith, Greenway Engineering 540-722-9528 The Proposed Sites Complete The Coverage Gaps Berkeley d oo RAIDCenters 170' ERP 47 ectra-Om s 182 SS , Slope 3.1 Access Factor 10 i Shared Towers Sites In Zoning Signal Legend I' Frederick County, VA Red 0 87 Good Coverage Purple -87 -90 Acceptable Coverages---- Re Hold's Store 195" I 1 '._- Blue -90 -93 Poor Coverage j' Green 93 -99 Calls Drop A LFrequency 1950 MHz.' Omni DB906 Antenna yt , P F Q A Jeffersor L + -�- ,6 Huntnn Rfd a 195' Hunting Ridge 39-16-07.2 78-13-28.3 195' Pole Ground 921' �- Cross Juction 39-19-10.2 78-17-37.7 195' Pole Ground 975' Re nolds Store 39-22-28.5 78-17-39.7 195' Pole Ground 1130' Crown 39-12-53.37 78-12-15 195' SS Ground 940' Spectrasite-Omps 39-2449.5 78-19-41.7 182' SS Ground 1383 j rown 1 5' S `v• Crown 39-14-37.9 78-11-49 140' Pole Ground 1190' / C �+ Existing toweres cannot provide coverage from Hunting Ridge to Timber Ridge _ Berkeley RAD Centers 170' A Oa - ERP 47 j - A Octra-O s 182' SS Slope 3.1 Shared Towers Sites In Zoning Access Factor 10 Frederick County, VA Signal Legend Red 0 -87 Good Coverage Purple -87 -90 Acceptable Coverage— ---- Re no d's Store 195 �il Blue -90 -93 Poor Coverage t1�� ♦ Green -93 -99 Calls Drop ���� `t `� �`i �/ • :/, ZFrequency 1950 MHz/ ° Omni DB906 Antenna ' ,�, � Q, Cross Juction 0/�,'; �.� ,`'t ��� • �� ° Jeffersor Huntin Ri e 1 5 y k: Hunting Ridge 39-16-07.2 78-13-28.3 195' Pole Ground 921' �y� Cross Juction 39-19-10.2 78-17-37.7 195' Pole Ground 975' Reynolds Store 39-22-28.5 78-17-39.7 195' Pole Ground 1130' Crown 140' Pole Crown 39-12-53.37 78-12-15 195' SS Ground 940' Spectrasite-Omps 39-24-49.5 78-19-41.7 182' SS Ground 1383 f town 195' S Crown 39-14-37.9 78-11-49 140' Pole Ground 1190' s .. 2.5 _ 5 lop s • The Proposed Sites Complete The Coverage Gaps s � , Berkeley RAD Centers 170' p 00 ' A ERP 47 .ems ectra-Om s 182' SS, , Slope 3.1 Shared Towers Sites In Zoning Access Factor 10 Frederick County, VA Signal Legend Red 0 -87 Good Coverage Purple -87 -90 Acceptable Coverages e nold's Store 195 i Blue -90 -93 Poor Coverage Green -93 -99 Calls Drop ° LFrequency 1950 MHz/ Omni DB906 Antenna r oss Judi 1 / Jeffersor y � y A/ Huntin Rid a 19 ° � , • � ti. '�A;k'' � Hunting Ridge 39-16-07.2 78-13-28.3 195' Pole Ground 921' ij Cross Juction 39-19-10.2 78-17-37.7 195 Pole Ground 975 Reynolds Store 39-22-28.5 78-17-39.7 195' Pole Ground 1130' rown 1 ' rown 39-12-53.37 78-12-15 195' SS Ground 940' Spectrasite-Omps 39-24-49.5 78-19-41.7 182' SS Ground 1383 rown 195' `Crown 39-14-37.9 78-11-49 140' Pole Ground 1190' -,// 5 ♦ I GREENWAY ENGINEERING 151 Windy Hill Lane Winchester, Virginia 22602 Founded in 1971 TRANS MI TTAL Project Name: Communication Towers -Cross Junction File No.: 3126 Date: October 23, 2001 To: FC Planning Attn: Eric Lawrence Copied: From: Donna GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 Remarks: MUrgent M For Your Review ri As You Requested l.W Please Comment Message: Eric, Attached are the following for the above project: -Application fee check -All Agencies comment sheets -Existing and Proposed Towers coverage area maps Call with any concerns IHEC;3�'EIVED ,OCT 2 4'2001 _77 OF PLANNINGIDEVELOEMR1- Engineers Surveyors Telephone 540-662-4185 FAX 540-722-9528 greenway@visuallink. com Conditional Use Permit Comments Department of Planning and Development Mail to: Hand deliver to: Department of Planning and Development 107 N. Kent Street Attn: County Planner Fourth Floor 107 North Kent Street Winchester, VA Winchester, VA 22601 (540) 665-5651 (540) 665-5651 Please fill out the information as accurately as possible in order to assist the agency with their review. Attach a copy of your application form, location map, proffer statement, impact analysis, Agencies comment sheets, and any other pertinent information Applicant's Name: Greenway Engineering Address: 151 Windy Hill Lane, Winchester VA 22601 Phone Number: _(540) 662-4185 Name of development and/or description of the request: Unmanned commercial communications facilities. Location of property: Corner of Collinsville Road and Cross Junction Road Planning and Development's Comments: Planning Dept. use only Date received Date revision received Date approved Incomplete _ Incomplete Date reviewed Date reviewed Signature and Date Signature and Date (revision) s M1 Conditional Use Permit Comments Winchester Regional Airport `•.�b5c.�r`"o"�,�.�a"/a.w.."��„�..�G�x�.�r.,'',xz",3.;'.�;��.s�.z��.x$z:YxA�k�4F�.�:z���ww.�;,�:,cv-.i�"s.;�,�zx,.ez�.as.3.�i�„",.�%.sw.�a� Mail to: Winchester Regional Airport Attn: Executive Director 491 Airport Road Winchester, Virginia 22602 (540) 662-2422 Hand deliver to: Winchester Regional Airport 491 Airport Road (Rt. 645, off of Rt. 522 South) Winchester, Virginia Applicant: Please fill out the information as accurately as possible in order to assist the Winchester Regional Airport with their review. Attach a copy of your application form, location map, proffer statement, impact analysis, and any other, pertinent information. Applicant's Name: Greenway Engineering Address: 151 Windy Hill Lane Winchester, VA 22602 Phone Number: 662-4185 Name of development and/or description of the request: Unmanned commercial communications facilities. Location of property: Corner of Collinsville Road and Cross Junction Road Winchester'Regional Airnort's Comments: Winchester Regional Airport's Signature & Date:C—��OAiAkfk- -Ps )03aml a n Notice to Winchester Regional Airport - Please Return Form to Applicant Mail to: Frederick County Dept. of Public Works Attn: Director of Engineering 107 North Kent Street_ Winchester, Virginia 22601 (540) 665-5643 Hand deliver to: Frederick County Dept. of Public Works Attn: Director of Engineering County Administration Bldg., 4th.Floor 107 North Kent Street Winchester, Virginia Applicant: Please fill out the information as accurately as possible in order to assist the Department of Public Works with their review. Attach a copy. of your application form, location map, proffer statement, impact analysis, and any other pertinent information. Applicant's Name: Greenway Engineering Address: 151 Windy -Hill Lane Winchester, VA 22602 Phone Number: 662-4185 Name of development and/or description of the request: Unmanned commercial communications facilities. Location of property: Corner of Collinsville Road and Cross Junction Road Department of.Public Work's Comments: +t�✓b o o PSS I ,� w :I V-IV<- k--t Q (. -01 I WA V C A 0 a Ok A/- A. A ` Public Works Signature & Date. Notice to Dept. of Public Wor - lease Return This Form to the Applicant Conditional Use Pemdt Comments Frederick County Inspections Department M*1 Frederick County Inspections Dept. Attn: Building Official 107 North Kent Street Winchester, Virginia 22601 (540) 665-5650 s Hand deliver to: Frederick County Inspections Department Attn: Building Official County Administration Bldg., 4th Floor 107 North Kent Street Winchester, Virginia �' ibir aC"F 44 6� Y � '" }�r3 i#' n. $�'�' 7t e�y ♦ r ` §� _L. Lx i C �t c>.� r� �:.n��!, �i 3�1 Applicant's Name: Ureenwa-y Engineering Address: 151 Windy Hill Lave Winchester. VA 22602 Phone Number: 662-4185 Name of development and/or description of the request: Unmanned corumercial co rnunicationg facilities. Location of property: Corner of Collinsville Road and Cross Junction Road Inaptction Department Comments: Structure shall acruply with the Virginia unifom statewide Building Gbde and section 312, use group a (utility) of jhe BOLA National Building wade/1996. Please rite Chapter 17 of BOCA for special inspection requirements for this type structure. (oonctate/bolt testing, act.) Public Works Signature & Date: — lt�) Notice, o Applicant Fieldl: COUNTY OF FREDERICK, VIRGINIA FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS i Control No. CUPO1-0020 Date Received 9/18/01 Date Reviewed 10/02/01 Applicant Greenway Engineering Collinsville Road Address 151 Windy Hill Lane Winchester, Va. 22602 Project Name Unmanned Communications Tower Phone No.540-662-4185 Type of Application Conditional Use Current Zoning RA 1st Due Fire Co. 16 1st Due Rescue Co. 16 Election District Gainesboro Tax I.D. No. 18-A-38 RECOMMENDATIONS Automatic Sprinkler System Residential Sprinkler System Automatic Fire Alarm System Other REQUIREMENTS Emergency Vehicle Access Adequate XX Inadequate Not Identified Fire Lanes Required Yes No XX Comments : Maintenance of roadway for emergency vehicle access. 14.5 ft verticle clearance and entire width per NFPA. Roadway/Aisleway Widths Adequate XX Inadequate Not Identified Special Hazards Noted Yes No XX Comments : Roadway requirements allow for enhancement of Rural Fire Protection in Wildland Fire Control. Hydrant Locations Adequate Inadequate Not Identified XX Siamese Location Adequate Inadequate Not Identified XX Additional Comments Attached? Yes No XX Plan Approval Recommended? Yes XX No 1 Signatui ���itle �,�p Conditional Use Permit Comments Virginia Department of Transportation Mail to: Virginia Department of Transportation Attn: Resident Engineer 14031 Old Valley Pike Edinburg, Virginia 22824 (540) 984-5600 Hand deliver to: Virginia Department of Transportation Attn: Resident Engineer 1550 Commerce Street Winchester, Virginia Applicant: Please fill out the information as accurately as possible in order to assist the Virginia Department of Transportation with their review. Attach a copy of your application form, location map, proffer statement, impact analysis, and any other pertinent information. Applicant's Name: Greenway Engineering Address: 151 Windy Hill Lane Winchester, VA 22602 Phone Number: 662-4185 va�RECEIVED deny SEP 21 2001 C]JAC ❑ HFC ❑ BHL LAB USAM Name of development and/or description of the request: Unmanned commercial communications facilities. Location of property: Corner of Collinsville Road and Cross Junction Roa i LG E 1 V C L) Or.T �. -4 2001 Virginia Department of Transportation Comments: -IT OF PLANN1%0FVELOPMP I WO) I I Mt i ,i • for a1lowlr�;_ •..• • • • _ D• : i 1GTKjl� a o u COUNTY of FREDERICK Department of Planning and Development 5401665-5651 FAX: 540/ 665-6395 IU7'lr C-MICA! I Jr PUBLIC HEARING November 21, 2001 TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNERS(S) RE: CONDITION USE PERMIT APPLICATION #18-01 OF CROSS JUNCTION TOWER On behalf of the Frederick County Planning Commission, you are hereby notified of a public hearing being held on Wednesday, December 5, 2001, at 7:00 p.m. in the boardroom of the Frederick County Administration Building at 107 N. Kent Street, Winchester, Virginia to consider the following: Conditional Use Permit #18-01 of Cross Junction Tower, submitted by Spectrum Resources, Inc., for a 195-foot-high monopole telecommunications facility. This property is located at the corner of Collinsville Road and Cross Junction Road, approximately 290 feet from Northwestern Pike (Rt. 522N) and is identified with Property Identification Number 18-A-38 in the Gainesboro Magisterial District. Any interested parties having questions or wishing to speak may attend this public hearing. A copy of the application will be available for review at the Handley Library approximately one week prior to the meeting, or at the Department of Planning and Development located at 107 North Kent Street in Winchester, Virginia. Sincerely, "oow Mark R. Ch ran Planner I MRC/ch O:\Agendas\Adjoiner Ltrs\2001\Cross Junction Tower.wpd 107 North Kent Street • Winchester, Virginia 22601-5000 F, This is to certify that the attached correspondence was mailed to the following on from the Department of Planning and Development, Frederick County, Virgi 'a: 17 A• 16- j THE LORD'S CHAPEL, INC Mr. Mark D. Smith Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 18 -A- - 42-A SHAWNEE CANNING COMPANY, INC. PO BOX 657 CROSS JUNCTION, VA 22625.0657 18 - A- - 32-C COLLINS, JEARLDEAN D 198 CHESTNUT GROVE RD WINCHESTER, VA 22603.2803 18 -A- - 39- EATON, JEANNETTE B. CIO JEANETTE HOFFMAN CIO JEANETTE HOFFMAN PO BOX 325 CROSS JUNCTION, VA 22625.0325 26 A 16 WEAKLEY, RUBY M 271 FAIRVIEW RD GORE, VA 22637-1917 STATE OF VIRGINIA COUNTY OF FREDERICK 1244 GREENWOOD RD WINCHESTER, VA 22602.6510 11 - A- - 37- OMPS, LARRY T & NANCY S 171 OMPS DR WINCHESTER, VA 22601-2834 el ark R. Cheran, Planner I Frederick County Planning Dept. I, L= Mn M 11 , a Notary Public in and for the State and County aforesaid, do hereby certify that Mark R. Cheran, Planner I for the Department of Planning and Development, whose name is signed to the foregoing, dated I I - C31 • 0 0 , has personally appeared before me and acknowledged the same in my State and County aforesaid. Given under my hand this day of My commission expires on Tbf KAI ow-j-, TARP PUBLIC t C, ( /9 4r/r- 0 / TO: Barbara in Data Processing FROM: Carol H f - Planning Department Please print sets of labels by: 0/ THANK YOU!! 9. It is proposed that the following buildings will be constructed: U 195' tall monopole tower structure inside a 100' x 100' leased area for ground equipment/shelters, to be placed on concrete pads All equipment and monopole will be secured by a fence. 10. The following are all of the individuals, firms, or corporations owning property adjacent to both sides and rear and in front of the property where the requested use will be conducted. These people will be notified by mail of this application: �r�SS �luhct�y, NAME Shawnee Canning Co C PROPERTY ID# 18-A-42A ZNAME Shawnee Canning Co PROPERTY ID# 18-A-41 NAME Jearldean D. Collins PROPERTY ID# 18-A-32C CpAME Jeanette Hoffman ROPERTY ID# 18-A-37 NAME Jeanette Hoffman PROPERTY ID# 18-A-39 �.0nct� po ADDRESS PO Box 657 Cross Junction, 22625 ADDRESS PO Box 657 Cross Junction, 22625 ADDRESS 198 Chestnut Grove Rd, Winchester 22603 ADDRESS PO Box 325 Cross Junction, 22625 ADDRESS PO Box 325 Cross Junction, 22625 7,/,4 i 12,111 I/Vvvc �2 44 y-A NgNcy ohs / 7/ w/tic fiff / COUNTY of FREDERICK Department of Planning and Development 5401665-5651 FAX: 540/ 665-6395 PICAMCAtICANI OF PUBLIC HEARING January 9, 2002 TO: THE APPLICANTS) AND/OR ADJOINING PROPERTY OWNERS(S) RE: CONDITION USE PERMIT APPLICATION #18-01 OF CROSS JUNCTION TOWER On behalf of the Frederick County Board of Supervisors, you are hereby notified of a public hearing being held on Wednesday, January 23, 2002, at 7:15 p.m. in the boardroom of the Frederick County Administration Building at 107 N. Kent Street, Winchester, Virginia to consider the following: Conditional Use Permit #18-01 of Cross Junction Tower, submitted by Spectrum Resources, Inc., for a 195-foot-high monopole telecommunications facility. This property is located at the corner of Collinsville Road and Cross Junction Road, approximately 290 feet from Northwestern Pike (Rt. 522N) and is identified with Property Identification Number 18-A-38 in the Gainesboro Magisterial District. Any interested parties having questions or wishing to speak may attend this public hearing. A copy of the application will be available for review at the Handley Library approximately one week prior to the meeting, or at the Department of Planning and Development located at 107 North Kent Street in Winchester, Virginia. Sincerely, ark R. Cheran Planner I MRC/ch 0AAgcndas\Adjoiner Ltrs\2001\Cross Junction Towenwpd 107 North Kent Street • Winchester, Virginia 22601-5000 _j 'J 1-J/kL This is to certify that the attached correspondence was mailed to the following on ` from the Department of Planning and Development, Frederick Co , irginia: 18 - A- - 39- EATON, JEANNETTE B. CIO JEANETTE HOFFMAN CIO JEANETTE HOFFMAN PO BOX 325 CROSS JUNCTION, VA I I 22625.0325 26 - A- - 16- WEAKLEY, RUBY M 271 FAIRVIEW RD GORE, VA 22637.1917 17 A- - 16- THE LORD'S CHAPEL, INC 1244 GREENWOOD RD WINCHESTER, VA 22602.6510 A k R. Cheran, Planner I Frederick County Planning Dept. STATE OF VIRGINIA COUNTY OF FREDE LA-a RICK I, & Ann U , a Notary Public in and for the State and County aforesaid, do hereby certify that Mark R. Cheran, Planner I for the De artment of Planning and Development, whose name is signed to the foregoing, dated 1 co a , has personally appeared beforemeand acknowledged the same in my State and County aforesaid. Given under my hand this "��+h day of �'..`ouo , aoo@ . My commission expires on Rhain ocon -3 i ARY PUBLIC 0 • COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 OF PUBLIC HEANRI G March 8, 2002 TO: THE APPLICANTS) AND/OR ADJOINING PROPERTY OWNERS(S) RE: HEIGHT REVISION REQUEST FOR CONDITIONAL USE PERMIT APPLICATION #18-01 FOR THE CROSS JUNCTION TOWER On behalf of the Frederick County Board of Supervisors, you are hereby notified of a public hearing being held on Wednesday, March 13, 2002, at 7:15 p.m. in the Board Room of the Frederick County Administration Building at 107 N. Kent Street, Winchester, Virginia to consider the following: Revision of Conditional Use Permit #18-01 for the Cross Junction Tower, submitted by Shared Towers, Inc., for a height increase from the approved 195-foot lattice -type telecommunications facility to 260 feet. This property is located at the corner of Collinsville Road and Cross Junction Road, approximately 290 feet from Northwestern Pike (Rt. 522N) and is identified with Property Identification Number 18-A-38 in the Gainesboro Magisterial District. Any interested parties having questions or wishing to speak may attend this public hearing. A copy of the application will be available for review at the Handley Library approximately one week prior to the meeting, or at the Department of Planning and Development located at 107 North Kent Street in Winchester, Virginia. le riL/Lawrence Deputy Planner ERL/ch O:\Agendas\Adjoiner Llrs\2002\CUP adjoiners\Cross Junction Revised.wpd 107 North Kent Street - Winchester, Virginia 22601-5000 This is to certify that the attached correspondence was mailed to the following on np ,c l b4 .2- y O from the Department of Planning and Development, Frederick County, Virginia: 18-A-42A Shawnee Canning Company, Inc. P.O. Box 657 Cross Junction, VA 22625 18-A-32C Collins, Jearldean D. 198 chestnut Grove Road Winchester, VA 22603 18-A-39 Eaton, Jeannette B. c/o Jeanette Hoffman P.O. Box 325 Cross Junction, VA 22625-0325 26-A-16 Weakley, Ruby M. j 271 Fairview Road Gore, VA 22637-1917 17-A-16 THE LORD'S CHAPEL, INC 1244 GREENWOOD RD WINCHESTER, BA 22602-6510 STATE OF VIRGINIA COUNTY OF FREDERICK 11-A-37 Omps, Larry T. & Nancy S. 171 Omps Drive Winchester, VA 22601-2834 a Eric R. Lawrence, Deputy Director Frederick County Planning Department I, M1 1 DI 11) Fri I I , a Notary Public in and for the State and County aforesaid, do hereby certify that Eric R. Lawrence, Deputy Director for the Department of Planning and Development, whose name is signed to the foregoing, dated has personally appeared before me and acknowledged the same in my State and County aforesaid. Given under my hand this +h day ofnch Xo My commission expires on , A -IL k-aa ARY PUBLIC a. Y '-' 2v-o1 PLA,J ►J%,- v",c% PC fO-r& Suncom'D Merry of th,e ATC Wlireless N etwork Proposed Hwy 522 Network Expansion V, L Af ige loss Hwy 522 Network with Shared Tower's proposed site 946D i 0 do {' Existing SunCom Coverage along Hwy 522 110 • kkw- o, lw Awlky AC (y1P;0 cl 119 4bG BM 629 0 117 116 1�&2 Se129 / See 122C 11 122B 10 8 han 3 42/'l 9 8 7�� //7 1 1 It 1 0 335-29 1 Ds 104 324-629 166 103 j 2 p t s. cc p 69 c g1 2pta 2pts 16s C 135 6 J 39 J6 SeJ6 ee166 1638 `3 16 A Chapman 62 Lane 13 5 JS6 s1 O 2 pts. `56 163C 16� 151 134 B st' S° . , - / / / 1 71) /3 0 13B 1 15 1 5 , 14 13D e��k�Qnd o� 13H 13F 13G 15A 15C 16,17 2 pts. ►.' 15B O A Ci 1 COUNTY 22 //22 )rn Hill ..•:� o� cv 25 3 pts_ 27 228-166 Is°°cs G� L 25A 25 3 pts. 0 7Z� ^r� � 26 �a �9? f 25C 30C Rf. S2 308 2 32